Invintation_For_Bid_(Spec)
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
TOWN OF INDIAN HEAD
Charles County, Maryland
PROJECT MANUAL
FOR
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
Engineer’s Project No. 6508.22
State Contract No. CH257B51
Federal Aid Programming No. AC-TAP-3(871)E
December 2023
ARRO Consulting, Inc.
201 Thomas Johnson Dr., Suite 207
Frederick, MD 21702
(717) 686-4688
SHA Contract No. CH257B51
F.A.P. Contract No. AC-TAP-3(871)E
TABLE OF CONTENTS
TITLE PAGE NO.
BIDDING REQUIREMENTS
INVITATION TO BID 00010-1
INSTRUCTIONS TO BIDDERS 00100-1
BID FORMS
PROPOSAL FORM PACKET (**)
BID BOND 00350-1
EXPERIENCE QUESTIONNAIRE 00400-1
LIST OF PROPOSED SUBCONTRACTORS AND MAJOR EQUIPMENT 00450-1
SUPPLIES
NON-DISCRIMINATION IN EMPLOYMENT 00460-1
CERTIFICATION REGARDING DEBARMENT, SUSPENSIONS 00470-1
CONTRACT FORMS
AGREEMENT 00500-1
PERFORMANCE BOND 00610-1
PAYMENT BOND 00620-1
CONDITIONS OF THE CONTRACT
STANDARD GENERAL CONDITIONS OF THE EJCDC C-700
CONSTRUCTION CONTRACT
SUPPLEMENTARY CONDITIONS 00800-1
SHA CONTRACT PROVISIONS (**)
USDOL WAGE RATES
SPECIFICATIONS
DIVISION 1 - GENERAL REQUIREMENTS
Section 01010 – SUMMARY OF WORK 01010-1
Section 01025 – MEASUREMENT AND PAYMENT 01025-1
Section 01040 – COORDINATION 01040-1
Section 01050 - FIELD ENGINEERING 01050-1
6508.22 -i- ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P. Contract No. AC-TAP-3(871)E
SPECIFICATIONS (Continued) PAGE NO.
DIVISION 1 - GENERAL REQUIREMENTS
Section 01200 – PROJECT MEETINGS 01200-1
Section 01300 – SUBMITTALS 01300-1
Section 01400 – QUALITY CONTROL 01400-1
Section 01500 – CONSTRUCTION FACILITIES AND TEMPORARY 01500-1
CONTROLS
Section 01560 – SOIL EROSION AND SEDIMENTATION CONTROL 01560-1
Section 01570 – TRAFFIC REGULATION 01570-1
Section 01600 – MATERIALS AND EQUIPMENT 01600-1
Section 01700 – CONTRACT CLOSEOUT 01700-1
DIVISION 2 - SITE WORK
Section 02015 – PROTECTION OF UNDERGROUND UTILITIES 02015-1
Section 02100 – CLEARING AND GRUBBING 02100-1
Section 02105 – SITE PREPARATION 02105-1
Section 02210 – SITE GRADING 02210-1
Section 02220 – STRUCTURAL EXCAVATION, BACKFILL, AND 02220-1
COMPACTION
Section 02221 – TRENCHING, BACKFILLING, AND COMPACTING 02221-1
Section 02400 – SITE DRAINAGE 02400-1
Section 02480 – LANDSCAPING 02480-1
Section 02520 – PORTLAND CEMENT CONCRETE PAVING 02520-1
Section 02700 – PIPED UTILITIES 02700-1
Section 02855 – PAVEMENT MARKINGS 02855-1
DIVISION 3 – CONCRETE
Section 03100 – CONCRETE FORMWORK 03100-1
Section 03200 – CONCRETE REINFORCEMENT 03200-1
Section 03300 – CAST–IN–PLACE CONCRETE 03300-1
Section 03400 – PRECAST CONCRETE 03400-1
Section 03600 – GROUT 03600-1
6508.22 - ii - ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P. Contract No. AC-TAP-3(871)E
SPECIFICATIONS (Continued) PAGE NO.
DIVISION 4 – MASONRY
Section 04100 – MORTAR 04100-1
Section 04150 – MASONRY ACCESSORIES 04150-1
Section 04200 – UNIT MASONRY 04200-1
DIVISION 5 – METALS
Section 05100 – STRUCTURAL METAL FRAMING 05100-1
Section 05500 – METAL FABRICATIONS 05500-1
DIVISION 6 – WOOD AND PLASTICS
Section 06100 – ROUGH CARPENTRY 06100-1
Section 06190 – WOOD TRUSSES 06190-1
Section 06200 – FINISH CARPENTRY 06200-1
DIVISION 7 – THERMAL AND MOISTURE PROTECTION
Section 07190 – VAPOR RETARDERS 07190-1
Section 07200 – INSULATION 07200-1
Section 07415 – PREFORMED METAL ROOF AND WALL PANEL
SYSTEMS 07415-1
Section 07600 – FLASHING AND SHEET METAL 07600-1
Section 07900 – JOINT SEALERS 07900-1
DIVISION 8 – DOORS AND WINDOWS
Section 08110 – STEEL DOORS AND FRAMES 08110-1
DIVISION 9 – FINISHES
Section 09510 – ACOUSTICAL CEILINGS 09510-1
Section 09900 – PAINTING 09900-1
Section 09940 – HARD GLAZE EPOXY WALL FINISH 09940-1
DIVISION 10 – SPECIALTIES
Section 10160 – TOILET PARTITIONS AND ACCESSORIES 10160-1
Section 10200 – LOUVERS AND VENTS 10200-1
Section 10400 – IDENTIFYING DEVICES 10400-1
6508.22 - iii - ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P. Contract No. AC-TAP-3(871)E
SPECIFICATIONS (Continued) PAGE NO.
DIVISION 10 – SPECIALTIES
Section 10520 – FIRE EXTINGUISHERS 10520-1
DIVISION 12 – FURNISHINGS
Section 12300 – MANUFACTURED CABINETS AND CASEWORK 12300-1
DIVISION 15 - MECHANICAL
Section 15010 – BASIC MECHANICAL REQUIREMENTS 15010-1
Section 15050 – BASIC MATERIALS AND METHODS 15050-1
Section 15090 – SUPPORTS, ANCHORS, AND SEALS 15090-1
Section 15400 – PLUMBING 15400-1
Section 15800 – AIR DISTRIBUTION 15800-1
DIVISION 16 – ELECTRICAL
Section 16010 – BASIC ELECTRICAL REQUIREMENTS 16010-1
Section 16050 – BASIC ELECTRICAL MATERIALS AND METHODS 16050-1
Section 16400 – SERVICE AND DISTRIBUTION 16400-1
Section 16450 – GROUNDING 16450-1
Section 16500 – LIGHTING 16500-1
Section 16850 – ELECTRIC RESISTANCE HEATING 16850-1
EXHIBITS – WATER AND SEWER DETAILS
Sewer Detail (S106) – Inside Drop Manhole Connection
Water Detail (W201) – Water Connection with Outside Meter
Water Detail (W610) – Meter Setting Detail
(**) Please note: All Contractors shall view the latest MDOT SHA Standard Specification
for Construction and Materials, July 2023 applies to the proposed project.
https://www.roads.maryland.gov/mdotsha/pages/sscm.aspx?PageId=853&lid=SSP
6508.22 - iv - ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
1 of 5
INVITATION FOR BIDS
Table of Contents
Latest No. Of Funding Types
IFB – Supplemental Specifications Date Sheets App Fed State
Cover
☐ ebid Cover and Title Sheet 05/19/2020 2 X X X
Flyers
☐ Location and Signature Sheet (for Contracts without
Plans) 08/07/2023 2 X X X
☐ Online Training Resources for Electronic Bidding -
Notice to Contractors 09/05/2019 1 X X X
☐ How to obtain potential bidder’s list - Notice to
Contractors (See Note 1) 03/03/2020 1 X X X
☐ Frequently Asked Questions - Notice to Contractors
(See Note 1) 06/15/2020 3 X X X
☐ Electronic CADD Files - Notice to Contractors (See
Note 3) 12/20/2017 1 X X X
☒ Cargo Preference Act - Notice to Contractors 05/30/2017 2 X X
☒ eMaryland Marketplace Advantage - Notice to
Contractors (See Note 2) 09/05/2019 1 X X X
☐ Small Business Enterprise (SBE) Program - Notice to
Contractors (See Note 1) 12/21/2017 1 X X X
☐ Veteran-Owned Small Business Enterprises -
Requirements 05/30/2017 1 X
Table of Contents
☒ Table of Contents 11/02/2023 5 X X X
Contract Provisions
☐ CP - Instructions and Requirements for Electronic
Bidding 04/11/2022 2 X X X
☒ CP - Contractor Registration Requirements 09/30/2020 1 X X X
☒ CP - Maryland Manual on Uniform Traffic Control
Devices (MdMUTCD) Requirements 05/30/2017 1 X X X
☒ CP - (NCHRP) Report 350 and MASH Compliance 10/04/2019 2 X X X
☒ CP - Occupying Wetlands 05/30/2017 1 X X X
☐ CP - Hiring Preference and Financial Incentives 05/30/2017 2 X
☒ CP - Form FHWA-1273 10/23/2023 14 X X
☐ CP - Form PR-1317 (Road Contracts other than
Construction Contracts - See Note 4) 09/01/1994 1 X
☐ CP - Affirmative Action Requirements Utilization of
Minority Business Enterprises for Straight State
Contracts (where the contractor's bid exceeds
$50,000) 04/11/2022 10 X
11/02/2023
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
2 of 5
INVITATION FOR BIDS
Table of Contents
Latest No. Of Funding Types
IFB – Supplemental Specifications Date Sheets App Fed State
☒ CP - Affirmative Action Requirements Utilization of
Disadvantaged Business Enterprises for Federal-Aid
Contracts 04/11/2022 11 X X
☐ CP - Notice to Contractors MBE Goal (See Note 5) 04/11/2022 1 X
☒ CP - Notice to Contractors DBE Goal (See Note 5) 04/11/2022 1 X X
☐ CP - MBE Dual Certification 04/11/2022 1 X
☐ CP - Apprenticeship Training Fund 05/30/2017 5 X
☐ CP - MBE Compliance Field Meeting 11/01/2021 1 X
☒ CP - DBE Compliance Field Meeting 11/01/2021 1 X X
☒ CP - Traffic Control Plan Certification 12/10/2018 1 X X X
☐ CP - Contractor and Railroad Public Liability and
Property Damage Insurance 05/30/2017 1 X X X
☐ CP - AMTRAK and/or CONRAIL Railroads 05/30/2017 1 X X X
☒ CP - Prevailing Wage Instructions for the Contractor 07/26/2023 4 X X X
☒ CP - Notice of Actions Required for Affirmative
Action to Ensure Equal Employment Opportunity
(Executive Order 11246) 05/30/2017 8 X X
☐ CP - Contractor Affirmative Action Program 05/30/2017 8 X
☒ CP - Training Provisions (See Note 6) 06/15/2020 4 X X
☒ CP - High Visibility Safety Apparel Policy 06/24/2019 2 X X X
Special Provisions
☒ SP - Project Description 07/01/2023 1 X X X
☐ SP - Notice to Contractor for State Contracts -
Request for Information 11/02/2023 5 X
☒ SP - Notice to Contractor for Federal Contracts -
Request for Information 11/02/2023 5 X X
☐ SP - Required Permits (Water Resources, Corp of
Engineers, etc.) X X X
☒ SP - Right-of-Way Status (if required) X X X
☒ SP - Notice to Contractor-Early Submissions (See
Note 7) 05/30/2017 1 X X X
General Provisions
☒ SP - GP – Section 2 — Bidding Requirements and
Conditions For all projects using paper bids (See
Note 2) 05/30/2017 10 X X X
11/02/2023
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
3 of 5
INVITATION FOR BIDS
Table of Contents
Latest No. Of Funding Types
IFB – Supplemental Specifications Date Sheets App Fed State
Terms and Conditions
☒ SP - TC – Section 2 — Bidding Requirements and
Conditions for All Projects Using Paper Bids (See
Note 2) 05/30/2017 5 X X X
☒ SP - TC — 4.02 Failure to Maintain Project 05/30/2017 1 X X X
☐ SP - TC — 7.09 Price Adjustment for Diesel Fuel 12/10/2018 1 X X X
Category 100 – Preliminary
☐ SP - Section 103 — Engineers Office
103.03.07 Specific Field Office Requirements 02/20/2019 1 X X X
☒ SP - Section 104 — Maintenance of Traffic
104.01 Traffic Control Plan (TCP) 11/03/2022 7 X X X
☐ SP - Section 104 — Maintenance of Traffic
104.25 Drone Radar 05/30/2017 1 X X X
☒ SP - Section 107 — Construction Stakeout 05/03/2023 5 X X X
☐ SP - Section 108 — Mobilization and Demobilization
For all areawide projects (See Note 9) 04/11/2022 2 X X X
☐ SPI - Section 111 — Sampling Devices, Testing and 08/07/2023 2 X X X
Safety Equipment
Category 200 – Grading
☒ SP - Section 203 — Borrow Excavation 05/30/2017 4 X X X
Category 300 – Drainage
☒ SP - Section 308 — Erosion and Sediment Control 10/26/2023 20 X X X
For all Contracts with Project Plans
☐ SP - Section 308 — Erosion and Sediment Control 10/26/2023 37 X X X
For all Contracts without Project Plans
Category 400 – Structures
Category 500 – Paving
Category 600 – Shoulders
Category 700 – Landscaping
Category 800 – Traffic
Category 875 – Utilities
☒ SP - Section 875 — Utilities Statement X X X
☐ SP - Section 876 — Water and Sanitary Sewer X X X
☐ SP - Section 877 — Telephone and Fiber Optics X X X
☐ SP - Section 878 — Electrics X X X
☐ SP - Section 879 — Gas X X X
11/02/2023
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
4 of 5
INVITATION FOR BIDS
Table of Contents
Latest No. Of Funding Types
IFB – Supplemental Specifications Date Sheets App Fed State
SP - Section 880 — Cable T.V. X X X
☐ SP - Section 881 — Railroad X X X
Category 900 – Materials
Miscellaneous – Details
☐ SP - Section Not Issued Standard Sheets and Other
Details (As Required) X X X
Proposal Form Packet
☒ CP - eMM Addendum Receipt Verification Form
(See Note 2) 05/30/2017 1 X X X
☐ CP - eMM Bid Submittal Instructions (See Note 2) 05/30/2017 1 X X X
☒ CP - Proposal Form Packet - Federal - Cover (See
Note 2) 09/05/2023 1 X X
☒ CP - Proposal Form Packet - Federal (See Note 2) 11/02/2023 44 X X
☐ CP - Proposal Form Packet - Federal Small Business
Enterprises - Cover (See Note 2) 09/05/2023 1 X X
☐ CP - Proposal Form Packet - Federal Small Business
(See Note 2) 11/02/2023 23 X X
☐ CP - Proposal Form Packet — State VSBE
Instructions (See Note 2) 11/02/2023 12 X
☐ CP - Proposal Form Packet - State - Cover (See Note
2) 09/05/2023 1 X
☐ CP - Proposal Form Packet - State (See Note 2) 11/02/2023 48 X
☐ CP - Proposal Form Packet - State Small Business -
Cover (See Note 2) 09/05/2023 1 X
☐ CP - Proposal Form Packet - State Small Business
(See Note 2) 11/02/2023 49 X
☐ CP - Proposal Form Packet - State - With Buy
America - Cover (See Note 2) 09/05/2023 1 X
☐ CP - Proposal Form Packet - State - With Buy
America (See Note 2) 11/02/2023 47 X
App - Appalachian Federal Aid Projects Only
Fed - All other Federal Aid Projects
NOTES:
1 Only to be used on projects that accept electronic bids only.
2 Only to be used on projects that accept paper bids only.
3 Only to be used on projects distributing electronic CADD files as part of the
advertisement.
11/02/2023
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
5 of 5
INVITATION FOR BIDS
Table of Contents
Latest No. Of Funding Types
IFB – Supplemental Specifications Date Sheets App Fed State
4 Do not use on highway, bridge, or any other construction projects. To be used
on non-construction type projects only such as training related to road contracts
and material acquisition. On Appalachian projects Form FHWA 1273 and
FHWA 1273A (Appalachian) or Form PR-1317 will be included in the
Invitation for Bids, not both.
5 Notice to Contractors MBE/DBE - Only to be used when structural steel is
used.
6 Only to be used in Projects when directed by the Office of Construction.
7 Notice to Contractors-Early Submissions – Only to be used when the project
has items that have a long lead time that could jeopardize the project schedule
and would need to be authorized prior to Notice to Proceed.
8 Proposal Form Packet and Schedule of Prices is included in the .ebsx file for
electronic bids. (See Note 1)
9 Only to be used on areawide projects that cap the bid to 3% or do not include a
pay item for mobilization and demobilization.
11/02/2023
SHA Contract No. CH257B51
F.A.P. Contract No. AC-TAP-3(871)E
BIDDING REQUIREMENTS
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
DOCUMENT 00010
INVITATION TO BID
Project: TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM FACILITY: This
project includes the installation of a new restroom in the Village Green Park in
Indian Head, Charles County, MD.
Owner: TOWN OF INDIAN HEAD
4195 Indian Head Highway
Indian Head, MD 20640
Phone: (301) 743-5511
Fax: (301) 743-9008
E-mail: ryan@townofindianhead.org
Engineer: ARRO CONSULTING, INC.
201 Thomas Johnson Drive, Suite 207
Frederick, MD 21702
Phone: (717) 686-4688
Fax: (717) 560-2788
E-mail: nate.merkel@arroconsulting.com
Direct inquiries concerning the Bidding Documents to Ryan Hicks, Town Manager, at the office
of the Owner and technical questions to Nate Merkel, at the Office of the Engineer.
A pre-bid meeting will be conducted at the office of the Owner on January 4, 2023, at 10:00 am.
Attendance is not mandatory, but is strongly encouraged. Questions will be accepted until 10:00
am, prevailing time, on January 18, 2024.
Sealed Bids will be received by the Owner at the office of the Owner until 12:00 pm, prevailing
time, February 1, 2024, at which time they will be publicly opened and read.
All submission materials are available on the webpage dedicated to Request for Bids on the
Town of Indian Head website at https://www.townofindianhead.org/ under “Government” drop
down menu and then “Request for Bids”, as well as eMaryland Marketplace at
emma.maryland.gov.
Bids may be modified or withdrawn by an appropriate document duly executed (in the manner
that a Bid must be executed) and delivered to the place where Bids are to be submitted at any
time prior to the opening of Bids.
6508.22 00010-1 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
After the Bid opening, Bidder may withdraw its Bid only by complying with applicable Federal,
State, or local laws and regulations. Unless prohibited by such applicable laws and regulations,
or if there are no applicable laws and regulations, Bidder shall forfeit the entire amount of Bid
security upon withdrawal of its Bid.
Bids shall remain open for a period of 90 days from the date of Bid opening, except as provided
in the Instructions to Bidders.
Each Bid must be accompanied by Bid security in the form of a certified check, bank check, or
Bid bond (in the required form) for 5 percent of the Bid total.
TOWN OF INDIAN HEAD hereby reserves the right, which is understood and agreed to by all
Bidders, to reject any and all Bids and to waive any omissions, errors, mistakes, defects or
irregularities in any Bid.
TOWN OF INDIAN HEAD
BRANDON PAULIN
MAYOR
6508.22 00010-2 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P. Contract No. AC-TAP-3(871)E
DOCUMENT 00100
INSTRUCTIONS TO BIDDERS
Article 1 - Defined Terms
1.01 Terms used in these Instructions to Bidders, which are defined in the Standard General
Conditions of the Construction Contract, as prepared by the Engineer's Joint Contract Documents
Committee (Document EJCDC C – 700, 2007 Edition), have the meanings assigned to them in
the General Conditions. Additional terms used in these Instructions to Bidders have meanings
indicated below, which are applicable to both the singular and plural thereof.
A. Issuing Office – The office from which the Bidding Documents are to be issued and
made available for sale, and where the bidding procedures are to be administered.
1. Issuing Office is the office of the Engineer whose name, address and phone
number are listed in the Invitation to Bid.
B. Successful Bidder – The lowest, responsible and responsive Bidder to whom Owner (on
the basis of Owner's evaluation as hereinafter provided) makes an award.
Article 2 - Copies of Bidding Documents
2.01 All submission material are available on the webpage dedicated to Request for Bids on
the Town of Indian Head website at https://www.townofindianhead.org/ under “Government”
drop down menu and then “Request for Bids”, as well as eMaryland Marketplace at
emma.maryland.gov.
2.02 Complete sets of Bidding Documents must be used in preparing Bids; neither Owner nor
Engineer assume responsibility for errors or misinterpretations resulting from the use of
incomplete sets of Bidding Documents, or Bidding Documents purchased from sources other
than the issuing office.
2.03 Bids from prospective Bidders who have not obtained the Bidding Documents from the
issuing office and who have not obtained complete sets of Bidding Documents will not be
accepted.
2.04 Copies of Bidding Documents are made available on the above terms only for the
purpose of obtaining Bids on the Work and not to confer a license or grant for any other use.
2.05 Digitizing and posting Bidding Documents on the Internet or on websites of prospective
Bidders and other parties, or reproduction of Bidding Documents by others, is not permitted
without Engineer’s approval.
6508.22 00100-1 ARRO
INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P. Contract No. AC-TAP-3(871)E
Article 3 - Qualifications of Bidders
3.01 To demonstrate qualifications to perform the Work, Bidder shall submit with the Bid the
qualification data indicated in the Invitation to Bid, the following Paragraph(s) of Article 3, and
the Bid Form. Bidders shall also be prepared to submit, within five calendar days after the Bid
opening date, upon Owner’s request, such additional data as may be pertinent to the Project.
3.02 The Bid of out-of-State Bidders and their Subbidder(s), if any, shall contain evidence of
qualification to do business in the State of Maryland or covenant to obtain such qualification
prior to and as a condition of award of a Contract.
A Bidders are required, under the Business Regulation Article, Section 17-602,
Annotated Code of Maryland, to show evidence of Certificate of Registration
before award of Contract.
B A copy of current License to operate in the State of Maryland will be required at
the time of awarding the Contract.
3.03 The Owner will evaluate Bidders through a multi-step bidding process. The Owner
requests delivery from all bidders, both qualifications and price proposals, each in a separate
sealed envelope. On the first scheduled public bid opening only the qualification envelopes are
opened. At the second scheduled public bid opening, the price proposal envelopes of those
Bidder's deemed to meet minimum qualifications are opened.
3.04 Submission of financial information is not required with the Bid, but the Owner reserves
the right to request such information as part of the Bid evaluation process. Financial Information
of all Bidders will be returned after selection of the apparent low bidder is made.
3.05 It is a requirement of the Contract that Bidders shall have a minimum (5) year, (10)
project documented experience in the type of Work required by this Project. Submit required
documentation with the Bid.
3.06 Failure, or refusal, to submit documentation required by the Invitation to Bid, this Article
3, and the Bid Form will be reason for rejection of the Bid. Following are additional reasons for
rejection of the Bid:
A. Failure to submit the Bid and other Bidding Documents, on the forms included
in the Project Manual.
B. Failure to sign the Bid Form or any of the required affidavits and other
documents attached to it.
C. Failure to furnish the required Bid Security.
D. Failure to include a unit/lump sum price for each item on the Bid Form, including
Alternates.
6508.22 00100-2 ARRO
INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P. Contract No. AC-TAP-3(871)E
E. The inclusion by Bidder of conditions or qualifications not provided for in the
Bidding Requirements and Bidding Documents.
F. Submission of incomplete Bid Form or other required documents.
G. If the Bid Form contains any omissions, erasures, alterations, additions not
called for, or irregularities of any other kind.
H. If any bid prices are obviously unbalanced.
I. The contractor attendance at the pre-bid meeting and site visit may be
recommended but not required.
J. Debarment by a Commonwealth agency, political subdivision, or Federal
agency.
K. Having been declared in default on prior projects.
Article 4 - Examination of Contract Documents and Site
4.01 It is the responsibility of each Bidder before submitting a Bid:
A. To examine thoroughly the Bidding Documents;
B. To visit the site and become familiar with and satisfy Bidder as to the general,
local and site conditions that may affect cost, progress, performance or furnishing
of the Work. Site visit may be recommended but shall not be required on federally
funded projects;
C. To consider federal, state, and local Laws and Regulations that may affect cost,
progress, performance or furnishing of the Work;
D. To study and carefully correlate Bidder's knowledge and observations with the
Bidding Documents and such other related data; and
E. To promptly notify Engineer of all conflicts, errors, ambiguities or discrepancies
which Bidder has discovered in or between the Bidding Documents.
F. Obtain such additional or supplementary examinations, investigations,
explorations, tests studies, and data concerning conditions (surface, subsurface,
and Underground Facilities) at or contiguous to the site or otherwise which may
affect cost, progress, performance, or furnishing of the Work or which relate to
any aspect of the means, methods, techniques, sequences or procedures of
construction to be employed by Bidder and safety precautions and programs
incident thereto or which Bidder deems necessary to determine its Bid for
performing and furnishing the Work in accordance with the time, price, and other
terms and conditions of the Contract Documents.
6508.22 00100-3 ARRO
INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P. Contract No. AC-TAP-3(871)E
1. Bidder shall be responsible for restoration of areas disturbed due to
supplementary examinations, investigations, explorations, and tests
concerning existing aboveground and underground conditions at, or
contiguous to the Site.
4.02 Information and data shown or indicated in the Bidding Documents with respect to
existing Underground Facilities at or contiguous to the site is based upon information and data
furnished to Owner and Engineer by owners of such Underground Facilities or others, and
Owner and Engineer do not assume responsibility for the accuracy or completeness thereof
unless it is expressly provided otherwise in the Supplementary Conditions.
4.03 Provisions concerning responsibilities for the adequacy of data furnished to prospective
Bidders with respect to subsurface conditions, other physical conditions and Underground
Facilities, and possible changes in the Contract Documents due to differing or unanticipated
conditions appear in Article 4, Paragraphs 4.02, 4.03, and 4.04 of the General Conditions, as
amended by the Supplementary Conditions.
4.04 The submission of a Bid will constitute an incontrovertible representation by Bidder that
Bidder has complied with every requirement of this Article 4, that without exception the Bid is
premised upon performing and furnishing the Work required by the Bidding Documents and
applying the specific means, methods, techniques, sequences or procedures of construction (if
any) that may be shown or indicated or expressly required by the Bidding Documents, that
Bidder has given Engineer written notice of all conflicts, errors, ambiguities and discrepancies
that Bidder has discovered in the Bidding Documents and the written resolutions thereof by
Engineer is acceptable to Bidder, and that the Bidding Documents are generally sufficient to
indicate and convey understanding of all terms and conditions for performing and furnishing the
Work.
4.05 The provisions of this Article 4 do not apply to Hazardous Environmental Conditions at
the site; provisions concerning these conditions appear in Article 4, Paragraph 4.06 of the
General Conditions.
Article 5 - Availability of Lands for Work
5.01 The lands upon which the Work is to be performed, rights-of-way and easements for
temporary or permanent access, and other lands designated for use by Contractor in performing
the Work are identified in the Bidding Documents. All additional lands and access required for
temporary construction facilities, or storage of construction equipment and of Products to be
incorporated in the Work shall be obtained and paid for by Contractor. Easements for permanent
structures or permanent changes in existing facilities will be obtained and paid for by Owner,
unless otherwise provided in the Bidding Documents.
Article 6 - Interpretations and Addenda
6.01 All questions about the meaning or intent of the Bidding Documents shall be submitted in
writing to:
6508.22 00100-4 ARRO
INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P. Contract No. AC-TAP-3(871)E
Ryan Hicks- The Town of Indian Head Town Manager
Email: Ryan@townofindianhead.org
Interpretations, or clarifications, considered necessary by Engineer in response to such questions,
will be issued by Addenda and posted on emma.maryland.gov. Questions received later than ten
calendar days prior to the date for opening of Bids, or the deadline, if any, indicated on the
Invitation to Bid, may not be answered. Oral statements, interpretations, or clarifications
will not be binding, or legally effective. Neither the Owner nor the Engineer shall be
responsible for the failure of any Bidder to receive notice of or to read the Addenda posted by the
Engineer.
6.02 Addenda may also be issued to modify the Bidding Documents as deemed advisable by
Owner or Engineer.
Article 7 - Bid Security
7.01 Each Bid shall be accompanied by Bid security made payable to Owner in an amount of
five (5) percent of Bidder's maximum Bid price and in the form of a certified or bank check, an
irrevocable letter of credit, or a Bid Bond (on form attached) issued by a surety meeting the
requirements EJCDC C-700 Standard General Conditions of the Construction Contract, Page
00700-17 Paragraphs 5.01, 5.02, and 5.03.
A. All instruments of Bid security shall be valid and remain in effect for at least 120
days from the date of the bid opening.
B. Substitute Bid Bond forms are not acceptable.
C. An electronic copy of the Bid security must be submitted with the Bid.
7.02 The Bid security and financial information, if any, of the three apparent lowest
responsive and responsible Bidders will be retained until the Successful Bidder has furnished the
required Performance and Payment Bonds, and Insurance Certificate, and Successful Bidder and
Owner have executed the Agreement.
7.03 Owner may annul the Notice of Intent to Award, if the apparent Successful Bidder fails
or refuses to execute and deliver to the Owner the Agreement, together with the required
Performance and Payment Bonds or other forms of security, and Insurance Certificate, within the
number of calendar days specified in the Notice of Intent to Award. Bidder shall be considered
in Default, and the full amount of its Bid Security shall be forfeited.
Article 8 - Contract Time
8.01 The number of calendar days within which, or the date by which the Work shall be
substantially completed (the Contract Time) are set forth in the Agreement.
Article 9 - Liquidated and Other Damages
9.01 Provisions for liquidated and other damages, if any, are set forth in the Agreement.
6508.22 00100-5 ARRO
INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P. Contract No. AC-TAP-3(871)E
Article 10 - Substitutions and “Or Equal” Items
10.01 Bids shall be based on Products and methods covered in the Specifications and shown on
the Drawings. When a Product specification includes the name or names of manufacturer(s),
Bids shall be based on a Product which: (1) meets all Specification requirements; and (2) is
produced by one of the manufacturers specifically named in the Specifications for that particular
Product.
A. Requests for substitutions, “or Equal” for Products or methods other than those
specified in the Project Manual, will not be considered prior to the Bid opening
date. Refer to Supplementary Conditions Paragraphs SC-6.05.A through SC-6.05.L
for procedures to be used in making, and costs to Contractor associated with, such
requests after award of the Contract.
Article 11 - Subcontractors
11.01 Article 6, Paragraph 6.06.B of the General Conditions, as amended by Paragraph
SC-6.06.B.1 of the Supplementary Conditions, sets forth requirements as to the approval of
Subcontractors.
11.02 The Bidder shall submit, with the Bid, a list of proposed Subcontractors on the form
supplied with the Bidding Documents.
11.03 Prime Contractor shall not perform less than 50.1% of the work with their own
organization.
Article 12 - Bid Form
12.01 The Bid form and other required Bidding Documents and supplements are provided at
emma.maryland.gov.
12.02 The Bid of an individual must be signed by the individual personally; the individual's
signature must be witnessed; and the individual's business address and any business trade name
must be stated. The Bid of a partnership must state the names and addresses of all partners, and
the partnership business name and address; and it must be signed by all general partners, with the
signatures witnessed. The Bid of a corporation must show the State of incorporation and the
principal office address, and must be signed by the President or Vice President, with the
corporate seal affixed, attested by the Secretary or Assistant Secretary. Bids by limited liability
companies must be executed in the limited liability company name and signed by all members.
The state of formation and official address of the limited liability company must be shown below
the signature lines.
12.03 Sealed Bids will be received by the Owner at the office of the owner, Town of INDIAN
HEAD, 4195 Indian Head Highway Indian Head, MD 20640.
12.04 The Bid shall contain an acknowledgement of receipt of all Addenda (the numbers and
dates of which must be filled in on the Bid Form).
6508.22 00100-6 ARRO
INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P. Contract No. AC-TAP-3(871)E
12.05 The address, e-mail, telephone number, and fax number of Bidder, and the name, e-mail,
and telephone number of the individual to whom communications regarding the Bid are to be
directed, must be shown.
12.06 The Bid Form may call for lump sum prices, unit prices, or a combination of both.
A. If the Bid form calls for lump sum prices, the Bidder shall state a single lump sum
price for the entire Work, or single lump sum prices for each portion of the Work,
subject to a lump sum price as set forth in the Bid form, as applicable. Any such
lump sum price or prices shall include all the work described in the Contract
Documents as being part of the Work.
B. If the Bid Form calls for unit prices, the Bidder shall state a single unit price for
each item to be furnished or work to be done as set forth in the Bid Form. The
Bid Form indicates, opposite each item for which a unit price is required, the
Engineer's estimated quantity of units of such items which will be required in the
prosecution of the Work; and the Bidder shall state in the space provided in the
Bid Form the total price for such items, as computed by multiplying such
estimated quantity of units of such item by the unit price bid.
12.07 Bid prices shall be all inclusive and shall include, if applicable, all taxes of whatever
nature applicable to the Work.
12.08 Owner may be exempt from sales and use taxes for certain items to be incorporated into
the Work. Each Bidder shall obtain legal advice to determine how and to what extent the
Contractor may utilize the Owner’s tax exemption. Owner will provide, at the Contractor's
request, documentation required to obtain applicable tax exemptions.
12.9 Submission of prices for all Alternates, if any, is mandatory.
12.10 The documents listed under Paragraph 6 of the Bid Form shall be provided as a single
file.
12.11 All bid submittals will include the “Town of Indian Head Bid Form” and “MDOT SHA
Proposal Form Packet-Federal.”
Article 13 – Electronic Submission of Bids
13.01 Bids will not be accepted electronically. The Owner requests, from all bidders, delivery
to the Office of the Owner both qualifications and price proposals, each in a separate sealed
envelope.
Office of the Owner:
TOWN OF INDIAN HEAD
4195 Indian Head Highway
Indian Head, MD 20640
6508.22 00100-7 ARRO
INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P. Contract No. AC-TAP-3(871)E
Article 14 - Modification and Withdrawal of Bids
14.01 Bids may be modified or withdrawn at any time prior to the Bid opening.
14.02 After the Bid opening, Bidder may withdraw its Bid only by complying with applicable
Federal, State, or local laws and regulations. Unless prohibited by such applicable laws and
regulations, or if there are no applicable laws and regulations, Bidder shall forfeit the entire
amount of Bid security upon withdrawal of its Bid.
Article 15 - Opening of Bids
15.01 Upon review of submitted Bids, results will be posted online at emma.maryland.gov.
Results shown on the website are for information only and do not constitute the issuance of
award of a contract. Selection of apparent low Bidder will be made by Owner after careful
review of submitted documentation, as described below under Article 17.
Article 16 - Bids to Remain Subject to Acceptance
16.01 Bids shall remain open for a period of 60 days from the date of Bid opening unless award
is delayed by a required approval from a governmental agency, the sale of bonds, or the award of
a grant or grants, in which event the Bids shall remain open for a period of 120 days from the
date of Bid opening. The Owner will either award the Contract within the applicable time period
or reject all Bids, returning the Bid security to the Bidders. Thirty-day extensions of the date for
the award may be made by the mutual written consent of the Owner and the apparent Successful
Bidder.
Article 17 - Award of Contract
17.01 Owner reserves the right, without limitation, to reject any or all Bids, which are
nonconforming, nonresponsive, unbalanced or conditional, and to reject the Bid of any Bidder, if
Owner believes that it would not be in the best interest of the Project to make an award to that
Bidder, whether because the Bidder is unqualified or of doubtful financial ability, or fails to meet
any other pertinent standard or criteria established by Owner. Owner also reserves the right to
waive all irregularities not involving price, time, or changes in the Work and to negotiate
contract terms with the Successful Bidder.
17.02 The Owner will resolve discrepancies in the Bidder’s mathematical totals, shown on the
hard copy of the Bid Form, by contacting the Bidder.
17.03 In evaluating Bids, Owner will consider the qualifications of Bidders, if the Bids comply
or do not comply with the prescribed requirements, and such Alternates, unit prices, and other
data, as may be listed on the Bid Form, or as may be requested by Owner prior to the Notice of
Intent to Award.
17.04 In evaluating Bids Owner may consider the qualifications and experience of
Subcontractors, Suppliers, and other persons and organizations proposed for those portions of the
6508.22 00100-8 ARRO
INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P. Contract No. AC-TAP-3(871)E
Work of which Owner, prior to Notice of Intent to Award, requests their identity. Owner also
may consider, where applicable, the operating costs, maintenance requirements, performance
data, and guarantees of major items of materials and equipment proposed for incorporation in the
Work when such data are required to be submitted prior to the Notice of Intent to Award.
17.05 In evaluating Bids Owner may conduct such investigations, as Owner deems necessary,
to assist in the evaluation of any Bid and to establish the responsibility, qualifications, and
financial ability of Bidders, proposed Subcontractors, Suppliers and other persons and
organizations, to perform and furnish the Work in accordance with the Contract Documents to
Owner's satisfaction within the prescribed time.
17.06 If the Contract is to be awarded, it will be awarded to the lowest responsible, responsive
Bidder whose evaluation by Owner indicates to Owner that the award will be in the best interests
of the Project.
17.07 If the Contract is to be awarded, Owner will give the apparent Successful Bidder a Notice
of Intent to Award within the time limits prescribed in Article 16.
17.08 Bidders may be required by Owner, prior to and as a condition of Contract award, to
execute and sign documents related to financing of the Project.
17.09 More than one bid from an individual, partnership, corporation, or an association under
the same name or different names will not be considered. Reasonable grounds for believing that
the Bidder is interested in more than one Bid for the same Work will cause the rejection of all
Bids in which such Bidder is interested. Any or all Bids will be rejected if there is any reason for
believing that collusion exists among any of the Bidders; participants in such collusion will not
be considered in future bidding.
17.10 Alternates, if any, will be considered and selected by Owner and the prices for the
selected Alternates will be added to or deducted from the Base Bid price to arrive at an adjusted
Bid price. Owner reserves the right to reject or select Alternates regardless of price attached to
such Alternates. The adjusted Bid price will be used in comparing Bids and will be the basis for
determining the "lowest" of all responsible, responsive Bidders.
Article 18 - Contract Bonds and Insurance
18.01 Article 5 of the General Conditions sets forth Owner's requirements as to Performance
and Payment Bonds to be provided by the Contractor. When the apparent Successful Bidder
delivers the signed Agreement to Owner, it must be accompanied by the required Performance
and Payment Bonds, each in the amount of one hundred percent (100%) of the Contract Price, on
the forms provided in the Bidding Documents. Substitute Bond forms are not acceptable.
18.02 Article 5 of the General Conditions and the Supplementary Conditions set forth Owner's
requirements as to insurance to be carried by the Contractor. When the apparent Successful
Bidder delivers the signed Agreement to the Owner, it must be accompanied by the required
insurance certificate on the latest version of the Acord 25 Certificate of Insurance form. All
policies of insurance shown on the Certificate of Insurance shall not be cancelled or materially
changed until thirty days prior notice has been given by Contractor to Owner and Engineer and
6508.22 00100-9 ARRO
INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P. Contract No. AC-TAP-3(871)E
to each additional insured, and shall contain waiver provisions in accordance with General
Conditions, Paragraph 5.07.
Article 19 - Signing of Agreement
19.01 When Owner gives a Notice of Intent to Award to the apparent Successful Bidder, it will
be accompanied by four unsigned counterparts each of the Agreement (each with a copy of the
Bid submission and, if applicable, the List of Proposed Subcontractors attached), Performance
and Payment Bonds, or other forms of financial security. Apparent Successful Bidder shall sign
and deliver to the Owner, within the calendar days specified in the Notice of Intent to Award, all
counterparts of the Agreement accompanied by the executed Performance and Payment Bonds
(with a Power-of-Attorney certificate attached to each), or other forms of financial security and
four originals of the required insurance certificate(s).
A. Successful Bidder(s)/Contractor(s) shall be responsible for all costs resulting from
reviewing by Engineer, or others, of non-conforming, or incomplete Contract
Document submissions prior to execution of an Agreement. Costs shall be
deducted by Change Order from Contractor’s first Application for Payment.
B. By signing the Agreement, the Contractor agrees to hold the prices Bid for
materials and equipment throughout the Project.
19.02 If the Owner finds the documents submitted by the apparent Successful Bidder
acceptable, it will, within fifteen (15) calendar days after receipt of such documents, complete
the signing of the Agreement and submit two fully executed counterparts and accompanying
documents to the Contractor.
19.03 If the Owner elects to issue a Notice to Proceed, such notice will accompany the fully
executed copies of the Agreement. If a Notice to Proceed is not issued, the Contract Times will
commence to run as specified in General Conditions, Paragraph 2.03, as amended by
Supplementary Conditions Paragraph SC-2.03.
19.04 Owner may annul the Intent to Award, if the apparent Successful Bidder fails or refuses
to execute and deliver to the Owner the Agreement, together with the required Performance and
Payment Bonds, Insurance Certificate, and any other required Contract Document(s), within the
number of calendar days specified in the Notice of Intent to Award; Bidder shall be considered in
Default, and the full amount of its Bid Bond shall be forfeited.
Article 20 - Pre-Bid Meeting and Site Visit
20.01 A pre-bid meeting and site visit will be held at the time and place set forth in the
Invitation to Bid. Engineer will transmit to all prospective Bidders, recorded by Engineer as
having purchased Bidding Documents, such Addenda, as Engineer considers necessary in
response to questions arising at the meeting. Attendance at the pre-bid meeting and site visit is
not required but is recommended.
6508.22 00100-10 ARRO
INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P. Contract No. AC-TAP-3(871)E
Article 21 - Regulatory and Funding Agency Requirements
21.01 STEEL PRODUCTS PROCUREMENT ACT: In accordance with the State Finance and
Procurement Article, Section 17-303, Annotated Code of Maryland, every public agency shall
require that every contract document for the construction, reconstruction, alteration, repair,
improvement or maintenance of Public Works contain a provision that, if any steel products are
to be used or supplied in the performance of the contract, only steel products as herein defined
shall be used or supplied in the performance of the contract or any subcontract thereunder.
A. “Public Works” are defined as any structure, building, highway, waterway, street,
bridge, transit system, airport, or other betterment, work or improvement whether
of a permanent or temporary nature and whether for governmental or proprietary
use.
B Steel products are defined as products rolled, formed, shaped, drawn, extruded,
forged, cast, fabricated or otherwise similarly processed, or processed by a
combination of two or more of such operations, from steel made in the United
States by the open-hearth, basic hearth, basic oxygen, electric furnace, Bessemer
or other steel making process.
C United States is defined as the United States of America and includes all territory,
continental or insular, subject to the jurisdiction of the United States.
END OF INSTRUCTIONS TO BIDDERS
6508.22 00100-11 ARRO
INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P. Contract No. AC-TAP-3(871)E
Article 21 - Regulatory and Funding Agency Requirements
21.01 STEEL PRODUCTS PROCUREMENT ACT: In accordance with the State Finance and
Procurement Article, Section 17-303, Annotated Code of Maryland, every public agency shall
require that every contract document for the construction, reconstruction, alteration, repair,
improvement or maintenance of Public Works contain a provision that, if any steel products are
to be used or supplied in the performance of the contract, only steel products as herein defined
shall be used or supplied in the performance of the contract or any subcontract thereunder.
A. “Public Works” are defined as any structure, building, highway, waterway, street,
bridge, transit system, airport, or other betterment, work or improvement whether
of a permanent or temporary nature and whether for governmental or proprietary
use.
B Steel products are defined as products rolled, formed, shaped, drawn, extruded,
forged, cast, fabricated or otherwise similarly processed, or processed by a
combination of two or more of such operations, from steel made in the United
States by the open-hearth, basic hearth, basic oxygen, electric furnace, Bessemer
or other steel making process.
C United States is defined as the United States of America and includes all territory,
continental or insular, subject to the jurisdiction of the United States.
END OF INSTRUCTIONS TO BIDDERS
6508.22 00100-12 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P. Contract No. AC-TAP-3(871)E
BID FORMS
CONTRACT PROVISIONS CONTRACT NO. CH257B51
PROPOSAL FORM PACKET — FEDERAL FAP NO. AC-TAP-3(871)E
1 of 44
STATE OF MARYLAND
DEPARTMENT OF TRANSPORTATION
STATE HIGHWAY ADMINISTRATION
PROPOSAL FORM PACKET — FEDERAL
Proposal by
Name
Address (Street and/or P.O. Box)
City State Zip
( ) ( )
A.C. Phone No. A.C. Fax No.
to furnish and deliver all materials and to do and perform all work, in conformance with the
Standard Specifications, revisions thereto, General Provisions and the Special Provisions in this
contract to The Town of Indian Head located in, Charles County, Maryland, for which Invitation
for Bids will be received until 12:00 o'clock noon on February 1, 2024, this work being situated as
follows: Located in the Town of Indian Head, Charles County, along Walter Thomas Road,
Cornwallis Court and Earl Road.
Town of Indian Head
4195 Indian Head Highway
Indian Head, Maryland 20640
In response to the advertisement by the Administration, inviting bids for the work in conformance
with the Contract Documents, now on file in the office of the Administration. I/We hereby certify
that I/we am/are the only person, or persons, interested in this bid proposal as principals, and that
an examination has been made of the work site, the Specifications, the Plans, and Invitation for
Bids, including the Special Provisions contained herein. I/We propose to furnish all necessary
machinery, equipment, tools, labor and other means of construction, and to furnish all materials
required to complete the project at the following unit price or lump sum price.
09/05/2023
CONTRACT PROVISIONS CONTRACT NO. CH257B51
PROPOSAL FORM PACKET- FEDERAL FAP NO. AC-TAP-3(871)E
SCHEDULE OF PRICES 1 of 3
Item Description Unit Qty. Unit Price Total Price
No.
1 Site
a Miscellaneous Grading LS 1 $ $
b Miscellaneous Excavation LS 1 $ $
c Sidewalk SY 210 $ $
d Detectable Warning Surfaces SF 40 $ $
e Stripping LS 1 $ $
f Install 6" PVC (Include Excavation and LF 246.5 $ $
Standard Backfill)
g Sanitary Sewer Cleanout EA 1 $ $
h Install 1 1/2" PVC (Include Excavation LF 33.5 $ $
and Standard Backfill)
i 1" Water Main EA 1 $ $
j Silt Fence LF 230 $ $
k Stabilized Construction Entrance TON 14 $ $
l Dry Wells EA 4 $ $
m Pavement Markings Paint Lines (6" LF 480 $ $
White)
n Pavement Marking Paint Lines (5" White) LF 110 $ $
o Pavement Marking Paint Lines (12" LF 100 $ $
White Thermoplastic)
p Pavement Marking Paint Lines (12" LF 53 $ $
White)
q Pavement Marking Paint Lines (4" White) LF 38 $ $
r Pavement Markings Paint Legends SF 60 $ $
s Signs SF 32 $ $
Item 1 Subtotal $
2 Building
a Concrete Footing (202LF x 2' x1')) CY 15 $ $
b Concrete Slab ( 61.17'x26.67'x0.42") CY 25.5 $ $
c Masonry (4" brick/8" Block), painted SF 860 $ $
05 30-17
-
CONTRACT PROVISIONS CONTRACT NO. CH257B51
PROPOSAL FORM PACKET- FEDERAL FAP NO. AC-TAP-3(871)E
SCHEDULE OF PRICES 2 of 3
interior
d Masonry (8"block), painted interior SF 794 $ $
e Brick Columns and footings SF 30 $ $
f Stl Tube Columns (6x6x1/4) LF 70 $ $
g Hollow Metal Doors EA 4 $ $
h Interior Plywood Sheating (Ceiling) SF 895 $ $
I Exterior Plywood Sheeting (Roof) SF 2100 $ $
m Acoustical Drop Ceiling (Restrooms) SF 675 $ $
n Wood Trusses EA 32 $ $
o Metal Roofing Panels SF 2100 $ $
p Metal Siding (Gable End) SF 75 $ $
q Timber Girders (3 - 2x10) LS 1 $ $
r Misc Metals (WWF, Stl Plates, etc) LS 1 $ $
s Restroom Flooring (2 part expoxy) SF 560 $ $
t Alum Gutter & Downspouts LF 170 $ $
Item 2 Subtotal $
3 Plumbing
a WC and partitions EA 4 $ $
b Handicapped WC and partitions EA 2 $ $
c Urinals and screens EA 2 $ $
d Sinks and accessories EA 5 $ $
e Exterior Drinking Fountains EA 2 $ $
f 1 1/2" copper installed LF 115 $ $
g 1/2" copper installed LF 73 $ $
h 4" PVC installed LF 36 $ $
i 3" PVC installed LF 65 $ $
j 2" PVC installed LF 11 $ $
k 3/4" copper installed LF 7.5 $ $
l 1" copper installed LF 5.5 $ $
Item 3 Subtotal $
4 HVAC
a Exhaust Fans EA 7 $ $
b 24'x16" Louvers and Dampers EA 2 $ $
c 12"x10" Exhaust Duct LF 81 $ $
05 30-17
-
CONTRACT PROVISIONS CONTRACT NO. CH257B51
PROPOSAL FORM PACKET- FEDERAL FAP NO. AC-TAP-3(871)E
SCHEDULE OF PRICES 3 of 3
d 16"x16" Stationary Exhaust Louver EA 4 $ $
e Duct to Louver Connector EA 2 $ $
Item 4 Subtotal $
5 Electrical
a LED Lights (Picnic Area) EA 9 $ $
b LED Lights (Restrooms) EA 8 $ $
c Wall Insert Electric Heaters EA 3 $ $
d Electrical Service, Wiring, and LS 1 $ $
Panelboard
Item 5 Subtotal $
A Alternate bid Items
a Provide & Install 3/4-inch Water House EA 1 $ $
Connection (incl. Excavation, standard
Backfill & Meter Setting)
b Provide and install 6" PVC SDR 26 (incl. LF 5 $ $
Excavation, standard Backfill & Meter
Setting)
c Provide and install 8" PVC SDR 35 (incl. LF 5 $ $
Excavation, standard Backfill & Meter
Setting)
Item A Subtotal $
Mobilization and Closeout (5%) $
Bonds and Insurance (2%) $
TOTAL BASE BID $
Grand Total BASE BID PRICE (Figures): $
Grand Total BASE BID PRICE (Words): $
Grand Total ALTERNATE BID ITEMS (Figures): $
Grand Total ALTERNATE BID ITEMS (Words): $
05 30-17
-
CONTRACT PROVISIONS CONTRACT NO. CH257B51
PROPOSAL FORM PACKET - FEDERAL FAP NO. AC-TAP-3(871)E
3 of 45
GENERAL MATERIAL REQUIREMENTS
CONVICT PRODUCED MATERIALS
Section 1019 of the Intermodal Surface Transportation Efficiency Act of 1991 (ISTEA) clarifies
that materials produced by convict labor after July 1, 1991 may not be used for Federal-aid
highway construction projects unless produced at a prison facility producing convict made
materials for Federal-aid construction projects prior to July 1, 1987.
CONTRACT PROVISION BUY AMERICA
This section only applies to projects partially or totally financed with Federal funds.
The prime contractor or its subcontractors shall comply with Section 313 of title 23, U.S.C., and
23 CFR Part 635.410 for iron and steel products, and manufactured products, and 2 CFR part 184
for construction materials.
Materials used on this contract and permanently incorporated into the project, including all
materials/items supplied, shall comply with the Buy America preference requirements including:
(A) All iron and steel used in the project are produced in the United States.
This means all manufacturing processes, from the initial melting stage through the
application of coatings, occurred in the United States.
(B) All manufactured products used in the project are produced in the United States.
This means the manufactured product was manufactured in the United States, and the cost
of the components of the manufactured product that are mined, produced, or manufactured
in the United States is greater than 55 percent of the total cost of all components of the
manufactured product, unless another standard for determining the minimum amount of
domestic content of the manufactured product has been established under applicable law
or regulation.
In accordance with 23 CFR Part 635.410, FHWA currently has a general applicability
waiver on manufactured products that do not contain steel and iron components. Therefore,
this 55 percent standard for manufactured products that do not contain steel and iron
components, does not apply on projects funded under Title 23 U.S.C.
Per 2 CFR part 184, items that have been processed into a specific form and shape; or
combined with other articles, materials, or supplies to create a product with different
properties than the individual articles, materials, or supplies, should be considered as
manufactured products, rather than as construction materials.
(C) All construction materials are manufactured in the United States.
11/02/2023
CONTRACT PROVISIONS CONTRACT NO. CH257B51
PROPOSAL FORM PACKET - FEDERAL FAP NO. AC-TAP-3(871)E
4 of 45
This means that all manufacturing processes for the construction material occurred in the
United States. Common construction materials used in public works infrastructure projects
are or consist primarily of non-ferrous metals, plastic and polymer-based products
(including polyvinylchloride, composite building materials, and polymers used in fiber
optic cables), glass (including optic glass), fiber optic cable (including drop cable), optical
fiber, lumber, engineered wood, and drywall.
The term 'construction materials' shall not include cement and cementitious materials,
aggregates such as stone, sand, or gravel, or aggregate binding agents (including asphalt
cement) or additives; or any material composed of or derived from these items, per Section
70917(c) of the Bipartisan Infrastructure Law (BIL).
Furnish iron and steel products, manufactured products, or construction materials, including
coating, for permanently incorporated work according to 23 CFR part 635.410 and 2 CFR part 184
as follows:
(a) All manufacturing processes of steel and iron materials in a product, including coating; and
any subsequent process that alters the steel or iron material’s physical form or shape, changes
its chemical composition, or the final finish; are to occur within the United States (One of
the 50 States, the District of Columbia, Puerto Rico, or in territories and possessions of the
U.S.). Manufacturing begins with the initial melting and mixing, and continues through the
coating stage. The processes include rolling, extruding, machining, bending, grinding,
drilling, welding, and coating. The action of applying a coating to steel or iron is deemed a
manufacturing process. Coating includes epoxy coating, galvanizing, aluminizing, painting,
and any other coating that protects or enhances the value of steel or iron. Any process from
the original reduction from ore to the finished product constitutes a manufacturing process
for iron.
(b) The following are considered to be steel manufacturing processes:
(1) Production of steel by any of the following processes:
(a) Open hearth furnace.
(b) Basic oxygen.
(c) Electric furnace.
(d) Direct reduction.
(2) Rolling, heat treating, and any other similar processing.
(3) Fabrication of the products:
11/02/2023
CONTRACT PROVISIONS CONTRACT NO. CH257B51
PROPOSAL FORM PACKET - FEDERAL FAP NO. AC-TAP-3(871)E
5 of 45
(a) Spinning wire into cable or strand.
(b) Corrugating and rolling into culverts.
(c) Shop fabrication.
(c) The manufacturing process for a steel/iron product is considered complete when the product
is ready for use as an item (e.g., fencing, posts, girders, pipe, manhole cover, etc.) or could
be incorporated as a component of a more complex product through a further manufacturing
process (e.g., prestressed concrete girders, reinforced concrete pipe, traffic control devices,
bearing pads, etc.). A product containing both steel and/or iron components, may be
assembled outside the United States and meet Buy America requirements if the constituent
steel and iron components (in excess of the minimal amounts permitted) were manufactured
domestically and are not modified at the assembly location prior to final assembly.
(d) If domestically produced steel billets or iron ingots are exported outside of the U.S., as
defined above, for any manufacturing process then the resulting product does not conform to
the Buy America requirements. Additionally, products manufactured domestically from
foreign source steel billets or iron ingots do not conform to the Buy America requirements
because the initial melting and mixing of alloys to create the material occurred in a foreign
country.
(e) Due to a nationwide waiver, Buy America does not apply to raw materials (iron ore and
alloys), scrap (recycled steel or iron), and pig iron or processed, pelletized, and reduced iron
ore.
(f) For the Buy America provisions to apply, the steel and iron products, manufactured products,
and construction materials must be permanently incorporated into the project. If an item is
rendered as a “donated material” in accordance with 23 U.S.C. 323 – Donations and Credits,
it will have to comply with Buy America requirements. While States and local governments
may receive a credit for donated material, this material must generally comply with Buy
America requirements. Buy America does not apply to temporary items, e.g., temporary
sheet piling, temporary bridges, steel scaffolding and falsework. Further, Buy America does
not apply to materials which remain in place at the contractor convenience only with previous
approval from the Engineer
(g) Certifications which document that steel and iron have been manufactured and that coatings
for iron or steel have been applied in the United States, as well as certificates documenting
that manufactured products and construction materials are Made in America, shall be
provided to the Contractor by the manufacturer. The manufacturer’s certificate must identify
where the material was produced and include a statement that specifically attests that the
material complies with 23 CFR 635.410 for iron and steel products, and manufactured
products, or 2 CFR part 184 for construction materials. The Contractor shall provide the
required certifications to the Engineer prior to such items being incorporated into the
permanent work.
11/02/2023
CONTRACT PROVISIONS CONTRACT NO. CH257B51
PROPOSAL FORM PACKET - FEDERAL FAP NO. AC-TAP-3(871)E
6 of 45
(h) Products manufactured of foreign steel or iron materials may be used, provided the cost of
such products as they are delivered to the project does not exceed 0.1% of the total contract
amount, or $2,500, whichever is greater. Foreign manufactured products and construction
materials may be used, provided the cost of such products as they are delivered to the project
is no more than the lesser of $1,000,000, or 5% of the total contract amount. If a supplier or
fabricator wishes to use a partial fabrication process where domestic and foreign source
components are assembled at a domestic location, the “as delivered cost” of the foreign
components should include any transportation, assembly and testing costs required to install
them in the final product. When foreign products or materials are permanently incorporated
into the project, the contractor must provide documentation detailing the foreign material
costs and justification.
(i) A public interest waiver from USDOT has waived Buy America requirements for projects
with iron, steel, manufactured products, and construction materials, that are under a single
Federal financial assistance award or subaward for which the total project amount is below
$500,000.
11/02/2023
CONTRACT PROVISIONS CONTRACT NO. CH257B51
PROPOSAL FORM PACKET - FEDERAL FAP NO. AC-TAP-3(871)E
7 of 45
ALTERNATE BID
USING FOREIGN PRODUCTS
Are you using Foreign Products? Yes No
When a bidder elects to utilize Foreign Products on one or more items, the following summation
indicating the Total Bid using Foreign Products must be completed in addition to the individual
item bid tabulations.
The following instructions are given to the bidder in completing the Total Bid summation using
Foreign Products:
1 - The "Bid Total" for the initial bid using Domestic Products shall be shown on line (1).
2 - The subtotal for Item Amounts using Domestic Products shall be shown on line (2), for
those items which the Contractor elects to use Foreign Products.
3 - The subtotal for Item Amounts using Foreign Products shall be shown on line (3).
4 - The total Bid, utilizing Foreign Products shall be shown on line (4). The value is obtained
by subtracting subtotal (2) from the Total Bid (1) and then adding subtotal (3).
Bid Total for Bid 1 using Line (1)
Domestic items
Total of Domestic Items Line (2) -
Total of Foreign Items Line (3) +
Bid Total using Foreign Items Line (4)
11/02/2023
CONTRACT NO. CH257B51
PROPOSAL FORM PACKET — FEDERAL FAP NO. AC-TAP-3(871)E
8 of 45
ALTERNATE BID - USING FOREIGN PRODUCTS
BIDDER'S INSTRUCTIONS
When the bidder elects to submit a bid for one or more items using Foreign Products, the following form must be used. For each item that
Foreign Products are contemplated, the appropriate "Item Numbers", "Approximate Quantities", "Description of Items", "Unit Price or Lump
Sum Price", "Item Amount Domestic" and "Item Amount Foreign" shall be tabulated below as specified in the initial bid. The bidder shall
indicate the unit price in dollars and cents and show the total cost of the item for each item that utilizes Foreign Products. When all items
utilizing Foreign Products have been listed, the bidder shall indicate on Page 6 of 45 the subtotals of the Item Amounts for Domestic Products
in Line (2) and for Foreign Products in Line (3).
Item Approximate Description of Items Unit Price Items Amount Items Amount
Nos. Quantities or Domestic Foreign
Lump Sum Dollars.Cts. Dollars.Cts.
Dollars.Cts.
11/02/2023
CONTRACT PROVISIONS CONTRACT NO. CH257B51
PROPOSAL FORM PACKET — FEDERAL FAP NO. AC-TAP-3(871)E
9 of 45
NOTICE
All bidders shall complete and submit with their bid the Bid/Proposal Affidavit below.
BID/PROPOSAL AFFIDAVIT
A. AUTHORIZED REPRESENTATIVE AND AFFIANT
I HEREBY AFFIRM THAT:
I, ________________________ (print name), possess the legal authority to make this Affidavit.
B. CERTIFICATION REGARDING COMMERCIAL NONDISCRIMINATION
The undersigned bidder hereby certifies and agrees that the following information is correct: In
preparing its bid on this project, the bidder has considered all proposals submitted from qualified,
potential subcontractors and suppliers, and has not engaged in “discrimination” as defined in §19-
103 of the State Finance and Procurement Article of the Annotated Code of Maryland.
“Discrimination” means any disadvantage, difference, distinction, or preference in the solicitation,
selection, hiring, or commercial treatment of a vendor, subcontractor, or commercial customer on
the basis of race, color, religion, ancestry, or national origin, sex, age, marital status, sexual
orientation, sexual identity, genetic information or an individual’s refusal to submit to a genetic
test or make available the results of a genetic test, disability, or any otherwise unlawful use of
characteristics regarding the vendor’s, supplier’s, or commercial customer’s employees or owners.
“Discrimination” also includes retaliating against any person or other entity for reporting any
incident of “discrimination”. Without limiting any other provision of the solicitation on this
project, it is understood that, if the certification is false, such false certification constitutes grounds
for the State to reject the bid submitted by the bidder on this project, and terminate any contract
awarded based on the bid. As part of its bid or proposal, the bidder herewith submits a list of all
instances within the past 4 years where there has been a final adjudicated determination in a legal
or administrative proceeding in the State of Maryland that the bidder discriminated against
subcontractors, vendors, suppliers, or commercial customers, and a description of the status or
resolution of that determination, including any remedial action taken. Bidder agrees to comply in
all respects with the State’s Commercial Nondiscrimination Policy as described under Title 19 of
the State Finance and Procurement Article of the Annotated Code of Maryland.
11/02/2023
CONTRACT PROVISIONS CONTRACT NO. CH257B51
PROPOSAL FORM PACKET — FEDERAL FAP NO. AC-TAP-3(871)E
10 of 45
C. AFFIRMATION REGARDING BRIBERY CONVICTIONS
I FURTHER AFFIRM THAT:
Neither I, nor to the best of my knowledge, information, and belief, the above business (as is
defined in Section 16-101(b) of the State Finance and Procurement Article of the Annotated Code
of Maryland), or any of its officers, directors, partners, controlling stockholders, or any of its
employees directly involved in the business’s contracting activities, including obtaining or
performing contracts with public bodies, has been convicted of, or has had probation before
judgment imposed pursuant to Criminal Procedure Article, §6-220, Annotated Code of Maryland,
or has pleaded nolo contendere to a charge of, bribery, attempted bribery, or conspiracy to bribe
in violation of Maryland law, or of the law of any other state or federal law, except as follows
(indicate the reasons why the affirmation cannot be given and list any conviction, plea, or
imposition of probation before judgment with the date, court, official or administrative body, the
sentence or disposition, the name(s) of person(s) involved, and their current positions and
responsibilities with the business):
If required, please attach the required document for affirmation regarding bribery convictions:
______________________________________________________________________________
______________________________________________________________________________
_____________________________________________________________________________.
D. AFFIRMATION REGARDING OTHER CONVICTIONS
I FURTHER AFFIRM THAT:
Neither I, nor to the best of my knowledge, information, and belief, the above business, or any of
its officers, directors, partners, controlling stockholders, or any of its employees directly involved
in the business's contracting activities including obtaining or performing contracts with public
bodies, has:
(1) Been convicted under state or federal statute of:
(a) a criminal offense incident to obtaining, attempting to obtain, or performing a public or
private contract; or
(b) fraud, embezzlement, theft, forgery, falsification or destruction of records, or receiving
stolen property;
(2) Been convicted of any criminal violation of a state or federal antitrust statute;
(3) Been convicted under the provisions of Title 18 of the United States Code for violation of the
Racketeer Influenced and Corrupt Organization Act, 18 U.S.C. §1961, et seq., or the Mail
Fraud Act, 18 U.S.C. §1341, et seq., for acts in connection with the submission of bids or
proposals for a public or private contract;
11/02/2023
CONTRACT PROVISIONS CONTRACT NO. CH257B51
PROPOSAL FORM PACKET — FEDERAL FAP NO. AC-TAP-3(871)E
11 of 45
(4) Been convicted of a violation of the State Minority Business Enterprise Law, Section 14-308
of the State Finance and Procurement Article of the Annotated Code of Maryland;
(5) Been convicted of a violation of the Section 11-205.1 of the State Finance and Procurement
Article of the Annotated Code of Maryland;
(6) Been convicted of conspiracy to commit any act or omission that would constitute grounds for
conviction or liability under any law or statute described in subsections (1) through (5) above;
(7) Been found civilly liable under a state or federal antitrust statute for acts or omissions in
connection with the submission of bids or proposals for a public or private contract;
(8) Been found in a final adjudicated decision to have violated the Commercial Nondiscrimination
Policy under Title 19 of the State Finance and Procurement Article of the Annotated Code of
Maryland with regard to a public or private contract;
(9) Been convicted of a violation of one or more of the following provisions of the Internal
Revenue Code:
(a) §7201, Attempt to Evade or Defeat Tax;
(b) §7203, Willful Failure to File Return, Supply Information, or Pay Tax,
(c) §7205, Fraudulent Withholding Exemption Certificate or Failure to Supply Information,
(d) §7206, Fraud and False Statements, or
(e) §7207 Fraudulent Returns, Statements, or Other Documents;
(10) Been convicted of a violation of 18 U.S.C. §286 Conspiracy to Defraud the Government with
Respect to Claims, 18 U.S.C. §287, False, Fictitious, or Fraudulent Claims, or 18 U.S.C. §371,
Conspiracy to Defraud the United States;
(11) Been convicted of a violation of the Tax-General Article, Title 13, Subtitle 7 or Subtitle 10,
Annotated Code of Maryland;
(12) Been found to have willfully or knowingly violated State Prevailing Wage Laws as provided
in the State Finance and Procurement Article, Title 17, Subtitle 2, Annotated Code of
Maryland, if:
(a) A court:
(i) Made the finding; and
(ii) Decision became final; or
(b) The finding was:
(i) Made in a contested case under the Maryland Administrative Procedure Act; and
(ii) Not overturned on judicial review;
11/02/2023
CONTRACT PROVISIONS CONTRACT NO. CH257B51
PROPOSAL FORM PACKET — FEDERAL FAP NO. AC-TAP-3(871)E
12 of 45
(13) Been found to have willfully or knowingly violated State Living Wage Laws as provided in
the State Finance and Procurement Article, Title 18, Annotated Code of Maryland, if:
(a) A court:
(i) Made the finding; and
(ii) Decision became final; or
(b) The finding was:
(i) Made in a contested case under the Maryland Administrative Procedure Act; and
(ii) Not overturned on judicial review;
(14) Been found to have willfully or knowingly violated the Labor and Employment Article, Title
3, Subtitles 3, 4, or 5, or Title 5, Annotated Code of Maryland, if:
(a) A court:
(i) Made the finding; and
(ii) Decision became final; or
(b) The finding was:
(i) Made in a contested case under the Maryland Administrative Procedure Act; and
(ii) Not overturned on judicial review; or
(15) Admitted in writing or under oath, during the course of an official investigation or other
proceedings, acts or omissions that would constitute grounds for conviction or liability under
any law or statute described in §§B and C and subsections D(1) — (14) above, except as
follows (indicate reasons why the affirmations cannot be given, and list any conviction, plea,
or imposition of probation before judgment with the date, court, official or administrative
body, the sentence or disposition, the name(s) of the person(s) involved and their current
positions and responsibilities with the business, and the status of any debarment):
If required, please attach the required document for affirmation regarding other convictions:
_________________________________________________________________________
_________________________________________________________________________
_________________________________________________________________________.
11/02/2023
CONTRACT PROVISIONS CONTRACT NO. CH257B51
PROPOSAL FORM PACKET — FEDERAL FAP NO. AC-TAP-3(871)E
13 of 45
E. AFFIRMATION REGARDING DEBARMENT
I FURTHER AFFIRM THAT:
Neither I, nor to the best of my knowledge, information, and belief, the above business, or any of
its officers, directors, partners, controlling stockholders, or any of its employees directly involved
in the business’s contracting activities, including obtaining or performing contracts with public
bodies, has ever been suspended or debarred (including being issued a limited denial of
participation) by any public entity, except as follows (list each debarment or suspension providing
the dates of the suspension or debarment, the name of the public entity and the status of the
proceedings, the name(s) of the person(s) involved and their current positions and responsibilities
with the business, the grounds of the debarment or suspension, and the details of each person's
involvement in any activity that formed the grounds of the debarment or suspension):
If required, please attach the required document for affirmation regarding debarment:
______________________________________________________________________________
______________________________________________________________________________
_____________________________________________________________________________.
F. AFFIRMATION REGARDING DEBARMENT OF RELATED ENTITIES
I FURTHER AFFIRM THAT:
(1) The business was not established and it does not operate in a manner designed to evade the
application of or defeat the purpose of debarment pursuant to Sections 16-101, et seq., of the
State Finance and Procurement Article of the Annotated Code of Maryland; and
(2) The business is not a successor, assignee, subsidiary, or affiliate of a suspended or debarred
business, except as follows (you must indicate the reasons why the affirmations cannot be
given without qualification):
If required, please attach the required document for affirmation regarding debarment of related
entities:
___________________________________________________________________________
___________________________________________________________________________
__________________________________________________________________________.
11/02/2023
CONTRACT PROVISIONS CONTRACT NO. CH257B51
PROPOSAL FORM PACKET — FEDERAL FAP NO. AC-TAP-3(871)E
14 of 45
G. SUB-CONTRACT AFFIRMATION
I FURTHER AFFIRM THAT:
Neither I, nor to the best of my knowledge, information, and belief, the above business, has
knowingly entered into a contract with a public body under which a person debarred or suspended
under Title 16 of the State Finance and Procurement Article of the Annotated Code of Maryland
will provide, directly or indirectly, supplies, services, architectural services, construction related
services, leases of real property, or construction.
H. AFFIRMATION REGARDING COLLUSION
I FURTHER AFFIRM THAT:
Neither I, nor to the best of my knowledge, information, and belief, the above business has:
(1) Agreed, conspired, connived, or colluded to produce a deceptive show of competition in the
compilation of the accompanying bid or offer that is being submitted;
(2) In any manner, directly or indirectly, entered into any agreement of any kind to fix the bid
price or price proposal of the bidder or offeror or of any competitor, or otherwise taken any
action in restraint of free competitive bidding in connection with the contract for which the
accompanying bid or offer is submitted.
I. CERTIFICATION OF TAX PAYMENT
I FURTHER AFFIRM THAT:
Except as validly contested, the business has paid, or has arranged for payment of, all taxes due
the State of Maryland and has filed all required returns and reports with the Comptroller of the
Treasury, the State Department of Assessments and Taxation, and the Department of Labor,
Licensing, and Regulation, as applicable, and will have paid all withholding taxes due the State of
Maryland prior to final settlement.
11/02/2023
CONTRACT PROVISIONS CONTRACT NO. CH257B51
PROPOSAL FORM PACKET — FEDERAL FAP NO. AC-TAP-3(871)E
15 of 45
J. CONTINGENT FEES
I FURTHER AFFIRM THAT:
The business has not employed or retained any person, partnership, corporation, or other entity,
other than a bona fide employee, bona fide agent, bona fide salesperson, or commercial selling
agency working for the business, to solicit or secure the Contract, and that the business has not
paid or agreed to pay any person, partnership, corporation, or other entity, other than a bona fide
employee, bona fide agent, bona fide salesperson, or commercial selling agency, any fee or any
other consideration contingent on the making of the Contract.
K. CERTIFICATION REGARDING INVESTMENTS IN IRAN
(1) The undersigned certifies that, in accordance with State Finance and Procurement Article, §17-
705, Annotated Code of Maryland:
(a) It is not identified on the list created by the Board of Public Works as a person engaging in
investment activities in Iran as described in State Finance and Procurement Article, §17-
702, Annotated Code of Maryland; and
(b) It is not engaging in investment activities in Iran as described in State Finance and
Procurement Article, §17-702, Annotated Code of Maryland.
(2) The undersigned is unable to make the above certification regarding its investment activities
in Iran due to the following activities: ___________________________________________.
If required, please attach the required document for affirmation regarding Certification regarding
investment in Iran:
L. CONFLICT MINERALS ORIGINATED IN THE DEMOCRATIC REPUBLIC OF
CONGO (FOR SUPPLIES AND SERVICES CONTRACTS)
I FURTHER AFFIRM THAT:
The business has complied with the provisions of State Finance and Procurement Article, §14-413,
Annotated Code of Maryland governing proper disclosure of certain information regarding conflict
minerals originating in the Democratic Republic of Congo or its neighboring countries as required
by federal law.
11/02/2023
CONTRACT PROVISIONS CONTRACT NO. CH257B51
PROPOSAL FORM PACKET — FEDERAL FAP NO. AC-TAP-3(871)E
16 of 45
M. I FURTHER AFFIRM THAT:
Any claims of environmental attributes made relating to a product or service included in the bid or
proposal are consistent with the Federal Trade Commission’s Guides for the Use of Environmental
Marketing Claims as provided in 16 CFR §260, that apply to claims about the environmental
attributes of a product, package, or service in connection with the marketing, offering for sale, or
sale of such item or service.
N. ACKNOWLEDGEMENT
I ACKNOWLEDGE THAT this Affidavit is to be furnished to the Procurement Officer and may
be distributed to units of: (1) the State of Maryland; (2) counties or other subdivisions of the State
of Maryland; (3) other states; and (4) the federal government. I further acknowledge that this
Affidavit is subject to applicable laws of the United States and the State of Maryland, both criminal
and civil, and that nothing in this Affidavit or any contract resulting from the submission of this
bid or proposal shall be construed to supersede, amend, modify or waive, on behalf of the State of
Maryland, or any unit of the State of Maryland having jurisdiction, the exercise of any statutory
right or remedy conferred by the Constitution and the laws of Maryland with respect to any
misrepresentation made or any violation of the obligations, terms and covenants undertaken by the
above business with respect to (1) this Affidavit, (2) the contract, and (3) other Affidavits
comprising part of the contract.
I DO SOLEMNLY DECLARE AND AFFIRM UNDER THE PENALTIES OF PERJURY THAT
THE CONTENTS OF THIS AFFIDAVIT ARE TRUE AND CORRECT TO THE BEST OF MY
KNOWLEDGE, INFORMATION, AND BELIEF.
Date: ______________
By: ________________________________ (print name of Authorized Representative and Affiant)
_________________________________ (signature of Authorized Representative and Affiant)
11/02/2023
CONTRACT PROVISIONS CONTRACT NO. CH257B51
PROPOSAL FORM PACKET — FEDERAL FAP NO. AC-TAP-3(871)E
17 of 45
COMPREHENSIVE SIGNATURE PAGE 1 OF 2
THE BIDDER IS HEREBY NOTIFIED THAT THIS DOCUMENT SHALL BE SIGNED IN
INK IN ORDER FOR THE BID TO BE ACCEPTED. BY SIGNING, THE BIDDER CERTIFIES
THAT HE/SHE WILL COMPLY IN EVERY ASPECT WITH THESE SPECIFICATIONS.
FURTHER, I DO SOLEMNLY DECLARE AND AFFIRM UNDER THE PENALTIES OF
PERJURY THAT THE CONTENTS OF THIS AFFIDAVIT (PARAGRAPHS A-N) ARE TRUE
AND CORRECT TO THE BEST OF MY KNOWLEDGE, INFORMATION, AND BELIEF.
This bid form shall be filled out legibly in ink or typed. The bid, if submitted by an individual,
shall be signed by an individual; if submitted by a partnership, shall be signed by such member or
members of the partnership as have authority to bind the partnership; if submitted by a corporation
the same shall be signed by the President and attested by the Secretary or an Assistant Secretary.
If not signed by the President as aforesaid, there must be attached a copy of that portion of the By-
Laws, or a copy of a Board resolution, duly certified by the Secretary, showing the authority of the
person so signing on behalf of the corporation. In lieu thereof, the corporation may file such
evidence with the Administration, duly certified by the Secretary, together with a list of the names
of those officers having authority to execute documents on behalf of the corporation, duly certified
by the Secretary, which listing shall remain in full force and effect until such time as the
Administration is advised in writing to the contrary. In any case where a bid is signed by an
Attorney in Fact the same must be accompanied by a copy of the appointing document, duly
certified.
IF AN INDIVIDUAL:
NAME:
Street and/or P.O. Box
City State Zip Code Fed ID or SSN
(SEAL)
Signature Date
Print Signature
WITNESS:
Signature
Print Signature
11/02/2023
CONTRACT PROVISIONS CONTRACT NO. CH257B51
PROPOSAL FORM PACKET — FEDERAL FAP NO. AC-TAP-3(871)E
18 of 45
COMPREHENSIVE SIGNATURE PAGE 2 OF 2
IF A PARTNERSHIP:
NAME OF PARTNERSHIP:
Street and/or P.O. Box
City State Zip Code Fed ID or SSN
BY: (SEAL)
Signature Date
Print Signature
TITLE: WITNESS:
Signature
Print Signature
IF A CORPORATION:
NAME OF CORPORATION:
Street and/or P.O. Box
City State Zip Code Fed ID or SSN
STATE OF INCORPORATION:
BY: (SEAL)
Signature Date
Print Signature
TITLE: WITNESS:
Secretary’s Signature
Print Signature
11/02/2023
CONTRACT PROVISIONS CONTRACT NO. CH257B51
PROPOSAL FORM PACKET — FEDERAL FAP NO. AC-TAP-3(871)E
19 of 45
MDOT DBE FORM A
FEDERALLY-FUNDED CONTRACTS
CERTIFIED DBE UTILIZATION AND FAIR SOLICITATION AFFIDAVIT
PAGE 1 OF 2
This affidavit must be included with the bid/ proposal. If the bidder/offeror fails to
accurately complete and submit this affidavit as required, the bid shall be deemed not
responsive or the proposal shall be deemed not susceptible of being selected for award.
In connection with the bid/proposal submitted in response to Solicitation No. CH257B51, I affirm
the following:
1. DBE Participation (PLEASE CHECK ONLY ONE)
I have met the overall certified Disadvantaged Business Enterprise (DBE) participation goal of
twenty-five percent [25%]. I agree that this percentage of the total dollar amount of the Contract
for the DBE goal will be performed by certified DBE firms as set forth in the DBE Participation
Schedule - Part 2 of the MDOT DBE Form B (Federally-Funded Contracts).
OR
I conclude that I am unable to achieve the DBE participation goal. I hereby request a waiver,
in whole or in part, of the goal. Within 10 business days of receiving notice that our firm is the
apparent awardee or as requested by the Procurement Officer, I will submit a written waiver
request and all required documentation in accordance with COMAR 21.11.03.11. For a partial
waiver request, I agree that certified DBE firms will be used to accomplish the percentages of the
total dollar amount of the Contract as set forth in the DBE Participation Schedule - Part 2 of the
MDOT DBE Form B (Federally-Funded Contracts).
2. Additional DBE Documentation
I understand that if I am notified that I am the apparent awardee or as requested by the Procurement
Officer, I must submit the following documentation within 10 business days of receiving such
notice: (a) Outreach Efforts Compliance Statement (MDOT DBE Form C - Federally-Funded
Contracts ); (b) Subcontractor Project Participation Statement (MDOT DBE Form D - Federally-
Funded Contracts); (c) DBE Waiver Request documentation per COMAR 21.11.03.11 (if waiver
was requested); and (d) Any other documentation required by the Procurement Officer to ascertain
bidder’s responsibility/ offeror’s susceptibility of being selected for award in connection with the
certified DBE participation goal.
11/02/2023
CONTRACT PROVISIONS CONTRACT NO. CH257B51
PROPOSAL FORM PACKET — FEDERAL FAP NO. AC-TAP-3(871)E
20 of 45
MDOT DBE FORM A
FEDERALLY-FUNDED CONTRACTS
CERTIFIED DBE UTILIZATION AND FAIR SOLICITATION AFFIDAVIT
PAGE 2 OF 2
I acknowledge that if I fail to return each completed document (in 2 (a) through (d)) within the
required time, the Procurement Officer may determine that I am not responsible and therefore
not eligible for contract award or not susceptible of being selected for award.
3. Information Provided to DBE firms
In the solicitation of subcontract quotations or offers, DBE firms were provided not less than the
same information and amount of time to respond as were non-DBE firms.
4. Products and Services Provided by DBE firms
I hereby affirm that the DBEs are only providing those products and services for which they are
MDOT certified.
I solemnly affirm under the penalties of perjury that the information in this affidavit is true to the
best of my knowledge, information and belief.
_________________________ ________________________
Company Name Signature of Representative
_________________________ ________________________
Address Printed Name and Title
_________________________ ________________________
City, State and Zip Code Date
11/02/2023
CONTRACT PROVISIONS CONTRACT NO. CH257B51
PROPOSAL FORM PACKET — FEDERAL FAP NO. AC-TAP-3(871)E
21 of 45
MDOT DBE FORM B
FEDERALLY-FUNDED CONTRACTS
DBE PARTICIPATION SCHEDULE
PART 1 – INSTRUCTIONS FOR DBE PARTICIPATION SCHEDULE
PARTS 2 AND 3 MUST BE INCLUDED WITH THE BID/PROPOSAL. IF THE BIDDER/OFFEROR FAILS TO
ACCURATELY COMPLETE AND SUBMIT PART 2 WITH THE BID/PROPOSAL AS REQUIRED, THE BID
SHALL BE DEEMED NOT RESPONSIVE OR THE PROPOSAL SHALL BE DEEMED NOT SUSCEPTIBLE OF
BEING SELECTED FOR AWARD.
PAGE 1 OF 4
*** STOP ***
FORM INSTRUCTIONS
PLEASE READ BEFORE COMPLETING THIS FORM
1. Please refer to the Maryland Department of Transportation (MDOT) DBE Directory at
https://www.mdot.maryland.gov to determine if a firm is certified for the appropriate North American
Industry Classification System (“NAICS”) Code and the product/services description (specific
product that a firm is certified to provide or specific areas of work that a firm is certified to perform).
For more general information about NAICS, please visit www.naics.com. Only those specific
products and/or services for which a firm is certified in the MDOT Directory can be used for purposes
of achieving the DBE participation goal.
2. In order to be counted for purposes of achieving the DBE participation goal, the firm must be certified
for that specific NAICS (“DBE” for Federally-funded projects designation after NAICS Code).
WARNING: If the firm’s NAICS Code is in graduated status, such services/products will not be
counted for purposes of achieving the DBE participation goals. Graduated status is clearly identified
in the MDOT Directory (such graduated codes are designated with the word graduated after the
appropriate NAICS Code).
3. Examining the NAICS Code is the first step in determining whether a DBE firm is certified and
eligible to receive DBE participation credit for the specific products/services to be supplied or
performed under the contract. The second step is to determine whether a firm’s Products/Services
Description in the DBE Directory includes the products to be supplied and/or services to be performed
that are being used to achieve the DBE participation goal.
4. If you have any questions as to whether a firm is MDOT DBE certified, or if it is certified to perform
specific services or provide specific products, please call MDOT’s Office of Minority Business
Enterprise at 1-800-544-6056 or send an email to mbe@mdot.maryland.gov.
11/02/2023
CONTRACT PROVISIONS CONTRACT NO. CH257B51
PROPOSAL FORM PACKET — FEDERAL FAP NO. AC-TAP-3(871)E
22 of 45
MDOT DBE FORM B
FEDERALLY-FUNDED CONTRACTS
DBE PARTICIPATION SCHEDULE
PART 1 – INSTRUCTIONS FOR DBE PARTICIPATION SCHEDULE
PAGE 2 OF 4
5. The Contractor’s subcontractors are considered second-tier subcontractors. Third-tier contracting
used to meet a DBE goal is to be considered the exception and not the rule. The following two
conditions must be met before MDOT, its Modal Administrations and the Maryland Transportation
Authority may approve a third-tier contracting agreement: (a) the bidder/offeror must request in
writing approval of each third-tier contract arrangement, and (b) the request must contain specifics
as to why a third-tier contracting arrangement should be approved. These documents must be
submitted with the bid/proposal in Part 2 of this DBE Participation Schedule.
6. For each DBE firm that is being used as supplier/wholesaler/regular dealer/broker/manufacturer,
please follow these instructions for calculating the amount of the subcontract for purposes of
achieving the DBE participation goal:
A. Is the firm certified as a broker of the products/supplies? If the answer is YES, please continue
to Item C. If the answer is NO, please continue to Item B.
B. Is the firm certified as a supplier, wholesaler, regular dealer, or manufacturer of such
products/supplies? If the answer is YES, continue to Item D. If the answer is NO, continue to
Item C only if the DBE firm is certified to perform trucking/hauling services under NAICS
Codes 484110, 484121, 484122, 484210, 484220 and 484230. If the answer is NO and the
firm is not certified under these NAICS Codes, then no DBE participation credit will be given
for the supply of these products.
C. For purposes of achieving the DBE participation goal, you may count only the amount of any
reasonable fee that the DBE firm will receive for the provision of such products/supplies - not
the total subcontract amount or the value (or a percentage thereof) of such products and/or
supplies. For Column 3 of the DBE Participation Schedule, please divide the amount of any
reasonable fee that the DBE firm will receive for the provision of such products/services by the
total Contract value and insert the percentage in Line 3.1.
D. Is the firm certified as a manufacturer (refer to the firm’s NAICS Code and specific description
of products/services) of the products/supplies to be provided? If the answer is NO please
continue to Item E. If the answer is YES, for purposes of achieving the DBE participation goal,
you may count the total amount of the subcontract. For Column 3 of the DBE Participation
Schedule, please divide the total amount of the subcontract by the total Contract value and
insert the percentage in Line 3.1.
11/02/2023
CONTRACT PROVISIONS CONTRACT NO. CH257B51
PROPOSAL FORM PACKET — FEDERAL FAP NO. AC-TAP-3(871)E
23 of 45
MDOT DBE FORM B
FEDERALLY-FUNDED CONTRACTS
DBE PARTICIPATION SCHEDULE
PART 1 – INSTRUCTIONS FOR DBE PARTICIPATION SCHEDULE
PAGE 3 OF 4
E. Is the firm certified as a supplier, wholesaler and/or regular dealer? If the answer is YES and
the DBE firm is furnishing and installing the materials and is certified to perform these
services, please divide the total subcontract amount (including full value of supplies) by the
total Contract value and insert the percentage in Line 3.1. If the answer is YES and the DBE
firm is only being used as a supplier, wholesaler and/or regular dealer or is not certified to
install the supplies/materials, for purposes of achieving the DBE participation goal, you may
only count sixty percent (60%) of the value of the subcontract for these supplies/products (60%
Rule). To apply the 60% Rule, first divide the amount of the subcontract for these
supplies/products only (not installation) by the total Contract value. Then, multiply the result
by sixty percent (60%) and insert the percentage in Line 3.2.
7. For each DBE firm that is not being used as a supplier/wholesaler/regular
dealer/broker/manufacturer, to calculate the amount of the subcontract for purposes of
achieving the DBE participation goal, divide the total amount of the subcontract by the total
Contract value and insert the percentage in Line 3.1.
Example: $ 2,500 (Total Subcontract Amount) $10,000 (Total Contract Value) x 100 = 25%.
8. Please note that for USDOT-funded projects, a DBE prime may count towards its DBE
participation goal work performed by its own forces. Include information about the DBE prime in
Part 2.
9. WARNING: The percentage of DBE participation, computed using the dollar amounts in Column
3 for all of the DBE firms listed in Part 2, MUST at least equal the DBE participation goal as set
forth in MDOT DBE Form A – Federally-Funded Contracts for this solicitation. If the
bidder/offeror is unable to achieve the DBE participation goals, then the bidder/offeror must request
a waiver in Form A or the bid will be deemed not responsive, or the proposal not susceptible of
being selected for award. You may wish to use the Goal Worksheet shown below to assist you in
calculating the percentage and confirming that you have met the applicable DBE participation goal.
11/02/2023
CONTRACT PROVISIONS CONTRACT NO. CH257B51
PROPOSAL FORM PACKET — FEDERAL FAP NO. AC-TAP-3(871)E
24 of 45
MDOT DBE FORM B
FEDERALLY-FUNDED CONTRACTS
DBE PARTICIPATION SCHEDULE
PART 1 – INSTRUCTIONS FOR DBE PARTICIPATION SCHEDULE
PAGE 4 OF 4
GOAL WORKSHEET
Total DBE Firm Participation
(Add percentages in Column 3 for all DBE firms
listed in DBE Participation Schedule) (A) ____________________%
The percentage amount in Box A above should be equal to the percentage amount in Box E below.
Add Countable Subcontract Amounts (see 6 through
8 of Instructions) for all DBE firms listed in DBE
(B) $____________________
Participation Schedule, and insert in Box B
Insert the Total Contract Amount in Box C
(C) $____________________
Divide Box B by Box C and Insert in Box D
(D) =____________________
Multiply Box D by 100 and insert in Box E
(E) =___________________%
11/02/2023
CONTRACT PROVISIONS CONTRACT NO. CH257B51
PROPOSAL FORM PACKET — FEDERAL FAP NO. AC-TAP-3(871)E
25 of 45
MDOT DBE FORM B
FEDERALLY-FUNDED CONTRACTS
DBE PARTICIPATION SCHEDULE
PART 2 – DBE PARTICIPATION SCHEDULE
PARTS 2 AND 3 MUST BE INCLUDED WITH THE BID/PROPOSAL. IF THE BIDDER/OFFEROR FAILS TO
ACCURATELY COMPLETE AND SUBMIT PART 2 WITH THE BID/PROPOSAL AS REQUIRED, THE BID SHALL
BE DEEMED NOT RESPONSIVE OR THE PROPOSAL SHALL BE DEEMED NOT SUSCEPTIBLE OF BEING
SELECTED FOR AWARD.
PAGE __ OF ___
Prime Contractor Project Description Solicitation Number
LIST INFORMATION FOR EACH CERTIFIED DBE SUBCONTRACTOR YOU AGREE TO USE TO
ACHIEVE THE DBE PARTICIPATION GOAL.
COLUMN 1 COLUMN 2 COLUMN 3
Unless the bidder/offeror requested a waiver in MDOT DBE Form A – Federally
Funded Contracts for this solicitation, the cumulative DBE participation for all DBE
firms listed herein must equal at least the DBE participation goal set forth in Form
A.
NAME OF DBE CERTIFICATION NO. FOR PURPOSES OF ACHIEVING THE DBE PARTICIPATION GOAL, refer to
SUBCONTRACTOR sections 6, 7 and 8 in Part 1 - Instructions. State the percentage amount of the
AND TIER products/services in Line 3.1, except for those products or services where the DBE
firm is being used as a wholesaler, supplier, or regular dealer. For items of work
where the DBE firm is being used as a supplier, wholesaler and/or regular dealer,
complete Line 3.2 using the 60% Rule.
Certification Number: 3.1. TOTAL PERCENTAGE TO BE PAID TO THE
SUBCONTRACTOR (STATE THIS PERCENTAGE AS A PERCENTAGE
OF THE TOTAL CONTRACT VALUE- EXCLUDING
PRODUCTS/SERVICES FROM SUPPLIERS, WHOLESALERS OR
REGULAR DEALERS).
Please check if DBE firm is __________% (Percentage for purposes of calculating achievement of DBE
a third-tier contractor (if Participation goal)
applicable).
Please submit written 3.2 TOTAL PERCENTAGE TO BE PAID TO THE SUBCONTRACTOR
documents in accordance with FOR ITEMS OF WORK WHERE THE DBE FIRM IS BEING USED AS
Section 5 of Part 1 - A SUPPLIER, WHOLESALER AND/OR REGULAR DEALER) (STATE
Instructions THE PERCENTAGE AS A PERCENTAGE OF THE TOTAL CONTRACT
VALUE AND THEN APPLY THE 60% RULE PER SECTION 6(E) IN
PART 1 - INSTRUCTIONS).
_____________% Total percentage of Supplies/Products
x _________60% (60% Rule)
__________% (Percentage for purposes of calculating achievement of DBE
Participation goal)
Please check if Continuation Sheets are attached.
11/02/2023
CONTRACT PROVISIONS CONTRACT NO. CH257B51
PROPOSAL FORM PACKET — FEDERAL FAP NO. AC-TAP-3(871)E
26 of 45
MDOT DBE FORM B
FEDERALLY-FUNDED CONTRACTS
DBE PARTICIPATION SCHEDULE
CONTINUATION SHEET
PAGE __ OF ___
Prime Contractor Project Description Solicitation Number
LIST INFORMATION FOR EACH CERTIFIED DBE SUBCONTRACTOR YOU AGREE TO USE TO
ACHIEVE THE DBE PARTICIPATION GOAL.
COLUMN 1 COLUMN 2 COLUMN 3
Unless the bidder/offeror requested a waiver in MDOT DBE Form A – Federally
Funded Contracts for this solicitation, the cumulative DBE participation for all
DBE firms listed herein must equal at least the DBE participation goal set forth
in Form A.
NAME OF DBE CERTIFICATION NO. FOR PURPOSES OF ACHIEVING THE DBE PARTICIPATION GOAL, refer
SUBCONTRACTOR to sections 6, 7 and 8 in Part 1 - Instructions. State the percentage amount of the
AND TIER products/services in Line 3.1, except for those products or services where the
DBE firm is being used as a wholesaler, supplier, or regular dealer. For items of
work where the DBE firm is being used as a supplier, wholesaler and/or regular
dealer, complete Line 3.2 using the 60% Rule.
Certification Number: 3.1. TOTAL PERCENTAGE TO BE PAID TO THE
SUBCONTRACTOR (STATE THIS PERCENTAGE AS A
PERCENTAGE OF THE TOTAL CONTRACT VALUE- EXCLUDING
PRODUCTS/SERVICES FROM SUPPLIERS, WHOLESALERS OR
REGULAR DEALERS).
__________% (Percentage for purposes of calculating achievement of
DBE Participation goal)
Please check if DBE
3.2 TOTAL PERCENTAGE TO BE PAID TO THE
firm is a third-tier SUBCONTRACTOR FOR ITEMS OF WORK WHERE THE DBE
contractor (if applicable). FIRM IS BEING USED AS A SUPPLIER, WHOLESALER AND/OR
Please submit written REGULAR DEALER) (STATE THE PERCENTAGE AS A
documents in accordance PERCENTAGE OF THE TOTAL CONTRACT VALUE AND THEN
APPLY THE 60% RULE PER SECTION 6(E) IN PART 1 -
with Section 5 of Part 1 - INSTRUCTIONS).
Instructions
_____________% Total percentage of Supplies/Products
x _________60% (60% Rule)
__________% (Percentage for purposes of calculating achievement of
DBE Participation goal)
Please check if Continuation Sheets are attached.
11/02/2023
CONTRACT PROVISIONS CONTRACT NO. CH257B51
PROPOSAL FORM PACKET — FEDERAL FAP NO. AC-TAP-3(871)E
27 of 45
MDOT DBE FORM B
FEDERALLY-FUNDED CONTRACTS
DBE PARTICIPATION SCHEDULE
PART 3 – CERTIFICATION FOR DBE PARTICIPATION SCHEDULE
PARTS 2 AND 3 MUST BE INCLUDED WITH THE BID/PROPOSAL AS DIRECTED IN THE SOLICITATION.
I hereby affirm that I have reviewed the Products and Services Description (specific product that a firm is
certified to provide or areas of work that a firm is certified to perform) set forth in the MDOT DBE Directory
for each of the DBE firms listed in Part 2 of this DBE Form B for purposes of achieving the DBE
participation goal that was identified in the DBE Form A that I submitted with this solicitation, and
that the DBE firms listed are only performing those products/services/areas of work for which they are
certified. I also hereby affirm that I have read and understand the form instructions set forth in Part 1 of
this DBE Form B.
The undersigned Prime Contractor hereby certifies and agrees that it has fully complied with the State
Minority Business Enterprise law, State Finance and Procurement Article §14-308(a)(2), Annotated Code
of Maryland which provides that, except as otherwise provided by law, a contractor may not identify a
certified minority business enterprise in a bid or proposal and:
(1) fail to request, receive, or otherwise obtain authorization from the certified minority business
enterprise to identify the certified minority business enterprise in its bid or proposal;
(2) fail to notify the certified minority business enterprise before execution of the contract of its
inclusion of the bid or proposal;
(3) fail to use the certified minority business enterprise in the performance of the contract; or
(4) pay the certified minority business enterprise solely for the use of its name in the bid or
proposal.
I solemnly affirm under the penalties of perjury that the contents of Parts 2 and 3 of MDOT DBE Form B
are true to the best of my knowledge, information and belief.
_________________________________________________________________________________
Company Name Signature of Representative
____________________________________________________________________________________
Address Printed Name and Title
____________________________________________________________________________________
City, State and Zip Code Date
11/02/2023
CONTRACT PROVISIONS CONTRACT NO. CH257B51
PROPOSAL FORM PACKET — FEDERAL FAP NO. AC-TAP-3(871)E
28 of 45
MDOT MBE/DBE FORM E
GOOD FAITH EFFORTS GUIDANCE AND DOCUMENTATION
PART 1 – GUIDANCE FOR DEMONSTRATING GOOD FAITH EFFORTS
TO MEET MBE/DBE PARTICIPATION GOALS
In order to show that it has made good faith efforts to meet the Minority Business Enterprise
(MBE)/Disadvantaged Business Enterprise (DBE) participation goal (including any MBE
subgoals) on a contract, the bidder/offeror must either (1) meet the MBE/DBE Goal(s) and
document its commitments for participation of MBE/DBE Firms, or (2) when it does not meet the
MBE/DBE Goal(s), document its Good Faith Efforts to meet the goal(s).
I. Definitions
MBE/DBE Goal(s) – “MBE/DBE Goal(s)” refers to the MBE participation goal and MBE
participation subgoal(s) on a State-funded procurement and the DBE participation goal on a
federally-funded procurement.
Good Faith Efforts – The “Good Faith Efforts” requirement means that when requesting a waiver,
the bidder/offeror must demonstrate that it took all necessary and reasonable steps to achieve the
MBE/DBE Goal(s), which, by their scope, intensity, and appropriateness to the objective, could
reasonably be expected to obtain sufficient MBE/DBE participation, even if those steps were not
fully successful. Whether a bidder/offeror that requests a waiver made adequate good faith efforts
will be determined by considering the quality, quantity, and intensity of the different kinds of
efforts that the bidder/offeror has made. The efforts employed by the bidder/offeror should be
those that one could reasonably expect a bidder/offeror to take if the bidder/offeror were actively
and aggressively trying to obtain DBE participation sufficient to meet the DBE contract goal. Mere
pro forma efforts are not good faith efforts to meet the DBE contract requirements. The
determination concerning the sufficiency of the bidder's/offeror’s good faith efforts is a judgment
call; meeting quantitative formulas is not required.
Identified Firms – “Identified Firms” means a list of the DBEs identified by the procuring agency
during the goal setting process and listed in the federally-funded procurement as available to
perform the Identified Items of Work. It also may include additional DBEs identified by the
bidder/offeror as available to perform the Identified Items of Work, such as DBEs certified or
granted an expansion of services after the procurement was issued. If the procurement does not
include a list of Identified Firms or is a State-funded procurement, this term refers to all of the
MBE Firms (if State-funded) or DBE Firms (if federally-funded) the bidder/offeror identified as
available to perform the Identified Items of Work and should include all appropriately certified
firms that are reasonably identifiable.
11/02/2023
CONTRACT PROVISIONS CONTRACT NO. CH257B51
PROPOSAL FORM PACKET — FEDERAL FAP NO. AC-TAP-3(871)E
29 of 45
Identified Items of Work – “Identified Items of Work” means the bid items identified by the
procuring agency during the goal setting process and listed in the procurement as possible items
of work for performance by MBE/DBE Firms. It also may include additional portions of items of
work the bidder/offeror identified for performance by MBE/DBE Firms to increase the likelihood
that the MBE/DBE Goal(s) will be achieved. If the procurement does not include a list of
Identified Items of Work, this term refers to all of the items of work the bidder/offeror identified
as possible items of work for performance by MBE/DBE Firms and should include all reasonably
identifiable work opportunities.
MBE/DBE Firms – For State-funded contracts, “MBE/DBE Firms” refers to certified MBE
Firms. Certified MBE Firms can participate in the State’s MBE Program. For federally-funded
contracts, “MBE/DBE Firms” refers to certified DBE Firms. Certified DBE Firms can participate
in the federal DBE Program.
II. Types of Actions MDOT will Consider
The bidder/offeror is responsible for making relevant portions of the work available to MBE/DBE
subcontractors and suppliers and to select those portions of the work or material needs consistent
with the available MBE/DBE subcontractors and suppliers, so as to facilitate MBE/DBE
participation. The following is a list of types of actions MDOT will consider as part of the
bidder's/offeror’s Good Faith Efforts when the bidder/offeror fails to meet the MBE/DBE Goal(s).
This list is not intended to be a mandatory checklist, nor is it intended to be exclusive or exhaustive.
Other factors or types of efforts may be relevant in appropriate cases.
A. Identify Bid Items as Work for MBE/DBE Firms
1. Identified Items of Work in Procurements
(a) Certain procurements will include a list of bid items identified during the goal setting
process as possible work for performance by MBE/DBE Firms. If the procurement
provides a list of Identified Items of Work, the bidder/offeror shall make all reasonable
efforts to solicit quotes from MBE Firms or DBE Firms, whichever is appropriate, to
perform that work.
(b) Bidders/Offerors may, and are encouraged to, select additional items of work to be
performed by MBE/DBE Firms to increase the likelihood that the MBEDBE Goal(s)
will be achieved.
2. Identified Items of Work by Bidders/Offerors
(a) When the procurement does not include a list of Identified Items of Work,
bidders/offerors should reasonably identify sufficient items of work to be performed
by MBE/DBE Firms.
11/02/2023
CONTRACT PROVISIONS CONTRACT NO. CH257B51
PROPOSAL FORM PACKET — FEDERAL FAP NO. AC-TAP-3(871)E
30 of 45
(b) Where appropriate, bidders/offerors should break out contract work items into
economically feasible units to facilitate MBE/DBE participation, rather than perform
these work items with their own forces. The ability or desire of a prime contractor to
perform the work of a contract with its own organization does not relieve the
bidder/offeror of the responsibility to make Good Faith Efforts.
B. Identify MBE Firms or DBE Firms to Solicit
1. DBE Firms Identified in Procurements
(a) Certain procurements will include a list of the DBE Firms identified during the goal
setting process as available to perform the items of work. If the procurement provides
a list of Identified DBE Firms, the bidder/offeror shall make all reasonable efforts to
solicit those DBE firms.
(b) Bidders/offerors may, and are encouraged to, search the MBE/DBE Directory to
identify additional DBEs who may be available to perform the items of work, such as
DBEs certified or granted an expansion of services after the solicitation was issued.
2. MBE/DBE Firms Identified by Bidders/Offerors
(a) When the procurement does not include a list of Identified MBE/DBE Firms,
bidders/offerors should reasonably identify the MBE Firms or DBE Firms, whichever
is appropriate, that are available to perform the Identified Items of Work.
(b) Any MBE/DBE Firms identified as available by the bidder/offeror should be certified
in the appropriate program (MBE for State-funded procurements or DBE for federally-
funded procurements)
(c) Any MBE/DBE Firms identified as available by the bidder/offeror should be certified
to perform the Identified Items of Work.
C. Solicit MBE/DBEs
1. Solicit all Identified Firms for all Identified Items of Work by providing written notice.
The bidder/offeror should:
(a) provide the written solicitation at least 10 days prior to bid opening to allow sufficient
time for the MBE/DBE Firms to respond;
(b) send the written solicitation by first-class mail, facsimile, or email using contact
information in the MBE/DBE Directory, unless the bidder/offeror has a valid basis for
using different contact information; and
11/02/2023
CONTRACT PROVISIONS CONTRACT NO. CH257B51
PROPOSAL FORM PACKET — FEDERAL FAP NO. AC-TAP-3(871)E
31 of 45
(c) provide adequate information about the plans, specifications, anticipated time schedule
for portions of the work to be performed by the MBE/DBE, and other requirements of
the contract to assist MBE/DBE Firms in responding. (This information may be
provided by including hard copies in the written solicitation or by electronic means as
described in C.3 below.)
2. “All” Identified Firms includes the DBEs listed in the procurement and any MBE/DBE
Firms you identify as potentially available to perform the Identified Items of Work, but it
does not include MBE/DBE Firms who are no longer certified to perform the work as of
the date the bidder/offeror provides written solicitations.
3. “Electronic Means” includes, for example, information provided via a website or file
transfer protocol (FTP) site containing the plans, specifications, and other requirements of
the contract. If an interested MBE/DBE cannot access the information provided by
electronic means, the bidder/offeror must make the information available in a manner that
is accessible by the interested MBE/DBE.
4. Follow up on initial written solicitations by contacting DBEs to determine if they are
interested. The follow up contact may be made:
(a) by telephone using the contact information in the MBE/DBE Directory, unless the
bidder/offeror has a valid basis for using different contact information; or
(b) in writing via a method that differs from the method used for the initial written
solicitation.
5. In addition to the written solicitation set forth in C.1 and the follow up required in C.4, use
all other reasonable and available means to solicit the interest of MBE/DBE Firms certified
to perform the work of the contract. Examples of other means include:
(a) attending any pre-bid meetings at which MBE/DBE Firms could be informed of
contracting and subcontracting opportunities;
(b) if recommended by the procurement, advertising with or effectively using the
services of at least two minority focused entities or media, including trade
associations, minority/women community organizations, minority/women
contractors' groups, and local, state, and federal minority/women business
assistance offices listed on the MDOT Office of Minority Business Enterprise
website; and
(c) effectively using the services of other organizations, as allowed on a case-by-case
basis and authorized in the procurement, to provide assistance in the recruitment
and placement of MBE/DBE Firms.
D. Negotiate With Interested MBE/DBE Firms
11/02/2023
CONTRACT PROVISIONS CONTRACT NO. CH257B51
PROPOSAL FORM PACKET — FEDERAL FAP NO. AC-TAP-3(871)E
32 of 45
Bidders/Offerors must negotiate in good faith with interested MBE/DBE Firms.
1. Evidence of negotiation includes, without limitation, the following:
(a) the names, addresses, and telephone numbers of MBE/DBE Firms that were considered;
(b) a description of the information provided regarding the plans and specifications for the
work selected for subcontracting and the means used to provide that information; and
(c) evidence as to why additional agreements could not be reached for MBE/DBE Firms to
perform the work.
2. A bidder/offeror using good business judgment would consider a number of factors in
negotiating with subcontractors, including DBE subcontractors, and would take a firm's
price and capabilities as well as contract goals into consideration.
3. The fact that there may be some additional costs involved in finding and using MBE/DBE
Firms is not in itself sufficient reason for a bidder's/offeror’s failure to meet the contract
DBE goal, as long as such costs are reasonable. Factors to take into consideration when
determining whether a MBE/DBE Firm’s quote is excessive or unreasonable include,
without limitation, the following:
(a) the dollar difference between the MBE/DBE subcontractor’s quote and the average of
the other subcontractors’ quotes received by the bidder/offeror;
(b) the percentage difference between the MBE/DBE subcontractor’s quote and the
average of the other subcontractors’ quotes received by the bidder/offeror;
(c) the percentage that the DBE subcontractor’s quote represents of the overall contract
amount;
(d) the number of MBE/DBE firms that the bidder/offeror solicited for that portion of the
work;
(e) whether the work described in the MBE/DBE and Non-MBE/DBE subcontractor
quotes (or portions thereof) submitted for review is the same or comparable; and
(f) the number of quotes received by the bidder/offeror for that portion of the work.
4. The above factors are not intended to be mandatory, exclusive, or exhaustive, and other
evidence of an excessive or unreasonable price may be relevant.
5. The bidder/offeror may not use its price for self-performing work as a basis for rejecting a
MBE/DBE Firm’s quote as excessive or unreasonable.
11/02/2023
CONTRACT PROVISIONS CONTRACT NO. CH257B51
PROPOSAL FORM PACKET — FEDERAL FAP NO. AC-TAP-3(871)E
33 of 45
6. The “average of the other subcontractors’ quotes received by the” bidder/offeror refers to
the average of the quotes received from all subcontractors, except that there should be
quotes from at least three subcontractors, and there must be at least one quote from a
MBE/DBE and one quote from a Non-MBE/DBE.
7. A bidder/offeror shall not reject a MBE/DBE Firm as unqualified without sound reasons
based on a thorough investigation of the firm’s capabilities. For each certified MBE/DBE
that is rejected as unqualified or that placed a subcontract quotation or offer that the
bidder/offeror concludes is not acceptable, the bidder/offeror must provide a written
detailed statement listing the reasons for this conclusion. The bidder/offeror also must
document the steps taken to verify the capabilities of the MBE/DBE and Non-MBE/DBE
Firms quoting similar work.
(a) The factors to take into consideration when assessing the capabilities of a MBE/DBE
Firm, include, but are not limited to the following: financial capability, physical
capacity to perform, available personnel and equipment, existing workload, experience
performing the type of work, conduct and performance in previous contracts, and
ability to meet reasonable contract requirements.
(b) The MBE/DBE Firm’s standing within its industry, membership in specific groups,
organizations, or associations and political or social affiliations (for example union vs.
non-union employee status) are not legitimate causes for the rejection or non-
solicitation of bids in the efforts to meet the project goal.
E. Assisting Interested MBE/DBE Firms
When appropriate under the circumstances, the decision-maker will consider whether the
bidder/offeror:
1. made reasonable efforts to assist interested MBE/DBE Firms in obtaining the bonding,
lines of credit, or insurance required by MDOT or the bidder/offeror; and
2. made reasonable efforts to assist interested MBE/DBE Firms in obtaining necessary
equipment, supplies, materials, or related assistance or services.
III. Other Considerations
In making a determination of Good Faith Efforts the decision-maker may consider engineering
estimates, catalogue prices, general market availability and availability of certified MBE/DBE
Firms in the area in which the work is to be performed, other bids or offers and subcontract bids
or offers substantiating significant variances between certified MBE/DBE and Non-MBE/DBE
costs of participation, and their impact on the overall cost of the contract to the State and any other
relevant factors.
11/02/2023
CONTRACT PROVISIONS CONTRACT NO. CH257B51
PROPOSAL FORM PACKET — FEDERAL FAP NO. AC-TAP-3(871)E
34 of 45
The decision-maker may take into account whether a bidder/offeror decided to self-perform
subcontract work with its own forces, especially where the self-performed work is Identified Items
of Work in the procurement. The decision-maker also may take into account the performance of
other bidders/offerors in meeting the contract. For example, when the apparent successful
bidder/offeror fails to meet the contract goal, but others meet it, this reasonably raises the question
of whether, with additional reasonable efforts, the apparent successful bidder/offeror could have
met the goal. If the apparent successful bidder/offeror fails to meet the goal, but meets or exceeds
the average MBE/DBE participation obtained by other bidders/offerors, this, when viewed in
conjunction with other factors, could be evidence of the apparent successful bidder/offeror having
made Good Faith Efforts.
IV. Documenting Good Faith Efforts
At a minimum, a bidder/offeror seeking a waiver of the MBE/DBE Goal(s) or a portion thereof
must provide written documentation of its Good Faith Efforts, in accordance with COMAR
21.11.03.11, within 10 business days after receiving notice that it is the apparent awardee. The
written documentation shall include the following:
A. Items of Work (Complete Good Faith Efforts Documentation Form E, Part 2)
A detailed statement of the efforts made to select portions of the work proposed to be performed
by certified MBE/DBE Firms in order to increase the likelihood of achieving the stated MBE/DBE
Goal(s).
B. Outreach/Solicitation/Negotiation
1. The record of the bidder’s/offeror’s compliance with the outreach efforts prescribed by
COMAR 21.11.03.09C(2)(a) through (e) and 49 C.F.R. Part 26, Appendix A. (Complete
Outreach Efforts Compliance Statement)
2. A detailed statement of the efforts made to contact and negotiate with MBE/DBE Firms
including:
(a) the names, addresses, and telephone numbers of the MBE/DBE Firms who were
contacted, with the dates and manner of contacts (letter, fax, email, telephone, etc.)
(Complete Good Faith Efforts Form E, Part 3, and submit letters, fax cover sheets,
emails, etc. documenting solicitations); and
(b) a description of the information provided to MBE/DBE Firms regarding the plans,
specifications, and anticipated time schedule for portions of the work to be performed
and the means used to provide that information.
C. Rejected MBE/DBE Firms (Complete Good Faith Efforts Form E, Part 4)
11/02/2023
CONTRACT PROVISIONS CONTRACT NO. CH257B51
PROPOSAL FORM PACKET — FEDERAL FAP NO. AC-TAP-3(871)E
35 of 45
1. For each MBE/DBE Firm that the bidder/offeror concludes is not acceptable or qualified, a
detailed statement of the reasons for the bidder's/offeror’s conclusion, including the steps
taken to verify the capabilities of the MBE/DBE and Non-MBE/DBE Firms quoting similar
work.
2. For each certified MBE/DBE Firm that the bidder/offeror concludes has provided an
excessive or unreasonable price, a detailed statement of the reasons for the
bidder's/offeror’s conclusion, including the quotes received from all MBE/DBE and Non-
MBE/DBE firms bidding on the same or comparable work. (Include copies of all quotes
received.)
3. A list of MBE/DBE Firms contacted but found to be unavailable. This list should be
accompanied by a Minority Contractor Unavailability Certificate signed by the MBE/DBE
contractor or a statement from the bidder/offeror that the MBE/DBE contractor refused to
sign the Minority Contractor Unavailability Certificate.
D. Other Documentation
1. Submit any other documentation requested by the Procurement Officer to ascertain the
bidder’s/offeror’s Good Faith Efforts.
2. Submit any other documentation the bidder/offeror believes will help the Procurement
Officer ascertain its Good Faith Efforts.
11/02/2023
CONTRACT PROVISIONS CONTRACT NO. CH257B51
PROPOSAL FORM PACKET — FEDERAL FAP NO. AC-TAP-3(871)E
36 of 45
MDOT MBE/DBE FORM E
GOOD FAITH EFFORTS GUIDANCE AND DOCUMENTATION
PART 2 – CERTIFICATION REGARDING GOOD FAITH EFFORTS DOCUMENTATION
PAGE __ OF ___
Prime Contractor Project Description Solicitation Number
PARTS 3, 4, AND 5 MUST BE INCLUDED WITH THIS CERTIFICATE ALONG WITH ALL DOCUMENTS
SUPPORTING YOUR WAIVER REQUEST.
I hereby request a waiver of (1) the Minority Business Enterprise (MBE) participation goal and/or
subgoal(s), (2) the Disadvantaged Business Enterprise (DBE) participation goal, or (3) a portion
of the pertinent MBE/DBE participation goal and/or MBE subgoal(s) for this procurement. 1 I
affirm that I have reviewed the Good Faith Efforts Guidance MBE/DBE Form E. I further affirm
under penalties of perjury that the contents of Parts 3, 4, and 5 of MDOT MBE/DBE Form E are
true to the best of my knowledge, information and belief.
_________________________________ ________________________________________
Company Name Signature of Representative
_________________________________ ________________________________________
Address Printed Name and Title
_________________________________ _______________________________________
City, State and Zip Code Date
1
MBE participation goals and subgoals apply to State-funded procurements. DBE participation goals apply to
federally-funded procurements. Federally-funded contracts do not have subgoals.
11/02/2023
CONTRACT PROVISIONS CONTRACT NO. CH257B51
PROPOSAL FORM PACKET — FEDERAL FAP NO. AC-TAP-3(871)E
37 of 45
MDOT MBE/DBE FORM E
GOOD FAITH EFFORTS GUIDANCE AND DOCUMENTATION
PART 3 – IDENTIFIED ITEMS OF WORK BIDDER/OFFEROR MADE AVAILABLE TO
MBE/DBE FIRMS
PAGE __ OF ___
Prime Contractor Project Description Solicitation Number
Identify those items of work that the bidder/offeror made available to MBE/DBE Firms. This includes,
where appropriate, those items the bidder/offeror identified and determined to subdivide into economically
feasible units to facilitate the MBE/DBE participation. For each item listed, show the anticipated
percentage of the total contract amount. It is the bidder’s/offeror’s responsibility to demonstrate that
sufficient work to meet the goal was made available to MBE/DBE Firms, and the total percentage of the
items of work identified for MBE/DBE participation equals or exceeds the percentage MBE/DBE goal set
for the procurement. Note: If the procurement includes a list of bid items identified during the goal setting
process as possible items of work for performance by MBE/DBE Firms, the bidder/offeror should make all
of those items of work available to MBE/DBE Firms or explain why that item was not made available. If
the bidder/offeror selects additional items of work to make available to MBE/DBE Firms, those additional
items should also be included below.
Does bidder/offeror Was this work made available
Identified Items Was this work listed in the normally to MBE/DBE Firms?
of Work procurement? self-perform this If no, explain why?
work?
□ Yes □ No □ Yes □ No □ Yes □ No
□ Yes □ No □ Yes □ No □ Yes □ No
□ Yes □ No □ Yes □ No □ Yes □ No
□ Yes □ No □ Yes □ No □ Yes □ No
□ Yes □ No □ Yes □ No □ Yes □ No
□ Yes □ No □ Yes □ No □ Yes □ No
Please check if Additional Sheets are attached.
11/02/2023
CONTRACT PROVISIONS CONTRACT NO. CH257B51
PROPOSAL FORM PACKET — FEDERAL FAP NO. AC-TAP-3(871)E
38 of 45
MDOT MBE/DBE FORM E
GOOD FAITH EFFORTS GUIDANCE AND DOCUMENTATION
PART 4 – IDENTIFIED MBE/DBE FIRMS AND RECORD OF SOLICITATIONS
PAGE __ OF ___
Prime Contractor Project Description Solicitation Number
Identify the MBE/DBE Firms solicited to provide quotes for the Identified Items of Work made available
for MBE/DBE participation. Include the name of the MBE/DBE Firm solicited, items of work for which
bids/quotes were solicited, date and manner of initial and follow-up solicitations, whether the MBE/DBE
provided a quote, and whether the MBE/DBE is being used to meet the MBE/DBE participation goal.
MBE/DBE Firms used to meet the participation goal must be included on the MBE/DBE Participation
Schedule, Form B. Note: If the procurement includes a list of the MBE/DBE Firms identified during the
goal setting process as potentially available to perform the items of work, the bidder/offeror should solicit
all of those MBE/DBE Firms or explain why a specific MBE/DBE was not solicited. If the bidder/offeror
identifies additional MBE/DBE Firms who may be available to perform Identified Items of Work, those
additional MBE/DBE Firms should also be included below. Copies of all written solicitations and
documentation of follow-up calls to MBE/DBE Firms must be attached to this form. If the bidder/offeror
used a Non-MBE/DBE or is self-performing the identified items of work, Part 4 must be completed.
11/02/2023
CONTRACT PROVISIONS CONTRACT NO. CH257B51
PROPOSAL FORM PACKET — FEDERAL FAP NO. AC-TAP-3(871)E
39 of 45
Name of Describe Item Initial Follow-up Details for Quote Quote Reason
Identified of Work Solicitation Solicitation Follow-up Rec’d Used Quote
MBE/DBE Firm Solicited Date & Date & Calls Rejected
& MBE Method Method
Classification
Firm Name: Date: Date: Time of □ Yes □ Yes □ Used Other
Call: □ No □ No MBE/DBE
□ Mail □ Phone □ Used Non-
MBE Classification □ Facsimile □ Mail Spoke With: MBE/DBE
(Check only if □ Email □ Facsimile
requesting waiver of
□ Email □ Left □ Self-
MBE subgoal.)
Message performing
African American-
Owned
Hispanic
American- Owned
Asian American-
Owned
Women-Owned
Other MBE
Classification
__________________
__
Firm Name: Date: Date: Time of □ Yes □ Yes □ Used Other
Call: □ No □ No MBE/DBE
□ Mail □ Phone □ Used Non-
MBE Classification □ Facsimile □ Mail Spoke With: MBE/DBE
(Check only if □ Email □ Facsimile
requesting waiver of
□ Email □ Left □ Self-
MBE subgoal.)
Message performing
African American-
Owned
Hispanic
American- Owned
Asian American-
Owned
Women-Owned
Other MBE
Classification
__________________
__
Please check if Additional Sheets are attached.
11/02/2023
CONTRACT PROVISIONS CONTRACT NO. CH257B51
PROPOSAL FORM PACKET — FEDERAL FAP NO. AC-TAP-3(871)E
40 of 45
MDOT MBE/DBE FORM E
GOOD FAITH EFFORTS GUIDANCE AND DOCUMENTATION
PART 5 – ADDITIONAL INFORMATION REGARDING REJECTED MBE/DBE QUOTES
PAGE __ OF ___
Prime Contractor Project Description Solicitation Number
This form must be completed if Part 3 indicates that a MBE/DBE quote was rejected because the
bidder/offeror is using a Non-MBE/DBE or is self-performing the Identified Items of Work.
Provide the Identified Items Work, indicate whether the work will be self-performed or performed
by a Non-MBE/DBE, and if applicable, state the name of the Non-MBE/DBE. Also include the
names of all MBE/DBE and Non-MBE/DBE Firms that provided a quote and the amount of each
quote.
Describe Self-performing or Amount Name of Other Amount Indicate Reason Why
Identified Items Using Non- of Firms who Quoted MBE/DBE Quote Rejected
of Work Not MBE/DBE Non- Provided Quotes & Briefly Explain
Being Performed (Provide name) MBE/DB &
by MBE/DBE E Quote Whether
(Include MBE/DBE or Non-
spec/section MBE/DBE
number from
bid)
□ Self-performing □ Price
$_______ $_______ □ Capabilities
□ Using Non- ___ ________________ ___ □ Other
MBE/DBE __
□ MBE/DBE
□ Non-MBE/DBE
________________
□ Self-performing □ Price
$_______ $_______ □ Capabilities
□ Using Non- ___ ________________ ___ □ Other
MBE/DBE __
□ MBE/DBE
□ Non- MBE/DBE
________________
□ Self-performing □ Price
$_______ $_______ □ Capabilities
□ Using Non- ___ ________________ ___ □ Other
MBE/DBE __
□ MBE/DBE
□ Non- MBE/DBE
________________
Please check if Additional Sheets are attached.
11/02/2023
CONTRACT PROVISIONS CONTRACT NO. CH257B51
PROPOSAL FORM PACKET — FEDERAL FAP NO. AC-TAP-3(871)E
41 of 45
INFORMATION REQUIRED TO BE SUBMITTED FOR FEDERALLY ASSISTED
CONTRACTS:
(a) Each bidder shall provide the following information:
NAME OF FIRM:
Street and/or P.O. Box
City State Zip Code
DBE Non-DBE Age of the firm years
Annual gross receipts per last calendar year <$500,000 $500,000-1,000,000
$1,000,000-3,000,000 $3,000,000-5,000,000 $5,000,000-10,000,000
>$10,000,000
(b) Each bidder shall provide the following information for each firm quoting or
considered as subcontractors and/or suppliers:
NAME OF FIRM:
Street and/or P.O. Box
City State Zip Code
DBE Non-DBE Age of the firm years
Annual gross receipts per last calendar year <$500,000 $500,000-1,000,000
$1,000,000-3,000,000 $3,000,000-5,000,000 $5,000,000-10,000,000
> $10,000,000
NAME OF FIRM:
Street and/or P.O. Box
City State Zip Code
DBE Non-DBE Age of the firm years
Annual gross receipts per last calendar year <$500,000 $500,000-1,000,000
$1,000,000-3,000,000 $3,000,000-5,000,000 $5,000,000-10,000,000
> $10,000,000
11/02/2023
CONTRACT PROVISIONS CONTRACT NO. CH257B51
PROPOSAL FORM PACKET — FEDERAL FAP NO. AC-TAP-3(871)E
42 of 45
NAME OF FIRM:
Street and/or P.O. Box
City State Zip Code
DBE Non-DBE Age of the firm years
Annual gross receipts per last calendar year <$500,000 $500,000-1,000,000
$1,000,000-3,000,000 $3,000,000-5,000,000 $5,000,000-10,000,000
> $10,000,000
NAME OF FIRM:
Street and/or P.O. Box
City State Zip Code
DBE Non-DBE Age of the firm years
Annual gross receipts per last calendar year <$500,000 $500,000-1,000,000
$1,000,000-3,000,000 $3,000,000-5,000,000 $5,000,000-10,000,000
> $10,000,000
NAME OF FIRM:
Street and/or P.O. Box
City State Zip Code
DBE Non-DBE Age of the firm years
Annual gross receipts per last calendar year <$500,000 $500,000-1,000,000
$1,000,000-3,000,000 $3,000,000-5,000,000 $5,000,000-10,000,000
> $10,000,000
Submit additional copies of this page as page 41A of 44, 41B of 44, etc. as necessary, and
place them as the last pages in the Invitation for Bids. Place an “X” for “NO” on the last
copy. Any additional Copies: NO YES
11/02/2023
CONTRACT PROVISIONS CONTRACT NO. CH257B51
PROPOSAL FORM PACKET — FEDERAL FAP NO. AC-TAP-3(871)E
43 of 45
EXTRA WORK, CONTRACT TIME, BONDING, LIQUIDATED DAMAGES, AND
PROPOSAL GUARANTY
EXTRA WORK. It is further proposed to do all "Extra Work" which may be required to complete
the work contemplated at unit prices or lump sum prices to be agreed upon in writing prior to
starting such extra work, or if such prices or sums cannot be agreed upon, to perform such work
on a Force Account basis as specified in TC-7.03.
CONTRACT TIME. To commence work as specified in the "Notice to Proceed" and to prosecute
the work to complete the contract within/or before 365 days (calendar date)
Any delay in awarding or the execution of this contract will not be considered as a basis for any
monetary claim, however, an extension of time may be considered by the Administration, if
warranted.
BONDING. When the Contractor's bid is $100,000 or more, the Contractor shall furnish a
Payment Bond and a Performance Bond in the full amount of the Contract Award as security for
the construction and completion of the contract in conformance with the Plans, Standard
Specifications, revisions thereto, General Provisions and Special Provisions.
To guarantee all of the work performed under this contract to be done in conformance with the
Standard Specifications, revisions thereto, General Provisions and Special Provisions in a good
workmanlike manner and to renew or repair any work which may be rejected due to defective
materials or workmanship, prior to final completion and acceptance of the work, also we have the
equipment, labor, supervision and financial capacity to perform this contract either with our
organization or with Subcontractors.
LIQUIDATED DAMAGES. The Contractor is hereby advised that liquidated damages in the
amount of three hundred dollars ($300) per calendar day will be assessed for unauthorized
extensions beyond the contracted time of completion.
11/02/2023
CONTRACT PROVISIONS CONTRACT NO. CH257B51
PROPOSAL FORM PACKET — FEDERAL FAP NO. AC-TAP-3(871)E
44 of 45
PROPOSAL GUARANTY. A bid security is not required on Contract Proposals under
$100,000.
A bid security totaling at least five percent (5%) of the bid amount will be required on contracts
of $100,000 or over.
Acceptable forms of security for bid guaranty shall be per GP-2.07.
Enclosed herewith, find bid security based on at least five percent (5%) of the aggregate amount
of the bid submitted, and made payable to the "State of Maryland". The bid security shall be
delivered per GP-2.08. This bid security is a Proposal Guaranty (which is understood will be
forfeited in the event the contract is not executed, if awarded to the signer of this affidavit).
11/02/2023
CONTRACT PROVISIONS CONTRACT NO. CH257B51
PROPOSAL FORM PACKET — FEDERAL FAP NO. AC-TAP-3(871)E
45 of 45
Commercial Nondiscrimination
A. As a condition of entering into this Agreement, Contractor represents and warrants that it will
comply with the State’s Commercial Nondiscrimination Policy, as described under Title 19 of
the State Finance and Procurement Article of the Annotated Code of Maryland. As part of such
compliance, Contractor may not discriminate on the basis of race, color, religion, ancestry,
national origin, sex, age, marital status, sexual orientation, sexual identity, genetic information
or an individual’s refusal to submit to a genetic test or make available the results of a genetic
test or on the basis of disability, or other unlawful forms of discrimination in the solicitation,
selection, hiring, or commercial treatment of subcontractors, vendors, suppliers, or commercial
customers, nor shall Contractor retaliate against any person for reporting instances of such
discrimination. Contractor shall provide equal opportunity for subcontractors, vendors, and
suppliers to participate in all of its public sector and private sector subcontracting and supply
opportunities, provided that this clause does not prohibit or limit lawful efforts to remedy the
effects of marketplace discrimination that have occurred or are occurring in the marketplace.
Contractor understands that a material violation of this clause shall be considered a material
breach of this Agreement and may result in termination of this Agreement, disqualification of
Contractor from participating in State contracts, or other sanctions. This clause is not
enforceable by or for the benefit of, and creates no obligation to, any third party.
B. The Contractor agrees to include the clause contained in subsection (A.), above, in all
subcontracts, regardless of the tier.
C. As a condition of entering into this Agreement, upon the request of the Commission on Civil
Rights, and only after the filing of a complaint against Contractor under Title 19 of the State
Finance and Procurement Article of the Annotated Code of Maryland, as amended from time
to time, Contractor agrees to provide within 60 days after the request a complete list of the
names of all subcontractors, vendors, and suppliers that Contractor has used in the past 4 years
on any of its contracts that were undertaken within the State of Maryland, including the total
dollar amount paid by Contractor on each subcontract or supply contract. Contractor further
agrees to cooperate in any investigation conducted by the State pursuant to the State’s
Commercial Nondiscrimination Policy as set forth under Title 19 of the State Finance and
Procurement Article of the Annotated Code of Maryland, and to provide any documents
relevant to any investigation that are requested by the State. Contractor understands that
violation of this clause is a material breach of this Agreement and may result in contract
termination, disqualification by the State from participating in State contracts, and other
sanctions.
11/02/2023
SHA Contract No. CH257B51
F.A.P. Contract No. AC-TAP-3(871)E
DOCUMENT 00350
BID BOND
BIDDER (Name and Address): SURETY (Name and Address):
OWNER (Name and Address): TOWN OF INDIAN HEAD
4195 Indian Head Highway
Indian Head, MD 20640
PROJECT
Bid Date:
Project Identification: TOWN OF INDIAN HEAD - TRAILHEAD RESTROOM
Contract Number and Identification: One, General Construction
BOND
Date:
Amount:
1. Bidder and Surety, jointly and severally, bind themselves, their heirs, executors,
administrators, successors and assigns to pay to Owner upon default of Bidder the full face
amount of this Bond.
2. Default of Bidder shall occur upon the failure of Bidder to deliver within the time required by
the Bidding Documents the executed Agreement required by the Bidding Documents and any
Performance Bonds, Payment Bonds, Certificates of Insurance, or other documents required
by the Bidding Documents and Contract Documents.
3. This obligation shall be null and void if:
3.1 Owner accepts Bidder's Bid and Bidder delivers within the time required by the Bidding
Documents (or any extension thereof agreed to in writing by Owner) the executed
Agreement required by the Bidding Documents and any Performance Bonds, Payment
Bonds, Certificates of Insurance, or other documents required by the Bidding
Documents and Contract Documents, or
3.2 All Bids are rejected by Owner, or
3.3 Owner fails to issue a Notice of Award to Bidder within the time specified in the
Bidding Documents (or any extension thereof).
6508.22 00350-1 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P. Contract No. AC-TAP-3(871)E
4. Payment under this Bond will be due and payable upon default of Bidder and within 30
calendar days after receipt of Bidder and Surety of written notice of default from Owner,
which notice will be given with reasonable promptness, identifying this Bond and the Project
and including a statement of the amount due.
5. Surety waives notice of and any and all defenses based on or arising out of any time
extension to issue Notice of Award, provided that the time for issuing Notice of Award shall
not in the aggregate exceed 120 days from Bid opening date without Surety's written consent.
6. No suit or action shall be commenced under this Bond prior to 30 calendar days after the
notice of default required in paragraph 4 above is received by Bidder and Surety, and in no
case later than one year after Bid opening date.
7. Any suit or action under this Bond shall be commenced only in a court of competent
jurisdiction located in the state in which the Project is located.
8. Notice required hereunder shall be in writing and sent to Bidder and Surety at their respective
addresses shown on the first page of this Bond. Such notices may be sent by personal
delivery, commercial courier or by United States Registered or Certified Mail, return receipt
requested, postage pre-paid, and shall be deemed to be effective upon receipt by the party
concerned.
9. Surety shall cause to be attached to this Bond a current and effective Power of Attorney
evidencing the authority of the officer, agent or representative who executed this Bond on
behalf of Surety to execute, seal and deliver such Bond and bind the surety thereby.
10. This Bond is intended to conform to all applicable statutory requirements. Any applicable
requirement of any applicable statute that has been omitted from this Bond shall be deemed
to be included herein as if set forth at length. If any provision of the Bond conflicts with any
applicable provision of any applicable statute, then the provision of said statute shall govern
and the remainder of this Bond that is not in conflict therewith shall continue in full force and
effect.
11. The terms used in this Bid Bond which are defined in the General Conditions have the
meaning assigned to them in the General Conditions.
6508.22 00350-2 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P. Contract No. AC-TAP-3(871)E
(If Bidder is an Individual)
Signature of Witness Signature of Individual
Trading and doing business as:
Name of Business
Address of Business
(If Bidder is a Partnership)
Name of Partnership
Address of Partnership
Signature of Witness Signature of Partner
Signature of Witness Signature of Partner
Signature of Witness Signature of Partner
6508.22 00350-3 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P. Contract No. AC-TAP-3(871)E
(If Bidder is a Corporation)
Attest:
Name of Corporation
Signature of Secretary or Address of Principal Office
Assistant Secretary
(Corporate Seal) State of Incorporation
Signature of
President or Vice President
Type or print name below each signature.
(Corporation Surety)
Name of Corporation
Address of Office
Signature of Witness Signature of Attorney-in-fact
Attach an appropriate power of attorney, dated as of the same date as the Bond, evidencing the
authority of the Attorney-in-fact to act in behalf of the corporation.
Type or print name below each signature.
END OF BID BOND
6508.22 00350-4 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P. Contract No. AC-TAP-3(871)E
DOCUMENT 00400
EXPERIENCE QUESTIONNAIRE
PROJECT IDENTIFICATION: TOWN OF INDIAN HEAD - TRAILHEAD RESTROOM
CONTRACT IDENTIFICATION: General
SUBMITTED TO: TOWN OF INDIAN HEAD
(-Corporation
BY: (Partnership
(-An Individual
PRINCIPAL OFFICE ADDRESS:
(The signer of this questionnaire guarantees the truth and accuracy of all statements and of all
answers to interrogatories hereinafter made.)
1. What type of business is Bidder's organization?
2. How many years has Bidder's organization been performing work, as a contractor or
subcontractor, of the type required for this Project?
3. Provide information on all projects currently in progress.
Contract Type When Name and Address Engineer/
Amount of Work Completed of Owner Architect
6508.22 00400-1 ARRO
TOWN OF INDIAN HEAD –TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P. Contract No. AC-TAP-3(871)E
4. What projects, comparable to this Project, has Bidder's organization completed within the last
five years?
Contract Type When Name and Address Engineer/
Amount of Work Completed of Owner Architect
5. Has Bidder's organization ever defaulted on any contract or failed to complete any contract?
If so, where and why?
6. List names, addresses, and phone numbers of individuals or organizations that can be
contacted by Owner or Engineer to obtain references.
6508.22 00400-2 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P. Contract No. AC-TAP-3(871)E
7. What is the construction experience of the principal individuals of Bidder's organization?
Present
Position or Magnitude and
Individual’s Name Office Type of Work In What Capacity?
STATE OF COUNTY OF
being duly sworn deposes and says that he is of
Title Name of Organization
and that the answers to the foregoing questions and all statements therein are true and correct.
Signature
Sworn to before me this _____ day of _______________, 20____.
My commission expires:
Signature of Notary Public
Type or print name below each signature.
END OF EXPERIENCE QUESTIONNAIRE
6508.22 00400-3 ARRO
TOWN OF INDIAN HEAD –TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
DOCUMENT 00450
LIST OF PROPOSED SUBCONTRACTORS
AND MAJOR EQUIPMENT SUPPLIERS
PROJECT IDENTIFICATION: INDIAN HEAD – TRAIL HEAD RESTROOM
CONTRACT NUMBER AND ONE - GENERAL
IDENTIFICATION:
SUBMITTED TO: TOWN OF INDIAN HEAD
List proposed subcontracts as required in Instructions to Bidders.
Description of Subcontractor’s Percent of DBE
Type of Work or Supplier’s Name & Address Total Contract
Type of Equipment Value
Signature
Typed or Printed Name
Date:
Title
NOTE: This List of Proposed Subcontractors and Major Equipment Suppliers must be
submitted with the Bid, and failure to submit will be considered justification for
rejection of the Bid.
Prime Contractor shall not perform less than 50.1% of the work with their own
organization.
END OF LIST OF SUBCONTRACTORS
6508.22 00450-1 ARRO
INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P. Contract No. AC-TAP-3(871)E
DOCUMENT 00460
NON-DISCRIMINATION IN EMPLOYMENT
Under the provisions of the above contract(s) or subcontract(s) and in accordance with Executive
Order No. 11246, Section 202, dated September 24, 1965, the undersigned is obligated not to
discriminate against any employee or applicant for employment because of race, color, creed, or
national origin. This obligation not to discriminate in employment includes, but is not limited to,
the following:
HIRING, PLACEMENT, UPGRADING, TRANSFER OR DEMOTION,
RECRUITMENT, ADVERTISING, OR SOLICITATION FOR EMPLOYMENT,
TRAINING DURING EMPLOYMENT, RATES OF PAY OR OTHER FORMS OF
COMPENSATION, SELECTION FOR TRAINING INCLUDING APPRENTICESHIP,
LAYOFF OR TERMINATION.
This notice is furnished you pursuant to the provisions of the above contract(s) or subcontract(s)
and Executive Order No. 11246.
(Bidder)
END OF DOCUMENT
6508.22 00460-1 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P. Contract No. AC-TAP-3(871)E
DOCUMENT 00470
CERTIFICATION REGARDING
DEBARMENT, SUSPENSION, AND OTHER RESPONSIBILITY MATTERS
1. The prospective participant certifies to the best of its knowledge and belief that it and its
principals:
(a) Are not presently debarred, suspended, proposed for debarment, declared ineligible, or
voluntarily excluded from covered transactions by any Federal, Local, department or
agency;
(b) Have not within a three year period preceding this Bid been convicted of or had a civil
judgement rendered against them for commission of fraud or a criminal offense in
connection with obtaining, attempting to obtain, or performing a public (Federal, State,
or local) transaction or contract under a public transaction; violation of Federal or State
antitrust statutes or commission of embezzlement, theft, forgery, bribery, falsification or
destruction of records, making false statements, or receiving stolen property;
(c) Are not presently indicated for or otherwise criminally or civilly charged by a
government entity (Federal, State, or local) with commission of any of the offenses
enumerated in paragraph 1.(b) of this certification; and
(d) Have not within a three year period preceding this application/proposal had one or more
public transactions (Federal, State, or local) terminated for cause or default.
2. I understand that a false statement on this certification may be grounds for rejection of this
proposal or termination of the award.
Typed Name and Title of Bidder's Authorized Representative
Signature of Bidder's Authorized Representative Date
_____ I am unable to certify to the above statements. My explanation is attached
END OF CERTIFICATION
6508.22 00470-1 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
CONTRACT FORMS
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
DOCUMENT 00500
AGREEMENT
This Agreement made and entered into this day of , 20
by and between TOWN OF INDIAN HEAD, MD,
hereinafter called the Owner,
and
A Corporation known as
organized and existing under the laws of the State of
A Partnership known as
consisting of the following partners
An Individual, , trading as
whose address is
City of
State of , hereinafter called the Contractor,
WITNESSETH, that the parties hereto for the consideration stated do mutually agree as follows:
ARTICLE 1 - SCOPE OF WORK
1.1 The Contractor agrees to furnish all labor, superintendence, materials, necessary
equipment, and other utilities and facilities for, perform all work necessary for or
incidental to, and perform all other obligations imposed by this Agreement for, the
complete Work in connection with TRAILHEAD RESTROOM, TOWN OF INDIAN
HEAD, CHARLES COUNTY, MD, herein called for, all in strict accordance with the
Contract Documents as prepared by ARRO Consulting, Inc., acting as and entitled the
Engineer in this Agreement.
1.2 The Contract Documents are defined in the General Conditions. The Contract
Documents comprise the entire Agreement between Owner and Contractor and are
incorporated in this Agreement and made a part hereof. The Contract Documents may
only be altered, amended, or repealed as described in Paragraphs 3.5 and 3.6 of the
General Conditions.
6508.22 00500-1 ARRO
INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
1.3 The Drawings for the Work covered under this Agreement consist of the following:
Sheet No. Title Dwg. No.
1 Title Sheet, Vicinity Map C-ESD-1
2 Site Plan C-2
3 Construction Details C-ESD-2
4 Erosion and Sediment Control Plan C-ESD-3
5 Erosion and Sediment Control Notes, Details, Sequence of C-ESD-4
Construction
6 Drainage Area Map C-ESD-5
7 Picnic Shelter/Restroom – Arch. Floor Plan & Elevations A-1
8 Picnic Shelter/Restroom – Architectural Details A-2
9 Picnic Shelter/Restroom – Structural Plan & Details S-1
10 Picnic Shelter/Restroom – Mech./Elect./Plumbing Plans, MEP-1
Specifications & Details
11 Maintenance of Traffic Plan MOT-1
12 Maintenance of Traffic Plan MOT-2
13 Maintenance of Traffic Plan MOT-3
ARTICLE 2 - CONTRACT TIMES
2.1 The Work will be substantially completed within 365 calendar days after the date when
the Contract Times commence to run as provided in General Conditions Paragraph 2.3 as
amended by the Supplementary Conditions, and completed and ready for final payment
in accordance with Paragraph 14.13 of the General Conditions within 379 calendar days
after the date when the Contract Times commence to run.
2.2 Liquidated Damages. Owner and Contractor recognize that time is of the essence of this
Agreement and that Owner will suffer financial loss if the Work is not completed within
the times specified in Paragraph 2.1 above, plus any extensions thereof allowed in
accordance with Article 12 of the General Conditions. They also recognize the delays,
expense and difficulties involved in proving the actual loss suffered by Owner if the
Work is not completed on time. Accordingly, instead of requiring any such proof, Owner
and Contractor agree that as liquidated damages for delay (but not as a penalty)
Contractor shall pay Owner $300.00 for each calendar day that expires after the time
specified in Paragraph 2.1 above for Substantial Completion until the Work is
substantially complete. After Substantial Completion, if Contractor shall neglect, refuse,
or fail to complete the remaining Work within the time specified in Paragraph 2.1 above
for completion and readiness for final payment or any proper extension thereof granted
6508.22 00500-2 ARRO
INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
by Owner, Contractor shall pay Owner $300.00 for each calendar day that expires after
the time specified in Paragraph 2.1 above for completion and readiness for final payment.
2.3 Additional Damages: In addition to the liquidated damages amount(s) specified above
under Article 2, Contractor also agrees to reimburse Owner for all administrative, legal,
engineering, and construction observation costs associated with Contractor's failure to
meet any deadline specified above under Article 2.
ARTICLE 3 - CONTRACT PRICE, PAYMENT, AND RETAINAGE
3.1 The Owner shall pay, and the Contractor shall receive and accept as full payment for the
performance of the Contractor's obligations hereunder, the price(s) stipulated in the Bid
Form hereto attached and in the manner as specified in the General Conditions subject to
the retainage provisions set forth below.
3.2 Retainage
3.2.1 Ten percent [10%] retainage will be withheld from each application for payment
until the project is fifty percent [50%] completed. At that time the contractor may
make a written request to the Engineer requesting the Owner to withhold five
percent [5%] retainage from the subsequent partial payments. Such request will
be subject to the Engineer’s and Owner’s concurrence that the project is on
schedule and that the workmanship, etc. is generally satisfactory, ‘but does not
imply final acceptance of the work in place’. At the Owner’s option resumption
of full retainage may be instituted at any time deemed necessary.
3.2.2 In the event that a dispute arises between the Owner and the Contractor, which
dispute is based on increased costs incurred by one contractor occasioned by
delays or other actions of another contractor, additional retainages in the sum of
one and one-half times the amount of any possible liability may be withheld by
the Owner from the Contractor until such times as a final resolution is agreed to
by all parties directly or indirectly involved, unless the contractor causing the
additional claim furnishes a Bond satisfactory to Owner to indemnify Owner
against the claim.
3.3 Final Payment. Upon final completion and acceptance of the Work in accordance with
Paragraph 14.13 of the General Conditions, Owner shall pay the remainder of the
Contract Price as recommended by Engineer in accordance with said Paragraph 14.13.
ARTICLE 4 - CONTRACTOR'S REPRESENTATIONS
In order to induce Owner to enter into this Agreement, Contractor makes the following
representations:
6508.22 00500-3 ARRO
INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
4.1 Contractor has examined and carefully studied the Contract Documents and the other
related data identified in the Bidding Documents.
4.2 Contractor has visited the site and become familiar with and is satisfied as to the general,
local, and site conditions that may affect cost, progress, performance, and furnishing of
the Work.
4.3 Contractor is familiar with and is satisfied as to all federal, state, and local Laws and
Regulations that may affect cost, progress, performance, and furnishing of the Work.
4.4 Contractor has carefully studied all reports of explorations and tests of subsurface
conditions at or contiguous to the site and all drawings of physical conditions in or
relating to existing surface or subsurface structures at or contiguous to the site (except
Underground Facilities) which have been identified in the Supplementary Conditions as
provided in Paragraph 4.2.1 of the General Conditions. Contractor acknowledges that
such reports and drawings are not Contract Documents and may not be complete for
Contractor's purposes. Contractor acknowledges that Owner and Engineer do not assume
responsibility for the accuracy or completeness of information and data shown or
indicated in the Contract Documents with respect to Underground Facilities at or
contiguous to the site. Contractor has obtained and carefully studied (or assumes
responsibility for having done so) all such additional supplementary examinations,
investigations, explorations, tests, studies, and data concerning conditions (surface,
subsurface, and Underground Facilities) at or contiguous to the site or otherwise which
may affect cost, progress, performance, or furnishing of the Work or which relate to any
aspect of the means, methods, techniques, sequences, and procedures of construction to
be employed by Contractor and safety precautions and programs incident thereto.
Contractor does not consider that any additional examinations, investigations,
explorations, tests, studies, or data are necessary for the performance and furnishing of
the Work at the Contract Price, within the Contract Times and in accordance with the
other terms and conditions of the Contract Documents.
4.5 Contractor is aware of the general nature of work to be performed by Owner and others at
the site that relates to the Work as indicated in the Contract Documents.
4.6 Contractor has correlated the information known to Contractor, information and
observations obtained from visits to the site, reports, and drawings identified in the
Contract Documents and all additional examinations, investigations, explorations, tests,
studies, and data with the Contract Documents.
4.7 Contractor has given Engineer written notice of all conflicts, errors, ambiguities, or
discrepancies that Contractor has discovered in the Contract Documents and the written
resolution thereof by Engineer is acceptable to Contractor, and the Contract Documents
are generally sufficient to indicate and convey understanding of all terms and conditions
for performance and furnishing of the Work.
6508.22 00500-4 ARRO
INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
ARTICLE 5 - MISCELLANEOUS
5.1 Terms used in this Agreement which are defined in Article 1 of the General Conditions,
as modified by the Supplementary Conditions, will have the meanings indicated in the
General Conditions.
5.2 No assignment by a party hereto of any rights under or interests in the Contract
Documents will be binding on another party hereto without the written consent of the
party sought to be bound; and, specifically but without limitation, moneys that may
become due and moneys that are due may not be assigned without such consent (except
to the extent that the effect of this restriction may be limited by law), and unless
specifically stated to the contrary in any written consent to an assignment no assignment
will release or discharge the assignor from any duty or responsibility under the Contract
Documents.
5.3 Owner and Contractor each binds itself, its partners, successors, assigns, and legal
representatives to the other party hereto, its partners, successors, assigns, and legal
representatives in respect to all covenants, agreements, and obligations contained in the
Contract Documents.
5.4 Any provision or part of the Contract Documents held to be void or unenforceable under
any Law or Regulation shall be deemed stricken, and all remaining provisions shall
continue to be valid and binding upon Owner and Contractor, who agree that the Contract
Documents shall be reformed to replace such stricken provision or part thereof with a
valid and enforceable provision that comes as close as possible to expressing the
intention of the stricken provision.
5.5 Paragraph SC-6.7.3 of the Supplementary Conditions provides for charging the
Contractor for costs associated with any request for substitution made by the Contractor.
Section 1300 of the General Requirements provides for charging the Contractor for costs
associated with review of any submittals which are classified as excess re-submittals; that
is, any re-submittal beyond the first. Contractor agrees to compensate Owner for such
charges by allowing deductions from Contractor's progress payments.
5.6 Prime Contractor shall not perform less than 50.1% of the work with their own
organization.
6508.22 00500-5 ARRO
INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
IN WITNESS WHEREOF, the parties hereto have executed this Agreement the day and year first
above written.
(If Contractor is an Individual)
Signature of Witness Signature of Individual
Trading and doing business as:
Name of Business
Address of Business
(If Contractor is a Partnership - All General Partners Must Sign)
Name of Partnership
Address of Partnership
Signature of Witness Signature of Partner
Signature of Witness Signature of Partner
Signature of Witness Signature of Partner
6508.22 00500-6 ARRO
INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
(If Contractor is a Corporation)
Attest:
Name of Corporation
Signature of Secretary or Address of Principal Office
Assistant Secretary
(Corporate Seal) State of Incorporation
Signature of
President or Vice President
(Owner)
Attest:
Owner's Organizational Name
Owner’s Address
Signature Signature
Title Title
Type or print name below each signature.
END OF AGREEMENT
6508.22 00500-7 ARRO
INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P. Contract No. AC-TAP-3(871)E
DOCUMENT 00610
PERFORMANCE BOND
CONTRACTOR (Name and Address): SURETY (Name and Address):
OWNER (Name and Address): TOWN OF INDIAN HEAD
4195 Indian Head Hwy.
Indian Head, MD 20640
AGREEMENT
Amount:
Project Identification: TOWN OF INDIAN HEAD - TRAILHEAD RESTROOM
Contract Number: One, General Construction
BOND
Date:
Amount:
1. The Contractor and the Surety, jointly and severally, bind themselves, their heirs,
executors, administrators, successors and assigns to the Owner for the Performance of the
Work as defined by the Agreement, which is incorporated herein by reference.
2. If the Contractor performs the Work, the Surety and the Contractor shall have no
obligation under this Bond, except to participate in conferences as provided in Paragraph
3.1.
3. If there is no Owner Default, the Surety's obligation under this Bond shall arise after:
3.1 The Owner has notified the Contractor and the Surety at its address described in
Article 10 below, that the Owner is considering declaring a Contractor Default and
has requested and attempted to arrange a conference with the Contractor and the
Surety to be held not later than fifteen days after receipt of such notice to discuss
methods of performing the Work. If the Owner, the Contractor, and the Surety
agree, the Contractor shall be allowed a reasonable time to perform the Work, but
such an agreement shall not waive the Owner's right, if any, subsequently to declare
a Contractor default; and
6508.22 00610-1 ARRO
TOWN OF INDIAN HEAD –TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P. Contract No. AC-TAP-3(871)E
3.2 The Owner has declared a Contractor default and formally terminated the
Contractor's right to complete the Work. Such Contractor Default shall not be
declared earlier than twenty days after the Contractor and the Surety have received
notice as provided in Paragraph 3.1; and
3.3 The Owner has agreed to pay the Balance of the Contract Price to the Surety in
accordance with the terms of the Agreement or to a contractor selected to perform
the Work in accordance with the terms of the Agreement with the Owner.
4. When the Owner has satisfied the conditions of Article 3, the Surety shall promptly and at
the Surety's expense take one of the following actions:
4.1 Arrange for the Contractor, with consent of the Owner, to perform and complete
the Work; or
4.2 Undertake to perform and complete the Work itself, through its agents or through
independent contractors; or
4.3 Obtain bids or negotiated proposals from qualified contractors acceptable to the
Owner for a contract for performance and completion of the Work, arrange for a
contract to be prepared for execution by the Owner and the contractor selected with
the Owner's concurrence, to be secured with performance and payment bonds
executed by a qualified surety equivalent to the bonds issued on the Work, and pay
to the Owner the amount of damages as described in Article 6 in excess of the
Balance of the Contract Price incurred by the Owner resulting from the Contractor's
default; or
4.4 Waive its right to perform and complete, arrange for completion, or obtain a new
contractor and with reasonable promptness under the circumstances:
1. After investigation, determine the amount for which it may be liable to the
Owner and, as soon as practicable after the amount is determined, tender
payment therefor to the Owner; or
2. Deny liability in whole or in part and notify the Owner citing reasons therefor.
5. If the Surety does not proceed as provided in Article 4 with reasonable promptness, the
Surety shall be deemed to be in default on this Bond fifteen days after receipt of an
additional written notice from the Owner to the Surety demanding that the Surety perform
its obligations under this Bond, and the Owner shall be entitled to enforce any remedy
available to the Owner. If the Surety proceeds as provided in Paragraph 4.4, and the
Owner refuses the payment tendered or the Surety has denied liability, in whole or in part,
without further notice the Owner shall be entitled to enforce any remedy available to the
Owner.
6508.22 00610-2 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P. Contract No. AC-TAP-3(871)E
6. After the Owner has terminated the Contractor's right to complete the Work, and if the
Surety elects to act under Paragraph 4.1, 4.2, or 4.3 above, then the responsibilities of the
Surety to the Owner shall not be greater than those of the Contractor under the
Agreement, and the responsibilities of the Owner to the Surety shall not be greater than
those of the Owner under the Agreement. To the limit of the amount of this Bond, but
subject to commitment by the Owner of the Balance of the Contract Price to mitigation
of costs and damages on the Work, the Surety is obligated without duplication for:
6.1 The responsibilities of the Contractor for:
1. Completion of the Work, as defined in Article 1 of the General Conditions.
2. Correction of defective work during the One Year Correction Period, as
defined in Paragraph 13.12 of the General Conditions.
6.2 Additional legal, design professional, and delay costs resulting from the
Contractor's Default, and resulting from the actions or failure to act of the Surety
under Article 4; and
6.3 Liquidated damages, or if no liquidated damages are specified in the Agreement,
actual damages caused by delayed performance or non-performance of the
Contractor.
7. The Surety shall not be liable to the Owner or others for obligations of the Contractor that
are unrelated to the Work, and the Balance of the Contract Price shall not be reduced or
set off on account of any such unrelated obligations. No right of action shall accrue on
this Bond to any person or entity other than the Owner or its heirs, executors,
administrators, or successors.
8. The Surety hereby waives notice of any change, including changes of time, to the
Agreement or to related subcontracts, purchase orders, and other obligations.
9. Any proceeding, legal or equitable, under this Bond may be instituted in any court of
competent jurisdiction in the location in which the Work or part of the Work is located
and shall be instituted within two years after Contractor Default or within two years after
the Contractor ceased working and within two years after the Surety refuses or fails to
perform its obligations under this Bond, whichever occurs first. If the provisions of
this Article are void or prohibited by law, the minimum period of limitation available to
sureties as a defense in the jurisdiction of the suit shall be applicable.
10. Notice to the Surety, the Owner or the Contractor shall be mailed or delivered to the
address shown on the front page.
11. When this Bond has been furnished to comply with a statutory or other legal requirement
in the location where the construction was to be performed, any provision in this Bond
6508.22 00610-3 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P. Contract No. AC-TAP-3(871)E
conflicting with said statutory or legal requirement shall be deemed deleted here from and
provisions conforming to such statutory or other legal requirement shall be deemed
incorporated herein. The intent is that this Bond shall be construed as a statutory bond
and not as a common law bond.
12. Definitions
12.1 Balance of the Contract Price: The total amount payable by the Owner to the
Contractor under the Agreement after all proper adjustments have been made,
including allowance to the Contractor of any amounts received or to be received by
the Owner in settlement of insurance or other claims for damages to which the
Contractor is entitled, reduced by all valid and proper payments made to or on
behalf of the Contractor under the Agreement.
12.2 Contractor Default: Failure of the Contractor, which has neither been remedied nor
waived, to perform or otherwise to comply with the terms of the Agreement.
12.3 Owner Default: Failure of the Owner, which has neither been remedied nor
waived, to pay the Contractor as required by the Agreement or to perform and
complete or comply with the other terms thereof.
12.4 The terms used in this Performance Bond which are defined in the General
Conditions have the meaning assigned to them in the General Conditions.
(If Contractor is an Individual)
Signature of Witness Signature of Individual
Trading and doing business as:
Name of Business
Address of Business
6508.22 00610-4 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P. Contract No. AC-TAP-3(871)E
(If Contractor is a Partnership)
Name of Partnership
Address of Partnership
Signature of Witness Signature of Partner
Signature of Witness Signature of Partner
Signature of Witness Signature of Partner
6508.22 00610-5 ARRO
TOWN OF INDIAN HEAD –TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P. Contract No. AC-TAP-3(871)E
(If Contractor is a Corporation)
Attest:
Name of Corporation
Signature of Secretary or Address of Principal Office
Assistant Secretary
(Corporate Seal) State of Incorporation
Signature of
President or Vice President
Type or print name below each signature.
(Corporation Surety)
Name of Corporation
Address of Office
Signature of Witness Signature of Attorney-in-fact
Attach an appropriate power of attorney, dated as of the same date as the Bond, evidencing the
authority of the Attorney-in-fact to act in behalf of the corporation.
Type or print name below each signature.
END OF PERFORMANCE BOND
6508.22 00610-6 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P. Contract No. AC-TAP-3(871)E
DOCUMENT 00620
PAYMENT BOND
CONTRACTOR (Name and Address): SURETY (Name and Principal Place of
Business):
OWNER (Name and Address): TOWN OF INDIAN HEAD
4195 Indian Head Hwy.
Indian Head, MD 20640
AGREEMENT
Amount:
Project Identification: TOWN OF INDIAN HEAD - TRAILHEAD RESTROOM
Contract Number: One, General Construction
BOND
Date:
Amount:
1. The Contractor and the Surety, jointly and severally, bind themselves, their heirs,
executors, administrators, successors and assigns to the Owner to pay for labor, materials,
and equipment furnished for use in the performance of the Work as defined by the
Agreement, which is incorporated herein by reference.
2. With respect to the Owner, this obligation shall be null and void if the Contractor:
2.1 Promptly makes payment, directly or indirectly, for all sums due Claimants, and
2.2 Defends, indemnifies, and holds harmless the Owner from all claims, demands,
liens, or suits by any person or entity who furnished labor, materials, or equipment
for use in the performance of the Work, provided the Owner has promptly notified
the Contractor and the Surety (at the address described in Article 12) of any claims,
demands, liens, or suits and tendered defense of such claims, demands, liens, or
suits to the Contractor and the Surety, and provided there is no Owner Default.
3. With respect to Claimants, this obligation shall be null and void if the Contractor
promptly makes payment, directly or indirectly, for all sums due.
6508.22 00620-1 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P. Contract No. AC-TAP-3(871)E
4. The Surety shall have no obligation to Claimants under this Bond until:
4.1 Claimants who are employed by or have a direct contract with the Contractor have
given notice to the Surety (at the address described in Article 12) and sent a copy,
or notice thereof, to the Owner, stating that a claim is being made under this Bond
and, with substantial accuracy, the amount of the claim.
4.2 Claimants who do not have a direct contract with the Contractor:
1. Have furnished written notice to the Contractor and sent a copy, or notice
thereof, to the Owner, within 90 days after having last performed labor or last
furnished materials or equipment included in the claim stating, with
substantial accuracy, the amount of the claim and the name of the party to
whom the materials were furnished or supplied or for whom the labor was
done or performed; and
2. Have either received a rejection in whole or in part from the Contractor, or not
received within 30 days of furnishing the above notice any communication
from the Contractor by which the Contractor has indicated the claim will be
paid directly or indirectly; and
3. Not having been paid within the above 30 days, have sent a written notice to
the Surety (at the address described in Article 12) and sent a copy, or notice
thereof, to the Owner, stating that a claim is being made under this Bond and
enclosing a copy of the previous written notice furnished to the Contractor.
5. If a notice required by Article 4 is given by the Owner to the Contractor or to the Surety,
that is sufficient compliance.
6. When the Claimant has satisfied the conditions of Article 4, the Surety shall promptly and
at the Surety's expense take the following actions.
6.1 Send an answer to the Claimant, with a copy to the Owner, within 45 days after
receipt of the claim, stating the amounts that are undisputed and the basis for
challenging any amounts that are disputed.
6.2 Pay or arrange for payment of any undisputed amounts.
7. The Surety's total obligation shall not exceed the amount of this Bond, and the amount of
this Bond shall be credited for any payments made in good faith by the Surety.
8. Amounts owed by the Owner to the Contractor under the Agreement shall be used for the
performance of the Work and to satisfy claims, if any, under any Performance Bond. By
the Contractor furnishing and the Owner accepting this Bond, they agree that all funds
earned by the Contractor in the performance of the Work are dedicated to satisfy
6508.22 00620-2 ARRO
TOWN OF INDIAN HEAD –TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P. Contract No. AC-TAP-3(871)E
obligations of the Contractor and the Surety under this Bond, subject to the Owner's
priority to use the funds for the completion of the Work.
9. The Surety shall not be liable to the Owner, Claimants, or others for obligations of the
Contractor that are unrelated to the Work. The Owner shall not be liable for payment of
any costs or expenses of any Claimant under this Bond, and shall have under this Bond no
obligations to make payments to, give notices on behalf of, or otherwise have obligations
to Claimants under this Bond.
10. The Surety hereby waives notice of any change, including changes of time, to the
Agreement or to related subcontracts, purchase orders, and other obligations.
11. No suit or action shall be commenced by a Claimant under this Bond other than in a court
of competent jurisdiction in the location in which the Work or part of the Work is located
or after the expiration of one year from the date (1) on which the Claimant gave the notice
required by Paragraphs 4.2.3 or 4.1, or (2) on which the last labor or service was
Performed by anyone or the last materials or equipment were furnished by anyone under
the Agreement, whichever of (1) or (2) first occurs. If the provisions of this Paragraph
are void or prohibited by law, the minimum period of limitation available to sureties as a
defense in the jurisdiction of the suit shall be applicable.
12. Notice to the surety, the Owner, or the Contractor shall be mailed or delivered to the
Address shown on the front page. Actual receipt of notice by Surety, the Owner, or the
Contractor, however accomplished, shall be sufficient compliance as of the date received
at the address shown on the front page.
13. When this Bond has been furnished to comply with a statutory or other legal requirement
in the location where the construction was to be performed, any provision in this Bond
conflicting with said statutory or legal requirement shall be deemed deleted here from and
provisions conforming to such statutory or other legal requirement shall be deemed
incorporated herein. The intent is that this Bond shall be construed as a statutory bond
and not as a common law bond.
14. Upon request by any person or entity appearing to be a potential beneficiary of this Bond,
the Contractor shall promptly furnish a copy of this Bond or shall permit a copy to be
made.
15. Definitions
15.1 Claimant: An individual or entity having a direct contract with the Contractor or
with a subcontractor of the Contractor to furnish labor, materials, or equipment for
use in the performance of the Work. The intent of this Bond shall be to include
without limitation in the terms "labor, materials, or equipment" that part of water,
gas, power, light, heat, oil, gasoline, telephone service, or rental equipment used in
the Work, architectural and engineering services required for performance of the
Work of the Contractor and the Contractor's subcontractors, and all other items for
6508.22 00620-3 ARRO
TOWN OF INDIAN HEAD –TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P. Contract No. AC-TAP-3(871)E
which a mechanic's lien may be asserted in the jurisdiction where the labor,
materials, or equipment were furnished.
15.2 Owner Default: Failure of the Owner, which has neither been remedied nor
waived, to pay the Contractor as required by the Agreement or to perform and
complete or comply with the other terms thereof.
15.3 The terms used in this Payment Bond which are defined in the General Conditions
have the same meaning assigned to them in the General Conditions.
(If Contractor is an Individual)
Signature of Witness Signature of Individual
Trading and doing business as:
Name of Business
Address of Business
6508.22 00620-4 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P. Contract No. AC-TAP-3(871)E
(If Contractor is a Partnership)
Name of Partnership
Address of Partnership
Signature of Witness Signature of Partner
Signature of Witness Signature of Partner
Signature of Witness Signature of Partner
6508.22 00620-5 ARRO
TOWN OF INDIAN HEAD –TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P. Contract No. AC-TAP-3(871)E
(If Contractor is a Corporation)
Attest:
Name of Corporation
Signature of Secretary or Address of Principal Office
Assistant Secretary
(Corporate Seal) State of Incorporation
Signature of
President or Vice President
Type or print name below each signature.
(Corporation Surety)
Name of Corporation
Address of Office
Signature of Witness Signature of Attorney-in-fact
Attach an appropriate power of attorney, dated as of the same date as the Bond, evidencing the
authority of the Attorney-in-fact to act in behalf of the corporation.
Type or print name below each signature.
END OF PAYMENT BOND
6508.22 00620-6 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
CONDITIONS OF THE CONTRACT
This document has important legal consequences; consultation with an attorney is encouraged with respect to its
use or modification. This document should be adapted to the particular circumstances of the contemplated Project
and the controlling Laws and Regulations.
STANDARD GENERAL CONDITIONS
OF THE CONSTRUCTION CONTRACT
Prepared by
ENGINEERS JOINT CONTRACT DOCUMENTS COMMITTEE
and
Issued and Published Jointly by
AMERICAN COUNCIL OF ENGINEERING COMPANIES
ASSOCIATED GENERAL CONTRACTORS OF AMERICA
AMERICAN SOCIETY OF CIVIL ENGINEERS
PROFESSIONAL ENGINEERS IN PRIVATE PRACTICE
A Practice Division of the
NATIONAL SOCIETY OF PROFESSIONAL ENGINEERS
Endorsed by
CONSTRUCTION SPECIFICATIONS INSTITUTE
EJCDC C-700 Standard General Conditions of the Construction Contract
Copyright © 2007 National Society of Professional Engineers for EJCDC. All rights reserved.
Page 00700-1
Copyright © 2007 National Society of Professional Engineers
1420 King Street, Alexandria, VA 22314-2794
(703) 684-2882
www.nspe.org
American Council of Engineering Companies
1015 15th Street N.W., Washington, DC 20005
(202) 347-7474
www.acec.org
American Society of Civil Engineers
1801 Alexander Bell Drive, Reston, VA 20191-4400
(800) 548-2723
www.asce.org
Associated General Contractors of America
2300 Wilson Boulevard, Suite 400, Arlington, VA 22201-3308
(703) 548-3118
www.agc.org
The copyright for this EJCDC document is owned jointly by the four
EJCDC sponsoring organizations and held in trust for their benefit by NSPE.
EJCDC C-700 Standard General Conditions of the Construction Contract
Copyright © 2007 National Society of Professional Engineers for EJCDC. All rights reserved.
Page 00700-2
STANDARD GENERAL CONDITIONS OF THE
CONSTRUCTION CONTRACT
TABLE OF CONTENTS
Page
ARTICLE 1 – DEFINITIONS AND TERMINOLOGY ........................................................................................................................... 6
1.01 Defined Terms................................................................................................................................................................ 6
1.02 Terminology ................................................................................................................................................................... 9
ARTICLE 2 – PRELIMINARY MATTERS ............................................................................................................................................. 9
2.01 Delivery of Bonds and Evidence of Insurance ............................................................................................................... 9
2.02 Copies of Documents ................................................................................................................................................... 10
2.03 Commencement of Contract Times; Notice to Proceed ............................................................................................... 10
2.04 Starting the Work ......................................................................................................................................................... 10
2.05 Before Starting Construction ....................................................................................................................................... 10
2.06 Preconstruction Conference; Designation of Authorized Representatives .................................................................. 10
2.07 Initial Acceptance of Schedules ................................................................................................................................... 10
ARTICLE 3 – CONTRACT DOCUMENTS: INTENT, AMENDING, REUSE .................................................................................... 11
3.01 Intent ............................................................................................................................................................................ 11
3.02 Reference Standards .................................................................................................................................................... 11
3.03 Reporting and Resolving Discrepancies ...................................................................................................................... 11
3.04 Amending and Supplementing Contract Documents ................................................................................................... 12
3.05 Reuse of Documents ..................................................................................................................................................... 12
3.06 Electronic Data............................................................................................................................................................ 12
ARTICLE 4 – AVAILABILITY OF LANDS; SUBSURFACE AND PHYSICAL CONDITIONS; HAZARDOUS
ENVIRONMENTAL CONDITIONS; REFERENCE POINTS ...................................................................................... 13
4.01 Availability of Lands.................................................................................................................................................... 13
4.02 Subsurface and Physical Conditions ........................................................................................................................... 13
4.03 Differing Subsurface or Physical Conditions .............................................................................................................. 13
4.04 Underground Facilities ............................................................................................................................................... 14
4.05 Reference Points .......................................................................................................................................................... 15
4.06 Hazardous Environmental Condition at Site ............................................................................................................... 15
ARTICLE 5 – BONDS AND INSURANCE ........................................................................................................................................... 17
5.01 Performance, Payment, and Other Bonds ................................................................................................................... 17
5.02 Licensed Sureties and Insurers .................................................................................................................................... 17
5.03 Certificates of Insurance.............................................................................................................................................. 17
5.04 Contractor’s Insurance ................................................................................................................................................ 17
5.05 Owner’s Liability Insurance ........................................................................................................................................ 18
5.06 Property Insurance ...................................................................................................................................................... 18
5.07 Waiver of Rights .......................................................................................................................................................... 19
5.08 Receipt and Application of Insurance Proceeds .......................................................................................................... 20
5.09 Acceptance of Bonds and Insurance; Option to Replace ............................................................................................. 20
5.10 Partial Utilization, Acknowledgment of Property Insurer ........................................................................................... 21
ARTICLE 6 – CONTRACTOR’S RESPONSIBILITIES ....................................................................................................................... 21
6.01 Supervision and Superintendence ................................................................................................................................ 21
6.02 Labor; Working Hours ................................................................................................................................................ 21
6.03 Services, Materials, and Equipment ............................................................................................................................ 21
6.04 Progress Schedule ....................................................................................................................................................... 22
6.05 Substitutes and “Or-Equals” – Delete ALL paragraphs and replace with new A. – L. .............................................. 22
EJCDC C-700 Standard General Conditions of the Construction Contract
Copyright © 2007 National Society of Professional Engineers for EJCDC. All rights reserved.
Page 00700-3
6.06 Concerning Subcontractors, Suppliers, and Others .................................................................................................... 24
6.07 Patent Fees and Royalties ........................................................................................................................................... 25
6.08 Permits ......................................................................................................................................................................... 25
6.09 Laws and Regulations.................................................................................................................................................. 25
6.10 Taxes ............................................................................................................................................................................ 26
6.11 Use of Site and Other Areas ........................................................................................................................................ 26
6.12 Record Documents ....................................................................................................................................................... 26
6.13 Safety and Protection................................................................................................................................................... 26
6.14 Safety Representative ................................................................................................................................................... 27
6.15 Hazard Communication Programs .............................................................................................................................. 27
6.16 Emergencies................................................................................................................................................................. 27
6.17 Shop Drawings and Samples ....................................................................................................................................... 27
6.18 Continuing the Work.................................................................................................................................................... 29
6.19 Contractor’s General Warranty and Guarantee ......................................................................................................... 29
6.20 Indemnification ............................................................................................................................................................ 29
6.21 Delegation of Professional Design Services ................................................................................................................ 30
ARTICLE 7 – OTHER WORK AT THE SITE ....................................................................................................................................... 30
7.01 Related Work at Site .................................................................................................................................................... 30
7.02 Coordination ............................................................................................................................................................... 31
7.03 Legal Relationships ..................................................................................................................................................... 31
ARTICLE 8 – OWNER’S RESPONSIBILITIES ................................................................................................................................... 31
8.01 Communications to Contractor ................................................................................................................................... 31
8.02 Replacement of Engineer ............................................................................................................................................. 31
8.03 Furnish Data ............................................................................................................................................................... 31
8.04 Pay When Due ............................................................................................................................................................. 31
8.05 Lands and Easements; Reports and Tests.................................................................................................................... 32
8.06 Insurance ..................................................................................................................................................................... 32
8.07 Change Orders ............................................................................................................................................................ 32
8.08 Inspections, Tests, and Approvals ............................................................................................................................... 32
8.09 Limitations on Owner’s Responsibilities ..................................................................................................................... 32
8.10 Undisclosed Hazardous Environmental Condition ..................................................................................................... 32
8.11 Evidence of Financial Arrangements .......................................................................................................................... 32
8.12 Compliance with Safety Program ................................................................................................................................ 32
8.13 Resident Project Representative .................................................................................................................................. 32
ARTICLE 9 – ENGINEER’S STATUS DURING CONSTRUCTION .................................................................................................. 32
9.01 Owner’s Representative ............................................................................................................................................... 32
9.02 Visits to Site ................................................................................................................................................................. 32
9.03 Project Representative ................................................................................................................................................. 33
9.04 Authorized Variations in Work .................................................................................................................................... 33
9.05 Rejecting Defective Work............................................................................................................................................. 33
9.06 Shop Drawings, Change Orders and Payments .......................................................................................................... 33
9.07 Determinations for Unit Price Work............................................................................................................................ 33
9.08 Decisions on Requirements of Contract Documents and Acceptability of Work ......................................................... 33
9.09 Limitations on Engineer’s Authority and Responsibilities .......................................................................................... 34
9.10 Compliance with Safety Program ................................................................................................................................ 34
ARTICLE 10 – CHANGES IN THE WORK; CLAIMS ......................................................................................................................... 34
10.01 Authorized Changes in the Work ................................................................................................................................. 34
10.02 Unauthorized Changes in the Work ............................................................................................................................. 34
10.03 Execution of Change Orders ....................................................................................................................................... 35
EJCDC C-700 Standard General Conditions of the Construction Contract
Copyright © 2007 National Society of Professional Engineers for EJCDC. All rights reserved.
Page 00700-4
10.04 Notification to Surety ................................................................................................................................................... 35
10.05 Claims .......................................................................................................................................................................... 35
ARTICLE 11 – COST OF THE WORK; ALLOWANCES; UNIT PRICE WORK................................................................................ 36
11.01 Cost of the Work .......................................................................................................................................................... 36
11.02 Allowances ................................................................................................................................................................... 38
11.03 Unit Price Work ........................................................................................................................................................... 38
ARTICLE 12 – CHANGE OF CONTRACT PRICE; CHANGE OF CONTRACT TIMES ................................................................... 38
12.01 Change of Contract Price ............................................................................................................................................ 38
12.02 Change of Contract Times ........................................................................................................................................... 39
12.03 Delays .......................................................................................................................................................................... 39
ARTICLE 13 – TESTS AND INSPECTIONS; CORRECTION, REMOVAL OR ACCEPTANCE OF DEFECTIVE WORK ............ 40
13.01 Notice of Defects .......................................................................................................................................................... 40
13.02 Access to Work............................................................................................................................................................. 40
13.03 Tests and Inspections ................................................................................................................................................... 40
13.04 Uncovering Work ......................................................................................................................................................... 41
13.05 Owner May Stop the Work ........................................................................................................................................... 41
13.06 Correction or Removal of Defective Work ................................................................................................................... 41
13.07 Correction Period ........................................................................................................................................................ 42
13.08 Acceptance of Defective Work ..................................................................................................................................... 42
13.09 Owner May Correct Defective Work............................................................................................................................ 42
ARTICLE 14 – PAYMENTS TO CONTRACTOR AND COMPLETION ............................................................................................ 43
14.01 Schedule of Values ....................................................................................................................................................... 43
14.02 Progress Payments ...................................................................................................................................................... 43
14.03 Contractor’s Warranty of Title .................................................................................................................................... 45
14.04 Substantial Completion ............................................................................................................................................... 45
14.05 Partial Utilization ........................................................................................................................................................ 46
14.06 Final Inspection ........................................................................................................................................................... 46
14.07 Final Payment ............................................................................................................................................................. 46
14.08 Final Completion Delayed ........................................................................................................................................... 47
14.09 Waiver of Claims ......................................................................................................................................................... 47
ARTICLE 15 – SUSPENSION OF WORK AND TERMINATION ...................................................................................................... 48
15.01 Owner May Suspend Work .......................................................................................................................................... 48
15.02 Owner May Terminate for Cause ................................................................................................................................ 48
15.03 Owner May Terminate For Convenience..................................................................................................................... 49
15.04 Contractor May Stop Work or Terminate .................................................................................................................... 49
ARTICLE 16 – DISPUTE RESOLUTION – DELETE Entire Article. ................................................................................................... 49
16.01 Methods and Procedures ............................................................................................................................................. 49
ARTICLE 17 – MISCELLANEOUS ...................................................................................................................................................... 50
17.01 Giving Notice ............................................................................................................................................................... 50
17.02 Computation of Times .................................................................................................................................................. 50
17.03 Cumulative Remedies................................................................................................................................................... 50
17.04 Survival of Obligations ................................................................................................................................................ 50
17.05 Controlling Law........................................................................................................................................................... 50
17.06 Headings ...................................................................................................................................................................... 50
17.07 Resident Project Representative Responsibilities and Authority ................................................................................. 50
EJCDC C-700 Standard General Conditions of the Construction Contract
Copyright © 2007 National Society of Professional Engineers for EJCDC. All rights reserved.
Page 00700-5
9. Change Order—A document recommended
ARTICLE 1 – DEFINITIONS AND TERMINOLOGY by Engineer which is signed by Contractor
and Owner and authorizes an addition,
deletion, or revision in the Work or an
1.01 Defined Terms
adjustment in the Contract Price or the
Contract Times, issued on or after the
A. Wherever used in the Bidding Requirements or
Effective Date of the Agreement.
Contract Documents and printed with initial
capital letters, the terms listed below will have the
10. Claim—A demand or assertion by Owner or
meanings indicated which are applicable to both
Contractor seeking an adjustment of Contract
the singular and plural thereof. In addition to
Price or Contract Times, or both, or other
terms specifically defined, terms with initial
relief with respect to the terms of the Contract.
capital letters in the Contract Documents include
A demand for money or services by a third
references to identified articles and paragraphs,
party is not a Claim.
and the titles of other documents or forms.
1. Addenda—Written or graphic instruments 11. Contract—The entire and integrated written
issued prior to the opening of Bids which agreement between the Owner and Contractor
clarify, correct, or change the Bidding concerning the Work. The Contract
Requirements or the proposed Contract supersedes prior negotiations, representations,
Documents. or agreements, whether written or oral.
2. Agreement—The written instrument which is 12. Contract Documents—Those items so
evidence of the agreement between Owner designated in the Agreement. Only printed or
and Contractor covering the Work. hard copies of the items listed in the
Agreement are Contract Documents.
3. Application for Payment—The form Approved Shop Drawings, other Contractor
acceptable to Engineer which is to be submittals, and the reports and drawings of
used by Contractor during the course of the subsurface and physical conditions are not
Work in requesting progress or final payments Contract Documents.
and which is to be accompanied by such
supporting documentation as is required by 13. Contract Price—The moneys payable by
the Contract Documents. Owner to Contractor for completion of the
Work in accordance with the Contract
4. Asbestos—Any material that contains more Documents as stated in the Agreement
than one percent asbestos and is friable or is (subject to the provisions of Paragraph 11.03
releasing asbestos fibers into the air above in the case of Unit Price Work).
current action levels established by the United
States Occupational Safety and Health 14. Contract Times—The number of days or the
Administration. dates stated in the Agreement to: (i) achieve
Milestones, if any; (ii) achieve Substantial
5. Bid—The offer or proposal of a Bidder Completion; and (iii) complete the Work so
submitted on the prescribed form setting forth that it is ready for final payment as evidenced
the prices for the Work to be performed. by Engineer’s written recommendation of
final payment.
6. Bidder—The individual or entity who submits
a Bid directly to Owner. 15. Contractor—The individual or entity with
whom Owner has entered into the Agreement.
7. Bidding Documents—The Bidding
Requirements and the proposed Contract 16. Cost of the Work—See Paragraph 11.01 for
Documents (including all Addenda). definition.
8. Bidding Requirements—The advertisement or 17. Drawings—That part of the Contract
invitation to bid, Instructions to Bidders, Bid Documents prepared or approved by Engineer
security of acceptable form, if any, and the which graphically shows the scope, extent,
Bid Form with any supplements. and character of the Work to be performed by
Contractor. Shop Drawings and other
EJCDC C-700 Standard General Conditions of the Construction Contract
Copyright © 2007 National Society of Professional Engineers for EJCDC. All rights reserved.
Page 00700-6
Contractor submittals are not Drawings as so 28. Notice to Proceed—A written notice given by
defined. Owner to Contractor fixing the date on which
the Contract Times will commence to run and
18. Effective Date of the Agreement—The date on which Contractor shall start to perform the
indicated in the Agreement on which it Work under the Contract Documents.
becomes effective, but if no such date is
indicated, it means the date on which the 29. Owner—The individual or entity with whom
Agreement is signed and delivered by the last Contractor has entered into the Agreement
of the two parties to sign and deliver. and for whom the Work is to be performed.
19. Engineer—The individual or entity named as 30. PCBs—Polychlorinated biphenyls.
such in the Agreement.
31. Petroleum—Petroleum, including crude oil or
20. Field Order—A written order issued by any fraction thereof which is liquid at standard
Engineer which requires minor changes in the conditions of temperature and pressure (60
Work but which does not involve a change in degrees Fahrenheit and 14.7 pounds per
the Contract Price or the Contract Times. square inch absolute), such as oil, petroleum,
fuel oil, oil sludge, oil refuse, gasoline,
21. General Requirements—Sections of Division kerosene, and oil mixed with other non-
1 of the Specifications. Hazardous Waste and crude oils.
22. Hazardous Environmental Condition—The 32. Progress Schedule—A schedule, prepared
presence at the Site of Asbestos, PCBs, and maintained by Contractor, describing the
Petroleum, Hazardous Waste, or Radioactive sequence and duration of the activities
Material in such quantities or circumstances comprising the Contractor’s plan to
that may present a substantial danger to accomplish the Work within the Contract
persons or property exposed thereto. Times.
23. Hazardous Waste—The term Hazardous 33. Project—The total construction of which the
Waste shall have the meaning provided in Work to be performed under the Contract
Section 1004 of the Solid Waste Disposal Act Documents may be the whole, or a part.
(42 USC Section 6903) as amended from time
to time. *34. Project Manual—The bound documentary
information prepared for bidding and
24. Laws and Regulations; Laws or constructing the Work. A listing of the
Regulations—Any and all applicable laws, contents of the Project Manual, which may be
rules, regulations, ordinances, codes, and bound in one or more volumes, is contained in
orders of any and all governmental bodies, the table(s) of contents.
agencies, authorities, and courts having
jurisdiction. 35. Radioactive Material—Source, special
nuclear, or byproduct material as defined by
25. Liens—Charges, security interests, or the Atomic Energy Act of 1954 (42 USC
encumbrances upon Project funds, real Section 2011 et seq.) as amended from time to
property, or personal property. time.
26. Milestone—A principal event specified in the 36. Resident Project Representative—The
Contract Documents relating to an authorized representative of Engineer who
intermediate completion date or time prior to may be assigned to the Site or any part
Substantial Completion of all the Work. thereof.
27. Notice of Award—The written notice by 37. Samples—Physical examples of materials,
Owner to the Successful Bidder stating that equipment, or workmanship that are
upon timely compliance by the Successful representative of some portion of the Work
Bidder with the conditions precedent listed and which establish the standards by which
therein, Owner will sign and deliver the such portion of the Work will be judged.
Agreement.
EJCDC C-700 Standard General Conditions of the Construction Contract
Copyright © 2007 National Society of Professional Engineers for EJCDC. All rights reserved.
Page 00700-7
38. Schedule of Submittals—A schedule, 46. Supplementary Conditions—That part of
prepared and maintained by Contractor, of the Contract Documents which amends or
required submittals and the time requirements supplements these General Conditions.
to support scheduled performance of related
construction activities. 47. Supplier—A manufacturer, fabricator,
supplier, distributor, materialman, or vendor
39. Schedule of Values—A schedule, prepared having a direct contract with Contractor or
and maintained by Contractor, allocating with any Subcontractor to furnish materials or
portions of the Contract Price to various equipment to be incorporated in the Work by
portions of the Work and used as the basis for Contractor or Subcontractor.
reviewing Contractor’s Applications for
Payment. 48. Underground Facilities—All underground
pipelines, conduits, ducts, cables, wires,
40. Shop Drawings—All drawings, diagrams, manholes, vaults, tanks, tunnels, or other such
illustrations, schedules, and other data or facilities or attachments, and any encasements
information which are specifically prepared or containing such facilities, including those that
assembled by or for Contractor and submitted convey electricity, gases, steam, liquid
by Contractor to illustrate some portion of the petroleum products, telephone or other
Work. communications, cable television, water,
wastewater, storm water, other liquids or
41. Site—Lands or areas indicated in the Contract chemicals, or traffic or other control systems.
Documents as being furnished by Owner upon
which the Work is to be performed, including 49. Unit Price Work—Work to be paid for on the
rights-of-way and easements for access basis of unit prices.
thereto, and such other lands furnished by
Owner which are designated for the use of 50. Work—The entire construction or the various
Contractor. separately identifiable parts thereof required
to be provided under the Contract Documents.
42. Specifications—That part of the Contract Work includes and is the result of performing
Documents consisting of written requirements or providing all labor, services, and
for materials, equipment, systems, standards documentation necessary to produce such
and workmanship as applied to the Work, and construction, and furnishing, installing, and
certain administrative requirements and incorporating all materials and equipment into
procedural matters applicable thereto. such construction, all as required by the
Contract Documents.
43. Subcontractor—An individual or entity
having a direct contract with Contractor or 51. Work Change Directive—A written statement
with any other Subcontractor for the to Contractor issued on or after the Effective
performance of a part of the Work at the Site. Date of the Agreement and signed by Owner
and recommended by Engineer ordering an
44. Substantial Completion—The time at which addition, deletion, or revision in the Work, or
the Work (or a specified part thereof) has responding to differing or unforeseen
progressed to the point where, in the opinion subsurface or physical conditions under which
of Engineer, the Work (or a specified part the Work is to be performed or to
thereof) is sufficiently complete, in emergencies. A Work Change Directive will
accordance with the Contract Documents, so not change the Contract Price or the Contract
that the Work (or a specified part thereof) can Times but is evidence that the parties expect
be utilized for the purposes for which it is that the change ordered or documented by a
intended. The terms “substantially complete” Work Change Directive will be incorporated
and “substantially completed” as applied to all in a subsequently issued Change Order
or part of the Work refer to Substantial following negotiations by the parties as to its
Completion thereof. effect, if any, on the Contract Price or
Contract Times.
45. Successful Bidder—The Bidder submitting a
responsive Bid to whom Owner makes an 1.01.52 through 1.01.55.
award.
EJCDC C-700 Standard General Conditions of the Construction Contract
Copyright © 2007 National Society of Professional Engineers for EJCDC. All rights reserved.
Page 00700-8
1.02 Terminology c. has been damaged prior to
Engineer’s recommendation of final
A. The words and terms discussed in Paragraph payment (unless responsibility for
1.02.B through F are not defined but, when used the protection thereof has been
in the Bidding Requirements or Contract assumed by Owner at Substantial
Documents, have the indicated meaning. Completion in accordance with
Paragraph 14.04 or 14.05).
B. Intent of Certain Terms or Adjectives:
1. The Contract Documents include the terms E. Furnish, Install, Perform, Provide:
“as allowed,” “as approved,” “as ordered,” “as 1. The word “furnish,” when used in connection
directed” or terms of like effect or import to with services, materials, or equipment, shall
authorize an exercise of professional mean to supply and deliver said services,
judgment by Engineer. In addition, the materials, or equipment to the Site (or some
adjectives “reasonable,” “suitable,” other specified location) ready for use or
“acceptable,” “proper,” “satisfactory,” or installation and in usable or operable
adjectives of like effect or import are used to condition.
describe an action or determination of
Engineer as to the Work. It is intended that 2. The word “install,” when used in connection
such exercise of professional judgment, with services, materials, or equipment, shall
action, or determination will be solely to mean to put into use or place in final position
evaluate, in general, the Work for compliance said services, materials, or equipment
with the information in the Contract complete and ready for intended use.
Documents and with the design concept of the
Project as a functioning whole as shown or 3. The words “perform” or “provide,” when used
indicated in the Contract Documents (unless in connection with services, materials, or
there is a specific statement indicating equipment, shall mean to furnish and install
otherwise). The use of any such term or said services, materials, or equipment
adjective is not intended to and shall not be complete and ready for intended use.
effective to assign to Engineer any duty or
authority to supervise or direct the 4. When “furnish,” “install,” “perform,” or
performance of the Work, or any duty or “provide” is not used in connection with
authority to undertake responsibility contrary services, materials, or equipment in a context
to the provisions of Paragraph 9.09 or any clearly requiring an obligation of Contractor,
other provision of the Contract Documents. “provide” is implied.
C. Day: F. Unless stated otherwise in the Contract
1. The word “day” means a calendar day of 24 Documents, words or phrases that have a well-
hours measured from midnight to the next known technical or construction industry or trade
midnight. meaning are used in the Contract Documents in
accordance with such recognized meaning.
D. Defective:
ARTICLE 2 – PRELIMINARY MATTERS
1. The word “defective,” when modifying the
word “Work,” refers to Work that is
unsatisfactory, faulty, or deficient in that it: 2.01 Delivery of Bonds and Evidence of Insurance
a. does not conform to the Contract A. When Contractor delivers the executed
Documents; or counterparts of the Agreement to Owner,
Contractor shall also deliver to Owner such bonds
b. does not meet the requirements of as Contractor may be required to furnish.
any applicable inspection, reference
standard, test, or approval referred to B. Evidence of Insurance: Before any Work at the
in the Contract Documents; or Site is started, Contractor and Owner shall each
deliver to the other, with copies to each additional
insured identified in the Supplementary
EJCDC C-700 Standard General Conditions of the Construction Contract
Copyright © 2007 National Society of Professional Engineers for EJCDC. All rights reserved.
Page 00700-9
Conditions, certificates of insurance (and other performance of the Work. Such prices will
evidence of insurance which either of them or any include an appropriate amount of overhead
additional insured may reasonably request) which and profit applicable to each item of Work.
Contractor and Owner respectively are required to
purchase and maintain in accordance with
B.
Article 5.
2.06 Preconstruction Conference; Designation of
2.02 Copies of Documents
Authorized Representatives
A. Owner shall furnish to Contractor up to ten printed
A. Before any Work at the Site is started, a
or hard copies of the Drawings and Project
conference attended by Owner, Contractor,
Manual. Additional copies will be furnished upon
Engineer, and others as appropriate will be held to
request at the cost of reproduction.
establish a working understanding among the
parties as to the Work and to discuss the schedules
2.03 Commencement of Contract Times; Notice to Proceed referred to in Paragraph 2.05.A, procedures for
handling Shop Drawings and other submittals,
A. The Contract Times will commence to run on the processing Applications for Payment, and
thirtieth day after the Effective Date of the maintaining required records.
Agreement or, if a Notice to Proceed is given, on
the day indicated in the Notice to Proceed. A B. At this conference Owner and Contractor each
Notice to Proceed may be given at any time within shall designate, in writing, a specific individual to
30 days after the Effective Date of the Agreement. act as its authorized representative with respect to
In no event will the Contract Times commence to the services and responsibilities under the
run later than the sixtieth day after the day of Bid Contract. Such individuals shall have the
opening or the thirtieth day after the Effective authority to transmit instructions, receive
Date of the Agreement, whichever date is earlier. information, render decisions relative to the
Contract, and otherwise act on behalf of each
2.04 Starting the Work respective party.
A. Contractor shall start to perform the Work on the 2.07 Initial Acceptance of Schedules
date when the Contract Times commence to run.
No Work shall be done at the Site prior to the date A. At least 10 days before submission of the first
on which the Contract Times commence to run. Application for Payment a conference attended by
Contractor, Engineer, and others as appropriate
2.05 Before Starting Construction will be held to review for acceptability to
Engineer as provided below the schedules
A. Preliminary Schedules: Within 10 days after the submitted in accordance with Paragraph 2.05.A.
Effective Date of the Agreement (unless otherwise Contractor shall have an additional 10 days to
specified in the General Requirements), make corrections and adjustments and to complete
Contractor shall submit to Engineer for timely and resubmit the schedules. No progress payment
review: shall be made to Contractor until acceptable
1. a preliminary Progress Schedule indicating schedules are submitted to Engineer.
the times (numbers of days or dates) for 1. The Progress Schedule will be acceptable to
starting and completing the various stages of Engineer if it provides an orderly progression
the Work, including any Milestones specified of the Work to completion within the Contract
in the Contract Documents; Times. Such acceptance will not impose on
Engineer responsibility for the Progress
2. a preliminary Schedule of Submittals; and Schedule, for sequencing, scheduling, or
progress of the Work, nor interfere with or
3. a preliminary Schedule of Values for all of the relieve Contractor from Contractor’s full
Work which includes quantities and prices of responsibility therefor.
items which when added together equal the
Contract Price and subdivides the Work into 2. Contractor’s Schedule of Submittals will be
component parts in sufficient detail to serve as acceptable to Engineer if it provides a
the basis for progress payments during
EJCDC C-700 Standard General Conditions of the Construction Contract
Copyright © 2007 National Society of Professional Engineers for EJCDC. All rights reserved.
Page 00700-10
workable arrangement for reviewing and subcontractors, consultants, agents, or
processing the required submittals. employees, from those set forth in the
Contract Documents. No such provision or
3. Contractor’s Schedule of Values will be instruction shall be effective to assign to
acceptable to Engineer as to form and Owner, Engineer, or any of their officers,
substance if it provides a reasonable directors, members, partners,
allocation of the Contract Price to component employees, agents, consultants, or
parts of the Work. subcontractors, any duty or authority to
supervise or direct the performance of the
Work or any duty or authority to undertake
ARTICLE 3 – CONTRACT DOCUMENTS: INTENT, responsibility inconsistent with the provisions
AMENDING, REUSE of the Contract Documents.
3.01 Intent 3.03 Reporting and Resolving Discrepancies
A. The Contract Documents are complementary; A. Reporting Discrepancies:
what is required by one is as binding as if required
by all. 1. Contractor’s Review of Contract Documents
Before Starting Work: Before undertaking
B. It is the intent of the Contract Documents to each part of the Work, Contractor shall
describe a functionally complete project (or part carefully study and compare the Contract
thereof) to be constructed in accordance with the Documents and check and verify pertinent
Contract Documents. Any labor, documentation, figures therein and all applicable field
services, materials, or equipment that reasonably measurements. Contractor shall promptly
may be inferred from the Contract Documents or report in writing to Engineer any conflict,
from prevailing custom or trade usage as being error, ambiguity, or discrepancy which
required to produce the indicated result will be Contractor discovers, or has actual knowledge
provided whether or not specifically called for, at of, and shall obtain a written interpretation or
no additional cost to Owner. clarification from Engineer before proceeding
with any Work affected thereby.
C. Clarifications and interpretations of the Contract
Documents shall be issued by Engineer as 2. Contractor’s Review of Contract Documents
provided in Article 9. During Performance of Work: If, during the
performance of the Work, Contractor
3.02 Reference Standards discovers any conflict, error, ambiguity, or
discrepancy within the Contract Documents,
or between the Contract Documents and (a)
A. Standards, Specifications, Codes, Laws, and
any applicable Law or Regulation , (b) any
Regulations
standard, specification, manual, or code, or (c)
1. Reference to standards, specifications, any instruction of any Supplier, then
manuals, or codes of any technical society, Contractor shall promptly report it to
organization, or association, or to Laws or Engineer in writing. Contractor shall not
Regulations, whether such reference be proceed with the Work affected thereby
specific or by implication, shall mean the (except in an emergency as required by
standard, specification, manual, code, or Laws Paragraph 6.16.A) until an amendment or
or Regulations in effect at the time of opening supplement to the Contract Documents has
of Bids (or on the Effective Date of the been issued by one of the methods indicated
Agreement if there were no Bids), except as in Paragraph 3.04.
may be otherwise specifically stated in the
Contract Documents. 3. Contractor shall not be liable to Owner or
Engineer for failure to report any conflict,
2. No provision of any such standard, error, ambiguity, or discrepancy in the
specification, manual, or code, or any Contract Documents unless Contractor had
instruction of a Supplier, shall be effective to actual knowledge thereof.
change the duties or responsibilities of Owner,
Contractor, or Engineer, or any of their
EJCDC C-700 Standard General Conditions of the Construction Contract
Copyright © 2007 National Society of Professional Engineers for EJCDC. All rights reserved.
Page 00700-11
B. Resolving Discrepancies: 2. reuse any such Drawings, Specifications,
other documents, or copies thereof on
1. Except as may be otherwise specifically stated
extensions of the Project or any other project
in the Contract Documents, the provisions of
without written consent of Owner and
the Contract Documents shall take precedence
Engineer and specific written verification or
in resolving any conflict, error, ambiguity, or
adaptation by Engineer.
discrepancy between the provisions of the
Contract Documents and:
B. The prohibitions of this Paragraph 3.05 will
a. the provisions of any standard, survive final payment, or termination of the
specification, manual, or code, or the Contract. Nothing herein shall preclude
instruction of any Supplier (whether Contractor from retaining copies of the Contract
or not specifically incorporated by Documents for record purposes.
reference in the Contract
Documents); or 3.06 Electronic Data
b. the provisions of any Laws or
Regulations applicable to the A. Unless otherwise stated in the Supplementary
performance of the Work (unless Conditions, the data furnished by Owner or
such an interpretation of the Engineer to Contractor, or by Contractor to Owner
provisions of the Contract or Engineer, that may be relied upon are limited to
Documents would result in violation the printed copies (also known as hard copies).
of such Law or Regulation). Files in electronic media format of text, data,
graphics, or other types are furnished only for the
convenience of the receiving party. Any
3.04 Amending and Supplementing Contract Documents conclusion or information obtained or derived
from such electronic files will be at the user’s sole
A. The Contract Documents may be amended to risk. If there is a discrepancy between the
provide for additions, deletions, and revisions in electronic files and the hard copies, the hard
the Work or to modify the terms and conditions copies govern.
thereof by either a Change Order or a Work
Change Directive. B. Because data stored in electronic media format
can deteriorate or be modified inadvertently or
B. The requirements of the Contract Documents may otherwise without authorization of the data’s
be supplemented, and minor variations and creator, the party receiving electronic files agrees
deviations in the Work may be authorized, by one that it will perform acceptance tests or procedures
or more of the following ways: within 60 days, after which the receiving party
1. A Field Order; shall be deemed to have accepted the data thus
transferred. Any errors detected within the 60-day
2. Engineer’s approval of a Shop Drawing or acceptance period will be corrected by the
Sample (subject to the provisions of transferring party.
Paragraph 6.17.D.3); or
C. When transferring documents in electronic media
3. Engineer’s written interpretation or format, the transferring party makes no
clarification. representations as to long term compatibility,
usability, or readability of documents resulting
from the use of software application packages,
3.05 Reuse of Documents operating systems, or computer hardware differing
from those used by the data’s creator.
A. Contractor and any Subcontractor or Supplier
shall not:
1. have or acquire any title to or ownership
rights in any of the Drawings, Specifications,
or other documents (or copies of any thereof)
prepared by or bearing the seal of Engineer or
its consultants, including electronic media
editions; or
EJCDC C-700 Standard General Conditions of the Construction Contract
Copyright © 2007 National Society of Professional Engineers for EJCDC. All rights reserved.
Page 00700-12
ARTICLE 4 – AVAILABILITY OF LANDS; “technical data” is identified in the Supplementary
SUBSURFACE AND PHYSICAL Conditions. Except for such reliance on such
CONDITIONS; HAZARDOUS “technical data,” Contractor may not rely upon or
ENVIRONMENTAL CONDITIONS; make any claim against Owner or Engineer, or any
REFERENCE POINTS of their officers, directors, members, partners,
employees, agents, consultants, or subcontractors
4.01 Availability of Lands with respect to:
1. the completeness of such reports and drawings
A. Owner shall furnish the Site. Owner shall notify for Contractor’s purposes, including, but not
Contractor of any encumbrances or restrictions not limited to, any aspects of the means, methods,
of general application but specifically related to techniques, sequences, and procedures of
use of the Site with which Contractor must comply construction to be employed by Contractor,
in performing the Work. Owner will obtain in a and safety precautions and programs incident
timely manner and pay for easements for thereto; or
permanent structures or permanent changes in
existing facilities. If Contractor and Owner are 2. other data, interpretations, opinions, and
unable to agree on entitlement to or on the amount information contained in such reports or
or extent, if any, of any adjustment in the Contract shown or indicated in such drawings; or
Price or Contract Times, or both, as a result of any
delay in Owner’s furnishing the Site or a part 3. any Contractor interpretation of or conclusion
thereof, Contractor may make a Claim therefor as drawn from any “technical data” or any such
provided in Paragraph 10.05. other data, interpretations, opinions, or
information.
B. Upon reasonable written request, Owner shall
furnish Contractor with a current statement of
record legal title and legal description of the lands 4.03 Differing Subsurface or Physical Conditions
upon which the Work is to be performed and
Owner’s interest therein as necessary for giving A. Notice: If Contractor believes that any subsurface
notice of or filing a mechanic’s or construction or physical condition that is uncovered or revealed
lien against such lands in accordance with either:
applicable Laws and Regulations.
1. is of such a nature as to establish that any
C. Contractor shall provide for all additional lands “technical data” on which Contractor is
and access thereto that may be required for entitled to rely as provided in Paragraph 4.02
temporary construction facilities or storage of is materially inaccurate; or
materials and equipment.
2. is of such a nature as to require a change in
the Contract Documents; or
4.02 Subsurface and Physical Conditions
3. differs materially from that shown or indicated
A. Reports and Drawings: The Supplementary in the Contract Documents; or
Conditions identify:
1. those reports known to Owner of explorations 4. is of an unusual nature, and differs materially
and tests of subsurface conditions at or from conditions ordinarily encountered and
contiguous to the Site; and generally recognized as inherent in work of
the character provided for in the Contract
2. those drawings known to Owner of physical Documents; then Contractor shall, promptly
conditions relating to existing surface or after becoming aware thereof and before
subsurface structures at the Site (except further disturbing the subsurface or physical
Underground Facilities). conditions or performing any Work in
connection therewith (except in an emergency
as required by Paragraph 6.16.A), notify
B. Limited Reliance by Contractor on Technical Owner and Engineer in writing about such
Data Authorized: Contractor may rely upon the condition. Contractor shall not further disturb
accuracy of the “technical data” contained in such such condition or perform any Work in
reports and drawings, but such reports and
drawings are not Contract Documents. Such
EJCDC C-700 Standard General Conditions of the Construction Contract
Copyright © 2007 National Society of Professional Engineers for EJCDC. All rights reserved.
Page 00700-13
connection therewith (except as aforesaid) c. Contractor failed to give the written
until receipt of written order to do so. notice as required by Paragraph
4.03.A.
B. Engineer’s Review: After receipt of written notice 3. If Owner and Contractor are unable to agree
as required by Paragraph 4.03.A, Engineer will on entitlement to or on the amount or extent,
promptly review the pertinent condition, if any, of any adjustment in the Contract Price
determine the necessity of Owner’s obtaining or Contract Times, or both, a Claim may be
additional exploration or tests with respect made therefor as provided in Paragraph 10.05.
thereto, and advise Owner in writing (with a copy However, neither Owner or Engineer, or any
to Contractor) of Engineer’s findings and of their officers, directors, members, partners,
conclusions. employees, agents, consultants, or
subcontractors shall be liable to Contractor for
C. Possible Price and Times Adjustments: any claims, costs, losses, or damages
1. The Contract Price or the Contract Times, or (including but not limited to all fees and
both, will be equitably adjusted to the extent charges of engineers, architects, attorneys, and
that the existence of such differing subsurface other professionals and all court or arbitration
or physical condition causes an increase or or other dispute resolution costs) sustained by
decrease in Contractor’s cost of, or time Contractor on or in connection with any other
required for, performance of the Work; project or anticipated project.
subject, however, to the following:
a. such condition must meet any one 4.04 Underground Facilities
or more of the categories
described in Paragraph 4.03.A; and A. Shown or Indicated: The information and data
shown or indicated in the Contract Documents
b. with respect to Work that is paid with respect to existing Underground Facilities at
for on a unit price basis, any or contiguous to the Site is based on information
adjustment in Contract Price will be and data furnished to Owner or Engineer by the
subject to the provisions of owners of such Underground Facilities, including
Paragraphs 9.07 and 11.03. Owner, or by others. Unless it is otherwise
expressly provided in the Supplementary
2. Contractor shall not be entitled to any Conditions:
adjustment in the Contract Price or Contract
Times if: 1. Owner and Engineer shall not be responsible
for the accuracy or completeness of any such
a. Contractor knew of the existence of information or data provided by others; and
such conditions at the time
Contractor made a final commitment 2. the cost of all of the following will be
to Owner with respect to Contract included in the Contract Price, and Contractor
Price and Contract Times by the shall have full responsibility for:
submission of a Bid or becoming
bound under a negotiated contract; a. reviewing and checking all such
or information and data;
b. the existence of such condition could b. locating all Underground Facilities
reasonably have been discovered or shown or indicated in the Contract
revealed as a result of any Documents;
examination, investigation, c. coordination of the Work with the
exploration, test, or study of the Site owners of such Underground
and contiguous areas required by the Facilities, including Owner, during
Bidding Requirements or Contract construction; and
Documents to be conducted by or for
Contractor prior to Contractor’s
making such final commitment; or
EJCDC C-700 Standard General Conditions of the Construction Contract
Copyright © 2007 National Society of Professional Engineers for EJCDC. All rights reserved.
Page 00700-14
d. the safety and protection of all such 4.05 Reference Points
Underground Facilities and repairing
any damage thereto resulting from A. Owner shall provide engineering surveys to
the Work. establish reference points for construction which
in Engineer’s judgment are necessary to enable
3. Contractor to proceed with the Work. Contractor
shall be responsible for laying out the Work, shall
B. Not Shown or Indicated: protect and preserve the established reference
points and property monuments, and shall make
1. If an Underground Facility is uncovered or no changes or relocations without the prior written
revealed at or contiguous to the Site which approval of Owner. Contractor shall report to
was not shown or indicated, or not shown or Engineer whenever any reference point or
indicated with reasonable accuracy in the property monument is lost or destroyed or requires
Contract Documents, Contractor shall, relocation because of necessary changes in grades
promptly after becoming aware thereof and or locations, and shall be responsible for the
before further disturbing conditions affected accurate replacement or relocation of such
thereby or performing any Work in reference points or property monuments by
connection therewith (except in an emergency professionally qualified personnel.
as required by Paragraph 6.16.A), identify the
owner of such Underground Facility and give 4.06 Hazardous Environmental Condition at Site
written notice to that owner and to Owner and
Engineer. Engineer will promptly review the A. Reports and Drawings: The Supplementary
Underground Facility and determine the Conditions identify those reports and drawings
extent, if any, to which a change is required in known to Owner relating to Hazardous
the Contract Documents to reflect and Environmental Conditions that have been
document the consequences of the existence identified at the Site.
or location of the Underground Facility.
During such time, Contractor shall be B. Limited Reliance by Contractor on Technical
responsible for the safety and protection of Data Authorized: Contractor may rely upon the
such Underground Facility. accuracy of the “technical data” contained in such
reports and drawings, but such reports and
2. If Engineer concludes that a change in the drawings are not Contract Documents. Such
Contract Documents is required, a Work “technical data” is identified in the Supplementary
Change Directive or a Change Order will be Conditions. Except for such reliance on such
issued to reflect and document such “technical data,” Contractor may not rely upon or
consequences. An equitable adjustment shall make any claim against Owner or Engineer, or any
be made in the Contract Price or Contract of their officers, directors, members, partners,
Times, or both, to the extent that they are employees, agents, consultants, or subcontractors
attributable to the existence or location of any with respect to:
Underground Facility that was not shown or
indicated or not shown or indicated with 1. the completeness of such reports and drawings
reasonable accuracy in the Contract for Contractor’s purposes, including, but not
Documents and that Contractor did not know limited to, any aspects of the means, methods,
of and could not reasonably have been techniques, sequences and procedures of
expected to be aware of or to have construction to be employed by Contractor
anticipated. If Owner and Contractor are and safety precautions and programs incident
unable to agree on entitlement to or on the thereto; or
amount or extent, if any, of any such
adjustment in Contract Price or Contract 2. other data, interpretations, opinions and
Times, Owner or Contractor may make a information contained in such reports or
Claim therefor as provided in Paragraph shown or indicated in such drawings; or
10.05.
3. any Contractor interpretation of or conclusion
drawn from any “technical data” or any such
other data, interpretations, opinions or
information.
EJCDC C-700 Standard General Conditions of the Construction Contract
Copyright © 2007 National Society of Professional Engineers for EJCDC. All rights reserved.
Page 00700-15
C. Contractor shall not be responsible for any cannot agree as to entitlement to or on the amount
Hazardous Environmental Condition uncovered or or extent, if any, of an adjustment in Contract
revealed at the Site which was not shown or Price or Contract Times as a result of deleting
indicated in Drawings or Specifications or such portion of the Work, then either party may
identified in the Contract Documents to be within make a Claim therefor as provided in Paragraph
the scope of the Work. Contractor shall be 10.05. Owner may have such deleted portion of
responsible for a Hazardous Environmental the Work performed by Owner’s own forces or
Condition created with any materials brought to others in accordance with Article 7.
the Site by Contractor, Subcontractors, Suppliers,
or anyone else for whom Contractor is G. To the fullest extent permitted by Laws and
responsible. Regulations, Owner shall indemnify and hold
harmless Contractor, Subcontractors, and
D. If Contractor encounters a Hazardous Engineer, and the officers, directors, members,
Environmental Condition or if Contractor or partners, employees, agents, consultants, and
anyone for whom Contractor is responsible creates subcontractors of each and any of them from and
a Hazardous Environmental Condition, Contractor against all claims, costs, losses, and damages
shall immediately: (i) secure or otherwise isolate (including but not limited to all fees and charges
such condition; (ii) stop all Work in connection of engineers, architects, attorneys, and other
with such condition and in any area affected professionals and all court or arbitration or other
thereby (except in an emergency as required dispute resolution costs) arising out of or relating
by Paragraph 6.16.A); and (iii) notify Owner and to a Hazardous Environmental Condition,
Engineer (and promptly thereafter confirm such provided that such Hazardous Environmental
notice in writing). Owner shall promptly consult Condition: (i) was not shown or indicated in the
with Engineer concerning the necessity for Owner Drawings or Specifications or identified in the
to retain a qualified expert to evaluate such Contract Documents to be included within the
condition or take corrective action, if any. scope of the Work, and (ii) was not created by
Promptly after consulting with Engineer, Owner Contractor or by anyone for whom Contractor is
shall take such actions as are necessary to permit responsible. Nothing in this Paragraph 4.06.G
Owner to timely obtain required permits and shall obligate Owner to indemnify any individual
provide Contractor the written notice required by or entity from and against the consequences of
Paragraph 4.06.E. that individual’s or entity’s own negligence.
E. Contractor shall not be required to resume Work H. To the fullest extent permitted by Laws and
in connection with such condition or in any Regulations, Contractor shall indemnify and hold
affected area until after Owner has obtained any harmless Owner and Engineer, and the officers,
required permits related thereto and delivered directors, members, partners, employees, agents,
written notice to Contractor: (i) specifying that consultants, and subcontractors of each and any of
such condition and any affected area is or has them from and against all claims, costs, losses,
been rendered safe for the resumption of Work; or and damages (including but not limited to all fees
(ii) specifying any special conditions under which and charges of engineers, architects, attorneys,
such Work may be resumed safely. If Owner and other professionals and all court or arbitration
and Contractor cannot agree as to entitlement or other dispute resolution costs) arising out of or
to or on the amount or extent, if any, of any relating to a Hazardous Environmental Condition
adjustment in Contract Price or Contract Times, or created by Contractor or by anyone for whom
both, as a result of such Work stoppage or such Contractor is responsible. Nothing in this
special conditions under which Work is agreed to Paragraph 4.06.H shall obligate Contractor to
be resumed by Contractor, either party may make indemnify any individual or entity from and
a Claim therefor as provided in Paragraph 10.05. against the consequences of that individual’s or
entity’s own negligence.
F. If after receipt of such written notice Contractor
does not agree to resume such Work based on a I. The provisions of Paragraphs 4.02, 4.03, and 4.04
reasonable belief it is unsafe, or does not agree to do not apply to a Hazardous Environmental
resume such Work under such special conditions, Condition uncovered or revealed at the Site.
then Owner may order the portion of the Work
that is in the area affected by such condition to be
deleted from the Work. If Owner and Contractor
EJCDC C-700 Standard General Conditions of the Construction Contract
Copyright © 2007 National Society of Professional Engineers for EJCDC. All rights reserved.
Page 00700-16
ARTICLE 5 – BONDS AND INSURANCE the limits and coverages so required. Such surety
and insurance companies shall also meet such
5.01 Performance, Payment, and Other Bonds additional requirements and qualifications as may
be provided in the Supplementary Conditions.
A. Contractor shall furnish performance and payment
bonds, each in an amount at least equal to the 5.03 Certificates of Insurance
Contract Price as security for the faithful
performance and payment of all of Contractor’s A. Contractor shall deliver to Owner, with copies
obligations under the Contract Documents. These to each additional insured and loss payee
bonds shall remain in effect until one year after identified in the Supplementary Conditions,
the date when final payment becomes due or until certificates of insurance (and other evidence of
completion of the correction period specified in insurance requested by Owner or any other
Paragraph 13.07, whichever is later, except as additional insured) which Contractor is required to
provided otherwise by Laws or Regulations or by purchase and maintain.
the Contract Documents. Contractor shall also
furnish such other bonds as are required by the B. Owner shall deliver to Contractor, with copies
Contract Documents. to each additional insured and loss payee
identified in the Supplementary Conditions,
B. All bonds shall be in the form prescribed by the certificates of insurance (and other evidence of
Contract Documents except as provided otherwise insurance requested by Contractor or any other
by Laws or Regulations, and shall be executed by additional insured) which Owner is required to
such sureties as are named in the list of purchase and maintain.
“Companies Holding Certificates of Authority as
Acceptable Sureties on Federal Bonds and as C. Failure of Owner to demand such certificates or
Acceptable Reinsuring Companies” as published other evidence of Contractor's full compliance
in Circular 570 (amended) by the Financial with these insurance requirements or failure of
Management Service, Surety Bond Branch, U.S. Owner to identify a deficiency in compliance from
Department of the Treasury. All bonds signed by the evidence provided shall not be construed as a
an agent or attorney-in-fact must be accompanied waiver of Contractor’s obligation to maintain such
by a certified copy of that individual’s authority to insurance.
bind the surety. The evidence of authority shall
show that it is effective on the date the agent or D. Owner does not represent that insurance coverage
attorney-in-fact signed each bond. and limits established in this Contract necessarily
will be adequate to protect Contractor.
1.
E. The insurance and insurance limits required herein
C. If the surety on any bond furnished by Contractor shall not be deemed as a limitation on
is declared bankrupt or becomes insolvent or its Contractor’s liability under the indemnities
right to do business is terminated in any state granted to Owner in the Contract Documents.
where any part of the Project is located or it
ceases to meet the requirements of Paragraph 5.04 Contractor’s Insurance
5.01.B, Contractor shall promptly notify Owner
and Engineer and shall, within 20 days after the A. Contractor shall purchase and maintain such
event giving rise to such notification, provide insurance as is appropriate for the Work being
another bond and surety, both of which shall performed and as will provide protection from
comply with the requirements of Paragraphs claims set forth below which may arise out of or
5.01.B and 5.02. result from Contractor’s performance of the Work
and Contractor’s other obligations under the
5.02 Licensed Sureties and Insurers Contract Documents, whether it is to be performed
by Contractor, any Subcontractor or Supplier, or
A. All bonds and insurance required by the Contract by anyone directly or indirectly employed by any
Documents to be purchased and maintained by of them to perform any of the Work, or by anyone
Owner or Contractor shall be obtained from surety for whose acts any of them may be liable:
or insurance companies that are duly licensed or
authorized in the jurisdiction in which the Project
is located to issue bonds or insurance policies for
EJCDC C-700 Standard General Conditions of the Construction Contract
Copyright © 2007 National Society of Professional Engineers for EJCDC. All rights reserved.
Page 00700-17
1. claims under workers’ compensation, required by Laws or Regulations, whichever is
disability benefits, and other similar employee greater;
benefit acts;
3. include contractual liability insurance
2. claims for damages because of bodily injury, covering Contractor’s indemnity obligations
occupational sickness or disease, or death of under Paragraphs 6.11 and 6.20;
Contractor’s employees;
4. contain a provision or endorsement that
3. claims for damages because of bodily injury, the coverage afforded will not be
sickness or disease, or death of any person canceled, materially changed or renewal
other than Contractor’s employees; refused until at least 30 days prior written
notice has been given to Owner and
4. claims for damages insured by reasonably Contractor and to each other additional
available personal injury liability coverage insured identified in the Supplementary
which are sustained: Conditions to whom a certificate of insurance
has been issued (and the certificates of
a. by any person as a result of an insurance furnished by the Contractor
offense directly or indirectly related pursuant to Paragraph 5.03 will so provide);
to the employment of such person by
Contractor, or 5. remain in effect at least until final payment
and at all times thereafter when Contractor
b. by any other person for any other
may be correcting, removing, or replacing
reason;
defective Work in accordance with Paragraph
5. claims for damages, other than to the Work 13.07; and
itself, because of injury to or destruction of
tangible property wherever located, including 6. include completed operations coverage:
loss of use resulting therefrom; and
a. Such insurance shall remain in effect
for two years after final payment.
6. claims for damages because of bodily injury
or death of any person or property damage b. Contractor shall furnish Owner and
arising out of the ownership, maintenance or each other additional insured
use of any motor vehicle. identified in the Supplementary
Conditions, to whom a certificate of
B. The policies of insurance required by this insurance has been issued, evidence
Paragraph 5.04 shall: satisfactory to Owner and any such
additional insured of continuation of
1. with respect to insurance required by such insurance at final payment and
Paragraphs 5.04.A.3 through 5.04.A.6 one year thereafter.
inclusive, be written on an occurrence basis,
include as additional insureds (subject to any c.
customary exclusion regarding professional
liability) Owner and Engineer, and any other 5.05 Owner’s Liability Insurance
individuals or entities identified in the
Supplementary Conditions, all of whom shall A. In addition to the insurance required to be
be listed as additional insureds, and include provided by Contractor under Paragraph 5.04,
coverage for the respective officers, directors, Owner, at Owner’s option, may purchase and
members, partners, employees, agents, maintain at Owner’s expense Owner’s own
consultants, and subcontractors of each and liability insurance as will protect Owner against
any of all such additional insureds, and the claims which may arise from operations under the
insurance afforded to these additional insureds Contract Documents.
shall provide primary coverage for all claims
covered thereby;
5.06 Property Insurance
2. include at least the specific coverages and be
A. Unless otherwise provided in the Supplementary
written for not less than the limits of liability
Conditions, Owner shall purchase and maintain
provided in the Supplementary Conditions or
EJCDC C-700 Standard General Conditions of the Construction Contract
Copyright © 2007 National Society of Professional Engineers for EJCDC. All rights reserved.
Page 00700-18
property insurance upon the Work at the Site in B. Owner shall purchase and maintain such
the amount of the full replacement cost thereof equipment breakdown insurance or additional
(subject to such deductible amounts as may be property insurance as may be required by the
provided in the Supplementary Conditions or Supplementary Conditions or Laws and
required by Laws and Regulations). This Regulations which will include the interests of
insurance shall: Owner, Contractor, Subcontractors, and Engineer,
and any other individuals or entities identified in
1. include the interests of Owner, Contractor,
the Supplementary Conditions, and the officers,
Subcontractors, and Engineer, and any other
directors, members, partners, employees, agents,
individuals or entities identified in the
consultants and subcontractors of each and any of
Supplementary Conditions, and the officers,
them, each of whom is deemed to have an
directors, members, partners, employees,
insurable interest and shall be listed as a loss
agents, consultants, and subcontractors of
payee.
each and any of them, each of whom is
deemed to have an insurable interest and shall
C. All the policies of insurance (and the certificates
be listed as a loss payee;
or other evidence thereof) required to be
purchased and maintained in accordance with this
2. be written on a Builder’s Risk “all-risk”
Paragraph 5.06 will contain a provision or
policy form that shall at least include
endorsement that the coverage afforded will not
insurance for physical loss or damage to the
be canceled or materially changed or renewal
Work, temporary buildings, falsework, and
refused until at least 30 days prior written notice
materials and equipment in transit, and shall
has been given to Owner and Contractor and to
insure against at least the following perils or
each other loss payee to whom a certificate of
causes of loss: fire, lightning, extended
insurance has been issued and will contain waiver
coverage, theft, vandalism and malicious
provisions in accordance with Paragraph 5.07.
mischief, earthquake, collapse, debris
removal, demolition occasioned by
D. Owner shall not be responsible for purchasing and
enforcement of Laws and Regulations, water
maintaining any property insurance specified in
damage (other than that caused by flood), and
this Paragraph 5.06 to protect the interests of
such other perils or causes of loss as may be
Contractor, Subcontractors, or others in the Work
specifically required by the Supplementary
to the extent of any deductible amounts that are
Conditions.
identified in the Supplementary Conditions. The
risk of loss within such identified deductible
3. include expenses incurred in the repair or
amount will be borne by Contractor,
replacement of any insured property
Subcontractors, or others suffering any such loss,
(including but not limited to fees and charges
and if any of them wishes property insurance
of engineers and architects);
coverage within the limits of such amounts, each
may purchase and maintain it at the purchaser’s
4. cover materials and equipment stored at the
own expense.
Site or at another location that was agreed to
in writing by Owner prior to being
E. If Contractor requests in writing that other
incorporated in the Work, provided that such
special insurance be included in the property
materials and equipment have been included
insurance policies provided under this Paragraph
in an Application for Payment recommended
5.06, Owner shall, if possible, include such
by Engineer;
insurance, and the cost thereof will be charged to
Contractor by appropriate Change Order. Prior to
5. allow for partial utilization of the Work by
commencement of the Work at the Site, Owner
Owner;
shall in writing advise Contractor whether or not
such other insurance has been procured by Owner.
6. include testing and startup; and
7. be maintained in effect until final payment is 5.07 Waiver of Rights
made unless otherwise agreed to in writing by
Owner, Contractor, and Engineer with 30 days A. Owner and Contractor intend that all policies
written notice to each other loss payee to purchased in accordance with Paragraph 5.06 will
whom a certificate of insurance has been protect Owner, Contractor, Subcontractors, and
issued. Engineer, and all other individuals or entities
EJCDC C-700 Standard General Conditions of the Construction Contract
Copyright © 2007 National Society of Professional Engineers for EJCDC. All rights reserved.
Page 00700-19
identified in the Supplementary Conditions as loss C. Any insurance policy maintained by Owner
payees (and the officers, directors, members, covering any loss, damage or consequential loss
partners, employees, agents, consultants, and referred to in Paragraph 5.07.B shall contain
subcontractors of each and any of them) in such provisions to the effect that in the event of
policies and will provide primary coverage for all payment of any such loss, damage, or
losses and damages caused by the perils or causes consequential loss, the insurers will have no rights
of loss covered thereby. All such policies shall of recovery against Contractor, Subcontractors, or
contain provisions to the effect that in the event of Engineer, and the officers, directors, members,
payment of any loss or damage the insurers will partners, employees, agents, consultants and
have no rights of recovery against any of the subcontractors of each and any of them.
insureds or loss payees thereunder. Owner and
Contractor waive all rights against each other and 5.08 Receipt and Application of Insurance Proceeds
their respective officers, directors, members,
partners, employees, agents, consultants and A. Any insured loss under the policies of insurance
subcontractors of each and any of them for all required by Paragraph 5.06 will be adjusted with
losses and damages caused by, arising out of or Owner and made payable to Owner as fiduciary
resulting from any of the perils or causes of loss for the loss payees, as their interests may appear,
covered by such policies and any other property subject to the requirements of any applicable
insurance applicable to the Work; and, in addition, mortgage clause and of Paragraph 5.08.B. Owner
waive all such rights against Subcontractors and shall deposit in a separate account any money so
Engineer, and all other individuals or entities received and shall distribute it in accordance with
identified in the Supplementary Conditions as loss such agreement as the parties in interest may
payees (and the officers, directors, members, reach. If no other special agreement is reached,
partners, employees, agents, consultants, and the damaged Work shall be repaired or replaced,
subcontractors of each and any of them) under the moneys so received applied on account
such policies for losses and damages so caused. thereof, and the Work and the cost thereof
None of the above waivers shall extend to the covered by an appropriate Change Order.
rights that any party making such waiver may have
to the proceeds of insurance held by Owner as B. Owner as fiduciary shall have power to adjust and
trustee or otherwise payable under any policy so settle any loss with the insurers unless one of the
issued. parties in interest shall object in writing within 15
days after the occurrence of loss to Owner’s
B. Owner waives all rights against Contractor, exercise of this power. If such objection be made,
Subcontractors, and Engineer, and the officers, Owner as fiduciary shall make settlement with the
directors, members, partners, employees, agents, insurers in accordance with such agreement as the
consultants and subcontractors of each and any of parties in interest may reach. If no such agreement
them for: among the parties in interest is reached, Owner as
1. loss due to business interruption, loss of use, fiduciary shall adjust and settle the loss with the
or other consequential loss extending beyond insurers and, if required in writing by any party in
direct physical loss or damage to Owner’s interest, Owner as fiduciary shall give bond for the
property or the Work caused by, arising out proper performance of such duties.
of, or resulting from fire or other perils
whether or not insured by Owner; and 5.09 Acceptance of Bonds and Insurance; Option to
Replace
2. loss or damage to the completed Project or
part thereof caused by, arising out of, or A. If either Owner or Contractor has any objection to
resulting from fire or other insured peril or the coverage afforded by or other provisions of
cause of loss covered by any property the bonds or insurance required to be purchased
insurance maintained on the completed and maintained by the other party in accordance
Project or part thereof by Owner during with Article 5 on the basis of non-conformance
partial utilization pursuant to Paragraph with the Contract Documents, the objecting party
14.05, after Substantial Completion pursuant shall so notify the other party in writing within 10
to Paragraph 14.04, or after final payment days after receipt of the certificates (or other
pursuant to Paragraph 14.07. evidence requested) required by Paragraph
2.01.B. Owner and Contractor shall each provide
to the other such additional information in respect
EJCDC C-700 Standard General Conditions of the Construction Contract
Copyright © 2007 National Society of Professional Engineers for EJCDC. All rights reserved.
Page 00700-20
of insurance provided as the other may reasonably written notice to Owner and Engineer except
request. If either party does not purchase or under extraordinary circumstances.
maintain all of the bonds and insurance required
of such party by the Contract Documents, such 6.02 Labor; Working Hours
party shall notify the other party in writing of such
failure to purchase prior to the start of the Work, A. Contractor shall provide competent, suitably
or of such failure to maintain prior to any change qualified personnel to survey and lay out the Work
in the required coverage. Without prejudice to any and perform construction as required by the
other right or remedy, the other party may elect to Contract Documents. Contractor shall at all times
obtain equivalent bonds or insurance to protect maintain good discipline and order at the Site.
such other party’s interests at the expense of the
party who was required to provide such coverage, B. Except as otherwise required for the safety or
and a Change Order shall be issued to adjust the protection of persons or the Work or property at
Contract Price accordingly. the Site or adjacent thereto, and except as
otherwise stated in the Contract Documents, all
5.10 Partial Utilization, Acknowledgment of Property Work at the Site shall be performed during regular
Insurer working hours. Contractor will not permit the
performance of Work on a Saturday, Sunday, or
A. If Owner finds it necessary to occupy or use a any legal holiday without Owner’s written consent
portion or portions of the Work prior to (which will not be unreasonably withheld) given
Substantial Completion of all the Work as after prior written notice to Engineer.
provided in Paragraph 14.05, no such use or
1. and 2.
occupancy shall commence before the insurers
providing the property insurance pursuant to
Paragraph 5.06 have acknowledged notice thereof 6.03 Services, Materials, and Equipment
and in writing effected any changes in coverage
necessitated thereby. The insurers providing the A. Unless otherwise specified in the Contract
property insurance shall consent by endorsement Documents, Contractor shall provide and assume
on the policy or policies, but the property full responsibility for all services, materials,
insurance shall not be canceled or permitted to equipment, labor, transportation, construction
lapse on account of any such partial use or equipment and machinery, tools, appliances, fuel,
occupancy. power, light, heat, telephone, water, sanitary
facilities, temporary facilities, and all other
facilities and incidentals necessary for the
ARTICLE 6 – CONTRACTOR’S RESPONSIBILITIES
performance, testing, start-up, and completion of
the Work.
6.01 Supervision and Superintendence
B. All materials and equipment incorporated into the
A. Contractor shall supervise, inspect, and direct the Work shall be as specified or, if not specified,
Work competently and efficiently, devoting such shall be of good quality and new, except as
attention thereto and applying such skills and otherwise provided in the Contract Documents.
expertise as may be necessary to perform the All special warranties and guarantees required by
Work in accordance with the Contract Documents. the Specifications shall expressly run to the
Contractor shall be solely responsible for the benefit of Owner. If required by Engineer,
means, methods, techniques, sequences, and Contractor shall furnish satisfactory evidence
procedures of construction. Contractor shall not (including reports of required tests) as to the
be responsible for the negligence of Owner or source, kind, and quality of materials and
Engineer in the design or specification of a equipment.
specific means, method, technique, sequence, or
procedure of construction which is shown or C. All materials and equipment shall be stored,
indicated in and expressly required by the applied, installed, connected, erected, protected,
Contract Documents. used, cleaned, and conditioned in accordance with
instructions of the applicable Supplier, except as
B. At all times during the progress of the Work, otherwise may be provided in the Contract
Contractor shall assign a competent resident Documents.
superintendent who shall not be replaced without
EJCDC C-700 Standard General Conditions of the Construction Contract
Copyright © 2007 National Society of Professional Engineers for EJCDC. All rights reserved.
Page 00700-21
6.04 Progress Schedule a. in the exercise of reasonable
judgment Engineer determines that:
A. Contractor shall adhere to the Progress Schedule
1) it is at least equal in
established in accordance with Paragraph 2.07 as
materials of construction,
it may be adjusted from time to time as provided
quality, durability, appearance,
below.
strength, and design
1. Contractor shall submit to Engineer for characteristics;
acceptance (to the extent indicated in
2) it will reliably perform at least
Paragraph 2.07) proposed adjustments in the
equally well the function and
Progress Schedule that will not result in
achieve the results imposed by
changing the Contract Times. Such
the design concept of the
adjustments will comply with any provisions
completed Project as a
of the General Requirements applicable
functioning whole; and
thereto.
3) it has a proven record of
2. Proposed adjustments in the Progress performance and availability of
Schedule that will change the Contract Times responsive service.
shall be submitted in accordance with the
requirements of Article 12. Adjustments in b. Contractor certifies that, if approved
Contract Times may only be made by a and incorporated into the Work:
Change Order. 1) there will be no increase in cost
to the Owner or increase in
Contract Times; and
6.05 Substitutes and “Or-Equals” – Delete ALL
paragraphs and replace with new A. – L. 2) it will conform substantially to
the detailed requirements of the
A. Whenever an item of material or equipment is item named in the Contract
specified or described in the Contract Documents Documents.
by using the name of a proprietary item or the
name of a particular Supplier, the specification or 2. Substitute Items:
description is intended to establish the type,
function, appearance, and quality required. Unless a. If in Engineer’s sole discretion an
the specification or description contains or is item of material or equipment
followed by words reading that no like, proposed by Contractor does not
equivalent, or “or-equal” item or no substitution is qualify as an “or-equal” item under
permitted, other items of material or equipment or Paragraph 6.05.A.1, it will be
material or equipment of other Suppliers may be considered a proposed substitute
submitted to Engineer for review under the item.
circumstances described below. b. Contractor shall submit sufficient
1. “Or-Equal” Items: If in Engineer’s sole information as provided below to
discretion an item of material or allow Engineer to determine if the
equipment proposed by Contractor is item of material or equipment
functionally equal to that named and proposed is essentially equivalent to
sufficiently similar so that no change in that named and an acceptable
related Work will be required, it may be substitute therefor. Requests for
considered by Engineer as an “or-equal” item, review of proposed substitute items
in which case review and approval of the of material or equipment will not be
proposed item may, in Engineer’s sole accepted by Engineer from anyone
discretion, be accomplished without other than Contractor.
compliance with some or all of the
c. The requirements for review by
requirements for approval of proposed
Engineer will be as set forth in
substitute items. For the purposes of this
Paragraph 6.05.A.2.d, as
Paragraph 6.05.A.1, a proposed item of
supplemented by the General
material or equipment will be considered
Requirements, and as Engineer may
functionally equal to an item so named if:
EJCDC C-700 Standard General Conditions of the Construction Contract
Copyright © 2007 National Society of Professional Engineers for EJCDC. All rights reserved.
Page 00700-22
decide is appropriate under the substitute item, including costs
circumstances. of redesign and claims of other
contractors affected by any
d. Contractor shall make written resulting change.
application to Engineer for review of
a proposed substitute item of
material or equipment that B. Substitute Construction Methods or Procedures:
Contractor seeks to furnish or use. If a specific means, method, technique, sequence,
The application: or procedure of construction is expressly required
by the Contract Documents, Contractor may
1) shall certify that the proposed furnish or utilize a substitute means, method,
substitute item will: technique, sequence, or procedure of construction
a) perform adequately the approved by Engineer. Contractor shall submit
functions and achieve the sufficient information to allow Engineer, in
results called for by the Engineer’s sole discretion, to determine that the
general design, substitute proposed is equivalent to that expressly
b) be similar in substance to called for by the Contract Documents. The
that specified, and c) be requirements for review by Engineer will be
suited to the same use as similar to those provided in Paragraph 6.05.A.2.
that specified;
C. Engineer’s Evaluation: Engineer will be allowed
2) will state:
a reasonable time within which to evaluate each
a) the extent, if any, to which proposal or submittal made pursuant to
the use of the proposed Paragraphs 6.05.A and 6.05.B. Engineer may
substitute item will require Contractor to furnish additional data about
prejudice Contractor’s the proposed substitute item. Engineer will be the
achievement of Substantial sole judge of acceptability. No “or equal” or
Completion on time, substitute will be ordered, installed or utilized
b) whether use of the until Engineer’s review is complete, which will be
proposed substitute item in evidenced by a Change Order in the case of a
the Work will require a substitute and an approved Shop Drawing for an
change in any of the “or equal.” Engineer will advise Contractor in
Contract Documents (or in writing of any negative determination.
the provisions of any other
direct contract with Owner D. Special Guarantee: Owner may require
for other work on the Contractor to furnish at Contractor’s expense a
Project) to adapt the design special performance guarantee or other surety with
to the proposed substitute respect to any substitute.
item, and
c) whether incorporation or E. Engineer’s Cost Reimbursement: Engineer will
use of the proposed record Engineer’s costs in evaluating a substitute
substitute item in proposed or submitted by Contractor pursuant to
connection with the Work Paragraphs 6.05.A.2 and 6.05.B. Whether or not
is subject to payment of Engineer approves a substitute so proposed or
any license fee or royalty; submitted by Contractor, Contractor shall
3) will identify: reimburse Owner for the reasonable charges of
Engineer for evaluating each such proposed
a) all variations of the
substitute. Contractor shall also reimburse Owner
proposed substitute item
for the reasonable charges of Engineer for making
from that specified, and
changes in the Contract Documents (or in the
b) available engineering, sales,
provisions of any other direct contract with
maintenance, repair, and
Owner) resulting from the acceptance of each
replacement services; and
proposed substitute.
4) shall contain an itemized
estimate of all costs or credits F. Contractor’s Expense: Contractor shall provide
that will result directly or all data in support of any proposed substitute or
indirectly from use of such “or-equal” at Contractor’s expense.
EJCDC C-700 Standard General Conditions of the Construction Contract
Copyright © 2007 National Society of Professional Engineers for EJCDC. All rights reserved.
Page 00700-23
6.06 Concerning Subcontractors, Suppliers, and Others Subcontractor, Supplier, or other individual or
entity except as may otherwise be required by
A. Contractor shall not employ any Subcontractor, Laws and Regulations.
Supplier, or other individual or entity (including
those acceptable to Owner as indicated in
D. Contractor shall be solely responsible for
Paragraph 6.06.B), whether initially or as a
scheduling and coordinating the Work of
replacement, against whom Owner may have
Subcontractors, Suppliers, and other individuals
reasonable objection. Contractor shall not be
or entities performing or furnishing any of the
required to employ any Subcontractor, Supplier,
Work under a direct or indirect contract with
or other individual or entity to furnish or perform
Contractor.
any of the Work against whom Contractor has
reasonable objection.
E. Contractor shall require all Subcontractors,
Suppliers, and such other individuals or entities
B. If the Supplementary Conditions require the
performing or furnishing any of the Work to
identity of certain Subcontractors, Suppliers, or
communicate with Engineer through Contractor.
other individuals or entities to be submitted to
Owner in advance for acceptance by Owner by a
F. The divisions and sections of the Specifications
specified date prior to the Effective Date of the
and the identifications of any Drawings shall not
Agreement, and if Contractor has submitted a list
control Contractor in dividing the Work among
thereof in accordance with the Supplementary
Subcontractors or Suppliers or delineating the
Conditions, Owner’s acceptance (either in writing
Work to be performed by any specific trade.
or by failing to make written objection thereto by
the date indicated for acceptance or objection in
G. All Work performed for Contractor by a
the Bidding Documents or the Contract
Subcontractor or Supplier will be pursuant to an
Documents) of any such Subcontractor, Supplier,
appropriate agreement between Contractor and the
or other individual or entity so identified may be
Subcontractor or Supplier which specifically binds
revoked on the basis of reasonable objection after
the Subcontractor or Supplier to the applicable
due investigation. Contractor shall submit an
terms and conditions of the Contract Documents
acceptable replacement for the rejected
for the benefit of Owner and Engineer. Whenever
Subcontractor, Supplier, or other individual or
any such agreement is with a Subcontractor or
entity, and the Contract Price will be adjusted by
Supplier who is listed as a loss payee on the
the difference in the cost occasioned by such
property insurance provided in Paragraph 5.06,
replacement, and an appropriate Change Order
the agreement between the Contractor and the
will be issued. No acceptance by Owner of any
Subcontractor or Supplier will contain provisions
such Subcontractor, Supplier, or other individual
whereby the Subcontractor or Supplier waives all
or entity, whether initially or as a replacement,
rights against Owner, Contractor, Engineer, and
shall constitute a waiver of any right of Owner or
all other individuals or entities identified in the
Engineer to reject defective Work.
Supplementary Conditions to be listed as insureds
or loss payees (and the officers, directors,
C. Contractor shall be fully responsible to Owner and
members, partners, employees, agents,
Engineer for all acts and omissions of the
consultants, and subcontractors of each and any of
Subcontractors, Suppliers, and other individuals
them) for all losses and damages caused by,
or entities performing or furnishing any of the
arising out of, relating to, or resulting from any of
Work just as Contractor is responsible for
the perils or causes of loss covered by such
Contractor’s own acts and omissions. Nothing in
policies and any other property insurance
the Contract Documents:
applicable to the Work. If the insurers on any such
1. shall create for the benefit of any such policies require separate waiver forms to be
Subcontractor, Supplier, or other individual or signed by any Subcontractor or Supplier,
entity any contractual relationship between Contractor will obtain the same.
Owner or Engineer and any such
1.
Subcontractor, Supplier or other individual or
entity; nor
2. shall create any obligation on the part of
Owner or Engineer to pay or to see to the
payment of any moneys due any such
EJCDC C-700 Standard General Conditions of the Construction Contract
Copyright © 2007 National Society of Professional Engineers for EJCDC. All rights reserved.
Page 00700-24
6.07 Patent Fees and Royalties 6.08 Permits
A. Contractor shall pay all license fees and royalties A. Unless otherwise provided in the Supplementary
and assume all costs incident to the use in the Conditions, Contractor shall obtain and pay for all
performance of the Work or the incorporation in construction permits and licenses. Owner shall
the Work of any invention, design, process, assist Contractor, when necessary, in obtaining
product, or device which is the subject of patent such permits and licenses. Contractor shall pay all
rights or copyrights held by others. If a particular governmental charges and inspection fees
invention, design, process, product, or device is necessary for the prosecution of the Work which
specified in the Contract Documents for use in the are applicable at the time of opening of Bids, or, if
performance of the Work and if, to the actual there are no Bids, on the Effective Date of the
knowledge of Owner or Engineer, its use is Agreement. Owner shall pay all charges of utility
subject to patent rights or copyrights calling for owners for connections for providing permanent
the payment of any license fee or royalty to others, service to the Work.
the existence of such rights shall be disclosed by
Owner in the Contract Documents. B.
B. To the fullest extent permitted by Laws and 6.09 Laws and Regulations
Regulations, Owner shall indemnify and hold
harmless Contractor, and its officers, directors, A. Contractor shall give all notices required by and
members, partners, employees, agents, shall comply with all Laws and Regulations
consultants, and subcontractors from and applicable to the performance of the Work. Except
against all claims, costs, losses, and damages where otherwise expressly required by applicable
(including but not limited to all fees and charges Laws and Regulations, neither Owner nor
of engineers, architects, attorneys, and other Engineer shall be responsible for monitoring
professionals, and all court or arbitration or other Contractor’s compliance with any Laws or
dispute resolution costs) arising out of or relating Regulations.
to any infringement of patent rights or copyrights
incident to the use in the performance of the Work 1 – 7.
or resulting from the incorporation in the Work of
any invention, design, process, product, or device B. If Contractor performs any Work knowing or
specified in the Contract Documents, but not having reason to know that it is contrary to Laws
identified as being subject to payment of any or Regulations, Contractor shall bear all claims,
license fee or royalty to others required by patent costs, losses, and damages (including but not
rights or copyrights. limited to all fees and charges of engineers,
architects, attorneys, and other professionals and
C. To the fullest extent permitted by Laws and all court or arbitration or other dispute resolution
Regulations, Contractor shall indemnify and hold costs) arising out of or relating to such Work.
harmless Owner and Engineer, and the officers, However, it shall not be Contractor’s
directors, members, partners, employees, agents, responsibility to make certain that the
consultants and subcontractors of each and any of Specifications and Drawings are in accordance
them from and against all claims, costs, losses, with Laws and Regulations, but this shall not
and damages (including but not limited to all fees relieve Contractor of Contractor’s obligations
and charges of engineers, architects, attorneys, under Paragraph 3.03.
and other professionals and all court or arbitration
or other dispute resolution costs) arising out of or C. Changes in Laws or Regulations not known at the
relating to any infringement of patent rights or time of opening of Bids (or, on the Effective Date
copyrights incident to the use in the performance of the Agreement if there were no Bids) having an
of the Work or resulting from the incorporation in effect on the cost or time of performance of the
the Work of any invention, design, process, Work shall be the subject of an adjustment in
product, or device not specified in the Contract Contract Price or Contract Times. If Owner and
Documents. Contractor are unable to agree on entitlement to or
on the amount or extent, if any, of any such
adjustment, a Claim may be made therefor as
provided in Paragraph 10.05.
EJCDC C-700 Standard General Conditions of the Construction Contract
Copyright © 2007 National Society of Professional Engineers for EJCDC. All rights reserved.
Page 00700-25
6.10 Taxes and other debris. Removal and disposal of such
waste materials, rubbish, and other debris shall
A. Contractor shall pay all sales, consumer, use, and conform to applicable Laws and Regulations.
other similar taxes required to be paid by
Contractor in accordance with the Laws and C. Cleaning: Prior to Substantial Completion of the
Regulations of the place of the Project which are Work Contractor shall clean the Site and the Work
applicable during the performance of the Work. and make it ready for utilization by Owner. At the
completion of the Work Contractor shall remove
6.11 Use of Site and Other Areas from the Site all tools, appliances, construction
equipment and machinery, and surplus materials
A. Limitation on Use of Site and Other Areas: and shall restore to original condition all property
not designated for alteration by the Contract
1. Contractor shall confine construction Documents.
equipment, the storage of materials and
equipment, and the operations of workers to D. Loading Structures: Contractor shall not load nor
the Site and other areas permitted by Laws permit any part of any structure to be loaded in
and Regulations, and shall not unreasonably any manner that will endanger the structure, nor
encumber the Site and other areas with shall Contractor subject any part of the Work or
construction equipment or other materials or adjacent property to stresses or pressures that will
equipment. Contractor shall assume full endanger it.
responsibility for any damage to any such land
or area, or to the owner or occupant thereof, 1. & 2.
or of any adjacent land or areas resulting from
the performance of the Work.
6.12 Record Documents
2. Should any claim be made by any such owner
A. Contractor shall maintain in a safe place at the
or occupant because of the performance of the
Site one record copy of all Drawings,
Work, Contractor shall promptly settle with
Specifications, Addenda, Change Orders, Work
such other party by negotiation or otherwise
Change Directives, Field Orders, and written
resolve the claim by arbitration or other
interpretations and clarifications in good order and
dispute resolution proceeding or at law.
annotated to show changes made during
construction. These record documents together
3. To the fullest extent permitted by Laws and
with all approved Samples and a counterpart of all
Regulations, Contractor shall indemnify and
approved Shop Drawings will be available to
hold harmless Owner and Engineer, and the
Engineer for reference. Upon completion of the
officers, directors, members, partners,
Work, these record documents, Samples, and
employees, agents, consultants and
Shop Drawings will be delivered to Engineer for
subcontractors of each and any of them from
Owner.
and against all claims, costs, losses, and
damages (including but not limited to all fees
and charges of engineers, architects, attorneys, 6.13 Safety and Protection
and other professionals and all court or
arbitration or other dispute resolution costs) A. Contractor shall be solely responsible for
arising out of or relating to any claim or initiating, maintaining and supervising all safety
action, legal or equitable, brought by any such precautions and programs in connection with
owner or occupant against Owner, Engineer, the Work. Such responsibility does not relieve
or any other party indemnified hereunder to Subcontractors of their responsibility for the
the extent caused by or based upon safety of persons or property in the performance
Contractor’s performance of the Work. of their work, nor for compliance with
applicable safety Laws and Regulations.
4. Contractor shall take all necessary precautions
for the safety of, and shall provide the necessary
protection to prevent damage, injury or loss to:
B. Removal of Debris During Performance of the
Work: During the progress of the Work 1. all persons on the Site or who may be affected
Contractor shall keep the Site and other areas free by the Work;
from accumulations of waste materials, rubbish,
EJCDC C-700 Standard General Conditions of the Construction Contract
Copyright © 2007 National Society of Professional Engineers for EJCDC. All rights reserved.
Page 00700-26
2. all the Work and materials and equipment to Contractor’s duties and responsibilities for safety
F.
be incorporated therein, whether in storage on and for protection of the Work shall continue until
or off the Site; and such time as all the Work is completed and
Engineer has issued a notice to Owner and
3. other property at the Site or adjacent Contractor in accordance with Paragraph 14.07.B
thereto, including trees, shrubs, lawns, that the Work is acceptable (except as otherwise
walks, pavements, roadways, structures, expressly provided in connection with Substantial
utilities, and Underground Facilities not Completion). The contractor shall submit their
designated for removal, relocation, or company's safety plan.
replacement in the course of construction. 6.14 Safety Representative
B. Contractor shall comply with all applicable Laws A. Contractor shall designate a qualified and
and Regulations relating to the safety of persons experienced safety representative at the Site
or property, or to the protection of persons or whose duties and responsibilities shall be the
property from damage, injury, or loss; and shall prevention of accidents and the maintaining and
erect and maintain all necessary safeguards for supervising of safety precautions and programs.
such safety and protection. Contractor shall notify
owners of adjacent property and of Underground 6.15 Hazard Communication Programs
Facilities and other utility owners when
prosecution of the Work may affect them, and A. Contractor shall be responsible for coordinating
shall cooperate with them in the protection, any exchange of material safety data sheets or
removal, relocation, and replacement of their other hazard communication information required
property. to be made available to or exchanged between or
among employers at the Site in accordance with
C. Contractor shall comply with the applicable Laws or Regulations.
requirements of Owner’s safety programs, if any.
The Supplementary Conditions identify any 6.16 Emergencies
Owner’s safety programs that are applicable to the
Work. A. In emergencies affecting the safety or protection
of persons or the Work or property at the Site or
1.
adjacent thereto, Contractor is obligated to act to
prevent threatened damage, injury, or loss.
D. Contractor shall inform Owner and Engineer of Contractor shall give Engineer prompt written
the specific requirements of Contractor’s safety notice if Contractor believes that any significant
program with which Owner’s and Engineer’s changes in the Work or variations from the
employees and representatives must comply while Contract Documents have been caused thereby or
at the Site. are required as a result thereof. If Engineer
determines that a change in the Contract
E. All damage, injury, or loss to any property Documents is required because of the action taken
referred to in Paragraph 6.13.A.2 or 6.13.A.3 by Contractor in response to such an emergency, a
caused, directly or indirectly, in whole or in part, Work Change Directive or Change Order will be
by Contractor, any Subcontractor, Supplier, or any issued.
other individual or entity directly or indirectly
employed by any of them to perform any of the B. & C.
Work, or anyone for whose acts any of them may
be liable, shall be remedied by Contractor (except 6.17 Shop Drawings and Samples
damage or loss attributable to the fault of
Drawings or Specifications or to the acts or A. Contractor shall submit Shop Drawings and
omissions of Owner or Engineer or anyone Samples to Engineer for review and approval in
employed by any of them, or anyone for whose accordance with the accepted Schedule of
acts any of them may be liable, and not Submittals (as required by Paragraph 2.07). Each
attributable, directly or indirectly, in whole or in submittal will be identified as Engineer may
part, to the fault or negligence of Contractor or require.
any Subcontractor, Supplier, or other individual or
entity directly or indirectly employed by any of
them).
EJCDC C-700 Standard General Conditions of the Construction Contract
Copyright © 2007 National Society of Professional Engineers for EJCDC. All rights reserved.
Page 00700-27
1. Shop Drawings: c. determined and verified the
suitability of all materials offered
a. Submit number of copies specified in with respect to the indicated
the General Requirements. application, fabrication, shipping,
handling, storage, assembly, and
b. Data shown on the Shop
installation pertaining to the
Drawings will be complete with
performance of the Work; and
respect to quantities, dimensions,
specified performance and design d. determined and verified all
criteria, materials, and similar data to information relative to
show Engineer the services, Contractor’s responsibilities for
materials, and equipment Contractor means, methods, techniques,
proposes to provide and to enable sequences, and procedures of
Engineer to review the information construction, and safety precautions
for the limited purposes required by and programs incident thereto.
Paragraph 6.17.D.
2. Each submittal shall bear a stamp or specific
2. Samples: written certification that Contractor has
satisfied Contractor’s obligations under the
a. Submit number of Samples specified Contract Documents with respect to
in the Specifications. Contractor’s review and approval of that
b. Clearly identify each Sample as to submittal.
material, Supplier, pertinent data
such as catalog numbers, the use for 3. With each submittal, Contractor shall give
which intended and other data as Engineer specific written notice of any
Engineer may require to enable variations that the Shop Drawing or Sample
Engineer to review the submittal for may have from the requirements of the
the limited purposes required by Contract Documents. This notice shall be both
Paragraph 6.17.D. a written communication separate from the
Shop Drawings or Sample submittal; and, in
B. Where a Shop Drawing or Sample is required by addition, by a specific notation made on each
the Contract Documents or the Schedule of Shop Drawing or Sample submitted to
Submittals, any related Work performed prior to Engineer for review and approval of each
Engineer’s review and approval of the pertinent such variation.
submittal will be at the sole expense and
responsibility of Contractor.
D. Engineer’s Review:
a. Owner Should provide a list of samples needed.
1. Engineer will provide timely review of Shop
C. Submittal Procedures: Drawings and Samples in accordance with the
1. Before submitting each Shop Drawing or Schedule of Submittals acceptable to
Sample, Contractor shall have: Engineer. Engineer’s review and approval will
be only to determine if the items covered by
a. reviewed and coordinated each Shop the submittals will, after installation or
Drawing or Sample with other Shop incorporation in the Work, conform to the
Drawings and Samples and with the information given in the Contract Documents
requirements of the Work and the and be compatible with the design concept of
Contract Documents; the completed Project as a functioning whole
as indicated by the Contract Documents.
b. determined and verified all field
measurements, quantities, 2. Engineer’s review and approval will not
dimensions, specified performance extend to means, methods, techniques,
and design criteria, installation sequences, or procedures of construction
requirements, materials, catalog (except where a particular means, method,
numbers, and similar information technique, sequence, or procedure of
with respect thereto; construction is specifically and expressly
called for by the Contract Documents) or to
safety precautions or programs incident
EJCDC C-700 Standard General Conditions of the Construction Contract
Copyright © 2007 National Society of Professional Engineers for EJCDC. All rights reserved.
Page 00700-28
thereto. The review and approval of a separate individual or entity for whom Contractor is
item as such will not indicate approval of the responsible; or
assembly in which the item functions.
2. normal wear and tear under normal usage.
3. Engineer’s review and approval shall not
relieve Contractor from responsibility for any
C. Contractor’s obligation to perform and complete
variation from the requirements of the
the Work in accordance with the Contract
Contract Documents unless Contractor has
Documents shall be absolute. None of the
complied with the requirements of Paragraph
following will constitute an acceptance of Work
6.17.C.3 and Engineer has given written
that is not in accordance with the Contract
approval of each such variation by specific
Documents or a release of Contractor’s obligation
written notation thereof incorporated in or
to perform the Work in accordance with the
accompanying the Shop Drawing or Sample.
Contract Documents:
Engineer’s review and approval shall not
relieve Contractor from responsibility for 1. observations by Engineer;
complying with the requirements of Paragraph
6.17.C.1. 2. recommendation by Engineer or payment by
Owner of any progress or final payment;
E. Resubmittal Procedures:
3. the issuance of a certificate of Substantial
1. Contractor shall make corrections required by Completion by Engineer or any payment
Engineer and shall return the required number related thereto by Owner;
of corrected copies of Shop Drawings and
submit, as required, new Samples for review 4. use or occupancy of the Work or any part
and approval. Contractor shall direct specific thereof by Owner;
attention in writing to revisions other than the
corrections called for by Engineer on previous 5. any review and approval of a Shop Drawing
submittals. or Sample submittal or the issuance of a
notice of acceptability by Engineer;
6.18 Continuing the Work 6. any inspection, test, or approval by others; or
A. Contractor shall carry on the Work and adhere to 7. any correction of defective Work by Owner.
the Progress Schedule during all disputes or
disagreements with Owner. No Work shall be 8.
delayed or postponed pending resolution of any
disputes or disagreements, except as permitted by
Paragraph 15.04 or as Owner and Contractor may 6.20 Indemnification
otherwise agree in writing.
A. To the fullest extent permitted by Laws and
6.19 Contractor’s General Warranty and Guarantee Regulations, Contractor shall indemnify and hold
harmless Owner and Engineer, and the officers,
A. Contractor warrants and guarantees to Owner that directors, members, partners, employees, agents,
all Work will be in accordance with the Contract consultants and subcontractors of each and any of
Documents and will not be defective. Engineer them from and against all claims, costs, losses,
and its officers, directors, members, partners, and damages (including but not limited to all fees
employees, agents, consultants, and and charges of engineers, architects, attorneys,
subcontractors shall be entitled to rely on and other professionals and all court or arbitration
representation of Contractor’s warranty and or other dispute resolution costs) arising out of or
guarantee. relating to the performance of the Work, provided
that any such claim, cost, loss, or damage is
B. Contractor’s warranty and guarantee hereunder attributable to bodily injury, sickness, disease, or
excludes defects or damage caused by: death, or to injury to or destruction of tangible
property (other than the Work itself), including
1. abuse, modification, or improper maintenance the loss of use resulting therefrom but only to the
or operation by persons other than Contractor, extent caused by any negligent act or omission of
Subcontractors, Suppliers, or any other
EJCDC C-700 Standard General Conditions of the Construction Contract
Copyright © 2007 National Society of Professional Engineers for EJCDC. All rights reserved.
Page 00700-29
Contractor, any Subcontractor, any Supplier, or and Engineer will specify all performance and
any individual or entity directly or indirectly design criteria that such services must satisfy.
employed by any of them to perform any of the Contractor shall cause such services or
Work or anyone for whose acts any of them may certifications to be provided by a properly
be liable . licensed professional, whose signature and seal
shall appear on all drawings, calculations,
B. In any and all claims against Owner or Engineer specifications, certifications, Shop Drawings and
or any of their officers, directors, members, other submittals prepared by such professional.
partners, employees, agents, consultants, or Shop Drawings and other submittals related to the
subcontractors by any employee (or the survivor Work designed or certified by such professional,
or personal representative of such employee) of if prepared by others, shall bear such
Contractor, any Subcontractor, any Supplier, or professional’s written approval when submitted to
any individual or entity directly or indirectly Engineer.
employed by any of them to perform any of the
Work, or anyone for whose acts any of them may C. Owner and Engineer shall be entitled to rely upon
be liable, the indemnification obligation under the adequacy, accuracy and completeness of the
Paragraph 6.20.A shall not be limited in any way services, certifications or approvals performed by
by any limitation on the amount or type of such design professionals, provided Owner and
damages, compensation, or benefits payable by or Engineer have specified to Contractor all
for Contractor or any such Subcontractor, performance and design criteria that such services
Supplier, or other individual or entity under must satisfy.
workers’ compensation acts, disability benefit
acts, or other employee benefit acts. D. Pursuant to this Paragraph 6.21, Engineer’s
review and approval of design calculations and
C. The indemnification obligations of Contractor design drawings will be only for the limited
under Paragraph 6.20.A shall not extend to the purpose of checking for conformance with
liability of Engineer and Engineer’s officers, performance and design criteria given and the
directors, members, partners, employees, agents, design concept expressed in the Contract
consultants and subcontractors arising out of: Documents. Engineer’s review and approval of
Shop Drawings and other submittals (except
1. the preparation or approval of, or the failure
design calculations and design drawings) will be
to prepare or approve maps, Drawings,
only for the purpose stated in Paragraph 6.17.D.1.
opinions, reports, surveys, Change Orders,
designs, or Specifications; or
E. Contractor shall not be responsible for the
adequacy of the performance or design criteria
2. giving directions or instructions, or failing to
required by the Contract Documents.
give them, if that is the primary cause of the
injury or damage.
ARTICLE 7 – OTHER WORK AT THE SITE
6.21 Delegation of Professional Design Services
7.01 Related Work at Site
A. Contractor will not be required to provide
professional design services unless such services A. Owner may perform other work related to the
are specifically required by the Contract Project at the Site with Owner’s employees, or
Documents for a portion of the Work or unless through other direct contracts therefor, or have
such services are required to carry out other work performed by utility owners. If such
Contractor’s responsibilities for construction other work is not noted in the Contract
means, methods, techniques, sequences and Documents, then:
procedures. Contractor shall not be required to 1. written notice thereof will be given to
provide professional services in violation of Contractor prior to starting any such other
applicable law. work; and
B. If professional design services or certifications by 2. if Owner and Contractor are unable to agree
a design professional related to systems, materials on entitlement to or on the amount or extent,
or equipment are specifically required of if any, of any adjustment in the Contract Price
Contractor by the Contract Documents, Owner or Contract Times that should be allowed as a
EJCDC C-700 Standard General Conditions of the Construction Contract
Copyright © 2007 National Society of Professional Engineers for EJCDC. All rights reserved.
Page 00700-30
result of such other work, a Claim may be 3. the extent of such authority and
made therefor as provided in Paragraph 10.05. responsibilities will be provided.
B. Contractor shall afford each other contractor who B. Unless otherwise provided in the Supplementary
is a party to such a direct contract, each utility Conditions, Owner shall have sole authority and
owner, and Owner, if Owner is performing other responsibility for such coordination.
work with Owner’s employees, proper and safe
access to the Site, provide a reasonable 7.03 Legal Relationships
opportunity for the introduction and storage of
materials and equipment and the execution of such A. Paragraphs 7.01.A and 7.02 are not applicable for
other work, and properly coordinate the Work utilities not under the control of Owner.
with theirs. Contractor shall do all cutting, fitting,
and patching of the Work that may be required to B. Each other direct contract of Owner under
properly connect or otherwise make its several Paragraph 7.01.A shall provide that the other
parts come together and properly integrate with contractor is liable to Owner and Contractor for
such other work. Contractor shall not endanger the reasonable direct delay and disruption costs
any work of others by cutting, excavating, or incurred by Contractor as a result of the other
otherwise altering such work; provided, however, contractor’s wrongful actions or inactions.
that Contractor may cut or alter others' work with
the written consent of Engineer and the others C. Contractor shall be liable to Owner and any other
whose work will be affected. The duties and contractor under direct contract to Owner for the
responsibilities of Contractor under this Paragraph reasonable direct delay and disruption costs
are for the benefit of such utility owners and other incurred by such other contractor as a result of
contractors to the extent that there are comparable Contractor’s wrongful action or inactions.
provisions for the benefit of Contractor in said
direct contracts between Owner and such utility
owners and other contractors.
C. If the proper execution or results of any part of
Contractor’s Work depends upon work performed ARTICLE 8 – OWNER’S RESPONSIBILITIES
by others under this Article 7, Contractor shall 8.01 Communications to Contractor
inspect such other work and promptly report to
Engineer in writing any delays, defects, or A. Except as otherwise provided in these General
deficiencies in such other work that render it Conditions, Owner shall issue all communications
unavailable or unsuitable for the proper execution to Contractor through Engineer.
and results of Contractor’s Work. Contractor’s
failure to so report will constitute an acceptance of 8.02 Replacement of Engineer
such other work as fit and proper for integration
with Contractor’s Work except for latent defects A. In case of termination of the employment of
and deficiencies in such other work. Engineer, Owner shall appoint an engineer to
whom Contractor makes no reasonable objection,
7.02 Coordination whose status under the Contract Documents shall
be that of the former Engineer.
A. If Owner intends to contract with others for the
performance of other work on the Project at the 8.03 Furnish Data
Site, the following will be set forth in
Supplementary Conditions: A. Owner shall promptly furnish the data required of
1. the individual or entity who will have Owner under the Contract Documents.
authority and responsibility for coordination
of the activities among the various contractors 8.04 Pay When Due
will be identified;
A. Owner shall make payments to Contractor when
2. the specific matters to be covered by such they are due as provided in Paragraphs 14.02.C
authority and responsibility will be itemized; and 14.07.C.
and
EJCDC C-700 Standard General Conditions of the Construction Contract
Copyright © 2007 National Society of Professional Engineers for EJCDC. All rights reserved.
Page 00700-31
8.05 Lands and Easements; Reports and Tests 8.12 Compliance with Safety Program
A. Owner’s duties with respect to providing lands A. While at the Site, Owner’s employees and
and easements and providing engineering surveys representatives shall comply with the specific
to establish reference points are set forth in applicable requirements of Contractor’s safety
Paragraphs 4.01 and 4.05. Paragraph 4.02 refers programs of which Owner has been informed
to Owner’s identifying and making available to pursuant to Paragraph 6.13.D.
Contractor copies of reports of explorations and
tests of subsurface conditions and drawings of 8.13 Resident Project Representative
physical conditions relating to existing surface or
subsurface structures at the Site.
ARTICLE 9 – ENGINEER’S STATUS DURING
8.06 Insurance CONSTRUCTION
A. Owner’s responsibilities, if any, with respect to 9.01 Owner’s Representative
purchasing and maintaining liability and property
insurance are set forth in Article 5. A. Engineer will be Owner’s representative during
the construction period. The duties and
8.07 Change Orders responsibilities and the limitations of authority of
Engineer as Owner’s representative during
A. Owner is obligated to execute Change Orders as construction are set forth in the Contract
indicated in Paragraph 10.03. Documents.
8.08 Inspections, Tests, and Approvals 9.02 Visits to Site
A. Owner’s responsibility with respect to certain A. Engineer will make visits to the Site at intervals
inspections, tests, and approvals is set forth in appropriate to the various stages of construction
Paragraph 13.03.B. as Engineer deems necessary in order to observe
as an experienced and qualified design
professional the progress that has been made and
8.09 Limitations on Owner’s Responsibilities
the quality of the various aspects of Contractor’s
executed Work. Based on information obtained
A. The Owner shall not supervise, direct, or have
during such visits and observations, Engineer, for
control or authority over, nor be responsible for,
the benefit of Owner, will determine, in general, if
Contractor’s means, methods, techniques,
the Work is proceeding in accordance with the
sequences, or procedures of construction, or the
Contract Documents. Engineer will not be
safety precautions and programs incident thereto,
required to make exhaustive or continuous
or for any failure of Contractor to comply with
inspections on the Site to check the quality or
Laws and Regulations applicable to the
quantity of the Work. Engineer’s efforts will be
performance of the Work. Owner will not be
directed toward providing for Owner a greater
responsible for Contractor’s failure to perform the
degree of confidence that the completed Work
Work in accordance with the Contract Documents.
will conform generally to the Contract
Documents. On the basis of such visits and
8.10 Undisclosed Hazardous Environmental Condition observations, Engineer will keep Owner informed
of the progress of the Work and will endeavor to
A. Owner’s responsibility in respect to an guard Owner against defective Work.
undisclosed Hazardous Environmental Condition
is set forth in Paragraph 4.06. B. Engineer’s visits and observations are subject to
all the limitations on Engineer’s authority and
8.11 Evidence of Financial Arrangements responsibility set forth in Paragraph 9.09.
Particularly, but without limitation, during or as a
A. Upon request of Contractor, Owner shall furnish result of Engineer’s visits or observations of
Contractor reasonable evidence that financial Contractor’s Work, Engineer will not supervise,
arrangements have been made to satisfy Owner’s direct, control, or have authority over or be
obligations under the Contract Documents. responsible for Contractor’s means, methods,
techniques, sequences, or procedures of
EJCDC C-700 Standard General Conditions of the Construction Contract
Copyright © 2007 National Society of Professional Engineers for EJCDC. All rights reserved.
Page 00700-32
construction, or the safety precautions and Paragraph 13.04, whether or not the Work is
programs incident thereto, or for any failure of fabricated, installed, or completed.
Contractor to comply with Laws and Regulations
applicable to the performance of the Work. 9.06 Shop Drawings, Change Orders and Payments
9.03 Project Representative A. In connection with Engineer’s authority, and
limitations thereof, as to Shop Drawings and
A. If Owner and Engineer agree, Engineer will Samples, see Paragraph 6.17.
furnish a Resident Project Representative to assist
Engineer in providing more extensive observation B. In connection with Engineer’s authority, and
of the Work. The authority and responsibilities of limitations thereof, as to design calculations and
any such Resident Project Representative and design drawings submitted in response to a
assistants will be as provided in the delegation of professional design services, if any,
Supplementary Conditions, and limitations on the see Paragraph 6.21.
responsibilities thereof will be as provided in
Paragraph 9.09. If Owner designates another C. In connection with Engineer’s authority as to
representative or agent to represent Owner at the Change Orders, see Articles 10, 11, and 12. D. In
Site who is not Engineer’s consultant, agent or connection with Engineer’s authority as to
employee, the responsibilities and authority and Applications for Payment, see Article 14.
limitations thereon of such other individual or
entity will be as provided in the Supplementary 9.07 Determinations for Unit Price Work
Conditions.
A. Engineer will determine the actual quantities and
9.04 Authorized Variations in Work classifications of Unit Price Work performed by
Contractor. Engineer will review with Contractor
A. Engineer may authorize minor variations in the the Engineer’s preliminary determinations on such
Work from the requirements of the Contract matters before rendering a written decision
Documents which do not involve an adjustment in thereon (by recommendation of an Application for
the Contract Price or the Contract Times and are Payment or otherwise). Engineer’s written
compatible with the design concept of the decision thereon will be final and binding (except
completed Project as a functioning whole as as modified by Engineer to reflect changed factual
indicated by the Contract Documents. These may conditions or more accurate data) upon Owner and
be accomplished by a Field Order and will be Contractor, subject to the provisions of Paragraph
binding on Owner and also on Contractor, who 10.05.
shall perform the Work involved promptly. If
Owner or Contractor believes that a Field Order 9.08 Decisions on Requirements of Contract Documents
justifies an adjustment in the Contract Price or and Acceptability of Work
Contract Times, or both, and the parties are unable
to agree on entitlement to or on the amount or A. Engineer will be the initial interpreter of the
extent, if any, of any such adjustment, a requirements of the Contract Documents and
Claim may be made therefor as provided in judge of the acceptability of the Work thereunder.
Paragraph 10.05. All matters in question and other matters between
Owner and Contractor arising prior to the date
9.05 Rejecting Defective Work final payment is due relating to the acceptability
of the Work, and the interpretation of the
A. Engineer will have authority to reject Work which requirements of the Contract Documents
Engineer believes to be defective, or that Engineer pertaining to the performance of the Work, will be
believes will not produce a completed Project that referred initially to Engineer in writing within 30
conforms to the Contract Documents or that will days of the event giving rise to the question.
prejudice the integrity of the design concept of the
completed Project as a functioning whole as B. Engineer will, with reasonable promptness, render
indicated by the Contract Documents. Engineer a written decision on the issue referred. If Owner
will also have authority to require special or Contractor believes that any such decision
inspection or testing of the Work as provided in entitles them to an adjustment in the Contract
Price or Contract Times or both, a Claim may be
EJCDC C-700 Standard General Conditions of the Construction Contract
Copyright © 2007 National Society of Professional Engineers for EJCDC. All rights reserved.
Page 00700-33
made under Paragraph 10.05. The date of Paragraph 14.07.A will only be to determine
Engineer’s decision shall be the date of the event generally that their content complies with the
giving rise to the issues referenced for the requirements of, and in the case of certificates of
purposes of Paragraph 10.05.B. inspections, tests, and approvals that the results
certified indicate compliance with, the Contract
C. Engineer’s written decision on the issue referred Documents.
will be final and binding on Owner and
Contractor, subject to the provisions of Paragraph E. The limitations upon authority and responsibility
10.05. set forth in this Paragraph 9.09 shall also apply to
the Resident Project Representative, if any, and
D. When functioning as interpreter and judge under assistants, if any.
this Paragraph 9.08, Engineer will not show
partiality to Owner or Contractor and will not be 9.10 Compliance with Safety Program
liable in connection with any interpretation or
decision rendered in good faith in such capacity. A. While at the Site, Engineer’s employees and
representatives shall comply with the specific
9.09 Limitations on Engineer’s Authority and applicable requirements of Contractor’s safety
Responsibilities programs of which Engineer has been informed
pursuant to Paragraph 6.13.D.
A. Neither Engineer’s authority or responsibility
under this Article 9 or under any other provision
of the Contract Documents nor any decision made ARTICLE 10 – CHANGES IN THE WORK; CLAIMS
by Engineer in good faith either to exercise or not
exercise such authority or responsibility or the 10.01 Authorized Changes in the Work
undertaking, exercise, or performance of any
authority or responsibility by Engineer shall A. Without invalidating the Contract and without
create, impose, or give rise to any duty in contract, notice to any surety, Owner may, at any time or
tort, or otherwise owed by Engineer to Contractor, from time to time, order additions, deletions, or
any Subcontractor, any Supplier, any other revisions in the Work by a Change Order, or a
individual or entity, or to any surety for or Work Change Directive. Upon receipt of any such
employee or agent of any of them. document, Contractor shall promptly proceed with
the Work involved which will be performed under
1., 2., and 3. the applicable conditions of the Contract
Documents (except as otherwise specifically
B. Engineer will not supervise, direct, control, or provided).
have authority over or be responsible for
Contractor’s means, methods, techniques, B. If Owner and Contractor are unable to agree on
sequences, or procedures of construction, or the entitlement to, or on the amount or extent, if any,
safety precautions and programs incident thereto, of an adjustment in the Contract Price or Contract
or for any failure of Contractor to comply with Times, or both, that should be allowed as a result
Laws and Regulations applicable to the of a Work Change Directive, a Claim may be
performance of the Work. Engineer will not be made therefor as provided in Paragraph 10.05.
responsible for Contractor’s failure to perform the
Work in accordance with the Contract Documents. C.
C. Engineer will not be responsible for the acts or 10.02 Unauthorized Changes in the Work
omissions of Contractor or of any Subcontractor,
any Supplier, or of any other individual or entity A. Contractor shall not be entitled to an increase in
performing any of the Work. the Contract Price or an extension of the Contract
Times with respect to any work performed that is
D. Engineer’s review of the final Application for not required by the Contract Documents as
Payment and accompanying documentation and amended, modified, or supplemented as provided
all maintenance and operating instructions, in Paragraph 3.04, except in the case of an
schedules, guarantees, bonds, certificates of emergency as provided in Paragraph 6.16 or in the
inspection, tests and approvals, and other case of uncovering Work as provided in
documentation required to be delivered by Paragraph 13.04.D.
EJCDC C-700 Standard General Conditions of the Construction Contract
Copyright © 2007 National Society of Professional Engineers for EJCDC. All rights reserved.
Page 00700-34
10.03 Execution of Change Orders B. Notice: Written notice stating the general nature
of each Claim shall be delivered by the claimant
A. Owner and Contractor shall execute appropriate to Engineer and the other party to the Contract
Change Orders recommended by Engineer promptly (but in no event later than 30 days) after
covering: the start of the event giving rise thereto. The
responsibility to substantiate a Claim shall rest
1. changes in the Work which are: (i) ordered
with the party making the Claim. Notice of the
by Owner pursuant to Paragraph 10.01.A, (ii)
amount or extent of the Claim, with supporting
required because of acceptance of defective
data shall be delivered to the Engineer and the
Work under Paragraph 13.08.A or Owner’s
other party to the Contract within 60 days after the
correction of defective Work under Paragraph
start of such event (unless Engineer allows
13.09, or (iii) agreed to by the parties;
additional time for claimant to submit additional
or more accurate data in support of such Claim).
2. changes in the Contract Price or Contract
A Claim for an adjustment in Contract Price shall
Times which are agreed to by the parties,
be prepared in accordance with the provisions of
including any undisputed sum or amount of
Paragraph 12.01.B. A Claim for an adjustment in
time for Work actually performed in
Contract Times shall be prepared in accordance
accordance with a Work Change Directive;
with the provisions of Paragraph 12.02.B. Each
and
Claim shall be accompanied by claimant’s written
statement that the adjustment claimed is the entire
3. changes in the Contract Price or Contract
adjustment to which the claimant believes it is
Times which embody the substance of any
entitled as a result of said event. The opposing
written decision rendered by Engineer
party shall submit any response to Engineer and
pursuant to Paragraph 10.05; provided that, in
the claimant within 30 days after receipt of the
lieu of executing any such Change Order, an
claimant’s last submittal (unless Engineer allows
appeal may be taken from any such decision
additional time).
in accordance with the provisions of the
Contract Documents and applicable Laws and
C. Engineer’s Action: Engineer will review each
Regulations, but during any such appeal,
Claim and, within 30 days after receipt of the last
Contractor shall carry on the Work and adhere
submittal of the claimant or the last submittal of
to the Progress Schedule as provided in
the opposing party, if any, take one of the
Paragraph 6.18.A.
following actions in writing:
1. deny the Claim in whole or in part;
10.04 Notification to Surety
2. approve the Claim; or
A. If the provisions of any bond require notice to be
given to a surety of any change affecting the 3. notify the parties that the Engineer is unable to
general scope of the Work or the provisions of the resolve the Claim if, in the Engineer’s sole
Contract Documents (including, but not limited to, discretion, it would be inappropriate for the
Contract Price or Contract Times), the giving of Engineer to do so. For purposes of further
any such notice will be Contractor’s resolution of the Claim, such notice shall be
responsibility. The amount of each applicable deemed a denial.
bond will be adjusted to reflect the effect of any
such change.
D. In the event that Engineer does not take action on
10.05 Claims a Claim within said 30 days, the Claim shall be
deemed denied.
A. Engineer’s Decision Required: All Claims,
except those waived pursuant to Paragraph 14.09, E. Engineer’s written action under Paragraph
shall be referred to the Engineer for decision. A 10.05.C or denial pursuant to Paragraphs
decision by Engineer shall be required as a 10.05.C.3 or 10.05.D will be final and binding
condition precedent to any exercise by Owner or upon Owner and Contractor, unless Owner or
Contractor of any rights or remedies either may Contractor invoke the dispute resolution
otherwise have under the Contract Documents or procedure set forth in Article 16 within 30 days of
by Laws and Regulations in respect of such such action or denial.
Claims.
EJCDC C-700 Standard General Conditions of the Construction Contract
Copyright © 2007 National Society of Professional Engineers for EJCDC. All rights reserved.
Page 00700-35
F. No Claim for an adjustment in Contract Price or payments, in which case the cash discounts
Contract Times will be valid if not submitted in shall accrue to Owner. All trade discounts,
accordance with this Paragraph 10.05. rebates and refunds and returns from sale of
surplus materials and equipment shall accrue
to Owner, and Contractor shall make
ARTICLE 11 – COST OF THE WORK; ALLOWANCES; provisions so that they may be obtained.
UNIT PRICE WORK
3. Payments made by Contractor to
11.01 Cost of the Work Subcontractors for Work performed by
Subcontractors. If required by Owner,
A. Costs Included: The term Cost of the Work Contractor shall obtain competitive bids from
means the sum of all costs, except those excluded subcontractors acceptable to Owner and
in Paragraph 11.01.B, necessarily incurred and Contractor and shall deliver such bids to
paid by Contractor in the proper performance of Owner, who will then determine, with the
the Work. When the value of any Work covered advice of Engineer, which bids, if any, will be
by a Change Order or when a Claim for an acceptable. If any subcontract provides that
adjustment in Contract Price is determined on the the Subcontractor is to be paid on the basis of
basis of Cost of the Work, the costs to be Cost of the Work plus a fee, the
reimbursed to Contractor will be only those Subcontractor’s Cost of the Work and fee
additional or incremental costs required because shall be determined in the same manner as
of the change in the Work or because of the event Contractor’s Cost of the Work and fee as
giving rise to the Claim. Except as otherwise may provided in this Paragraph 11.01.
be agreed to in writing by Owner, such costs shall
be in amounts no higher than those prevailing in 4. Costs of special consultants (including but not
the locality of the Project, shall not include any of limited to engineers, architects, testing
the costs itemized in Paragraph 11.01.B, and shall laboratories, surveyors, attorneys, and
include only the following items: accountants) employed for services
1. Payroll costs for employees in the direct specifically related to the Work.
employ of Contractor in the performance of
the Work under schedules of job 5. Supplemental costs including the following:
classifications agreed upon by Owner and
a. The proportion of necessary
Contractor. Such employees shall include,
transportation, travel, and
without limitation, superintendents, foremen,
subsistence expenses of
and other personnel employed full time on the
Contractor’s employees incurred in
Work. Payroll costs for employees not
discharge of duties connected with
employed full time on the Work shall be
the Work.
apportioned on the basis of their time spent on
the Work. Payroll costs shall include, but not b. Cost, including transportation and
be limited to, salaries and wages plus the cost maintenance, of all materials,
of fringe benefits, which shall include social supplies, equipment, machinery,
security contributions, unemployment, excise, appliances, office, and temporary
and payroll taxes, workers’ compensation, facilities at the Site, and hand tools
health and retirement benefits, bonuses, sick not owned by the workers, which are
leave, vacation and holiday pay applicable consumed in the performance of the
thereto. The expenses of performing Work Work, and cost, less market value, of
outside of regular working hours, on Saturday, such items used but not consumed
Sunday, or legal holidays, shall be included in which remain the property of
the above to the extent authorized by Owner. Contractor.
2. Cost of all materials and equipment furnished c. Rentals of all construction
and incorporated in the Work, including costs equipment and machinery, and the
of transportation and storage thereof, and parts thereof whether rented from
Suppliers’ field services required in Contractor or others in accordance
connection therewith. All cash discounts shall with rental agreements approved by
accrue to Contractor unless Owner deposits Owner with the advice of Engineer,
funds with Contractor with which to make and the costs of transportation,
EJCDC C-700 Standard General Conditions of the Construction Contract
Copyright © 2007 National Society of Professional Engineers for EJCDC. All rights reserved.
Page 00700-36
loading, unloading, assembly, i. The costs of premiums for all bonds
dismantling, and removal thereof. and insurance Contractor is required
All such costs shall be in accordance by the Contract Documents to
with the terms of said rental purchase and maintain.
agreements. The rental of any such
equipment, machinery, or parts shall B. Costs Excluded: The term Cost of the Work shall
cease when the use thereof is no not include any of the following items:
longer necessary for the Work.
1. Payroll costs and other compensation of
d. Sales, consumer, use, and other Contractor’s officers, executives, principals
similar taxes related to the Work, (of partnerships and sole proprietorships),
and for which Contractor is liable, general managers, safety managers, engineers,
as imposed by Laws and Regulations. architects, estimators, attorneys, auditors,
accountants, purchasing and contracting
e. Deposits lost for causes other
agents, expediters, timekeepers, clerks, and
than negligence of Contractor,
other personnel employed by Contractor,
any Subcontractor, or anyone
whether at the Site or in Contractor’s principal
directly or indirectly employed by
or branch office for general administration of
any of them or for whose acts any of
the Work and not specifically included in the
them may be liable, and royalty
agreed upon schedule of job classifications
payments and fees for permits and
referred to in Paragraph 11.01.A.1 or
licenses.
specifically covered by Paragraph 11.01.A.4,
f. Losses and damages (and related all of which are to be considered
expenses) caused by damage to administrative costs covered by the
the Work, not compensated by Contractor’s fee.
insurance or otherwise, sustained by
Contractor in connection with the 2. Expenses of Contractor’s principal and branch
performance of the Work (except offices other than Contractor’s office at the
losses and damages within the Site.
deductible amounts of property
insurance established in accordance 3. Any part of Contractor’s capital expenses,
with Paragraph 5.06.D), provided including interest on Contractor’s capital
such losses and damages have employed for the Work and charges against
resulted from causes other than the Contractor for delinquent payments.
negligence of Contractor, any
Subcontractor, or anyone directly 4. Costs due to the negligence of Contractor, any
or indirectly employed by any of Subcontractor, or anyone directly or indirectly
them or for whose acts any of them employed by any of them or for whose acts
may be liable. Such losses shall any of them may be liable, including but not
include settlements made with the limited to, the correction of defective Work,
written consent and approval of disposal of materials or equipment wrongly
Owner. No such losses, damages, supplied, and making good any damage to
and expenses shall be included in the property.
Cost of the Work for the purpose of
determining Contractor’s fee. 5. Other overhead or general expense costs
of any kind and the costs of any item not
g. The cost of utilities, fuel, and specifically and expressly included in
sanitary facilities at the Site. Paragraphs 11.01.A.
h. Minor expenses such as telegrams,
long distance telephone calls, 6.
telephone service at the Site, express
and courier services, and similar C. Contractor’s Fee: When all the Work is
petty cash items in connection with performed on the basis of cost-plus, Contractor’s
the Work. fee shall be determined as set forth in the
Agreement. When the value of any Work covered
by a Change Order or when a Claim for an
EJCDC C-700 Standard General Conditions of the Construction Contract
Copyright © 2007 National Society of Professional Engineers for EJCDC. All rights reserved.
Page 00700-37
adjustment in Contract Price is determined on the 11.03 Unit Price Work
basis of Cost of the Work, Contractor’s fee shall
be determined as set forth in Paragraph 12.01.C. A. Where the Contract Documents provide that all or
part of the Work is to be Unit Price Work, initially
D. Documentation: Whenever the Cost of the Work the Contract Price will be deemed to include for
for any purpose is to be determined pursuant to all Unit Price Work an amount equal to the sum of
Paragraphs 11.01.A and 11.01.B, Contractor will the unit price for each separately identified item of
establish and maintain records thereof in Unit Price Work times the estimated quantity of
accordance with generally accepted accounting each item as indicated in the Agreement.
practices and submit in a form acceptable to
Engineer an itemized cost breakdown together B. The estimated quantities of items of Unit Price
with supporting data. Work are not guaranteed and are solely for the
purpose of comparison of Bids and determining an
11.02 Allowances initial Contract Price. Determinations of the actual
quantities and classifications of Unit Price Work
A. It is understood that Contractor has included in the performed by Contractor will be made by
Contract Price all allowances so named in the Engineer subject to the provisions of Paragraph
Contract Documents and shall cause the Work so 9.07.
covered to be performed for such sums and by
such persons or entities as may be acceptable to C. Each unit price will be deemed to include an
Owner and Engineer. amount considered by Contractor to be adequate
to cover Contractor’s overhead and profit for each
B. Cash Allowances: separately identified item.
1. Contractor agrees that: D. Owner or Contractor may make a Claim for an
adjustment in the Contract Price in accordance
a. the cash allowances include the cost
with Paragraph 10.05 if:
to Contractor (less any applicable
trade discounts) of materials and 1. the quantity of any item of Unit Price Work
equipment required by the performed by Contractor differs materially
allowances to be delivered at the and significantly from the estimated quantity
Site, and all applicable taxes; and of such item indicated in the Agreement; and
b. Contractor’s costs for unloading 2. there is no corresponding adjustment with
and handling on the Site, labor, respect to any other item of Work; and
installation, overhead, profit, and
other expenses contemplated for the 3. Contractor believes that Contractor is entitled
cash allowances have been included to an increase in Contract Price as a result of
in the Contract Price and not in the having incurred additional expense or Owner
allowances, and no demand for believes that Owner is entitled to a decrease in
additional payment on account of Contract Price and the parties are unable to
any of the foregoing will be valid. agree as to the amount of any such increase or
decrease.
C. Contingency Allowance:
1. Contractor agrees that a contingency
allowance, if any, is for the sole use of Owner ARTICLE 12 – CHANGE OF CONTRACT PRICE;
to cover unanticipated costs. CHANGE OF CONTRACT TIMES
12.01 Change of Contract Price
D. Prior to final payment, an appropriate Change
Order will be issued as recommended by Engineer A. The Contract Price may only be changed by a
to reflect actual amounts due Contractor on Change Order. Any Claim for an adjustment in the
account of Work covered by allowances, and the Contract Price shall be based on written notice
Contract Price shall be correspondingly adjusted. submitted by the party making the Claim to the
Engineer and the other party to the Contract in
EJCDC C-700 Standard General Conditions of the Construction Contract
Copyright © 2007 National Society of Professional Engineers for EJCDC. All rights reserved.
Page 00700-38
accordance with the provisions of Paragraph such Subcontractor under
10.05. Paragraphs 11.01.A.1 and 11.01.A.2
and that any higher tier
B. The value of any Work covered by a Change Subcontractor and Contractor will
Order or of any Claim for an adjustment in the each be paid a fee of five percent of
Contract Price will be determined as follows: the amount paid to the next lower
tier Subcontractor;
1. where the Work involved is covered by unit
prices contained in the Contract Documents, d. no fee shall be payable on the basis
by application of such unit prices to the of costs itemized under Paragraphs
quantities of the items involved (subject to the 11.01.A.4, 11.01.A.5, and 11.01.B;
provisions of Paragraph 11.03); or
e. the amount of credit to be allowed
2. where the Work involved is not covered by by Contractor to Owner for any
unit prices contained in the Contract change which results in a net
Documents, by a mutually agreed lump sum decrease in cost will be the amount
(which may include an allowance for of the actual net decrease in cost plus
overhead and profit not necessarily in a deduction in Contractor’s fee by an
accordance with Paragraph 12.01.C.2); or amount equal to five percent of such
net decrease; and
3. where the Work involved is not covered by
f. when both additions and credits are
unit prices contained in the Contract
involved in any one change, the
Documents and agreement to a lump sum is
adjustment in Contractor’s fee shall
not reached under Paragraph 12.01.B.2, on
be computed on the basis of the net
the basis of the Cost of the Work (determined
change in accordance with
as provided in Paragraph 11.01) plus a
Paragraphs 12.01.C.2.a through
Contractor’s fee for overhead and profit
12.01.C.2.e, inclusive.
(determined as provided in Paragraph
12.01.C).
12.02 Change of Contract Times
C. Contractor’s Fee: The Contractor’s fee for
A. The Contract Times may only be changed by a
overhead and profit shall be determined as
Change Order. Any Claim for an adjustment in the
follows:
Contract Times shall be based on written notice
1. a mutually acceptable fixed fee; or submitted by the party making the Claim to the
Engineer and the other party to the Contract in
2. if a fixed fee is not agreed upon, then a fee accordance with the provisions of Paragraph
based on the following percentages of the 10.05.
various portions of the Cost of the Work:
B. Any adjustment of the Contract Times covered
a. for costs incurred under Paragraphs by a Change Order or any Claim for an
11.01.A.1 and 11.01.A.2, the adjustment in the Contract Times will be
Contractor’s fee shall be 15 percent; determined in accordance with the provisions of
this Article 12.
b. for costs incurred under Paragraph
11.01.A.3, the Contractor’s fee shall
be five percent; 12.03 Delays
c. where one or more tiers of A. Where Contractor is prevented from completing
subcontracts are on the basis of Cost any part of the Work within the Contract Times
of the Work plus a fee and no fixed due to delay beyond the control of Contractor, the
fee is agreed upon, the intent of Contract Times will be extended in an amount
Paragraphs 12.01.C.2.a and equal to the time lost due to such delay if a Claim
12.01.C.2.b is that the Subcontractor is made therefor as provided in Paragraph
who actually performs the Work, at 12.02.A. Delays beyond the control of Contractor
whatever tier, will be paid a fee of shall include, but not be limited to, acts or neglect
15 percent of the costs incurred by by Owner, acts or neglect of utility owners or
EJCDC C-700 Standard General Conditions of the Construction Contract
Copyright © 2007 National Society of Professional Engineers for EJCDC. All rights reserved.
Page 00700-39
other contractors performing other work as ARTICLE 13 – TESTS AND INSPECTIONS;
contemplated by Article 7, fires, floods, CORRECTION, REMOVAL OR
epidemics, abnormal weather conditions, or acts ACCEPTANCE OF DEFECTIVE WORK
of God.
13.01 Notice of Defects
B. If Owner, Engineer, or other contractors or utility
owners performing other work for Owner as A. Prompt notice of all defective Work of which
contemplated by Article 7, or anyone for whom Owner or Engineer has actual knowledge will be
Owner is responsible, delays, disrupts, or given to Contractor. Defective Work may be
interferes with the performance or progress of the rejected, corrected, or accepted as provided in this
Work, then Contractor shall be entitled to an Article 13.
equitable adjustment in the Contract Price or the
Contract Times, or both. Contractor’s entitlement
to an adjustment of the Contract Times is 13.02 Access to Work
conditioned on such adjustment being essential to
Contractor’s ability to complete the Work within A. Owner, Engineer, their consultants and other
the Contract Times. representatives and personnel of Owner,
independent testing laboratories, and
C. If Contractor is delayed in the performance or governmental agencies with jurisdictional interests
progress of the Work by fire, flood, epidemic, will have access to the Site and the Work at
abnormal weather conditions, acts of God, acts or reasonable times for their observation, inspection,
failures to act of utility owners not under the and testing. Contractor shall provide them proper
control of Owner, or other causes not the fault of and safe conditions for such access and advise
and beyond control of Owner and Contractor, then them of Contractor’s safety procedures and
Contractor shall be entitled to an equitable programs so that they may comply therewith as
adjustment in Contract Times, if such adjustment applicable.
is essential to Contractor’s ability to complete the
Work within the Contract Times. Such an
13.03 Tests and Inspections
adjustment shall be Contractor’s sole and
exclusive remedy for the delays described in this
Paragraph 12.03.C. A. Contractor shall give Engineer timely notice of
readiness of the Work for all required
inspections, tests, or approvals and shall cooperate
D. Owner, Engineer, and their officers, directors,
with inspection and testing personnel to facilitate
members, partners, employees, agents,
required inspections or tests.
consultants, or subcontractors shall not be liable to
Contractor for any claims, costs, losses, or
damages (including but not limited to all fees and B. Owner shall employ and pay for the services of an
charges of engineers, architects, attorneys, and independent testing laboratory to perform all
other professionals and all court or arbitration or inspections, tests, or approvals required by the
other dispute resolution costs) sustained by Contract Documents except:
Contractor on or in connection with any other 1. for inspections, tests, or approvals covered by
project or anticipated project. Paragraphs 13.03.C and 13.03.D below;
E. Contractor shall not be entitled to an adjustment in 2. that costs incurred in connection with tests or
Contract Price or Contract Times for delays within inspections conducted pursuant to Paragraph
the control of Contractor. Delays attributable to 13.04.B shall be paid as provided in
and within the control of a Subcontractor or Paragraph 13.04.C; and
Supplier shall be deemed to be delays within the
control of Contractor. 3. as otherwise specifically provided in the
Contract Documents.
F.
C. If Laws or Regulations of any public body having
jurisdiction require any Work (or part thereof)
specifically to be inspected, tested, or approved by
an employee or other representative of such public
EJCDC C-700 Standard General Conditions of the Construction Contract
Copyright © 2007 National Society of Professional Engineers for EJCDC. All rights reserved.
Page 00700-40
body, Contractor shall assume full responsibility (including but not limited to all costs of repair or
for arranging and obtaining such inspections, tests, replacement of work of others); and Owner shall
or approvals, pay all costs in connection be entitled to an appropriate decrease in the
therewith, and furnish Engineer the required Contract Price. If the parties are unable to agree as
certificates of inspection or approval. to the amount thereof, Owner may make a Claim
therefor as provided in Paragraph 10.05.
D. Contractor shall be responsible for arranging and
obtaining and shall pay all costs in connection D. If the uncovered Work is not found to be
with any inspections, tests, or approvals required defective, Contractor shall be allowed an increase
for Owner’s and Engineer’s acceptance of in the Contract Price or an extension of the
materials or equipment to be incorporated in the Contract Times, or both, directly attributable to
Work; or acceptance of materials, mix designs, or such uncovering, exposure, observation,
equipment submitted for approval prior to inspection, testing, replacement, and
Contractor’s purchase thereof for incorporation in reconstruction. If the parties are unable to agree as
the Work. Such inspections, tests, or approvals to the amount or extent thereof, Contractor may
shall be performed by organizations acceptable to make a Claim therefor as provided in Paragraph
Owner and Engineer. 10.05.
E. If any Work (or the work of others) that is to be 13.05 Owner May Stop the Work
inspected, tested, or approved is covered by
Contractor without written concurrence of A. If the Work is defective, or Contractor fails to
Engineer, Contractor shall, if requested by supply sufficient skilled workers or suitable
Engineer, uncover such Work for observation. materials or equipment, or fails to perform the
Work in such a way that the completed Work will
F. Uncovering Work as provided in Paragraph conform to the Contract Documents, Owner may
13.03.E shall be at Contractor’s expense unless order Contractor to stop the Work, or any portion
Contractor has given Engineer timely notice of thereof, until the cause for such order has been
Contractor’s intention to cover the same and eliminated; however, this right of Owner to stop
Engineer has not acted with reasonable the Work shall not give rise to any duty on the
promptness in response to such notice. part of Owner to exercise this right for the benefit
of Contractor, any Subcontractor, any Supplier,
13.04 Uncovering Work any other individual or entity, or any surety for, or
employee or agent of any of them.
A. If any Work is covered contrary to the written
request of Engineer, it must, if requested by 13.06 Correction or Removal of Defective Work
Engineer, be uncovered for Engineer’s
observation and replaced at Contractor’s expense. A. Promptly after receipt of written notice,
Contractor shall correct all defective Work,
B. If Engineer considers it necessary or advisable whether or not fabricated, installed, or completed,
that covered Work be observed by Engineer or or, if the Work has been rejected by Engineer,
inspected or tested by others, Contractor, at remove it from the Project and replace it with
Engineer’s request, shall uncover, expose, or Work that is not defective. Contractor shall pay all
otherwise make available for observation, claims, costs, losses, and damages (including but
inspection, or testing as Engineer may require, not limited to all fees and charges of engineers,
that portion of the Work in question, furnishing all architects, attorneys, and other professionals and
necessary labor, material, and equipment. all court or arbitration or other dispute resolution
costs) arising out of or relating to such correction
C. If it is found that the uncovered Work is defective, or removal (including but not limited to all costs
Contractor shall pay all claims, costs, losses, and of repair or replacement of work of others).
damages (including but not limited to all fees and
charges of engineers, architects, attorneys, and B. When correcting defective Work under the terms
other professionals and all court or arbitration or of this Paragraph 13.06 or Paragraph 13.07,
other dispute resolution costs) arising out of or Contractor shall take no action that would void or
relating to such uncovering, exposure, otherwise impair Owner’s special warranty and
observation, inspection, and testing, and of guarantee, if any, on said Work.
satisfactory replacement or reconstruction
EJCDC C-700 Standard General Conditions of the Construction Contract
Copyright © 2007 National Society of Professional Engineers for EJCDC. All rights reserved.
Page 00700-41
13.07 Correction Period such Work will be extended for an additional
period of one year after such correction or
A. If within one year after the date of Substantial removal and replacement has been satisfactorily
Completion (or such longer period of time as may completed.
be prescribed by the terms of any applicable
special guarantee required by the Contract E. Contractor’s obligations under this Paragraph
Documents) or by any specific provision of the 13.07 are in addition to any other obligation or
Contract Documents, any Work is found to be warranty. The provisions of this Paragraph 13.07
defective, or if the repair of any damages to the shall not be construed as a substitute for, or a
land or areas made available for Contractor’s use waiver of, the provisions of any applicable statute
by Owner or permitted by Laws and Regulations of limitation or repose.
as contemplated in Paragraph 6.11.A is found to
be defective, Contractor shall promptly, without F. & G.
cost to Owner and in accordance with Owner’s
written instructions: 13.08 Acceptance of Defective Work
1. repair such defective land or areas; or
A. If, instead of requiring correction or removal and
2. correct such defective Work; or replacement of defective Work, Owner (and, prior
to Engineer’s recommendation of final payment,
3. if the defective Work has been rejected by Engineer) prefers to accept it, Owner may do so.
Owner, remove it from the Project and replace Contractor shall pay all claims, costs, losses, and
it with Work that is not defective, and damages (including but not limited to all fees and
charges of engineers, architects, attorneys, and
4. satisfactorily correct or repair or remove and other professionals and all court or arbitration or
replace any damage to other Work, to the other dispute resolution costs) attributable to
work of others or other land or areas resulting Owner’s evaluation of and determination to accept
therefrom. such defective Work (such costs to be approved
by Engineer as to reasonableness) and for the
diminished value of the Work to the extent not
B. If Contractor does not promptly comply with the otherwise paid by Contractor pursuant to this
terms of Owner’s written instructions, or in an sentence. If any such acceptance occurs prior to
emergency where delay would cause serious risk Engineer’s recommendation of final payment, a
of loss or damage, Owner may have the defective Change Order will be issued incorporating the
Work corrected or repaired or may have the necessary revisions in the Contract Documents
rejected Work removed and replaced. All claims, with respect to the Work, and Owner shall be
costs, losses, and damages (including but not entitled to an appropriate decrease in the Contract
limited to all fees and charges of engineers, Price, reflecting the diminished value of Work so
architects, attorneys, and other professionals and accepted. If the parties are unable to agree as to
all court or arbitration or other dispute resolution the amount thereof, Owner may make a Claim
costs) arising out of or relating to such correction therefor as provided in Paragraph 10.05. If the
or repair or such removal and replacement acceptance occurs after such recommendation, an
(including but not limited to all costs of repair or appropriate amount will be paid by Contractor to
replacement of work of others) will be paid by Owner.
Contractor.
13.09 Owner May Correct Defective Work
C. In special circumstances where a particular item of
equipment is placed in continuous service before A. If Contractor fails within a reasonable time
Substantial Completion of all the Work, the after written notice from Engineer to correct
correction period for that item may start to run defective Work, or to remove and replace rejected
from an earlier date if so provided in the Work as required by Engineer in accordance with
Specifications. Paragraph 13.06.A, or if Contractor fails to
perform the Work in accordance with the Contract
D. Where defective Work (and damage to other Documents, or if Contractor fails to comply with
Work resulting therefrom) has been corrected or any other provision of the Contract Documents,
removed and replaced under this Paragraph 13.07, Owner may, after seven days written notice to
the correction period hereunder with respect to
EJCDC C-700 Standard General Conditions of the Construction Contract
Copyright © 2007 National Society of Professional Engineers for EJCDC. All rights reserved.
Page 00700-42
Contractor, correct, or remedy any such ARTICLE 14 – PAYMENTS TO CONTRACTOR AND
deficiency. COMPLETION
B. In exercising the rights and remedies under this 14.01 Schedule of Values
Paragraph 13.09, Owner shall proceed
expeditiously. In connection with such corrective A. The Schedule of Values established as provided in
or remedial action, Owner may exclude Paragraph 2.07.A will serve as the basis for
Contractor from all or part of the Site, take progress payments and will be incorporated into a
possession of all or part of the Work and suspend form of Application for Payment acceptable to
Contractor’s services related thereto, take Engineer. Progress payments on account of Unit
possession of Contractor’s tools, appliances, Price Work will be based on the number of units
construction equipment and machinery at the Site, completed.
and incorporate in the Work all materials and
equipment stored at the Site or for which Owner 14.02 Progress Payments
has paid Contractor but which are stored
elsewhere. Contractor shall allow Owner, Owner’s A. Applications for Payments:
representatives, agents and employees, Owner’s
other contractors, and Engineer and Engineer’s 1. At least 20 days before the date established in
consultants access to the Site to enable Owner to the Agreement for each progress payment (but
exercise the rights and remedies under this not more often than once a month), Contractor
Paragraph. shall submit to Engineer for review an
Application for Payment filled out and signed
C. All claims, costs, losses, and damages (including by Contractor covering the Work completed
but not limited to all fees and charges of as of the date of the Application and
engineers, architects, attorneys, and other accompanied by such supporting
professionals and all court or arbitration or other documentation as is required by the Contract
dispute resolution costs) incurred or sustained by Documents. If payment is requested on the
Owner in exercising the rights and remedies under basis of materials and equipment not
this Paragraph 13.09 will be charged against incorporated in the Work but delivered and
Contractor, and a Change Order will be issued suitably stored at the Site or at another
incorporating the necessary revisions in the location agreed to in writing, the Application
Contract Documents with respect to the Work; for Payment shall also be accompanied by a
and Owner shall be entitled to an appropriate bill of sale, invoice, or other documentation
decrease in the Contract Price. If the parties are warranting that Owner has received the
unable to agree as to the amount of the materials and equipment free and clear of all
adjustment, Owner may make a Claim therefor as Liens and evidence that the materials and
provided in Paragraph 10.05. Such claims, costs, equipment are covered by appropriate
losses and damages will include but not be limited property insurance or other arrangements to
to all costs of repair, or replacement of work of protect Owner’s interest therein, all of which
others destroyed or damaged by correction, must be satisfactory to Owner.
removal, or replacement of Contractor’s defective
Work. 2. Beginning with the second Application for
Payment, each Application shall include an
D. Contractor shall not be allowed an extension of affidavit of Contractor stating that all previous
the Contract Times because of any delay in the progress payments received on account of the
performance of the Work attributable to the Work have been applied on account to
exercise by Owner of Owner’s rights and remedies discharge Contractor’s legitimate
under this Paragraph 13.09. obligations associated with prior Applications
for Payment.
3. The amount of retainage with respect to
progress payments will be as stipulated in the
Agreement.
4.
EJCDC C-700 Standard General Conditions of the Construction Contract
Copyright © 2007 National Society of Professional Engineers for EJCDC. All rights reserved.
Page 00700-43
B. Review of Applications: to Engineer in the Contract
Documents; or
1. Engineer will, within 10 days after receipt of
each Application for Payment, either indicate b. there may not be other matters or
in writing a recommendation of payment and issues between the parties that might
present the Application to Owner or return the entitle Contractor to be paid
Application to Contractor indicating in writing additionally by Owner or entitle
Engineer’s reasons for refusing to recommend Owner to withhold payment to
payment. In the latter case, Contractor may Contractor.
make the necessary corrections and resubmit
the Application. 4. Neither Engineer’s review of Contractor’s
Work for the purposes of recommending
2. Engineer’s recommendation of any payment payments nor Engineer’s recommendation of
requested in an Application for Payment will any payment, including final payment, will
constitute a representation by Engineer to impose responsibility on Engineer:
Owner, based on Engineer’s observations of
the executed Work as an experienced and a. to supervise, direct, or control the
qualified design professional, and on Work, or
Engineer’s review of the Application for
b. for the means, methods, techniques,
Payment and the accompanying data and
sequences, or procedures of
schedules, that to the best of Engineer’s
construction, or the safety
knowledge, information and belief:
precautions and programs incident
a. the Work has progressed to the point thereto, or
indicated; c. for Contractor’s failure to comply
b. the quality of the Work is generally with Laws and Regulations
in accordance with the Contract applicable to Contractor’s
Documents (subject to an evaluation performance of the Work, or
of the Work as a functioning whole d. to make any examination to ascertain
prior to or upon Substantial how or for what purposes Contractor
Completion, the results of any has used the moneys paid on account
subsequent tests called for in the of the Contract Price, or
Contract Documents, a final
determination of quantities and e. to determine that title to any of the
classifications for Unit Price Work Work, materials, or equipment has
under Paragraph 9.07, and any other passed to Owner free and clear of
qualifications stated in the any Liens.
recommendation); and
5. Engineer may refuse to recommend the whole
c. the conditions precedent to or any part of any payment if, in Engineer’s
Contractor’s being entitled to such opinion, it would be incorrect to make the
payment appear to have been representations to Owner stated in Paragraph
fulfilled in so far as it is Engineer’s 14.02.B.2. Engineer may also refuse to
responsibility to observe the Work. recommend any such payment or, because of
subsequently discovered evidence or the
3. By recommending any such payment results of subsequent inspections or tests,
Engineer will not thereby be deemed to have revise or revoke any such payment
represented that: recommendation previously made, to such
extent as may be necessary in Engineer’s
a. inspections made to check the
opinion to protect Owner from loss because:
quality or the quantity of the
Work as it has been performed a. the Work is defective, or completed
have been exhaustive, extended to Work has been damaged, requiring
every aspect of the Work in correction or replacement;
progress, or involved detailed
inspections of the Work beyond the b. the Contract Price has been reduced
responsibilities specifically assigned by Change Orders;
EJCDC C-700 Standard General Conditions of the Construction Contract
Copyright © 2007 National Society of Professional Engineers for EJCDC. All rights reserved.
Page 00700-44
c. Owner has been required to correct the amount wrongfully withheld shall be
defective Work or complete Work in treated as an amount due as determined by
accordance with Paragraph 13.09; or Paragraph 14.02.C.1 and subject to interest as
provided in the Agreement.
d. Engineer has actual knowledge of
the occurrence of any of the events
enumerated in Paragraph 15.02.A. 14.03 Contractor’s Warranty of Title
C. Payment Becomes Due: A. Contractor warrants and guarantees that title to all
Work, materials, and equipment covered by any
1. Ten days after presentation of the Application Application for Payment, whether incorporated in
for Payment to Owner with Engineer’s the Project or not, will pass to Owner no later than
recommendation, the amount recommended the time of payment free and clear of all Liens.
will (subject to the provisions of Paragraph
14.02.D) become due, and when due will be 14.04 Substantial Completion
paid by Owner to Contractor.
A. When Contractor considers the entire Work ready
D. Reduction in Payment: for its intended use Contractor shall notify Owner
and Engineer in writing that the entire Work is
1. Owner may refuse to make payment of the full substantially complete (except for items
amount recommended by Engineer because: specifically listed by Contractor as incomplete)
and request that Engineer issue a certificate of
a. claims have been made against
Substantial Completion.
Owner on account of Contractor’s
performance or furnishing of the
B. Promptly after Contractor’s notification, Owner,
Work;
Contractor, and Engineer shall make an inspection
b. Liens have been filed in of the Work to determine the status of completion.
connection with the Work, except If Engineer does not consider the Work
where Contractor has delivered a substantially complete, Engineer will notify
specific bond satisfactory to Owner Contractor in writing giving the reasons therefor.
to secure the satisfaction and
discharge of such Liens; C. If Engineer considers the Work substantially
complete, Engineer will deliver to Owner a
c. there are other items entitling Owner tentative certificate of Substantial Completion
to a set-off against the amount which shall fix the date of Substantial Completion.
recommended; or There shall be attached to the certificate a
tentative list of items to be completed or corrected
d. Owner has actual knowledge of the
before final payment. Owner shall have seven
occurrence of any of the events
days after receipt of the tentative certificate during
enumerated in Paragraphs
which to make written objection to Engineer as to
14.02.B.5.a through 14.02.B.5.c or
any provisions of the certificate or attached list. If,
Paragraph 15.02.A.
after considering such objections, Engineer
2. If Owner refuses to make payment of the full concludes that the Work is not substantially
amount recommended by Engineer, Owner complete, Engineer will, within 14 days after
will give Contractor immediate written notice submission of the tentative certificate to Owner,
(with a copy to Engineer) stating the reasons notify Contractor in writing, stating the reasons
for such action and promptly pay Contractor therefor. If, after consideration of Owner’s
any amount remaining after deduction of the objections, Engineer considers the Work
amount so withheld. Owner shall promptly substantially complete, Engineer will, within said
pay Contractor the amount so withheld, or any 14 days, execute and deliver to Owner and
adjustment thereto agreed to by Owner Contractor a definitive certificate of Substantial
and Contractor, when Contractor remedies Completion (with a revised tentative list of items
the reasons for such action. to be completed or corrected) reflecting such
changes from the tentative certificate as Engineer
3. Upon a subsequent determination that believes justified after consideration of any
Owner’s refusal of payment was not justified, objections from Owner.
EJCDC C-700 Standard General Conditions of the Construction Contract
Copyright © 2007 National Society of Professional Engineers for EJCDC. All rights reserved.
Page 00700-45
D. At the time of delivery of the tentative certificate shall make an inspection of that part of the
of Substantial Completion, Engineer will deliver Work to determine its status of completion. If
to Owner and Contractor a written Engineer does not consider that part of the
recommendation as to division of responsibilities Work to be substantially complete, Engineer
pending final payment between Owner and will notify Owner and Contractor in writing
Contractor with respect to security, operation, giving the reasons therefor. If Engineer
safety, and protection of the Work, maintenance, considers that part of the Work to be
heat, utilities, insurance, and warranties and substantially complete, the provisions of
guarantees. Unless Owner and Contractor agree Paragraph 14.04 will apply with respect to
otherwise in writing and so inform Engineer in certification of Substantial Completion of that
writing prior to Engineer’s issuing the part of the Work and the division of
definitive certificate of Substantial Completion, responsibility in respect thereof and access
Engineer’s aforesaid recommendation will be thereto.
binding on Owner and Contractor until final
4. No use or occupancy or separate
payment.
operation of part of the Work may occur
prior to compliance with the requirements of
E. Owner shall have the right to exclude Contractor
Paragraph 5.10 regarding property insurance.
from the Site after the date of Substantial
Completion subject to allowing Contractor
reasonable access to remove its property and 14.06 Final Inspection
complete or correct items on the tentative list.
A. Upon written notice from Contractor that the
entire Work or an agreed portion thereof is
14.05 Partial Utilization
complete, Engineer will promptly make a final
inspection with Owner and Contractor and will
A. Prior to Substantial Completion of all the Work,
notify Contractor in writing of all particulars in
Owner may use or occupy any substantially
which this inspection reveals that the Work is
completed part of the Work which has specifically
incomplete or defective. Contractor shall
been identified in the Contract Documents, or
immediately take such measures as are necessary
which Owner, Engineer, and Contractor agree
to complete such Work or remedy such
constitutes a separately functioning and usable
deficiencies.
part of the Work that can be used by Owner for its
intended purpose without significant interference
with Contractor’s performance of the remainder of 14.07 Final Payment
the Work, subject to the following conditions:
A. Application for Payment:
1. Owner at any time may request Contractor in
writing to permit Owner to use or occupy any 1. After Contractor has, in the opinion of
such part of the Work which Owner Engineer, satisfactorily completed all
believes to be ready for its intended use corrections identified during the final
and substantially complete. If and when inspection and has delivered, in accordance
Contractor agrees that such part of the Work with the Contract Documents, all maintenance
is substantially complete, Contractor, Owner, and operating instructions, schedules,
and Engineer will follow the procedures of guarantees, bonds, certificates or other
Paragraph 14.04.A through D for that part of evidence of insurance, certificates of
the Work. inspection, marked-up record documents (as
provided in Paragraph 6.12), and other
2. Contractor at any time may notify Owner and documents, Contractor may make application
Engineer in writing that Contractor considers for final payment following the procedure for
any such part of the Work ready for its progress payments.
intended use and substantially complete and
request Engineer to issue a certificate of 2. The final Application for Payment shall be
Substantial Completion for that part of the accompanied (except as previously delivered)
Work. by:
a. all documentation called for in the
3. Within a reasonable time after either such
Contract Documents, including but
request, Owner, Contractor, and Engineer
not limited to the evidence of
EJCDC C-700 Standard General Conditions of the Construction Contract
Copyright © 2007 National Society of Professional Engineers for EJCDC. All rights reserved.
Page 00700-46
insurance required by Paragraph indicating in writing the reasons for refusing
5.04.B.6; to recommend final payment, in which case
Contractor shall make the necessary
b. consent of the surety, if any, to final corrections and resubmit the Application for
payment; Payment.
c. a list of all Claims against Owner that
Contractor believes are unsettled; C. Payment Becomes Due:
and
1. Thirty days after the presentation to
d. complete and legally effective Owner of the Application for Payment and
releases or waivers (satisfactory to accompanying documentation, the amount
Owner) of all Lien rights arising recommended by Engineer, less any sum
out of or Liens filed in connection Owner is entitled to set off against Engineer’s
with the Work. recommendation, including but not limited to
liquidated damages, will become due and will
3. In lieu of the releases or waivers of Liens be paid by Owner to Contractor.
specified in Paragraph 14.07.A.2 and as
approved by Owner, Contractor may furnish
receipts or releases in full and an affidavit of 14.08 Final Completion Delayed
Contractor that: (i) the releases and receipts
include all labor, services, material, and A. If, through no fault of Contractor, final completion
equipment for which a Lien could be filed; of the Work is significantly delayed, and if
and (ii) all payrolls, material and equipment Engineer so confirms, Owner shall, upon receipt
bills, and other indebtedness connected with of Contractor’s final Application for Payment (for
the Work for which Owner might in any way Work fully completed and accepted) and
be responsible, or which might in any way recommendation of Engineer, and without
result in liens or other burdens on Owner's terminating the Contract, make payment of the
property, have been paid or otherwise balance due for that portion of the Work fully
satisfied. If any Subcontractor or Supplier completed and accepted. If the remaining balance
fails to furnish such a release or receipt in full, to be held by Owner for Work not fully completed
Contractor may furnish a bond or other or corrected is less than the retainage stipulated in
collateral satisfactory to Owner to indemnify the Agreement, and if bonds have been furnished
Owner against any Lien. as required in Paragraph 5.01, the written consent
of the surety to the payment of the balance due for
that portion of the Work fully completed and
B. Engineer’s Review of Application and accepted shall be submitted by Contractor to
Acceptance: Engineer with the Application for such payment.
1. If, on the basis of Engineer’s observation Such payment shall be made under the terms and
of the Work during construction and final conditions governing final payment, except that it
inspection, and Engineer’s review of the final shall not constitute a waiver of Claims.
Application for Payment and accompanying
documentation as required by the Contract 14.09 Waiver of Claims
Documents, Engineer is satisfied that the
Work has been completed and Contractor’s A. The making and acceptance of final payment will
other obligations under the Contract constitute:
Documents have been fulfilled, Engineer will,
within ten days after receipt of the final 1. a waiver of all Claims by Owner against
Application for Payment, indicate in writing Contractor, except Claims arising from
Engineer’s recommendation of payment and unsettled Liens, from defective Work
present the Application for Payment to Owner appearing after final inspection pursuant to
for payment. At the same time Engineer will Paragraph 14.06, from failure to comply with
also give written notice to Owner and the Contract Documents or the terms of any
Contractor that the Work is acceptable subject special guarantees specified therein, or from
to the provisions of Paragraph 14.09. Contractor’s continuing obligations under the
Otherwise, Engineer will return the Contract Documents; and
Application for Payment to Contractor,
EJCDC C-700 Standard General Conditions of the Construction Contract
Copyright © 2007 National Society of Professional Engineers for EJCDC. All rights reserved.
Page 00700-47
2. a waiver of all Claims by Contractor against tools, appliances, construction equipment, and
Owner other than those previously made in machinery at the Site, and use the same to the
accordance with the requirements herein and full extent they could be used by Contractor
expressly acknowledged by Owner in writing (without liability to Contractor for trespass or
as still unsettled. conversion);
2. incorporate in the Work all materials and
ARTICLE 15 – SUSPENSION OF WORK AND equipment stored at the Site or for which
TERMINATION Owner has paid Contractor but which are
stored elsewhere; and
15.01 Owner May Suspend Work
3. complete the Work as Owner may deem
A. At any time and without cause, Owner may expedient.
suspend the Work or any portion thereof for a
period of not more than 90 consecutive days by C. If Owner proceeds as provided in Paragraph
notice in writing to Contractor and Engineer 15.02.B, Contractor shall not be entitled to receive
which will fix the date on which Work will be any further payment until the Work is completed.
resumed. Contractor shall resume the Work on the If the unpaid balance of the Contract Price
date so fixed. Contractor shall be granted an exceeds all claims, costs, losses, and damages
adjustment in the Contract Price or an extension (including but not limited to all fees and charges
of the Contract Times, or both, directly of engineers, architects, attorneys, and other
attributable to any such suspension if Contractor professionals and all court or arbitration or other
makes a Claim therefor as provided in Paragraph dispute resolution costs) sustained by Owner
10.05. arising out of or relating to completing the Work,
such excess will be paid to Contractor. If such
15.02 Owner May Terminate for Cause claims, costs, losses, and damages exceed such
unpaid balance, Contractor shall pay the
A. The occurrence of any one or more of the difference to Owner. Such claims, costs, losses,
following events will justify termination for cause: and damages incurred by Owner will be reviewed
by Engineer as to their reasonableness and, when
1. Contractor’s persistent failure to perform the
so approved by Engineer, incorporated in a
Work in accordance with the Contract
Change Order. When exercising any rights or
Documents (including, but not limited to,
remedies under this Paragraph, Owner shall not be
failure to supply sufficient skilled workers or
required to obtain the lowest price for the Work
suitable materials or equipment or failure to
performed.
adhere to the Progress Schedule established
under Paragraph 2.07 as adjusted from time to
D. Notwithstanding Paragraphs 15.02.B and 15.02.C,
time pursuant to Paragraph 6.04);
Contractor’s services will not be terminated if
Contractor begins within seven days of receipt of
2. Contractor’s disregard of Laws or Regulations
notice of intent to terminate to correct its failure to
of any public body having jurisdiction;
perform and proceeds diligently to cure such
failure within no more than 30 days of receipt of
3. Contractor’s repeated disregard of the said notice.
authority of Engineer; or
E. Where Contractor’s services have been so
4. Contractor’s violation in any substantial way terminated by Owner, the termination will not
of any provisions of the Contract Documents. affect any rights or remedies of Owner against
Contractor then existing or which may thereafter
B. If one or more of the events identified in accrue. Any retention or payment of moneys due
Paragraph 15.02.A occur, Owner may, after giving Contractor by Owner will not release Contractor
Contractor (and surety) seven days written notice from liability.
of its intent to terminate the services of
Contractor: F. If and to the extent that Contractor has provided a
performance bond under the provisions of
1. exclude Contractor from the Site, and take Paragraph 5.01.A, the termination procedures of
possession of the Work and of all Contractor’s
EJCDC C-700 Standard General Conditions of the Construction Contract
Copyright © 2007 National Society of Professional Engineers for EJCDC. All rights reserved.
Page 00700-48
that bond shall supersede the provisions of the Contract and recover from Owner payment on
Paragraphs 15.02.B and 15.02.C. the same terms as provided in Paragraph 15.03.
15.03 Owner May Terminate For Convenience B. In lieu of terminating the Contract and without
prejudice to any other right or remedy, if Engineer
A. Upon seven days written notice to Contractor and has failed to act on an Application for Payment
Engineer, Owner may, without cause and without within 30 days after it is submitted, or Owner has
prejudice to any other right or remedy of Owner, failed for 30 days to pay Contractor any sum
terminate the Contract. In such case, Contractor finally determined to be due, Contractor may,
shall be paid for (without duplication of any seven days after written notice to Owner and
items): Engineer, stop the Work until payment is made of
all such amounts due Contractor, including
1. completed and acceptable Work executed in interest thereon. The provisions of this Paragraph
accordance with the Contract Documents 15.04 are not intended to preclude Contractor
prior to the effective date of termination, from making a Claim under Paragraph 10.05 for
including fair and reasonable sums for an adjustment in Contract Price or Contract Times
overhead and profit on such Work; or otherwise for expenses or damage directly
attributable to Contractor’s stopping the Work as
2. expenses sustained prior to the effective date permitted by this Paragraph.
of termination in performing services and
furnishing labor, materials, or equipment as
required by the Contract Documents in ARTICLE 16 – DISPUTE RESOLUTION – DELETE Entire
connection with uncompleted Work, plus fair Article.
and reasonable sums for overhead and profit
on such expenses; 16.01 Methods and Procedures
3. all claims, costs, losses, and damages A. Either Owner or Contractor may request
(including but not limited to all fees and mediation of any Claim submitted to Engineer for
charges of engineers, architects, attorneys, and a decision under Paragraph 10.05 before such
other professionals and all court or arbitration decision becomes final and binding. The
or other dispute resolution costs) incurred in mediation will be governed by the Construction
settlement of terminated contracts with Industry Mediation Rules of the American
Subcontractors, Suppliers, and others; and Arbitration Association in effect as of the
Effective Date of the Agreement. The request for
4. reasonable expenses directly attributable to mediation shall be submitted in writing to the
termination. American Arbitration Association and the other
party to the Contract. Timely submission of the
B. Contractor shall not be paid on account of loss of request shall stay the effect of Paragraph 10.05.E.
anticipated profits or revenue or other economic
loss arising out of or resulting from such B. Owner and Contractor shall participate in the
termination. mediation process in good faith. The process shall
be concluded within 60 days of filing of the
request. The date of termination of the mediation
15.04 Contractor May Stop Work or Terminate
shall be determined by application of the
mediation rules referenced above.
A. If, through no act or fault of Contractor, (i) the
Work is suspended for more than 90 consecutive
C. If the Claim is not resolved by mediation,
days by Owner or under an order of court or other
Engineer’s action under Paragraph 10.05.C or a
public authority, or (ii) Engineer fails to act on
denial pursuant to Paragraphs 10.05.C.3 or
any Application for Payment within 30 days after
10.05.D shall become final and binding 30 days
it is submitted, or (iii) Owner fails for 30 days to
after termination of the mediation unless, within
pay Contractor any sum finally determined to be
that time period, Owner or Contractor:
due, then Contractor may, upon seven days written
notice to Owner and Engineer, and provided 1. elects in writing to invoke any dispute
Owner or Engineer do not remedy such resolution process provided for in the
suspension or failure within that time, terminate Supplementary Conditions; or
EJCDC C-700 Standard General Conditions of the Construction Contract
Copyright © 2007 National Society of Professional Engineers for EJCDC. All rights reserved.
Page 00700-49
2. agrees with the other party to submit the accordance with the Contract Documents, as well
Claim to another dispute resolution process; as all continuing obligations indicated in the
or Contract Documents, will survive final payment,
completion, and acceptance of the Work or
3. gives written notice to the other party of the termination or completion of the Contract or
intent to submit the Claim to a court of termination of the services of Contractor.
competent jurisdiction.
17.05 Controlling Law
ARTICLE 17 – MISCELLANEOUS A. This Contract is to be governed by the law of the
state in which the Project is located.
17.01 Giving Notice
17.06 Headings
A. Whenever any provision of the Contract
Documents requires the giving of written notice, it A. Article and paragraph headings are inserted for
will be deemed to have been validly given if: convenience only and do not constitute parts of
these General Conditions.
1. delivered in person to the individual or to a
member of the firm or to an officer of the
corporation for whom it is intended; or 17.07 Resident Project Representative Responsibilities and
Authority
2. delivered at or sent by registered or certified
mail, postage prepaid, to the last business
address known to the giver of the notice.
17.02 Computation of Times
A. When any period of time is referred to in the
Contract Documents by days, it will be computed
to exclude the first and include the last day of such
period. If the last day of any such period falls on a
Saturday or Sunday or on a day made a legal
holiday by the law of the applicable jurisdiction,
such day will be omitted from the computation.
17.03 Cumulative Remedies
A. The duties and obligations imposed by these
General Conditions and the rights and remedies
available hereunder to the parties hereto are in
addition to, and are not to be construed in any way
as a limitation of, any rights and remedies
available to any or all of them which are otherwise
imposed or available by Laws or Regulations, by
special warranty or guarantee, or by other
provisions of the Contract Documents. The
provisions of this Paragraph will be as effective as
if repeated specifically in the Contract Documents
in connection with each particular duty,
obligation, right, and remedy to which they apply.
17.04 Survival of Obligations
A. All representations, indemnifications, warranties,
and guarantees made in, required by, or given in
EJCDC C-700 Standard General Conditions of the Construction Contract
Copyright © 2007 National Society of Professional Engineers for EJCDC. All rights reserved.
Page 00700-50
SHA Contract No. CH257B51
F.A.P. Contract No. AC-TAP-3(871)E
DOCUMENT 00800
SUPPLEMENTARY CONDITIONS
These Supplementary Conditions amend or supplement the Standard General Conditions of the
Construction Contract, EJCDC C-700 (2007 Edition). All provisions which are not so amended
or supplemented remain in full force and effect.
The terms used in these Supplementary Conditions have the meanings stated in the General
Conditions. Additional terms used in these Supplementary Conditions have the meanings stated
below, which are applicable to both the singular and plural thereof.
The address system used in these Supplementary Conditions is the same as the address system
used in the General Conditions, with the prefix “SC” added thereto.
SC-1.01.A
Add the following new Defined Terms to General Conditions Paragraph 1.01.A:
52. Consultant – A person, firm, or corporation having a contract with Owner or
Engineer to furnish services as Owner's or Engineer’s independent professional
associate with respect to the Project and who is identified as such in the
Supplementary Conditions.
53. Emergency – An occurrence which in the opinion of the Owner, the Owner’s
Representative, or the Contractor requires immediate attention by the Contractor
and for which written notice to the Contractor, or the Owner, due to the urgency of
the occurrence, cannot be issued within the time stipulated by the General
Conditions.
54. Products – New materials, machinery, components, equipment, fixtures, systems,
and any other item which will become or has become a permanent physical
portion of the Work. The term “Products” may also include materials, equipment,
or components removed from existing facilities that may, if specifically permitted
by the Contract Documents, be re-used in the Work. The term “Products” does
not include machinery and equipment used for preparation, fabrication, conveying,
or erection of the Work.
55. Imminent Danger - Any conditions or practices in any place of employment, which
are such that a danger exists, which could reasonably be expected to cause death or
serious physical harm to a person immediately or before the imminence of such
danger can be eliminated.
6508.22 00800-1 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P. Contract No. AC-TAP-3(871)E
SC-1.01.A.8
Delete General Conditions Subparagraph 1.01.A.8 in its entirety.
SC-1.01.A.27
Amend the defined term “Notice of Award” to read “Notice of Intent to Award.”
SC-1.01.A.34
Delete General Conditions Subparagraph 1.01.A.34 in its entirety and insert the following in its
place:
34. Project Manual – The bound document containing the Invitation to Bid, Instructions
to Bidders, Bidding Documents, Contract Documents, General Conditions,
Supplementary Conditions, the Specifications (Divisions 1 through 16, as
applicable), and any attached supplementary exhibits, appendices, and attachments..
SC-1.01.A.36
Delete General Conditions Subparagraph 1.01.A.36 in its entirety and insert the following in its
place:
36. Resident Project Representative – A representative of either the Owner or Engineer
who may be assigned to the Project site on either a full- or part-time basis. The
duties, responsibilities, and limitations on authority of the Resident Project
Representative are specified in Supplementary Conditions paragraph SC-17.07.
SC-1.01.A.44
Add the following new subparagraph to General Conditions Subparagraph 1.01.A.44:
a. In accordance with PA Act 317 of 1978, as amended by Pennsylvania Public Works
Contract Regulation Law Act 142 of 1994, in no event will the Work be certified as
substantially complete until at least 90 percent of Work is completed. Partial
utilization of any portion of the Work does not constitute Substantial Completion
for that portion. Refer to Section 01700 for additional requirements to be met prior
to Engineer issuing a “Definitive Certificate of Substantial Completion”.
6508.22 00800-2 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P. Contract No. AC-TAP-3(871)E
SC-2.02.A
Delete General Conditions Paragraph 2.02.A in its entirety and insert the following in its place:
A. Owner will furnish to the Contractor five (5) complete sets of the Contract
Documents. Additional copies of the Contract Documents may be obtained from
the Owner at the cost specified below.
1. Additional bound copies of the Project Manual: $40.00 per set.
2. Additional Drawings: 4.00 per sheet.
SC-2.03.A
Delete General Conditions Paragraph 2.03.A in its entirety and insert the following in its place:
A. The Contract Times will commence to run on the Effective Date of the Agreement,
or if a Notice to Proceed is given on the date indicated on the Notice to Proceed.
SC-2.05.A
Amend General Conditions Paragraph 2.05.A by deleting from the first line the words
“…Effective Date of the Agreement…” and replacing them with “…date when the Contract
Times commence to run…”.
SC-2.05.B
Add the following new Paragraph immediately after General Conditions Paragraph 2.05.A:
B. Insurance Certificates: Before any Work at the site is started, Contractor shall
deliver to Owner, with a copy to Engineer, certificates (and other evidence of
insurance requested by Owner) which Contractor is required to purchase and
maintain in accordance with General Conditions Paragraph 5.04 and Supplementary
Conditions Paragraph SC-5.06.
SC-2.06
Delete General Conditions Paragraphs 2.06.A and 2.06.B in their entirety. A pre-construction
conference will not be required for this Project.
SC-3.03.B
Add the following new subparagraph to General conditions Paragraph 3.03.B:
2. If there are any conflicts, errors, ambiguities, or discrepancies within the Contract
Documents, the documents shall be interpreted in the following order of precedence:
6508.22 00800-3 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P. Contract No. AC-TAP-3(871)E
(1) Agreement, together with all Written Amendments, (2) Supplementary
Conditions, (3) Standard General Conditions, (4) Specifications together with all
Written Amendments, Change Orders, Work Orders, Change Directives, Field
Orders, and Engineer’s written interpretations and clarifications, (5) Drawings as
more specifically identified in the Agreement, together with all Written
Amendments, Change Orders, Work Orders, Change Directives, Field Orders and
Engineer’s written interpretations and clarifications.
SC-4.02
Delete General Conditions Paragraphs 4.02.A and 4.02.B, including their subparagraphs, in their
entirety and delete all references to them elsewhere in the Contract Documents.
SC-5.01.B
Add the following new subparagraph to General Conditions Paragraph 5.01.B:
1. The Payment Bond and the Performance Bond, or other instruments of financial
security, to be supplied by the Contractor shall be in the forms included in the
Contract Documents, and no other forms shall be acceptable.
SC-5.01.D
Add the following new Paragraph immediately after General Conditions Paragraph 5.01.C:
D. Additional Bonds: If Contract Price or Contract Times are changed in
accordance with General Conditions Article 10, Owner may require that
Contractor’s bonds and insurance policies be modified to reflect such
changes. Any resulting changes in Contractor’s bond and insurance costs
will be paid for in accordance with General Conditions
Paragraph 11.01.A.5.i.
SC-5.03
Delete General Conditions Paragraphs 5.03A and 5.03.B in their entirety and replace with the
following:
A. Contractor shall deliver to Owner, with copies to each additional insured identified
in the Supplementary Conditions, certificates of insurance (and other evidence of
insurance requested by Owner or any other additional insured) which Contractor is
required to purchase and maintain in accordance with General Conditions
Paragraph 5.04 and Supplementary Conditions Paragraphs SC-5.04 and SC-5.06.A
through SC-5.06.E
6508.22 00800-4 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P. Contract No. AC-TAP-3(871)E
B. Contractor shall submit evidence of required insurance coverage on the most current
Accord 25 “Certificate of Insurance” form. All the policies of insurance required to
be purchased and maintained by Contractor shall not be cancelled or materially
changed until thirty days prior notice has been given by Contractor to Owner and
Engineer and to each additional insured, and shall contain waiver provisions in
accordance with General Conditions Paragraph 5.07, as amended by Supplementary
Conditions Paragraphs SC-5.07.A and SC-5.07.B.
SC-5.04.B
Amend General Conditions Subparagraph 5.04.B.1 by inserting the word ”non-contributory”
between the words “primary” and “coverage” at the end of the Subparagraph.
SC-5.04.C
Add the following new Paragraph immediately after General Conditions Paragraph 5.04.B:
C. The limits of liability for the insurance required by General Conditions
Paragraphs 5.04.A.1 through 5.04.B.6 inclusive shall provide coverage for not
less than the following amounts or greater where required by Laws and
Regulations; coverage shall be per project and per occurrence:
1. Workers’ Compensation, and related coverages under General
Conditions Paragraphs 5.04.A.1 and 5.04.A.2:
a. State: Statutory
b. Applicable Federal Statutory
(e.g. Longshoreman’s):
c. Employer’s Liability: $1,000,000
6508.22 00800-5 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P. Contract No. AC-TAP-3(871)E
2. Contractor’s General Liability under General Conditions Paragraphs
5.04.A.3 through 5.04.A.6, which shall include completed operations
and product liability coverage; and eliminate the exclusion with respect
to property under the care, custody and control of Contractor(*):
a. General Aggregate: $3,000,000
b. Products – Completed Operations $1,000,000
Aggregate:
c. Personal and Advertising Injury: $1,000,000
d. Each Occurrence (Bodily Injury $1,000,000
and Property Damage):
e. Property Damage liability insurance will provide Explosion,
Collapse, and Under-ground coverage’s, where applicable.
f. Blasting hazards, where applicable.
g. Excess or Umbrella Liability: (**)
General Aggregate: $3,000,000
Each Occurrence: $1,000,000
(*) If Contractor’s insurance does not allow eliminating the exclusion
with respect to property under its care, custody and control,
Contractor shall provide, by endorsement, “Voluntary Property
Damage” coverage in the amount of the full replacement cost of
the damaged property.
(**) If Contractor has lower underlying coverage than required above
under Paragraphs SC-5.04.C.2.a through SC-5.04.C.2.d,
Contractor may provide additional coverage to at least satisfy the
required amount.
6508.22 00800-6 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P. Contract No. AC-TAP-3(871)E
3. Automobile Liability under Paragraph 5.04.A.6 of the General
Conditions:
a. Bodily Injury and Property $1,000,000
Damage, Combined Single Limit
of:
4. The Contractual Liability coverage required by General Conditions
Paragraph 5.04.B.3 shall provide coverage for not less than the
following amounts:
a. Bodily Injury and Property
Damage (Each Occurrence):
Combined Single Limit $1,000,000
Contractor’s insurance agent shall indicate on the insurance certificate, or by separate letter, that the
limits required herein and shown on the certificate have not been reduced by an outstanding claim; and
that the specific coverages required under Paragraph SC- 5.04 are provided in the Comprehensive
General (Public) Liability Policy.
SC-5.05.A
Delete General Conditions Paragraph 5.05.A in its entirety.
SC-5.06.A
Delete General Conditions Paragraph 5.06 A, including its subparagraphs, in its entirety and
insert the following in its place:
A. Contractor shall purchase and maintain property insurance upon the Work at the Site
in the amount of the full replacement cost therefo. Contractor shall be responsible
for any deductible or self-insured retention. This insurance shall:
1. Include the interests of Owner, Contractor, Subcontractors, Engineer,
Engineer’s Consultants, and the officers, directors, partners, employees,
agents and other consultants and subcontractors of any of them, each of
whom is deemed to have an insurable interest and shall be listed as an insured
or loss payee;
2. Be written on a Builder’s Risk “all-risk” policy form that shall at least include
insurance for physical loss and damage to the Work, temporary buildings,
falsework, and materials and equipment in transit and shall insure against at
least the following perils or causes of loss: fire lightning, extended coverage,
theft, vandalism and malicious mischief, earthquake, collapse, debris
removal, demolition occasioned by enforcement of Laws and Regulations,
6508.22 00800-7 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P. Contract No. AC-TAP-3(871)E
water damage, and such other perils or causes of loss as may be specifically
required by these Supplementary Conditions and shall also include “soft
costs”;
3. Include expenses incurred in the repair or replacement of any insured
property (including but not limited to fees and charges of engineers and
architects);
4. Cover materials and equipment stored at the Site or at another location that
was agreed to in writing by Owner prior to being incorporated in the Work,
provided that such materials and equipment have been included in an
Application for Payment recommended by Engineer;
5. Allow for partial utilization of the Work by Owner;
6. Include testing and startup;
7. Be maintained in effect until final payment is made unless otherwise agreed
to in writing by Owner, Contractor, and Engineer with 30 days written notice
to each other loss payee to whom a certificate of insurance has been issued;
and
8. Comply with the requirements of General Conditions Paragraph 5.06.C.
SC-5.06.B
Delete General Conditions Paragraph 5.06.B in its entirety and replace with the following:
B. Contractor shall purchase and maintain equipment breakdown insurance any other
additional property insurance required by Laws and Regulations, which insurance
shall include the interest of Owner, Contractor, Subcontractors, and Engineer and
their officers, directors, partners, employees, agents and other consultants and
subcontractors of any of them, each of whom is deemed to have an insurable interest
and shall be listed as an additional insured or loss payee.
SC-5.07.A
Amend General Conditions Paragraph 5.07.A by inserting the word “and non-contributory”
immediately after the word “primary” at the end of the fifth line.
Add the following new Subparagraph to General Conditions Paragraph 5.07.A:
1. Notwithstanding the provisions of Paragraph 5.07.A, any waiver of rights by the
Owner shall be effective only to the extent of actual recovery of insurance proceeds.
6508.22 00800-8 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P. Contract No. AC-TAP-3(871)E
SC-5.07.B
Add the following new Subparagraph to General Conditions Paragraph 5.07.B:
3. Notwithstanding the provisions of Paragraph 5.07.B and its Subparagraphs, any
waiver of rights as contemplated shall be effective only if such waiver is permitted by
Owner's policies.
SC-6.02.B
Add the following new subparagraphs to General Conditions Paragraph 6.02.B:
1. Regular working hours for the Project are defined as 7:30 A.M. to 4:30 P.M. Monday
through Friday.
2. If Owner consents to Contractor working during non-regular hours or on Saturday,
Sunday, or any legal holiday, Contractor shall reimburse Owner for wages, salaries,
and expenses paid to Owner’s and Engineer’s personnel which, in the Owner’s
judgment, are required to be present at the Project site during the Contractor’s
Work. Contractor’s reimbursement to Owner for these extra personnel costs will be
in the form of deduction from a progress payment. Contractor’s superintendent
shall also be present during performance of Work during non-regular hours, or on
Saturday, Sunday, or any legal holiday.
SC-6.05
Delete General Conditions Paragraphs 6.05.A through 6.05.F in their entirety and insert the
following new Paragraphs 6.05.A through 6.05.L in their place:
A. “Or-Approved Equal”: If in Engineer’s sole discretion a Product proposed by
Contractor is functionally the same, is fully equivalent in quality and durability, and
is sufficiently similar so that no change in related Work will be required, it may be
considered by Engineer as an “or-approved equal” item, in which case review and
approval of the proposed Product may, in Engineer’s sole discretion, be
accomplished without compliance with some or all of the requirements, specified in
the following Paragraphs 6.05.C. through 6.05.J., for acceptance of proposed
substitute items.
B. Substitute Items: If in Engineer’s sole discretion a Product proposed by Contractor
does not qualify as an “or-approved equal” item under Paragraph 6.05.A. above, it
will be considered a proposed substitute item. The determination as to whether the
Product is an “or-approved equal” or a proposed substitute item will be made during
Engineer’s review of the Product Shop Drawing, as defined in Article 1 of the
General Conditions. If the Product proposed by the Contractor is not considered an
“or-approved equal” Product, the Shop Drawing will be returned to the Contractor
6508.22 00800-9 ARRO
TOWN OF INDIAN HEAD –TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P. Contract No. AC-TAP-3(871)E
with the notation “Returned for Correction”. Contractor will then be required to
proceed as specified in the following Paragraphs 6.05.C through 6.05.J.
C. Submit three copies of request for substitution, plus the number required to be
returned to the entity making the request, to the Engineer. Each request for
substitution shall cover one Product only.
D. Requests for Equal or substitutions will be accepted only from a prime Contractor
on the Project and, if requests are permitted during the Bidding period, from a
Bidder as defined in the Instructions to Bidders.
E. If Instructions to Bidders allow requests for Equal or substitutions during the
Bidding period, time the submittal so that Engineer receives request for at least 18
days prior to the Bid opening date.
F. Submit, with request for substitution, Shop Drawings, Product data, warranty
information, case histories, lists of projects on which the Product has been
successfully used, test reports, manufacturer’s company profile, name and address of
manufacturer’s service organization, and other data as required to establish that
proposed substitute Product is fully equivalent in quality to the Product of the
named manufacturer(s) and meets all Specification requirements.
G. Submit, with request for Equal or substitution, the dollar amount which the Owner
will receive as a credit toward the Contract Price if the Equal or substitution is
approved. The Owner and Engineer reserve the right to make an independent
investigation of the cost savings, to negotiate with the Contractor to increase the
credit, and to reject a proposed Equal or substitution if the credit is considered
insufficient.
H. Attach letters, provided by other contractors whose work may be affected by the
proposed substitution, stating that the substitution will either have no effect on their
work or that the substitution will affect their work and that the entity making the
request for substitution has agreed to pay any extra costs which may be incurred if
the substitution is approved. (This requirement does not apply during the Bidding
period.)
I. The entity submitting the request for Equal or substitution shall include, on its
transmittal letter, the signed statement: “The signer of this letter certifies that all
requirements of Supplementary Conditions Paragraph SC-6.05.I have been or will be
met”. The signer of the transmittal letter, by making this statement, affirms that: the
proposed substitute Product has been investigated and has been found to equal or
exceed in quality and durability the Product of the named manufacturer(s) and,
further, that it meets all Specification requirements; all other prime contractors on the
Project have been contacted as to the effect of the proposed substitution on their
work and that letters from all other prime contractors are being submitted with the
request (this condition does not apply during the Bidding period); the same Product
warranty, which would have been provided by the named manufacturer(s), will be
provided for the substitute Product; the entity submitting the request for substitution
6508.22 00800-10 ARRO
TOWN OF INDIAN HEAD –TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P. Contract No. AC-TAP-3(871)E
will coordinate installation of the proposed substitute and make any required changes
in the Work at no additional cost to the Owner; the entity submitting the request for
substitution will not make claims for additional costs, including but not limited to
costs resulting from increases in purchase price(s) and installation costs of accepted
substitute Product(s), or additional time required to implement the substitution; the
entity making the request for substitution will reimburse the Owner for all costs
associated with review by Engineer, or others, of the request for substitution, all
redesign costs, and all costs required to obtain re-approval from regulatory agencies;
all licenses required for use of the proposed substitute Product will be obtained and
paid for by the entity submitting the request for substitution and such license(s) will
be transferred to the Owner; if required by the Engineer, the entity submitting the
request for substitution will provide a special performance warranty or bond
(separate from the Contract Performance Bond) as a condition of Engineer’s
acceptance of the proposed substitute Product (such bond may be in an amount up to
200 percent of the dollar value of the Product as determined by the Engineer).
J. Engineer will notify the entity submitting the request, in writing, of decision to
accept or reject proposed substitute Product.
K. The procedures for proposed substitute means, methods, techniques, sequences, or
procedures shall be equivalent to those specified above in Paragraphs 6.05.A.
through 6.05.J.
L. Engineer will be allowed a reasonable time within which to evaluate each proposed
substitute. Engineer will be the sole judge of acceptability, and no substitute will be
ordered, installed, or utilized without Engineer’s prior written approval. Engineer
will record time required by Engineer and Engineer’s Consultants in evaluating
substitutions, making any required revisions to Contract Documents, and obtaining
re-approval from regulatory agencies. Contractor will be charged for the recorded
man-hours, whether or not substitution is approved, at Engineer’s and Engineer’s
Consultant’s current hourly rates. Charges shall be subtracted from the Contractor’s
next progress payment.
SC-6.06.B
Add the following new subparagraph to General Conditions Paragraph 6.06B:
1. Instructions to Bidders and these Supplementary Conditions require that a list of
proposed Subcontractors be submitted with the Bid. Contractor shall not make
substitutions of Subcontractors shown on the list, or additions of Subcontractors,
after award of a Contract, without prior written approval of Owner or Engineer.
Engineer will be allowed a reasonable time within which to investigate each
proposed substitute or new Subcontractor. Engineer will be the sole judge of
acceptability, and no substitute/new Subcontractor will perform any portion of the
Work without Engineer’s prior written approval. Engineer will record time required
by Engineer in investigating the proposed substitute/new Subcontractor(s).
Contractor shall be charged for the recorded man-hours, whether or not substitution
6508.22 00800-11 ARRO
TOWN OF INDIAN HEAD –TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P. Contract No. AC-TAP-3(871)E
is approved, at Engineer’s current hourly rates. Charges will be subtracted from the
Contractor’s next progress payment.
SC-6.06.G
Add the following new sub-paragraph to General Conditions Paragraph 6.06.G:
1. If a written agreement between the Contractor and a Subcontractor or supplier is not
obtained, Contractor, Subcontractor or supplier will not be entitled to payment for
any additional Work performed or changes to Work performed by Subcontractor or
Supplier.
SC-6.09.A
Add the following new subparagraph(s) to General Conditions Paragraph 6.09.A:
1. The Contractor shall comply with Federal minimum wage rate laws and regulations
and the “Labor Standards Provisions for Federal and Federally-Assisted Contracts.”
The applicable provisions of the regulations and the wage rate determination are
included in this Project Manual.
2. The Contractor shall comply with Federal Requirements and Contract Provisions
included in this Project Manual, which provisions cover:
a. Buy American provisions.
b. Affirmative Action Program requirements and goals.
c. Minority Business Enterprise (MBE) program requirements.
d. MBE documentation requirements.
e. Certification of non-segregated facilities.
f. Project sign requirements
Buy American.
6508.22 00800-12 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P. Contract No. AC-TAP-3(871)E
SC-6.10.A
Delete General Conditions Paragraph 6.10.A in its entirety and insert the following in its place:
A. The Contractor shall be responsible for the payment of all sales and use taxes
required by law on all Products which may be purchased for use in and which will
become part of the Work. Owner may be exempt from sales and use taxes for
certain Products to be incorporated into the Work. Contractor shall obtain legal
advice to determine how and to what extent the Owner's tax exemption may be
utilized by the Contractor. Owner will provide, at Contractor's request, required
documentation to assist Contractor in obtaining any applicable tax exemptions.
SC-6.11.A
Add the following new subparagraph immediately after General Conditions subparagraph
6.11.A.3:
4. Contractor’s responsibility shall include repairing, replacing, or restoring damaged
property to its original or better condition, or the payment of money in a sum equal
to the reasonable value of the damage caused to such property. If Contractor fails to
promptly repair or replace damaged property, Owner may have the work performed
by others and the cost of such work shall be deducted from Contractor’s subsequent
progress payment.
SC-6.11.D
Add the following new subparagraphs to General Conditions Paragraph 6.11.D:
1. The Contractor shall determine the legal dimensional and load limits on all roads
and bridges over and under which equipment and materials will be moved. In the
event that loads or dimensions exceed legal limits, the Contractor shall obtain the
necessary permits, pay permit fees, and comply with all regulations for moving such
loads.
2. Contractor shall be responsible for damages to structures, roads and bridges
resulting from loads or dimensions exceeding legal or design limits.
SC-6.16
Add the following new Paragraphs immediately after General Conditions Paragraph 6.16.A:
B. The Contractor shall provide during non-working hours a maintenance crew to
correct conditions, which are hazardous to the public or detrimental to proper
system operation. If the Contractor refuses, or fails to correct the problem within a
reasonable period of time, the Owner will have the necessary corrections performed
by others and the full cost of the work shall be deducted from Contractor’s
subsequent Application for Payment. Names, addresses, and telephone numbers of
6508.22 00800-13 ARRO
TOWN OF INDIAN HEAD –TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P. Contract No. AC-TAP-3(871)E
the Contractor’s emergency repair personnel shall be submitted to the Owner and
Engineer at the pre-construction conference.
C. In the event of an emergency if Contractor refuses, or fails to respond to Owner’s
directive to make necessary corrections Owner may stop work immediately, and
without seven days’ written notice as required by General Conditions Paragraph 15.02.
SC-6.19.C
Add the following new subparagraph immediately after General Conditions subparagraph 6.19.C.7:
8. Any contract between Owner and subcontractor regarding the correction of
defective work.
SC-6.20.C
Delete General Conditions Paragraph 6.20.C in its entirety. Including its subparagraphs, and
insert the following in its place:
C. The indemnification obligations of the Contractor under Paragraph 6.20.A shall not
extend to the liability of the Engineer, Engineer’s Consultants, agents, officers,
directors, or employees arising out of errors or omissions of any of them in the
preparation of maps, drawings, opinions, reports, surveys, Change Orders, designs
or specifications, or the giving or failure to give directions or instructions, relating to
design of the Work, as opposed to Project Construction procedures, by the Engineer,
its agents or employees, if such giving or failure to give is the primary cause of the
injury or damage.
SC-7.02
Delete General Conditions Paragraphs 7.02.A and 7.02.B, including its subparagraphs, in their
entirety and replace with the following two new Paragraphs A and B:
A. The Contractor for General construction shall be designated the Construction
Coordinator as defined in SC-1.50. The Construction Coordinator shall have
coordination responsibility for all contracts in progress during performance of the
Work.
B. The Construction Coordinator’s responsibilities shall consist of:
1. Preparation of an overall progress schedule covering the work of all prime
contractors on the Project (GC-2.05.A.1 and General Requirements Section
01050).
6508.22 00800-14 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P. Contract No. AC-TAP-3(871)E
2. Surveying to locate building corners, construction benchmarks, and other
required Project control points (GC-4.05 and General Requirements Section
01010).
3. Obtaining and paying for building permit for entire Project (GC-6.08) unless
otherwise specified in Section 01010.
4. Coordinating storage of all equipment and materials on site (GC-6.11.A and
General Requirements).
5. Cleaning entire Project site, both during construction and upon completion
(GC-6.11.B and General Requirements).
6. Preparation and submission of Work Sequence (General Requirements
Section 01010).
7. Meeting all Special Requirements, including but not limited to paying all
invoices for electricity (whether billed to the Owner or to the Contractor),
used during construction up to final payment and acceptance of the Work,
unless otherwise specified in Section 01500.
8. Scheduling and coordinating the work of all prime contractors on the Project
(GC-7.02.A and General Requirements).
9. Requesting Certificate of Substantial Completion and scheduling closeout
inspections for entire Project (GC-14.04 and General Requirements, Section
01700).
10. Coordinating prime contractors’ work on list of items to be completed
(punchlist) (GC-14.04 and General Requirements).
11. Assuming responsibility for granting use of part of Project to Owner before
completion of entire Project (GC-14.05).
12. Developing, implementing, and monitoring security program for entire
Project, including erection of fencing (General Requirements, Section
01500).
13. Providing water and sanitary facilities for entire Project (General
Requirements, Section 01500).
14. Coordinating locations for field offices and parking areas for all contractors’
personnel (General Requirements, Section 01500).
15. Providing office for Resident Project Representative (General Requirements,
Section 01500).
16. Fabricating and erecting Project signs (General Requirements, Section
01500).
6508.22 00800-15 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P. Contract No. AC-TAP-3(871)E
17. Taking and submitting construction photographs and video records for entire
Project (General Requirements, Section 01300).
18. Coordination of system start-up and training of Owner’s operating personnel
(General Requirements, Section 01650).
19. Initial operation of facility (General Requirements, Section 01650).
20. Constructing and maintaining temporary access entrances and roads (General
Requirements, Section 01560).
21. Sediment and erosion control measures for entire Project (General
Requirements, Section 01560).
SC-8.04
Insert the following text at the end of General Conditions Paragraph 8.04.A:
“….unless otherwise dictated by a State/Federal law or regulation, or agreed to by Owner and
Contractor.”
SC-8.06
Delete General Conditions Paragraph 8.06 in its entirety.
SC-8.13
Add the following new Paragraph to General Conditions Article 8:
8.13 Resident Project Representative:
A. Owner will assign a Resident Project Representative (RPR) to the Project site.
The responsibilities, authority and limitations thereon of the Resident Project
Representative will be as provided in Supplementary Conditions
Paragraph SC-17.07.A.
SC-9.01
Modify the first sentence of General Conditions Paragraph 9.01 to read:
“Engineer will be one of Owner’s representatives during the construction period.”
6508.22 00800-16 ARRO
TOWN OF INDIAN HEAD –TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P. Contract No. AC-TAP-3(871)E
SC-9.03.A
Delete General Conditions Paragraph 9.03.A in its entirety, including the heading “Project
Representative.” Delete all other General Conditions references to Paragraph 9.03.A.
SC-9.09.A
Add the following new subparagraphs under General Conditions Paragraph 9.09.A:
1. The Engineer will give the Contractor all desired assistance in interpreting
specifications, drawings, or written instructions. Such assistance or lack thereof
shall not relieve the Contractor from its responsibility to perform the Work in
accordance with the Contract Documents.
2. The fact that the Engineer has permitted faulty work, or work to be performed not in
accordance with the Contract Documents will not prevent the Engineer or Owner
from requiring that the Contractor corrects any faults or incorrect construction
immediately at no additional cost to the Owner.
3. The Engineer may not enter into any agreement with a Subcontractor which binds
the Owner to make payments for work performed by the Subcontractor absent
express written permission by the Owner for the specific work and Subcontractor
involved.
SC-10.01.C
Add the following new Paragraph immediately after General Conditions Paragraph 10.01.B.
C. When submitting a Change Order request, the Contractor shall provide such
information as the Engineer and Resident Project Representative may require for the
preparation of the Change Order in accordance with the General Conditions. Such
information may include, but not be limited to, the following:
1. Itemized description of the addition, deletion, or revision to the Work.
2. Itemized description of the change in the Contract Price, including itemized
contractor’s /subcontractor’s labor costs and materials pricing data to enable
determination of the necessity and reasonableness of the costs. For work
performed by subcontractor(s), documentation may require submittal of actual
invoices.
3. Description of the change, if any, in the Contract Time. The Contractor shall
submit adequate documentation to satisfactorily prove that the nature of the
delay actually and unavoidably will impact the Contract Times.
6508.22 00800-17 ARRO
TOWN OF INDIAN HEAD –TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P. Contract No. AC-TAP-3(871)E
SC-11.01.B
Add the following new subparagraph to General Conditions Paragraph 11.01.B:
6. Costs associated with retaining Contractor’s and others’ own or rented equipment
on the site, but not utilized, due to work stoppage or any other reason, including but
not limited to addressing unforeseen, unknown and differing subsurface or physical
conditions.
SC-11.01.C
Amend General Conditions Paragraph 11.01.C by inserting the following words prior to the word
“Agreement” at the end of the first sentence:
“…Bid Form which is attached to the...”
SC-11.03.D
Amend General Conditions Subparagraph 11.03.D by inserting the following words at the
beginning of the Paragraph:
D. “Unless otherwise noted in the Bid Form, or elsewhere in the Contract
Documents…”
SC-12.01.B
Add the following new Subparagraph immediately after General Conditions Subparagraph
12.01.B.3:
4. Where the Work involves locating and repairing unmarked, or incorrectly marked,
underground utilities or utilities previously (concealed) damaged, or which due to
age must be replaced, Contractor shall be reimbursed as required by specification
Section 02015.
SC-12.01.B.2
Amend General Conditions Subparagraph 12.01.B.2 by deleting the words within the parentheses
and replacing them with the following:
…(which may include a fee for overhead and profit in accordance with General
Conditions Paragraph 12.01.C.2)…
SC-12.01.C
Amend General Conditions Paragraph 12.01.C by deleting subparagraph 1.
6508.22 00800-18 ARRO
TOWN OF INDIAN HEAD –TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P. Contract No. AC-TAP-3(871)E
SC-12.01.C.2
Amend subparagraph 12.01.C.2 of the General Conditions by deleting the following words at the
beginning of the subparagraph:
“…if a fixed fee is not agreed upon, then…”.
SC-12.03
Add the following at the end of General Conditions Paragraph E:
“……Costs resulting from such delays, including but not limited to liquidated damages
and regulatory agencies’ penalties, shall be deducted, by Change Order, from
Contractors Final Application for Payment in accordance with the Agreement.
Add the following new Paragraphs immediately after General Conditions Paragraph 12.03.E:
F. When Contractor has submitted to Owner a schedule for completing the Work within
a shorter time period than the Contract Times, or Milestones indicated in the
Agreement, Contractor will not be entitled to any claims for additional costs, of any
type, or delays, if the Contractor-submitted time schedule is for any reason exceeded,
but its completion date is still within the Contract Times indicated in the Agreement.
G. Contractor shall submit to Engineer detailed documentation, which shall include
associated costs, reason(s), including but not limited to those described in General
Conditions Paragraph 12.03.A , and responsible party, for all delays beyond the
control of the Contractor.
SC-13.03.B
Amend General Conditions Paragraph 13.03.B by deleting the word “Owner” at the beginning of
the Paragraph and replacing it with the following:
“Unless otherwise specified in Section 01025 of the Project Manual, Contractor…”
SC-13.07.C
Delete General Conditions Paragraph 13.07.C and replace with the following:
C. Correction Period for Products placed into service prior to the date of Substantial
Completion, as defined in Supplementary Conditions Paragraph SC-1.01.44, shall
not begin any earlier than the date of Substantial Completion for the entire Project
(the Work).
6508.22 00800-19 ARRO
TOWN OF INDIAN HEAD –TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P. Contract No. AC-TAP-3(871)E
SC-14.02.A
Add the following new subparagraph immediately after General Conditions
subparagraph 14.02.A.3:
4. Conditions relating to payment for Products suitably stored on the Project site or
elsewhere, but not yet incorporated in the Work, are given in General Requirements
Section 01025 of the Project Manual.
SC-14.04.C
Amend General Conditions Paragraph 14.04.C by deleting the following words from the end of
the first sentence and inserting them in the last sentence, after the parenthesis”
“. . . , which shall fix the date of Substantial Completion”
SC-14.07.A.2
Amend General Conditions Subparagraph 14.07.A.2.b to read as follows:
b. consent of surety to final payment;
SC-17.02.A
Delete General Conditions Paragraph 17.02.A in its entirety and replace with the following:
A. When any period of time is referred to in the Contract Documents by “day(s)” it will
be defined to mean “calendar day(s)” except when it is contained within a Federal or
State legal act, or statute, in which case it will be as defined by the legal act or
statute.
SC-17.07
Add the following new Paragraph immediately after General Conditions Paragraph 17.06:
17.07 Resident Project Representative Responsibilities and Authority
A. A Resident Project Representative (RPR) will be assigned to the Project site. The
responsibilities and authority and limitations thereon of the RPR will be as follows:
1. Schedules: Review the progress schedule and schedule of values prepared by
Contractor and consult with Owner and Engineer concerning acceptability.
6508.22 00800-20 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P. Contract No. AC-TAP-3(871)E
2. Conferences and Meetings: Attend meetings with Contractor, such as pre-
construction conferences, progress meetings, pre-installation conferences and
other project-related meetings.
3. Liaison:
a. Serve as Owner’s liaison with Contractor, working principally through
Contractor’s superintendent to assist in understanding the intent of the
Contract Documents.
b. Serve as Owner’s liaison with Contractor when Contractor’s operations
affect Owner’s on-site operations.
c. Assist in obtaining from Owner or Engineer additional details or
information, when required for proper execution of the Work.
4. Shop Drawings and Samples:
a. Receive samples which are furnished at the site by Contractor, and notify
Owner and Engineer of availability of samples for examination.
b. Advise Owner and Engineer and Contractor of the commencement of
any Work requiring a Shop Drawing or sample if the submittal has not
been approved.
5. Review of Work, Rejection of Defective Work, Inspections, and Tests:
a. Conduct on-site observations of the Work in progress to assist Owner
and Engineer in determining if the Work is in general proceeding in
accordance with the Contract Documents.
b. Report to Owner and Engineer whenever any work is unsatisfactory,
faulty or defective, or does not conform to the Contract Documents, or
has been damaged, or does not meet the requirements of any inspection,
test, or approval required to be made; and advise Owner and Engineer of
Work that should be corrected or rejected or should be uncovered for
observation, or requires special testing, inspection, or approval.
c. Verify that tests, equipment, and systems start-ups and operating and
maintenance training are conducted in the presence of appropriate
personnel, and that Contractor maintains adequate records thereof; and
observe, record, and report to Owner and Engineer appropriate details
relative to the test procedures and start-ups.
d. Accompany visiting inspectors representing public or other agencies
having jurisdiction over the Project; record the results of these
inspections and report to Owner and Engineer.
6508.22 00800-21 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P. Contract No. AC-TAP-3(871)E
6. Interpretation of Contract Documents: Report to Owner and Engineer when
clarifications and interpretations of the Contract Documents are needed and
transmit to Contractor clarifications and interpretations as issued by Owner
and Engineer
7. Modifications:
a. Consider and evaluate Contractor’s suggestions for modifications in
Drawings or Specifications and report with recommendations to Owner
and Engineer. Transmit to Contractor decisions as issued by Owner and
Engineer.
b. Allow minor deviations from Drawings or Specifications when Resident
Project Representative is considered to be in the best position to make
such decisions on a timely basis.
8. Records:
a. Maintain orderly files of correspondence, reports of job conferences,
Shop Drawings and samples, reproductions of original Contract
Documents including all Work Change Directives, Addenda, Change
Orders, Field Orders, additional Drawings and Specifications issued
subsequent to the execution of the Agreement, Owner’s or Engineer’s
clarifications and interpretations of the Contract Documents, progress
reports, and other Project-related documents.
b. Monitor Contractor’s work on Record Documents.
c. Keep a diary or log book, recording Contractor hours on the job site,
weather conditions, data relative to questions on Work Change
Directives, Change Orders or changed conditions, list of job site visitors,
daily activities, decisions, observations in general, and specific
observations in more detail as in the case of observing test procedures;
and send copies to Owner and Engineer.
d. Record names, addresses, and telephone numbers of all Contractors,
Subcontractors, and major suppliers of materials and equipment.
9. Reports:
a. Furnish Owner and Engineer periodic reports as required of progress of
the Work and of Contractor’s compliance with the progress schedule and
schedule of Shop Drawing and sample submittals.
b. Consult with Owner and Engineer in advance of scheduled major tests,
inspections, or start of important phases of the Work.
c. Report immediately to Owner and Engineer upon the occurrence of any
accident.
6508.22 00800-22 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P. Contract No. AC-TAP-3(871)E
10. Payment Requests: Review applications for payment with Contractor for
compliance with the established procedure for their submission and forward
with recommendations to Owner and Engineer, noting particularly the
relationship of the payment requested to the schedule of values, Work
completed, and materials and equipment delivered at the site but not
incorporated in the Work.
11. Certificates, Operation and Maintenance Manuals: During the course of the
Work, verify that certificates, Operation and Maintenance manuals, and other
data required to be assembled and furnished by Contractor are applicable to
the items actually installed and in accordance with the Contract Documents.
12. Completion: Conduct closeout and final inspections in the company of
Engineer, Owner, and Contractor, and assist in preparation of lists of items to
be completed or corrected.
13. The authority of the RPR is limited and (s)he is not authorized to:
a. Exceed limitations of authority as set forth in the Agreement or other
Contract Documents.
b. Undertake any of the responsibilities of Contractor, Contractor’s
subcontractors and suppliers, or Contractor’s superintendent.
c. Advise on, issue directions relative to, or assume control over any aspect
of the means, methods, techniques, sequences, or procedures of
construction unless such advice or directions are specifically required by
the Contract Documents.
d. Advise on, issue directions regarding, or assume control over safety
precautions and programs in connection with the Work, with the
exception when, in RPR’s opinion, conditions of imminent danger exist.
If such conditions exist, RPR shall:
1) Immediately notify Contractor’s on-site safety representative and
require that the work be stopped.
2) Concurrently RPR shall immediately notify Owner and Engineer of
the work conditions and resulting action.
END OF DOCUMENT
6508.22 00800-23 ARRO
TOWN OF INDIAN HEAD – VTRAILHEAD RESTROOM
CONTRACT NO. CH257B51
F.A.P. NO. AC-TAP-3(871)E
NOTICE TO CONTRACTORS
CARGO PREFERENCE ACT (CPA)
All Contractors and Sub-Contractors are to be in compliance with the requirements of 46 CFR Part
381 and incorporate by reference the recommended clauses in 46 CFR 381.7(a)-(b) - ("Contractor
and Subcontractor Clauses. "Use of United States-flag vessels")
(a) Agreement Clauses. "Use of United States-flag vessels:
"(1) Pursuant to Pub. L. 664 (43 U.S.C. 1241(b)) at least 50 percent of any equipment, materials
or commodities procured, contracted for or otherwise obtained with funds granted, guaranteed,
loaned, or advanced by the U.S. Government under this agreement, and which may be transported
by ocean vessel, shall be transported on privately owned United States-flag commercial vessels, if
available.
"(2) Within 20 days following the date of loading for shipments originating within the United
States or within 30 working days following the date of loading for shipments originating outside
the United States, a legible copy of a rated, 'on-board' commercial ocean bill-of-lading in English
for each shipment of cargo described in paragraph (a)(1) of this section shall be furnished to both
the Contracting Officer (through the prime contractor in the case of subcontractor bills-of-lading)
and to the Division of National Cargo, Office of Market Development. Maritime Administration,
Washington, DC 20590."
(b) Contractor and Subcontractor Clauses. "Use of United States-flag vessels: The contractor
agrees-
"(1) To utilize privately owned United States-flag commercial vessels to ship at least 50 percent
of the gross tonnage (computed separately for dry bulk carriers, dry cargo liners, and tankers)
involved, whenever shipping any equipment. material, or commodities pursuant to this contract,
to the extent such vessels are available at fair and reasonable rates for United States-flag
commercial vessels.
"(2) To furnish within 20 days following the date of loading for shipments originating within the
United States or within 30 working days following the date of loading for shipments originating
outside the United States. a legible copy of a rated, 'on-board' commercial ocean bill-of-lading in
English for each shipment of cargo described in paragraph (b) (1) of this section to both the
Contracting Officer (through the prime contractor in the case of subcontractor bills-of-lading) and
to the Division of National Cargo, Office of Market Development, Maritime Administration,
Washington, DC 20590.
"(3) To insert the substance of the provisions of this clause in all subcontracts issued pursuant to
this contract”.
Guidance documents for this requirement, including the 12/11/2015 policy memo, the 12/8/2015
legal opinion and a page of Q&A’s are available on the CPA construction Program Guidance page:
CONTRACT NO. CH257B51
F.A.P. NO. AC-TAP-3(871)E
https://www.fhwa.dot.gov/construction/cqit/cargo.cfm
This requirement applies to material or equipment that is acquired for a specific Federal-aid
highway project. It is not applicable to goods or materials that come into inventories independent
of an FHWA funded-contract.
CONTRACT NO. CH257B51
F.A.P. NO. AC-TAP-3(871)E
NOTICE TO CONTRACTORS
eMaryland Marketplace Advantage.
eMaryland Marketplace Advantage (eMMA) is an electronic commerce system administered by
the Maryland Department of General Services. All associated materials, the solicitation, the
summary of pre-bid meetings, bidder’s questions and the Procurement Officers responses,
Addenda, and other solicitation related information will be provided via eMaryland Marketplace
Advantage; https://procurement.maryland.gov.
Bidders must register, (registration is free) on eMMA, log-in and acknowledge all bid
amendments and submit the Addendum Verifications to be Awarded a Contract. Should you
have any questions regarding registration, please call the eMMA Help Desk at 410-767-1492.
Bid Opening and Requirements.
Bid Opening will be administered per the current bidding process through;
Town of Indian Head
4195 Indian Head Highway
Indian Head, MD 20640
and per TC SECTION 2 BIDDING REQUIREMENTS AND CONDITIONS of the Standard
Specifications for Construction and Materials.
Bidders are required to provide verifications for all Addenda and include with your sealed bids.
“Sealed Bid” should be labeled on your envelope.
CONTRACT NO. CH257B51
CONTRACT PROVISIONS F.A.P. NO. AC-TAP-3(871)E
MARYLAND MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES
(MdMUTCD) REQUIREMENTS 1 of 1
NOTICE TO ALL HOLDERS OF THIS CONTRACT DOCUMENT
MARYLAND MANUAL ON UNIFORM TRAFFIC CONTROL
DEVICES (MdMUTCD) REQUIREMENTS
The 2011 Maryland Manual on Uniform Traffic Control Devices (MdMUTCD) is the legal State
standard for traffic control devices. All traffic control devices (temporary or permanent) utilized
on Administration projects shall be in conformance with the requirements provided in the 2011
Edition of the Administration’s MdMUTCD for Streets and Highways.
05-30-17
CONTRACT NO. CH257B51
CONTRACT PROVISIONS F.A.P NO. AC-TAP-3(871)E
(NCHRP) REPORT 350 AND MASH COMPLIANCE 1 of 2
NOTICE TO ALL HOLDERS OF THIS CONTRACT DOCUMENT
NATIONAL COOPERATIVE HIGHWAY RESEARCH PROGRAM (NCHRP)
REPORT 350 AND THE MANUAL FOR ASSESSING SAFETY HARDWARE (MASH)
COMPLIANCE FOR DEVICES USED IN THE MAINTENANCE OF TRAFFIC AND
TRAFFIC CONTROL
Except as otherwise specified in this section, all temporary and permanent highway safety features,
including longitudinal barriers, transitions, end terminals, crash cushions, breakaway/yielding
supports, truck-mounted attenuators, and work zone traffic control devices, shall meet values
recommended when applicable tests are performed for evaluation criteria for the respective
evaluation factors, as defined in NCHRP Report 350, or the MASH 2016, as noted herein. When
conformance with NCHRP Report 350 or MASH 2016 is required, provide the Engineer with the
manufacturers’ certifications that the devices comply with the specified criteria. All temporary
and permanent highway safety features shall comply with MASH 2016 criteria by the relevant
dates noted below.
TEMPORARY INSTALLATIONS FOR MAINTENANCE OF TRAFFIC
The implementation dates below apply to temporary work zone roadside safety hardware and
devices.
Temporary work zone devices, including Category 1, 2, 3 and 4 devices manufactured after
12/31/2019, when applicable, must be successfully tested to the 2016 edition of MASH. Relevant
devices manufactured on or before 12/31/2019, and successfully tested to NCHRP 350, the 2009
edition of MASH, or otherwise authorized, may continue to be used.
Unless specifically waived in the Contract Documents, only devices approved on Qualified
Product List by the Administration may be used.
Category 1 Devices
These devices include cones, tubular markers, flexible delineator posts, and drums, none of which
have any accessories or attachments, and are used for channelization and/or delineation.
Category 2 Devices
These devices include Type I, II, and III barricades, portable sign supports with signs, intrusion
alarms, and vertical panels. Category 1 devices, such as drums or cones, that are modified with
accessories or attachments shall be considered Category 2 devices.
Category 3 Devices
(a) Truck Mounted Attenuators (TMAs) and Trailer Truck Mounted Attenuators (TTMAs).
(b) Temporary Barrier.
(1) Concrete Barrier.
(2) Traffic Barrier W-Beam and Water Filled Barrier.
(3) Steel/Aluminum Barrier.
10-04-19
CONTRACT NO. CH257B51
CONTRACT PROVISIONS F.A.P NO. AC-TAP-3(871)E
(NCHRP) REPORT 350 AND MASH COMPLIANCE 2 of 2
(c) Temporary End Treatments.
Category 4 Devices
These devices include area lighting supports, arrow panels, and portable variable message signs
that may be portable or trailer-mounted.
Use of Category 4 devices shall comply with the provisions of Part 6 of the MD MUTCD.
PERMANENT ROADSIDE HARDWARE INSTALLATION
The implementation dates below apply to both new and replacement installations of roadside safety
hardware on National Highway System (NHS) roadways except when a waiver is approved by
FHWA
December 31, 2017: Contracts with bid openings after this date shall meet MASH 2016 testing
criteria for all installations and replacements of W-beam barriers and cast-in-place concrete
barriers as specified in Contract Documents.
June 30, 2018: Contracts with bid openings after this date shall meet MASH 2016 testing criteria
for all installations and replacements of W-beam tangent terminals as specified in Contract
Documents.
December 31, 2018: Contracts with bid openings after this date shall meet MASH 2016 testing
criteria for all installations and replacements of crash cushions.
December 31, 2019: Contracts with bid openings after this date shall meet testing criteria as
defined in MASH 2016 guidelines for all new permanent installations and full replacements of
bridge rail, transitions, all other longitudinal barrier (including portable barriers installed
permanently), other W-beam terminals (such as double-sided or median terminals, flared
terminals, and terminals installed on a flare), sign supports, cable barrier, cable barrier terminals,
all other terminals, and all other breakaway hardware as specified in Contract Documents.
10-04-19
CONTRACT NO. CH257B51
CONTRACT PROVISIONS F.A.P. NO. AC-TAP-3(871)E
OCCUPYING WETLANDS 1 of 1
OCCUPYING WETLANDS
The Contractor is hereby alerted to the importance of preserving wetland areas. The Administration,
in conjunction with the various environmental agencies, has developed these Contract Documents so
as to minimize or eliminate disturbance and damage to existing wetland areas. In order to accomplish
this, the following must be rigidly adhered to:
(a) Prior to performing any work on the project, the areas of wetland will be identified and marked
as directed by the Administration. All personnel of the Contractor or sub-contractors shall be
alerted to these designated areas.
(b) The Contractor or sub-contractors shall not impact any wetland or waterway, whether it be
permanently or temporarily unless otherwise stipulated in the permit application and
approved as an authorized action by the appropriate regulatory agency. No fill shall be
placed in these areas without a permit.
(c) If a Contractor or sub-contractor has to impact a wetland or waterway that is not covered by
an existing wetland permit, they shall immediately notify the Engineer. The Engineer will
notify the Environmental Programs Division to determine the extent of any permit
modification. At that time the Environmental Programs Division will request a permit
modification or submit a permit application.
(d) If the Contractor impacts any wetland or waterway for which they do not have a wetland
permit, they shall be responsible for restoring the wetland areas and possibly mitigating the
wetland impacts to the full satisfaction of the environmental agencies, which could include
monetary compensation.
(e) The cost of restoration and mitigation of the impacted areas shall be at no additional cost to
the Administration.
The importance of not abusing the wetland areas cannot be overemphasized. Abuse of wetland
areas could jeopardize the operation of the total Contract and could be cause for a shut-down. If a
shut-down occurs because of the Contractor's failure to secure the required permits (i.e. the
Contractor’s method of work includes impacts not approved by previously acquired permits), the
Contractor’s negligence or operations, all costs and damages to the Contractor and to the State will
be at no additional cost to the Administration. Noncompliance with these requirements will not be
considered for an extension of Contract time.
05-30-17
FHWA-1273 – Revised October 23, 2023
REQUIRED CONTRACT PROVISIONS
FEDERAL-AID CONSTRUCTION CONTRACTS
performed on the contract by the contractor's own organization
I. General and with the assistance of workers under the contractor's
II. Nondiscrimination immediate superintendence and to all work performed on the
III. Non-segregated Facilities contract by piecework, station work, or by subcontract. 23
IV. Davis-Bacon and Related Act Provisions CFR 633.102(d).
V. Contract Work Hours and Safety Standards Act
Provisions 3. A breach of any of the stipulations contained in these
VI. Subletting or Assigning the Contract Required Contract Provisions may be sufficient grounds for
VII. Safety: Accident Prevention withholding of progress payments, withholding of final
VIII. False Statements Concerning Highway Projects payment, termination of the contract, suspension / debarment
IX. Implementation of Clean Air Act and Federal Water or any other action determined to be appropriate by the
Pollution Control Act contracting agency and FHWA.
X. Certification Regarding Debarment, Suspension,
Ineligibility and Voluntary Exclusion 4. Selection of Labor: During the performance of this contract,
XI. Certification Regarding Use of Contract Funds for the contractor shall not use convict labor for any purpose
Lobbying within the limits of a construction project on a Federal-aid
XII. Use of United States-Flag Vessels: highway unless it is labor performed by convicts who are on
parole, supervised release, or probation. 23 U.S.C. 114(b).
ATTACHMENTS The term Federal-aid highway does not include roadways
functionally classified as local roads or rural minor collectors.
A. Employment and Materials Preference for Appalachian 23 U.S.C. 101(a).
Development Highway System or Appalachian Local Access
Road Contracts (included in Appalachian contracts only)
II. NONDISCRIMINATION (23 CFR 230.107(a); 23 CFR Part
230, Subpart A, Appendix A; EO 11246)
I. GENERAL
The provisions of this section related to 23 CFR Part 230,
1. Form FHWA-1273 must be physically incorporated in each Subpart A, Appendix A are applicable to all Federal-aid
construction contract funded under title 23, United States construction contracts and to all related construction
Code, as required in 23 CFR 633.102(b) (excluding subcontracts of $10,000 or more. The provisions of 23 CFR
emergency contracts solely intended for debris removal). The Part 230 are not applicable to material supply, engineering, or
contractor (or subcontractor) must insert this form in each architectural service contracts.
subcontract and further require its inclusion in all lower tier
subcontracts (excluding purchase orders, rental agreements In addition, the contractor and all subcontractors must comply
and other agreements for supplies or services). 23 CFR with the following policies: Executive Order 11246, 41 CFR
633.102(e). Part 60, 29 CFR Parts 1625-1627, 23 U.S.C. 140, Section 504
of the Rehabilitation Act of 1973, as amended (29 U.S.C. 794),
The applicable requirements of Form FHWA-1273 are Title VI of the Civil Rights Act of 1964, as amended (42 U.S.C.
incorporated by reference for work done under any purchase 2000d et seq.), and related regulations including 49 CFR Parts
order, rental agreement or agreement for other services. The 21, 26, and 27; and 23 CFR Parts 200, 230, and 633.
prime contractor shall be responsible for compliance by any
subcontractor, lower-tier subcontractor or service provider. 23 The contractor and all subcontractors must comply with: the
CFR 633.102(e). requirements of the Equal Opportunity Clause in 41 CFR 60-
1.4(b) and, for all construction contracts exceeding $10,000,
Form FHWA-1273 must be included in all Federal-aid design- the Standard Federal Equal Employment Opportunity
build contracts, in all subcontracts and in lower tier Construction Contract Specifications in 41 CFR 60-4.3.
subcontracts (excluding subcontracts for design services,
purchase orders, rental agreements and other agreements for Note: The U.S. Department of Labor has exclusive authority to
supplies or services) in accordance with 23 CFR 633.102. The determine compliance with Executive Order 11246 and the
design-builder shall be responsible for compliance by any policies of the Secretary of Labor including 41 CFR Part 60,
subcontractor, lower-tier subcontractor or service provider. and 29 CFR Parts 1625-1627. The contracting agency and
the FHWA have the authority and the responsibility to ensure
Contracting agencies may reference Form FHWA-1273 in compliance with 23 U.S.C. 140, Section 504 of the
solicitation-for-bids or request-for-proposals documents, Rehabilitation Act of 1973, as amended (29 U.S.C. 794), and
however, the Form FHWA-1273 must be physically Title VI of the Civil Rights Act of 1964, as amended (42 U.S.C.
incorporated (not referenced) in all contracts, subcontracts and 2000d et seq.), and related regulations including 49 CFR Parts
lower-tier subcontracts (excluding purchase orders, rental 21, 26, and 27; and 23 CFR Parts 200, 230, and 633.
agreements and other agreements for supplies or services
related to a construction contract). 23 CFR 633.102(b). The following provision is adopted from 23 CFR Part 230,
Subpart A, Appendix A, with appropriate revisions to conform
2. Subject to the applicability criteria noted in the following to the U.S. Department of Labor (US DOL) and FHWA
sections, these contract provisions shall apply to all work requirements.
1
1. Equal Employment Opportunity: Equal Employment d. Notices and posters setting forth the contractor's EEO
Opportunity (EEO) requirements not to discriminate and to policy will be placed in areas readily accessible to employees,
take affirmative action to assure equal opportunity as set forth applicants for employment and potential employees.
under laws, executive orders, rules, regulations (see 28 CFR
Part 35, 29 CFR Part 1630, 29 CFR Parts 1625-1627, 41 CFR e. The contractor's EEO policy and the procedures to
Part 60 and 49 CFR Part 27) and orders of the Secretary of implement such policy will be brought to the attention of
Labor as modified by the provisions prescribed herein, and employees by means of meetings, employee handbooks, or
imposed pursuant to 23 U.S.C. 140, shall constitute the EEO other appropriate means.
and specific affirmative action standards for the contractor's
project activities under this contract. The provisions of the 4. Recruitment: When advertising for employees, the
Americans with Disabilities Act of 1990 (42 U.S.C. 12101 et contractor will include in all advertisements for employees the
seq.) set forth under 28 CFR Part 35 and 29 CFR Part 1630 notation: "An Equal Opportunity Employer." All such
are incorporated by reference in this contract. In the execution advertisements will be placed in publications having a large
of this contract, the contractor agrees to comply with the circulation among minorities and women in the area from
following minimum specific requirement activities of EEO: which the project work force would normally be derived.
a. The contractor will work with the contracting agency and a. The contractor will, unless precluded by a valid
the Federal Government to ensure that it has made every bargaining agreement, conduct systematic and direct
good faith effort to provide equal opportunity with respect to all recruitment through public and private employee referral
of its terms and conditions of employment and in their review sources likely to yield qualified minorities and women. To
of activities under the contract. 23 CFR 230.409 (g)(4) & (5). meet this requirement, the contractor will identify sources of
potential minority group employees and establish with such
b. The contractor will accept as its operating policy the identified sources procedures whereby minority and women
following statement: applicants may be referred to the contractor for employment
consideration.
"It is the policy of this Company to assure that applicants
are employed, and that employees are treated during b. In the event the contractor has a valid bargaining
employment, without regard to their race, religion, sex, agreement providing for exclusive hiring hall referrals, the
sexual orientation, gender identity, color, national origin, age contractor is expected to observe the provisions of that
or disability. Such action shall include: employment, agreement to the extent that the system meets the contractor's
upgrading, demotion, or transfer; recruitment or recruitment compliance with EEO contract provisions. Where
advertising; layoff or termination; rates of pay or other forms implementation of such an agreement has the effect of
of compensation; and selection for training, including discriminating against minorities or women, or obligates the
apprenticeship, pre-apprenticeship, and/or on-the-job contractor to do the same, such implementation violates
training." Federal nondiscrimination provisions.
2. EEO Officer: The contractor will designate and make c. The contractor will encourage its present employees to
known to the contracting officers an EEO Officer who will have refer minorities and women as applicants for employment.
the responsibility for and must be capable of effectively Information and procedures with regard to referring such
administering and promoting an active EEO program and who applicants will be discussed with employees.
must be assigned adequate authority and responsibility to do
so. 5. Personnel Actions: Wages, working conditions, and
employee benefits shall be established and administered, and
3. Dissemination of Policy: All members of the contractor's personnel actions of every type, including hiring, upgrading,
staff who are authorized to hire, supervise, promote, and promotion, transfer, demotion, layoff, and termination, shall be
discharge employees, or who recommend such action or are taken without regard to race, color, religion, sex, sexual
substantially involved in such action, will be made fully orientation, gender identity, national origin, age or disability.
cognizant of and will implement the contractor's EEO policy The following procedures shall be followed:
and contractual responsibilities to provide EEO in each grade
and classification of employment. To ensure that the above a. The contractor will conduct periodic inspections of project
agreement will be met, the following actions will be taken as a sites to ensure that working conditions and employee facilities
minimum: do not indicate discriminatory treatment of project site
personnel.
a. Periodic meetings of supervisory and personnel office
employees will be conducted before the start of work and then b. The contractor will periodically evaluate the spread of
not less often than once every six months, at which time the wages paid within each classification to determine any
contractor's EEO policy and its implementation will be evidence of discriminatory wage practices.
reviewed and explained. The meetings will be conducted by
the EEO Officer or other knowledgeable company official. c. The contractor will periodically review selected personnel
actions in depth to determine whether there is evidence of
b. All new supervisory or personnel office employees will be discrimination. Where evidence is found, the contractor will
given a thorough indoctrination by the EEO Officer, covering promptly take corrective action. If the review indicates that the
all major aspects of the contractor's EEO obligations within discrimination may extend beyond the actions reviewed, such
thirty days following their reporting for duty with the contractor. corrective action shall include all affected persons.
c. All personnel who are engaged in direct recruitment for d. The contractor will promptly investigate all complaints of
the project will be instructed by the EEO Officer in the alleged discrimination made to the contractor in connection
contractor's procedures for locating and hiring minorities and with its obligations under this contract, will attempt to resolve
women. such complaints, and will take appropriate corrective action
2
within a reasonable time. If the investigation indicates that the sufficient referrals (even though it is obligated to provide
discrimination may affect persons other than the complainant, exclusive referrals under the terms of a collective bargaining
such corrective action shall include such other persons. Upon agreement) does not relieve the contractor from the
completion of each investigation, the contractor will inform requirements of this paragraph. In the event the union referral
every complainant of all of their avenues of appeal. practice prevents the contractor from meeting the obligations
pursuant to Executive Order 11246, as amended, and these
6. Training and Promotion: special provisions, such contractor shall immediately notify the
contracting agency.
a. The contractor will assist in locating, qualifying, and
increasing the skills of minorities and women who are 8. Reasonable Accommodation for Applicants /
applicants for employment or current employees. Such efforts Employees with Disabilities: The contractor must be familiar
should be aimed at developing full journey level status with the requirements for and comply with the Americans with
employees in the type of trade or job classification involved. Disabilities Act and all rules and regulations established
thereunder. Employers must provide reasonable
b. Consistent with the contractor's work force requirements accommodation in all employment activities unless to do so
and as permissible under Federal and State regulations, the would cause an undue hardship.
contractor shall make full use of training programs (i.e.,
apprenticeship and on-the-job training programs for the 9. Selection of Subcontractors, Procurement of Materials
geographical area of contract performance). In the event a and Leasing of Equipment: The contractor shall not
special provision for training is provided under this contract, discriminate on the grounds of race, color, religion, sex, sexual
this subparagraph will be superseded as indicated in the orientation, gender identity, national origin, age, or disability in
special provision. The contracting agency may reserve the selection and retention of subcontractors, including
training positions for persons who receive welfare assistance procurement of materials and leases of equipment. The
in accordance with 23 U.S.C. 140(a). contractor shall take all necessary and reasonable steps to
ensure nondiscrimination in the administration of this contract.
c. The contractor will advise employees and applicants for
employment of available training programs and entrance a. The contractor shall notify all potential subcontractors,
requirements for each. suppliers, and lessors of their EEO obligations under this
contract.
d. The contractor will periodically review the training and
promotion potential of employees who are minorities and b. The contractor will use good faith efforts to ensure
women and will encourage eligible employees to apply for subcontractor compliance with their EEO obligations.
such training and promotion.
7. Unions: If the contractor relies in whole or in part upon 10. Assurances Required:
unions as a source of employees, the contractor will use good
faith efforts to obtain the cooperation of such unions to a. The requirements of 49 CFR Part 26 and the State
increase opportunities for minorities and women. 23 CFR DOT’s FHWA-approved Disadvantaged Business Enterprise
230.409. Actions by the contractor, either directly or through a (DBE) program are incorporated by reference.
contractor's association acting as agent, will include the
procedures set forth below: b. The contractor, subrecipient or subcontractor shall not
discriminate on the basis of race, color, national origin, or sex
a. The contractor will use good faith efforts to develop, in in the performance of this contract. The contractor shall carry
cooperation with the unions, joint training programs aimed out applicable requirements of 49 CFR part 26 in the award
toward qualifying more minorities and women for membership and administration of DOT-assisted contracts. Failure by the
in the unions and increasing the skills of minorities and women contractor to carry out these requirements is a material breach
so that they may qualify for higher paying employment. of this contract, which may result in the termination of this
contract or such other remedy as the recipient deems
b. The contractor will use good faith efforts to incorporate an appropriate, which may include, but is not limited to:
EEO clause into each union agreement to the end that such (1) Withholding monthly progress payments;
union will be contractually bound to refer applicants without (2) Assessing sanctions;
regard to their race, color, religion, sex, sexual orientation, (3) Liquidated damages; and/or
gender identity, national origin, age, or disability. (4) Disqualifying the contractor from future bidding as non-
responsible.
c. The contractor is to obtain information as to the referral c. The Title VI and nondiscrimination provisions of U.S.
practices and policies of the labor union except that to the DOT Order 1050.2A at Appendixes A and E are incorporated
extent such information is within the exclusive possession of by reference. 49 CFR Part 21.
the labor union and such labor union refuses to furnish such
information to the contractor, the contractor shall so certify to 11. Records and Reports: The contractor shall keep such
the contracting agency and shall set forth what efforts have records as necessary to document compliance with the EEO
been made to obtain such information. requirements. Such records shall be retained for a period of
three years following the date of the final payment to the
d. In the event the union is unable to provide the contractor contractor for all contract work and shall be available at
with a reasonable flow of referrals within the time limit set forth reasonable times and places for inspection by authorized
in the collective bargaining agreement, the contractor will, representatives of the contracting agency and the FHWA.
through independent recruitment efforts, fill the employment
vacancies without regard to race, color, religion, sex, sexual a. The records kept by the contractor shall document the
orientation, gender identity, national origin, age, or disability; following:
making full efforts to obtain qualified and/or qualifiable
minorities and women. The failure of a union to provide
3
(1) The number and work hours of minority and non- Projects funded under 23 U.S.C. 117, and National Highway
minority group members and women employed in each work Freight Program projects funded under 23 U.S.C. 167.
classification on the project;
The following provisions are from the U.S. Department of
(2) The progress and efforts being made in cooperation
Labor regulations in 29 CFR 5.5 “Contract provisions and
with unions, when applicable, to increase employment
related matters” with minor revisions to conform to the FHWA-
opportunities for minorities and women; and
1273 format and FHWA program requirements.
(3) The progress and efforts being made in locating, hiring,
training, qualifying, and upgrading minorities and women. 1. Minimum wages (29 CFR 5.5)
b. The contractors and subcontractors will submit an annual
a. Wage rates and fringe benefits. All laborers and
report to the contracting agency each July for the duration of
mechanics employed or working upon the site of the work (or
the project indicating the number of minority, women, and non-
otherwise working in construction or development of the
minority group employees currently engaged in each work
project under a development statute), will be paid
classification required by the contract work. This information is
unconditionally and not less often than once a week, and
to be reported on Form FHWA-1391. The staffing data should
without subsequent deduction or rebate on any account
represent the project work force on board in all or any part of
(except such payroll deductions as are permitted by
the last payroll period preceding the end of July. If on-the-job
regulations issued by the Secretary of Labor under the
training is being required by special provision, the contractor
Copeland Act (29 CFR part 3)), the full amount of basic hourly
will be required to collect and report training data. The
wages and bona fide fringe benefits (or cash equivalents
employment data should reflect the work force on board during
thereof) due at time of payment computed at rates not less
all or any part of the last payroll period preceding the end of
July. than those contained in the wage determination of the
Secretary of Labor which is attached hereto and made a part
hereof, regardless of any contractual relationship which may
III. NONSEGREGATED FACILITIES be alleged to exist between the contractor and such laborers
and mechanics. As provided in paragraphs (d) and (e) of 29
CFR 5.5, the appropriate wage determinations are effective by
This provision is applicable to all Federal-aid construction
contracts and to all related construction subcontracts of more operation of law even if they have not been attached to the
contract. Contributions made or costs reasonably anticipated
than $10,000. 41 CFR 60-1.5.
for bona fide fringe benefits under the Davis-Bacon Act (40
As prescribed by 41 CFR 60-1.8, the contractor must ensure U.S.C. 3141(2)(B)) on behalf of laborers or mechanics are
considered wages paid to such laborers or mechanics, subject
that facilities provided for employees are provided in such a
to the provisions of paragraph 1.e. of this section; also, regular
manner that segregation on the basis of race, color, religion,
sex, sexual orientation, gender identity, or national origin contributions made or costs incurred for more than a weekly
period (but not less often than quarterly) under plans, funds, or
cannot result. The contractor may neither require such
programs which cover the particular weekly period, are
segregated use by written or oral policies nor tolerate such use
by employee custom. The contractor's obligation extends deemed to be constructively made or incurred during such
further to ensure that its employees are not assigned to weekly period. Such laborers and mechanics must be paid the
appropriate wage rate and fringe benefits on the wage
perform their services at any location under the contractor's
control where the facilities are segregated. The term "facilities" determination for the classification(s) of work actually
includes waiting rooms, work areas, restaurants and other performed, without regard to skill, except as provided in
paragraph 4. of this section. Laborers or mechanics performing
eating areas, time clocks, restrooms, washrooms, locker
work in more than one classification may be compensated at
rooms and other storage or dressing areas, parking lots,
drinking fountains, recreation or entertainment areas, the rate specified for each classification for the time actually
worked therein: Provided, That the employer's payroll records
transportation, and housing provided for employees. The
accurately set forth the time spent in each classification in
contractor shall provide separate or single-user restrooms and
necessary dressing or sleeping areas to assure privacy which work is performed. The wage determination (including
any additional classifications and wage rates conformed under
between sexes.
paragraph 1.c. of this section) and the Davis-Bacon poster
(WH–1321) must be posted at all times by the contractor and
its subcontractors at the site of the work in a prominent and
IV. DAVIS-BACON AND RELATED ACT PROVISIONS
accessible place where it can be easily seen by the workers.
This section is applicable to all Federal-aid construction
projects exceeding $2,000 and to all related subcontracts and b. Frequently recurring classifications. (1) In addition to wage
lower-tier subcontracts (regardless of subcontract size), in and fringe benefit rates that have been determined to be
accordance with 29 CFR 5.5. The requirements apply to all prevailing under the procedures set forth in 29 CFR part 1, a
projects located within the right-of-way of a roadway that is wage determination may contain, pursuant to § 1.3(f), wage
functionally classified as Federal-aid highway. 23 U.S.C. 113. and fringe benefit rates for classifications of laborers and
This excludes roadways functionally classified as local roads mechanics for which conformance requests are regularly
or rural minor collectors, which are exempt. 23 U.S.C. 101. submitted pursuant to paragraph 1.c. of this section, provided
Where applicable law requires that projects be treated as a that:
project on a Federal-aid highway, the provisions of this subpart
will apply regardless of the location of the project. Examples (i) The work performed by the classification is not
include: Surface Transportation Block Grant Program projects performed by a classification in the wage determination for
funded under 23 U.S.C. 133 [excluding recreational trails which a prevailing wage rate has been determined;
projects], the Nationally Significant Freight and Highway
4
(ii) The classification is used in the area by the under paragraphs 1.c.(3) and (4) of this section. The contractor
construction industry; and must furnish a written copy of such determination to each
affected worker or it must be posted as a part of the wage
determination. The wage rate (including fringe benefits where
(iii) The wage rate for the classification bears a reasonable
appropriate) determined pursuant to paragraph 1.c.(3) or (4) of
relationship to the prevailing wage rates contained in the
this section must be paid to all workers performing work in the
wage determination.
classification under this contract from the first day on which
work is performed in the classification.
(2) The Administrator will establish wage rates for such
classifications in accordance with paragraph 1.c.(1)(iii) of this
d. Fringe benefits not expressed as an hourly rate.
section. Work performed in such a classification must be paid
Whenever the minimum wage rate prescribed in the contract
at no less than the wage and fringe benefit rate listed on the
for a class of laborers or mechanics includes a fringe benefit
wage determination for such classification.
which is not expressed as an hourly rate, the contractor may
either pay the benefit as stated in the wage determination or
c. Conformance. (1) The contracting officer must require that may pay another bona fide fringe benefit or an hourly cash
any class of laborers or mechanics, including helpers, which is equivalent thereof.
not listed in the wage determination and which is to be
employed under the contract be classified in conformance with
e. Unfunded plans. If the contractor does not make
the wage determination. Conformance of an additional
payments to a trustee or other third person, the contractor may
classification and wage rate and fringe benefits is appropriate
consider as part of the wages of any laborer or mechanic the
only when the following criteria have been met:
amount of any costs reasonably anticipated in providing bona
fide fringe benefits under a plan or program, Provided, That
(i) The work to be performed by the classification the Secretary of Labor has found, upon the written request of
requested is not performed by a classification in the wage the contractor, in accordance with the criteria set forth in
determination; and § 5.28, that the applicable standards of the Davis-Bacon Act
have been met. The Secretary of Labor may require the
contractor to set aside in a separate account assets for the
(ii) The classification is used in the area by the
meeting of obligations under the plan or program.
construction industry; and
f. Interest. In the event of a failure to pay all or part of the
(iii) The proposed wage rate, including any bona fide fringe
wages required by the contract, the contractor will be required
benefits, bears a reasonable relationship to the wage rates
to pay interest on any underpayment of wages.
contained in the wage determination.
2. Withholding (29 CFR 5.5)
(2) The conformance process may not be used to split,
subdivide, or otherwise avoid application of classifications
listed in the wage determination. a. Withholding requirements. The contracting agency may,
upon its own action, or must, upon written request of an
authorized representative of the Department of Labor, withhold
(3) If the contractor and the laborers and mechanics to be or cause to be withheld from the contractor so much of the
employed in the classification (if known), or their
accrued payments or advances as may be considered
representatives, and the contracting officer agree on the
necessary to satisfy the liabilities of the prime contractor or any
classification and wage rate (including the amount designated subcontractor for the full amount of wages and monetary relief,
for fringe benefits where appropriate), a report of the action
including interest, required by the clauses set forth in this
taken will be sent by the contracting officer by email to
section for violations of this contract, or to satisfy any such
DBAconformance@dol.gov. The Administrator, or an liabilities required by any other Federal contract, or federally
authorized representative, will approve, modify, or disapprove assisted contract subject to Davis-Bacon labor standards, that
every additional classification action within 30 days of receipt is held by the same prime contractor (as defined in § 5.2). The
and so advise the contracting officer or will notify the necessary funds may be withheld from the contractor under
contracting officer within the 30–day period that additional time this contract, any other Federal contract with the same prime
is necessary. contractor, or any other federally assisted contract that is
subject to Davis-Bacon labor standards requirements and is
(4) In the event the contractor, the laborers or mechanics to held by the same prime contractor, regardless of whether the
be employed in the classification or their representatives, and other contract was awarded or assisted by the same agency,
the contracting officer do not agree on the proposed and such funds may be used to satisfy the contractor liability
classification and wage rate (including the amount designated for which the funds were withheld. In the event of a
for fringe benefits, where appropriate), the contracting officer contractor's failure to pay any laborer or mechanic, including
will, by email to DBAconformance@dol.gov, refer the any apprentice or helper working on the site of the work all or
questions, including the views of all interested parties and the part of the wages required by the contract, or upon the
recommendation of the contracting officer, to the Administrator contractor's failure to submit the required records as discussed
for determination. The Administrator, or an authorized in paragraph 3.d. of this section, the contracting agency may
representative, will issue a determination within 30 days of on its own initiative and after written notice to the contractor,
receipt and so advise the contracting officer or will notify the take such action as may be necessary to cause the
contracting officer within the 30–day period that additional time suspension of any further payment, advance, or guarantee of
is necessary. funds until such violations have ceased.
(5) The contracting officer must promptly notify the b. Priority to withheld funds. The Department has priority to
contractor of the action taken by the Wage and Hour Division funds withheld or to be withheld in accordance with paragraph
5
2.a. of this section or Section V, paragraph 3.a., or both, over agency. The prime contractor is responsible for the submission
claims to those funds by: of all certified payrolls by all subcontractors. A contracting
agency or prime contractor may permit or require contractors
to submit certified payrolls through an electronic system, as
(1) A contractor's surety(ies), including without limitation
long as the electronic system requires a legally valid electronic
performance bond sureties and payment bond sureties;
signature; the system allows the contractor, the contracting
agency, and the Department of Labor to access the certified
(2) A contracting agency for its reprocurement costs; payrolls upon request for at least 3 years after the work on the
prime contract has been completed; and the contracting
agency or prime contractor permits other methods of
(3) A trustee(s) (either a court-appointed trustee or a U.S. submission in situations where the contractor is unable or
trustee, or both) in bankruptcy of a contractor, or a contractor's
limited in its ability to use or access the electronic system.
bankruptcy estate;
(2) Information required. The certified payrolls submitted
(4) A contractor's assignee(s); must set out accurately and completely all of the information
required to be maintained under paragraph 3.a.(2) of this
(5) A contractor's successor(s); or section, except that full Social Security numbers and last
known addresses, telephone numbers, and email addresses
must not be included on weekly transmittals. Instead, the
(6) A claim asserted under the Prompt Payment Act, 31 certified payrolls need only include an individually identifying
U.S.C. 3901–3907. number for each worker ( e.g., the last four digits of the
worker's Social Security number). The required weekly
3. Records and certified payrolls (29 CFR 5.5) certified payroll information may be submitted using Optional
Form WH–347 or in any other format desired. Optional Form
WH–347 is available for this purpose from the Wage and Hour
a. Basic record requirements (1) Length of record retention. Division website at https://www.dol.gov/sites/dolgov/files/WHD/
All regular payrolls and other basic records must be legacy/files/wh347/.pdf or its successor website. It is not a
maintained by the contractor and any subcontractor during the violation of this section for a prime contractor to require a
course of the work and preserved for all laborers and subcontractor to provide full Social Security numbers and last
mechanics working at the site of the work (or otherwise known addresses, telephone numbers, and email addresses to
working in construction or development of the project under a the prime contractor for its own records, without weekly
development statute) for a period of at least 3 years after all submission by the subcontractor to the contracting agency.
the work on the prime contract is completed.
(3) Statement of Compliance. Each certified payroll
(2) Information required. Such records must contain the submitted must be accompanied by a “Statement of
name; Social Security number; last known address, telephone Compliance,” signed by the contractor or subcontractor, or the
number, and email address of each such worker; each contractor's or subcontractor's agent who pays or supervises
worker's correct classification(s) of work actually performed; the payment of the persons working on the contract, and must
hourly rates of wages paid (including rates of contributions or certify the following:
costs anticipated for bona fide fringe benefits or cash
equivalents thereof of the types described in 40 U.S.C.
3141(2)(B) of the Davis-Bacon Act); daily and weekly number (i) That the certified payroll for the payroll period contains
of hours actually worked in total and on each covered contract; the information required to be provided under paragraph 3.b.
deductions made; and actual wages paid. of this section, the appropriate information and basic records
are being maintained under paragraph 3.a. of this section,
and such information and records are correct and complete;
(3) Additional records relating to fringe benefits. Whenever
the Secretary of Labor has found under paragraph 1.e. of this
section that the wages of any laborer or mechanic include the (ii) That each laborer or mechanic (including each helper
amount of any costs reasonably anticipated in providing and apprentice) working on the contract during the payroll
benefits under a plan or program described in 40 U.S.C. period has been paid the full weekly wages earned, without
3141(2)(B) of the Davis-Bacon Act, the contractor must rebate, either directly or indirectly, and that no deductions
maintain records which show that the commitment to provide have been made either directly or indirectly from the full
such benefits is enforceable, that the plan or program is wages earned, other than permissible deductions as set
financially responsible, and that the plan or program has been forth in 29 CFR part 3; and
communicated in writing to the laborers or mechanics affected,
and records which show the costs anticipated or the actual (iii) That each laborer or mechanic has been paid not less
cost incurred in providing such benefits. than the applicable wage rates and fringe benefits or cash
equivalents for the classification(s) of work actually
(4) Additional records relating to apprenticeship. Contractors performed, as specified in the applicable wage determination
with apprentices working under approved programs must incorporated into the contract.
maintain written evidence of the registration of apprenticeship
programs, the registration of the apprentices, and the ratios (4) Use of Optional Form WH–347. The weekly submission
and wage rates prescribed in the applicable programs. of a properly executed certification set forth on the reverse
side of Optional Form WH–347 will satisfy the requirement for
b. Certified payroll requirements (1) Frequency and method submission of the “Statement of Compliance” required by
of submission. The contractor or subcontractor must submit paragraph 3.b.(3) of this section.
weekly, for each week in which any DBA- or Related Acts-
covered work is performed, certified payrolls to the contracting
6
(5) Signature. The signature by the contractor, of each covered worker, and must provide them upon request
subcontractor, or the contractor's or subcontractor's agent to the contracting agency, the State DOT, the FHWA, the
must be an original handwritten signature or a legally valid contractor, or the Wage and Hour Division of the Department
electronic signature. of Labor for purposes of an investigation or other compliance
action.
(6) Falsification. The falsification of any of the above
certifications may subject the contractor or subcontractor to 4. Apprentices and equal employment opportunity (29 CFR
civil or criminal prosecution under 18 U.S.C. 1001 and 31 5.5)
U.S.C. 3729.
a. Apprentices (1) Rate of pay. Apprentices will be permitted
(7) Length of certified payroll retention. The contractor or to work at less than the predetermined rate for the work they
subcontractor must preserve all certified payrolls during the perform when they are employed pursuant to and individually
course of the work and for a period of 3 years after all the work registered in a bona fide apprenticeship program registered
on the prime contract is completed. with the U.S. Department of Labor, Employment and Training
Administration, Office of Apprenticeship (OA), or with a State
Apprenticeship Agency recognized by the OA. A person who is
c. Contracts, subcontracts, and related documents. The
not individually registered in the program, but who has been
contractor or subcontractor must maintain this contract or
certified by the OA or a State Apprenticeship Agency (where
subcontract and related documents including, without
appropriate) to be eligible for probationary employment as an
limitation, bids, proposals, amendments, modifications, and
apprentice, will be permitted to work at less than the
extensions. The contractor or subcontractor must preserve
predetermined rate for the work they perform in the first 90
these contracts, subcontracts, and related documents during
days of probationary employment as an apprentice in such a
the course of the work and for a period of 3 years after all the
program. In the event the OA or a State Apprenticeship
work on the prime contract is completed.
Agency recognized by the OA withdraws approval of an
apprenticeship program, the contractor will no longer be
d. Required disclosures and access (1) Required record permitted to use apprentices at less than the applicable
disclosures and access to workers. The contractor or predetermined rate for the work performed until an acceptable
subcontractor must make the records required under program is approved.
paragraphs 3.a. through 3.c. of this section, and any other
documents that the contracting agency, the State DOT, the
(2) Fringe benefits. Apprentices must be paid fringe benefits
FHWA, or the Department of Labor deems necessary to
in accordance with the provisions of the apprenticeship
determine compliance with the labor standards provisions of
program. If the apprenticeship program does not specify fringe
any of the applicable statutes referenced by § 5.1, available for
benefits, apprentices must be paid the full amount of fringe
inspection, copying, or transcription by authorized
benefits listed on the wage determination for the applicable
representatives of the contracting agency, the State DOT, the
classification. If the Administrator determines that a different
FHWA, or the Department of Labor, and must permit such
practice prevails for the applicable apprentice classification,
representatives to interview workers during working hours on
fringe benefits must be paid in accordance with that
the job.
determination.
(2) Sanctions for non-compliance with records and worker
(3) Apprenticeship ratio. The allowable ratio of apprentices to
access requirements. If the contractor or subcontractor fails to
journeyworkers on the job site in any craft classification must
submit the required records or to make them available, or
not be greater than the ratio permitted to the contractor as to
refuses to permit worker interviews during working hours on
the entire work force under the registered program or the ratio
the job, the Federal agency may, after written notice to the
applicable to the locality of the project pursuant to paragraph
contractor, sponsor, applicant, owner, or other entity, as the
4.a.(4) of this section. Any worker listed on a payroll at an
case may be, that maintains such records or that employs
apprentice wage rate, who is not registered or otherwise
such workers, take such action as may be necessary to cause
employed as stated in paragraph 4.a.(1) of this section, must
the suspension of any further payment, advance, or guarantee
be paid not less than the applicable wage rate on the wage
of funds. Furthermore, failure to submit the required records
determination for the classification of work actually performed.
upon request or to make such records available, or to permit
In addition, any apprentice performing work on the job site in
worker interviews during working hours on the job, may be
excess of the ratio permitted under this section must be paid
grounds for debarment action pursuant to § 5.12. In addition,
not less than the applicable wage rate on the wage
any contractor or other person that fails to submit the required
determination for the work actually performed.
records or make those records available to WHD within the
time WHD requests that the records be produced will be
precluded from introducing as evidence in an administrative (4) Reciprocity of ratios and wage rates. Where a contractor
proceeding under 29 CFR part 6 any of the required records is performing construction on a project in a locality other than
that were not provided or made available to WHD. WHD will the locality in which its program is registered, the ratios and
take into consideration a reasonable request from the wage rates (expressed in percentages of the journeyworker's
contractor or person for an extension of the time for hourly rate) applicable within the locality in which the
submission of records. WHD will determine the construction is being performed must be observed. If there is
reasonableness of the request and may consider, among other no applicable ratio or wage rate for the locality of the project,
things, the location of the records and the volume of the ratio and wage rate specified in the contractor's registered
production. program must be observed.
(3) Required information disclosures. Contractors and b. Equal employment opportunity. The use of apprentices
subcontractors must maintain the full Social Security number and journeyworkers under this part must be in conformity with
and last known address, telephone number, and email address
7
the equal employment opportunity requirements of Executive b. No part of this contract shall be subcontracted to any
Order 11246, as amended, and 29 CFR part 30. person or firm ineligible for award of a Government contract by
virtue of 40 U.S.C. 3144(b) or § 5.12(a).
c. Apprentices and Trainees (programs of the U.S. DOT).
c. The penalty for making false statements is prescribed in
the U.S. Code, Title 18 Crimes and Criminal Procedure, 18
Apprentices and trainees working under apprenticeship and
U.S.C. 1001.
skill training programs which have been certified by the
Secretary of Transportation as promoting EEO in connection
with Federal-aid highway construction programs are not 11. Anti-retaliation. It is unlawful for any person to discharge,
subject to the requirements of paragraph 4 of this Section IV. demote, intimidate, threaten, restrain, coerce, blacklist, harass,
23 CFR 230.111(e)(2). The straight time hourly wage rates for or in any other manner discriminate against, or to cause any
apprentices and trainees under such programs will be person to discharge, demote, intimidate, threaten, restrain,
established by the particular programs. The ratio of coerce, blacklist, harass, or in any other manner discriminate
apprentices and trainees to journeyworkers shall not be against, any worker or job applicant for:
greater than permitted by the terms of the particular program.
a. Notifying any contractor of any conduct which the worker
5. Compliance with Copeland Act requirements. The reasonably believes constitutes a violation of the DBA, Related
contractor shall comply with the requirements of 29 CFR part Acts, this part, or 29 CFR part 1 or 3;
3, which are incorporated by reference in this contract as
provided in 29 CFR 5.5.
b. Filing any complaint, initiating or causing to be initiated
any proceeding, or otherwise asserting or seeking to assert on
6. Subcontracts. The contractor or subcontractor must insert behalf of themselves or others any right or protection under the
FHWA-1273 in any subcontracts, along with the applicable DBA, Related Acts, this part, or 29 CFR part 1 or 3;
wage determination(s) and such other clauses or contract
modifications as the contracting agency may by appropriate
c. Cooperating in any investigation or other compliance
instructions require, and a clause requiring the subcontractors
action, or testifying in any proceeding under the DBA, Related
to include these clauses and wage determination(s) in any
Acts, this part, or 29 CFR part 1 or 3; or
lower tier subcontracts. The prime contractor is responsible for
the compliance by any subcontractor or lower tier
subcontractor with all the contract clauses in this section. In d. Informing any other person about their rights under the
the event of any violations of these clauses, the prime DBA, Related Acts, this part, or 29 CFR part 1 or 3.
contractor and any subcontractor(s) responsible will be liable
for any unpaid wages and monetary relief, including interest
from the date of the underpayment or loss, due to any workers
of lower-tier subcontractors, and may be subject to debarment, V. CONTRACT WORK HOURS AND SAFETY STANDARDS
as appropriate. 29 CFR 5.5. ACT
7. Contract termination: debarment. A breach of the Pursuant to 29 CFR 5.5(b), the following clauses apply to any
contract clauses in 29 CFR 5.5 may be grounds for termination Federal-aid construction contract in an amount in excess of
of the contract, and for debarment as a contractor and a $100,000 and subject to the overtime provisions of the
Contract Work Hours and Safety Standards Act. These
subcontractor as provided in 29 CFR 5.12.
clauses shall be inserted in addition to the clauses required by
29 CFR 5.5(a) or 29 CFR 4.6. As used in this paragraph, the
8. Compliance with Davis-Bacon and Related Act terms laborers and mechanics include watchpersons and
requirements. All rulings and interpretations of the Davis- guards.
Bacon and Related Acts contained in 29 CFR parts 1, 3, and 5
are herein incorporated by reference in this contract as
1. Overtime requirements. No contractor or subcontractor
provided in 29 CFR 5.5.
contracting for any part of the contract work which may require
or involve the employment of laborers or mechanics shall
9. Disputes concerning labor standards. As provided in 29 require or permit any such laborer or mechanic in any
CFR 5.5, disputes arising out of the labor standards provisions workweek in which he or she is employed on such work to
of this contract shall not be subject to the general disputes work in excess of forty hours in such workweek unless such
clause of this contract. Such disputes shall be resolved in laborer or mechanic receives compensation at a rate not less
accordance with the procedures of the Department of Labor than one and one-half times the basic rate of pay for all hours
set forth in 29 CFR parts 5, 6, and 7. Disputes within the worked in excess of forty hours in such workweek. 29 CFR
meaning of this clause include disputes between the contractor 5.5.
(or any of its subcontractors) and the contracting agency, the
U.S. Department of Labor, or the employees or their
representatives. 2. Violation; liability for unpaid wages; liquidated
damages. In the event of any violation of the clause set forth
in paragraph 1. of this section the contractor and any
10. Certification of eligibility. a. By entering into this contract, subcontractor responsible therefor shall be liable for the
the contractor certifies that neither it nor any person or firm unpaid wages and interest from the date of the underpayment.
who has an interest in the contractor's firm is a person or firm In addition, such contractor and subcontractor shall be liable to
ineligible to be awarded Government contracts by virtue of 40 the United States (in the case of work done under contract for
U.S.C. 3144(b) or § 5.12(a). the District of Columbia or a territory, to such District or to such
territory), for liquidated damages. Such liquidated damages
shall be computed with respect to each individual laborer or
8
mechanic, including watchpersons and guards, employed in event of any violations of these clauses, the prime contractor
violation of the clause set forth in paragraph 1. of this section, and any subcontractor(s) responsible will be liable for any
in the sum currently provided in 29 CFR 5.5(b)(2)* for each unpaid wages and monetary relief, including interest from the
calendar day on which such individual was required or date of the underpayment or loss, due to any workers of lower-
permitted to work in excess of the standard workweek of forty tier subcontractors, and associated liquidated damages and
hours without payment of the overtime wages required by the may be subject to debarment, as appropriate.
clause set forth in paragraph 1. of this section.
5. Anti-retaliation. It is unlawful for any person to discharge,
* $31 as of January 15, 2023 (See 88 FR 88 FR 2210) as may demote, intimidate, threaten, restrain, coerce, blacklist, harass,
be adjusted annually by the Department of Labor, pursuant to or in any other manner discriminate against, or to cause any
the Federal Civil Penalties Inflation Adjustment Act of 1990. person to discharge, demote, intimidate, threaten, restrain,
coerce, blacklist, harass, or in any other manner discriminate
against, any worker or job applicant for:
3. Withholding for unpaid wages and liquidated damages
a. Notifying any contractor of any conduct which the worker
a. Withholding process. The FHWA or the contracting
reasonably believes constitutes a violation of the Contract
agency may, upon its own action, or must, upon written
Work Hours and Safety Standards Act (CWHSSA) or its
request of an authorized representative of the Department of
implementing regulations in this part;
Labor, withhold or cause to be withheld from the contractor so
much of the accrued payments or advances as may be
considered necessary to satisfy the liabilities of the prime b. Filing any complaint, initiating or causing to be initiated
contractor or any subcontractor for any unpaid wages; any proceeding, or otherwise asserting or seeking to assert on
monetary relief, including interest; and liquidated damages behalf of themselves or others any right or protection under
required by the clauses set forth in this section on this CWHSSA or this part;
contract, any other Federal contract with the same prime
contractor, or any other federally assisted contract subject to
c. Cooperating in any investigation or other compliance
the Contract Work Hours and Safety Standards Act that is held
action, or testifying in any proceeding under CWHSSA or this
by the same prime contractor (as defined in § 5.2). The
part; or
necessary funds may be withheld from the contractor under
this contract, any other Federal contract with the same prime
contractor, or any other federally assisted contract that is d. Informing any other person about their rights under
subject to the Contract Work Hours and Safety Standards Act CWHSSA or this part.
and is held by the same prime contractor, regardless of
whether the other contract was awarded or assisted by the
same agency, and such funds may be used to satisfy the
VI. SUBLETTING OR ASSIGNING THE CONTRACT
contractor liability for which the funds were withheld.
This provision is applicable to all Federal-aid construction
b. Priority to withheld funds. The Department has priority to contracts on the National Highway System pursuant to 23 CFR
funds withheld or to be withheld in accordance with Section IV 635.116.
paragraph 2.a. or paragraph 3.a. of this section, or both, over
claims to those funds by: 1. The contractor shall perform with its own organization
contract work amounting to not less than 30 percent (or a
greater percentage if specified elsewhere in the contract) of
(1) A contractor's surety(ies), including without limitation
the total original contract price, excluding any specialty items
performance bond sureties and payment bond sureties;
designated by the contracting agency. Specialty items may be
performed by subcontract and the amount of any such
(2) A contracting agency for its reprocurement costs; specialty items performed may be deducted from the total
original contract price before computing the amount of work
required to be performed by the contractor's own organization
(3) A trustee(s) (either a court-appointed trustee or a U.S.
(23 CFR 635.116).
trustee, or both) in bankruptcy of a contractor, or a contractor's
bankruptcy estate;
a. The term “perform work with its own organization” in
paragraph 1 of Section VI refers to workers employed or
(4) A contractor's assignee(s); leased by the prime contractor, and equipment owned or
rented by the prime contractor, with or without operators.
Such term does not include employees or equipment of a
(5) A contractor's successor(s); or subcontractor or lower tier subcontractor, agents of the prime
contractor, or any other assignees. The term may include
(6) A claim asserted under the Prompt Payment Act, 31 payments for the costs of hiring leased employees from an
U.S.C. 3901–3907. employee leasing firm meeting all relevant Federal and State
regulatory requirements. Leased employees may only be
included in this term if the prime contractor meets all of the
4. Subcontracts. The contractor or subcontractor must insert following conditions: (based on longstanding interpretation)
in any subcontracts the clauses set forth in paragraphs 1.
through 5. of this section and a clause requiring the (1) the prime contractor maintains control over the
subcontractors to include these clauses in any lower tier supervision of the day-to-day activities of the leased
subcontracts. The prime contractor is responsible for employees;
compliance by any subcontractor or lower tier subcontractor (2) the prime contractor remains responsible for the quality
with the clauses set forth in paragraphs 1. through 5. In the of the work of the leased employees;
9
(3) the prime contractor retains all power to accept or health standards (29 CFR Part 1926) promulgated by the
exclude individual employees from work on the project; and Secretary of Labor, in accordance with Section 107 of the
(4) the prime contractor remains ultimately responsible for Contract Work Hours and Safety Standards Act (40 U.S.C.
the payment of predetermined minimum wages, the 3704). 29 CFR 1926.10.
submission of payrolls, statements of compliance and all
other Federal regulatory requirements. 3. Pursuant to 29 CFR 1926.3, it is a condition of this contract
that the Secretary of Labor or authorized representative
b. "Specialty Items" shall be construed to be limited to work thereof, shall have right of entry to any site of contract
that requires highly specialized knowledge, abilities, or performance to inspect or investigate the matter of compliance
equipment not ordinarily available in the type of contracting with the construction safety and health standards and to carry
organizations qualified and expected to bid or propose on the out the duties of the Secretary under Section 107 of the
contract as a whole and in general are to be limited to minor Contract Work Hours and Safety Standards Act (40 U.S.C.
components of the overall contract. 23 CFR 635.102. 3704).
2. Pursuant to 23 CFR 635.116(a), the contract amount upon
which the requirements set forth in paragraph (1) of Section VI VIII. FALSE STATEMENTS CONCERNING HIGHWAY
is computed includes the cost of material and manufactured PROJECTS
products which are to be purchased or produced by the
contractor under the contract provisions. This provision is applicable to all Federal-aid construction
contracts and to all related subcontracts.
3. Pursuant to 23 CFR 635.116(c), the contractor shall furnish
(a) a competent superintendent or supervisor who is employed In order to assure high quality and durable construction in
by the firm, has full authority to direct performance of the work conformity with approved plans and specifications and a high
in accordance with the contract requirements, and is in charge degree of reliability on statements and representations made
of all construction operations (regardless of who performs the by engineers, contractors, suppliers, and workers on Federal-
work) and (b) such other of its own organizational resources aid highway projects, it is essential that all persons concerned
(supervision, management, and engineering services) as the with the project perform their functions as carefully, thoroughly,
contracting officer determines is necessary to assure the and honestly as possible. Willful falsification, distortion, or
performance of the contract. misrepresentation with respect to any facts related to the
project is a violation of Federal law. To prevent any
4. No portion of the contract shall be sublet, assigned or misunderstanding regarding the seriousness of these and
otherwise disposed of except with the written consent of the similar acts, Form FHWA-1022 shall be posted on each
contracting officer, or authorized representative, and such Federal-aid highway project (23 CFR Part 635) in one or more
consent when given shall not be construed to relieve the places where it is readily available to all persons concerned
contractor of any responsibility for the fulfillment of the with the project:
contract. Written consent will be given only after the
contracting agency has assured that each subcontract is
evidenced in writing and that it contains all pertinent provisions 18 U.S.C. 1020 reads as follows:
and requirements of the prime contract. (based on long-
standing interpretation of 23 CFR 635.116). "Whoever, being an officer, agent, or employee of the United
States, or of any State or Territory, or whoever, whether a
5. The 30-percent self-performance requirement of paragraph person, association, firm, or corporation, knowingly makes any
(1) is not applicable to design-build contracts; however, false statement, false representation, or false report as to the
contracting agencies may establish their own self-performance character, quality, quantity, or cost of the material used or to
requirements. 23 CFR 635.116(d). be used, or the quantity or quality of the work performed or to
be performed, or the cost thereof in connection with the
submission of plans, maps, specifications, contracts, or costs
VII. SAFETY: ACCIDENT PREVENTION of construction on any highway or related project submitted for
approval to the Secretary of Transportation; or
This provision is applicable to all Federal-aid construction
contracts and to all related subcontracts. Whoever knowingly makes any false statement, false
representation, false report or false claim with respect to the
1. In the performance of this contract the contractor shall character, quality, quantity, or cost of any work performed or to
comply with all applicable Federal, State, and local laws be performed, or materials furnished or to be furnished, in
governing safety, health, and sanitation (23 CFR Part 635). connection with the construction of any highway or related
The contractor shall provide all safeguards, safety devices and project approved by the Secretary of Transportation; or
protective equipment and take any other needed actions as it
determines, or as the contracting officer may determine, to be Whoever knowingly makes any false statement or false
reasonably necessary to protect the life and health of representation as to material fact in any statement, certificate,
employees on the job and the safety of the public and to or report submitted pursuant to provisions of the Federal-aid
protect property in connection with the performance of the Roads Act approved July 11, 1916, (39 Stat. 355), as
work covered by the contract. 23 CFR 635.108. amended and supplemented;
2. It is a condition of this contract, and shall be made a Shall be fined under this title or imprisoned not more than 5
condition of each subcontract, which the contractor enters into years or both."
pursuant to this contract, that the contractor and any
subcontractor shall not permit any employee, in performance
of the contract, to work in surroundings or under conditions
which are unsanitary, hazardous or dangerous to his/her
health or safety, as determined under construction safety and
10
IX. IMPLEMENTATION OF CLEAN AIR ACT AND FEDERAL
WATER POLLUTION CONTROL ACT (42 U.S.C. 7606; 2 e. The terms "covered transaction," "debarred,"
CFR 200.88; EO 11738) "suspended," "ineligible," "participant," "person," "principal,"
and "voluntarily excluded," as used in this clause, are defined
This provision is applicable to all Federal-aid construction in 2 CFR Parts 180, Subpart I, 180.900-180.1020, and 1200.
contracts in excess of $150,000 and to all related “First Tier Covered Transactions” refers to any covered
subcontracts. 48 CFR 2.101; 2 CFR 200.327. transaction between a recipient or subrecipient of Federal
funds and a participant (such as the prime or general contract).
By submission of this bid/proposal or the execution of this “Lower Tier Covered Transactions” refers to any covered
contract or subcontract, as appropriate, the bidder, proposer, transaction under a First Tier Covered Transaction (such as
Federal-aid construction contractor, subcontractor, supplier, or subcontracts). “First Tier Participant” refers to the participant
vendor agrees to comply with all applicable standards, orders who has entered into a covered transaction with a recipient or
or regulations issued pursuant to the Clean Air Act (42 U.S.C. subrecipient of Federal funds (such as the prime or general
7401-7671q) and the Federal Water Pollution Control Act, as contractor). “Lower Tier Participant” refers any participant who
amended (33 U.S.C. 1251-1387). Violations must be reported has entered into a covered transaction with a First Tier
to the Federal Highway Administration and the Regional Office Participant or other Lower Tier Participants (such as
of the Environmental Protection Agency. 2 CFR Part 200, subcontractors and suppliers).
Appendix II.
f. The prospective first tier participant agrees by submitting
The contractor agrees to include or cause to be included the this proposal that, should the proposed covered transaction be
requirements of this Section in every subcontract, and further entered into, it shall not knowingly enter into any lower tier
agrees to take such action as the contracting agency may covered transaction with a person who is debarred,
direct as a means of enforcing such requirements. 2 CFR suspended, declared ineligible, or voluntarily excluded from
200.327. participation in this covered transaction, unless authorized by
the department or agency entering into this transaction. 2
CFR 180.330.
X. CERTIFICATION REGARDING DEBARMENT,
SUSPENSION, INELIGIBILITY AND VOLUNTARY g. The prospective first tier participant further agrees by
EXCLUSION submitting this proposal that it will include the clause titled
"Certification Regarding Debarment, Suspension, Ineligibility
This provision is applicable to all Federal-aid construction and Voluntary Exclusion-Lower Tier Covered Transactions,"
contracts, design-build contracts, subcontracts, lower-tier provided by the department or contracting agency, entering
subcontracts, purchase orders, lease agreements, consultant into this covered transaction, without modification, in all lower
contracts or any other covered transaction requiring FHWA tier covered transactions and in all solicitations for lower tier
approval or that is estimated to cost $25,000 or more – as covered transactions exceeding the $25,000 threshold. 2 CFR
defined in 2 CFR Parts 180 and 1200. 2 CFR 180.220 and 180.220 and 180.300.
1200.220.
h. A participant in a covered transaction may rely upon a
certification of a prospective participant in a lower tier covered
1. Instructions for Certification – First Tier Participants: transaction that is not debarred, suspended, ineligible, or
voluntarily excluded from the covered transaction, unless it
a. By signing and submitting this proposal, the prospective knows that the certification is erroneous. 2 CFR 180.300;
first tier participant is providing the certification set out below. 180.320, and 180.325. A participant is responsible for
ensuring that its principals are not suspended, debarred, or
b. The inability of a person to provide the certification set out otherwise ineligible to participate in covered transactions. 2
below will not necessarily result in denial of participation in this CFR 180.335. To verify the eligibility of its principals, as well
covered transaction. The prospective first tier participant shall as the eligibility of any lower tier prospective participants, each
submit an explanation of why it cannot provide the certification participant may, but is not required to, check the System for
set out below. The certification or explanation will be Award Management website (https://www.sam.gov/). 2 CFR
considered in connection with the department or agency's 180.300, 180.320, and 180.325.
determination whether to enter into this transaction. However,
failure of the prospective first tier participant to furnish a i. Nothing contained in the foregoing shall be construed to
certification or an explanation shall disqualify such a person require the establishment of a system of records in order to
from participation in this transaction. 2 CFR 180.320. render in good faith the certification required by this clause.
The knowledge and information of the prospective participant
c. The certification in this clause is a material representation is not required to exceed that which is normally possessed by
of fact upon which reliance was placed when the contracting a prudent person in the ordinary course of business dealings.
agency determined to enter into this transaction. If it is later
determined that the prospective participant knowingly rendered j. Except for transactions authorized under paragraph (f) of
an erroneous certification, in addition to other remedies these instructions, if a participant in a covered transaction
available to the Federal Government, the contracting agency knowingly enters into a lower tier covered transaction with a
may terminate this transaction for cause of default. 2 CFR person who is suspended, debarred, ineligible, or voluntarily
180.325. excluded from participation in this transaction, in addition to
other remedies available to the Federal Government, the
d. The prospective first tier participant shall provide department or agency may terminate this transaction for cause
immediate written notice to the contracting agency to whom or default. 2 CFR 180.325.
this proposal is submitted if any time the prospective first tier
participant learns that its certification was erroneous when *****
submitted or has become erroneous by reason of changed
circumstances. 2 CFR 180.345 and 180.350.
11
2. Certification Regarding Debarment, Suspension, this transaction originated may pursue available remedies,
Ineligibility and Voluntary Exclusion – First Tier including suspension and/or debarment.
Participants:
c. The prospective lower tier participant shall provide
a. The prospective first tier participant certifies to the best of immediate written notice to the person to which this proposal is
its knowledge and belief, that it and its principals: submitted if at any time the prospective lower tier participant
learns that its certification was erroneous by reason of
(1) Are not presently debarred, suspended, proposed for changed circumstances. 2 CFR 180.365.
debarment, declared ineligible, or voluntarily excluded from
participating in covered transactions by any Federal d. The terms "covered transaction," "debarred,"
department or agency, 2 CFR 180.335;. "suspended," "ineligible," "participant," "person," "principal,"
and "voluntarily excluded," as used in this clause, are defined
(2) Have not within a three-year period preceding this in 2 CFR Parts 180, Subpart I, 180.900 – 180.1020, and 1200.
proposal been convicted of or had a civil judgment rendered You may contact the person to which this proposal is
against them for commission of fraud or a criminal offense in submitted for assistance in obtaining a copy of those
connection with obtaining, attempting to obtain, or performing regulations. “First Tier Covered Transactions” refers to any
a public (Federal, State, or local) transaction or contract under covered transaction between a recipient or subrecipient of
a public transaction; violation of Federal or State antitrust Federal funds and a participant (such as the prime or general
statutes or commission of embezzlement, theft, forgery, contract). “Lower Tier Covered Transactions” refers to any
bribery, falsification or destruction of records, making false covered transaction under a First Tier Covered Transaction
statements, or receiving stolen property, 2 CFR 180.800; (such as subcontracts). “First Tier Participant” refers to the
participant who has entered into a covered transaction with a
(3) Are not presently indicted for or otherwise criminally or recipient or subrecipient of Federal funds (such as the prime or
civilly charged by a governmental entity (Federal, State or general contractor). “Lower Tier Participant” refers any
local) with commission of any of the offenses enumerated in participant who has entered into a covered transaction with a
paragraph (a)(2) of this certification, 2 CFR 180.700 and First Tier Participant or other Lower Tier Participants (such as
180.800; and subcontractors and suppliers).
(4) Have not within a three-year period preceding this e. The prospective lower tier participant agrees by
application/proposal had one or more public transactions submitting this proposal that, should the proposed covered
(Federal, State or local) terminated for cause or default. 2 transaction be entered into, it shall not knowingly enter into
CFR 180.335(d). any lower tier covered transaction with a person who is
debarred, suspended, declared ineligible, or voluntarily
(5) Are not a corporation that has been convicted of a felony excluded from participation in this covered transaction, unless
violation under any Federal law within the two-year period authorized by the department or agency with which this
preceding this proposal (USDOT Order 4200.6 implementing transaction originated. 2 CFR 1200.220 and 1200.332.
appropriations act requirements); and
f. The prospective lower tier participant further agrees by
(6) Are not a corporation with any unpaid Federal tax liability submitting this proposal that it will include this clause titled
that has been assessed, for which all judicial and "Certification Regarding Debarment, Suspension, Ineligibility
administrative remedies have been exhausted, or have lapsed, and Voluntary Exclusion-Lower Tier Covered Transaction,"
and that is not being paid in a timely manner pursuant to an without modification, in all lower tier covered transactions and
agreement with the authority responsible for collecting the tax in all solicitations for lower tier covered transactions exceeding
liability (USDOT Order 4200.6 implementing appropriations act the $25,000 threshold. 2 CFR 180.220 and 1200.220.
requirements).
g. A participant in a covered transaction may rely upon a
b. Where the prospective participant is unable to certify to certification of a prospective participant in a lower tier covered
any of the statements in this certification, such prospective transaction that is not debarred, suspended, ineligible, or
participant should attach an explanation to this proposal. 2 voluntarily excluded from the covered transaction, unless it
CFR 180.335 and 180.340. knows that the certification is erroneous. A participant is
responsible for ensuring that its principals are not suspended,
***** debarred, or otherwise ineligible to participate in covered
transactions. To verify the eligibility of its principals, as well as
3. Instructions for Certification - Lower Tier Participants: the eligibility of any lower tier prospective participants, each
participant may, but is not required to, check the System for
(Applicable to all subcontracts, purchase orders, and other Award Management website (https://www.sam.gov/), which is
lower tier transactions requiring prior FHWA approval or compiled by the General Services Administration. 2 CFR
estimated to cost $25,000 or more - 2 CFR Parts 180 and 180.300, 180.320, 180.330, and 180.335.
1200). 2 CFR 180.220 and 1200.220.
h. Nothing contained in the foregoing shall be construed to
a. By signing and submitting this proposal, the prospective require establishment of a system of records in order to render
lower tier participant is providing the certification set out below. in good faith the certification required by this clause. The
knowledge and information of participant is not required to
b. The certification in this clause is a material representation exceed that which is normally possessed by a prudent person
of fact upon which reliance was placed when this transaction in the ordinary course of business dealings.
was entered into. If it is later determined that the prospective
lower tier participant knowingly rendered an erroneous i. Except for transactions authorized under paragraph e of
certification, in addition to other remedies available to the these instructions, if a participant in a covered transaction
Federal Government, the department, or agency with which knowingly enters into a lower tier covered transaction with a
person who is suspended, debarred, ineligible, or voluntarily
12
excluded from participation in this transaction, in addition to cooperative agreement, the undersigned shall complete and
other remedies available to the Federal Government, the submit Standard Form-LLL, "Disclosure Form to Report
department or agency with which this transaction originated Lobbying," in accordance with its instructions.
may pursue available remedies, including suspension and/or
debarment. 2 CFR 180.325. 2. This certification is a material representation of fact upon
which reliance was placed when this transaction was made or
***** entered into. Submission of this certification is a prerequisite
for making or entering into this transaction imposed by 31
4. Certification Regarding Debarment, Suspension, U.S.C. 1352. Any person who fails to file the required
Ineligibility and Voluntary Exclusion--Lower Tier certification shall be subject to a civil penalty of not less than
Participants: $10,000 and not more than $100,000 for each such failure.
a. The prospective lower tier participant certifies, by 3. The prospective participant also agrees by submitting its
submission of this proposal, that neither it nor its principals: bid or proposal that the participant shall require that the
language of this certification be included in all lower tier
(1) is presently debarred, suspended, proposed for subcontracts, which exceed $100,000 and that all such
debarment, declared ineligible, or voluntarily excluded from recipients shall certify and disclose accordingly.
participating in covered transactions by any Federal
department or agency, 2 CFR 180.355;
XII. USE OF UNITED STATES-FLAG VESSELS:
(2) is a corporation that has been convicted of a felony
violation under any Federal law within the two-year period This provision is applicable to all Federal-aid construction
preceding this proposal (USDOT Order 4200.6 implementing contracts, design-build contracts, subcontracts, lower-tier
appropriations act requirements); and subcontracts, purchase orders, lease agreements, or any other
covered transaction. 46 CFR Part 381.
(3) is a corporation with any unpaid Federal tax liability that
has been assessed, for which all judicial and administrative This requirement applies to material or equipment that is
remedies have been exhausted, or have lapsed, and that is acquired for a specific Federal-aid highway project. 46 CFR
not being paid in a timely manner pursuant to an agreement 381.7. It is not applicable to goods or materials that come into
with the authority responsible for collecting the tax liability. inventories independent of an FHWA funded-contract.
(USDOT Order 4200.6 implementing appropriations act
requirements) When oceanic shipments (or shipments across the Great
Lakes) are necessary for materials or equipment acquired for a
b. Where the prospective lower tier participant is unable to specific Federal-aid construction project, the bidder, proposer,
certify to any of the statements in this certification, such contractor, subcontractor, or vendor agrees:
prospective participant should attach an explanation to this
proposal. 1. To utilize privately owned United States-flag commercial
vessels to ship at least 50 percent of the gross tonnage
***** (computed separately for dry bulk carriers, dry cargo liners,
and tankers) involved, whenever shipping any equipment,
material, or commodities pursuant to this contract, to the
XI. CERTIFICATION REGARDING USE OF CONTRACT extent such vessels are available at fair and reasonable rates
FUNDS FOR LOBBYING for United States-flag commercial vessels. 46 CFR 381.7.
This provision is applicable to all Federal-aid construction 2. To furnish within 20 days following the date of loading for
contracts and to all related subcontracts which exceed shipments originating within the United States or within 30
$100,000. 49 CFR Part 20, App. A. working days following the date of loading for shipments
originating outside the United States, a legible copy of a rated,
1. The prospective participant certifies, by signing and ‘on-board’ commercial ocean bill-of-lading in English for each
submitting this bid or proposal, to the best of his or her shipment of cargo described in paragraph (b)(1) of this section
knowledge and belief, that: to both the Contracting Officer (through the prime contractor in
the case of subcontractor bills-of-lading) and to the Office of
a. No Federal appropriated funds have been paid or will be Cargo and Commercial Sealift (MAR-620), Maritime
paid, by or on behalf of the undersigned, to any person for Administration, Washington, DC 20590. (MARAD requires
influencing or attempting to influence an officer or employee of copies of the ocean carrier's (master) bills of lading, certified
any Federal agency, a Member of Congress, an officer or onboard, dated, with rates and charges. These bills of lading
employee of Congress, or an employee of a Member of may contain business sensitive information and therefore may
Congress in connection with the awarding of any Federal be submitted directly to MARAD by the Ocean Transportation
contract, the making of any Federal grant, the making of any Intermediary on behalf of the contractor). 46 CFR 381.7.
Federal loan, the entering into of any cooperative agreement,
and the extension, continuation, renewal, amendment, or
modification of any Federal contract, grant, loan, or
cooperative agreement.
b. If any funds other than Federal appropriated funds have
been paid or will be paid to any person for influencing or
attempting to influence an officer or employee of any Federal
agency, a Member of Congress, an officer or employee of
Congress, or an employee of a Member of Congress in
connection with this Federal contract, grant, loan, or
13
ATTACHMENT A - EMPLOYMENT AND MATERIALS
PREFERENCE FOR APPALACHIAN DEVELOPMENT
HIGHWAY SYSTEM OR APPALACHIAN LOCAL ACCESS
ROAD CONTRACTS (23 CFR 633, Subpart B, Appendix B)
This provision is applicable to all Federal-aid projects funded
under the Appalachian Regional Development Act of 1965.
1. During the performance of this contract, the contractor
undertaking to do work which is, or reasonably may be, done
as on-site work, shall give preference to qualified persons who
regularly reside in the labor area as designated by the DOL
wherein the contract work is situated, or the subregion, or the
Appalachian counties of the State wherein the contract work is
situated, except:
a. To the extent that qualified persons regularly residing in
the area are not available.
b. For the reasonable needs of the contractor to employ
supervisory or specially experienced personnel necessary to
assure an efficient execution of the contract work.
c. For the obligation of the contractor to offer employment to
present or former employees as the result of a lawful collective
bargaining contract, provided that the number of nonresident
persons employed under this subparagraph (1c) shall not
exceed 20 percent of the total number of employees employed
by the contractor on the contract work, except as provided in
subparagraph (4) below.
2. The contractor shall place a job order with the State
Employment Service indicating (a) the classifications of the
laborers, mechanics and other employees required to perform
the contract work, (b) the number of employees required in
each classification, (c) the date on which the participant
estimates such employees will be required, and (d) any other
pertinent information required by the State Employment
Service to complete the job order form. The job order may be
placed with the State Employment Service in writing or by
telephone. If during the course of the contract work, the
information submitted by the contractor in the original job order
is substantially modified, the participant shall promptly notify
the State Employment Service.
3. The contractor shall give full consideration to all qualified
job applicants referred to him by the State Employment
Service. The contractor is not required to grant employment to
any job applicants who, in his opinion, are not qualified to
perform the classification of work required.
4. If, within one week following the placing of a job order by
the contractor with the State Employment Service, the State
Employment Service is unable to refer any qualified job
applicants to the contractor, or less than the number
requested, the State Employment Service will forward a
certificate to the contractor indicating the unavailability of
applicants. Such certificate shall be made a part of the
contractor's permanent project records. Upon receipt of this
certificate, the contractor may employ persons who do not
normally reside in the labor area to fill positions covered by the
certificate, notwithstanding the provisions of subparagraph (1c)
above.
5. The provisions of 23 CFR 633.207(e) allow the
contracting agency to provide a contractual preference for the
use of mineral resource materials native to the Appalachian
region.
6. The contractor shall include the provisions of Sections 1
through 4 of this Attachment A in every subcontract for work
which is, or reasonably may be, done as on-site work.
14
CONTRACT NO. CH257B51
CONTRACT PROVISIONS F.A.P. NO. AC-TAP-3(871)E
DBE FOR FEDERAL-AID CONTRACTS 1 of 11
AFFIRMATIVE ACTION REQUIREMENTS
UTILIZATION OF DISADVANTAGE BUSINESS ENTERPRISES
FOR FEDERAL-AID CONTRACTS
CONTRACT GOALS
FOR THE PURPOSE OF THIS CONTRACT, A GOAL OF 25 PERCENT HAS BEEN
ESTABLISHED FOR SOCIALLY AND ECONOMICALLY DISADVANTAGED
BUSINESSES THAT ARE OWNED AND CONTROLLED BY THOSE INDIVIDUALS WHO
ARE BLACK AMERICANS, HISPANIC AMERICANS, ASIAN-PACIFIC AMERICANS,
SUBCONTINENT ASIAN AMERICANS, NATIVE AMERICANS, OR WOMEN PURSUANT
TO THE MARYLAND DEPARTMENT OF TRANSPORTATION (MDOT) MINORITY
BUSINESS ENTERPRISE PROGRAM:
It is the policy of the Maryland Department of Transportation that Disadvantaged Business
Enterprises as defined in 49 CFR Part 26 and the Safe, Accountable, Flexible, Efficient
Transportation Equity Act: A Legacy for Users (SAFETEA-LU) shall have an equal opportunity
to participate in the performance of the contracts financed in whole or in part with Federal funds
under these agreements. Consequently, the Disadvantaged Business Enterprise requirements of
49 CFR Part 26 and SAFETEA-LU apply to this agreement.
The bidder agrees to ensure that Disadvantaged Business Enterprises as defined in 49 CFR Part 26
and SAFETEA-LU have an equal opportunity to participate in the performance of contracts and
subcontracts financed in whole or in part with Federal funds provided under this agreement. In
this regard, all bidders shall take all necessary and reasonable steps in accordance with
49 CFR Part 26 and SAFETEA-LU to ensure that Disadvantaged Business Enterprises have an
equal opportunity to compete for and perform on Federally funded contracts.
The Maryland State Highway Administration, in accordance with the provisions of Title VI of the
Civil Rights Act of 1964 (78 Stat. 252, 42 USC§§ 2000d to 2000d-4) and the Regulations, hereby
notifies all bidders that it will affirmatively ensure that any Contract entered into pursuant to this
advertisement, Disadvantaged Business Enterprises will be afforded full and fair opportunity to
submit bids in response to this invitation and will not be discriminated against on the grounds of
race, color, or national origin in consideration for an award.
A. GENERAL
For the purpose of these requirements, the following terms as defined below shall apply:
Administration Representative – A DBE Officer or employee of an Administration who
enforces the laws and regulations pertaining to disadvantaged and minority business enterprise
and contract compliance.
Affirmative Actions – Specific steps taken to eliminate discrimination and its effects, to
ensure nondiscriminatory results and practices in the future, and to involve disadvantaged and
minority business enterprises fully in contracts and programs.
04/11/2022
CONTRACT NO. CH257B51
CONTRACT PROVISIONS F.A.P. NO. AC-TAP-3(871)E
DBE FOR FEDERAL-AID CONTRACTS 2 of 11
Business Enterprises – Any legal entity which is organized in any form other than as a joint
venture (e.g., sole proprietorship, partnership, corporation, etc.) to engage in lawful
commercial transactions.
Certified Business – A business which, by order of the Chair/MBE Advisory Council or
his/her designee, has been certified as a bona fide DBE. MDOT certification does not equate
to a pre-qualification status.
DBE – Disadvantaged Business Enterprise – (Reference 49 CFR Part 26, Subpart A) A
small business concern: (1) which is at least 51 percent owned by one or more socially and
economically disadvantaged individuals. Where stock ownership is involved, the
disadvantaged owner(s) shall own at least 51 percent of each class of voting stock and at least
51 percent of the aggregate of all classes of stock that have been issued (also applies to publicly
owned businesses); and (2) whose management and daily business operations are controlled
by one or more of the socially and economically disadvantaged individuals who have
ownership.
DBE Directory – A compilation of businesses certified by MDOT as disadvantaged, minority,
or socially and economically disadvantaged businesses. The directory will be published
annually with quarterly supplements. It will also be provided in automated format and on the
Internet to be updated as changes are made.
DBE Participation Packet – The documents submitted by the bidder or proposer pursuant to
the appropriate special bid provisions. The DBE Participation Packet consists of the Certified
DBE Utilization and Fair Solicitation Affidavit and the DBE Participation Schedule, both of
which must be submitted with your bid or initial price proposal. The DBE Participation Packet
also includes the following documents, which shall be submitted after bids or proposals are
opened: Outreach Efforts Compliance Statement, DBE Subcontractor Project Participation
Affidavit, MDOT Joint Venture Disclosure Affidavit, and Minority Contractor Unavailability
Certificate. See all bid proposal documents at
https://www.mdot.maryland.gov/tso/pages/Index.aspx?PageId=39. Under Federally Funded
DBE Bid/Proposal Forms as listed below:
Form A MDOT-OP 016-2/ MDOT DBE FEDERALLY FUNDED CONTRACTS
CERTIFIED DBE UTILIZATION AND FAIR SOLICITATION AFFIDAVIT
Form B MDOT-OP 017-1/ MDOT DBE FEDERALLY FUNDED CONTRACTS
DBE PARTICIPATION SCHEDULE PART 1- INSTRUCTIONS FOR DBE
PARTICIPATION SCHEDULE
Form C MDOT-OP 018-1/ MDOT DBE FEDERALLY FUNDED CONTRACTS
OUTREACH EFFORTS COMPLIANCE STATEMENT
Form D MDOT -OP 019-2/ MDOT DBE FEDERALLY FUNDED CONTRACTS
DBE SUBCONTRACTOR PROJECT PARTICIPATION AFFIDAVIT
Form E MDOT MBE/DBE GOOD FAITH EFFORTS GUIDANCE AND
DOCUMENTATION; PART 1- GUIDANCE FOR DEMONSTRATING GOOD FAITH
EFFORTS TO MEET MBE/DBE PARTICIPATION GOALS
04/11/2022
CONTRACT NO. CH257B51
CONTRACT PROVISIONS F.A.P. NO. AC-TAP-3(871)E
DBE FOR FEDERAL-AID CONTRACTS 3 of 11
Form E MDOT MBE/DBE GOOD FAITH EFFORTS GUIDANCE AND
DOCUMENTATION; PART 2- CERTIFICATION REGARDING GOOD FAITH
EFFORTS DOCUMENTATION
DBE Program – A program developed by MDOT to implement the requirements of Title 14,
Subtitle 3, of the State Finance and Procurement Article, Annotated Code of Maryland;
Title 10, Subtitle 3, of the State Finance and Procurement Article, Annotated Code of
Maryland, for Leases of State-Owned Property; and 49 CFR Part 26, Subparts A and C for all
Federal Department of Transportation Financial Assistance Programs.
Director, Office of Equal Opportunity – The individual designated for the Administration’s
overall DBE compliance.
Joint Venture – An association of a DBE firm and one or more other firms to carry out a
single, for-profit business enterprise, for which the parties combine their property, capital,
efforts, skills, and knowledge, and in which the DBE is responsible for a distinct, clearly
defined portion of the work of the contract and whose share in the capital contribution, control,
management, risks, and profits of the joint venture are commensurate with its ownership
interest.
Small Business Administration (SBA) 8(a) Certification – The SBA 8(a) Certification
Program is a Federal Program which establishes firms as disadvantaged and eligible for
participation in the Federal SBA Program.
Socially and Economically Disadvantaged Individual Pursuant to 49 CFR Part 26 –
Those individuals who are citizens of the United States (or lawfully admitted permanent
residents). For convenience, these individuals and groups are referred to as “minorities” in
this document and who are:
1. Found by the MDOT to be socially and economically disadvantaged on a case-by-case
basis;
2. Any individual in the following groups, members of which are rebuttably presumed to be
socially and economically disadvantaged;
a. “Black Americans,” which includes persons having origins in any of the Black racial
groups of Africa;
b. “Hispanic Americans,” which includes persons of Mexican, Puerto Rican, Cuban,
Dominican, Central or South American, or other Spanish or Portuguese culture or
origin, regardless of race;
c. “Native Americans,” which includes persons who are American Indian, Eskimos,
Aleuts, or Native Hawaiians;
d. “Asian-Pacific Americans,” which included persons whose origins are from Japan,
China, Taiwan, Korea, Burma (Myanmar), Vietnam, Laos, Cambodia (Kampuchea),
Thailand, Malaysia, Indonesia, the Philippines, Brunei, Samoa, Guam, the U.S. Trust
Territories of the Pacific Islands (Republic of Palau), the Commonwealth of the
Northern Marianas Islands, Macao, Fiji, Tonga, Kirbati, Juvalu, Nauru, Federated
States of Micronesia, or Hong Kong;
04/11/2022
CONTRACT NO. CH257B51
CONTRACT PROVISIONS F.A.P. NO. AC-TAP-3(871)E
DBE FOR FEDERAL-AID CONTRACTS 4 of 11
e. “Subcontinent Asian American,” which includes persons whose origins are from India,
Pakistan, Bangladesh, Bhutan, the Maldives Islands, Nepal or Sri Lanka;
f. Women;
3. Only those persons whose personal net worth does not exceed $750,000 may be found to
be economically disadvantaged.
B. DBE and Good Faith Effort Requirements
1. This contract includes a DBE participation goal for subcontracting and/or procurement of
materials and/or services. Bidders (or offerors) must make a good faith effort to meet the
DBE participation goal before bids or proposals are due, including outreach efforts. A
bid or initial proposal must include both a completed and executed Certified DBE
Utilization and Fair Solicitation Affidavit and DBE Participation Schedule. The failure of
a bidder to complete and submit these documents shall result in a determination that the
bid is not responsive. The failure of an offeror to complete and submit these documents
shall result in a determination that the proposal is not susceptible of being selected for
award.
2. In making a good faith effort to achieve the DBE goal, prior to completing the Certified
DBE Utilization and Fair Solicitation Affidavit and the DBE Participation Schedule and
prior to submitting a bid or initial proposal the bidders (or offerors) including those bidders
or offerors that are certified DBEs must:
a. Identify specific work categories within the scope of the procurement appropriate for
subcontracting and/or procurement of materials and/or services;
b. Solicit DBEs in writing at least 10 days before bids or initial proposals are due,
describing the identified work categories and providing instructions on how to bid on
the subcontracts and/or procurement of materials and/or services;
c. Attempt to make personal contact with the DBEs solicited and to document these
attempts;
d. Assist DBEs to fulfill, or to seek waiver of, bonding requirements; and
e. Attend prebid or other meetings the procurement agency schedules to publicize
contracting opportunities to DBEs.
3. All firms bidding on a Federal-Aid Contract shall submit the name and address of all
subcontractors, service providers, and suppliers that submitted quotes on the Contract. All
subcontractors, service providers, and suppliers shall complete and submit to the
Administration the form titled Contractor Information.
4. The bidder shall seek commitments from disadvantaged business enterprises by
subcontracting and/or procurement of materials and/or services, the combined value of
which equals or exceeds the appropriate percent (goal) of the total value of the prime
contract. A bidder may count toward its DBE goals expenditures for materials and supplies
obtained from DBE regular dealers and/or manufacturers provided that the DBEs assume
the actual and contractual responsibility for the provision of the materials and supplies.
The bidder may count its entire expenditure to a DBE manufacturer (i.e., a supplier that
04/11/2022
CONTRACT NO. CH257B51
CONTRACT PROVISIONS F.A.P. NO. AC-TAP-3(871)E
DBE FOR FEDERAL-AID CONTRACTS 5 of 11
produces goods from raw materials or substantially alters them before resale). The bidder
may count 60 percent of its expenditures to a DBE regular dealer that is not a manufacturer,
provided that the DBE supplier performs a commercially useful function in the supply
process. The apparent low bidder shall submit to the Administration, within 10 business
days after notification that it is the apparent low bidder, an acceptable Affirmative Action
Plan for the utilization of Disadvantaged Business Enterprises in this Contract. The
Contract will not be awarded without the Bidder’s AAP being approved by the
Administration.
The Affirmative Action Plan shall include as a minimum:
a. The name of an employee designated as the bidder’s liaison officer for minority affairs.
b. A complete DBE Subcontractor Project Participation Affidavit , using contractors
whose names appear in the DBE directory or who are otherwise certified by MDOT as
being a disadvantaged business enterprise. Except as permitted by law and approved
by the Administration, this affidavit shall include all DBE firms identified on the DBE
Participation Schedule with a percentage of participation that meets or exceeds the
percentage of participation indicated in the bid or initial proposal.
c. A completed Outreach Efforts Compliance Statement .
5. When a bidder intends to attain the appropriate goal for disadvantaged business enterprise
participation by use of a joint venture, the bidder shall submit a Joint Venture Disclosure
Affidavit showing the extent of disadvantaged business participation. If a bidder intends
to use a joint venture as a subcontractor to meet its goal, the affidavit shall be submitted
through the bidder by the proposed subcontractor and be signed by all parties. A DBE,
even in a joint venture arrangement shall be certified as a DBE by MDOT prior to being
included in the Affirmative Action Plan.
6. Where the proposed DBE participation does not meet the DBE contract goals, sufficient
evidence to demonstrate that the bidder has taken all necessary and reasonable steps to
make a good faith effort to meet these goals shall be required.
7. Determination of Bid Responsiveness for Federal-Aid Contracts
If the bidder is unable to secure from DBEs by subcontracting and/or by procurement of
materials and/or services, commitments which at least equal the appropriate percent (goal)
of the values of the prime Contract at the time of bid, he shall request, in writing, a waiver
of the unmet portion of the goal. This request must be initiated by checking the appropriate
box on the Certified DBE Utilization and Fair Solicitation Affidavit submitted with the bid
or initial proposal.
The waiver may be granted by the Administrator. To obtain approval of a waiver, the
bidder shall submit the following information:
a. A detailed statement of efforts made prior to bid to contact and negotiate with DBEs
including: (i) the dates, names, addresses, and telephone numbers of DBEs who were
contacted; (ii) a description of the information provided to DBEs requesting the plans,
specifications, and anticipated time schedule for portions of the work to be performed
and (iii) a detailed statement of the reasons why additional prospective agreements with
DBEs were not reached;
04/11/2022
CONTRACT NO. CH257B51
CONTRACT PROVISIONS F.A.P. NO. AC-TAP-3(871)E
DBE FOR FEDERAL-AID CONTRACTS 6 of 11
b. A detailed statement of the efforts made to select portions of the work proposed to be
performed by DBEs in order to increase the likelihood of achieving the stated goals;
c. For each DBE that the Contractor considers not qualified, but from which a bid has
been received, a detailed statement of the reasons for the bidder’s conclusion; and
d. For each DBE contacted but unavailable, (i) a Minority Contractor Unavailability
Certificate signed by the disadvantaged business enterprise, or (ii) a statement from
the bidder shall be submitted that states that the DBE refused to sign the Certificate.
8. Guidance concerning good faith efforts. The following is a list of the types of actions
and factors that will be used to determine the bidder's or offeror’s good faith efforts to
obtain DBE participation. It is not intended to be a mandatory checklist, nor is it intended
to be exclusive or exhaustive. Other factors or types of efforts may be relevant in
appropriate cases.
a. Soliciting through all reasonable and available means (e.g. attendance at pre-bid
meetings, advertising and/or written notices) the interest of certified DBEs who have
the capability to perform the work of the contract. The bidder must solicit this interest
within sufficient time to allow the DBEs to respond to the solicitation. The bidder must
determine with certainty if the DBEs are interested by taking appropriate steps to follow
up initial solicitations.
b. Selecting portions of the work to be performed by DBEs in order to increase the
likelihood that the DBE goals will be achieved. This includes, where appropriate,
breaking out contract work items into economically feasible units to facilitate DBE
participation, even when the bidder or offeror might otherwise prefer to perform these
work items with its own forces.
c. Providing interested DBEs with adequate information about the plans, specifications,
and requirements of the contract in a timely manner to assist them in responding to a
solicitation.
d. (1) Negotiating in good faith with interested DBEs. It is the bidder's or offeror’s
responsibility to make a portion of the work available to DBE subcontractors and
suppliers and to select those portions of the work or material needs consistent with the
available DBE subcontractors and suppliers, so as to facilitate DBE participation.
(2) A bidder using good business judgment would consider a number of factors in
negotiating with subcontractors, including DBE subcontractors, and would take a firm's
price and capabilities as well as contract goals into consideration. However, the fact
that there may be some additional costs involved in finding and using DBEs is not in
itself sufficient reason for a bidder's failure to meet the contract DBE goal, as long as
such costs are reasonable. Also, the ability or desire of a prime contractor to perform
the work of a contract with its own organization does not relieve the bidder of the
responsibility to make good faith efforts. Bidders and offerors are not, however,
required to accept higher quotes from DBEs if the price difference is excessive or
04/11/2022
CONTRACT NO. CH257B51
CONTRACT PROVISIONS F.A.P. NO. AC-TAP-3(871)E
DBE FOR FEDERAL-AID CONTRACTS 7 of 11
unreasonable.
e. Not rejecting DBEs as being unqualified without sound reasons based on a thorough
investigation of their capabilities. The contractor's standing within its industry,
membership in specific groups, organizations, or associations and political or social
affiliations (for example union vs. non-union employee status) are not legitimate causes
for the rejection or non-solicitation of bids in the contractor's efforts to meet the project
goal.
f. Making efforts to assist interested DBEs in obtaining bonding, lines of credit, or
insurance as required by the recipient or contractor.
g. Making efforts to assist interested DBEs in obtaining necessary equipment, supplies,
materials, or related assistance or services.
h. Effectively using the services of available minority/women community organizations;
minority/women contractors' groups; local, state, and Federal minority/women
business assistance offices; and other organizations as allowed on a case-by-case basis
to provide assistance in the recruitment and placement of DBEs.
i. In determining whether a bidder or offeror has made good faith efforts, the
Administration may take into account the performance of other bidders or offerors in
meeting the contract goal. For example, when the apparent successful bidder or offeror
fails to meet the contract goal, but others meet it, the Administration may reasonably
raise the question of whether, with additional reasonable efforts, the apparent
successful bidder or offeror could have met the goal. If the apparent successful bidder
or offeror fails to meet the goal, but meets or exceeds the average DBE participation
obtained by other bidders or offerors, the Administration may view this, in conjunction
with other factors, as evidence of the apparent successful bidder or offeror having made
good faith efforts.
9. Bidder Use of DBE Special Services
The bidder shall consider, whenever possible, utilizing the services of minority-owned
banks. Most minority banks are full-service corporations that can provide an array of
financial services such as Treasury and Tax Loan fund accounts, time and demand deposit
accounts, payroll services, and if needed, organization investment counseling.
10. Bidder Records
The bidder shall maintain records showing actions which have been taken to comply with
procedures set forth herein.
11. Bidder Cooperation
The bidder shall cooperate with the Administration Representative in any reviews of the
Contractor’s procedures and practices, with respect to DBEs, which the Administration
Representative may, from time to time, conduct.
04/11/2022
CONTRACT NO. CH257B51
CONTRACT PROVISIONS F.A.P. NO. AC-TAP-3(871)E
DBE FOR FEDERAL-AID CONTRACTS 8 of 11
12. Bidder DBE Modifications
During the life of the Contract, all plans to modify the approved DBE participation program
will require the approval of the Administrator or his authorized representative. This shall
include any changes to the items of work to be sublet or materials and services to be
obtained which differ for those in the original DBE participation program. Any such
request for revisions shall be directed to the appropriate District Engineer for their
disposition.
C. RECORDS AND REPORTS
1. The Contractor shall keep such records as are necessary to determine compliance with its
Disadvantaged Business Enterprise utilization obligations. The records kept by the
Contractor shall be designed to indicate:
a. The name of disadvantaged and non-disadvantaged subcontractors and suppliers, the
type of work materials or services being performed on or incorporated in this project,
and the monetary value of such work materials or services.
b. Documentation of all correspondence, contacts, telephone calls, etc., to obtain the
services of disadvantaged business enterprises on this project.
c. The progress and efforts made in seeking out disadvantaged contractor organizations
and individual disadvantaged contractors for work on this project.
2. Information required to be submitted for Federally Assisted contracts in accordance with
49 CFR Part 26:
a. All bidders (not only the apparent successful bidder) shall provide the following
information:
(1) The age of the bidding firm; and
(2) The annual gross receipts of the bidding firm.
b. All bidders (not only the apparent successful bidder) shall provide the following
information for each firm quoting or considered as subcontractors:
(1) The name of firm; and
(2) The address of firm.
c. The Administration will contact each of the firms quoting or considered as
subcontractors to obtain:
(1) The age of the firm; and
(2) The annual gross receipts of the firm.
If this information already has been gathered by the Administration on a firm and it is
current, it will not be requested.
04/11/2022
CONTRACT NO. CH257B51
CONTRACT PROVISIONS F.A.P. NO. AC-TAP-3(871)E
DBE FOR FEDERAL-AID CONTRACTS 9 of 11
3. The Contractor shall submit reports on a monthly basis of those contracts and other
business transactions executed with disadvantaged business enterprises with respect to the
records referred to in Subparagraph 1.a above, in such form, manner, and content as
prescribed by the Administration. The reports shall be due monthly on the 15th calendar
day of each month. If the Contractor cannot submit their report on time, they shall notify
the Administration’s Representative and request additional time to submit the report.
Failure of the Contractor to report in a timely manner may result in a finding of
noncompliance. Additional reports may be required by the Administration upon written
request.
4. To ensure compliance with the certified DBE contract participation goals, the Contractor
shall:
a. Submit monthly, a report listing unpaid invoices over 30 days from all certified DBE
subcontractors and the reason payment has not been made;
b. Include in its agreement with certified DBE subcontractors a requirement that DBE
subcontractors are to submit monthly to the Administration a report identifying the
prime Contractor and listing the following:
(1) Payment received from the Contractor in the preceding 30 days; and
(2) Invoices for which the subcontractor has not been paid.
5. All such records shall be retained for a period of three years following acceptance of final
payment and shall be available for inspection by the U.S. Department of Transportation,
MDOT, and the Administration.
D. ADMINISTRATIVE PROCEDURES FOR ENFORCEMENT
1. Whenever the Administration believes the prime Contractor or any subcontractor may not
be operating in compliance with the terms of these provisions, the Administration
Representative will conduct an investigation. If the Administration representative finds
the prime Contractor or any subcontractor is not in compliance with these provisions, the
representative will make a report of noncompliance and notify such Contractor in writing
of the steps that will, in the judgment of the Administration, bring the Contractor into
compliance. If the Contractor fails or refuses to comply fully with such steps, the
Administration’s representative will make a final report of noncompliance to the
Administrator, who may direct the imposition of one or more of the sanctions listed below:
a. Suspension of work on a project, pending correction;
b. Withholding payment or a percentage thereof, pending correction;
c. Referral of DBE to the MDOT Office of MBE for review for decertification or minority
business fraud investigation;
d. Referral to MDOT Office of MBE for review/referral to the Attorney General’s Office
for review for initiation of debarment;
e. Referral to the Attorney General’s Office for review for debarment or for criminal
prosecution through the MDOT Office of General Counsel; or
04/11/2022
CONTRACT NO. CH257B51
CONTRACT PROVISIONS F.A.P. NO. AC-TAP-3(871)E
DBE FOR FEDERAL-AID CONTRACTS 10 of 11
f. Any other action as appropriate.
The Administrator will determine which sanction(s) should be imposed in order to promote
the purpose of the MDOT DBE Program.
2. If the documents used to determine the status of a DBE contain false, misleading, or
misrepresenting information, the matter may be referred to the MDOT Office of MBE for
appropriate action.
3. Loss of DBE Certification
a. When a prime Contractor has made a commitment to use a DBE who has lost its
certification but the subcontract has not been executed prior to the notice of loss of
certification, the prime Contractor is required to obtain an eligible, certified DBE for
the Contract or demonstrate to MDOT that it has made a good faith effort to do so.
b. When a prime Contractor has executed a contract with a DBE subcontractor before the
notice of loss of certification, the prime Contractor may continue to use the firm on the
Contract and may continue to receive credit towards its DBE goal, i.e., contract goal,
for the work of that subcontractor.
c. The work carried out by a DBE Prime Contractor would be counted by MDOT up to
the loss of certification. The work performed after the loss of certification would not
be considered DBE participation.
d. When a DBE subcontractor has lost its certification, MDOT may not continue to count
the DBE participation which takes place after the loss of certification as DBE work
when counting participation towards the overall goal of the modal administration or the
Department.
e. If a DBEs loss of certification is the result of exceeding the size standards while
performing on a contract, the DBE participation may be counted for both the Contract
goal and the overall goal.
4. Each Contract that the Administrator signs with a Prime contractor (and each subcontract
the Prime contractor signs with a subcontractor) must include the following assurance: The
contractor, sub recipient or subcontractor shall not discriminate on the basis of race, color,
national origin, or sex in the performance of this contract. The contractor shall carry out
applicable requirements of 49 CFR Part 26 in the award and administration of DOT-
assisted contracts. Failure by the contractor to carry out these requirements is a material
breach of this Contract, which may result in the termination of this Contract or such other
remedy as the recipient deems appropriate, which may include, but is not limited to:
a. Withholding monthly progress payments;
b. Assessing sanctions;
c. Liquidated damages; and/or
d. Disqualifying the contractor from future bidding as non-responsible.
04/11/2022
CONTRACT NO. CH257B51
CONTRACT PROVISIONS F.A.P. NO. AC-TAP-3(871)E
DBE FOR FEDERAL-AID CONTRACTS 11 of 11
E. SUBCONTRACTING.
Subcontracting by the Prime Contractor. Form B Request for Approval of Subcontractor
shall be used by the Prime Contractor to request approval of a Subcontractor and also to ensure
that a formal Subcontract has been or will be written and kept on file by the Prime Contractor.
Completion and submittal of the form by the Prime Contractor acknowledges that the
Administration’s Contracting Officer may require the submission of the written Subcontract
for review by the Administration and/or FHWA.
Lower Tier Subcontracting by an Approved Subcontractor. Form B Subcontractor’s
Request for Approval of Lower Tier Subcontractor shall be used by an Approved
Subcontractor to request approval of a Lower Tier Subcontractor and also to ensure that a
formal Subcontract has been or will be written and kept on file by the Subcontractor.
Completion and submittal of the form by the Subcontractor acknowledges that the
Administration’s Contracting Officer may require the submission of the written Subcontract
for review by the Administration and/or FHWA.
Form Acquisitions. Maryland State Highway Administration Form B may be acquired
through the Administration’s Contracts Award Team or District Office. All questions should
be directed to the Office of Construction, Contracts Award Team.
It is the Administration’s intention to randomly select during each calendar quarter a
representative sample of written Subcontracts for review. This review will be conducted by
the Office of Construction's Contracts Award Team.
04/11/2022
CONTRACT NO. CH257B51
CONTRACT PROVISIONS F.A.P. NO. AC-TAP-3(871)E
NOTICE TO CONTRACTORS DBE GOAL 1 of 1
NOTICE TO CONTRACTORS
CONCERNING THE DBE GOAL ON THIS CONTRACT
The Maryland Department of Transportation is committed to providing the maximum amount of
contracting opportunities to certified Disadvantaged Business Enterprises (DBEs). The previously
established policy excluded consideration of the cost of supplying structural steel for DBE
participation since there were no structural steel manufacturers certified by MDOT. This
exemption is no longer applicable since DBE firms have been certified under this category.
The Administration reserves the right to verify the accuracy of the dollar value included on the
Contractor’s Affirmative Action Plan, including the value associated with the manufacture, supply,
and installation of structural steel.
04/11/2022
CONTRACT NO. CH257B51
CONTRACT PROVISIONS F.A.P. NO. AC-TAP-3(871)E
DBE COMPLIANCE FIELD MEETING 1 of 1
DBE COMPLIANCE FIELD MEETING
A DBE compliance Field Meeting will be conducted to review the responsibilities of the
Administration and the Contractor’s personnel relative to DBE Compliance and documentation.
The meeting will be held within two weeks after starting work on the project.
The Construction Project Engineer, who will notify the following of the date, time and location,
will arrange the meeting. At least one week advanced notice will be required.
(a) Administrative Representatives.
(1) Director, Office of Equal Opportunity or Designee
(2) District Equal Opportunity Officer
(3) Regional Constructional Engineer
(4) Construction Project Engineer
(5) Construction Inspection Division Inspector
(b) Contract Representatives.
(1) Superintendent - Prime Contractor
(2) Equal Opportunity Officer - Prime Contractor
(3) Owner/Superintendent/Foreman DBE - Subcontractor
The Construction Project Engineer and Equal Opportunity Representative will jointly conduct the
meeting. The Contractor shall notify the appropriate subcontractors and ensure their attendance.
11/01/2021
CONTRACT PROVISIONS CONTRACT NO. CH257B51
TRAFFIC CONTROL PLAN CERTIFICATION FAP NO. AC-TAP-3(871)E
1 of 1
TRAFFIC CONTROL PLAN CERTIFICATION
PRIOR TO THE COMMENCEMENT OF WORK ON THIS PROJECT, THE SUCCESSFUL
BIDDER WILL BE REQUIRED TO COMPLETE A TRAFFIC CONTROL PLAN
CERTIFICATION CONTAINING THE INFORMATION SHOWN BELOW. THE
CERTIFICATION FORM WILL BE PROVIDED TO THE SUCCESSFUL BIDDER UPON
AWARD OF THE CONTRACT.
The Administration's Traffic Control Plan (TCP) has been reviewed and the following course of
action shall be followed:
Option 1
The TCP is accepted and shall be used on this project.
Option 2
The TCP is accepted; however, revisions and/or additions shall be submitted for approval
in conformance with the Administration's Specifications 104.01 and TC-2.10. It is
understood that no additional sum of money is payable to the Contractor if the
Administration accepts Option 2.
Option 3
The TCP is not accepted and revision shall be submitted for approval in accordance with
the Administration's Specifications 104.01 and TC-2.10. It is understood that no additional
sum of money is payable to the Contractor if the Administration accepts Option 3.
It is understood that the effective implementation of the approved TCP is the responsibility of the
Contractor. Minor modifications may be made by the Traffic Manager if field conditions warrant
and prior concurrence is obtained from the Engineer. Significant changes to the TCP shall be
submitted to the Engineer in writing, for approval, in conformance with the Administration's
Specifications 104.01.
(DATE) (SIGNATURE)
(PRINT SIGNATURE)
(TITLE)
12-10-18
CONTRACT NO. CH257B51
CONTRACT PROVISIONS FAP NO. AC-TAP-3(871)E
PREVAILING WAGE INSTRUCTIONS FOR THE CONTRACTOR 1 of 4
PREVAILING WAGE INSTRUCTIONS FOR THE CONTRACTOR
PAYROLLS.
Non-Federally Funded Contracts. The Division of Labor and Industry, Prevailing Wage Unit is
requiring that all certified payroll records be submitted electronically. For instructions on how to
register and submit go online to www.dllr.state.md.us/prevwage and follow the instructions for
registering. The regulation addressing this change can be found at COMAR 21.11.11.02. For
Non-Federally funded projects, which include prevailing wage rates, the prime Contractor and
each subcontractor, shall submit the certified payroll electronically and provide one hard copy to
the Project Engineer. All wages shall be paid in conformance with the State Finance and
Procurement Article, Section 17-201-17-226 of the Annotated Code of Maryland and the Fair
Labor Standards Amendments of 1974 (P.L. 93259). If the award amount of a Non-Federally
funded job is less than $250,000, the project will be exempt from prevailing wage requirements.
A review has been made of the wage conditions in the locality and, based on the information
available, the wage rates and fringe payments listed are determined by the Commissioner of the
Department of Labor and Industry to be prevailing for the Contract for the described classes of
labor in conformance with the law. It shall be the responsibility of the Contractor to fully comply
with the law and to contact the Office of the Commissioner of Labor and Industry for interpretation
of the provisions of the law.
Federally Funded Contracts. For Federally funded projects, the prime Contractor and each
subcontractor shall submit one copy of the certified payroll to the Project Engineer.
General Requirements for Federally and Non-Federally Funded Contracts. All payrolls are
subject to the following requirements:
(a) All payrolls shall be numbered, beginning at No. 1, and consecutively numbered through
the end of the Contract.
(b) Contract and FAP numbers shall be shown on all payrolls (as applicable).
(c) All payroll submissions shall include:
(1) Federally Funded – employees’ full name, classification, and Individual Identifying
Number (IIN) e.g. (last four digits of social security number). Refer to FHWA 1273
(IV),(3),(b)1) for further requirements related to weekly payrolls.
(2) Non-Federally Funded – employees’ full name, classification, address and social
security number.
07/26/2023
CONTRACT NO. CH257B51
CONTRACT PROVISIONS FAP NO. AC-TAP-3(871)E
PREVAILING WAGE INSTRUCTIONS FOR THE CONTRACTOR 2 of 4
(d) All payrolls shall show the employee’s basic hourly wage rate, overtime rate (if applicable),
and the number of hours worked (tabulated both daily and weekly).
(e) When fringe benefits are required, indicate separately the amount of employer
contributions to fringe benefit funds and/or programs. The fringe benefits shall be
individually identified, but may be tabulated on a separate sheet. When required fringe
benefits are paid in cash, add the required fringe benefit amount to the basic hourly rate to
obtain the total prevailing wage rate for the employee.
(f) The employee’s net pay and the itemized deductions shall be included in all payrolls.
(g) A Contractor may make deductions that are required by law or required by a collective
bargaining agreement (between the Contractor and a bona fide labor organization).
Deductions are also permitted if they are identified in a written agreement between the
employee and employer that was made at the beginning of employment, provided that the
Contractor presents the agreement to the Administration before the employee begins
working on the Contract. Each payroll shall also include the U.S. Department of Labor
and Hour Public Contracts Division Statement of Compliance Form WH-347 (or its
equivalent), signed by an appropriate official of the Contractor/subcontractor. The
Contractor’s name, address, and telephone number shall also be shown.
(h) On Non-Federally funded projects, all apprentices shall be registered with the Maryland
Apprenticeship and Training Council.
(i) Contractors employing a classification of worker for which a wage rate was not included
on the original wage decision, shall submit to either the Wage and Hour Team (Federally
Funded) or Department of Labor and Licensing (DLLR), (Non-Federally Funded), a
request for an additional classification and rate prior to the employee’s employment at the
project.
(j) Payrolls for Non-Federally Funded projects shall be submitted within 14 calendar days
after the end of each payroll period.
(k) Payrolls for Federally Funded projects shall be submitted within 7 calendar days after the
end of each payroll period.
(l) Contractors and Subcontractors are required to maintain complete social security numbers
and home addresses for employees. Government agencies are entitled to request or review
all relevant payroll information, including social security numbers and addresses of
employees. Contractors and Subcontractors are required to provide such information upon
request.
07/26/2023
CONTRACT NO. CH257B51
CONTRACT PROVISIONS FAP NO. AC-TAP-3(871)E
PREVAILING WAGE INSTRUCTIONS FOR THE CONTRACTOR 3 of 4
OVERTIME.
Non-Federally Funded Contracts. Overtime rates shall be paid by the prime Contractors and
subcontractors under their Contracts and agreements with their employees, which in no event shall
be less than time and a half the prevailing hourly rate of wages for all hours worked in excess of
ten hours in any one calendar day or forty hours in any one calendar week and work performed on
Sundays and legal holidays.
Fringe benefits shall be paid for all hours worked, including the overtime hours. However, the
fringe benefit amounts may be excluded from the half time premium due as overtime
compensation.
Federally Funded Contracts. Overtime rates shall be paid as specified in Form FHWA 1273.
Fringe benefits shall be paid for all hours worked, including the overtime hours. However, the
fringe benefit amounts may be excluded from the half time premium due as overtime
compensation.
PENALTIES.
Non-Federally Funded Contracts. When the Contractor is delinquent in submitting payroll
records, processing of partial payment estimates will be held in abeyance, pending receipt of the
records. The Contractor shall be liable to the Administration for liquidated damages in the amount
of $10.00 for each calendar day the records are late.
The Contractor shall be liable to the Administration for liquidated damages in the amount of $20.00
for each day that an employee is paid less than the prevailing wage.
Federally Funded Contracts. When the Contractor is delinquent in submitting payroll records,
processing of partial payment estimates will be held in abeyance pending receipt of the records.
ADDITIONAL CLASSIFICATIONS.
Federally Funded Contracts. If the wage determination lacks a necessary classification the Prime
Contractor is responsible to submit the request for the additional classification, with a proposed
rate, to the State Highway Administration’s Wage and Hour Team. The request is to include a
copy of the projects wage determination.
Non-Federally Funded Contracts. If the wage determination lacks a necessary classification the
Prime Contractor is responsible to submit the request for the additional classification, with a
proposed rate, to the Department of Labor and Licensing (DLLR).
07/26/2023
CONTRACT NO. CH257B51
CONTRACT PROVISIONS FAP NO. AC-TAP-3(871)E
PREVAILING WAGE INSTRUCTIONS FOR THE CONTRACTOR 4 of 4
INQUIRIES.
Request for information or questions shall be addressed to:
Maryland State Highway Administration
Office of Construction
Wage and Hour Team
7450 Traffic Drive, Building #4
Hanover, MD 21076
or
Email: wageandhourteam@sha.state.md.us
Wages must conform to the latest prevailing wage rates available on sam.gov.
07/26/2023
10/6/23, 9:23 AM SAM.gov
"General Decision Number: MD20230041 08/04/2023
Superseded General Decision Number: MD20220041
State: Maryland
Construction Type: Building
County: Charles County in Maryland.
BUILDING CONSTRUCTION PROJECTS (does not include single family
homes or apartments up to and including 4 stories).
Note: Contracts subject to the Davis-Bacon Act are generally
required to pay at least the applicable minimum wage rate
required under Executive Order 14026 or Executive Order 13658.
Please note that these Executive Orders apply to covered
contracts entered into by the federal government that are
subject to the Davis-Bacon Act itself, but do not apply to
contracts subject only to the Davis-Bacon Related Acts,
including those set forth at 29 CFR 5.1(a)(2)-(60).
______________________________________________________________
|If the contract is entered |. Executive Order 14026 |
|into on or after January 30, | generally applies to the |
|2022, or the contract is | contract. |
|renewed or extended (e.g., an |. The contractor must pay |
|option is exercised) on or | all covered workers at |
|after January 30, 2022: | least $16.20 per hour (or |
| | the applicable wage rate |
| | listed on this wage |
| | determination, if it is |
| | higher) for all hours |
| | spent performing on the |
| | contract in 2023. |
|______________________________|_____________________________|
|If the contract was awarded on|. Executive Order 13658 |
|or between January 1, 2015 and| generally applies to the |
|January 29, 2022, and the | contract. |
|contract is not renewed or |. The contractor must pay all|
|extended on or after January | covered workers at least |
|30, 2022: | $12.15 per hour (or the |
| | applicable wage rate listed|
| | on this wage determination,|
| | if it is higher) for all |
| | hours spent performing on |
| | that contract in 2023. |
|______________________________|_____________________________|
The applicable Executive Order minimum wage rate will be
adjusted annually. If this contract is covered by one of the
Executive Orders and a classification considered necessary for
performance of work on the contract does not appear on this
wage determination, the contractor must still submit a
conformance request.
Additional information on contractor requirements and worker
protections under the Executive Orders is available at
http://www.dol.gov/whd/govcontracts.
Modification Number Publication Date
0 01/06/2023
1 01/13/2023
https://sam.gov/wage-determination/MD20230041/8 1/9
10/6/23, 9:23 AM SAM.gov
2 03/24/2023
3 04/07/2023
4 05/05/2023
5 06/02/2023
6 06/30/2023
7 07/28/2023
8 08/04/2023
ASBE0024-007 04/01/2021
Rates Fringes
ASBESTOS WORKER/HEAT & FROST
INSULATOR........................$ 39.27 18.67+a
Includes the application of all insulating materials,
protective coverings, coatings and finishes to all types of
mechanical systems
a. PAID HOLIDAYS: New Year's Day, Martin Luther King Day,
Memorial Day, Independence Day, Labor Day, Veterans' Day,
Thanksgiving Day,the day after Thanksgiving and Christmas
Day provided the employee works the regular work day before
and after the paid holiday.
----------------------------------------------------------------
ASBE0024-010 04/01/2021
Rates Fringes
ASBESTOS WORKER: HAZARDOUS
MATERIAL HANDLER (Removal of
hazardous material from
ceilings, floors, mechanical
systems, and walls)..............$ 24.46 8.69+a
a. PAID HOLIDAYS: New Year's Day, Martin Luther King Day,
Memorial Day, Independence Day, Labor Day, Veterans' Day,
Thanksgiving Day,the day after Thanksgiving and Christmas
Day provided the employee works the regular work day before
and after the paid holiday.
----------------------------------------------------------------
BRMD0001-006 04/30/2023
Rates Fringes
TILE SETTER......................$ 33.41 12.67
----------------------------------------------------------------
BRMD0001-009 04/30/2023
Rates Fringes
TILE FINISHER....................$ 27.68 11.63
----------------------------------------------------------------
BRMD0001-011 04/30/2023
Rates Fringes
BRICKLAYER (Excluding
Pointing, Caulking and
Cleaning)........................$ 36.50 13.47
----------------------------------------------------------------
BRMD0001-012 04/30/2023
https://sam.gov/wage-determination/MD20230041/8 2/9
10/6/23, 9:23 AM SAM.gov
Rates Fringes
MASON - STONE....................$ 43.16 20.28
----------------------------------------------------------------
BRMD0001-013 04/30/2023
Rates Fringes
TERRAZZO WORKER/SETTER...........$ 33.41 12.67
----------------------------------------------------------------
CARP0197-001 05/01/2023
Rates Fringes
CARPENTER (Including
Acoustical Ceiling
Installation, Drywall
Hanging, Metal Stud
Installation and Form Work)......$ 33.21 13.87
----------------------------------------------------------------
* CARP0219-001 05/01/2023
Rates Fringes
MILLWRIGHT.......................$ 37.65 14.54
----------------------------------------------------------------
ELEC0026-021 09/07/2020
Rates Fringes
ELECTRICIAN (Communication
and Sound Equipment).............$ 29.05 11.39
----------------------------------------------------------------
ELEC0026-022 12/06/2021
Rates Fringes
ELECTRICIAN (Including low
voltage wiring for and
installation of alarms, HVAC
controls)........................$ 50.00 20.49+a
a.PAID HOLIDAYS: New Year's Day, Inauguration Day, Martin
Luther King Jr.'s Birthday, Memorial Day, Independence Day,
Labor Day, Veterans' Day, Thanksgiving Day, the day after
Thanksgiving Day and Christmas Day.
----------------------------------------------------------------
ELEV0010-001 01/01/2023
Rates Fringes
ELEVATOR MECHANIC................$ 52.49 37.335+a+b
a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence
Day, Labor Day, Veterans' Day, Thanksgiving Day, Christmas
Day and the Friday after Thanksgiving.
b. VACATIONS: Employer contributes 8% of basic hourly rate
for 5 years or more of service; 6% of basic hourly rate for
6 months to 5 years of service as vacation pay credit.
----------------------------------------------------------------
ENGI0077-017 05/01/2022
https://sam.gov/wage-determination/MD20230041/8 3/9
10/6/23, 9:23 AM SAM.gov
Rates Fringes
POWER EQUIPMENT OPERATOR:
Backhoe.....................$ 33.98 11.07+a
Bulldozer...................$ 33.98 11.07+a
a. PAID HOLIDAYS: New Year's Day, Inaugural Day, Decoration
Day, Independence Day, Labor Day, Martin Luther King's
Birthday, Veterans' Day, Thanksgiving Day, Friday after
Thanksgiving and Christmas Day.
----------------------------------------------------------------
IRON0005-005 06/01/2023
Rates Fringes
IRONWORKER, STRUCTURAL AND
ORNAMENTAL.......................$ 36.10 25.19
----------------------------------------------------------------
IRON0005-014 05/01/2023
Rates Fringes
IRONWORKER, REINFORCING..........$ 30.70 23.33
----------------------------------------------------------------
LABO0011-013 06/15/2020
Rates Fringes
LABORER: Mason Tender -
Cement/Concrete..................$ 25.88 8.63
LABORER: Pipelayer..............$ 25.88 8.63
----------------------------------------------------------------
PAIN0051-014 06/01/2023
Rates Fringes
GLAZIER
Glazing Contracts $2
million and under...........$ 30.52 13.85
Glazing Contracts over $2
million.....................$ 34.76 13.85
----------------------------------------------------------------
PAIN0051-019 06/01/2022
Rates Fringes
PAINTER
Brush, Roller, Spray and
Drywall Finisher/Taper......$ 26.61 11.41
Industrial..................$ 33.05 13.22
----------------------------------------------------------------
PLAS0891-005 07/01/2021
Rates Fringes
PLASTERER (Including
Fireproofing)....................$ 30.53 7.93
----------------------------------------------------------------
PLAS0891-006 02/01/2020
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 28.82 11.68
----------------------------------------------------------------
https://sam.gov/wage-determination/MD20230041/8 4/9
10/6/23, 9:23 AM SAM.gov
PLUM0005-010 08/01/2022
Rates Fringes
PLUMBER..........................$ 48.00 20.75+a
a. PAID HOLIDAYS: Labor Day, Veterans' Day, Thanksgiving Day
and the day after Thanksgiving, Christmas Day, New Year's
Day, Martin Luther King's Birthday, Memorial Day and the
Fourth of July.
----------------------------------------------------------------
PLUM0602-013 08/01/2022
Rates Fringes
PIPEFITTER (HVAC Pipe and
System Installation Only)........$ 47.98 23.12+a
a. PAID HOLIDAYS: New Year's Day, Martin Luther King's
Birthday, Memorial Day, Independence Day, Labor Day,
Veterans' Day, Thanksgiving Day and the day after
Thanksgiving and Christmas Day.
----------------------------------------------------------------
ROOF0030-016 07/01/2022
Rates Fringes
ROOFER...........................$ 32.26 14.71
----------------------------------------------------------------
SFMD0669-001 04/01/2023
Rates Fringes
SPRINKLER FITTER (Fire
Sprinklers)......................$ 40.46 25.22
----------------------------------------------------------------
SHEE0100-015 11/01/2021
Rates Fringes
SHEET METAL WORKER (Including
HVAC Duct Installation)..........$ 44.37 21.33+a
a. PAID HOLIDAYS: New Year's Day, Martin Luther King's
Birthday, Memorial Day, Independence Day, Labor Day,
Veterans Day, Thanksgiving Day and Christmas Day
----------------------------------------------------------------
* SUMD2010-089 08/20/2010
Rates Fringes
LABORERS
Common or General...........$ 11.38 **
Grade Checker...............$ 16.00 ** 2.90
Landscape...................$ 9.23 **
Mason Tender - Brick........$ 13.00 **
Mason Tender - Stone........$ 14.03 **
Mason Tender for Pointing,
Caulking and Cleaning.......$ 13.25 **
Mortar Mixer................$ 16.61 9.09
PIPEFITTER (Excluding HVAC
https://sam.gov/wage-determination/MD20230041/8 5/9
10/6/23, 9:23 AM SAM.gov
Pipe and System Installation)....$ 28.96 11.35
POINTER, CAULKER, CLEANER,
Includes pointing, caulking,
cleaning of existing masonry,
brick, stone and cement
structures (restoration
work); excludes pointing,
caulking, cleaning of new or
replacement
masonry, brick, stone or
cement...........................$ 19.17
POWER EQUIPMENT OPERATOR:
Asphalt Roller..............$ 21.35 5.38
Bobcat/Skid Loader..........$ 18.05 8.78
Boom........................$ 21.44 8.29
Crane.......................$ 20.95 6.18
Excavator...................$ 20.00
Forklift....................$ 16.00 ** 5.12
Gradall.....................$ 20.50 8.42
Grader/Blade................$ 14.50 ** 5.18
Loader......................$ 22.75 4.91
Paver.......................$ 17.47 6.36
Roller excluding Asphalt....$ 17.60 3.88
TRUCK DRIVER
Dump Truck..................$ 15.90 ** 1.12
Tractor Haul Truck..........$ 17.87 9.98
----------------------------------------------------------------
WELDERS - Receive rate prescribed for craft performing
operation to which welding is incidental.
================================================================
** Workers in this classification may be entitled to a higher
minimum wage under Executive Order 14026 ($16.20) or 13658
($12.15). Please see the Note at the top of the wage
determination for more information.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave
for Federal Contractors applies to all contracts subject to the
Davis-Bacon Act for which the contract is awarded (and any
solicitation was issued) on or after January 1, 2017. If this
contract is covered by the EO, the contractor must provide
employees with 1 hour of paid sick leave for every 30 hours
they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their
own illness, injury or other health-related needs, including
preventive care; to assist a family member (or person who is
like family to the employee) who is ill, injured, or has other
health-related needs, including preventive care; or for reasons
resulting from, or to assist a family member (or person who is
like family to the employee) who is a victim of, domestic
violence, sexual assault, or stalking. Additional information
on contractor requirements and worker protections under the EO
is available at
https://www.dol.gov/agencies/whd/government-contracts.
Unlisted classifications needed for work not included within
the scope of the classifications listed may be added after
award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (ii)).
https://sam.gov/wage-determination/MD20230041/8 6/9
10/6/23, 9:23 AM SAM.gov
----------------------------------------------------------------
The body of each wage determination lists the classification
and wage rates that have been found to be prevailing for the
cited type(s) of construction in the area covered by the wage
determination. The classifications are listed in alphabetical
order of ""identifiers"" that indicate whether the particular
rate is a union rate (current union negotiated rate for local),
a survey rate (weighted average rate) or a union average rate
(weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed
in dotted lines beginning with characters other than ""SU"" or
""UAVG"" denotes that the union classification and rate were
prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of
the union which prevailed in the survey for this
classification, which in this example would be Plumbers. 0198
indicates the local union number or district council number
where applicable, i.e., Plumbers Local 0198. The next number,
005 in the example, is an internal number used in processing
the wage determination. 07/01/2014 is the effective date of the
most current negotiated rate, which in this example is July 1,
2014.
Union prevailing wage rates are updated to reflect all rate
changes in the collective bargaining agreement (CBA) governing
this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that
no one rate prevailed for this classification in the survey and
the published rate is derived by computing a weighted average
rate based on all the rates reported in the survey for that
classification. As this weighted average rate includes all
rates reported in the survey, it may include both union and
non-union rates. Example: SULA2012-007 5/13/2014. SU indicates
the rates are survey rates based on a weighted average
calculation of rates and are not majority rates. LA indicates
the State of Louisiana. 2012 is the year of survey on which
these classifications and rates are based. The next number, 007
in the example, is an internal number used in producing the
wage determination. 5/13/2014 indicates the survey completion
date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a
new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate
that no single majority rate prevailed for those
classifications; however, 100% of the data reported for the
classifications was union data. EXAMPLE: UAVG-OH-0010
08/29/2014. UAVG indicates that the rate is a weighted union
average rate. OH indicates the state. The next number, 0010 in
the example, is an internal number used in producing the wage
determination. 08/29/2014 indicates the survey completion date
for the classifications and rates under that identifier.
https://sam.gov/wage-determination/MD20230041/8 7/9
10/6/23, 9:23 AM SAM.gov
A UAVG rate will be updated once a year, usually in January of
each year, to reflect a weighted average of the current
negotiated/CBA rate of the union locals from which the rate is
based.
----------------------------------------------------------------
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can
be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on
a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests
for summaries of surveys, should be with the Wage and Hour
National Office because National Office has responsibility for
the Davis-Bacon survey program. If the response from this
initial contact is not satisfactory, then the process described
in 2.) and 3.) should be followed.
With regard to any other matter not yet ripe for the formal
process described here, initial contact should be with the
Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an
interested party (those affected by the action) can request
review and reconsideration from the Wage and Hour Administrator
(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the
interested party's position and by any information (wage
payment data, project description, area practice material,
etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an
interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
================================================================
https://sam.gov/wage-determination/MD20230041/8 8/9
10/6/23, 9:23 AM SAM.gov
END OF GENERAL DECISIO"
https://sam.gov/wage-determination/MD20230041/8 9/9
CONTRACT NO. CH257B51
CONTRACT PROVISIONS FAP NO. AC-TAP-3(871)E
NOTICE OF ACTIONS FOR AFFIRMATIVE ACTION 1 of 8
NOTICE OF ACTIONS REQUIRED FOR AFFIRMATIVE ACTION TO
ENSURE EQUAL EMPLOYMENT OPPORTUNITY (EXECUTIVE ORDER 11246)
1. The Offeror's or Bidders attention is called to the "Equal Opportunity Clause" and the "Standard
Federal Equal Employment Specifications" set forth herein.
2. The goals and timetables for minority and female participation, expressed in percentage terms for
the Contractor's aggregate work force in each trade on all construction work in the covered area,
are as noted in Appendix A and B:
These goals are applicable to all the Contractors' construction work (whether or not it is Federal
or federally assisted) performed in the covered area. If the contractor performs construction work
in a geographical area located outside of the covered area, it shall apply the goals established for
such geographical area where the work is actually performed. With regard to this second area,
the contractor also is subject to the goals for both its federally involved and nonfederally involved
construction.
The contractor's compliance with the Executive Order and the regulations in 41 CFR Part 60-4
shall be based on its implementation of the Equal Opportunity Clause, specific affirmative action
obligations required by the specifications set forth in 41 CFR 60-4.3(a), and its efforts to meet the
goals. The hours of minority and female employment and training must be substantially uniform
throughout the length of contract, and in each trade, and the contractor shall make a good faith
effort to employ minorities and women evenly on each of its projects. The transfer of minority
or female employees or trainees from Contractor to Contractor or from project to project for the
sole purpose of meeting the contractor's goals shall be a violation of the contract, the Executive
Order and the regulations in 41 CFR Part 60-4. Compliance with the goals will be measured
against the total work hours performed.
3. The Contractor shall provide written notification to the Director of the Office of Federal Contract
Compliance Programs within 10 working days of award of any construction subcontract in excess
of $10,000 at any tier for construction work under the contract resulting from this notification.
The notification shall list the name, address, and telephone number of the subcontractor; employer
identification number of the subcontractor; estimated dollar amount of the subcontract; estimated
starting and completion dates of the subcontract; and the geographical area in which the
subcontract is to be performed.
4. As used in this Notice, and in the contract resulting from this solicitation, the "covered area" is
noted on appendix B.
STANDARD FEDERAL EQUAL EMPLOYMENT OPPORTUNITY CONSTRUCTION
CONTRACT SPECIFICATIONS (Executive Order 11246)
1. As used in these specifications:
a. "Covered area" means the geographical area described in the solicitation from which this
contract resulted;
b. "Director" means Director, Office of Federal Contract Compliance Programs, United States
Department of Labor, or any person to whom the Director delegates authority;
05-30-17
CONTRACT NO. CH257B51
CONTRACT PROVISIONS FAP NO. AC-TAP-3(871)E
NOTICE OF ACTIONS FOR AFFIRMATIVE ACTION 2 of 8
c. “Employer identification number" means the Federal Social Security number used on the
Employer's Quarterly Federal Tax Return, U.S. Treasury Department Form 941.
d. "Minority" includes:
(i) Black (all persons having origins in any of the Black African racial groups not of
Hispanic origin);
(ii) Hispanic (all persons of Mexican, Puerto Rican, Cuban, Central or South American or
other Spanish culture or origin regardless of race);
(iii) Asian and Pacific Islander (all persons having origins in any of the original people of the
Far East, Southeast Asia, the Indian Subcontinent, or the Pacific Islands); and,
(iv) American Indians or Alaskan Native (all persons having origins in any of the original
peoples of North America and maintaining identifiable tribal affiliations through
membership and participation or community identification).
2. Whenever the Contractor, or any Subcontractor at any tier, subcontracts a portion of the work
involving any construction trade, it shall physically include in each subcontract in excess of
$10,000 the provisions of these specifications and the Notice which contains the applicable
goals for minority and female participation and which is set forth in the solicitations from which
this contract resulted.
3. If the Contractor is participating (pursuant to 41 CFR 60-4.5) in a Hometown Plan approved by
the U.S. Department of Labor in the covered area either individually or through an association,
its affirmative action obligations on all work in the Plan area (including goals and timetables)
shall be in accordance with that Plan for those trades which have unions participating in the Plan.
Contractors must be able to demonstrate their participation in and compliance with the provisions
of any such Hometown Plan. Each Contractor or Subcontractor participating in an approved Plan
is individually required to comply with its obligations under the EEO clause, and to make a good
faith effort to achieve each goal under the Plan in each trade in which it has employees. The
overall good faith performance by other Contractors or Subcontractors toward a goal in an
approved Plan does not excuse any covered Contractor's or Subcontractor's failure to take good
faith efforts to achieve the Plan goals and timetables.
4. The Contractor shall implement the specific affirmative action standards provided in paragraphs
7.a through 7.p of these specifications. The goals set forth in the solicitation from which this
contract resulted are expressed as percentages of the total hours of employment and training of
minority and female utilization the Contractor should reasonably be able to achieve in each
construction trade in which it has employees in the covered area. The Contractor is expected to
make substantially uniform progress toward its goal in each craft during the period specified.
5. Neither the provisions of any collective bargaining agreement, nor the failure by a union with
whom the Contractor has a collective bargaining agreement, to refer either minorities or women
shall excuse the Contractor's obligations under these specifications, Executive Order 11246, or
the regulations promulgated pursuant thereto.
05-30-17
CONTRACT NO. CH257B51
CONTRACT PROVISIONS FAP NO. AC-TAP-3(871)E
NOTICE OF ACTIONS FOR AFFIRMATIVE ACTION 3 of 8
6. In order for the nonworking training hours of apprentices and trainees to be counted in meeting
the goals, such apprentices and trainees must be employed by the Contractor during the training
period, and the Contractor must have made a commitment to employ the apprentices and trainees
at the completion of their training, subject to the availability of employment opportunities.
Trainees must be trained pursuant to training programs approved by the U.S. Department of
Labor.
7. The Contractor shall take specific affirmative actions to ensure equal employment opportunity.
The evaluation of the Contractor's compliance with these specifications shall be based upon its
effort to achieve maximum results from its actions. The Contractor shall document these efforts
fully, and shall implement affirmative action steps at least as extensive as the following:
a. Ensure and maintain a working environment free of harassment, intimidation, and coercion at
all sites, and in all facilities at which the Contractor's employees are assigned to work. The
Contractor, where possible, will assign two or more women to each construction project. The
Contractor shall specifically ensure that all foremen, superintendents, and other on-site
supervisory personnel are aware of and carry out the Contractor's obligation to maintain such
a working environment, with specific attention to minority or female individuals working at
such sites or in such facilities.
b. Establish and maintain a current list of minority and female recruitment sources, provide
written notification to minority and female recruitment sources and to community
organizations when the Contractor or its unions have employment opportunities available, and
maintain a record of the organizations' responses.
c. Maintain a current file of the names, addresses and telephone numbers of each minority and
female off-the-street applicant and minority or female referral from a union, a recruitment
source or community organization and of what action was taken with respect to each such
individual. If such individual was sent to the union hiring hall for referral and was not referred
back to the Contractor by the union or, if referred, not employed by the Contractor, this shall
be documented in the file with reason therefore, along with whatever additional actions the
Contractor may have taken.
d. Provide immediate written notification to the Director when the union or unions with which
the Contractor has a collective bargaining agreement has not referred to the Contractor a
minority person or woman sent by the Contractor, or when the Contractor has other
information that the union referral process has impeded the Contractor's efforts to meet its
obligations.
e. Develop on-the-job training opportunities and/or participate in training programs for the area
which expressly include minorities and women, including upgrading programs and
apprenticeship and trainee programs relevant to the contractor's employment needs, especially
those programs funded or approved by the Department of Labor. The Contractor shall provide
notice of these programs to the sources compiled under 7.b above.
f. Disseminate the Contractor's EEO policy by providing notice of the policy to unions and
training programs and requesting their cooperation in assisting the Contractor in meeting its
EEO obligations; by including it in any policy manual and collective bargaining agreement;
by publicizing it in the company newspaper, annual report, etc.; by specific review of the
05-30-17
CONTRACT NO. CH257B51
CONTRACT PROVISIONS FAP NO. AC-TAP-3(871)E
NOTICE OF ACTIONS FOR AFFIRMATIVE ACTION 4 of 8
policy with all management personnel and with all minority and female employees at least
once a year and by posting the company EEO policy on bulletin boards accessible to all
employees at each location where construction work is performed.
g. Review, at least annually, the company's EEO Policy and affirmative action obligations under
these specifications with all employees having any responsibility for hiring, assignment,
layoff, termination or other employment decisions including specific review of these items
with on-site supervisory personnel such as Superintendents, General Foremen, etc., prior to
the initiation of construction work at any job site. A written record shall be made and
maintained identifying the time and place of these meetings, persons attending, subject matter
discussed, and disposition of the subject matter.
h. Disseminate the Contractor's EEO policy externally by including it in any advertising in the
news media, specifically including minority and female news media, and providing written
notification to and discussing the Contractor's EEO policy with other Contractors and
Subcontractors with whom the Contractor does or anticipates doing business.
i. Direct its recruitment efforts, both oral and written, to minority, female and community
organizations, to schools with minority and female students and to minority and female
recruitment and training organizations serving the Contractor's recruitment area and
employment needs. Not later than one month prior to the date for the acceptance of
applications for apprenticeship or other training by any recruitment source, the Contractor
shall send written notification to organizations such as the above, describing the openings,
screening procedures, and tests to be used in the selection process.
j. Encourage present minority and female employees to recruit other minority persons and
women and, where reasonable, provide after school, summer and vacation employment to
minority and female youth both on the site and in other areas of a Contractor's work force.
k. Validate all tests and other selection requirements where there is an obligation to do so under
41 CFR Part 60-3.
l. Conduct, at least annually, an inventory and evaluation at least of all minority and female
personnel for promotional opportunities and encourage these employees to seek or to prepare
for, through appropriate training, etc., such opportunities.
m. Ensure that seniority practices, job classifications, work assignments and other personnel
practices, do not have a discriminatory effect by continually monitoring all personnel and
employment related activities to insure that the EEO policy and the Contractor's obligations
under these specifications are being carried out.
n. Ensure that all facilities and company activities are nonsegregated except that separate or
single-user toilet and necessary changing facilities shall be provided to assure privacy between
the sexes.
o. Document and maintain a record of all solicitations of offers for subcontracts from minority
and female construction contractors and suppliers, including circulation of solicitations to
minority and female contractor associations and other business associations.
05-30-17
CONTRACT NO. CH257B51
CONTRACT PROVISIONS FAP NO. AC-TAP-3(871)E
NOTICE OF ACTIONS FOR AFFIRMATIVE ACTION 5 of 8
p. Conduct a review, at least annually, of all supervisors' adherence to and performance under
the Contractor's EEO policies and affirmative action obligations.
8. Contractors are encouraged to participate in voluntary associations which assist in fulfilling one
or more of their affirmative action obligations (7.a through 7.p). The efforts of a contractor
association, joint contractor-union, contractor-community, or other similar group of which the
contractor is a member and participant, may be asserted as fulfilling any one or more if its
obligations under 7.a through 7.p of these specifications provided that the contractor actively
participates in the group, makes every effort to assure that the group has a positive impact on the
employment of minorities and women in the industry, ensures that the concrete benefits of the
program are reflected in the Contractor's minority and female work force participation, makes a
good faith effort to meet its individual goals and timetables, and can provide access to
documentation which demonstrates the effectiveness of actions taken on behalf of the Contractor.
The obligation to comply, however, is the Contractor's and failure of such a group to fulfill an
obligation shall not be a defense for the Contractor's non-compliance.
9. A single goal for minorities and a separate single goal for women have been established. The
Contractor, however, is required to provide equal employment opportunity and to take affirmative
action for all minority groups, both male and female, and all women, both minority and non-
minority. Consequently, the Contractor may be in violation of the Executive Order if a particular
group is employed in a substantially disparate manner (for example, even though the Contractor
has achieved its goals for women generally the Contractor may be in violation of the Executive
Order if a specific minority group of women is underutilized).
10. The Contractor shall not use the goals and timetables or affirmative action standards to
discriminate against any person because of race, color, religion, sex, or national origin.
11. The Contractor shall not enter into any Subcontract with any person or firm debarred from
Government contracts pursuant to Executive Order 11246.
12. The Contractor shall carry out such sanctions and penalties for violation of these specifications
and of the Equal Opportunity Clause, including suspension, termination and cancellation of
existing subcontracts as may be imposed or ordered pursuant to Executive Order 11246, as
amended, and its implementing regulations, by the Office of Federal Contract Compliance
Programs. Any Contractor who fails to carry out such sanctions and penalties shall be in violation
of these specifications and Executive Order 11246, as amended.
13. The Contractor, in fulfilling its obligations under these specifications, shall implement specific
affirmative action steps, at least as extensive as those standards prescribed in paragraph 7 of these
specifications, so as to achieve maximum results from its efforts to ensure equal employment
opportunity. If the Contractor fails to comply with the requirements of the Executive Order, the
implementing regulations, or these specifications, the Director shall proceed in accordance with
41 CFR 60-4.8.
14. The Contractors shall designate a responsible official to monitor all employment related
activity to ensure that the company EEO policy is being carried out to submit reports relating
to the provisions hereof as may be required by the Government and to keep records. Records
shall at affiliation if any, employee identification number when assigned, social security
number, race, sex, status (e.g., mechanic, apprentice, trainee, helper, or laborer), dates of
changes in status, hours worked per week in the indicated trade, rate of pay, and locations at
05-30-17
CONTRACT NO. CH257B51
CONTRACT PROVISIONS FAP NO. AC-TAP-3(871)E
NOTICE OF ACTIONS FOR AFFIRMATIVE ACTION 6 of 8
which the work was performed. Records shall be maintained in an easily understandable and
retrievable form; however, to the degree that existing records satisfy this requirement,
contractors shall not be required to maintain separate records.
15. Nothing herein provided shall be construed as a limitation upon the application of other laws
which establish different standards of compliance or upon the application of requirements for the
hiring of local or other area residents
(a.g., those under the Public Works Employment Act of 1977 and the Community Development
Block Grant Program).
16. The Contractor will receive at the time of Award Federal Form CC-257 for his use in reporting
monthly the Affirmative Actions for minority and female which he has employed.
05-30-17
CONTRACT NO. CH257B51
CONTRACT PROVISIONS FAP NO. AC-TAP-3(871)E
NOTICE OF ACTIONS FOR AFFIRMATIVE ACTION 7 of 8
APPENDIX A
The following goals and timetables for female utilization shall be included in all Federal and
federally assisted construction contracts and subcontracts in excess of $10,000. The goals are
applicable to the Contractor's aggregate on-site construction work force whether or not part of that
work force is performing on a Federal or federally assisted construction contract or subcontract.
AREA COVERED: Nationwide
GOALS AND TIMETABLES
Timetable Goals
(percent)
From April 1, 1978 until March 31, 1979.................................................. 3.1
From April 1, 1979 until March 31, 1980.................................................. 5.0
From April 1, 1980 until further notice...................................................... 6.9
05-30-17
CONTRACT NO. CH257B51
CONTRACT PROVISIONS FAP NO. AC-TAP-3(871)E
NOTICE OF ACTIONS FOR AFFIRMATIVE ACTION 8 of 8
APPENDIX B
Until further notice, the following goals for minority utilization in each construction craft and trade
shall be included in all Federal or federally assisted construction contracts and subcontracts in excess
of $10,000 to be performed in the respective geographical areas. The goals are applicable to each
nonexempt contractor's total on-site construction work force, regardless of whether or not part of
that work force is performing work on a Federal, federally assisted or nonfederally related project,
contract or subcontract.
Construction contractors which are participating in an approved Hometown Plan (see 41 CFR 60-
4.5) are required to comply with the goals of the Hometown Plan with regard to construction work
they perform in the area covered by the Hometown Plan. With regard to all their other covered
construction work such contractors are required to comply with the applicable SMSA or EA goal
contained in this appendix B-80.
Goal
State (percent)
Maryland:
019 Baltimore, MD:
SMSA Counties:
0720 Baltimore, MD........................................................................................... 23.0
MD Anne Arundel; MD Baltimore;
MD Carroll; MD Harford;
MD Howard; MD Baltimore City
Non-SMSA Counties............................................................................................... 23.6
MD Caroline; MD Dorchester;
MD Kent; MD Queen Annes;
MD Somerset; MD Talbot;
MD Wicomico; MD Worcestar
Washington, DC:
020 Washington, DC:
SMSA Counties:
8840 Washington, DC.......................................................................................... 28.0
MD Charles; MD Montgomery;
MD Prince Georges
Non-SMSA Counties............................................................................................ 25.2
MD Calvert; MD Frederick
MD St. Marys; MD Washington
Pennsylvania
Non-SMSA Counties............................................................................................ 4.8
MD Allegany: MD Garrett
05-30-17
CONTRACT NO. CH257B51
CONTRACT PROVISIONS F.A.P. NO. AC-TAP-3(871)E
TRAINING PROVISIONS 1 of 4
TRAINING PROVISIONS
As part of the Contract's Equal Employment Opportunity Affirmative Action Program, on-the-job
training shall be provided as follows:
The on-the-job training shall be aimed at developing full journeypersons in the type of trade or job
classification involved. On this Contract (0) persons will be trained.
In the event that a Contractor subcontracts a portion of the Contract work, the Contractor shall
determine how many, if any, of the trainees are to be trained by the subcontractor, however, the
Contractor shall retain the primary responsibility for meeting the training requirements imposed by
this Provision. The Contractor shall also ensure that this training Provision is physically included in
each subcontract to ensure that the workforce utilized by the subcontractor meet the goals for minority
and female employment and training. Where feasible, 25 percent of apprentices or trainees in each
occupation shall be in their first year of apprenticeship or training.
The number of trainees in each classification shall be distributed among the work classifications on
the basis of the Contractor's needs, minority and women employment goals specified for each trade
in the Contract Provision, and the reasonable area of recruitment.
Prior to beginning construction, the Contractor shall submit to the Administration for approval a
Manpower and Training Utilization (MTU) Schedule no later than at the preconstruction meeting.
The MTU schedule shall include:
1. The proposed training programs.
2. The number of trainees to be trained in each classification.
3. Anticipated starting and ending dates for training in each classification.
No Contract work may be undertaken until the Administration has accepted the schedule.
If the submitted training programs fail to meet the requirements as defined within these Provisions,
the Administration will withhold one percent of the total category code one pay items from the
payment due the Contractor. The Contractor shall submit a revised Manpower and Training
Utilization Schedule when major changes in the Contract work schedule occur that substantially affect
the previously submitted schedule.
The Contractor shall be credited for each trainee employee who is currently enrolled or becomes
enrolled in an approved program and will be reimbursed for the hourly cost of the trainee as specified
in the schedule of prices.
06-15-20
CONTRACT NO. CH257B51
CONTRACT PROVISIONS F.A.P. NO. AC-TAP-3(871)E
TRAINING PROVISIONS 2 of 4
Training and upgrading of minorities and women toward journeyperson status is a primary objective
of this Training Provision. The purpose for this objective is to ensure a pool of qualified minorities
and women to replace those journeypersons who, in the natural course of events will leave the
workforce. The program will also provide opportunities to the minorities and women trainees in
geographic areas where shortages in minority and women journeypersons are prevalent and
recognized due to the Contractor's inability to meet the Equal Employment Opportunity goals
specified in this Contract.
The training requirements of this Training Provision are not intended nor shall they be used to
discriminate against any applicant for training, whether a member of a protected class or not. It is the
Contractor's responsibility to demonstrate good faith efforts to ensure an adequate workforce
representation of minorities and women in all job classifications on this Contract. Therefore, the
Contractor shall consider the employment Contract goals set for minorities and females when
enrolling trainees. The Contractor's utilization of the on-the-job training goals will be weighed when
an Equal Employment Opportunity workforce compliance determination is made.
The Contractor shall make every effort to enroll minority and women trainees (e.g., by conducting
systematic and direct recruitment through public and private sources likely to yield minorities and
women to the extent that these persons are available within a reasonable area of recruitment).
No employee shall be employed as a trainee in any classification which the individual has successfully
completed a training program leading to journeyperson status or has been employed as a
journeyperson. This includes a person gainfully employed as a journeyperson by virtue of informal
on-the-job training. The Contractor should satisfy this requirement by including appropriate
questions in the employee job application or by other suitable means. Regardless of the method used,
the Contractor's records shall document the findings in each case. In the case of apprentices, evidence
of indentureship and registration of the approved apprenticeship program shall be included in the
Contractor's records.
The minimum length and type of training and rate for each classification shall be specified in the
training program by the Contractor and approved by the Administration and the Federal Highway
Administration.
The Administration will approve any program specified in the Administration's On-The-Job Training
Manual. The Administration and the Federal Highway Administration will consider other programs
if it is reasonably calculated that the programs conform to the Equal Employment Opportunity
obligations of the Contract and will qualify the average trainee for journeyperson status in the
specified classification by the end of the training period. Apprenticeship programs registered with
the U.S. Department of Labor, Bureau of Apprenticeship and Training, or with a State apprenticeship
agency recognized by the Bureau, and training programs approved by, but not necessarily sponsored
by the U.S. Department of Labor, Employment and Training Administration, Bureau of
Apprenticeship and Training will also be acceptable, provided that the program being offered is
administered in a manner consistent with the Equal Employment obligation of Federal-aid highway
construction Contracts and meets the minimum requirements of this Training Provision.
06-15-20
CONTRACT NO. CH257B51
CONTRACT PROVISIONS F.A.P. NO. AC-TAP-3(871)E
TRAINING PROVISIONS 3 of 4
Some offsite training is permissible as long as the training is an integral part of an approved training
program and does not comprise a significant part of the overall training.
Unless otherwise specified, the Contractor will be reimbursed 80 cents per hour of training given an
employee on this Contract in conformance with an approved training program. As approved by the
Engineer, reimbursement will be made for training persons in excess of the number specified herein.
This reimbursement will be made even though the Contractor received additional training program
funds from other sources, provided that the other sources do not specifically prohibit the Contractor
from receiving other reimbursement. Reimbursement for offsite training indicated above will only
be made to the Contractor where the Contractor does one or more of the following and the trainees
are concurrently employed on a Federal-aid project:
1. Contributes to the cost of the training.
2. Provides the instruction to the trainee or pays the trainee's wages during the offsite training
period.
No payment will be made to the Contractor if either the failure to provide the required training, or the
failure to hire the trainee as a journeyperson is caused by the Contractor and evidences a lack of "good
faith" on the part of the Contractor in meeting the requirements of this Training Provision. It is
normally expected that a trainee will begin training on the project as soon as feasible after the start of
work utilizing the skill involved and remain on the project as long as training opportunities exist in
the work classification or until the program is completed. It is not required that all trainees be on
board for the entire length of the Contract. A Contractor will have fulfilled their responsibilities under
this Training Provision when:
1. Systematic and direct recruitment likely to yield qualified minority and women applicants is
conducted through:
a. Public and private referral sources.
b. Advising the existing workforce of training opportunities.
c. Unions (if applicable).
2. Acceptable training has been provided to trainees enrolled in the program.
3. The number of specified trainees have completed the minimum hours required in an approved
training program.
4. Trainees completing approved programs are retained in the workforce as journeypersons.
The Contractor shall pay the trainees at least 60 percent of the appropriate minimum journeyperson's
hourly rate plus the full fringe benefits specified in the Contract for the first half of the training period,
75 percent for the third quarter of the training period plus full fringe benefits, and 90 percent for the
06-15-20
CONTRACT NO. CH257B51
CONTRACT PROVISIONS F.A.P. NO. AC-TAP-3(871)E
TRAINING PROVISIONS 4 of 4
last quarter of the training period plus full fringe benefits. However, in no case shall the total hourly
rate be less than the U.S. Department of Labor's unskilled laborer wage rate for the project. In
addition, all trainees shall be identified as such on the certified payroll.
The Contractor shall furnish the trainee a copy of the approved training program in which the trainee
is enrolled. The Contractor shall provide each trainee with a certificate showing the type and length
of training satisfactorily completed. The Contractor shall submit a Certificate to the trainee in the
following instances:
1. Certificate of Completion when a trainee completes the total number of hours required to
complete a training program.
2. Certificate of Training when a trainee does not totally complete the required program hours.
The Contractor shall provide for the maintenance of records and furnish periodic reports inclusive of
the Administration's Contractor's Semiannual Training Reports, documenting his performance under
this Training Provision. The Semiannual Training Report is to be submitted by the 10th of the month
following the reporting period (July 10 and January 10).
If the Contractor fails to fully comply with these Training Provisions, the Administration's
Representative will make a final report of non compliance to the Administrator, who may direct the
imposition of one or both of the sanctions listed below:
1. Withholding a percentage of the progress payment.
2. Other action appropriate and/or within the discretion of the Administrator.
06-15-20
CONTRACT NO. CH257B51
SPECIAL PROVISIONS FAP NO. AC-TAP-3(871)E
PROJECT DESCRIPTION 1 of 1
PROJECT DESCRIPTION
This project, located in the Town of Indian Head, Charles County, is for the construction of a new
restroom/pavilion building, signage, pavement markings, sidewalks, and related incidentals.
SPECIFICATIONS
All work on this project shall conform to the Maryland Department of Transportation, State
Highway Administration's Specifications entitled, "Standard Specifications for Construction and
Materials" dated July 1, 2023, revisions thereof, or additions thereto, and the Special Provisions
included in this Invitation for Bids.
PROJECT SCHEDULE
The required project schedule for this project is Type A - Bar Chart.
EMPLOYMENT AGENCY
The Maryland Department of Labor, Division of Workforce Development and Adult Learning,
Maryland American Job Centers can be found on the Website at
http://www.labor.maryland.gov/county/.
07/01/2023
CONTRACT NO. CH257B51
SPECIAL PROVISIONS F.A.P. NO. AC-TAP-3(871)E
NOTICE TO CONTRACTOR FOR FEDERAL CONTRACTS 1 of 5
NOTICE TO CONTRACTOR FOR FEDERAL CONTRACTS
NOTICE TO BIDDERS. The Proposal Form Packet in Bid Express requires the following
information be submitted for the Bidder and each firm quoting or considered as subcontractors:
(a) Name of firm.
(b) Address of firm.
(c) DBE or Non-DBE.
(d) Age of firm.
(e) Annual gross receipts per last calendar year.
AFFIRMATIVE ACTION PLAN (AAP) CONTRACT GOALS. In order to be in compliance
with the revised DBE laws effective September 27, 2011, or later, the bidder is required to
complete the AAP information within the MDOT DBE Form A and Form B (Parts 2 and 3) of the
Proposal Form Packet for State, Federal, and State Small Business Reserve Procurements. Failure
to complete the information may be grounds for the bid to be declared non-responsive.
HIGH VISIBILITY SAFETY APPAREL POLICY. The Maryland Department of
Transportation’s State Highway Administration (MDOT SHA) has updated the High Visibility
Safety Apparel Policy which is included in this Contract. Contractor shall comply to the policy
fully for the parts Contractor is responsible for.
BOOK OF STANDARDS. The Book of Standards for Highway and Incidental Structures is only
available on the Administration’s Internet Site at www.roads.maryland.gov. The Book of
Standards can be located by clicking on Business; Business Standards and Specifications;
Construction and Material Standards and Specifications; and Book of Standards for Highway and
Incidental Structures.
2023 STANDARD SPECIFICATION FOR CONSTRUCTION AND MATERIALS BOOK.
The 2023 Standard Specifications for Construction and Materials Book is only available on the
Administration’s Internet Site at www.roads.maryland.gov. The 2023 Specification Book can be
located by clicking on Business; Business Standards and Specifications; Construction and Material
Standards and Specifications; and Standard and Supplemental Specifications for Construction and
Materials.
11/02/2023
CONTRACT NO. CH257B51
SPECIAL PROVISIONS F.A.P. NO. AC-TAP-3(871)E
NOTICE TO CONTRACTOR FOR FEDERAL CONTRACTS 2 of 5
BRIDGE UNDERCLEARANCE. The minimum underclearances shall be maintained whenever
resurfacing a roadway. This may require grinding the existing pavement prior to placing the
resurfacing material. Immediately after completing the resurfacing operation and when the lane
closures are still in the effect, the Contractor, in the presence of the Engineer, shall measure the
minimum vertical underclearance. The Engineer will submit results to the Office of Structures.
The cost of these measurements will be incidental to other pertinent items specified in the Contract
Documents.
REQUEST FOR INFORMATION. Any information regarding the requirements or the
interpretation of any provision of the Contract Documents shall be requested, in writing, as
specified in GP-2.09. Responses to questions or inquiries having any material effect on the bids
shall be made by written addenda sent to all prospective bidders. The Administration will not
respond to telephone requests for information concerning this invitation for bids that would
materially affect the bid.
Written requests for information or questions shall be addressed to:
Bethany Stoll, E.I.T.
Engineer I (ARRO Consulting, Inc)
Attention: (Project Engineer)
201 Thomas Johnson Drive, Suite 207
Frederick, MD 21702
Each request for information or questions shall include the Contract number and the name and
address of the originator.
PROCUREMENT OFFICER. The Procurement Officer for this Contract is as follows:
Annie Brady
Town Clerk
4195 Indian Head Hwy
Indian Head, MD 20640
RIGHT-OF-WAY STATUS.
The Town of Indian Head, located in Charles County, possesses all Right-Of-Way and rights of
way required to construct and maintain the project.
11/02/2023
CONTRACT NO. CH257B51
SPECIAL PROVISIONS F.A.P. NO. AC-TAP-3(871)E
NOTICE TO CONTRACTOR FOR FEDERAL CONTRACTS 3 of 5
RAILROAD STATEMENT. Federal Aid Contract No. AC-TAP-3(871)E
For this project, the Administration is providing the following statement of coordination (check
one):
No Railroad coordination required (no RR facilities are affected) (check this box when
there is no railroad facility within or near the terminus of the project limits)
All Railroad work has been completed prior to the project (check this box if traffic control
devices within or near the terminus of the Federal-Aid project limits comply with the
current edition of the Manual on Uniform Traffic Control Devices)
The necessary arrangements have been made for all railroad work to be undertaken and
completed as required for proper coordination with physical construction schedules.
(Appropriate notification shall be provided in the PS&E for railroad coordination
concurrent with the project construction)
For AREAWIDE Contracts, the Administration will provide a Statement of Coordination
when the Modification to the 25C is submitted, prior to NTP. (Check this box for all
AREAWIDE Projects)
11/02/2023
CONTRACT NO. CH257B51
SPECIAL PROVISIONS F.A.P. NO. AC-TAP-3(871)E
NOTICE TO CONTRACTOR FOR FEDERAL CONTRACTS 4 of 5
REQUIRED ENVIRONMENTAL PERMITS, APPROVALS AND AUTHORIZATIONS.
The Administration will obtain all required permits, approvals, or authorizations which are within
the project scope and limits set forth in the Contract Documents and listed in the below table. The
Contractor shall comply with the requirements of all permits, approvals, or authorizations required
for this project. All permits received by advertisement are included in the IFB. Permits received
after advertisement and prior to bid opening will be added to the IFB via an addendum.
All of the indicated permits, approvals, and authorizations should be kept on-site unless indicated
otherwise. Proposed changes to the project may require additional permits, approvals, and
authorizations and/or modifications.
Permit,
Permit/ Required Approval/ Permit/ Expiration
Approval,
Approval/Authorization for this Authorization Included Date
Or Auth.
Description project? in IFB?1
Number
WETLANDS, WATERWAYS, CRITICAL AREA
MDE Non-tidal Wetland &
Yes No Yes Draft No
Waterway Permit
MDE Authorization to
Yes No Yes Draft No
Proceed
MDE Letter of Authorization Yes No Yes Draft No
MDE General Waterway
Yes No Yes Draft No
Construction Permit
MDE Water Quality
Yes No Yes Draft No
Certification
MDE Tidal License Yes No Yes Draft No
MDE Tidal Permit Yes No Yes Draft No
MDE Tidal No-License Yes No Yes Draft No
Maryland State
Yes No Yes Draft No
Programmatic General Permit
COE Individual Permit Yes No Yes Draft No
U.S. Coast Guard Permit Yes No Yes Draft No
Critical Area Commission
Yes No Yes Draft No
Approval
MDE Water Appropriations
Yes No Yes Draft No
Permit for Ground Water
Other Yes No Yes Draft No
EROSION/SEDIMENT CONTROL & STORMWATER MANAGEMENT
Stormwater Management and
Erosion & Sediment Control Yes No Yes Draft No
Approval
NPDES Permit for
Stormwater Associated with Yes No Yes Draft No
Construction Activity
AASCD Approval Yes No Yes Draft No
11/02/2023
CONTRACT NO. CH257B51
SPECIAL PROVISIONS F.A.P. NO. AC-TAP-3(871)E
NOTICE TO CONTRACTOR FOR FEDERAL CONTRACTS 5 of 5
Permit,
Permit/ Required Approval/ Permit/ Expiration
Approval,
Approval/Authorization for this Authorization Included Date
Or Auth.
Description project? in IFB?1
Number
TREES
MD Roadside Tree Permit Yes No Yes Draft No
Maryland Reforestation Law
Yes No Yes Draft No
Approval
Maryland Forest
Yes No Yes Draft No
Conservation Act Approval
1
‘Draft’ indicates the formal permit has not been obtained but draft permit conditions are included.
Abbreviations:
AASCD - Anne Arundel Soil Conservation District
COE – U.S. Army Corps of Engineers
MDE – Maryland Department of the Environment
NPDES – National Pollutant Discharge Elimination System
11/02/2023
CONTRACT NO. CH257B51
SPECIAL PROVISIONS F.A.P. NO. AC-TAP-3(871)E
NOTICE TO CONTRACTOR 1 of 1
NOTICE TO CONTRACTOR
EARLY SUBMISSIONS. The last sentence of the first paragraph of TC-5.02, “No work shall be
started before receipt of the Notice to Proceed” shall not apply to the following:
After notification to the Contractor from the Administration that the Contractor is the apparent
low bidder, the Contractor will be permitted to provide a written request to the Engineer to submit
documentation for materials sources and working drawings for any items of work that have a long
lead time and could jeopardize the project schedule. Upon written approval from the Engineer the
Contractor may submit the applicable documentation to the Engineer.
Should the Contract not be awarded to the apparent low bidder who meets the requirements of
the Contract, GP-8.10 will apply for all costs accrued for the preparation and approval of the
working drawings and any resultant material purchase approved by the District Engineer and steel
fabricated in conformance with the approved working drawings between the date the Contractor
received notice of apparent low bidder and the date of notice that the apparent low bidder will not
be awarded this Contract.
Should this Contract not be awarded to the apparent low bidder due to failure of the Contractor
to comply with all award and execution requirements, all costs accrued for the preparation of the
specific items and any resultant material purchased and steel fabrication shall be borne by the
Contractor.
Failure of the Contractor to submit the early submissions will not be basis for delaying issuance
of the Notice to Proceed or be considered a reason for a time extension.
05-30-17
CONTRACT NO. CH257B51
SPECIAL PROVISIONS F.A.P NO. AC-TAP-3(871)E
104.01 —TRAFFIC CONTROL PLAN 1 of 7
CATEGORY 100
PRELIMINARY
SECTION 104 — MAINTENANCE OF TRAFFIC
104.01 TRAFFIC CONTROL PLAN (TCP)
104.01.01 DESCRIPTION.
DELETE: The fourth paragraph sentence “Refer to contract Documents for Work Restrictions.”
in its entirety.
INSERT: The following.
Work Restrictions.
Work is not permitted on the following days indicated below with an “X” unless prior written
approval is given by the Engineer.
Day Day of Day
immediately observed immediately
Holiday
preceding holiday following
the holiday the holiday
New Year's Day, January 1* ☐ ☒ ☐
Dr. Martin Luther King, Jr.'s Birthday, the third
☐ ☐ ☐
Monday in January
Presidents’ Day, the third Monday in February ☐ ☐ ☐
Good Friday ☐ ☐ ☐
Easter Sunday ☐ ☐ ☐
Memorial Day, the last Monday in May ☐ ☒ ☐
Juneteenth National Independence Day, June
☐ ☐ ☐
19*
Independence Day, July 4* ☐ ☒ ☐
Labor Day, the first Monday in September ☐ ☒ ☐
Columbus Day, the second Monday in October ☐ ☐ ☐
Veterans’ Day, November 11* ☐ ☐ ☐
Thanksgiving Day, the fourth Thursday in
☐ ☒ ☐
November
Christmas Day, December 25* ☐ ☒ ☐
11/03/2022
CONTRACT NO. CH257B51
SPECIAL PROVISIONS F.A.P NO. AC-TAP-3(871)E
104.01 —TRAFFIC CONTROL PLAN 2 of 7
Day Day
Day of the
OTHER: List below. immediately immediately
event
(e.g., special events, Election day, etc.). preceding following
the event the event
☐ ☐ ☐
☐ ☐ ☐
☐ ☐ ☐
*When the holiday occurs on a Saturday, the holiday is observed on the Friday before. When a
holiday occurs on Sunday, the holiday is observed on the Monday after the actual holiday.
Work is not permitted on the following weekend days indicated below with an “X”.
☒ Saturdays, unless prior written approval is given by the Engineer
☒ Sundays, unless prior written approval is given by the Engineer
11/03/2022
CONTRACT NO. CH257B51
SPECIAL PROVISIONS F.A.P NO. AC-TAP-3(871)E
104.01 —TRAFFIC CONTROL PLAN 3 of 7
TEMPORARY LANE OR SHOULDER
CLOSURE SCHEDULE
# LANE(S) / DAY OF CLOSURE
ROADWAY SHOULDER CAN THE PERIOD
BE CLOSED WEEK (TIME OF DAY)
Walter Thomas Road Shoulder M-F 8am -5pm
Mildred Rice Road Shoulder M-F 8am -5pm
Cornwallis Court Shoulder M-F 8am -5pm
Earl Road Shoulder/Parking Area M-F 8am -5pm
Dr. Mitchell Lane Shoulder M-F 8am -5pm
A Traffic Control Permit must be obtained for all temporary lane or shoulder closures. Permits
will be approved according to the schedule above. The Contractor must submit a Traffic Control
Permit Application to the Project Engineer at least 5 business days prior to the needed closure.
Weekend requests must be in by Monday and Monday requests must be in by the previous
Tuesday. Permittee must coordinate closures with adjacent work zones and provide coordination
between adjacent work zone operations to ensure that inapplicable or conflicting messages or
devices are not displayed to traffic. Permittee is responsible for implementation of all traffic
control devices, which must be in compliance with noted traffic control standard(s) and the
MdMUTCD. This permit is subject to revocation at the direction of MDOT SHA. Permittee must
have a copy of the approved Traffic Control Permit at the work site. The State Operations Center
(SOC) must be contacted at 1-800-543-2515 each day the permit is in effect. Permittee must
11/03/2022
CONTRACT NO. CH257B51
SPECIAL PROVISIONS F.A.P NO. AC-TAP-3(871)E
104.01 —TRAFFIC CONTROL PLAN 4 of 7
contact the SOC within 30 minutes prior to closing any MDOT SHA roadway lane or shoulder
and within 30 minutes after the closure is removed.
ADD: The following after the last paragraph, “Any monetary savings...and the Administration.”
When closing, or opening a lane or shoulder on freeways, expressways, and roadways with posted
speed ≥ 55 mph, ensure a work vehicle is closely followed by a protection vehicle (PV) during
installation and removal of temporary traffic control devices. Per specification 104.23.01, The PV
shall consist of a work vehicle with approved flashing lights, either a truck-mounted attenuator
(TMA) with support structure designed for attaching the system to the work vehicle or a trailer
truck-mounted attenuator (TTMA) designed for attaching the system to the work vehicle by a
Pintle hook and an arrow panel.
Temporary Traffic Control for shoulder work along freeways, expressways, and roadways with
posted speed > 55 mph shall include the use of a PV. The PV shall be outfitted with a TMA or
TTMA as noted above and be positioned on the shoulder to protect the work area throughout the
duration of the shoulder work operation.
While the PV is used to protect workers and equipment the PV shall not be used to store items
unrelated to MOT operations or items that will influence the performance characteristics of the
crash attenuator.
During mobile operations, the PV operator shall remain inside the vehicle. When PV is used
within a shoulder or lane closure for stationary operations, the PV operator may exit the positioned
PV to participate in work activities.
When a temporary lane or shoulder closure is in effect, begin work within one hour after the lane
is closed. For any delay, greater than one hour and no work in progress, remove the lane/shoulder
closure. Ensure the Traffic Manager attends the Pre-Construction, Pre-Structural Steel Erection,
Pre-Concrete Placement, Pre-MOT Shift, and Pre-Paving Meetings and is prepared to competently
discuss traffic control, the Traffic Control Plan (TCP), and the procedures to be implemented for
lane closures.
All closures shall be in conformance with the approved TCP, Standards, Specifications, and at the
direction of the Traffic Manager and the Engineer.
Workers and equipment, including temporary traffic control devices needed for setting up a lane
closure or restriction, are prohibited in the lane/shoulder to be closed or restricted before the time
permitted in the Contract Documents unless otherwise approved by the Engineer.
Temporary traffic control devices to be used for lane/shoulder closure may be placed on the
shoulder of the roadway by workers no earlier than minutes prior to the actual time
lane/shoulder closure or restriction is permitted. When temporary traffic control devices are being
installed, ensure that all work vehicles involved in the installation display flashing lights that
provide a 360-degree visibility of the vehicles. These lights shall remain on until the full
11/03/2022
CONTRACT NO. CH257B51
SPECIAL PROVISIONS F.A.P NO. AC-TAP-3(871)E
104.01 —TRAFFIC CONTROL PLAN 5 of 7
installation of TTC devices is complete. Temporary traffic signs may be displayed to traffic at this
time.
Workers shall not enter any lane open to traffic. Workers may be present on shoulders to prepare
for lane closure setup no earlier than minutes prior to the actual time lane/ shoulder closures
or restrictions are permitted. During preparation for the lane closure, ensure that all work vehicles
at the site and involved in the installation of the lane closure or restriction display flashing lights
that provide 360-degree visibility of the vehicles, as required by MD 104.01-18B. These lights
shall remain on while the vehicle remains in the work zone and until the full implementation of
the road closure or restriction is complete.
Ensure that no travel lane has been reduced to less than 11 ft on expressways and freeways, 10 ft
on other roadways, or as specified in the contract documents. Restore all temporary lane or
shoulder closures at the end of the closure period. Prior to opening the closed lane or shoulder,
clear the lane or shoulder of all material, equipment, and debris.
Failure to restore full traffic capacity within the time specified will result in a deduction assessed
in conformance with the following.
This is in addition to the requirements specified in TC-4.02.
The lane closure penalties for freeways are categorized by the District in which they are located.
For Districts 1, 2 and 6, the following fee structure will be followed:
ASSESSED DEDUCTIONS FOR FREEWAYS
ELAPSED TIME,
DEDUCTION
(MINUTES)
For 1 Lane Closures
1 – 10 $ 100.00
$50.00 per minute
Each minute over 10
(In addition to original 10 minute deduction)
For 2 or more Lane Closures
1 – 10 $ 200.00
$100.00 per minute
Each minute over 10
(In addition to original 10 minute deduction)
11/03/2022
CONTRACT NO. CH257B51
SPECIAL PROVISIONS F.A.P NO. AC-TAP-3(871)E
104.01 —TRAFFIC CONTROL PLAN 6 of 7
For Districts 3, 4, 5 and 7, the following fee structure will be followed:
ASSESSED DEDUCTIONS FOR FREEWAYS
ELAPSED TIME,
DEDUCTION
(MINUTES)
For 1 Lane Closures
1 – 10 $ 1,000.00
$500.00 per minute
Each minute over 10
(In addition to original 10 minute deduction)
For 2 or more Lane Closures
1 – 10 $ 2,000.00
$1,000.00 per minute
Each minute over 10
(In addition to original 10 minute deduction)
The lane closure penalties for other roads are categorized by intersection Level of Service. The
penalty for other roads with Level of Service D, E or F is greater than that for Level of Service A,
B or C.
For Level of Service A, B or C, the following fee structure will be followed:
ASSESSED DEDUCTIONS FOR OTHER ROADS
ELAPSED TIME,
DEDUCTION
(MINUTES)
For 1 Lane Closures
1 – 10 $ 150.00
$75.00 per minute
Over 10
(In addition to the original 10 minute deduction)
For 2 or more Lane Closures
1 – 10 $ 300.00
$150.00 per minute
Over 10
(In addition to the original 10 minute deduction)
For Level of Service D, E or F, the following fee structure will be followed:
ASSESSED DEDUCTIONS FOR OTHER ROADS
ELAPSED TIME,
DEDUCTION
(MINUTES)
For 1 Lane Closures
1 – 10 $ 300.00
$150.00 per minute
Over 10
(In addition to the original 10 minute deduction)
For 2 or more Lane Closures
1 – 10 $ 600.00
$300.00 per minute
Over 10
(In addition to the original 10 minute deduction)
11/03/2022
CONTRACT NO. CH257B51
SPECIAL PROVISIONS F.A.P NO. AC-TAP-3(871)E
104.01 —TRAFFIC CONTROL PLAN 7 of 7
To modify the work restrictions, submit a request to the Engineer in writing with at least 5 business
days notice. Do not implement any changes until written approval from the Engineer is received.
Include a copy of the original work restrictions with the written request. The Engineer also reserves
the right to modify or expand the methods of traffic control or working hours as specified in the
Contract Documents.
11/03/2022
CONTRACT NO. CH257B51
SPECIAL PROVISIONS F.A.P. NO. AC-TAP-3(871)E
107 — CONSTRUCTION STAKEOUT 1 of 5
CATEGORY 100
PRELIMINARY
SECTION 107 — CONSTRUCTION STAKEOUT
DELETE: SECTION 107 – CONSTRUCTION STAKEOUT in its entirety.
INSERT: The following.
SECTION 107 — CONSTRUCTION STAKEOUT
107.01 DESCRIPTION
Furnish, place, and maintain construction layout stakes that demarcate the Limit of Disturbance
(LOD) and protected resource areas including but not limited to, wetlands, wetland buffers, waters
of the United States (WUS), stream protection zones (SPZs), floodplains, and tree preservation
areas.
107.01.01 Limit of Disturbance (LOD). The allowable limit of earth disturbance as specified in
the Contract Documents.
107.02 MATERIALS
107.02.01 Wetland Ribbon. Pink vinyl ribbon having a width no less than 1 1/2 in. and having
the word “Wetland” in black letters.
107.02.02 Demarcation Ribbon. Vinyl ribbon of various colors having a width no less than
1 1/2 in.
107.03 CONSTRUCTION
107.03.01 Line and Grade. The Engineer will provide the following.
(a) Roadway Temporary Access Road, and Maintenance Access Road Stakeout.
(1) A staked center line of the roadway with stations not over 100 ft apart.
(2) Appropriately spaced benchmarks and necessary references, including all points
of curvature (PC) and points of tangency (PT), for the preservation and control
of the center line.
(3) Except for temporary access roads and maintenance access roads, two sets of
prints of the cross sections. Use the cross sections as a guide only. Dimensions
or elevations scaled from the cross sections are not sufficiently precise for use
in construction. Cross sections will not be provided for temporary access roads
nor for maintenance access roads.
05/03/2023
CONTRACT NO. CH257B51
SPECIAL PROVISIONS F.A.P. NO. AC-TAP-3(871)E
107 — CONSTRUCTION STAKEOUT 2 of 5
(b) Structure Stakeout.
(1) A staked center line or working line, whichever applies, with stations not over
100 ft apart and extending at least 100 ft beyond each end of the structure.
(2) When the structure is on a curve, a staked center line or working line, whichever
applies, consisting of stations not over 100 ft apart and including the PC, PT,
and at least one point on the tangents beyond each end of the curve.
(3) At least two benchmarks, one on each end of the structure.
107.03.02 Workmanship. Set and maintain the specified elevations and dimensions.
107.03.03 Control Markers. Preserve the center line and benchmarks set by the Engineer.
Replace disturbed, damaged, or destroyed control markers.
107.03.04 Control Stakes. As specified in 107.03.01(a), furnish, set, and preserve stakes at each
station along each side of the project on the right-of-way or easement line, whichever is farther
from the center line of construction. Where only part of an ultimate dual highway is to be
constructed, set the stakes on the side of the future improvement 10 ft beyond the construction
limits. On each of the stakes, mark the offset distance from the center line and its top elevation,
or the cut or fill to the profile grade line. Place additional stakes as necessary and as directed to
ensure the correct layout of the work.
For stormwater management (SWM) facilities, furnish, set, and preserve stakes at each station
along each side of the maintenance access road and at grading points. Place additional stakes as
necessary and as directed to ensure the specified layout of the work.
107.03.05 Layout. For structures, proceed with the layout work as specified in 107.03.01(b).
Before any actual construction begins, verify the lines and grades provided by the Engineer, then
establish all center line or working line intersections with the center line or center of bearing of all
piers, bents, and abutments. From these field layouts, check the proposed span lengths by either
electronic distance measurement or chaining from the field layouts. When chaining, compensate
for temperature, sag, and horizontal alignment. Verify the location of the structure to affirm its
correct location with relation to existing structures, roads, and existing conditions that are to
remain. If discrepancies are found, immediately notify the Engineer in writing. Ensure all lines
established on the ground are preserved or referenced, marked, and available at all times.
Ensure field elevations of all bridge seats are correct and that are finished to proper grade. When
steel beams or girders are incorporated in the project, determine the deflection of each member by
running elevations over the tops of the beams or girders after they are in place and before attaching
any forms. Apply this information to the deflection diagram to determine the corrected elevation
of bottom slab forms and screed supports. The Engineer will check the assembled information.
Make necessary adjustments prior to placing concrete.
05/03/2023
CONTRACT NO. CH257B51
SPECIAL PROVISIONS F.A.P. NO. AC-TAP-3(871)E
107 — CONSTRUCTION STAKEOUT 3 of 5
For SWM facilities, proceed with the layout work as specified. Verify the locations of drainage
structures to affirm the correct location with relation to the SWM facility layout, grading points,
maintenance access road, roads, and existing conditions that are to remain. If discrepancies are
found, immediately notify the Engineer in writing. Ensure that all lines established on the ground
are preserved of referenced, marked, and kept available for the duration of the Contract. Ensure
that the field elevations are correct and are finished to the proper grade.
107.03.06 Utilities. Upon request, furnish references to control points, alignment, and grade data
to the utility companies or agencies working within the limits of the project so that they may
properly locate and coordinate their work and improvements.
Intersection Utility Stakeout. Notify the appropriate agencies at least 72 hours (excluding
weekends and holidays) prior to the anticipated time for beginning underground work.
(a) Request a MISS UTILITY stakeout and possess a valid MISS UTILITY clearance
ticket number for any underground work.
(b) Contact all utilities within the limits of the project who are not a member of MISS
UTILITY and obtain a stakeout of their respective facilities.
(c) Request the Administration’s Office of Traffic & Safety’s Signal Operations Section to
stakeout Administration maintained traffic signal facilities.
(d) Request the District Engineer to stakeout Administration lighting facilities.
Stakeout the proposed construction as indicated in the Contract Documents. Allow the Engineer
to verify the location of the proposed facilities.
107.03.07 Right-of-Way and Easement Lines. Upon request, define the right-of-way and
easement lines for adjacent property owners.
107.03.08 Subgrade, Subbase, and Base Controls. When placing subgrade, subbase, and base
courses, furnish a string line and grade with fixed controls having longitudinal and transverse
spacing of no more than 25 ft. Along each form line for cement concrete pavement, provide the
line and grade with fixed controls not to exceed 25 ft.
(a) Automated Machine Control. When approved by the Engineer, construction
equipment guided by Global Positioning System (GPS) or Robotic Total Station (RTS)
equipment may be used in the placement of subgrade, subbase, base courses, and other
roadway materials. Preserve the stakeout established by the Engineer and set additional
controls as directed.
(1) When using GPS and RTS equipment, develop and submit a Digital Terrain
Model (DTM) for review. When using the Contract Documents and
Administration furnished DTM data, develop a DTM independently. The
05/03/2023
CONTRACT NO. CH257B51
SPECIAL PROVISIONS F.A.P. NO. AC-TAP-3(871)E
107 — CONSTRUCTION STAKEOUT 4 of 5
Administration and its designers shall be released from all liability for the
accuracy of the data and its conformance to the Contract Documents.
(2) Establish primary control points at appropriate intervals along the length of the
project. Where project work is performed beyond the project limits, establish
control points at intervals not to exceed 1000 ft. Determine the horizontal
position of these points by static GPS sessions or by traverse connection from
the original base line control points. Establish the elevation of these control
points using differential leveling from the project benchmarks, forming closed
loops where practical. Prior to construction activities, provide a copy of all new
control point information to the Engineer.
(3) Provide control points and conventional grade stakes at critical points such as
PCs and PTs, super elevation points such as begin full super and half-level plane
inclined, and other critical points required for construction of structures and
utility relocation or coordination. The Engineer will determine when additional
stakeout and control points are necessary.
(4) Provide adequate control points, stationing, and stakes for coordination
activities involving environmental agencies, utility companies, and other
entities on adjacent projects or work areas.
(b) Real-Time Kinematic (RTK) GPS. May be used to control equipment where the
grade tolerance is ±0.1 ft or greater.
(c) RTS Positioning. RTS shall be used where grade tolerances are less than ±0.1 ft.
Verify the index error of the vertical circle of the RTS and adjust as necessary prior to
operations each workday. Begin and end each work session by checking between
adjacent control points.
(d) Automated Controlled Equipment. When automated controlled equipment is used,
furnish a GPS Rover instrument for Administration use during the project, along with
8 hours of formal training on GPS/RTS and used systems. Provide a surveyor to
perform verification when discrepancies arise.
(e) Test Sections. Perform test sections for GPS and RTS systems to demonstrate the
capability, knowledge, equipment, and experience to properly operate the systems and
achieve acceptable tolerances. If this ability is not satisfactorily demonstrated to the
Engineer, conventional stakeout procedures shall be required.
107.03.09 Demarcation. Demarcate as specified and as directed, and preserve until no longer
applicable. When necessary and as directed, replace disturbed, damaged, destroyed, or otherwise
missing demarcation. If demarcation is not re-established within 48 hours, the Engineer may
proceed to demarcate. Demarcate wetland areas using 107.02.01. Demarcate LOD and other areas
as specified using 107.02.02 and label as directed. Remove all demarcations when they are no
longer needed.
05/03/2023
CONTRACT NO. CH257B51
SPECIAL PROVISIONS F.A.P. NO. AC-TAP-3(871)E
107 — CONSTRUCTION STAKEOUT 5 of 5
Establish tree preservation areas as specified in Section 120.
107.04 MEASUREMENT AND PAYMENT
Construction Stakeout will not be measured but will be paid for at the Contract lump sum price.
The payment will be full compensation for all material, labor, equipment, tools, and incidentals
necessary to complete the work. Payment of the Contract lump sum price will be prorated and
paid in equal amounts on each monthly estimate. The number of months used for prorating will
be the number estimated to complete the work.
Replacement of control markers with undamaged control markers and replacement of missing or
damaged demarcations with undamaged demarcations will be at no additional cost to the
Administration. Demarcation replaced by the Engineer will be deducted from monies due under
the Contract.
Corrections to deficiencies in primary control points for subgrade, subbase, and base controls will
be at no additional cost to the Administration.
Corrections to grade busts and all associated quantity adjustments or errors resulting from
construction activities will be at no additional cost to the Administration.
05/03/2023
CONTRACT NO. CH257B51
SPECIAL PROVISIONS INSERT FAP NO. AC-TAP-3(871)E
875 — UTILITIES STATEMENT 1 of 7
CATEGORY 800
SECTION 875-UTILITIES STATEMENT
875.01 DESCRIPTION. The Contractor's attention is called to the requirements of Sections GP-
5.05, GP-7.13 and GP-7.17.
875.02 MATERIALS. Not Applicable.
875.03 CONSTRUCTION.
875.03.01 General. Attention of the Contractor is directed to the possible presence of water,
sewer, gas mains, electrical wires, conduit, communications cables (both overhead and
underground), poles and house service connections in the street or highway in which the
construction project is to be performed. The Contractor shall exercise special care and extreme
caution to protect and avoid damage to utility company facilities as described in the preceding
sentence. The Contractor shall take into consideration the adjustments and installations by public
utilities in areas within the limits of this Contract. Existing storm drains and storm sewers have
been generally located and shown on the plans as they are believed to exist; however, the
Administration assumes no responsibility for the accuracy of these locations. In the event of a
water or sewer main break, the Contractor shall immediately notify the Maryland Department of
the Environment and the State’s Project Engineer.
The Contractor shall locate all existing utilities and be responsible for their safety. Should any
existing utilities be damaged or destroyed due to the operations of the Contractor, the damaged
or destroyed components shall be immediately replaced or repaired as necessary to restore the
utility to a satisfactory operating condition. These repairs or replacements shall be at no
additional expense to the Administration or the owner of the utility.
875.03.02 Miss Utility. Contact “MISS UTILITY” via the internet at www.missutility.net, two
(2) business days in advance of performing any excavating or similar work. If the Contractor is
unable to contact Miss Utility via the internet, the Contractor may call Miss Utility at 1-800-257-
7777. The contractor must provide the contract number when contacting Miss Utility for locates.
This provision is required whether the contractor contact Miss Utility via the internet or by
phone. Failure of the contractor to comply with this requirement may result in a locate fee by the
Administration for which the Contractor will not be allowed to recover. In the event of missing,
incorrect marks, or abandoned utilities in the construction area the Contractor shall file a Locate
Discrepancy through Ticket Check or contact the Notification Center. To ensure the safety of the
excavation crews and the general public, an excavation or demolition should not begin until the
person is confident that all facilities have been marked correctly. The Contractor shall call an
insufficient notice to the MISS UTILITY call center have all utilities respond to the site to
identify the utility exposed, and follow thru this process until the utility concern is resolved.
These are unforeseen circumstances which are incidental to construction.
03-01-2022
CONTRACT NO. CH257B51
SPECIAL PROVISIONS INSERT FAP NO. AC-TAP-3(871)E
875 — UTILITIES STATEMENT 2 of 7
875.03.03 Clearance Requirements. Contractor is required to contact each utility owner that
Miss Utility marks in the field and determine their utility facility clearance. Document Miss
Utility marks in the field by taking pictures and maintaining accurate records. Infrastructure shall
not be placed within the utility owner’s clearances as they must be adhered to and be maintained.
Contractor must adhere to any and all utility owner requirements for vertical and horizontal
clearances; this work is incidental to the respective pay items.
The Contractor shall locate all existing utilities and be responsible for their safety. Confirmation
of existing utilities shall be made by means of safe excavation (non mechanized non intrusive
digging) any form of SOFT DIG is acceptable to determine vertical and horizontal location of
any utility located within the area of disturbance. All work shall be in accordance with all state
and federal guide lines HAND DIG or SOFT DIG within 18 Inches of any marked utility.
875.03.04 Locating Conflicts. Prior to ordering any materials, the Contractor shall locate and
test pit any underground facilities that appear to be in conflict in order to determine if conflicts
exist. The Contractor shall also review the location of the existing and proposed (when possible)
aerial utilities in order to determine if conflicts exist. In the event that conflicts may be possible,
this information shall immediately be forwarded to the State’s representative for review and
resolution. Material ordered prior to obtaining test pit information will not be considered in any
request from the Contractor for any equitable adjustments due to existing utility conflicts.
Underground service connections are typically not shown on the plans, or test pitted therefore,
the Contractor must communicate with the utility companies to: determine where services exist;
if there are conflicts and how they can be resolved. This needs to be done as a first order of
business before ordering materials, no compensation will be considered for rework due to failure
to follow this procedure.
In the event that it is necessary for utilities to be relocated due to potential conflicts with the
project, the Contractor is hereby notified that the relocations have been based on the best
information available at the time the relocation design was completed. However, as it is
impossible to determine how a Contractor will perform certain operations or how much space
will be needed to perform those operations, the relocations will be based upon the utility
companies safety and clearance requirements. It may be necessary for the Contractor to utilize
non-typical procedures in some cases and any associated costs will be incidental to the pertinent
items. Contractor will notify the SHA Project Engineer immediately if there is a utility conflict.
SHA Project Engineer will get with District 7 Utility Section to determine action that need to be
taken.
At least 72 hours prior to placement of any new traffic signal related equipment being installed
near existing or proposed utility lines contact the various utility companies to determine their
clearances. Contact the Project Engineer and the Office of Traffic & Safety (both Traffic
Operations Division & Traffic Engineering Design Division) to arrange a field meeting to
discuss the proposed construction.
03-01-2022
CONTRACT NO. CH257B51
SPECIAL PROVISIONS INSERT FAP NO. AC-TAP-3(871)E
875 — UTILITIES STATEMENT 3 of 7
If an adjustment is required to facilities, it is necessary that the existing facilities remain in
service until the new construction is complete and placed in service. The Contractor will prepare
a plan to keep the facilities in service and submit copies to the State’s Project Engineer and the
Utility Owner for review and approval at least 10 business days prior to the start of work. Also,
when adjustments are required, establishment of lead times are necessary to meet the applicable
utility schedule and coordination with the Contractor's work operation.
875.03.05 Critical Path Method / Phasing. Any submittal by the Contractor to vary the
sequence of work and / or perform concurrent work in multiple phased differing from the
recommended maintenance of traffic phasing, must be accompanied by an updated schedule or
CPM reflecting all utility relocations and adjustments. The Contractor shall be responsible, upon
gaining approval, for coordinating utility relocations and adjustments with the affected utility
owners, the Administration’s Project Engineer and the District Utility Engineer. All requirements
and lead times as stated in the Utility Statement and Special Provisions will remain in effect
unless written approval from the utility company and the District Utility Engineer is received by
the Contractor prior to commencing any requested work.
875.03.06 Contractor Utility Relocations. Contractor shall be responsible to invite
representatives from all utilities to attend the pre-construction meeting. It is anticipated that
service line relocations will not be necessary for this project. Any damage to underground
service lines during the course of construction shall be repaired or replaced to the satisfaction of
the utility owner at the Contractor’s cost.
Water
The Town of Indian Head owns and maintains water lines within the project limits. The
Contractor shall connect to the existing water main shown on the Plan or as indicated by the
Construction Inspector. Any adjustments or relocations will be incidental to the contract. All
utility installation specifications are provided in the Technical Specifications.
Sanitary
The Town of Indian Head owns and maintains sanitary sewer lines within the project limits. The
Contractor shall connect to the existing sewer shown on the Plan or as indicated by the
Construction Inspector. Any adjustments or relocations will be incidental to the contract. All
utility installation specifications are provided in the Technical Specifications.
Mayor Brandon Paulin
Town of Indian Head
4195 Indian Head Hwy
Indian Head, MD 20640
301-743-5511
875.03.07 Utility Owner Relocations. Contractor shall be responsible to invite representatives
from all utilities to attend the pre-construction meeting. It is anticipated that service line
relocations will not be necessary for this project. Any damage to underground or overhead
03-01-2022
CONTRACT NO. CH257B51
SPECIAL PROVISIONS INSERT FAP NO. AC-TAP-3(871)E
875 — UTILITIES STATEMENT 4 of 7
service lines during the course of construction shall be repaired or replaced to the satisfaction of
the utility owner at the Contractor’s cost.
Southern Maryland Electric Cooperative, Inc. (SMECO): Owns and maintains aerial
facilities, within the project limits. Contractor shall maintain vertical and horizontal clearances
from above ground existing facilities. No service lines are anticipated to be affected during the
course of this project.
Ms. Amy Barnes
15035 Burnt Store Rd.
Hughesville, MD 20637
301-396-4907
Verizon: Owns and maintains facilities, aerial and underground, within the entire project limits.
Contractor shall maintain vertical and horizontal clearances from above ground and underground
existing facilities. No service lines are anticipated to be affected during the course of this project.
Mr. Robert Grubb
Phone: 301-934-0511
E-Main: Robert.Grubb@verizon.com
Comcast: Owns and maintains facilities, aerial and underground, within the entire project limits.
Contractor shall maintain vertical and horizontal clearances from above ground and underground
existing facilities. No service lines are anticipated to be affected during the course of this project.
Comcast-
Department: Care Team
1-800-391-3000
Washington Gas: Owns and maintains underground facilities within or near the project limits.
Contractor shall maintain vertical and horizontal clearances from underground existing facilities.
No service lines are anticipated to be affected during the course of this project.
Customer Service
1-844-927-4427
875.03.08 Pole Bracing. If it is necessary to have utility facilities braced and/or supported at any
time during the course of this project, it will be the Contractor’s responsibility to coordinate
activities with the utility owner. All costs associated with this work will be incidental to the
respective pay items.
875.03.09 Utility Adjustments for Asphalt Pavement.
Adjustment of all visible existing manholes, valve boxes, inlets, or other structures will not be
measured but the cost will be incidental to the Asphalt Pavement item in conformance with
Section 504.04. Adjustment of existing manholes, valve boxes, inlets, or other structures
03-01-2022
CONTRACT NO. CH257B51
SPECIAL PROVISIONS INSERT FAP NO. AC-TAP-3(871)E
875 — UTILITIES STATEMENT 5 of 7
encountered below existing grade will be considered for payment in conformance with GP 4.07.
All adjustments shall be done according to the pertinent utility owners specifications. Contact the
pertinent utility owners at least 5 business days prior to adjustment of any facility in order to
ensure that the location of all facilities is known prior to paving.
875.03.10 Steel Plates. When it is necessary to use steel plates at any point during construction,
the following minimum requirements shall be met:
(a) Steel plates are to be no less than 1-inch thick.
(b) Steel plates are to cover access pits(s) with 1-ft overlap onto existing pavement on all
four sides of access pit(s).
(c) When only three sides overlap existing roadway, the fourth side shall be supported by a
12 x 12in. I beam or timber.
(d) In cases where plates are used to cover extremely large excavations, it will be necessary
to install an intermediate support system to prevent deflection.
(e) Steel plates must be pinned to prevent movement.
(f) Steel plates must be ramped with cold patch or asphalt pavement at the end of each work
shift.
(g) It will be necessary to recess any steel plates that are placed in the roadway when deemed
necessary by the State’s representative on the project.
(h) In cases where two or more are placed together, they shall be welded together by placing
at least three welds, 12 in. (centered on each plate) in length on each abutting plate. One
weld is placed no more than one foot from each edge and one is placed in the center of
the plates.
875.03.11 Buy America
Material.
CONTRACT PROVISION BUY AMERICA
This section only applies to projects partially or totally financed with Federal funds.
The prime contractor or its subcontractors shall comply with Infrastructure Investment and Jobs Act
(IIJA) Title IX – Build America, Buy America (BABA) Act. Pub. L. No. 117-58, §§ 70901-52.
03-01-2022
CONTRACT NO. CH257B51
SPECIAL PROVISIONS INSERT FAP NO. AC-TAP-3(871)E
875 — UTILITIES STATEMENT 6 of 7
Materials used for the utility work and permanently incorporated into the project, including all
materials/items supplied by the Utility Company, shall comply with the Buy America preference
requirements including:
(a) All iron and steel used in the project are produced in the United States.
This means all manufacturing processes, from the initial melting stage through the application
of coatings, occurred in the United States.
(b) All manufactured products used in the project are produced in the United States.
This means the manufactured product was manufactured in the United States, and the cost of
the components of the manufactured product that are mined, produced, or manufactured in
the United States is greater than 55 percent of the total cost of all components of the
manufactured product, unless another standard for determining the minimum amount of
domestic content of the manufactured product has been established under applicable law or
regulation.
In accordance with 23 CFR Part 635.410, FHWA currently has a general applicability waiver
on manufactured products that do not contain steel and iron components. Therefore, this 55
percent standard for manufactured products that do not contain steel and iron components,
does not apply on projects funded under Title 23 U.S.C.
(c) All construction materials are manufactured in the United States.
This means that all manufacturing processes for the construction material occurred in
the United States. Common construction materials used in public works infrastructure
projects are or consist primarily of non-ferrous metals, plastic and polymer-based
products (including polyvinylchloride, composite building materials, and polymers
used in fiber optic cables), glass (including optic glass), lumber, and drywall.
The term 'construction materials' shall not include cement and cementitious materials,
aggregates such as stone, sand, or gravel, or aggregate binding agents (including
asphalt cement) or additives; or any material composed of or derived from these
items.
Items that consist of two or more of the listed materials that have been combined
together through a manufacturing process, and items that include at least one of the
listed construction materials combined with a material that is not listed through a
manufacturing process, shall be treated as manufactured products, rather than as
construction materials.
The prime contractor or its subcontractors shall also comply with Section 165 of the Surface
Transportation Assistance Act of 1982 as amended by Section 1041(a) and 1048(a) of the
intermodal Surface Transportation Efficiency Act of 1991 with regard to the furnishing and
coating of iron and steel products.
03-01-2022
CONTRACT NO. CH257B51
SPECIAL PROVISIONS INSERT FAP NO. AC-TAP-3(871)E
875 — UTILITIES STATEMENT 7 of 7
The prime contractor or its subcontractor shall supply certifications to the Project Engineer from
the manufacturer of all costing, iron or steel products which document that the steel and iron
have been manufactured and the coatings for iron or steel have been applied by the manufacturer
in the United States. The Project Engineer shall forward copies of the certifications to the Office
of Materials Technology for review and approval prior to such items being incorporated into the
permanent work. Certifications shall extend to the materials utilized in manufactured and
fabricated products purchased by the Contractor.
Products manufactured of foreign steel or iron materials may be used, provided the cost of such
products as they delivered to the project does not exceed 0.1% of the total contract amount or
$2,500.00, whichever is greater. If a supplier or fabricator wishes to user a partial fabrication
process where domestic and foreign source components are assembled at a domestic location, the
“as delivered cost” of the foreign components should include any transportation, assembly and
testing costs required to install them in the final product.
This applies to all iron, steel and coating materials used for utility work incorporated into the
project including materials/items supplied by the Utility Company.
875.04 MEASUREMENT AND PAYMENT. All work performed coordinating with utilities or
their contractor, working around or protecting existing aerial and underground utilities, will
not be measured for payment. Any service line relocations will be considered incidental to
respective pay items. Contractor must adhere to any and all utility owner requirements for
vertical and horizontal clearances; this work is incidental to the respective pay items; including
pole bracing, will be considered incidental to the items specified in the Contract Documents.
03-01-2022
CONTRACT NO. CH257B51
CONTRACT PROVISIONS F.A.P. NO. AC-TAP-3(871)E
CONTRACTOR REGISTRATION REQUIREMENTS 1 of 1
CONTRACTOR REGISTRATION REQUIREMENTS
Register in the System for Award Management (SAM) online at https://www.sam.gov prior to the
time an offer is submitted for all Federal-Aid funded Contracts. The System for Award
Management (SAM) is the Official U.S. Government system that consolidated the capabilities of
CCR/FedReg, ORCA, and EPLS. There is no fee to register for this site. User guides and webinars
are available under the Help tab. Allow up to 12 to 15 business days after you submit before your
registration is active in SAM.
09/30/2020
CONTRACT NO. CH257B51
SPECIAL PROVISIONS F.A.P. NO. AC-TAP-3(871)E
203 — BORROW EXCAVATION 1 of 3
CATEGORY 200
GRADING
SECTION 203 — BORROW EXCAVATION
203.01.02 Notice to Contractor — Borrow Pits.
ADD: After the first paragraph.
This project is located in District 5 – Charles County . The following conditions applicable
to the county or city shall be complied with and documented.
DISTRICT 1
Dorchester (DO) County
Site plan approved by Soil Conservation District.
Grading permit from County Highway Department (except City of Cambridge).
Planning and Zoning approval for use.
Critical Areas approval (if applicable).
Inspection by County.
Somerset (SO) County
Site plan approved by Soil Conservation District.
Grading Permit from the County.
Land Use permit.
Critical Areas approval by Planning and Zoning (if applicable).
Inspection by SHA.
Wicomico (WI) County
Site plan approved by Soil Conservation District.
Certificate of compliance with Planning and Zoning if located in Critical Area.
Inspection by SHA.
Worcester (WO) County
Site plan approved by Soil Conservation District.
Critical areas approved by Planning and Zoning (if applicable).
Inspection by SHA.
DISTRICT 2
Caroline (CO), Cecil (CE), Queen Anne's (QA) and
Talbot (TA) Counties
Site plan approved by Soil Conservation District.
Planning and Zoning approval.
Critical Areas approval (if applicable).
Inspection by SHA.
Kent (KE) County
Site plan approved by Soil Conservation District.
Grading permit.
Planning and Zoning approval.
Critical Areas approval (if applicable).
Inspection by SHA.
05-30-17¶
CONTRACT NO. CH257B51
SPECIAL PROVISIONS F.A.P. NO. AC-TAP-3(871)E
203 — BORROW EXCAVATION 2 of 3
DISTRICT 3
Montgomery (MO) County
Sediment control permit and plan approval by County
Department of Environmental Protection, Division of
Water Resources Management, Storm Water Management Section/Sediment Control.
Approval by Maryland National Capital Park and Planning Commission (if applicable).
Inspection by County.
Prince Georges (PG) County
Site Plan approved by Soil Conservation District.
County Grading Permit.
Tree conservation plan approval by Maryland National Capital Park and Planning
Commission (if applicable).
Critical Areas approval (if applicable).
Payment of all pertinent county fees and/or securing of county required bonding.
Inspection by SHA with oversight by County.
DISTRICT 4
Baltimore (BA) County
Site Plan approved by the Department of Environmental Protection and the Soil
Conservation District.
County Grading Permit.
Critical Areas approval by the Department of Environmental Protection and Resource
Management (if applicable).
Inspection by County.
Harford (HA) County
Site Plan approved by Soil Conservation District.
County Grading Permit.
Critical Areas approval (if applicable).
Inspection by County.
DISTRICT 5
Anne Arundel (AA) County
Site Plan approved by Soil Conservation District.
Planning and zoning approval - special exception required.
Grading plan issued by the County Department of Inspections and Permits.
Critical Areas approval (if applicable).
Inspection by County and SHA.
Calvert (CA) County
Site Plan approved by Soil Conservation District.
Grading plan issued by the County after a mining permit or exemption is issued.
Critical Areas approval (if applicable).
Inspection by SHA.
05-30-17¶
CONTRACT NO. CH257B51
SPECIAL PROVISIONS F.A.P. NO. AC-TAP-3(871)E
203 — BORROW EXCAVATION 3 of 3
Charles (CH) County
Site Plan approved by Soil Conservation District.
Special exception granted by the County.
Critical Areas approval (if applicable).
Inspection by SHA.
St. Mary’s (SM) County
Site Plan approved by Soil Conservation District.
County Grading Permit.
Critical Areas approval (if applicable).
Inspection by SHA.
DISTRICT 6
Allegany (AL) County
Site plan approved by Soil Conservation District.
Informational copy of plans to County Planning and Zoning Commission.
Inspection by SHA.
Garrett (GA) and Washington (WA) Counties
Site plan approval by Soil Conservation District.
Inspection by SHA.
DISTRICT 7
Carroll (CL) County
Site plan approved by County Planning Commission.
Sediment control plan approval by Soil Conservation District.
County Grading Permit.
Inspection by County.
Frederick (FR) County
Site plan approved by Soil Conservation District.
County Grading Permit.
Inspection by SHA.
Howard (HO) County
Site Plan approved by Soil Conservation District.
County Grading Permit.
Inspection by County.
BALTIMORE CITY (BC)
Site plan approved Baltimore City Department of Public Works (BCDPW).
Inspection by BCDPW.
STATE AND FEDERAL PROPERTY
Borrow pits located on state and federal property are subject to Maryland Department
of the Environment approval.
Inspection by SHA.
05-30-17¶
CONTRACT NO. CH257B51
SPECIAL PROVISIONS F.A.P. NO. AC-TAP-3(871)E
308 — EROSION AND SEDIMENT CONTROL 1 of 20
CATEGORY 300
DRAINAGE
SECTION 308 — EROSION AND SEDIMENT CONTROL
DELETE: SECTION 308 – EROSION AND SEDIMENT CONTROL in its entirety.
INSERT: The following.
SECTION 308 — EROSION AND SEDIMENT CONTROL
308.01 DESCRIPTION
Install and maintain erosion and sediment control (ESC) measures and best practices throughout
the duration of the Contract as specified in the Contract Documents, regulations, regulatory
approvals, and regulatory permits.
308.01.01 ESC Approved Plans. The portion of the Contract Documents consisting of the ESC
plans bearing the pertinent regulatory approval from the Administration’s Plan Review Division
(PRD) and inclusive of all approved revisions and modifications thereto.
308.01.02 Training, Certifications, and Accounts. The Erosion and Sediment Control Manager
(ESCM) and the Superintendent shall have valid certification from successful completion of the
MDE “Responsible Personnel Certification Training for Erosion and Sediment Control” and the
Administration’s “Erosion and Sediment Control Certification Training for Contractors and
Inspectors.” The certifications shall be current for the duration of the Contract.
The ESCM and the Superintendent shall maintain active accounts as specified in 308.01.06.
308.01.03 Conformance Requirements. In addition to the Contract Documents, conform with
the latest applicable regulations, regulatory approvals, regulatory permits, and other documents,
including but not limited to, the following.
(a) Annotated Code of Maryland and the Code of Maryland Regulations
(COMAR) 26.17.01 (Erosion and Sediment Control), 26.17.02 (Stormwater
Management), 26.17.04 (Construction on Nontidal Waters and Floodplains), and
26.17.06 (Water Appropriation or Use).
(b) Title 9 of the Environment Article, Annotated Code of Maryland and
COMAR 26.08.04.
(c) The provisions of the Federal Clean Water Act (CWA), 33 U.S.C. §1251 et seq., as
amended by the Water Quality Act of 1987, and its implementing regulations at 40
Code of Federal Regulations (CFR) Parts 122, 123, 124, 125 and 127.
10/26/2023
CONTRACT NO. CH257B51
SPECIAL PROVISIONS F.A.P. NO. AC-TAP-3(871)E
308 — EROSION AND SEDIMENT CONTROL 2 of 20
(d) 23 CFR §I.G. Part 650 Subpart B.
(e) 23 U.S.C. 109 Standards (2020) Subsection (g).
(f) 40 CFR Part 110, 40 CFR Part 117, and 40 CFR Part 302.
(g) 40 CFR part 112 and Section 311 of the CWA.
(h) 40 CFR 122.26(a)(1)(v) or 40 CFR 122.26(b)(15)(ii).
(i) 40 CFR 122.26(b)(14)(x) or 122.26(b)(15)(i).
(j) 40 CFR 122.44(i)(1)(iv).
(k) 40 CFR 144 -147.
(l) General Permit for Stormwater Discharge Associated with Construction Activity
General National Pollutant Discharge Elimination System (NPDES) Permit Number
MDRC0000 State Discharge Permit Number 20CP0000.
(m) ESC Handbook, which refers to the handbook codified in COMAR 26.17.01 titled
“2011 Maryland Standards and Specifications for Soil Erosion and Sediment Control”,
or its successor.
(n) MDE “2000 Maryland Stormwater Design Manual,” Volumes I and II or its successor.
(o) SHA “Field Guide for Erosion and Sediment Control.”
(p) MDE Waterway Construction Guidelines.
308.01.04 Erosion and Sediment Control Manager (ESCM). The ESCM is responsible for the
implementation of the ESC measures and methods of operations, including implementation of
corrective actions. The ESCM shall have the authority to implement ESC, schedules, and methods
of operation for both on-site and off-site activities. When the Contract Documents indicate a limit
of disturbance (LOD) is greater than or equal to 1 acre, the ESCM is also a member of the
stormwater team. Duties include the following.
(a) Attend the pre-construction meeting.
(b) Attend the initial ESC field meeting and periodic field meetings to evaluate the
effectiveness of ESC measures installed and to plan for the implementation of
additional measures for subsequent areas of soil disturbance, which includes
developing a list of activities and schedules to ensure compliance with the Contract
Documents and conformance requirements as specified. Must be on site at a frequency
and duration to ensure compliance.
10/26/2023
CONTRACT NO. CH257B51
SPECIAL PROVISIONS F.A.P. NO. AC-TAP-3(871)E
308 — EROSION AND SEDIMENT CONTROL 3 of 20
(c) Perform daily inspections of the installed ESC measures and ensure they are always in
place and functioning.
(d) Maintain a daily log of the ESC inspections that includes documenting steps taken for
corrective actions, and submit a daily written report to the Engineer at the end of each
calendar day.
(e) Conduct inspections after a storm event of 0.25 inches or greater, within 24 hours, either
the same day the rainfall event concludes or the next day, concurrently with the
Engineer, submitting a written report documenting observations and corrective actions,
to the Engineer.
(f) Authorize mobilization of crews 24 hours a day each calendar day to make immediate
repairs and implement corrective actions to ESC measures. Coordinate with the
Engineer and the REC to ensure that all deficiencies are immediately corrected, and
that Contract remains in compliance.
(g) When requested, accompany the Engineer and Regional Environmental Coordinator
(REC) during compliance inspections and inspections made by regulatory agency
personnel.
(h) Ensure prohibited discharges per 308.01.03(l) are not released and measures are in
place to prevent prohibited discharges from occurring.
(i) Ensure dewatering activity and turbidity monitoring is performed, recorded,
documented, and ensure documentation includes corrective actions taken.
308.01.05 Severe Weather Event. A weather event in which measured rainfall exceeds 3 in. in a
continuous 24-hr period based upon rainfall data obtained from the nearest official National
Weather Service (NWS) gauge station in proximity to the specific location of construction
activities or from a gauge per 308.03.02 (c).
308.01.06 Quality Assurance (QA) Toolkit. A web-based system that contains Contract and
permit information, ESC inspection reports, stormwater management (SWM) facility as-built
certification package submittals and tracking and may be used to submit requests for field
modifications to the ESC Approved Plans, as well as track the status thereof, as instructed by the
Administration’s “Quality Assurance Toolkit Construction Field Manual.”
(https://apps.roads.maryland.gov/epd.qatoolkit/frmLogin.aspx)
308.01.07 Stormwater Team. When the Contract Documents indicate an LOD greater than or
equal to 1 acre, the Administration will establish a stormwater team. The stormwater team is not
involved with permanent stormwater management (SWM) facilities in any way and is instead a
team focused on ESC and pollution prevention during construction activities.
The stormwater team includes personnel who are responsible for the following.
10/26/2023
CONTRACT NO. CH257B51
SPECIAL PROVISIONS F.A.P. NO. AC-TAP-3(871)E
308 — EROSION AND SEDIMENT CONTROL 4 of 20
(a) Compliance with the installation, maintenance, and repair of ESC measures and
pollution prevention.
(b) Conducting inspections as specified.
(c) Taking corrective actions.
The stormwater team shall have sufficient knowledge of requirements associated with the
installation, maintenance, and removal of ESC measures, stabilization, locations of ESC measures
and how they are to be maintained, procedures to follow, and when and how to conduct
inspections, record applicable findings, and take corrective actions. The stormwater team shall
have ready and easy access to the specified documents and reports.
308.02 MATERIALS
Riprap 901.02.01
Stone for Channels and Ditches 901.03
Stone for Slopes 901.04
Stone for Gabion 901.05
4 in. to 7 in. Stone 901.05
Asphalt Mixes Section 904
Pipe Section 905
Gabion Wire Section 906
Steel Plate 909.02
Welding Material 909.03
Fence Fabric for Super Silt Fence 914.01.01
Geotextile, Woven and Non-Woven 919.01, Class E
Geotextile, Woven Slit Film 919.01, Class F
Soil Amendments 920.02
Compost 920.02.05, Type C
Fertilizer 920.03
Mulch 920.04
Soil Stabilization Matting 920.05
Seed and Turfgrass Sod 920.06
Straw Bales 921.08
2 in. to 3 in. Stone M 43, No. 2
3/4 in.to 1-1/2 in. Stone M 43, No. 4
No. 57 Stone M 43, No. 57
308.02.01 Filter Log Casing. Produced from 5 mils thick continuous high-density polyethylene
or polypropylene, woven into a tubular mesh netting material with openings in the knitted mesh
of 1/8 in. to 3/8 in.
10/26/2023
CONTRACT NO. CH257B51
SPECIAL PROVISIONS F.A.P. NO. AC-TAP-3(871)E
308 — EROSION AND SEDIMENT CONTROL 5 of 20
308.03 CONSTRUCTION
308.03.01 Preliminary Activities. Prior to beginning construction activities, complete the
following.
(a) Attend the Pre-Construction Meeting and present a general overview of how ESC
measures shall be implemented for the Contract.
(b) Assign an Erosion and Sediment Control Manager (ESCM) and submit to the Engineer
the name and credentials of the ESCM for approval. The ESCM shall hold valid
certifications as specified in 308.01.02.
308.03.02 Erosion and Sediment Control (ESC) Preparation. Prior to establishing staging
(heavy use) areas or stockpile areas, and prior to beginning grading and other earth disturbing
activities, complete the following.
(a) Attend the Initial ESC Meeting with the Engineer and the Regional Environmental
Coordinator (REC) to discuss, at a minimum, ESC for the project, responsibilities,
corrective action procedures, and modification procedures. When the Contract
Documents indicate an LOD greater than or equal to 1 acre, the meeting shall include
an invitation to a representative from the Maryland Department of the Environment’s
(MDE’s) Compliance Program (MDE Compliance Inspector and the establishment of
the Stormwater Team.)
(b) When the Contract Documents indicate an LOD greater than or equal to 1 acre, post at
a safe, publicly accessible location in proximity to the construction area(s), a notice of
National Pollutant Discharge Elimination System (NPDES) permit coverage for
stormwater discharges associated with construction activities.
Locate the notice such that it is visible from the public right of way that is nearest
to the construction activities. (For linear work zones that extend over several miles
and for which a posting may be insufficient to provide notice of permit coverage,
submit proposed alternatives of notification to the Engineer, who will coordinate with
the REC and the MDE Compliance Inspector for approval.)
The notice shall include the following, be accessible to the public, and be a minimum
of 24 in. by 36 in.
(1) The Contract Number and project name as listed on the permit.
(2) The permittee as SHA.
(3) The words “General Permit for Stormwater Associated with Construction
Activity” and the permit authorization number.
10/26/2023
CONTRACT NO. CH257B51
SPECIAL PROVISIONS F.A.P. NO. AC-TAP-3(871)E
308 — EROSION AND SEDIMENT CONTROL 6 of 20
(c) Submit, to the Engineer and REC for acceptance and approval, the location of the
nearest official National Weather Service (NWS) gauge station or submit a proposal
to install a gauge station for the specific location(s) of work. Proposals shall include
detailed information regarding the type, location, accuracy, methodology, and
security of the rain gauge.
The rain gauge shall meet NWS large 20 in. gauge standards and have a measuring
stick, overflow can, collector funnel, and an inner measuring tube that holds 2 in. of
precipitation. The rain gauge shall use aluminum supports and be installed to where
the bottom of the gauge is approximately 10 in. to 15 in. above the ground.
(d) Demarcate all wetlands, wetland buffers, 100-yr floodplains, waters of the United
States (WUS), tree protection areas, stream protection zones (SPZs), special protection
areas, and LOD as specified in Section 107. Ensure the demarcations are inspected and
accepted by the Engineer.
308.03.03 ESCM and Superintendent. Do not commence work without both an approved ESCM
and a Superintendent meeting the certification requirements as specified in 308.01.02.
Do not perform excavation, grading, or dewatering activities without the presence of the ESCM.
When excavation, grading, or dewatering activities require an alternate ESCM, submit to the
Engineer for approval the name and credentials of an alternate ESCM meeting the certifications as
specified in 308.01.02. Inform the Engineer when the alternate ESCM will be responsible.
If the certifications for the ESCM expire or are revoked, cease construction activities and
immediately submit to the Engineer for approval the name and credentials of a new ESCM meeting
the certifications as specified in 308.01.02. Resume construction activities when directed by the
Engineer.
The Administration reserves the right to require reassignment of the ESCM duties to another
individual at any time with detailed justification.
If the certifications for the Superintendent expire or are revoked, cease construction activities and
immediately replace the Superintendent with another meeting the requirements as specified in
308.01.02. Resume construction activities when directed by the Engineer.
Proactively prevent deficiencies. Promptly resolve deficiencies identified by the Regional
Environmental Coordinator (REC) and maintain compliant quality assurance ratings. Refer to
308.03.07.
308.03.04 Off-Site Waste Areas. Obtain approvals and permits from the appropriate
jurisdictional authority for off-site waste areas that are not included in the Contract Documents
and coordinate with the Engineer. Provide a copy of the approvals and permits to the Engineer,
who will place in the Contract records.
308.03.05 MDE Inspections. All areas associated within the Contract are subject to routine,
10/26/2023
CONTRACT NO. CH257B51
SPECIAL PROVISIONS F.A.P. NO. AC-TAP-3(871)E
308 — EROSION AND SEDIMENT CONTROL 7 of 20
periodic, scheduled, unscheduled, and random field inspections by one or more MDE Compliance
Inspectors. If non-compliance is found, the MDE Compliance Inspector will immediately notify
the Engineer and require corrective actions. The non-compliance and/or corrective actions may
require a shutdown of construction activities until the non-compliance is satisfactorily resolved.
308.03.06 Field Modifications. Alternatives or variations to the ESC Approved Plans, including
but not limited to changes to the ESC sequence of construction, location and placement of ESC
measures, type of ESC measures, additional or redundant ESC measures, location of staging
(heavy use) areas within the LOD, and location of stockpiles within the LOD, may be submitted,
at the option of the Contractor, to the Administration for approval. Such alternatives are known
as ESC field modifications.
Submit modification requests to the Administration using the Quality Assurance (QA) Toolkit at
least 14 days prior to the desired time to implement the change. When an ESC field modification
request changes the LOD for projects in which the LOD is greater than or equal to 1 acre, submit
modification requests at least 30 days prior to the desired time to implement the change. Requests
to change the total LOD for projects in which the total LOD is less than 1 acre but will equal or
exceed 1 acre as a result of the ESC field modification are unacceptable.
Submit ESC field modifications overlaid on the pertinent ESC Approved Plans. Ensure requested
ESC field modifications to the ESC Approved Plans are submitted in PDF format, that changes
are blue in color, and are overlayed on the pertinent full-size ESC Approved Plans, typically
36 in. x 24 in. in size. Ensure the ESC field modifications adhere to the standard symbology and
names of ESC measures used in the Contract Documents and conform to 308.01.03. Ensure the
request is legible, clear, and easily understood.
The Administration reserves the right to require ESC field modifications to be prepared, stamped,
and sealed by a Professional Engineer, licensed in the State of Maryland.
Do not implement ESC field modifications until they have been approved via the QA Toolkit;
however, if MDE or another regulatory authority directs ESC field modifications, or if the
Engineer determines a modification is needed to prevent discharges, immediately implement the
direction and follow up with a submission in the QA Toolkit.
308.03.07 Quality Assurance Ratings. The REC will routinely inspect the project to ensure
compliance with the Contract Documents with regards to ESC and Stormwater Management
(SWM). The REC will assign scores based on these inspections. The scores will be reported on
Form No. OOC61/QA-1: Erosion/Sediment Control and Stormwater Management Field
Investigation Report.
10/26/2023
CONTRACT NO. CH257B51
SPECIAL PROVISIONS F.A.P. NO. AC-TAP-3(871)E
308 — EROSION AND SEDIMENT CONTROL 8 of 20
The REC will use the scores to determine the following ratings.
QUALITY ASSURANCE RATING TABLE
SCORE RATING
>90.0 A
80.0 - 89.9 B
70.0 - 79.9 C
60.0 - 69.9 D
< 60.0 F
(a) Rating A. A project complies. Corrections to deficiencies may be necessary.
(b) Rating B. A project generally complies. Corrections to deficiencies are necessary.
(c) Rating C. A project marginally complies. Corrections to deficiencies are necessary.
Shutdown conditions may arise quickly. The REC will reinspect within 72 hours. If the
deficiencies have not been satisfactorily corrected, a ‘D’ rating will be issued.
Inspection frequency may increase.
If a consecutive 'C' rating is issued, the REC will reinspect after 72 hours. Failure to
achieve a ‘B’ or better rating will result in a ‘D’ rating.
(d) Rating D. A project is in non-compliance. Corrections to deficiencies are necessary.
The Administration will shut down earthwork operations and will impose liquidated
damages for each day of a 'D' rating. The REC will reinspect within 72 hours.
Inspection frequency may increase.
Failure to achieve a 'B' or better rating will result in an 'F' rating and the entire project
will be shutdown. Liquidated damages will be imposed for each day of a ‘F’ rating.
Inspection frequency may increase.
(e) Rating F. A project is in non-compliance. Corrections to deficiencies are necessary.
An 'F' rating indicates one or more of the following.
(1) A score of less than 60.
(2) Required permits and approvals have not been obtained or have expired.
(3) The approved LOD has been exceeded.
(4) Sensitive areas as specified have been encroached upon without prior necessary
and adequate approval.
10/26/2023
CONTRACT NO. CH257B51
SPECIAL PROVISIONS F.A.P. NO. AC-TAP-3(871)E
308 — EROSION AND SEDIMENT CONTROL 9 of 20
(5) The work is not proceeding in conformance with the Contract Documents.
The Administration will shut down earthwork operations until all deficiencies are
satisfactorily corrected and ’B’ or better rating is achieved. The Administration will
impose liquidated damages for each day of a 'F' rating. Inspection frequency may
increase.
Following an initial ‘F’ rating, subsequent ‘F’ ratings will result in the following until
a ‘B’ rating or better is achieved.
(i.) The Administration will shut down the entire project.
(ii.) The ESC Training Certificate (Yellow Card) issued by the Administration
will be immediately revoked from the Superintendent, and the ESCM
responsible at the time of the subsequent rating, for no less than six-months
and during which time access to the QA Toolkit will be restricted, after
which time the individual may be eligible to take the Administration’s
“Erosion and Sediment Control Certification Training for Contractors and
Inspectors” (Yellow Card) again. Upon meeting 308.01.02, they may
resume their former roles on the project.
(iii.) If degradation to a sensitive area, protected resource, or Waters of the State
occurs or has already occurred, or if corrective actions have not been taken,
the Administration may elect to have corrective actions performed by
another contractor or by Administration personnel.
308.03.08 Severe Weather Event. Maintain, repair, remove and reset, or replace damaged or
dysfunctional ESC measures, and install missing ESC measures, beginning within 24 hours
following a severe weather event when safe conditions prevail.
308.03.09 Prohibited Discharges. Prevent the release of prohibited discharges throughout the
duration of the Contract.
308.03.10 Stabilization Requirements. Following initial soil disturbance, complete temporary
or permanent stabilization as specified.
308.03.11 Stabilized Construction Entrance (SCE). Construct stabilized construction entrances
(SCEs) as specified. Rehabilitate SCEs with periodic top dressing using additional aggregate,
replacing the drainage pipe beneath the SCE when one is installed, or making other repairs to the
SCE and sediment trapping devices.
When necessary and as directed, place wash racks to prevent tracking of mud and sediment.
308.03.12 Side or Berm Ditches and Culverts. Construct side ditches in fill areas and berm
ditches in cut areas. Protect linings from sediment deposits. Place silt fence along the banks of
10/26/2023
CONTRACT NO. CH257B51
SPECIAL PROVISIONS F.A.P. NO. AC-TAP-3(871)E
308 — EROSION AND SEDIMENT CONTROL 10 of 20
existing streams as specified prior to placing culverts. To help avoid sedimentation during
construction, divert the streams around the location of the culvert until the proposed culvert and
channel are stabilized as specified.
308.03.13 Erosion and Sediment Control Original Excavation. Excavate, construct
embankments, grade, and backfill for sediment traps, sediment basins, and other pertinent ESC
measures.
308.03.14 Erosion and Sediment Control Cleanout Excavation. Remove accumulated
sediment from ESC measures and other areas during routine inspection and maintenance of ESC
measures when necessary and as directed, per the ESC Handbook.
Dispose of removed sediment as excess or unsuitable material. Alternatively, removed sediment
may be reused once it is dried and if it meets embankment requirements unless otherwise specified.
308.03.15 Heavy Use Areas. Heavy use areas may be used for staging and for storage of
equipment and non-erodible materials. Locate heavy use areas using optional areas that may be
identified for use in the Contract Documents. For locations within the approved LOD, these areas
may not be shared with other entities not directly performing work on the Contract.
Alternatively, obtain property owner permission and appropriate regulatory approvals and permits
for off-site locations from the appropriate jurisdictional authority(ies) and coordinate with the
Engineer. Provide copies of documented permission, approvals, and permits to the REC and
Engineer, who will keep copies of the documents with the Contract records. Do not allow
approvals and permits to expire for the duration of the Contract or as long as the location(s) is (are)
needed.
308.03.16 Stockpile Areas. Stockpile areas may be used for the storage of erodible materials,
including but not limited to sand and soils. Locate stockpile areas using the optional areas that
may be identified for use in the Contract Documents. For locations within the approved LOD,
these areas may not be shared with other entities not directly performing work on the Contract.
Alternatively, obtain property owner permission and appropriate regulatory approvals and permits
for off-site locations from the appropriate jurisdictional authority(ies) and while coordinating with
the Engineer. Provide copies of documented permission, approvals, and permits to the REC and
the Engineer who will keep copies of the documents with the Contract records. Do not allow
approvals and permits to expire for the duration of the Contract or as long as the location(s) is (are)
needed.
308.03.17 Onsite Concrete Washout Structures. Locate onsite concrete washout structures and
cleanout activities as far away as practical from sensitive areas, Waters of the State, stormwater
inlets, and stormwater conveyances. Direct wash water into an approved leak-proof container or
leak-proof and lined pit designed so that no overflows occur due to inadequate sizing or
precipitation.
Do not dump washout or cleanout wastes, solid and liquid, in storm sewers or Waters of the State.
10/26/2023
CONTRACT NO. CH257B51
SPECIAL PROVISIONS F.A.P. NO. AC-TAP-3(871)E
308 — EROSION AND SEDIMENT CONTROL 11 of 20
Dispose of at an approved facility.
308.03.18 Earth Dike (ED). Do not use sod as vegetative stabilization unless directed.
308.03.19 Temporary Swale (TS). Do not use sod as vegetative stabilization unless directed.
308.03.20 Perimeter Dike/Swale. Do not use sod as vegetative stabilization unless directed.
308.03.21 Pipe Slope Drain. When slope drain is placed on grade, construct interceptor berms to
direct flow into the flared end section.
308.03.22 Riprap Inflow Protection. Construct as specified in Section 312.
308.03.23 Rock Outlet Protection (ROP). Construct as specified in Section 312.
308.03.24 Gabion Outlet Protection. Construct as specified in Section 313.
308.03.25 Gabion Inflow Protection. Construct as specified in Section 313.
308.03.26 Super Silt Fence (SSF). Use a 7-gauge top tension wire continuously between posts.
308.03.27 Filter Berms (FB). Use wood chips and up to 50 percent compost.
308.03.28 Filter Log. Use compost for filter media. Drive stakes perpendicular to water flow at
a maximum of 8 ft intervals. Restrict vehicular and construction traffic from crossing filter logs.
Once the drainage areas to filter logs are permanently stabilized with vegetation, with concurrence
of the Engineer and the REC, remove stakes. Filter logs may remain in place and vegetated or
removed. If remaining in place, cut filter log casings open, remove all non-biodegradable material,
spread the compost as a soil supplement, and perform the pertinent vegetative establishment.
308.03.29 Temporary Stone Outlet Structure (TSOS). Permanently stabilize the area
immediately after removal of the structure.
308.03.30 Temporary Gabion Outlet Structure (TGOS). Construct as specified in Section 313.
Grade and stabilize the area beneath the structure, immediately upon removal.
308.03.31 Dewatering. Dewater only when conditions facilitate successful operations and does
not alter stream clarity. When dewatering discharges flow to Tier II stream or Waters of the State
indicated as having an impairment of sediment or a sediment-related parameter, comply with
benchmark monitoring for turbidity.
Minimize the discharge of pollutants from dewatering operations as follows.
(a) Route dewatering water through ESC measures designed to minimize discharges of
pollutants and prevent discharges from altering visual turbidity or clarity.
(b) Do not discharge visible floating solids or foam.
10/26/2023
CONTRACT NO. CH257B51
SPECIAL PROVISIONS F.A.P. NO. AC-TAP-3(871)E
308 — EROSION AND SEDIMENT CONTROL 12 of 20
(c) To the extent feasible, use well-vegetated, upland areas of the site to infiltrate
dewatering water before discharge. Do not use Waters of the State as part of the
treatment area.
(d) Use stable, erosion-resistant surfaces, including but not limited to well-vegetated
grassy areas, clean filter stone, or geotextile underlayment, to discharge from
dewatering controls.
(e) Do not place dewatering operations on steep slopes.
(f) At all points where dewatering water is discharged, use velocity dissipation measures.
(g) With backwash water, either remove and dispose or return it to the beginning of the
treatment process.
(h) For filter bags, determine filter bag dimensions necessary to provide the required
storage volume, determine pump and hose sizes, and install. Do not place filter bags
on steep slopes.
(i) For portable sediment tanks, determine the dimensions necessary to provide the
necessary storage volume.
308.03.32 Sediment Traps. Excavate and grade sediment traps to the specified length, width, and
depth.
When grading and paving operations are complete and permanent vegetative stabilization within
the drainage areas to sediment traps, including slopes and channels, have been applied and those
areas are vegetated with at least a 3 inches of growth, with the concurrence of the Engineer and
the REC refill sediment traps with suitable materials, shape, and permanently stabilize as specified.
308.03.33 Stone for Sediment Control. Place No 57 aggregate, 3/4 in. to 1-1/2 in. stone, 2 in. to
3 in. stone, 4 in. to 7 in. stone, and riprap as specified.
308.03.34 Maintenance of Stream Flow. Maintain the continuous flow of waterways as
specified. Ensure that all excavation performed within the protected stream area is performed in
a dewatered condition, which may require additional pumps, sheeting, shoring, cofferdams, and
other measures.
With concurrence of the Engineer and REC, adjust stream diversion as necessary to ensure
satisfactory performance of the diversion, using additional ESC measures and equipment as
appropriate.
Always securely anchor the stream diversion system in place to prevent movement during high
water and storm events. Submit to the Engineer for approval the method of anchoring before
implementing. Do not install anchors beyond the LOD or infringe on the available channel area
10/26/2023
CONTRACT NO. CH257B51
SPECIAL PROVISIONS F.A.P. NO. AC-TAP-3(871)E
308 — EROSION AND SEDIMENT CONTROL 13 of 20
for stream flow.
Upon completion of construction and when temporary drainage devices are no longer necessary,
with the concurrence of the Engineer and the REC, remove the stream diversion.
308.03.35 Removal of ESC Measures. Do not remove ESC measures until all disturbed areas
have been permanently stabilized, vegetation is at least 4 inches tall, exhibits dark green color, and
has achieved at least 95 percent groundcover. Do not remove ESC measures without concurrence
from the REC and the Engineer.
308.04 MEASUREMENT AND PAYMENT
The payment will be full compensation for all material, labor, equipment, tools, and incidentals
necessary to complete the work.
Replacement of ESC measures that are damaged and replaced as a result of a Severe Weather
Event will be measured and paid for at the Contract unit prices provided that a Quality Assurance
Rating of “B” or better was obtained in the previous rating. Other damages as a result of an event
are subject to TC-7.03.
Maintenance, repairs, rehabilitation, removal, and corrective actions of and to ESC measures will
not be measured, but the cost will be incidental to the Contract price for the pertinent item.
The cost of posting a notice of National Pollutant Discharge Elimination System (NPDES) permit
coverage for stormwater discharges associated with construction activities will be measured and
paid per the temporary sign item.
Corrective actions, due to one or more ‘F’ ratings or are otherwise necessary due to degradation to
sensitive areas, protected resources, or Waters of the State due to the Contractor’s action or in-
action, directly or indirectly, or performed by Administration personnel or another contractor
under the direction of the Administration will be at the Contractor’s expense.
308.04.01 Erosion and Sediment Control Manager ESCM. The Erosion and Sediment Control
Manager (ESCM) will not be measured but the cost will be incidental to the ESC items.
Replacement of the ESCM with a new ESCM will be at no additional cost to the Administration.
308.04.02 Claims. No claims against the Administration will be considered due to a shutdown of
the grading operations or the entire project that resulted from non-compliance. When corrective
actions are performed by another contractor or by the Administration, all costs associated with the
work will be billed to the original Contractor.
308.04.03 Incentive Payments and Liquidated Damages Amounts. Applicable amounts as
specified.
308.04.04 Incentive Payments. When incentive payments are specified payment schedule is as
follows, beginning at the Notice to Proceed.
10/26/2023
CONTRACT NO. CH257B51
SPECIAL PROVISIONS F.A.P. NO. AC-TAP-3(871)E
308 — EROSION AND SEDIMENT CONTROL 14 of 20
(a) Rating Quarters and Quarterly Incentive Payments. A rating quarter is a three-
month period in which at least 4 inspections are performed by the REC. An average
score of at least 85.0 for the entire quarter is necessary to receive the quarterly incentive
amount. Payment will be made within 60 days from the end of the quarter. No
incentive will be paid for partial quarters or for three-month periods with less than 4
inspections by the REC. Time extensions approved by the Administration that increase
the number of eligible rating quarters will be drawn from the Final Incentive Payment.
(b) Disqualification for Incentive Payments. Ratings quarters in which a ‘D’ or ‘F’
rating occurs and/or an MDE enforcement action is issued are disqualified from the
quarterly incentive for the quarter(s) in which they occurred, regardless of the average
score for those entire quarter(s) and no payment will be made.
(c) Final Incentive Payment. When no ‘D’ or ‘F’ ratings have been received, the average
score for the Contract is at least 85.0, and no MDE enforcement actions have been
issued, the final incentive payment will be made at Final Closeout in the amount
specified or the remaining amount if additional eligible rating quarters were added by
time extensions approved by the Administration.
308.04.05 Liquidated Damages. When 'D' or 'F' ratings are received, liquidated damages will be
assessed, and deductions imposed.
308.04.06 Stabilized Construction Entrance (SCE). Stabilized Construction Entrance (SCE)
will be measured and paid for at the Contract unit price per each.
When drainage pipe under the SCE is specified, the pipe will not be measured but the cost will be
incidental to the SCE item.
308.04.07 Wash Racks for Stabilized Construction Entrance. Wash Racks for Stabilized
Construction Entrance will be measured and paid for at the Contact unit price per each.
308.04.08 Erosion and Sediment Control Original Excavation. Erosion and Sediment Control
Original Excavation will be measured and paid for at the Contract unit price per cubic yard.
308.04.09 Erosion and Sediment Control Cleanout Excavation. Erosion and Sediment Control
Cleanout Excavation will be measured and paid for at the Contract unit price per cubic yard.
308.04.10 Temporary Mulch. Temporary Mulch will be measured and paid for as specified in
704.04.01.
308.04.11 Temporary Seed. Temporary Seed will be measured and paid for as specified in
704.04.02.
308.04.12 Turfgrass Sod. Turfgrass Sod will be measured and paid for as specified in 708.04.01.
308.04.13 Soil Stabilization Matting (SSM). Soil Stabilization Matting (SSM) will be measured
10/26/2023
CONTRACT NO. CH257B51
SPECIAL PROVISIONS F.A.P. NO. AC-TAP-3(871)E
308 — EROSION AND SEDIMENT CONTROL 15 of 20
and paid for as specified in 709.04.
308.04.14 Heavy Use Area Protection. Heavy use area protection will not be measured but the
cost will be incidental to the pertinent ESC measures.
308.04.15 Stockpile Areas. Stockpile areas will not be measured but the cost will be incidental
to the pertinent ESC measures.
308.04.16 Earth Dike (ED). Earth Dike will be measured and paid for at the Contract unit price
per linear foot. 4 Inch to 7 Inch. stone, temporary seeding, and soil stabilization will be measured
and paid for as specified in 308.04.60, 704.04, and 709.04, respectively.
308.04.17 Temporary Swale (TS). Temporary Swale will be measured and paid for at the
Contract unit price per linear foot. 4 Inch to 7 Inch stone, temporary seeding, and soil stabilization
matting will be measured and paid for as specified in 308.04.60, 704.04, and 709.04, respectively.
308.04.18 Perimet er Dikes/Swales. Perimeter Dikes/Swales will be measured and paid for at the
Contract unit price per linear foot. Temporary seeding and soil stabilization matting will be
measured and paid for as specified in 704.04 and 709.04, respectively.
308.04.19 Temporary Storm Drain Diversion. Temporary Storm Drain Diversion will be
measured and paid for at the Contract unit price per linear foot of the size specified.
308.04.20 Temporary Asphalt Berm. Temporary Asphalt Berm will be measured and paid for
at the Contract unit price per linear foot for 5 Inch Asphalt Berm.
308.04.21 Clear Water Diversion (CWD). Clear Water Diversion will be measured and paid for
at the Contract unit price per linear foot of the size specified. The payment will include pipe,
connections, anchors, sandbags, sheeting, dewatering, and turbidity monitoring when monitoring
is required.
308.04.22 Temporary Barrier Diversion. Temporary Barrier Diversion will be measured and
paid for at the Contract unit price per linear foot. The payment will include barrier, sandbags,
sheeting, dewatering, and turbidity monitoring when monitoring is required.
308.04.23 Mountable Berm. Mountable Berm will be measured and paid for at the Contract unit
price per each.
308.04.24 Diversion Fence. Diversion Fence will be measured and paid for at the Contract unit
price per linear foot.
308.04.25 Pipe Slope Drain (PSD). Pipe Slope Drain (PSD) will be measured and paid for at the
Contract unit price per linear foot of the size specified. The payment will include excavation,
backfill, flared end section, geotextile, anchors, coupling bands, and pipe elbows.
308.04.26 Stone Check Dam. Stone check dam will be measured and paid for at the Contract unit
price per ton for the following. The payment will include geotextile, excavation, and backfill.
10/26/2023
CONTRACT NO. CH257B51
SPECIAL PROVISIONS F.A.P. NO. AC-TAP-3(871)E
308 — EROSION AND SEDIMENT CONTROL 16 of 20
(a) 4 Inch to 7 Inch Stone for Sediment Control.
(b) Washed aggregate as 3/4 Inch to 1-1/2 Inch Stone for Sediment Control.
308.04.27 Riprap Inflow Protection. Riprap Inflow Protection will be measured and paid for per
ton for Riprap for Sediment Control.
308.04.28 Gabion Inflow Protection. Gabion Inflow Protection will be measured and paid for
per cubic yard.
308.04.29 Rock Outlet Protection. Rock Outlet Protection will be measured and paid for at the
Contract unit price per square yard for Riprap Slope and Channel Protection.
308.04.30 Plunge Pool. Plunge Pool will be measured and paid for at the Contract unit price per
square yard for Riprap Slope and Channel Protection.
308.04.31 Silt Fence (SF). Silt Fence (SF) will be measured and paid for at the Contract unit price
per linear foot.
308.04.32 Silt Fence on Pavement. Silt fence on pavement will be measured and paid for at the
Contract unit price per linear foot for Silt Fence.
308.04.33 Super Silt Fence (SSF). Super Silt Fence (SSF) will be measured and paid for at the
Contract unit price per linear foot.
308.04.34 Clear Water Pipe Through Silt Fence or Super Silt Fence. Clear water pipe through
silt fence or super silt fence will not be measured but the cost will be incidental to the pertinent
clear water diversion and silt fence items.
308.04.35 Filter Berm. Filter Berm will be measured and paid for at the Contract unit price per
linear foot.
308.04.36 Filter Log. Filter Log will be measured and paid for at the Contract unit price per linear
foot for the size specified.
308.04.37 Temporary Stone Outlet Structure (TSOS). Temporary Stone Outlet Structure
(TSOS) will be measured and paid for per ton for 2 Inch. to 3 Inch Stone for Sediment Control.
The payment will include the baffle board, stakes, and geotextile.
308.04.38 Temporary Gabion Outlet Structure. Temporary Gabion Outlet Structures will be
measured and paid for at the Contract unit price per each.
308.04.39 Standard Inlet Protection. Standard Inlet Protection will be measured and paid for at
the Contract unit price per each for Inlet Protection.
10/26/2023
CONTRACT NO. CH257B51
SPECIAL PROVISIONS F.A.P. NO. AC-TAP-3(871)E
308 — EROSION AND SEDIMENT CONTROL 17 of 20
308.04.40 At Grade Inlet Protection. At grade inlet protection will be measured and paid for the
Contract unit price per each for Inlet Protection.
308.04.41 Curb Inlet Protection. Curb inlet protection will be measured and paid for at the
Contract unit per each for Inlet Protection.
308.04.42 Median Inlet Protection. Median inlet protection will be measured and paid for at the
Contract unit per each for Inlet Protection.
308.04.43 Median Sump Inlet Protection. Median sump inlet protection will be measured and
paid for at the Contract unit per each for Inlet Protection.
308.04.44 Combination Inlet Protection. Combination inlet protection will be measured and
paid for at the Contract unit per each for Inlet Protection.
308.04.45 Gabion Inlet Protection. Gabion inlet protection will be measured and paid for at the
Contract unit per each for Inlet Protection.
308.04.46 Catch Basin Insert. Catch basin insert will be measured and paid for at the Contract
unit price per each for Inlet Protection.
308.04.47 Dewatering Practices. Dewatering practices will be measured and paid for at the
Contract unit price for the pertinent dewatering item. The payment will include turbidity
monitoring when monitoring is required.
(a) Removable Pumping Station. Removable Pumping Station will be measured and paid
for at the Contract unit price per each. The payment will include excavation, pipe,
geotextile, wire mesh, steel plate, stone, hose, pump, and connections.
(b) Sump Pit. Sump Pit will be measured and paid for at the Contract unit price per each.
The payment will include excavation, pipe, geotextile, wire mesh, steel plate, stone,
hose, pump, and connections.
(c) Portable Sediment Tank. Portable Sediment Tank will be measured and paid for at
the Contract unit price per each. The payment will include pipe, geotextile, wire mesh,
steel plate, hose, pump, and connections.
(d) Filter Bags. Filter Bags will be measured and paid for at the Contract unit price per
each. The payment will include pump, hoses, connections, mulch, compost,
woodchips, sand, and straw bales.
308.04.48 Sediment Traps. Sediment traps, including ST-I, ST-II, and ST-III, will be measured
and paid for at the Contract unit price for one or more of the pertinent items as follows.
(a) Erosion and Sediment Control Original Excavation. Erosion and Sediment Control
Original Excavation as specified in 308.04.08.
10/26/2023
CONTRACT NO. CH257B51
SPECIAL PROVISIONS F.A.P. NO. AC-TAP-3(871)E
308 — EROSION AND SEDIMENT CONTROL 18 of 20
(b) Pipe. Pipe as specified in 303.04.
(c) Stone and Aggregate. Stone and aggregate will be measured and paid for at the
Contract unit price per the pertinent item for the following. The payment will include
geotextile, excavation, and backfill.
(1) Riprap for Sediment Control.
(2) No. 57 Stone for Sediment Control.
(3) 3/4 Inch to 1-1/2 Inch Stone for Sediment Control.
(4) 2 Inch to 3 Inch Stone for Sediment Control.
(5) 4 Inch to 7 Inch Stone for Sediment Control.
(d) Geotextile. Geotextile will not be measured but the cost will be incidental to the
Contact unit price for the pertinent stone and aggregate item(s).
(e) Inflow Protection. As follows.
(1) Riprap Inflow Protection. Riprap Inflow Protection will be measured and paid
for per ton for Riprap for Sediment Control.
(2) Gabion Inflow Protection. Gabion Inflow Protection will be measured and
paid for per cubic yard.
(f) Baffle Board and Stakes. Baffle board and stakes will not be measured but the cost
will be incidental to the Contract unit price for the pertinent inflow protection item(s).
(g) Temporary Risers. Temporary Risers will be measured and paid for at the Contract
unit price per each.
(h) Anti-Seep Collars. Anti-Seep Collars will be measured and paid for at the Contract
unit price per each.
308.04.49 Sediment Basins. Sediment basins will be measured and paid for at the Contract unit
price for one or more of the pertinent items as follows.
(a) Erosion and Sediment Control Original Excavation. Erosion and Sediment Control
Original Excavation as specified in 308.04.08.
(b) Pipe. Pipe as specified in 303.04.
(c) Stone and Aggregate. As specified in 308.04.48(c).
10/26/2023
CONTRACT NO. CH257B51
SPECIAL PROVISIONS F.A.P. NO. AC-TAP-3(871)E
308 — EROSION AND SEDIMENT CONTROL 19 of 20
(d) Geotextile. Geotextile will not be measured but the cost will be incidental to the
Contract unit price for the pertinent stone and aggregate item(s).
(e) Baffle Board and Stakes. Baffle board and stakes will not be measured but the cost
will be incidental to the Contract unit price for the pertinent stone and aggregate
item(s).
(f) Temporary Risers. Temporary Risers will be measured and paid for at the Contract
unit price per each. The payment will include trash racks, draw down devices, concrete
bases, projection collars, and riser connectors.
(g) Modifying Stormwater Management Riser Structures. Modifying Stormwater
Management Riser Structures will be measured and paid for at the Contract unit price
per each for Convert Stormwater Management Riser for Sediment Control. The
payment will include installing and removing dewatering pipe systems and restoring
stormwater management riser structures to the original condition.
(h) Anti-Seep Collars. Anti-Seep Collars will be measured and paid for at the Contract
unit price per each.
308.04.50 Temporary Access Bridge. Temporary Access Bridge will be measured and paid for
at the Contract lump sum price.
308.04.51 Temporary Access Culvert. Temporary Access Culvert will be measured and paid for
at the Contract unit price per linear foot.
308.04.52 Onsite Concrete Washout Structures. Onsite concrete washout structures will not be
measured but the cost will be incidental to the pertinent concrete mixes. The payment will include
implementation of controls associated with pollution prevention activities.
308.04.53 Vegetative Stabilization. Vegetative stabilization will be measured and paid for at the
Contract unit price for the pertinent temporary and permanent item(s). Reapplication of the
pertinent stabilization of permanently stabilized vegetated areas that are disturbed or re-disturbed
by grading operations, failure to maintain controls, general negligence, or other activities not
specifically authorized by the appropriate approval authority will be at no additional cost to the
Administration.
308.04.54 Stone and Aggregate for Sediment Control. As follows. Geotextile, excavation, and
backfill will not be measured but the cost will be incidental to the Contract price.
(a) Riprap for Sediment Control. Riprap for Sediment Control will be measured and
paid for at the Contract unit price per ton.
(b) Class I Riprap for Slope and Channel Protection. Class I Riprap for Slope and
Channel Protection will be measured and paid for at the Contract unit price per square
10/26/2023
CONTRACT NO. CH257B51
SPECIAL PROVISIONS F.A.P. NO. AC-TAP-3(871)E
308 — EROSION AND SEDIMENT CONTROL 20 of 20
yard.
(c) Class II Riprap for Slope and Channel Protection. Class II Riprap for Slope and
Channel Protection will be measured and paid for at the Contract unit price per square
yard.
(d) No. 57 Stone for Sediment Control. No. 57 Stone for Sediment Control will be
measured and paid for at the Contract unit price per ton.
(e) 3/4 Inch to 1-1/2 Inch Stone for Sediment Control. 3/4 Inch to 1-1/2 Inch Stone for
Sediment Control will be measured and paid for at the Contract unit price per ton.
(f) 2 Inch to 3 Inch Stone for Sediment Control. 2 Inch to 3 Inch Stone for Sediment
Control will be measured and paid for at the Contract unit price per ton.
(g) 4 Inch to 7 Inch Stone for Sediment Control. 4 Inch to 7 Inch Stone for Sediment
Control will be measured and paid for at the Contract unit price per ton.
308.04.55 Maintenance of Stream Flow. Maintenance of Stream Flow will not be measured but
will be paid for at the Contract lump sum price. Diversion structures necessary to satisfactorily
divert the stream flow, anchoring of the system, excavation, backfill, dewatering the site and
excavation within the stream diversion area, sandbags, polyethylene sheeting, diversion pipes,
pumps, hoses, connections, portable sediment tanks, maintenance, repairs, rehabilitation, removal,
removal and resetting, relocation, corrective actions of and to ESC measures, turbidity monitoring
when required, and implementation of controls associated with pollution prevention activities
especially with regards to stream clarity, cleanup, and restoration of the stream diversion area that
is damaged will not be measured, but the cost will be incidental to the Contract lump sum price.
Payment will not be adjusted for alternative stream diversion systems regardless of changes in
quantities from that shown in the Contract Documents. No payment adjustments will be made for
corrective actions to meet stream clarity discharge requirements.
Cleanup and restoration of the stream diversion area that is damaged and replaced as a result of a
Severe Weather Event will not be measured but paid for as specified in TC-7.03.
308.04.56 Sandbags. When sandbags are specified for use other than when incidental to
304.04.22, 304.04.23, 308.04.56, or otherwise specified as incidental, sandbags will be measured
and paid for per cubic yard.
10/26/2023
CONTRACT NO. CH257B51
SPECIAL PROVISIONS F.A.P NO. AC-TAP-3(871)E
GP – SECTION 2 — BIDDING REQUIREMENTS AND CONDITIONS 1 of 10
GENERAL PROVISIONS
GP SECTION 2
BIDDING REQUIREMENTS AND CONDITIONS
DELETE: GP-SECTION 2 — BIDDING REQUIREMENTS AND CONDITIONS in its
entirety.
INSERT: The following.
GP-2.01 BID IRREVOCABLE.
Unless otherwise provided in the Invitation for Bids, bid prices are irrevocable for 90 days
following bid opening.
GP-2.02 CONTENTS OF BID FORMS.
All papers included in, bound thereto or attached to the bid form are necessary parts thereof and
shall not be detached, separated or altered. The Plans, Specifications, Supplemental Specifications,
referred to in the Specifications, and all other Contract Documents will be considered a part of the
bid form whether attached thereto or not.
GP-2.03 INTERPRETATION OF QUANTITIES IN BID SCHEDULE.
Where designated as estimated quantities, the quantities in the prepared bid schedule are
approximate only. Payment to the Contractor will be made only for the actual quantities of work
performed or materials furnished in accordance with the Contract and as provided in GP-4.04
Variations in Estimated Quantities.
GP-2.04 SITE INVESTIGATION.
The Contractor acknowledges that he has investigated and satisfied himself as to the conditions
affecting the work, including but not restricted to those bearing upon transportation, disposal,
handling and storage of materials, availability of labor, water, electric power, roads and
uncertainties of weather, river stages, tides or similar physical conditions at the site, and
confirmation and conditions of the ground, the character of equipment and facilities needed
preliminary to and during prosecution of the work. The Contractor further acknowledges that he
has satisfied himself as to the character, quality and quantity of surface and subsurface materials
or obstacles to be encountered insofar as this information is reasonably ascertainable from an
inspection of the site, including all exploratory work done by the State, as well as from information
presented by the drawings and specifications made a part of this Contract. Any failure by the
Contractor to acquaint himself with the available information may not relieve him from
responsibility for estimating properly the difficulty or cost of successfully performing the work.
The State assumes no responsibility for any conclusions or interpretations made by the Contractor
on the basis of the information made available by the State.
05-30-17
CONTRACT NO. CH257B51
SPECIAL PROVISIONS F.A.P NO. AC-TAP-3(871)E
GP – SECTION 2 — BIDDING REQUIREMENTS AND CONDITIONS 2 of 10
GP-2.05 TAXES-RESPONSIBILITY FOR PAYMENT, EXEMPTIONS, FORMS TO FILE,
ETC.
(a) The Contractor is responsible for, and by submitting a bid agrees to pay, all retail sales,
income, real estate, sales and use, transportation and special taxes applicable to and
assessable against any materials, equipment, processes and operations incident to or involved
in the construction. The Contractor is responsible for ascertaining and acquainting himself
with such taxes and making all necessary arrangements to pay same.
(b) The Contractor shall indicate its Federal Tax Identification or Social Security number on the
face of each invoice billed to the Administration.
(c) The Administration or the Comptroller of the Treasury may withhold any payment under this
Contract until the Contractor and any subcontractors performing any duties under this
Contract have paid all State taxes or other obligations due the State of Maryland. The taxes
or other obligations shall be resolved either by set-off of the amount due the Contractor
against the amounts due the State or by direct payment.
GP-2.06 PREPARATION OF BID.
On Administration Contracts the Contractor may elect to submit his bid on forms generated in
the development of his bid as specified in TC-2.02 Preparation of Bid.
(a) The bidder shall submit his bid upon the blank forms furnished by the Administration. The
bidder shall specify a price in dollars and cents for each pay item given, and shall show the
products of the respective unit prices and quantities written in figures in the column provided
for that purpose, together with the total amount of the bid obtained by adding the amounts of
the several items.
(b) The bid form(s) shall be filled out legibly in ink or typed. The bid, if submitted by an
individual, shall be signed by the individual. If submitted by a partnership, the bid shall be
signed by such member or members of the partnership an have authority to bind the
partnership. If submitted by a corporation or other business entity, the same shall be signed
by an officer with his or her position stated below the signature line. Such signature shall
constitute the Contractor’s representation and warrant that the signing party has the
Contractor’s authorization to do so, binding the Contractor to the bid and to the Contract. All
bids shall be signed in ink. All erasures or alterations shall be initialed by the signer in ink.
(c) Bid Samples and Descriptive Literature. If the Invitation for Bids requires the bidder to
furnish samples or descriptive literature, it shall be submitted with the bid, unless the
Invitation for Bids provides otherwise.
(d) Offerors shall identify those portions of their proposals which they deem to be confidential,
proprietary information or trade secrets and provide any justification of why such materials
should not be disclosed by the State under the Maryland Public Information Act, Section 10-
611 et seq. of the State Government Article of the Annotated Code of Maryland.
05-30-17
CONTRACT NO. CH257B51
SPECIAL PROVISIONS F.A.P NO. AC-TAP-3(871)E
GP – SECTION 2 — BIDDING REQUIREMENTS AND CONDITIONS 3 of 10
(e) Foreign Corporations – Pursuant to the Corporations and Associations, Title 7 of the
Annotated Code of Maryland, corporations not incorporated in the State shall register with
the State Department of Assessments and Taxation, before doing any interstate or foreign
business in this State. Before doing any intrastate business in this State, a foreign corporation
shall qualify with the Department of Assessments and Taxation.
GP-2.07 PROPOSAL GUARANTY.
(a) No bid will be considered for any Contract in excess of $100,000 unless accompanied by a
guaranty in an amount not less than 5 percent of the amount bid, or such amount as may be
specified elsewhere in the bid documents and made payable to the State of Maryland.
(b) Acceptable forms of security for bid guaranty shall be:
(1) A bond in a form satisfactory to the State underwritten by a surety company authorized
to do business in this State;
(2) A bank certified check, bank cashier's check, bank treasurer's check, or trust account;
(3) Pledge of securities backed by the full faith and credit of the United States government
or bonds issued by the State of Maryland; or
(4) Cash or other securities—if submitted pursuant to COMAR 21.06.07.01
GP-2.08 DELIVERY OF BIDS.
Each bid must be submitted in a sealed envelope plainly marked to indicate its contents. When
sent by mail, the sealed bid must be addressed to the Administration at the address and in care of
the official in whose office the bids are to be received. All bids shall be filed prior to the time and
at the place specified in the Notice to Contractors. Bids received after the time for opening of bids
will be treated in accordance with the provisions of GP-2.12.
GP-2.09 COMMUNICATIONS AND INTERPRETATIONS PRIOR TO BID OPENING.
Any information regarding the requirements or the interpretation of any provision of the General
Provisions, Special General Provisions, Specifications or any part of the bidding documents shall
be requested, in writing, from the procurement officer, and delivered no later than 10 days prior to
the scheduled date of bid opening. Responses to questions or inquiries having any material effect
on the bids shall be made by written addenda, or by written notice sent to all prospective bidders.
DO NOT MAKE VERBAL INQUIRIES.
Any verbal interpretations or oral pre-bid statements made by State employees or their
representatives shall not be binding upon the State.
05-30-17
CONTRACT NO. CH257B51
SPECIAL PROVISIONS F.A.P NO. AC-TAP-3(871)E
GP – SECTION 2 — BIDDING REQUIREMENTS AND CONDITIONS 4 of 10
GP-2.10 AMENDMENTS TO INVITATION FOR BIDS.
(a) Form. Each amendment to an Invitation for Bids shall be in writing and identified as such.
(b) Acknowledgements. Unless otherwise provided, the bidder shall acknowledge receipt of all
amendments.
GP-2.11 PRE-OPENING MODIFICATION OR WITHDRAWAL OF BIDS.
(a) Procedure. Bids may be modified or withdrawn by written notice delivered to and received
in the office designated in the Invitation for Bids before the time and date set for bid opening.
Written notice of modification or withdrawal may be delivered by hand delivery, overnight
carrier, or by US Postal mail. Any notice addressed in this subsection must be received before
the time and date set for bid opening.
(b) Disposition of Bid Security. If a bid is withdrawn in accordance with this regulation, the
bid security, if any, shall be returned to the bidder.
05-30-17
CONTRACT NO. CH257B51
SPECIAL PROVISIONS F.A.P NO. AC-TAP-3(871)E
GP – SECTION 2 — BIDDING REQUIREMENTS AND CONDITIONS 5 of 10
GP-2.12 LATE BIDS, LATE WITHDRAWALS, AND LATE MODIFICATIONS.
(a) Policy. Any bid received at the place designated in the solicitation after the time and date set
for receipt of bids is late. Any request for withdrawal or request for modification received
after the time and date set for opening of bids at the place designated for opening is late.
(b) Treatment. A late bid, late request for modification, or late request for withdrawal may not
be considered. Late bids will be returned to the bidder unopened. Upon written approval of
the Office of the Attorney General, exceptions may be made when a late bid, withdrawal, or
modification is received before Contract award, and the bid, withdrawal, or modification
would have been timely but for the action or inaction of State personnel directing the
procurement activity or their employees.
NOTE: Provision GP-2.12(b) does not apply to Federal Aid projects.
GP-2.13 OPENING AND RECORDING OF BIDS.
(a) Opening and Recording. Bids and modifications shall be opened publicly, at the time, date,
and place designated in the Invitation for Bids. The name of each bidder, the bid price, and
such other information as is deemed appropriate shall be read aloud or otherwise made
available. This information also shall be recorded at the time of bid opening. The bids shall
be tabulated or a bid abstract made. The opened bid shall be available for public inspection
at a reasonable time after bid opening but in any case before Contract award except to the
extent the bidder designates trade secrets or other proprietary data to be confidential as set
forth in COMAR 21. Material so designated shall accompany the bid and shall be readily
separable from the bid in order to facilitate public inspection of the nonconfidential portion
of the bid. Prices, makes, and model or catalog numbers of the items offered, deliveries, and
terms of payment shall be publicly available at a reasonable time after bid opening but in any
event before Contract award regardless of any designation to the contrary at the time of bid
opening.
(b) Confidential Data. The procurement officer shall examine the bids to determine the validity
of any requests for nondisclosure of trade secrets and other proprietary data identified in
writing. Confidential, proprietary information, and trade secrets furnished by a bidder or
offeror may be disclosed to another State agency if there is a need for the information and
may not be disclosed outside of State government except as provided by the Public
Information Act or other applicable laws of this State.
05-30-17
CONTRACT NO. CH257B51
SPECIAL PROVISIONS F.A.P NO. AC-TAP-3(871)E
GP – SECTION 2 — BIDDING REQUIREMENTS AND CONDITIONS 6 of 10
GP-2.14 MISTAKES IN BIDS.
(a) Mistakes Discovered Before Opening. A bidder may correct mistakes discovered before
the time and date set for bid opening by withdrawing or correcting the bid as provided in GP-
2.11.
(b) Confirmation of Bid. If the procurement officer knows or has reason to conclude that a
mistake may have been made, the bidder may be required to confirm the bid. Situations in
which confirmation may be requested include obvious, apparent errors on the face of the bid
or a bid unreasonably lower than the other bids submitted. If the bidder alleges mistake, the
bid may be corrected or withdrawn upon written approval of the Office of the Attorney
General if any of the following conditions are met:
(1) If the mistake and intended correction are clearly evident on the face of the bid document,
the bid shall be corrected to the intended correct bid and may not be withdrawn. Examples
of mistakes that may be clearly evident on the face of the bid document are typographical
errors, errors in extending unit prices, transposition errors, and arithmetical errors.
(2) A bidder may be permitted to withdraw a low bid if:
(a) A mistake is clearly evident on the face of the bid document but the intended correct
bid is not similarly evident; or
(b) The bidder submits proof of evidentiary value which clearly and convincingly
demonstrates that a mistake was made.
(c) Mistakes Discovered After Award. Mistakes may not be corrected after award of the
Contract except when the procurement officer and the head of a procurement agency
makes a determination that it would be unconscionable not to allow the mistake to be
corrected. Changes in price are not permitted. Corrections shall be submitted to and
approved by the Office of the Attorney General.
GP-2.15 MINOR IRREGULARITIES OR INFORMALITIES.
General. Minor irregularities or informalities in bids, as defined below, may be waived if the
procurement officer determines that it shall be in the State's best interest. The procurement officer
may either give a bidder an opportunity to cure any deficiency resulting from a technicality or
minor irregularity in its bid, or waive the deficiency where it is to the State's advantage to do so.
When at any public opening of bids, a bid appears to be irregular, as herein specified, this fact
may be announced when read. Said bid shall be read as other bids and then referred to the
procurement officer for consideration and appropriate action thereon in accordance with these
General Provisions, Law and Regulation.
A minor irregularity is one which is merely a matter of form and not of substance or pertains to
some immaterial or inconsequential defect or variation of a bid or proposal from the exact
05-30-17
CONTRACT NO. CH257B51
SPECIAL PROVISIONS F.A.P NO. AC-TAP-3(871)E
GP – SECTION 2 — BIDDING REQUIREMENTS AND CONDITIONS 7 of 10
requirement of the solicitation, the correction or waiver of which would not be prejudicial to other
bidders or offerors. The defect or variation in the bid or proposal is immaterial and inconsequential
when its significance as to price, quantity, quality, or delivery is trivial or negligible when
contrasted with the total cost or scope of the supplies or services being procured and the intent and
meaning of the entire bid or proposal is clear.
GP-2.16 CANCELLATION OF INVITATION FOR BIDS.
(a) Before opening of bids a solicitation may be canceled in whole or in part when the State
determines this action is fiscally advantageous or otherwise in its best interest.
(b) When a solicitation is canceled before bid opening, the bids shall be returned to the vendors
submitting them and notice of cancellation shall be included.
GP-2.17 REJECTION OF INDIVIDUAL BIDS OR PROPOSALS.
(a) Any bid may be rejected in whole or in part when it is in the best interest of the State to do
so.
(b) Reasons for rejection of a bid may include but are not limited to:
(1) The bid is not responsive i.e., it does not conform in all material respects to the
solicitation.
(2) Unreasonable price;
(3) The bidder submitting the bid is determined to be nonresponsible. A determination of
nonresponsibility may be made for, but is not limited to, any of the following reasons:
(a) Bidder debarred or ineligible and period of debarment or ineligibility not expired.
(b) The unit prices contained in a bid are unbalanced.
(c) Evidence of collusion among bidders.
(d) Inadequate quantity and/or quality of experience, plant, equipment, financing,
manpower or other resources required to perform the Contract.
(e) Bidder's workload which, in the judgement of the Administration, might hinder or
prevent the prompt completion of the subject work if awarded.
(f) Default by the bidder on other Contracts.
(g) Failure to pay or satisfactorily settle all reasonable and just bills due for labor and
material on prior or current Contracts.
05-30-17
CONTRACT NO. CH257B51
SPECIAL PROVISIONS F.A.P NO. AC-TAP-3(871)E
GP – SECTION 2 — BIDDING REQUIREMENTS AND CONDITIONS 8 of 10
(h) The same person has an interest in more than one bid on a Contract exclusive of being
named by another bidder as a subcontractor.
(i) Failure to perform satisfactorily on other Contracts awarded, and the conditions
leading to unsatisfactory performance remain unresolved.
(j) Any other reason affecting the bidder's ability to perform, or record of business
integrity.
(k) Bidder not otherwise qualified and eligible to receive an award under applicable laws
and regulations.
(4) The bidder or offeror fails to supply information to the procurement officer promptly,
after notification from the procurement officer that such information is required in
connection with a determination to be made pursuant to this GP-2.17.
GP-2.18 REJECTION OF ALL BIDS.
(a) After opening of bids or proposals but before award, all bids or proposals may be rejected in
whole or in part when the procurement officer, with the approval of the agency head or his
designee, determines that this action is fiscally advantageous or otherwise in the State's best
interest.
(b) A notice of rejection of all bids shall be sent to all vendors that submitted bids, and bids
which have been opened shall be retained by the Administration.
GP-2.19 BID EVALUATION AND AWARD.
(a) General. The Contract is to be awarded to the responsible and responsive bidder whose bid
meets the requirements and evaluation criteria set forth in the Invitation for Bids, and is either
the lowest bid price or lowest evaluated bid price.
(b) Determination of Lowest Bidder. Bids shall be evaluated to determine which bidder offers
the lowest cost to the State in accordance with the evaluation criteria set forth in the Invitation
for Bids.
Except as otherwise provided under GP-2.14 Mistakes in Bids:
(1) The unit price will govern in the event of a discrepancy between the unit price bid and
the extended price (product of unit price multiplied by the quantity).
(2) The sum of the extended prices will govern in the event of a discrepancy between the
total lump sum bid and the extended prices.
(3) The written words will govern in the event of a discrepancy between the prices written
in words and the prices written in figures.
05-30-17
CONTRACT NO. CH257B51
SPECIAL PROVISIONS F.A.P NO. AC-TAP-3(871)E
GP – SECTION 2 — BIDDING REQUIREMENTS AND CONDITIONS 9 of 10
(4) If a unit price has been omitted, the unit price will be determined by dividing the
extended price by the quantity.
The Administration reserves the right to make the award by item, or groups of items,
or total bid if it is in the best interest of the State to do so unless the bidder specifies in
his bid that a particular or progressive award is not acceptable.
(c) Award. Upon determination of the lowest bidder, review of the bid for responsiveness, and
satisfaction that the bidder is responsible, the Contract may be awarded to that bidder. A
Contract may be awarded to a bidder offering a higher quality item than that designated in
the Invitation for Bids if that bidder is also the lowest responsive and responsible bidder.
GP-2.20 TIE BIDS.
On Administration Federal Aid Contracts, the preference to in-State Contractors does not apply.
(a) Definition. Tie bids are responsive bids from responsible bidders that are identical in
price, terms and conditions and which meet all the requirements and evaluation criteria
set forth in the Invitation for Bids.
(b) Award. In the instance of tie bids, the award shall be made in accordance with COMAR
21.05.02.14. If identical low bids are received from an in-State and out-of-State bidder,
the award shall be made to the in-State bidder. If identical low bids are received from
in-State bidders or from out-of-State bidders, a drawing shall be conducted, and a
witness shall be present to verify and certify the result.
GP-2.21 RESIDENT BUSINESS PREFERENCE.
(a) When awarding a Contract by competitive sealed bidding, if the State in which a nonresident
firm submitting the lowest responsible bid is located gives a competitive advantage to its
resident businesses, a procurement agency may give an identical competitive advantage to
the Maryland firm submitting the lowest responsive and responsible bid in order to determine
Contract award.
(b) A competitive advantage may include:
(1) A percentage preference;
(2) An employee residency requirement;
(3) Any other provision that favors a nonresident firm over a Maryland firm.
(c) This provision GP-2.21 shall not apply if it conflicts with any Federal grant or regulation
affecting this Contract.
GP-2.22 MULTIPLE OR ALTERNATE BIDS.
05-30-17
CONTRACT NO. CH257B51
SPECIAL PROVISIONS F.A.P NO. AC-TAP-3(871)E
GP – SECTION 2 — BIDDING REQUIREMENTS AND CONDITIONS 10 of 10
Unless multiple or alternate bids are requested in the solicitation, these bids may not be accepted.
However, if a bidder clearly indicates a base bid, it shall be considered for award as though it were
the only bid submitted by the bidder.
GP-2.23 BID PROTESTS.
A bid protest must be in writing and filed with the procurement officer. Oral objections, whether
or not acted on, are not protests.
(a) Time for Filing.
(1) A bid protest shall be filed not later than 7 days after the basis for protest is known or
should have been known, whichever is earlier.
(2) A protest based on alleged improprieties in the solicitation which are apparent before the
bid opening or the closing date for receipt of initial proposals shall be filed before the
opening date or the closing date for receipt of initial proposals.
(b) Content of Written Protest.
(1) Name and address of protestor.
(2) Bid or Contract number.
(3) Reasons for protest.
(4) Supporting exhibits, evidence or documents to support claim. If not available within
filing time, indicate expected availability date.
(5) Mark envelope "protest".
Bid protests will be resolved pursuant to COMAR 21.10.02.
05-30-17
CONTRACT NO. CH257B51
SPECIAL PROVISIONS F.A.P. NO. AC-TAP-3(871)E
TC - SECTION 2 — BIDDING REQUIREMENTS AND CONDITIONS 1 of 5
TERMS AND CONDITIONS
TC SECTION 2
BIDDING REQUIREMENTS AND CONDITIONS
DELETE: TC-SECTION 2 — BIDDING REQUIREMENTS AND CONDITIONS in its
entirety.
INSERT: The following.
TC-2.01 PROJECT CLASSIFICATION.
The Administration will estimate the cost of the Contract and classify it within one cost group
and letter designation as follows:
COST GROUP ESTIMATE COST GROUP LETTER CLASS
Up to $ 100 000 A
$ 100 001 to $ 500 000 B
$ 500 001 to $ 1 000 000 C
$ 1 000 001 to $ 2 500 000 D
$ 2 500 001 to $ 5 000 000 E
$ 5 000 001 to $ 10 000 000 F
$10 000 001 to $ 15 000 000 G
$ 15 000 001 to $ 30 000 000 H
$ 30 000 001 to $ 50 000 000 I
$ 50 000 001 to $ 75 000 000 J
$ 75 000 001 to $ 100 000 000 K
Over $ 100 000 000 L
The letter designation will be published as part of the Notice to Contractors.
TC-2.02 PREPARATION OF BID.
The requirements of GP2.06 (Preparation of Bid) is modified for Administration Contracts to
include the following after paragraph (a):
The Contractor may elect to submit the bid on forms generated in the development of the bid.
When approved, these forms may be submitted in lieu of the schedule of prices bid forms furnished
by the Administration in the Invitation for Bids. They shall emulate the forms currently furnished
by the Administration and contain the following information.
05-30-17
CONTRACT NO. CH257B51
SPECIAL PROVISIONS F.A.P. NO. AC-TAP-3(871)E
TC - SECTION 2 — BIDDING REQUIREMENTS AND CONDITIONS 2 of 5
(1) State and Federal Contract Nos.
(2) Administration Item Nos.
(3) Administration Category Code Nos.
(4) Administration Proposed Quantities
(5) Description of Items
(6) Unit Price
(7) Total Cost of Each Item
(8) Total Bid Amount
The document shall be 8-1/2 X 11 inches, and in landscape format. The font size shall be at least
10 points, with horizontal lines dividing each item. Addendums that revise items or quantities shall
be noted on all affected Schedule of Prices sheets. Any special bid requirements that are noted in
the Schedule of Prices shall also be listed on the form.
A sample of the form shall be submitted to the Administration at least 14 days prior to the
scheduled bid opening. Contractor generated forms shall be approved in writing prior to use. If the
forms were previously approved on another Administration project and were not changed, they
need not be resubmitted for each project.
Sample forms shall be submitted to:
Maryland State Highway Administration
Director, Office of Construction
Contracts Award Team
7450 Traffic Drive
Hanover, Maryland 21076
TC-2.03 VALUE ENGINEERING CHANGE PROPOSALS.
The Contractor may submit to the District Engineer, in writing, Value Engineering Change
Proposals (VECP) for modifying the Contract Documents for the purpose of reducing the total
cost of construction without reducing design capacity or quality of the finished product. The
District Engineer will then forward the proposal to the Chief Engineer with recommended action.
The final decision to accept or deny the VECP will be made by the Chief Engineer. The
Administration will not consider appeals once the final decision is made. If accepted by the
Administration, net savings resulting from a VECP will be equally divided between the
Administration and the Contractor.
05-30-17
CONTRACT NO. CH257B51
SPECIAL PROVISIONS F.A.P. NO. AC-TAP-3(871)E
TC - SECTION 2 — BIDDING REQUIREMENTS AND CONDITIONS 3 of 5
The Contractor may elect to pursue one of the following options:
Option 1—Submit the detailed plans, specifications, and estimate of savings, or
Option 2—Submit a written concept of the VECP for tentative approval and if accepted, submit
the detailed plans, specifications, and estimate for final approval at a later date.
Each VECP shall result in a net savings to the Contract cost without impairing essential functions
and characteristics of the items or of any other part of the project, including but not limited to
service life, reliability, economy of operation, ease of maintenance, desired aesthetics, and safety.
As a minimum, the Contractor shall submit the following information before final approval of a
VECP can be given:
(a) A statement that the proposal is submitted as a VECP.
(b) A statement concerning the basis for the VECP and benefits to the Administration, together
with an itemization of the Contract items and requirements affected by the VECP.
(c) A detailed estimate of the cost under the existing Contract and under the VECP.
(d) Proposed plans, specifications, and recommendations as to how the VECP changes shall be
accomplished.
(e) A statement as to the time by which a change order adopting the VECP must be issued so as
to obtain the maximum cost effectiveness. The Administration will require 30 days to review
and approve a VECP.
(f) The Contractor's engineering cost for the VECP.
The Administration will process the VECP in the same manner as prescribed for any other
proposal that would necessitate issuance of a change order. The Administration may accept, in
whole or in part, any VECP by issuing a change order, which will identify the VECP on which it
is based. The Administration will not be liable to the Contractor for failure to accept or act upon
any VECP submitted pursuant to these requirements nor for any delays to the work attributable to
any VECP proposal. Until a proposal is affected by a change order, the Contractor shall remain
obligated to the terms and conditions of the existing Contract. If an executed change order has not
been issued by the date upon which the Contractor's proposal specifies that a decision should be
made, or any other date as the Contractor may subsequently have specified in writing, the proposal
shall be deemed rejected.
05-30-17
CONTRACT NO. CH257B51
SPECIAL PROVISIONS F.A.P. NO. AC-TAP-3(871)E
TC - SECTION 2 — BIDDING REQUIREMENTS AND CONDITIONS 4 of 5
The change order affecting the necessary Contract modification will establish the net savings
agreed upon, will provide for adjustment in the Contract prices or Contract time, and will indicate
the net savings to be equally divided between the Contractor and the Administration. The
Contractor's costs for preparation of the VECP and the Administration's costs to review and
administer the VECP will be deducted from the gross savings. The Administration reserves the
right to include in the agreement any conditions it deems appropriate for consideration, approval,
and implementation of the proposal. The Contractor's 50 percent share of the net savings shall
constitute full compensation for affecting all changes pursuant to the agreement.
Acceptance of the VECP and performance of the additional work will not change the Contract
time limit as a result of the VECP, unless specifically provided for in the change order authorizing
the VECP.
The Administration expressly reserves the right to adopt a VECP for general use in Contracts
administered by the Administration when it determines that the proposal is suitable for application
to other Contracts. VECPs identical or similar to previously submitted proposals will be eligible
for consideration and compensation under these provisions if such proposals were not previously
adopted for general application to other Contracts administered by the Administration. When a
VECP is adopted for general use, compensation pursuant to these requirements will be applied
only to those Contracts awarded and for which the subject VECP has been submitted prior to the
date of adoption of the specific VECP.
Proposed changes in the basic design of a bridge or pavement type, or requiring modification to
the right of way limits, will not normally be considered as an acceptable VECP. Quantity decreases
or elimination of any Contract pay items as a result of changing field conditions, errors, etc. will
not be considered as an acceptable VECP. If a VECP is based upon or similar to a change in the
Plans, Specifications, or Special Provisions adopted by the Administration prior to submission of
the VECP, the Chief Engineer will reject the proposal.
These requirements apply to all VECPs initiated and developed by the Contractor and which are
identified as such by the Contractor at the time of its submission to the Chief Engineer; however,
nothing herein shall be construed as requiring the Chief Engineer to consider or approve a VECP
submitted by the Contractor.
Subject to these provisions, the Administration or any other public agency will have the right to
use all or part of any accepted VECP on other projects without obligation or compensation of any
kind to the Contractor.
In the event a VECP is accepted by the Administration, the provisions of the Contract Documents
that pertain to adjustment of Contract unit prices due to alterations of Contract quantities will not
apply to the items adjusted or deleted as a result of affecting the VECP by change order.
05-30-17
CONTRACT NO. CH257B51
SPECIAL PROVISIONS F.A.P. NO. AC-TAP-3(871)E
TC - SECTION 2 — BIDDING REQUIREMENTS AND CONDITIONS 5 of 5
TC-2.04 OWNER/OPERATOR.
For the purpose of labor compliance, the term "Owner/Operator" will be defined as being the
individual who owns and operates their own vehicle.
The prevailing wage rates shall not apply to these individuals. However, they shall appear on the
payroll of the Contractor or subcontractor with the notation "Owner/Operator".
Employees of Owner/Operator shall be subject to prevailing wage rates and shall appear on a
certified payroll.
TC-2.05 DEBARMENT/SUSPENSION.
Pursuant to the emergency regulations which were approved by the Administrative and
Executive Legislative Review (AELR) Committee of the Maryland General Assembly on July 27,
1982, and which went into effect on July 28, 1982, the Maryland Department of Transportation,
State Highway Administration has pursuant to applicable laws and regulation established a list of
Debarred or Suspended Contractors.
The current list of Debarred or Suspended Contractors or Suppliers is available at the
Administration’s Cashier’s Office, Baltimore, Maryland.
TC-2.06 PARTNERING.
The Administration invites the Contractor, subcontractors, and suppliers to participate in a
voluntary partnership agreement for the work. The partnership will be structured to draw on the
strengths of each organization through open communication, teamwork, and cooperative action to
identify and achieve reciprocal goals. The objectives are effective and efficient Contract
performance, completion within the Contract bid price, on schedule, and in conformance with the
Contract Documents. This partnership will not change the legal relationship of the parties to the
Contract nor relieve any party from any of the terms of the Contract.
The Administration will contact the Contractor to determine if there is an interest in partnering.
If the Contractor is interested, the Administration's Assistant District Engineer Construction and
the Contractor's management representative will meet, plan, and organize a partnering
development team. Persons recommended to be on the team are: The Administration's District
Engineer, Assistant District Engineer, Area Engineer, Construction Project Engineer, and Project
Design Engineer, the Contractor's designated on site project manager, and key project supervision
personnel of both the Contractor and principal subcontractors and suppliers. FHWA and key local
government personnel will also be invited to attend as necessary. The initial workshop team
meeting will be held prior to the Preconstruction Conference. Follow up workshops may be held
regularly as agreed by the Contractor and the Administration.
The partnership will be bilateral. Participation is voluntary. All partnering costs will be shared
equally by the Contractor and the Administration.
05-30-17
CONTRACT NO. CH257B51
SPECIAL PROVISIONS FAP NO. AC-TAP-3(871)E
TC — 4.02 FAILURE TO MAINTAIN PROJECT 1 of 1
TERMS AND CONDITIONS
TC SECTION 4
CONTROL OF WORK
TC-4.02 FAILURE TO MAINTAIN PROJECT
ADD: As a third paragraph.
Additionally, an appropriate deduction will be made from the Contractor's next progress estimate
for each day or portion thereof that Maintenance of Traffic deficiencies exist, and will continue until
the deficiencies are satisfactorily corrected and accepted by the Engineer. Any portion of a day will
be assessed a full day deduction. The deduction will be equal to a prorata share of the lump sum price
bid for Maintenance of Traffic or an amount prorated from the Engineer's estimate, whichever is
more. The amount prorated will be the per diem amount established by using the working days (based
upon calendar dates when required) divided into the total value of the bid item or the Engineer's
estimate of that item, whichever is more.
The above noted deduction will be assessed on the next progress estimate if:
The Contractor does not take action to correct the deficiencies and properly assume the
responsibilities of maintaining the project (as determined by the Engineer) within four hours of
receiving a notice to comply with the required maintenance provisions.
The deduction will be equal to the daily prorated share of the lump sum price bid for Maintenance
of Traffic or $300 per day, whichever is more for each day or portion thereof that the deficiencies
exist, and will continue until the deficiencies and proper assumption of the required maintenance
provisions are satisfactorily corrected and accepted by the Engineer. The amount of monies deducted
will be a permanent deduction and are not recoverable. Upon satisfactory correction of the
deficiencies, payment of the Maintenance of Traffic lump sum item will resume.
05-30-17
CONTRACT NO. CH257B51
CONTRACT PROVISIONS F.A.P. NO. AC-TAP-3(871)E
ADDENDUM RECEIPT VERIFICATION FORM 1 of 1
ADDENDUM RECEIPT VERIFICATION FORM
COMAR 21.05.02.08 requires that all addenda issued be acknowledged, therefore before bids
may be considered responsive, the Maryland State Highway Administration must receive
verification that all bids considered the contents of all Contract Documents and all Addenda issued,
as applicable, for this project.
I do solemnly declare and affirm under the penalties of perjury that this bid was prepared by this
firm, including all subcontractors and suppliers, with consideration of all the information contained
in the as advertised Contract Documents and all Addenda issued, as applicable.
NO ADDENDA WERE ISSUED
ADDENDUM NO. 1 to
(Must be filled in by the bidder – if only one Addendum enter 1 in the blank space provided)
Date:
By:
(print name of Authorized Representative)
(signature of Authorized Representative)
05/30/2017
OOC1 03/01/04
MARYLAND STATE HIGHWAY ADMINISTRATION
EXPERIENCE AND EQUIPMENT CERTIFICATION
Contract No. CH257B51
F.A.P. No. AC-TAP-3(871)E
I. General
(a) Legal Title, Address and Phone Number of Organization
(b) Maryland Representative's Name, Title and Address
(c) Corporation Co-Partnership Individual (Check One)
II. Name and Title of Corporation Officers authorized to sign Contract Documents, Change Orders,
Estimates, and other pertinent Contract Forms. Please be advised that it will be necessary to
inform the Maryland State Highway Administration of any changes in the above authorization.
NAME TITLE
III. Experience
(a) Indicate type of contracting undertaken by your organization and years of experience.
Prime Contractor: Type:
Years
Subcontractor:
Years
(b) State construction experience of principal members of your organization.
Construction Experience
Constr.
Title (Pres., Experience Type of Work (Hwy. In What Capacity
Name Mgr., etc.) (Years) Bridges, Paving, etc.) (Foreman, Supt., etc.)
Page 1 of 4
OOC1 03/01/04
Contract No. CH257B51
Construction Experience (Con't.) F.A.P. No. AC-TAP-3(871)E
Name Title Years Type of Work Capacity
(c) Give any special qualifications of firm members (Registered Engineer, surveyors, etc.)
(d) List some principal projects completed by your organization.
Prime Contractor/Subcontractor Your Contract
Description (If Sub., what type of work) Amount Year
(e) Have you ever performed work for the US Government? ; any State Government? ;
any County or City Government? ; If yes to any of the above, please list references.
References:
(f) Have you ever failed to complete any work awarded you?
If so, where and why?
(g) Has any officer or partner of your organization ever been an officer or partner of some other
organization that failed to complete a construction contract? If so, state name of
individual, other organization and reason therefore:
(h) Has any officer or partner of your organization ever failed to complete a construction contract
handled in his own name? If so, state name of individual, name of Owner and reason
therefore:
Page 2 of 4
OOC1 03/01/04
Contract No. CH257B51
F.A.P. No. AC-TAP-3(871)E
IV. Equipment
(a) What equipment do you own, or intend to rent or buy for use on this project without adversely
affecting S.H.A. projects now under Construction by your organization?
Date
Years Present Avail. for
Quantity Item Description, Size Capacity Cond. of Ser. Location project
V. Award of Contract
(a) If awarded this contract, do you intend to sublet any portion of the work? If so, state
item numbers or description, and if known the name and address of the subcontractor.
(b) Work presently under contract to, or pending award to your organization.
Contract No. or % of Work % to be Probable Date
Description Total Cost of Project Completed Completed of Completion
Page 3 of 4
OOC1 03/01/04
Contract No. CH257B51
F.A.P. No. AC-TAP-3(871)E
VI. Bidder Certification
The above statements are certified to be true and accurate, and we have the equipment, labor, supervision,
and financial capacity to perform the work on this Contract, either with our organization, or with
subcontractors, as provided in GP-8.01 and TC-5.03.
Dated at this day of ,
By:
(SEAL)
(Signature)
(Printed Name of Person Signing) (Title)
(Name of Organization)
STATE OF
SS:
COUNTY OF
being duly sworn, states that he is
(Title)
of and that the answers to the foregoing
questions and all statements therein contained are true and correct.
Sworn to before me this day of ,
Notary Public
My Commission Expires:
Page 4 of 4
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
SPECIFICATIONS
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
DIVISION 1 - GENERAL REQUIREMENTS
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
SECTION 01010
SUMMARY OF WORK
PART 1 - GENERAL
1.01 SECTION INCLUDES
A. Project Description.
B. Project Location.
C. Contractor's Use of Premises.
D. Work Sequence.
E. Special Requirements.
1.02 PROJECT DESCRIPTION
A. VILLAGE GREEN RESTROOM FACILITY– This project includes the construction of
a new restroom/pavilion building, signage, pavement markings, sidewalks, and related
incidentals. The project is located in Indian Head, Charles County, Maryland.
1.03 PROJECT LOCATION
A. Project site is located in Village Green Park in the Town of Indian Head, Charles County, Maryland.
1.04 CONTRACTOR'S USE OF PREMISES
A. Confine construction equipment, the storage of materials and equipment, and operations
of workmen to within the Project site.
B. Assume full responsibility for materials stored on site.
C. Transport materials remaining at the completion of the Project for which the Owner has
made payment to a storage area designated by the Owner.
D. The Contractor shall limit his use of the premises to the Work indicated, so as to allow
for Owner occupancy.
6508.22 01010-1 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
1. Keep existing driveways and entrances serving the premises clear and available to
the Owner and his employees at all times. Do not use these areas for parking or
storage of materials.
2. Do not unreasonably encumber the site with materials or equipment. Confine
stockpiling of materials and location of storage sheds to the areas designated by the
Owner. If additional storage is necessary obtain and pay for such storage off site.
E. Full Owner Occupancy: The Owner may occupy the site during the entire period of
construction. Cooperate fully with the Owner or his representative during construction
operations to minimize conflicts and to facilitate Owner usage. Perform the Work so as
not to interfere with the Owner's operations.
F. The contractor shall properly dispose of all waste excavation offsite. The Town does not
have a waste area available.
1.05 WORK SEQUENCE
A. The Work sequence outlined and described below is presented as a general guideline.
1. Erect sediment and erosion control measures, including the temporary stabilized
construction entrance at the location of the permanent entrance.
2. Erect temporary maintenance of traffic facilities for the work.
3. Construct new restrooms.
4. Construct site improvements.
5. Intall final stabilization of disturbed areas.
6. Remove sediment and erosion control and stabilize area.
B. Site Work: Storm water control, etc. is to be maintained throughout the project.
C. Sequence construction operations to:
1. Minimize inconvenience to the school operation located adjacent to the Project.
2. Minimize disruption of traffic and maintain continuous traffic flow through the
Work area to the maximum extent practicable.
3. Maintain continuous access to the Project site for the Owner.
1.06 SPECIAL REQUIREMENTS
A. Perform construction activities in such manner that the Owner will have access to
existing facilities at all times.
B. If the nature of construction work requires temporary disruption, relocation, or
modification of utility services to businesses, public facilities, or residences adjacent to
the Project, provide temporary services by methods approved by the utility company and
the Engineer. Cost of such temporary services is considered to be included in the Bid
price(s) and no extra compensation will be allowed. If the Contractor's operations result
6508.22 01010-2 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
in extended (in excess of one hour) interruption of services, Owner or Engineer may
direct utility company to correct such interruptions and the utility company's costs will
be charged to the Contractor.
C. In the event that utility relocations or modifications are required during the Work, make
arrangements with the affected utility company to perform such relocations or
modifications. Cost of such utility relocations or modifications is considered part of the
Bid price(s) and no extra compensation will be allowed.
PART 2 - PRODUCTS
NOT APPLICABLE TO THIS SECTION
PART 3 - EXECUTION
NOT APPLICABLE TO THIS SECTION
END OF SECTION
6508.22 01010-3 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
SECTION 01025
MEASUREMENT AND PAYMENT
PART 1 - GENERAL
1.01 SECTION INCLUDES
A. Applications for Payment.
B. Payment for Tests and Inspections.
C. Products Stored on Project Site.
D. Payment for Base Bid Items.
E. Payment for Contingency Items
1.02 APPLICATIONS FOR PAYMENT
A. Submit four copies of Application for Payment at times specified in Paragraphs 14.2 and
14.12 of the General Conditions.
B. Submit Application for Payment on form which has been used for the Schedule of
Values and approved by the Engineer.
C. Include following Contractor's signed certification on Application for Payment:
The undersigned Contractor certifies that (1) all previous progress payments received
from Owner on account of Work done under the Contract have been applied to
discharge in full all obligations of Contractor incurred in connection with Work covered
by prior Applications for Payment numbered 1 through X inclusive; (2) title to all
materials and equipment incorporated in said Work or otherwise listed in or covered by
this Application for Payment will pass to Owner at time of payment free and clear of all
liens, claims, security interests, and encumbrances (except such as covered by Bond
acceptable to Owner indemnifying Owner against any such lien, claim, security interest,
or encumbrance); and (3) all Work covered by this Application for Payment is in
accordance with the Contract Documents and is not defective, as that term is defined in
the Contract Documents.
6508.22 01025-1 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
1.03 PAYMENT FOR TESTS AND INSPECTIONS
A. Include the costs of shop tests and shop inspections in the price of the manufactured
Products, and no separate or extra payment will be made for such tests and inspections.
B. Contractor shall employ and pay for the services of an independent firm(s) to perform
laboratory and field testing and inspections as required in the various Specification
Sections. Obtain approval of the proposed testing and inspection firms from Engineer.
Costs of such tests and inspections shall be included in the bid prices and no separate or
extra payments will be made.
1.04 PRODUCTS STORED ON PROJECT SITE
A. Payment will not be made for Products stored on the Project site but not yet incorporated
in the Work.
1.05 ITEMS FOR BASE BID
A. Item No. 1 –Restroom
This item will not be measured for payment, but will be paid for at the lump sum
contract price. Payment will include all labor, materials, rentals, equipment, overhead
and profit for furnishing and installing: bonds; mobilization and demobilization;
clearing and grubbing; masonry building with metal roof; plumbing fixtures and
piping; sidewalks; excavation and backfill; painting; heating, lighting and ventilation;
electrical wiring and panel box; baby changing stations, grab bars, toilet partitions,
hand dryers, paper dispenser, mirrors, storm drains, drywells, pavement markings,
signage, sediment and erosion control; and all other improvements as shown on the
plans.
PART 2 - PRODUCTS
NOT APPLICABLE TO THIS SECTION
PART 3 - EXECUTION
NOT APPLICABLE TO THIS SECTION
END OF SECTION
6508.22 01025-2 ARRO
TOWN OF INDIAN HEAD –TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
SECTION 01040
COORDINATION
PART 1 - GENERAL
1.01 SECTION INCLUDES
A. Coordination.
1.02 COORDINATION
A. Coordinate scheduling, submittals, and Work of the various Sections of Specifications to
assure efficient and orderly sequence of installation of interdependent construction
elements.
B. Do not unload or store materials or equipment where they will interfere with the
progress of the Project or delay the work of other Contractors.
C. Coordinate completion and clean up of Work of separate Sections in preparation for
Substantial Completion and for portions of Work designated for Owner's partial
occupancy.
D. After Owner occupancy of premises, coordinate access to site for correction of defective
Work and Work not in accordance with Contract Documents, to minimize disruption of
Owner's activities.
PART 2 - PRODUCTS
NOT APPLICABLE TO THIS SECTION
PART 3 - EXECUTION
NOT APPLICABLE TO THIS SECTION
END OF SECTION
6508.22 01040-1 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
SECTION 01050
FIELD ENGINEERING
PART 1 - GENERAL
1.01 SECTION INCLUDES
A. Reference surveys.
B. Construction control surveys.
1.02 REFERENCE SURVEYS
A. Location of baselines with reference points and reference benchmarks are shown on the
Drawings. Contractor, at no additional cost to Owner, shall provide and pay for the
services of a surveyor to establish construction baselines and construction benchmarks
from the reference points indicated on the Drawings.
B. Surveys shall be performed by a surveyor registered in the State of Maryland.
C. Obtain approval of proposed surveyor from Engineer prior to the start of field surveys.
D. During progress of the Work, protect and preserve reference points, baselines, and
benchmarks. Report to Engineer the loss or destruction of any reference points or
permanent benchmarks. Replace any damaged or dislocated reference points or
permanent benchmarks at Contractor's expense.
1.03 CONSTRUCTION SURVEYS
A. Contractor, at no additional cost to Owner, shall provide and pay for surveys to establish
locations of the Work.
B. Establish and stake locations for:
1. Building corners
2. Location and elevations for site improvements including sidewalks, and utility
lines.
3. Location and elevation of pipeline connections and other utilities.
6508.22 01050-1 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
C. If, during the construction surveys, Contractor discovers an apparent problem with the
reference surveys, immediately report this situation to the Engineer. Do not proceed
with construction until the problem has been resolved and, if required, the reference
surveys have been corrected.
PART 2 - PRODUCTS
NOT APPLICABLE TO THIS SECTION
PART 3 - EXECUTION
NOT APPLICABLE TO THIS SECTION
END OF SECTION
6508.22 01050-2 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
SECTION 01200
PROJECT MEETINGS
PART 1 - GENERAL
1.01 SECTION INCLUDES
A. Preconstruction conference.
B. Progress meetings.
C. Preinstallation conferences.
1.02 PRECONSTRUCTION CONFERENCE
A. Engineer will schedule a conference to be held prior to Contractor's commencement of
the Work.
B. Attendance:
1. Owner's representatives
2. Engineer
3. Contractor (attendance required)
4. Major Subcontractors
5. Governmental agency representatives, utility representatives, and other parties who
may have control of, or may be affected by, the Work.
C. Agenda Items (as applicable to the Project):
1. Designation of Contractor's supervisory personnel and phone numbers to be used in
event of an emergency during non-working hours.
2. List of major Subcontractors and suppliers
3. List of proposed Products
4. Schedule of Shop Drawing submissions
5. Schedule of Values
6. Construction progress schedule and work sequencing
7. Utility relocations
8. Procedures for submittals; Field Orders and Change Orders; and Applications for
Payment
9. Control points
10. Record documents
11. Project coordination
6508.22 01200-1 ARRO
TOWN OF INDIAN HEAD –TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
12. Site security
13. Temporary utilities
14. Field offices
15. Housekeeping
16. Safety and first-aid procedures
17. Environmental requirements
D. Engineer will preside at conference and prepare minutes for distribution to participants.
1.03 PROGRESS MEETINGS
A. Engineer will schedule progress meetings throughout the construction period at intervals
of one month.
B. Attendance:
1. Owner's representative.
2. Contractor's Project Superintendent (attendance required) and other Contractor(s)
representatives.
3. Major Subcontractors and suppliers.
4. Others as appropriate for agenda topics for each meeting.
C. Agenda:
1. Review minutes of previous meetings.
2. Review of Work progress.
3. Field observations, problems, and decisions.
4. Identification of problems which impede planned progress.
5. Review of submittals schedule and status of submittals.
6. Review of off-site fabrication and delivery schedules.
7. Maintenance of progress schedule.
8. Corrective measures to regain projected schedules.
9. Planned progress during succeeding work period.
10. Coordination of projected progress.
11. Maintenance of quality and work standards.
12. Effect of proposed changes on progress schedule and coordination.
13. Other business relating to Work.
D. Engineer will conduct meeting and prepare minutes for distribution to participants.
1.04 PREINSTALLATION CONFERENCES
A. When preinstallation conference is required in individual Specification Section, notify
Engineer at least seven days prior to start of installation.
6508.22 01200-2 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
B. Engineer will schedule conference to be held prior to start of installation.
C. Attendance: Parties directly affecting, or affected by, work of the specific Section.
D. Engineer will prepare agenda, preside at conference, record minutes, and distribute
copies within five days after conference to participants.
E. At conference, Contractor shall review conditions of installation, preparation and
installation procedures, and coordination with related work.
PART 2 - PRODUCTS
NOT APPLICABLE TO THIS SECTION
PART 3 - EXECUTION
NOT APPLICABLE TO THIS SECTION
END OF SECTION
6508.22 01200-3 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
SECTION 01300
SUBMITTALS
PART 1 - GENERAL
1.01 SECTION INCLUDES
A. Submittal procedures.
B. Action on submittals.
C. Shop Drawings.
D. Product data.
E. Samples.
F. Manufacturers' instructions.
G. Manufacturers' certificates.
H. Construction Progress Schedule.
I. Submittals specified in other Documents/Sections.
1.02 SUBMITTAL PROCEDURES
A. Transmit each submittal with Engineer accepted form.
B. Number each submittal. Number shall consist of the following parts, each separated by
a dash:
1. Contract number.
2. Five-digit Specification Section number.
3. Two-digit sequence number starting for each Specification Section with 01 and
continuing with 02, 03, etc., for subsequent submittals with the same Specification
Section number.
4. Use the fourth part of the number only for resubmittals. For the first resubmittal of
a previous submittal, add -R1 to the previous number. For the second resubmittal,
change to -R2, and so on.
6508.22 01300-1 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
As an example of the numbering process for Contract Number 1, the third
submittal under Section 03300 would be numbered 1-03300-03 and the second
resubmittal of this same submittal would be numbered 1-03300-03-R2.
C. Identify Project, Contractor, Subcontractor, or supplier. Identify pertinent Drawing
sheet and detail number(s), and Specification Section number, as appropriate.
D. Apply Contractor's stamp, signed or initialled certifying that review, verification of
Products required, field dimensions, adjacent construction Work, and coordination of
information, is in accordance with the requirements of the Work and Contract
Documents. Stamp shall have the following format:
Approved for Contract Requirements
The Contractor's signature below indicates that this Submittal has been checked
with the Drawings, Specifications, and site conditions and found to meet all
requirements of same including dimensions, and that the Contractor's guarantee
fully applies to the Product(s) covered.
RE: Project
Submittal Number
Drawing Sheet Number Detail Number
Deviations from Contract Documents? No Yes
(letter attached)
By
Signature (Contractor)
Contractor's Name
E. Schedule submittals to expedite the Project, and deliver to Town at business address.
Town will forward submittals to Engineer. Coordinate submission of related items.
F. Submit letter which specifically identifies deviations from Contract Documents.
Identify Product or system limitations which may be detrimental to successful
performance of the completed Work.
G. Where deviations from Contract Documents will affect the Work of another Contractor,
the Contractor making the submittal shall attach a letter from the other Contractor(s)
stating that the deviation will either:
6508.22 01300-2 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
1. Have no effect on the other Contractor's Work; or
2. Have an effect on the other Contractor's Work and that the Contractor making the
submittal has agreed to pay all extra costs associated with the deviation.
H. Provide space for Contractor, Owner and Engineer review stamps and signature.
I. Revise and resubmit submittals as required. Identify all changes made since previous
submittal.
J. Distribute copies of reviewed submittals to concerned parties. Instruct parties to
promptly report any inability to comply with provisions.
1.03 ACTION ON SUBMITTALS
A. General: Owner shall review and approve submittals prior to Engineer's Action.
B. Engineer's Action: Where action and return is required or requested, Engineer will
review each submittal, mark with the action taken, and where possible return within two
weeks of receipt. Where submittal must be held for coordination, Contractor will be so
advised by Engineer.
C. Submittals returned with "APPROVED" action indicate that the information submitted
was found to be in conformance with the design concept and in compliance with the
requirements of the Contract Documents. The Contractor remains responsible for work-
related errors, deviations, and discrepancies in the submittal, but may proceed with
performance of the work covered by the submittal.
D. Submittals returned with "APPROVED AS NOTED" action indicate that the
information submitted was found to be in conformance with the design concept and in
compliance with the requirements of the Contract Documents, provided the noted
clarifications or corrections are incorporated in the Work and in the Record Documents.
The Contractor remains responsible for work-related
errors, deviations, and discrepancies in the submittal, but may proceed with performance
of the work covered by the submittal. Resubmission of information is not required.
E. Submittals returned with "RETURNED FOR CORRECTION" action indicate that: (1)
information submitted is at least partially not in conformance with the design concept,
(2) information submitted is at least partially not in compliance with the requirements of
the Contract Documents, (3) submittal is incomplete and does not include all items
required by the individual Specification Sections, or (4) certifications or computations
required by the individual Specification Sections have not been included with the Shop
Drawings and Product data. Engineer will note the deficiencies or corrections required,
6508.22 01300-3 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
and return the submittal to the Contractor. Performance of the work covered by the
submittal shall not proceed until corrected information is submitted and approved.
F. Submittals returned with "NOT AS SPECIFIED" action indicate that the Engineer
interprets the information submitted to be not in conformance with the design concept or
not in compliance with the Contract Documents. This action may also indicate non-
compliance
with the Contractor's responsibility to review information and submit notification of
deviations and discrepancies for the Engineer's review. Performance of the work shall
not proceed until new information is submitted and approved.
G. Review Action does not establish submitted information as a Contract Document, a
Change Order, or authorization to deviate from the Contract Documents.
H. For all re-submittals except the first, Engineer and Engineer's consultants will record
manhours required for review of the re-submittal. At the discretion of the Engineer,
Contractor may be charged for review of such repeat re-submittals at Engineer's (and
Engineer's consultant's) current hourly rates. Charges for repeat re-submittals will be
subtracted from Contractor's next progress payment.
1.04 SHOP DRAWINGS
A. Submit the number of opaque reproductions which Contractor requires, plus four copies
which will be retained by Engineer.
B. After review, distribute in accordance with Article on "Submittal Procedures" above and
provide copies for Record Documents described in Section 01700 - Contract Closeout.
1.05 PRODUCT DATA
A. Submit the number of copies which the Contractor requires, plus four copies which will
be retained by the Engineer.
B. Mark each copy to identify applicable products, models, options, and other data.
Supplement manufacturers' standard data to provide information unique to this Project.
C. After review, distribute in accordance with Article on "Submittal Procedures" above and
provide copies for Record Documents described in Section 01700 - Contract Closeout.
6508.22 01300-4 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
1.06 SAMPLES
A. Submit samples to illustrate functional and aesthetic characteristics of the Product, with
integral parts and attachment devices. Coordinate sample submittals for interfacing
work.
B. Submit samples of finishes from the full range of manufacturers' standard colors,
textures, and patterns for Engineer's or Owner's selection.
C. Include identification on each sample, with full Project information.
D. Large, bulky samples may be submitted to the Resident Project Representative at the
Project site. Whenever a sample is submitted
at the Project site, immediately notify the Engineer of this submittal in writing.
1.07 MANUFACTURER'S INSTRUCTIONS
A. When specified in individual Specification Sections, submit manufacturers' printed
instructions for delivery, storage, assembly, installation, start-up, adjusting, and
finishing, in quantities specified for Product data.
B. Identify conflicts between manufacturers' instructions and Contract Documents.
1.08 MANUFACTURER'S CERTIFICATES
A. When specified in individual Specification Sections, submit manufacturers' certificate to
Engineer for review, in quantities specified for Product data.
B. Indicate Product conforms to or exceeds specified requirements. Submit supporting
computations, reference data, affidavits, and certifications as appropriate.
C. Certificates may be recent or previous test results on material or Product, but must be
acceptable to Engineer.
D. When required by individual Specification Sections, include computations signed and
sealed (or stamped) by a registered Professional Engineer.
E. When Supplementary Conditions specify certain regulatory restrictions concerning
origin of Products (for example, that any steel used on the Project must be a Product of
the United States), submit a certificate from Products manufacturer that Products
supplied to the Contractor are in conformity with the regulatory requirements.
6508.22 01300-5 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
F. Submit samples of Manufacturers' Warranty Certificate for each item requiring such in
quantities specified for Product Data.
1.09 CONSTRUCTION PROGRESS SCHEDULES
A. Submit four copies of progress schedule for Owner and Engineer review. Revise and
resubmit as required.
B. Submit revised schedules with each Application for Payment, identifying changes since
previous version.
C. Indicate submittal dates required for Shop Drawings, Product data, samples, and Product
delivery dates, including those furnished by Owner and under Allowances.
D. Do not include extensions to the Contract Time in revised progress schedules until such
extensions have been approved by Owner and Engineer in accordance with the General
Conditions.
E. Failure to submit an initial or revised progress schedule, acceptable to the Engineer,
before or with each Application for Payment will be considered a substantial violation of
the Contract Document provisions. In accordance with the General Conditions, the
Engineer may recommend that the Owner withhold payment of all or part of the amount
shown in an Application for Payment until an acceptable progress schedule is submitted.
F. Time unit used on progress schedule: Week.
G. Establish a dollar value for each schedule activity and include on the schedule.
H. Submit a bar chart (Gantt chart) showing, for each activity on each submittal:
1. Anticipated start date.
2. Anticipated completion date.
3. Actual start date.
4. Actual completion date.
5. Percentage of activity completed on date of each submittal.
1.10 SUBMITTALS SPECIFIED IN OTHER DOCUMENTS/SECTIONS
A. Schedule of Shop Drawing Submittals:
B. Requests for Substitutions: General Conditions 6.05, as amended by the Supplementary
Conditions.
6508.22 01300-6 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
C. Claim Documentation: General Conditions 10.05.
D. Documentation Required with Applications for Progress Payments and Final
Application for Payment: General Conditions
E. Emergency Crew Names, Addresses, and Telephone Numbers
F. Work Sequence: Section 01010.
G. Notice to Owner of Required Electrical Outages or Utility Service Interruptions:
Section 01010.
H. Applications for Payment: Section 01025.
I. Request for Approval of Field Survey Firm: Section 01050.
J. Construction Survey Drawing and Certification: Section 01050.
K. Supervisory Personnel Names and Phone Numbers: Section 01200.
L. Request for Approval of Independent Testing and Inspection Firm(s): Section 01025.
M. Reports on Tests and Inspections: Section 01400.
N. Manufacturers' Field Service Reports: Section 01400.
O. Plans for Supplementary Erosion and Sedimentation Control Facilities: Section 01560.
P. Request for Closeout Inspection: Section 01700.
Q. Record Documents: Section 01700.
R. Warranties: Section 01700.
PART 2 - PRODUCTS
NOT APPLICABLE TO THIS SECTION
PART 3 - EXECUTION
NOT APPLICABLE TO THIS SECTION
END OF SECTION
6508.22 01300-7 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
SECTION 01400
QUALITY CONTROL
PART 1 - GENERAL
1.01 SECTION INCLUDES
A. Quality assurance and control of installation.
B. References.
C. Inspection and testing laboratory services.
D. Manufacturers' field services and reports.
1.02 QUALITY ASSURANCE/CONTROL OF INSTALLATION
A. Monitor quality control over suppliers, manufacturers, Products, services, site
conditions, and workmanship, to produce Work of specified quality.
B. Comply fully with manufacturers' instructions, including each step in sequence.
C. Should manufacturers' instructions conflict with Contract Documents, request
clarification from Engineer before proceeding.
D. Comply with specified standards as a minimum quality for the Work except when
more stringent tolerances, codes, or specified requirements indicate higher
standards or more precise workmanship.
E. Perform work by persons qualified to produce workmanship of specified quality.
F. Secure Products in place with positive anchorage devices designed and sized to
withstand stresses, vibration, physical distortion or disfigurement.
1.03 REFERENCES
A. Conform to reference standards cited in Specifications.
6508.22 01400-1 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
B. Should specified reference standards conflict with Contract Documents, request
clarification for Engineer before proceeding.
C. The contractual relationship of the parties to the Contract shall not be altered from
the Contract Documents by mention or inference otherwise in any reference
document.
D. Any measurement or payment provisions included in a reference standard are not
applicable to this Project.
1.04 INSPECTION AND TESTING LABORATORY SERVICES
A. Method of paying for the services of an independent firm(s) to perform inspection
and testing is specified in Section 01025.
B. The independent firm will perform inspections, tests, and other services specified
in individual Specification Sections and as required by the Engineer.
C. Reports will be submitted by the independent firm to the Engineer, in duplicate,
indicating observations and results of tests and indicating compliance or non-
compliance with Contract Documents. Reports will be submitted to Engineer
within 48 hours after completion of test.
D. Cooperate with independent firm; furnish samples of materials, design mix,
equipment, tools, storage and assistance as requested.
1. Notify Engineer and independent firm at least 24 hours prior to expected time
for operations requiring services.
2. Make arrangements with independent firm and pay for additional samples and
tests required for Contractor's use.
E. Retesting required because of non-conformance to specified requirements will be
performed by the same independent firm on instructions by the Engineer. Payment
for retesting will be charged to the Contractor.
1.05 MANUFACTURERS' FIELD SERVICES AND REPORTS
A. When specified in individual Specification Sections, require Product suppliers or
manufacturers to provide qualified staff personnel to observe site conditions,
conditions of surfaces and installation, quality of workmanship, start-up of
equipment, and testing, adjusting, and balancing of equipment as applicable, and to
initiate instructions when necessary.
6508.22 01400-2 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
B. Submit report in duplicate within 14 days of observation to Owner and Engineer
for review.
PART 2 - PRODUCTS
NOT APPLICABLE TO THIS SECTION
PART 3 - EXECUTION
NOT APPLICABLE TO THIS SECTION
END OF SECTION
6508.22 01400-3 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
SECTION 01500
CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS
PART 1 - GENERAL
1.01 SECTION INCLUDES
A. Regulatory requirements.
B. Temporary electricity.
C. Temporary lighting.
D. Temporary telephone service to Contractor's field Office.
E. Temporary water service.
F. Temporary sanitary facilities.
G. Barriers.
H. Water control.
I. Dust control.
J. Exterior enclosures
K. Protection of installed work.
L. Security.
M. Parking.
N. Progress cleaning.
O. Contractor's field offices and sheds.
P. Safety equipment.
Q. Removal of utilities, facilities.
R. Contractor may elect to provide field office or shed and associated items.
6508.22 01500-1 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
1.02 REGULATORY REQUIREMENTS
A. Comply with applicable laws and regulations of authorities having jurisdiction,
including but not limited to building codes, health and safety regulations, utility
company regulations, and environmental protection regulations.
B. Provide electrical equipment which is UL listed.
1.03 TEMPORARY ELECTRICITY
A. Provide and pay for temporary electrical service required from utility company. Pay
invoices for temporary electricity. Provide meter separate from Owner's meter.
B. Provide step down transformers if required for temporary power.
C. Provide main service disconnect and overcurrent protection at convenient location.
D. Provide receptacles and branch wiring for construction operations.
E. Provide flexible power cords as required.
F. Provide engine-generator set to supply power where utility company service is not
available.
G. Provide engine-generator set where power requirements for operations such as welding
are beyond the capacity of the existing Owner's system.
H. Provide engine-generator set for all by-pass pumping operations.
1.04 TEMPORARY LIGHTING
A. Provide and maintain incandescent lighting for construction operations to achieve a
minimum lighting level of two watt/sq ft.
B. Provide and maintain one watt/sq ft lighting to exterior staging and storage areas after
dark for security purposes.
C. Provide and maintain 0.25 watt/sq ft lighting to interior work areas after dark for
security purposes.
6508.22 01500-2 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
D. Maintain lighting and provide routine repairs.
1.05 TELEPHONE SERVICE TO CONTRACTORS' FIELD OFFICE(S)
A. Provide, maintain, and pay for telephone service to field office(s).
1.06 TEMPORARY WATER SERVICE
A. Provide, maintain, and pay for suitable quality water service required.
1.07 TEMPORARY SANITARY FACILITIES
A. Provide and maintain required facilities and enclosures. Existing facilities shall not be
used.
B. Provide self-contained single-occupant toilet units of the chemical, aerated-circulation,
or combustion type. Units shall be properly vented and fully enclosed with a shell of
glass fiber-reinforced polyester or similar non-absorbent material.
1.08 BARRIERS
A. Provide barriers to prevent unauthorized entry to construction areas and to protect
existing facilities and adjacent properties from damage from construction operations.
B. Provide protection for plant life designated to remain. Replace damaged plant life.
C. Protect vehicular traffic, stored Products, site and structures from damage.
1.09 WATER CONTROL
A. Contractor assumes risk from flood damages to the work in progress or to work
completed. Make repairs and replacements to the satisfaction of the Engineer.
B. Contractor assumes responsibility for damages to property caused by flooding due to
blocking or restriction of storm water passages and natural waterways.
C. See other water control requirements under Section 01560 -- "Sediment and Erosion
Control".
6508.22 01500-3 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
1.10 DUST CONTROL
A. Maintain all work areas, both on and off the Project site, free from dust.
B. Use sprinkling of water and/or, if approved by the Engineer or Resident Project
Representative, chemical or light bituminous treatment to control dust.
C. Where sprinkling is used, repeat at intervals as required to keep all parts of the disturbed
area at least damp at all times.
D. Perform dust control whenever a dust nuisance or hazard occurs and whenever directed
by the Engineer or Resident Project Representative.
1.11 EXTERIOR ENCLOSURES
A. Provide temporary weather-tight closure of exterior openings to accommodate
acceptable working conditions and protection for Products, to allow for temporary
heating and maintenance of required ambient temperatures identified in individual
Specification Sections, and to prevent entry of unauthorized persons.
B. Provide access doors with self-closing hardware and locks.
1.12 PROTECTION OF INSTALLED WORK
A. Protect installed Work and provide special protection where specified in individual
Specification Sections.
B. Provide temporary and removable protection for installed Products. Control activity in
immediate work area to minimize damage.
1.13 SECURITY
A. Provide security and facilities to protect Work from unauthorized entry, vandalism, or
theft.
1.14 PARKING
A. When site space is not adequate, provide additional off-site parking.
6508.22 01500-4 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
1.15 PROGRESS CLEANING
A. Maintain areas free of waste materials, debris, and rubbish. Maintain site in a clean and
orderly condition.
B. Remove waste materials, debris, and rubbish from site daily and dispose off-site.
C. Remove mud and construction debris on a daily basis from paved surfaces used by the
Contractor.
1.16 CONTRACTORS' FIELD OFFICES AND SHEDS (OPTIONAL)
A. Office: Weather-tight, with lighting, electrical outlets, heating, cooling and ventilating
equipment, and equipped with sturdy furniture, drawing rack, and drawing display table.
B. Locate offices and sheds a minimum distance of 50 feet from existing and new
structures.
1.17 SAFETY EQUIPMENT
A. First Aid Supplies: Comply with governing regulations.
B. Fire Extinguishers:
1. Provide wall-mounted fire extinguishers for temporary offices and for work spaces.
2. Comply with NFPA 10 and 241 for classification, extinguishing agent, and size
required by location and class of fire exposure.
1.18 REMOVAL OF UTILITIES, FACILITIES, AND CONTROLS
A. Remove temporary above grade or buried utilities, equipment, facilities, and materials
prior to Final Application for Payment inspection.
B. Clean and repair damage caused by installation or use of temporary work.
C. Restore existing facilities used during construction to original condition. Restore
permanent facilities used during construction to specified condition.
6508.22 01500-5 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
PART 2 - PRODUCTS
NOT APPLICABLE TO THIS SECTION
PART 3 - EXECUTION
NOT APPLICABLE TO THIS SECTION
END OF SECTION
6508.22 01500-6 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
SECTION 01560
SEDIMENT AND EROSION CONTROL
PART 1 - GENERAL
1.01 SECTION INCLUDES
A. Work required by regulations to prevent soil erosion and control sedimentation during
Work on the Project.
1.02 SEDIMENT AND EROSION CONTROL PLAN
A. The requirements of the Sediment and Erosion Control Plan are given in the following
Articles of this Section. Construction details for various Sediment and Erosion Control
measures are shown on the Drawings.
1.03 REGULATORY REQUIREMENTS
A. The sediment and erosion control measures are subject to inspection by State, county,
and local regulatory agencies. The Contractor shall be fully responsible for constructing
and maintaining the sediment and erosion control measures to the extent that they are, at
all times, acceptable to the regulatory agencies. The Contractor shall be liable for
payment of any fines or legal costs that the Owner may incur as a result of the
Contractor's failure to properly construct and maintain the sediment and erosion control
measures.
B. The objective of the "Sediment and Erosion Control Plan" is the protection of private
property. To assist any damaged property owners in redress of grievances, the following
stipulations are made:
1. Any silt, sediment, or mud leaving the construction site will be construed as
damage to neighboring property and evidence of negligence on the part of the
Contractor.
2. Any damages claimed by neighboring property owners will be rectified and
restitution made by the Contractor.
C. Comply with requirements of the State of Maryland, Charles County, or other State or
local agency having jurisdiction in the location of the project.
6508.22 01560-1 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
D. Comply with any local laws, codes, and regulations concerning the construction and
maintenance of sediment and erosion control measures.
1.04 MINIMUM CONSTRUCTION SEQUENCE
A. Install all sediment and erosion control measures prior to start of clearing operations.
B. Conduct construction operations in accordance with the following general sequence:
1. Construction of sediment and erosion control measures including ditches, swales,
silt fences, and construction entrances.
2. Clearing, removal of debris, and stockpiling of soil materials.
3. Construction of stabilized construction roads, temporary parking lots, and
construction staging areas.
4. Excavation and, if required, embankment construction.
5. Construction of structures, pipelines, and other items required by the Contract
Documents.
6. Backfilling, final grading, paving, seeding, and other ground stabilization.
7. Removal of temporary sediment and erosion control measures.
1.05 GENERAL SEDIMENT AND EROSION CONTROL METHODS/PROCEDURES
A. In all cases, the smallest practical area of land surface shall be disturbed.
B. Stripped topsoil shall be placed up slope from proposed construction areas where
possible. Stockpiles shall be stabilized if to remain in place longer than 20 days.
Topsoil shall be kept separate from all other materials.
C. Utility excavations shall be open only long enough to properly install and inspect all
underground facilities in accordance with applicable Specification Sections.
D. Excavated material shall be placed up slope from the excavation whenever possible.
Runoff from spoil piles shall be directed through a sediment filter structure and
discharged in a non-erosive manner. Stockpiles of excavated material shall be stabilized
if to remain in place longer than 20 days.
E. Dewatering equipment discharge shall be directed onto a stabilized surface so that
erosion does not occur. Discharges shall be directed through a sediment filter structure
or sedimentation basin and discharged in a non-erosive manner.
6508.22 01560-2 ARRO
TOWN OF INDIAN HEAD –TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
F. Backfilled excavations shall be restored to original type of cover and grade in
accordance with Specifications. Temporary stabilization is required for any and all
erodible/soluble areas and materials to be exposed for a period of time exceeding 20
days.
G. Areas to be seeded or sodded shall be finish graded with six inches of topsoil unless
otherwise specified. Positive drainage shall be maintained away from all structures. No
isolated low spots shall be created.
1.06 SPECIFIC SEDIMENT AND EROSION CONTROL PROCEDURES
A. Clearing/Grubbing:
1. Upstream diversion facilities shall be constructed and operational prior to removal
of vegetation from Project areas. This system shall divert surface runoff away from
the construction area.
2. A temporary diversion and collection system shall be provided at the downstream
limits of all areas to be stripped. This facility shall be in place and functional prior
to stripping operations. This system shall collect sediment-carrying water from the
construction area and convey it to temporary or permanent sediment traps for
non-erosive discharge onto stabilized areas.
3. Temporary and permanent sediment traps and discharge structures shall be located
such that all surface water leaving the construction area passes through them.
B. Rough Grading/Foundation Excavation:
1. Upstream diversion facilities shall be re-established and relocated as required to
maintain function during excavation operations.
2. Temporary and permanent diversion and collection system shall be modified or
installed at the downstream limits of all areas to be excavated. All discharge from
such facilities shall be via either temporary or permanent sediment traps and
discharge structures.
3. Temporary and permanent sediment traps and discharge structures shall be
modified or installed at all points of discharge of sediment-carrying water.
C. Embankments:
1. As embankment areas are established, temporary diversions across the top of the
fill area shall be maintained so that no surface water from the top of the fill area is
discharged over the fill side slope. Top of slope diversions shall discharge into
temporary downdrain structures which shall be relocated as required until replaced
with permanent structures or directed to be removed. Temporary downdrains shall
be located as required to protect the fill side slope. Temporary downdrains may be
removed when contributing area is altered such that a concentrated flow of water
6508.22 01560-3 ARRO
TOWN OF INDIAN HEAD –TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
no longer reaches that location. Upon removal of the temporary downdrain
structure, the area where it was located shall be brought to finished grade and
seeded in accordance with Specifications.
2. Maximum exposed fill side slope shall be eight feet measured on the slope face.
The fill side slope shall be seeded and mulched or otherwise stabilized when
exposed face is equal to or greater than eight feet.
D. Stockpiles: Soil stockpile areas to remain in place for periods of time greater than 20
days shall be stabilized with temporary seeding.
E. Dewatering Operations: Dewatering operations, when required, shall discharge through
sediment traps onto non-erodible surfaces. Existing sediment trap structures may be
utilized or additional structures may be required.
F. Temporary Sediment Traps for Ditches and Swales:
1. Traps shall be installed immediately upon completion of the ditch or swale.
2. Sediment traps shall be inspected after each rain and maintained in a functional
condition at all times during the construction period.
3. Traps shall be removed when entire ditch has been stabilized by seeding or other
methods.
4. See Drawings for materials and construction of sediment traps.
G. Silt Fence Sediment Barrier:
1. Silt fence sediment barrier shall be used to filter sediment from runoff.
2. Sediment barriers shall be inspected after each rain and repaired as required to
maintain proper function.
3. Remove sediment behind barrier whenever sediment deposit reaches depth of
approximately six inches.
4. See Drawings for details on construction of silt fence sediment barrier.
H. Straw Bale Sediment Barrier:
1. Straw bales shall be used only as short-term control measures.
2. Bales shall be securely staked across areas of concentrated flow.
3. Bales shall be inspected regularly and replaced as necessary.
I. Stabilized Construction Entrance:
1. Install stabilized construction entrance at each point where construction traffic
leaves Project site and enters any paved or public roads.
2. Stabilized construction entrances shall be used to reduce tracking of mud onto
paved roads.
3. Any sediment or mud which flows or is tracked onto any paved or public roads
shall be removed daily.
6508.22 01560-4 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
4. The stabilized construction entrance shall be removed when permanent pavement
structure will be constructed.
5. See Drawings for details on construction of stabilized construction entrance.
J. Temporary Stabilization of Construction Roads (including those which will become
permanent roads), Temporary Parking Areas, and Construction Staging Areas:
1. Stabilize all areas which will be used for storage and by construction vehicles to
minimize dusting, to prevent accumulation of water, and to prevent erosion.
2. Where temporary stabilization methods have been used on roads which will
become a permanent feature of the finished Project, remove all temporary
stabilization materials which have been contaminated with mud or are otherwise
unsuitable as permanent surfaces or as base/subbase for bituminous or cement
concrete paving materials.
K. Temporary Cover -- The following methods shall be used to provide temporary ground
cover and stabilization of erodible surfaces:
1. Seeding:
a. Temporary seeding on slopes in excess of 5:1 shall be mulched. All
temporary seeding between June 1 and September 15 shall be mulched.
Temporary seeding shall be watered as required to develop cover.
2. Black Polyethylene Sheeting: 3 mil black polyethylene sheeting may be used to
stabilize erodible/soluble material stockpiles. Sheets shall be overlapped so as to
shed and not contain water. Sheets shall be anchored with tires or approved equal
at six feet 0.C. along seams and edges and ten feet 0.C. throughout.
3. Plywood Sheeting: Plywood sheeting may be used to protect existing vegetation
under short duration storage/stockpile areas. Use of this protection method shall be
limited to maximum four days. Contractor shall be responsible for restoring or
replacing vegetation damaged under sheeting.
L. Erosion Control Matting for Ditches, Swales, and Slopes:
1. Install matting per manufacturer’s instructions in locations shown on the Drawings.
2. Matting shall consist of a machined produced mat of wheat straw, coconut fibers,
wood fibers, wood excelsior, or biodegradible man-made fibers.
3. Matting shall be smolder resistant without the use of chemicals.
4. Acceptable Manufacturers:
a. Hi-Velocity Curlex II by American Excelsior Company (Ditches/Swales).
b. Curlex I Excelsior Blanket by American Excelsior Company (Slopes).
c. EroNet C125 by North American Green (Ditches/Swales).
d. EroNet S75 by North American Green (Slopes).
e. US-1S by US Erosion Control Products, Inc./ L&M Supply Co.
(Ditches/Swales).
f. US-2C by US Erosion Control Products, Inc./ L&M Supply Co. (Slopes).
6508.22 01560-5 ARRO
TOWN OF INDIAN HEAD –TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
g. Or Approved Equal.
1.07 RESTORATION
A. After completion of construction, remove all temporary erosion and sedimentation
control devices. Restore areas in which these devices were located to the original
condition or to the condition called for by the Contract Documents.
PART 2 - PRODUCTS
NOT APPLICABLE TO THIS SECTION
PART 3 - EXECUTION
NOT APPLICABLE TO THIS SECTION
END OF SECTION
6508.22 01560-6 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
SECTION 01570
TRAFFIC REGULATION
PART 1 - GENERAL
1.01 SECTION INCLUDES
A. General requirements for control of public traffic through the Work area with the goal of
ensuring safe and efficient traffic movement and providing safe working conditions for
Contractor's personnel.
1.02 TRAFFIC REGULATION REQUIREMENTS
A. Requirements of Regulatory Agencies:
1. Traffic regulation on streets other than State Highways shall be performed in
accordance with the requirements of local agencies having jurisdiction.
B. Maintenance of Traffic
1. It shall be the Contractor's responsibility to maintain pedestrian and vehicular
traffic safety adequately and continuously on all portions of existing facilities
affected by the work. In addition to existing facilities undergoing improvement,
this responsibility also extends to crossroads, approaches, crossovers and entrances
affected or made necessary by the work.
a. Flagging motor vehicular traffic
1) For all construction operations requiring the flagging of motor vehicles,
said flagging shall be conducted as specified in the Manual on Uniform
Traffic Control Devices for Streets and Highways.
b. Barricades and warning signs
1) The Contractor shall provide, erect, and maintain all necessary
barricades, suitable and sufficient lights, danger signals, signs and other
traffic control devices; and the Contractor shall take all necessary
precautions for the protection of the Work and the safety of the public.
2) The Contractor shall erect warning signs, in advance, of any place on the
project where operations may interfere with the use of the facility by
vehicular traffic and at all other points where the new work crosses or
coincides with an existing roadway or traffic lane(s). Such Warning
Signs shall be constructed and erected in accordance with the Manual on
Uniform Traffic Control Devices, the Maryland State Highway
Administration, or as directed.
6508.22 01570-1 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
3) The Contractor shall furnish, erect, and maintain Warning and Direction
signs in the number required by the Engineer through the limits of the
Project. For street and highway-type traffic, the signs shall conform in
every respect to the requirements of the Manual on Uniform Traffic
Control Devices for Streets and Highways. Signs shall be freshly painted
before being placed on the Project. No Work may begin or be done
unless an adequate number of signs of the proper category are in place.
4) Where the Contractor's sequence of operations results in grade
differentials which would be hazardous to vehicular traffic, the
Contractor shall provide suitable guardrail.
PART 2 - PRODUCTS
NOT APPLICABLE TO THIS SECTION
PART 3 - EXECUTION
NOT APPLICABLE TO THIS SECTION
END OF SECTION
6508.22 01570-2 ARRO
TOWN OF INDIAN HEAD –TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
SECTION 01600
MATERIALS AND EQUIPMENT
PART 1 - GENERAL
1.01 SECTION INCLUDES
A. Transportation and handling.
B. Storage and protection.
1.02 TRANSPORTATION AND HANDLING
A. Transport and handle Products in accordance with manufacturer's instructions.
B. Promptly inspect shipments to assure that Products comply with requirements, quantities
are correct, and Products are undamaged.
C. Provide equipment and personnel to handle Products by methods to prevent soiling,
disfigurement, or damage.
1.03 STORAGE AND PROTECTION
A. Store and protect Products in accordance with manufacturer's instructions, with seals
and labels intact and legible. Store sensitive Products in weather-tight, climate
controlled enclosures.
B. For exterior storage of fabricated Products, place on sloped supports, above ground.
C. Provide off-site storage and protection when site does not permit on-site storage or
protection.
D. Cover Products subject to deterioration with impervious sheet covering. Provide
ventilation to avoid condensation.
E. Store loose granular materials on solid flat surfaces in a well-drained area. Prevent
mixing with foreign matter.
6508.22 01600-1 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
F. Provide equipment and personnel to store Products by methods to prevent soiling,
disfigurement, or damage.
G. Arrange storage of Products to permit access for inspection. Periodically inspect to
assure Products are undamaged and are maintained under specified conditions.
PART 2 - PRODUCTS
NOT APPLICABLE TO THIS SECTION
PART 3 - EXECUTION
NOT APPLICABLE TO THIS SECTION
END OF SECTION
6508.22 01600-2 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
SECTION 01700
CONTRACT CLOSEOUT
PART 1 - GENERAL
1.01 SECTION INCLUDES
A. Closeout procedures.
B. Final cleaning.
C. Project record documents.
D. Warranties.
1.02 CLOSEOUT PROCEDURES
A. General Conditions Article 14 contains detailed requirements for Project closeout.
Sequence of closeout procedures is as follows:
1. Contractor submits written request for closeout inspection to Engineer.
2. Owner, Engineer, and Contractor conduct closeout inspection.
3. Engineer prepares "punchlist" of items to be completed and submits to Contractor.
4. Contractor completes items on punchlist and requests re-inspection.
5. Engineer and Contractor conduct re-inspection.
6. If, on the basis of re-inspection, Engineer believes Project to be substantially
complete, Engineer prepares a tentative certificate of Substantial Completion and
submits to Owner for approval. Tentative certificate fixes the date of Substantial
Completion and includes a list of items to be completed and time limit for their
completion. List of items to be completed will include deficiencies in cleaning and
in submittal of manuals, inspection certificates from regulatory agencies, Record
Documents, warranties, and other items required by the Contract Documents.
7. When Owner accepts the tentative certificate, Engineer issues to the Contractor a
Certificate of Substantial Completion as described in the General Conditions.
8. When Contractor completes items on the final punchlist, as issued with the
Certificate of Substantial Completion, he requests final inspection.
9. Owner, Engineer, and Contractor conduct final inspection.
10. If Owner and Engineer agree that all items have been completed, Contractor will
submit Final Application for Payment.
6508.22 01700-1 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
11. Contractor submits Final Application for Payment, including all documents
required by the General Conditions and any other portion of the Contract
Documents, to the Engineer. Final Applications for Payment shall identify total
adjusted Contract Price, previous payments, and amount remaining due.
12. When Engineer approves Final Application for Payment, he submits to Owner with
recommendation for payment.
13. Owner makes final payment to Contractor, deducting the amount of liquidated
damages and the amount of any unresolved claims which have been filed against
the Owner in connection with the Work.
1.03 FINAL CLEANING
A. Execute final cleaning prior to final inspection.
B. Clean debris from roofs, gutters, downspouts, and drainage systems.
C. Remove debris from limited-access spaces including drainage, inlets and manholes.
D. Sweep and remove stains and foreign deposits from paved areas.
E. Rake landscaped areas.
F. Remove waste and surplus materials, rubbish, and construction facilities from the site.
Do not burn waste materials, bury debris or excess materials on Owner's property, or
discharge volatile or other hazardous materials into drainage systems. Remove waste
materials from the Project site and dispose of in a lawful manner.
1.04 PROJECT RECORD DOCUMENTS
A. Maintain on site, one set of the following record documents; record actual revisions to
the Work:
1. Drawings.
2. Specifications.
3. Addenda.
4. Change Orders and other Modifications to the Contract.
5. Reviewed Shop Drawings, Product data, and samples.
B. Store Record Documents separate from documents used for construction.
C. Record information concurrent with construction progress.
6508.22 01700-2 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
D. Specifications: Legibly mark and record at each Product Section description of actual
Products installed, including the following:
1. Manufacturer's name and Product model and number.
2. Product substitutions or alternates utilized.
3. Changes made by Addenda and Modifications.
E. Record Drawings and Shop Drawings: Legibly mark each item to record actual
construction including:
1. Measured elevations of foundations in relation to plant datum.
2. Measured horizontal and vertical locations of underground utilities and
appurtenances, referenced to plant datum and base lines.
3. Measured locations of internal utilities and appurtenances concealed in
construction, referenced to visible and accessible features of the Work.
4. Field changes of dimension and detail.
5. Details not on original Drawings.
F. Delete Engineer title block and seal (by crossing out) from Record Drawings.
G. Include the following Contractor's signed statement on each Record Drawing sheet:
These Record Drawings have been prepared by
(Name of Contractor)
and accurately reflect as-built conditions. Responsibility for accuracy of the
Record Drawings rests with the Contractor.
H. Submit documents to Engineer with request for closeout inspection. (See Paragraph
1.02A1 of this Section.)
1.05 WARRANTIES
A. Provide duplicate notarized copies.
B. Assemble documents from Subcontractors, suppliers, and manufacturers.
C. Provide Table of Contents and assemble in three D side ring binder with durable plastic
cover.
D. Submit prior to final Application for Payment.
6508.22 01700-3 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
E. Date of warranty shall be no earlier than the date of Substantial Completion and be in
effect for at least one (1) year.
F. For items of Work delayed beyond date of Substantial Completion, provide updated
warranty within ten days after acceptance of such work, listing date of acceptance as
start of warranty period.
G. For warranties with coverage period exceeding one year, make provisions for direct
assignment of warranty to Owner one year after date of Substantial Completion.
PART 2 - PRODUCTS
NOT APPLICABLE TO THIS SECTION
PART 3 - EXECUTION
NOT APPLICABLE TO THIS SECTION
END OF SECTION
6508.22 01700-4 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
DIVISION 2 – SITE WORK
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
SECTION 02015
PROTECTION OF UNDERGROUND UTILITIES
PART 1 - GENERAL
1.01 PROJECT CONDITIONS:
A. In preparation for and prior to commencing with the excavation work required by this
Project, Contractor shall comply with requirements of Maryland Underground Utility
Line Protection laws and notify Miss Utility prior to any work.
B. The existence and location of underground utilities shown on the Drawings is based on
information supplied by the underground utility owners in accordance with the laws of
Maryland. Neither the Owner nor the Engineer warrants the accuracy of this
information; this information is intended to serve as notification that such utilities exist
in the general proximity of the Work. The Contractor shall be responsible for the
protection against direct or indirect injury of known existing underground pipes,
conduits, utilities, and structures, or other property in the vicinity of the Work, or those
that may be discovered during performance of the Work. The Contractor shall maintain
on site, during performance of the Work, a sufficient quantity of suitable materials, for
sustaining or supporting any structure or utility that may be uncovered, which may be
weakened, or otherwise compromised, whether or not such structure or utility is
indicated on the Drawings. The cost of work associated with protection of utilities shall
be included in the Contract Price
C. The Contractor shall comply with notification provisions of the laws of Maryland.
Excavation shall only begin after notification by the Contractor, of its intent to dig, is
given to Miss Utility within the time required by the laws of Maryland. In case of
complex projects notification shall be not less than ten business days prior to the
beginning of excavation, or demolition work. If the Contractor removes its equipment
and vacates the work site for more than two business days, (s)he shall notify Miss
Utility again, unless other arrangements have been made directly with the utility
owner(s) involved. If the location of excavation changes, a new notification shall be
made. Damage to existing utilities resulting from the failure of the Contractor to follow
the notification requirements of the laws of Maryland shall be at Contractor’s expense
and no additional compensation will be provided.
1. Contractor shall cooperate with agents of the utility owners during the progress of
the Work.
2. Contractor shall provide Miss Utility with specific information to identify the site
of the proposed work. Contractor shall provide any other information requested
by Miss Utility.
3. Contractor shall obtain a serial number from Miss Utility evidencing compliance
with notification requirements of the laws of Maryland.
6508.22 02015-1 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
4. Contractor shall schedule and conduct a preconstruction meeting with the utility
owners. Notice of this meeting shall be provided, in writing, to the Engineer a
minimum of seven (7) business days in advance of the meeting. When a utility
owner, with facilities located within the project area, requests a meeting with the
Contractor, the Contractor shall promptly arrange and attend such a meeting.
Contractor shall provide full accounting of any such meetings to the Engineer.
5. If the utility owner fails to respond to the Contractor’s request to Miss Utility, or
the facility owner notifies Contractor that the utility cannot be marked within the
time frame, and a mutually agreeable date for marking cannot be arrived at, the
Contractor may proceed with excavation as scheduled, but not earlier than the
lawful dig date.
6. If the Contractor has reason to believe that the facilities have been overlooked or
marked incorrectly, the Contractor shall contact Miss Utility and re-notify the
utility owner. If, after re-notification, sufficient information to safely excavate is
still not provided, Contractor shall be compensated, by the Owner, in accordance
with the payment provisions of the laws of Maryland and of the Contract, for all
costs resulting from repairs to, or replacement of damaged, existing underground
utilities or structures.
D. Contractor shall establish procedures, for emergency action and repairs to utilities
accidentally damaged during construction, with the utility owners prior to the
commencement of work. During the course of the work, if the Contractor accidentally
damages an existing utility, the Contractor shall immediately follow the established
procedures for emergency action and repairs. The Contractor shall immediately notify
911 and the utility owner if the damage results in the escape of any flammable, toxic,
hazardous or corrosive gas or liquid, which endangers life, health, or property.
E. Provided that existing services had been correctly marked prior to excavation operations
and further provided that the Contractor did not further damage the existing service
line(s), when the Contractor, during the progress of the excavation, uncovers utility
services, which because of previous (concealed) damage or age are in poor condition,
the Contractor shall immediately notify the utility owner in order that steps may be
taken for replacement or repair. Locations of repairs, and the procedures of repairs that
have been made by Contractor, at the direction of the utility company, shall be recorded
by the Contractor. Contractor shall be compensated, by the Owner, in accordance with
the payment provisions of the laws of Maryland and of the Contract, for all costs
resulting from repairs, or replacement authorized by the utility owner.
1. In the event the Contractor, during the progress of the excavation, further damages
the existing service line(s) (s)he will be responsible for the resulting costs.
F. Pipes, conduits, and other underground utilities exposed as a result of the Contractor’s
operations, shall be adequately supported, along their entire exposed length, by timber
or planking, installed in such a manner that the anchorage of the supporting members
will not be disturbed or weakened during the backfilling operations. Backfill of selected
material shall be carefully placed and compacted under and around the supports, and all
6508.22 02015-2 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
supports shall be left in place as a guard against breakage of the supported facility due to
trench settlement.
G. Contractor shall perform exploratory excavations when, in the opinion of the Engineer,
the utility owner, or the project owner, it is necessary to determine, or confirm the
location(s) of existing underground structures and utilities.
1. Contractor shall excavate test pits to determine the location and elevation of
existing subsurface utilities, or structure(s) at locations where indicated on the
Drawings and other areas as directed by the Engineer. Excavate such test pits in
the presence of an authorized representative of the utility/structure owner.
Contractor may not proceed with excavation work without the prior notification
and approval of the owner of the subsurface utility, or structure(s).
2. Contractor may not proceed with excavation work in locations where new utility
lines are to be connected to existing utility lines until test pits have been dug and
the exact location and elevation of the existing utility has been determined.
3. Test pits or other miscellaneous excavation performed for the Contractor’s
convenience will be at Contractor's expense.
H. Contractor shall plan the excavation to avoid damage to or minimize interference with
underground utilities in the construction area. Excavation that requires temporary or
permanent interruption of a utility service shall be coordinated with the affected utility
owner.
I. When the Contractor damages a utility during the excavation work and the damage
results in personal injury or property damage to parties other than the Contractor or the
utility owner, the Contractor shall submit an incident report to the Town of Indian Head
and the Department of Labor and Industry and to any other agency required by the laws
of Maryland, not more than ten (10) business days after the incident. A copy of the
incident report shall also be submitted to the Engineer and Owner.
PART 2 - PRODUCTS
NOT APPLICABLE TO THIS SECTION
PART 3 - EXECUTION
3.01 PAYMENT FOR ADDITIONAL WORK
A. General: The cost for repair and/or support of existing underground utilities and
structures damaged during construction, including those found to have been damaged
previously (concealed), or in poor condition due to age, will be paid as follows:
1. If the utility/structure was properly and correctly marked, in accordance with the
laws of Maryland, Contractor shall be responsible for all costs, including support
material left in place.
6508.22 02015-3 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
2. If the utility/structure was not shown, or was marked improperly or incorrectly,
and not in accordance with the laws of Maryland, Contractor will be compensated
for the work performed in accordance with the payment provisions of the Contract
and as further specified below.
B. When information on the location of existing utilities is not provided, the information
provided is inaccurate or incorrect, or uncharted or incorrectly charted utilities are
encountered, the Contractor shall determine the location of the existing utilities by
utilizing prudent techniques including excavating test pits. The Contractor shall submit
written notification to the Engineer apprising the Engineer of the conditions that have
warranted the notification and request for additional compensation. In the event that
written notification cannot be immediately provided, the Contractor may provide oral
notification to the Engineer followed by written notification no later than three (3)
business days thereafter. After submission of written notification, the Contractor will be
entitled to additional compensation in accordance with the laws of Maryland.
1. Where a price has been indicated, in the Contract Documents, for additional
excavation, payment will be made as “Miscellaneous Unclassified Excavation”.
When a price is not indicated, the extra work will be paid on a force account (time
and material) basis.
2. When claiming extra work on a force account basis, the Contractor shall complete
a Force Account Daily Sign-Off form on a daily basis. The Engineer or an
authorized representative of the Owner shall countersign the sign-off form.
Failure to complete the sign-off form on a daily basis may constitute grounds to
deny additional payment.
3. Contractor shall submit a change order request for the extra force account work.
The change order request shall include a Negotiated Price Cost Justification form
as well as copies of the daily sign-off forms for the period covered under the
change order request. Fees for subcontractors, overhead and profit, and other
costs, as may be allowed by the Conditions of the Contract, shall be in accordance
with the Conditions of the Contract. The Engineer reserves the right to require
additional documentation to substantiate the amounts claimed in the change order
request.
4. The change order request will be processed in accordance with the Conditions of
the Contract.
END OF SECTION
6508.22 02015-4 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
SECTION 02100
CLEARING AND GRUBBING
PART 1 - GENERAL
1.01 SECTION INCLUDES
A. The Work of this Section includes, but is not limited to:
1. Clearing.
2. Grubbing.
3. Debris disposal.
1.02 RELATED SECTIONS
A. Summary of Work: Section 01010.
1.03 DEFINITIONS
A. Clearing: The removal of trees, brush, down timber, other vegetation, rubbish, and
objectionable materials at, or above original ground elevation not designated to be
saved. Clearing also includes removal of fences, walls, guard posts, guard rail, signs,
existing paving and other physical obstructions, interfering with the proposed work.
B. Grubbing: The removal from below the surface of the natural ground of stumps, roots,
organic material, and other buried debris.
1.04 SITE CONDITIONS
A. Environmental Requirements: Exercise the necessary means and methods to control
dust on the site during performance of the work.
B. Explosives and Blasting: Not permitted in performance of site preparation work.
C. The Contractor shall clear all obstructions within the permanent and temporary
construction rights-of-way except those specifically designated to remain, or to be
restored, on the Drawings, or Specifications, or in the field.
1. Right-of-way limits and obstructions specifically designated to remain or to be
restored will be marked by the Resident Project Representative.
2. Contractor shall make every effort to protect and prevent damage to trees,
shrubbery, and other physical features within the Project area designated to
remain. Generally, trees larger than 3 inches in diameter and shrubs planted by
6508.22 02100-1 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
landowners shall not be cleared unless approved by the Resident Project
Representative.
3. Contractor shall confine construction operations to within the limits identified in
the Drawings as they relate to the existing wetlands.
PART 2 - PRODUCTS
2.01 MATERIALS
A. Fill Material: On-site soil or soil-rock mixed materials free of topsoil, vegetation,
lumber, metal and refuse; and free of rock or similar hard objects larger than six inches
in any dimension. Rock to soil ratio shall not exceed one part rock to three parts soil.
Obtain fill material from the areas on-site where extensive excavation will be required.
B. Temporary Fencing:
1. Undamaged picket snow fence, 4' high, formed of wooden slats, tightly woven
with wire cable.
2. Undamaged plastic temporary fence, 4' high, formed of polyethylene plastic
fabric.
3. Soil-set fence posts, studded "T" type, 6' high.
C. Tree Wound Dressing:
1. Antiseptic and waterproof, asphalt base.
PART 3 - EXECUTION
3.01 PREPARATION
A. Prior to performance of the work, accompanied by the Resident Project Representative,
carefully inspect the entire site and locate objects and the plant life designated to be
preserved.
B. Notify the Resident Project Representative at least 48 hours prior to beginning any site
clearing and grubbing work.
C. Protect benchmarks, utilities, existing trees, shrubs, and other physical features
designated for preservation with temporary fencing, or barricades satisfactory to the
Resident Project Representative.
1. No material shall be stored, or construction operation carried on within 4 feet of
any tree/shrub to be preserved, or within the tree/shrub protection fence.
2. No material shall be stored, or construction operations carried on within the
wetlands protection fence.
D. When a private enclosure fence encroaches on the work area, notify the property owner
at least 5 days in advance of the clearing/grubbing operations and removal of the fence;
6508.22 02100-2 ARRO
TOWN OF INDIAN HEAD –TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
construct a supplemental fence, or make such other arrangements as may be necessary
for security purposes. Carefully remove the fence, in whole or in part, and neatly store
the materials on the Owner's property. Reconstruct fence when work in area is
complete. Costs for removal and reinstallation of fence shall be included in the
Contract Price, unless otherwise noted in Section 01025 – Measurement and Payment.
E. Inform all utility companies, individuals, and others owning or controlling facilities or
structures within the limits of the work which have to be relocated, adjusted, or
reconstructed in sufficient time to organize and perform such work in conjunction with
or in advance of the Contractor's operations.
3.02 EXECUTION
A. Confine clearing to within the limits of the right-of-way or easement.
B. Fell trees in a manner that will avoid damage to other trees, shrubs, and other
installations, which are to be retained.
C. Remove stumps and roots completely within permanent right-of-way. Where stumps
are not required to be removed, flush-cut to ground elevation.
D. Backfill stump holes with fill material as previously specified.
E. Where embankment work is to be performed, clear and grub the area to a minimum of
6-inches below existing ground.
F. Where excavation work is to be performed, clear and grub the area to the following
depths:
1. Footings and Trenches: Full depth.
2. Walks: 12 inches.
3. Road and Parking Areas: 18 inches.
4. Landscaped Areas: 8 inches.
G. Timber Salvage: Timber larger than 6 inches in smallest diameter from which saw logs
or cordwood can be produced shall be salvaged.
1. Trim salvaged timber of limbs and tops and, unless otherwise ordered by the
Engineer, saw timber into 8 foot lengths. Stock-pile timber at the location
designated in Section 01010, Paragraph 1.06A.
2. The disposal of the stock-piled timber is not a part of the contract obligations and
the stock-piled merchantable timber will remain the property of the Owner.
H. Debris Disposal:
1. All debris resulting from clearing and grubbing operations shall become the
property of the Contractor and shall be legally disposed of off-site.
2. Do not deposit, or bury on the site debris resulting from the clearing and grubbing
work.
6508.22 02100-3 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
3. Debris may not be burned on-site.
I. Restoration:
1. Repair all injuries to bark, trunk, limbs, and roots of remaining plants by properly
dressing, cutting, tracing and painting, using approved arboricultural practices and
materials.
2. Replace all trees, shrubs, and plants located outside of the permanent right-of-
way, designated to be saved, which are permanently injured, or die during the
Correction Period of the Contract as a result of construction operations, with like
species of same size, or reimburse to the property owner the current market value
for same size specimen(s).
3. Remove protective fences, enclosures, and guards upon the completion of the
project.
4. Restore guard posts, guardrails, signs, and other interferences removed prior to
commencing with Work to the condition equal to that existing before construction
operations.
END OF SECTION
6508.22 02100-4 ARRO
TOWN OF INDIAN HEAD –TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
SECTION 02105
SITE PREPARATION
PART 1 - GENERAL
1.01 RELATED SECTIONS
A. Site Grading: Section 02210.
1.02 SITE CONDITIONS
A. Environmental Requirements: Exercise the necessary means and methods to control
dust on the site during performance of the Work.
B. Burning is not permitted on site for this project.
C. Protection:
1. Preserve all objects, including trees and shrubs, designated to remain (if any). The
means and methods used for protection are at the Contractor’s option.
2. Use protective measures during the felling of trees and debris removal to provide
for the safety of employees and others.
D. Explosives and Blasting: Not permitted in performance of site preparation work.
E. Disposal:
1. Burning is not permitted on site for this project.
2. All debris must be removed from the site and disposed of accordingim to local
regulations at an approved facility.
PART 2 - PRODUCTS
2.01 MATERIALS
A. Fill Material: On-site, or borrow (imported) soil, or soil/rock mix material free of
vegetation and refuse, and free of rock or similar hard objects larger than two inches in
any dimension. Obtain fill material from the areas on site where extensive excavation
will be required.
6508.22 02105-1 ARRO
TOWN OF INDIAN HEAD –TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
PART 3 - EXECUTION
3.01 INSPECTION
A. Where Embankment is to be performed, clear and grub the area to a depth not less than
6 inches below existing ground.
B. Prior to performance of the actual work, carefully inspect the entire site and locate
objects and the plant life designated to be preserved.
3.02 PERFORMANCE
A. Where Landscaping work is to be performed, clear and grub the area to a depth not less
than 8 inches below existing ground.
B. Where Excavation work is to be performed, clear and grub the area to the depths as
follows:
1. Footings: 18 inches.
2. Walks: 12 inches.
3. Road and Parking areas: 18 inches.
C. Stump Removal:
1. Remove stumps and roots completely in areas of Excavation and Embankment.
2. In all other areas as specified previously and not included in Excavation and
Embankment area, remove stumps and roots, matted roots, and similar subsurface
debris to the depths as previously specified.
3. Stumps over 4 inches in diameter left in place in areas other than Excavations and
Embankments areas shall be treated with herbicide to prevent regrowth.
4. Backfill stump holes with fill material as previously specified.
END OF SECTION
6508.22 02105-2 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
SECTION 02210
SITE GRADING
PART 1 - GENERAL
1.01 SECTION INCLUDES
A. Topsoil removal and stockpiling, overlot grading, removal of obstructions, embankment
construction and soil compaction in preparation of final grading.
1.02 RELATED SECTIONS
A. Sediment and Erosion Control: Section 01560.
B. Roadway Excavation, Backfill and Conpaction: Section 02230.
C. Landscaping: 02480.
1.03 REFERENCES
A. American Association of State Highway and Transportation Officials:
1. AASHTO T 99, Moisture-Density Relations of Soils, Using a 5.5-lb. Rammer and
a 12-in. Drop.
2. AASHTO T 191, Standard Method of Test for Density of Soil In-Place by the Sand
Cone Method.
B. American Society for Testing and Materials: ASTM D 2167, Density of Soil in Place by
the Rubber-Balloon Method.
1.04 SITE CONDITIONS
A. Classification of Excavated Materials: No consideration will be given to the nature of
materials encountered in site grading operations. Therefore, as unclassified excavation,
no additional payment will be made for difficulties occurring in excavating and handling
of materials.
B. Environmental Requirements:
1. Do not perform grading when soil or weather conditions are unsuitable. Unsuitable
conditions include moisture saturated or frozen in place soil and precipitation of
any kind present on the soil or occurring during the Work.
2. Exercise the necessary means and methods to control dust on the site as well as in
the off site work areas where excavation and grading are required.
6508.22 02210-1 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
3. Do not leave the site in a dusting condition following the work of this Section. If
necessary, employ a watering schedule to control the dust.
4. Do not use frozen material in performing the work or place materials on frozen
surfaces.
5. When it is necessary to haul soft or wet soil material over roadways, use suitably
tight vehicles to prevent spillage. Clear away spillage of materials on roadways
caused by hauling at no expense to the Owner.
6. Plan work so as to provide adequate protection during storms with provisions
available at all times for preventing flood damage.
C. Protection: Assume all risks attending the presence or proximity of overhead or
underground public utility and private lines, pipes, conduits and support work for same,
also existing structures and property of whatever nature, in or over excavations or
adjacent to such excavations. Complete responsibility for replacement and restitution
work of whatever nature to the above, as damaged or destroyed by work of this
Contract, rests solely with the Contractor and at no expense to the Owner.
D. Accommodation of Traffic: Do not obstruct streets, roads and highways, unless the
Municipality or Governing Agency authorizes in writing the complete closing of the
street, road or highway. Employ such measures, at no expense to the Owner, as may be
necessary to keep the street, road or highway open and safe for traffic. DO NOT
OBSTRUCT FIRE HYDRANTS.
E. Explosives and Blasting: Not permitted in performance of site grading.
F. Borrow Excavation: When the required quantity of earth fill material exceeds the
quantity of suitable on site fill material, provide borrow excavation. If borrow
excavation is needed, notify the Engineer sufficiently in advance to permit the Engineer
to verify such need and to view the proposed borrow pit to determine the material
suitability. Borrow excavation will be subject to the Engineer's approval whose written
consent shall be obtained prior to its use.
G. Excess Materials: No right of property in materials is granted the Contractor of excess
on site materials prior to completion of Site Work. This provision does not relieve the
Contractor of his responsibility to remove and dispose of surplus excavated materials.
Unsuitable material such as sod, stumps and spongy soil as well as excess rock shall
become the property of the Contractor and shall be disposed of legally off-site.
H. Dust Control: Exercise the necessary means and methods to control dust on the site
during the roadway excavation, backfill and compaction work.
6508.22 02210-2 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
PART 2 - PRODUCTS
2.01 MATERIALS
A. Topsoil: See Section 02480.
PART 3 - EXECUTION
3.01 PREPARATION
A. Salvaged Topsoil: Within the areas indicated for grading, strip turf and topsoil to the
depth of suitable topsoil material and stock pile for subsequent topsoiling operations.
B. Stockpiling: Place topsoil storage piles within the limits of the project, on well drained
land and at locations not interfering with the Prosecution of Work.
3.02 PERFORMANCE
A. Erosion Control: Implement erosion control measures during performance of work of
this Section. Erosion Control as specified in Section 01560.
B. Overlot Grading: Perform rough grading over the site within the areas to be graded as
indicated on the Drawings.
1. Topsoiled areas: Not more than 0.15 ft. above or below indicated grade less
specified topsoil depths.
2. Vehicle Traffic Areas: Not more than 0.10 ft. above or below indicated grade less
specified or indicated depths of paving and aggregate base.
C. Removing Obstructions: Where rock is encountered at proposed subgrade elevations,
remove such for a depth of six inches below proposed subgrade. Blasting is not
permitted at the Water Treatment Plant site.
D. Compaction: Compact finished subgrades to the minimum final density percentages
specified herein which are based on the maximum dry weight density of subgrade
materials at their optimum moisture content.
1. Overlot Grading: Not less than 90%.
2. Roadway Subgrade: Not less than 95%.
3.03 FIELD QUALITY CONTROL
A. Surface Tolerance: Check finished subgrade for smoothness and elevation in
accordance with the following:
6508.22 02210-3 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
1. Use an approved ten foot straightedge to check for longitudinal irregularities in the
subgrade.
B. Field Moisture-Density Tests: The Contractor will be required to conduct a minimum of
two field moisture-density determinations on Site Grading work at locations designated
by the Engineer.
1. The moisture content at which the maximum density of the Backfill is obtained
with a given compactive effort, AASHTO T99, shall be considered the optimum
moisture content.
2. Field compaction density may be determined by the Rubber Balloon Method,
ASTM D 2167, or other acceptable method, in lieu of the sand-cone method
specified above; but only with Engineer's written permission.
3. Determine compaction density of roadway subgrade in accordance with AASHTO
191.
END OF SECTION
6508.22 02210-4 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
SECTION 02220
STRUCTURAL EXCAVATION, BACKFILL, AND COMPACTION
PART 1 - GENERAL
1.01 SECTION INCLUDES
A. Excavation and backfill for building foundation, footings, sign posts, and compaction
requirements.
1.02 RELATED SECTIONS
A. Soil Erosion and Sedimentation Control: Section 01560.
B. Protection of Underground Utilities: Section 02015.
C. Site Preparation: Section 02100.
D. Site Grading: Section 02210.
E. Trenching, Backfilling and Compacting: Section 02221.
F. Cast-In-Place Concrete: Section 03300.
1.03 DESCRIPTION
A. Definitions:
1. As specified in Section 02210 and such added definitions included herein.
1.04 QUALITY ASSURANCE
A. Source Quality Control:
1. Laboratory Tests: Certain materials stated herein under Products may require
advance examination or testing according to methods referenced, or as required by
the Engineer.
a. Testing laboratory shall furnish both Engineer and Contractor two (2) copies
of test result reports. Same reports will be considered as sufficient evidence
of acceptance or rejection of materials represented.
2. Aggregate Material Tests:
a. Conduct aggregate quality tests in accordance with requirements of
appropriate Referenced Standard for such materials.
6508.22 02220-1 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
b. The Engineer reserves the right to accept aggregate materials based on
certification from supplier that the aggregate originates from a source
approved by SHA and that the aggregate complies with specified SHA
requirements.
1.04 REFERENCES
A. American Association of State Highway and Transportation Officials:
1. AASHTO T191, Standard Method of Test for Density of Soil In-Place by the sand
cone method.
B. American Society For Testing and Materials (ASTM):
1. ASTM C33, Concrete Aggregates, Spec. for.
2. ASTM D422, Particle-Size Analysis of Soils, Method for.
3. ASTM D423, Liquid Limit of Soils, Test for.
4. ASTM D424, Plastic Limit and Plasticity Index of Soils, Test for.
5. ASTM D448, Standard Sizes of Coarse Aggregate for Highway Construction.
6. ASTM D698, Moisture-Density Relations Of Soils Using 5.5/lb. (2.5 kg) Rammer
and 12-in. (304.8-mm) Drop.
7. ASTM D1556, Density of Soil In Place By the Sand-Cone Method.
8. ASTM D2167, Density of Soil In Place By the Rubber-Balloon Method.
9. ASTM D2922, Density Of Soil and Soil-Aggregate In Place By Nuclear Methods
(Shallow Depth).
10. ASTM D3017, Moisture Content of Soil and Soil-Aggregate in Place by Nuclear
Methods (Shallow Depth).
11. ASTM D4318, Liquid Limit, Plastic Limit, and plasticity Index of Soils, Test
Method for.
C. MDOT SHA Standard Specifications for Construction and Materials.
D. Testing Agency: As approved by the Engineer with the following required
qualifications.
1. Laboratory and field testing must be performed under the general supervision of a
Registered Professional Engineer.
2. The independent testing agency must have experience in quality control of
earthwork structural fills.
1.05 SUBMITTALS
A. Testing Agency Approval: Submit experience qualifications of the proposed
independent testing agency for approval.
B. Samples: Submit samples of materials being proposed for use based on the following:
1. Aggregates: Submit a 10 lb. sample of each type, packaged in containers or bags
of suitable strength.
6508.22 02220-2 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
2. Selected Compacted Fill: Submit representative samples in quart size
moisture-proof containers of suitable strength.
3. Backfill: Submit samples of materials proposed for backfill when requested by
Engineer.
1.06 SITE CONDITIONS
A. Classification of Excavated Materials: Under this Contract, all excavation is
unclassified. No consideration will be given to the nature of materials, which may
include rock, encountered in structural excavation operations. Therefore, as unclassified
excavation, no additional payment will be made for difficulties occurring in excavating
and handling of materials.
B. Environmental Requirements:
1. Do not perform excavating, backfilling or compacting when weather conditions or
the condition of materials are such, in the opinion of the Engineer, that work
cannot be performed satisfactorily.
2. Do not use frozen materials as backfill nor wet materials containing moisture in
excess of the amount necessary for satisfactory compaction.
3. Prior to use, moisten dry backfill material not having sufficient moisture to obtain
satisfactory placement or compaction.
4. Accommodation of Drainage: Maintain sewers, drains, and swales free of debris
for surface drainage. No damming or ponding of water will be permitted. Do not
direct flow of water across or over pavements except through approved pipes or
properly constructed troughs. Provide pipes or troughs of sufficient sizes and
lengths. Control grading in the vicinity of excavations so the ground surface is
properly pitched to prevent water running into excavated areas.
5. Pumping: Keep excavations free from water. Provide and operate pumps of
sufficient capacity for dewatering the excavations. Dispose of water removed
from excavations in a manner that will not cause injury to public or private
property, to any portion of completed or in progress Work, or prevent the use of
highways and roadways by the public. No additional payment will be made for
pumping or other difficulties encountered due to water.
6. Control groundwater and surface water during construction in order to maintain
soil stability. Maintain the water table elevation sufficiently below the levels of
excavations that slopes will remain stable and bottoms of excavations will not
become loosened by flow of water. If the foundation material looses its strength
due to improper dewatering techniques, overexcavate the material and replace it
with Structural Foundation Backfill at the Contractor's expense.
C. Dust Control: To prevent spread of dust during performance of work of this Section,
thoroughly moisten excavation areas by sprinkling or other methods as approved by the
Engineer.
D. Explosives and Blasting: Not permitted in performance of structural excavation work.
6508.22 02220-3 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
E. Protection:
1. The Contractor shall, at no expense to the Owner, sustain in their places, and
protect from direct or indirect injury, all pipes, conduits, structures, or other
property in the vicinity of the work, whether above or below ground, or that may
appear in the excavation. Contractor shall at all times have a sufficient quantity of
appropriate materials and equipment, on site and shall use them as necessary for
sheeting excavations and for sustaining, or supporting any structures that are
uncovered, undermined, endangered, threatened, or weakened.
2. Pipes and underground conduits exposed as a result of Contractor's operations
shall be adequately supported along their entire exposed length by timber or
planking, installed in such manner that the anchorage of the supporting members
will not be disturbed or weakened during the backfilling operation. Backfill of
selected material shall be carefully placed and tamped under and around the pipe,
or conduit as the supports are removed.
3. The Contractor shall take all risks attending the presence, or proximity of pipes,
poles, power lines, wires, structures, or other property, of every kind and
description, in or over the excavation, or in the vicinity of the Work, whether
above or below the surface of the ground; and shall be responsible for all damages
and assume all expenses for direct, or indirect, injury, caused by the work, to any
of them, or to any person, or property by reason of them or by reason of injury to
them, whether such structures are, or are not indicated on the Drawings.
4. Where necessary, in order to keep one side of the street or roadway free from any
obstruction or to keep the material piled alongside the excavation from falling on
private property outside the rights-of-way, safe and suitable fence shall be placed
alongside the excavation.
5. In the event of encountering subsurface dangerous conditions, or where passing
especially heavy structures, which by their construction or position might bring a
great pressure upon the excavations, the right is reserved by the Engineer to
require that such structures shall be underpinned, or supported and protected, or
that special sheeting shall be driven in such a manner and to such depth, as may be
approved or that only a short length of excavation shall be opened at one time;
and, if necessary, that the excavation shall be securely sheeted and braced on all
sides, after the manner of a shaft, and that the permanent work shall be
constructed in the same way and the shaft backfilled before another opening is
made. Work performed as required above shall be at the cost and liability of the
Contractor.
6. The Engineer reserves the right under such conditions to stop the excavation or
any other part of the Work, and to require the Contractor to complete the structure
and the backfilling up to such a point as the Engineer, without assuming
responsibility for safety to persons or property, may require before proceeding
further with the excavation. Contractor shall not receive additional compensation,
other than an extension of the contract time for as many days as the Engineer may
determine that the work was delayed by such stoppage.
6508.22 02220-4 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
F. Removal of Obstructions:
1. Except for removal/relocation/replacement of known utilities shown on the
Drawings, remove unknown obstructions as specified below.
2. When during construction, the position of a previously unknown pipe, conduit,
pole, structure or other obstruction(s), above or below the ground, is such that in
the opinion of the Engineer, it must be removed, realigned, or replaced, the work
of removal, realignment, or replacement will be performed by the Contractor as
extra work, or it will be performed by the owner of the obstruction(s) without cost
to the Contractor or the Owner. Contractor shall uncover and sustain the
obstruction, before such removal and before and after such realignment or
replacement. Contractor shall be entitled to additional compensation, and when
applicable, to an extension of Contract Times, in accordance with the Conditions
of the Contract.
3. The Contractor shall, without extra compensation, break through and reconstruct,
if necessary, the invert or arch of any sewer, culvert, or conduit that may be
encountered, if the said structure is in such a position, in the judgment of the
Engineer, as not to require its removal, realignment, or complete reconstruction.
4. The Contractor shall allow the Owner, or the owner(s) of obstruction(s) to
implement such measures as they may deem necessary in order to protect, remove,
realign, or replace their pipes, conduits, poles, or other obstructions. Performance
of the work described above by others, shall not relieve the Contractor of its
responsibilities under the Contract.
5. Trees in rights-of-way shall not be removed except by written authorization of the
Engineer. The Contractor shall not receive extra compensation for hand
excavation or tunneling required in the vicinity of trees that are to remain.
6. Shrubbery, which would interfere with the construction, shall be carefully
removed, protected and replanted, or if damaged, shall be replaced without
additional cost to the Owner.
G. Borrow Excavation: When the required quantity of suitable fill/backfill material
exceeds the quantity of suitable on-site excavated material, provide borrow excavated
material at no additional cost to the Owner. If borrow excavated material is needed,
notify the Engineer sufficiently in advance to permit the Engineer to verify such need
and to confirm the proposed borrow material’s suitability. Engineer will approve, in
writing, borrow excavated material prior to its use. All borrow fill/backfill shall meet
the requirements of Item 2.01.A. of this Section.
H. Excess Excavated Materials: No right of property in materials is granted the Contractor
of excess on-site excavated materials prior to backfilling. This provision does not
relieve the Contractor of the responsibility to remove and dispose of surplus excavated
materials, as well as the unsuitable materials such as sod, stumps and spongy soil, and
excavated rock, which shall be removed by the Contractor and disposed legally off-site.
Costs for loading, transportation and disposal of excess and unsuitable material, and of
rock shall be included in the Contract Price.
6508.22 02220-5 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
I. Change of Excavation Location:
1. Should the Engineer require a change in location of excavation from that indicated
on the Drawings due to the presence of an obstruction, or from other cause and
such change is made before the excavation is begun, the Contractor shall not be
entitled to extra compensation or to a claim for damages.
2. Should the Engineer require a change in location of excavation from that indicated
on the Drawings, due to the presence of an obstruction or from any other cause,
and if such changed location increases or decreases the quantity of excavation,
then an adjustment will be made in the lump sum price bid under which the work
was performed.
a. The adjustment will be made by applying the unit price bid per cubic yard
for Miscellaneous Unclassified Excavation.
3. If a change in excavation location, made at the request or with the approval of the
Engineer, involves the abandonment of excavation already made, such abandoned
excavation, together with the necessary refill will be classified as Miscellaneous
Unclassified Excavation.
4. If a change of excavation location is authorized by Engineer, at the request of the
Contractor, the Contractor shall not be entitled to extra compensation, and if such
change of excavation location involves the abandonment of excavation already
made, the abandoned excavation and refill shall be at the Contractor's expense.
PART 2 - PRODUCTS
2.01 MATERIAL
A. Backfill: On-site, or borrow excavated soil or soil-rock mixed material free of topsoil,
vegetation, lumber, metal and refuse; and free of rock or similar hard objects larger than
six inches in any dimension, with the exception that highly plastic clays and silts will
not be permitted. Rock to soil ratio shall not exceed one part rock to three parts soil.
B. Aggregate Backfill: Select Granular Material (GAB) conforming to
MDOT SHA Standard Specifications for Construction and Materials.
C. Aggregate Base Course: AASHTO No. 57 Type C or better Coarse Aggregate
conforming to MDOT SHA Standard Specifications for Construction and
Materials.
D. Structural Foundation Backfill:
1. Concrete (2500 psi): Conforming to requirements of Section 03300.
2. Aggregate Fill:
a. AASHTO No. 57 Coarse Aggregate conforming to MDOT SHA
Standard Specifications for Construction and Materials.
b. Select Granular Material (GAB) Aggregate conforming to
MDOT SHA Standard Specifications for Construction and
Materials.
E. Flowable Backfill: As specified in MDOT SHA Standard Specification for
Construction and Materials.
6508.22 02220-6 ARRO
TOWN OF INDIAN HEAD –TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
PART 3 - EXECUTION
3.01 PREPARATION
A. Perform soil erosion control work in accordance with requirements of Section 01560.
B. Protect underground utilities in accordance with Section 02015.
3.02 EXCAVATION
A. General:
1. Perform excavation using machinery, except that hand excavation may be
required where necessary to protect existing structures, buried utilities or private
or public properties. No additional compensation will be paid for hand excavation
required by field conditions, instead of machine excavation.
2. Perform excavation to the lines and grades or depths indicated on the Drawings
and as specified herein.
3. Where work space is limited, remove excavated material from the limited area
and replace the material after the structure has been installed. No additional
compensation will be made for such removal and replacement.
4. Extend excavation a sufficient distance from footings, and foundations to permit
placing and removal of concrete formwork, installation of services, other
construction and for inspection.
B. Rock Excavation: Remove rock below subgrade that is shattered due to rock removal
operations and in the opinion of the Engineer is unfit for foundations. Fill to subgrade
with Structural Foundation Backfill those areas where shattered rock has been removed.
Perform such backfilling to the satisfaction of the Engineer. No separate or additional
payment will be made for such removal and backfill.
C. Removal of Rock by Means Other Than Blasting: Where removal of rock by means
other than blasting is required, remove by the use of mechanical surface impact
equipment, or by drilling and hydraulic rock splitting equipment, or by other methods.
D. Excavation Below Subgrade:
1. Do not excavate below depths indicated on the Drawings or such depths as
required by the Engineer.
2. Excavation below depths indicated on the Drawings or as required by the
Engineer, through the fault of the Contractor, shall be restored to the indicated or
required depths with Structural Foundation Backfill at the expense of the
Contractor. Structural Foundation Backfill material as selected by Engineer.
3. If the foundation for any structure is required by the Engineer to be carried lower
than plan subgrade elevation, the voids caused by this extra excavation shall be
backfilled up to plan subgrade elevation with Structural Foundation Backfill.
a. Payment for this additional work will be made at the applicable unit prices
bid for Miscellaneous Unclassified Excavation, and special Backfill.
6508.22 02220-7 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
E. Storage of Suitable Excavated Materials: If suitable materials are not used immediately,
store or stockpile separately from unsuitable materials.
1. Mixing of various suitable materials, or mixing of suitable materials with
unsuitable materials is not permitted.
2. On- or off-site stockpiling, or transportation of suitable materials shall be
included in the Contract Price..
F. Borrow Excavation: Perform excavation of borrow material in a manner satisfactory to
the Engineer. Strip borrow pits of brush, trees, roots, grass and other vegetation prior to
removal of material for use in backfill. During the excavation operation, grade the
borrow area to ensure free drainage of water from the area. After completion of the
excavation, grade the excavated area, including side slopes, to drain and present a
uniformly trim appearance merging into the surrounding terrain. After borrowing
operations are completed, regrade area, if necessary, to prevent erosion.
1. No additional compensation will be made for borrow material.
3.03 SUBGRADE PREPARATION
A. General:
1. Prior to construction of foundations or slabs on natural soils, and before placing
new fill, proof roll subgrade with a loaded tandem-axle dump truck or a 10-ton
vibratory roller under the observation of the Engineer, to check for any loose or
unstable areas.
2. Remove soft, loose and disturbed materials and replace with structural foundation
backfill.
a. Payment for this additional work will be made at the applicable unit prices
bid for Miscellaneous Unclassified Excavation.
3. Do not place fill materials on surfaces that are muddy, frozen, or contain frost.
4. Trim bottoms to indicated lines and grades; leave solid base to receive other work.
B. Placement and Compaction:
1. Structural Foundation Backfill:
a. Concrete (2500 psi): Provide at locations indicated on the Drawings and
where directed by the Engineer. Place in accordance with requirements of
Section 03300.
b. Aggregate Fill:
1) Provide at locations indicated on the Drawings and where directed by
the Engineer.
2) Maintain material in a moist condition during hauling, placing and
compacting.
3) Spread material uniformly without segregation of coarse and fine
material.
4) Place material in 8-inch layers and compact to 100 percent of the
maximum dry density based on ASTM D698, Method C, with
replacement of oversize material.
6508.22 02220-8 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
5) One field density determination is required for each layer of material
placed.
2. Flowable Fill: Provide at locations indicated on the Drawings and where directed
by the Engineer.
3. Aggregate Base Course:
a. Provide beneath concrete slabs for structures as indicated on the Drawings.
b. Place directly on excavation bottoms and where required on completed
structural fill.
c. Compact with a vibratory compactor to the satisfaction of the Engineer.
3.04 BACKFILLING
A. General:
1. Perform backfilling using machinery, except that hand backfilling may be required
where necessary to prevent displacing walls, foundations, or buried utilities or
damage to such. No additional compensation will be paid where backfilling by
hand is required.
2. After completion of footings and walls and the removal of forms and prior to
backfilling, remove trash and debris from excavated areas.
3. Refer to Section 02221 for locations where different types of backfill are used and
for surface finishing.
4. Do not place Backfill material prior to seven days after completion of structure
walls.
5. Do not place Backfill material on wet or frozen areas.
6. Do not operate heavy equipment closer to walls than a distance equal to the height
of Backfill material above the top of the structure footing.
7. Do not place Backfill material against exterior walls until supporting floors or
slabs at top of walls are in place.
8. Perform compaction using power driven tampers or compactors suitable for
material being placed.
B. Backfill: Place Backfill in loose, uniform horizontal layers not exceeding six inches in
depth.
1. Maintain moisture content of Backfill at compaction within two percent of
optimum moisture as determined by ASTM D698.
2. Compact Backfill to at least 95 percent of the maximum dry density based on
ASTM D698.
C. Aggregate Backfill: Place Aggregate Backfill in 4 inch layers and thoroughly compact
each layer with a vibratory compactor to the satisfaction of the Engineer and the
requirements of the SHA if required.
6508.22 02220-9 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
D. Flowable Fill: Place as specified in SHA Specification.
E. Cleanup: Remove and dispose excess excavated material off-site in a legal manner at
no additional expense to the Owner.
3.05 FIELD QUALITY CONTROL
A. Testing: Performed by the independent testing agency as prior approved for laboratory
testing.
1. In-place field density tests conducted in accordance with ASTM D1556,
ASTM D2167, or ASTM D2922. If methods of ASTM D2922 are used for
density testing, the moisture content must be determined as stated in
ASTM D3017.
2. Perform at least one field moisture-density determination (test) for each layer of
material placed.
3. Test locations as directed by the Engineer.
4. The Engineer may require additional tests to ensure that the specified density is
being obtained.
B. Corrective Measures: Whenever tests indicate that the field moisture or density does
not meet specified requirements, take corrective action as approved by the Engineer.
1. Corrective measures may include loosening the soil and wetting or drying it prior
to recompaction, additional compaction, or removing and replacing the material.
2. Retest material that did not meet the moisture and density requirements after
corrective measures have been performed.
3. Corrective measures shall be at Contractor’s expense.
C. Retesting: The Engineer may at any time require retesting of any material, whether in
stockpiles or being placed, if, in his opinion, the material differs from that which was
previously been approved for use. Retesting shall be at Contractor’s expense.
END OF SECTION
6508.22 02220-10 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
SECTION 02221
TRENCHING, BACKFILLING, AND COMPACTING
PART 1 - GENERAL
1.01 SECTION INCLUDES
A. Trench Excavation for Piped Utilities.
B. Trench Excavation for Electrical Work.
C. Bedding and Backfilling.
D. Surface Restoration.
1.02 RELATED SECTIONS
A. Soil Erosion and Sedimentation Control: Section 01560.
B. Traffic Regulations: Section 01570
C. Protection of Underground Utilities : Section 02015
D. Division 3 - Concrete.
1.03 DESCRIPTION
A. Definitions
1. Rock Excavation: Removal of consolidated hard mineral material in solid beds or
masses, in original or stratified position, and boulders greater than one-half cubic
yard in volume, which, in the opinion of the Engineer, must be removed by
blasting, or mechanical/chemical wedging. Structure foundations of concrete or
of masonry or stone laid in cement-mortar is classified as rock if the volume
requiring removal at any single location exceeds one-half cubic yard.
a. Soft or disintegrated rock, which can be removed with a pick, or any
material which can be broken down by sledge hammers, or any ledge or
single boulder less than one-half cubic yard in volume, or loose, shaken or
previously blasted rock, or broken stone in rock filling or elsewhere, or rock
exterior to the line of measurement specified, shall not be classified as rock
excavation.
6508.22 02221-1 ARRO
TOWN OF INDIAN HEAD –TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
b. Items involved in the excavation such as sidewalks, curbs and street or
roadway paving, of whatever material, shall not be classified as rock
excavation.
2. Earth Excavation: Removal of materials of any kind in the excavation, which
cannot be classified as rock excavation.
3. Earth Excavation Below Subgrade: Same as Earth Excavation except such
excavation is performed below elevations given as subgrade.
4. Unclassified Excavation: Removal of materials of any kind in the excavation,
including rock excavation.
5. Unclassified Excavation Below Subgrade: Same as unclassified excavation
except such excavation is performed below elevations given as subgrade.
6. Miscellaneous Unclassified Excavation: Unclassified excavation required by the
Engineer and not included in other items for payment.
7. Subgrade: Trench bottom prepared as specified to receive pipe bedding, concrete
cradle or encasement, or the bottom of excavations prepared to receive pipeline
structures or structure foundations.
1.04 REFERENCES
A. American Association of State Highway and Transportation Officials (AASHTO):
1. AASHTO T99, Moisture-Density Relations of Soils, Using a 5.5-lb. Rammer and
a 12-in. Drop.
2. AASHTO T191, Standard Method of Test for Density of Soil In-Place by the sand
cone method.
B. The SHA noted herein refer to sections contained in the MDOT SHA Standard
Specifications for Construction and Materials, July 2023, latest edition. The
referencespertain only to materials, construction equipment,methods and labor. The
paymentprovisions do not apply to work to be performed under this Contract.
1.05 PROJECT CONDITIONS
A. Classification of Excavated Materials: Under this Contract, all excavation is
unclassified. No consideration will be given to the nature of materials, which may
include rock, encountered in excavation operations, Therefore, as unclassified
excavation, no additional payment will be made for difficulties occurring in excavating
and handling of materials.
B. Trench Work for Electrical:
1. Requirements specified in this section for excavating, backfilling and compacting
pipe line trench work shall also apply to excavation work required for electrical
conduit installations.
2. Exceptions to pipe line trench work requirements are as specified in this section.
6508.22 02221-2 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
PART 2 - PRODUCTS
2.01 MATERIAL
A. Backfill Material (To Restoration Depth in Seeded Areas): On-site, or imported
(borrowed), excavated material, free of cinders, ash, refuse, vegetable or organic
material, boulders, rocks, stone, or other material which, in the opinion of the Engineer,
is unsuitable. Backfill material may not contain stones larger than six (6) inches in
maximum dimension. A maximum of 20% of the backfill volume may be stones so
long as the stones are evenly distributed within the material. No additional payment
will be made for imported materials.
B. Aggregate Backfill and Bedding: Fine aggregates and coarse aggregates conforming to
MDOT SHA Standards Specifications for Construction Materials as listed below or
shown on the Drawings.
1. Pipe Bedding: (AASHTO No. 57).
2. Initial Backfill: (AASHTO No. 57).
3. Aggregate Backfill (To Restoration Depth inPaved Areas): CR-6 or GAB Coarse
Aggregate where indicated on the Drawings.
C. Flowable Backfill: As specified in MDOT SHA Standard Specifications for
Construction Material.
D. Topsoil: On-site or imported, screened, fertile, friable, natural, productive surfacetopsoil; free
of subsoil, clay, stones, or similar hard objects larger than 2 inches ingreatest dimension, and
partially disintegrated debris and materials toxic or harmful to
growth.
E. Lawn and Seed Mixture: As indicated on the Drawings.
F. Underground Warning Tape:
1. Printed, and alkali resistant, polyethylene tape, 3 inches minimum width, color
coded, 1-inch minimum lettering, printed with name or symbol of utility buried
below, and suitable for installation in all soil types. Magnetic type shall be
manufactured with foil back or other means to enable detection, by a metal
detector, when it is buried up to 4 feet deep.
2. Magnetic.
3. Provide for:
a. Sanitary sewers, green.
b. Storm sewers, green.
c. Water line, blue.
d. Electrical conduit, red.
e. Telephone conduit, orange.
f. CATV conduit, orange.
6508.22 02221-3 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
PART 3 - EXECUTION
3.01 TRENCH PREPARATION AND EXCAVATION
A. Perform soil erosion control work in accordance with requirements of Soil Erosion and
Sedimentation Control: Section 01560.
B. General: Perform excavation to the lines and grades indicated on the Drawings and as
specified in this section, or as directed by the Engineer.
1. Excavation shall be made by open cut, unless written permission to tunnel or bore
is given by the Engineer, or is specified or shown on the Drawings.
2. Trenches may be excavated and backfilled either by machinery or by hand as the
Contractor may elect; Contractor shall use hand excavation and backfilling when
necessary to protect existing structures, utilities, or private or public properties.
3. Contractor shall have no claim for extra compensation for performing hand
instead of machine excavation and backfilling.
C. Stripping, Storing and Restoring Surface Items: Contractor shall remove all paving,
sub-paving, curbing, brick or concrete pavers, granite curbing or other similar materials,
and shall grub and clear the surface over the area to be excavated. Properly store and
preserve such materials that may be required for use in restoring the surface. Contractor
shall replace materials damaged or disposed due to Contractor’s negligence, with
materials of equal or better quality, at no cost to the Owner.
1. All suitable excavated materials may be stored, if practical, in the roadway or such
other suitable place and in such manner as the Engineer will approve. Unsuitable
materials will be removed and disposed off-site.
2. Excess suitable materials remaining after the trenches have been backfilled, which
cannot be stored on site, shall be removed and stored at a suitable site, provided
by the Contractor, at no additional cost to the Owner.
3. Contractor shall bring back as much of suitable and other removed materials as
may be required to properly refill trenches or restore areas disturbed by
construction operations, at no additional cost to the Owner.
4. Contractor shall furnish additional suitable materials to properly refill the
trenches, when on site excavated material is unsuitable or of not sufficient
volume, at no additional cost to the Owner.
5. Contractor shall restore shrubbery, fences, poles or other property and surface
structures, removed or disturbed by construction operations, to a condition equal
to or better than that before the Work began, furnishing all necessary labor and
materials, without additional cost to the Owner.
6. Engineer may mark certain trees, shrubs, or other items that are not to be
disturbed or damaged. In the event such items are disturbed or damaged, they
shall be replaced or compensated for at the Contractor's expense.
7. Tree(s), approved by the Engineer for removal, shall be cut into four-foot lengths
and stacked next to the pipeline right-of-way and, unless otherwise indicated on
the Drawings or the Specifications, shall become the property of the landowner.
6508.22 02221-4 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
D. Width of Trench: Pipe trenches shall be sufficiently true in alignment to permit the pipe
to be laid in the approximate center of the trench. The trench shall be wide enough to
provide a free working space on each side of the pipe; however, the trench width at
least 12 inches above the top of the outside barrel of the pipe shall not exceed pay-line
dimensions in the following table. Payment shall be made for trench widths not to
exceed the pay-line dimensions shown below.
MAXIMUM PAY-LINE WIDTHS
Nominal Pipe Aggregate Backfill and Final Pavement Restoration
Diameter Temporary Pavement and Reseeding over Trench
(Inches) (Trench Width Inches) (Width Inches)
2 and smaller 18 42
3 24 48
4 24 48
6 24 48
8 24 48
10 28 52
12 30 54
14 32 56
15 33 57
16 34 58
18 36 60
20 40 64
21 42 66
24 48 72
27 54 78
30 60 84
33 63 87
36 66 90
42 75 99
48 84 108
54 90 114
60 96 120
66 106 130
1. At manholes, valve pits, and other structures, the pay-line shall be measured as
one (1) foot outside the wall for excavation and eighteen (18) inches outside the
wall for restoration.
2. Where sheeting and shoring are used, the maximum allowable width of trench
shall be measured between the closest interior faces of the sheeting or shoring as
placed.
3. When the maximum trench width below the top of the pipe is exceeded, Engineer
may order Contractor, to cradle or encase the pipe in concrete in order to ensure
the structural integrity of the pipe. This work shall be at Contractor's expense.
6508.22 02221-5 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
4. When the maximum width of trench specified cannot be maintained, Contractor
shall install temporary sheeting at no additional cost to the Owner.
5. Where a line is to be constructed within a right-of-way or easement in open areas,
the specified maximum width of trench at the top may be exceeded, provided the
construction is confined entirely within the limits of the right-of-way or easement
and the Work can be performed without damage to adjoining property. The angle
of slope shall be such that the trench bank will remain stable, without sliding;
maximum angle of slope shall be one-half horizontal to one vertical.
6. In locations other than rights-of-way or easements, the Engineer may, as
warranted by working conditions, and where permitted by Federal or State safety
requirements, waive the requirements specified for exceeding the maximum width
at the top of trench.
7. When Engineer waives the maximum width requirements at the top of trench the
Contractor will not be entitled to additional compensation beyond the specified
trench widths.
8. When the Engineer requires the Contractor, in writing, to excavate beyond the
maximum allowable trench width, the Contractor shall be reimbursed for the
quantity of material excavated beyond the specified trench widths in accordance
with the applicable unit price bid for Miscellaneous Unclassified Excavation.
E. Trench Width and Depth for Electrical Work:
1. Excavate trenches for both single and banked conduit runs to vertical lines not
exceeding maximum trench pay-line widths specified for piping, to accommodate
the conduit or conduits width.
2. Excavate trenches for both single and banked conduit runs to elevations indicated,
and where not indicated, to the depth required to provide a minimum of two feet
of cover unless indicated otherwise on Drawings.
F. Length of Trench:
1. Trench shall not be opened more than 100 feet in advance of the pipelines laid.
2. Contractor shall limit all trench openings to a distance commensurate with all
rules of safety.
3. When Contractor stops the Work, either totally or partially, Contractor shall refill
the trench and temporarily repave over it at his expense and the trench shall not be
opened until he is ready to proceed with the construction of the pipeline.
4. When Owner stops the Work, either totally or partially, Contractor shall, if
directed by Engineer in writing, refill the trench and temporarily repave over it or
use other Engineer-approved method to cover the trench. The trench shall not be
opened until Engineer notifies Contractor in writing to proceed with the
construction of the pipeline. Work required by this paragraph will be at Owner’s
expense; payment will be made at the appropriate unit prices bid.
G. Pumping and Draining: Contractor shall provide pumping equipment, or use other
methods, to prevent water from accumulating in the trenches and other excavations.
1. When it is not possible to completely dewater the trench Engineer may authorize
use of special pipe or jointing Products at no additional cost to the Owner.
6508.22 02221-6 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
2. Contractor shall have sufficient pumping equipment at all times during placement
of pipelines.
3. Grade the surface or provide diversion measures in the vicinity of excavation to
prevent surface water from entering open trenches or excavations.
H. Accommodations of Drainage: Contractor shall prevent storm or sanitary sewer systems
from being obstructed and shall maintain flows in these pipelines at all times during
construction operations.
I. When the material excavated from the trenches must temporarily be placed over open
drainage gutters or other waterways Contractor shall, at no additional cost, install a
temporary bridge over the gutters, or provide other means for allowing water to flow
through.
J. Maintenance of Traffic: Work shall be conducted so as to cause a minimum of
inconvenience to pedestrian and vehicular traffic and to private and public properties
along the line of work. Contractor shall, at all times, maintain crossing, walks,
sidewalks, and roadways open and safe to pedestrian and vehicular traffic, and shall
keep fire hydrants, water valves, fire alarm boxes, and mail boxes accessible for use.
When it is necessary to maintain pedestrian traffic over open trenches, provide a timber
bridge at least three feet in width, equipped with side railings. When the excavated
material will encroach upon sidewalks or private property, planking shall be placed in
order to keep the sidewalk or private property clear of excavated material.
1. In important thoroughfares, highways, or in narrow streets, the material excavated
from the trench shall be removed from the site, at Contractor's expense, in order to
provide suitable space for traffic. Contractor shall, at no cost to the Owner, shall
bring back as much of the approved material as necessary or shall furnish such
other suitable materials as may be necessary to properly refill the trench.
2. When it is necessary to haul soft or wet materials over public roadways Contractor
shall provide suitable vehicles and shall conform to all laws and regulations
relevant to such hauling.
3. Where in order to keep one side of the roadway free from any obstruction or to
keep the material stored alongside the trench from falling on private property
outside the right-of-way, a safe and suitable barrier shall be placed alongside the
trench.
4. Refer to Section 01570 for traffic regulations.
K. Blasting and Explosives: Not permitted in performance of trenching work.
L. Protection of Utilities, Property and Structures: The existence and location of
underground utilities indicated on the Drawings is to serve as a notification that such
utilities exist in the general proximity of the work. Utilities not shown, or not located
where shown, shall not relieve the Contractor of the responsibility for their protection
during construction.
1. The Contractor shall notify all utility companies, through the Miss Utility System,
in advance of construction, to locate their facilities in accordance with the laws in
6508.22 02221-7 ARRO
TOWN OF INDIAN HEAD –TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
Maryland; and shall cooperate with agents of these companies during performance
of the Work. Procedures for emergency action and repairs to utilities shall be as
established by the Act.
2. When the Contractor, during the progress of the excavation uncovers pipelines or
conduits, which because of injury or age are in poor condition, Contractor shall
immediately notify the owner of the utility in order that steps may be taken for
replacement or repair. Contractor shall record locations and procedures of repairs
made by Contractor.
3. Refer to Section 02015 for specific requirements for protection, repair, and
payment for repair, of underground utilities.
3.02 PIPE BEDDING AND TRENCH BACKFILL
A. Bedding: The trench shall be excavated to a depth of six (6) inches below the outside
diameter of the pipe barrel, or deeper if so specified. The resultant subgrade shall be
undisturbed, or compacted as approved by the Engineer if disturbed. The bedding shall
then be prepared by placing a layer of thoroughly compacted aggregate bedding and
initial backfill material, as specified, in uncompacted 4-inch to 12-inches thickness
layers above top of pipe. Bedding shall provide uniform and continuous bearing and
support for the pipe at every point between bell holes.
B. Special Bedding:
1. Concrete Cradle and Concrete Encasement: If concrete cradle and/or encasement
is indicated on the Drawings or required by the Engineer, the trench shall be
excavated to a depth of six (6) inches below the outside of the barrel of
pipes 24-inches in diameter or less and nine (9) inches below the outside of the
barrel of pipes larger than 24-inches in diameter. All of this excavation may be
done by machine.
2. Unstable Subgrade: Where the bottom of the trench at subgrade is found to be
unstable or to include ashes, cinders, any type of refuse, vegetable, or other
organic material, or large pieces or fragments of inorganic material, which, in the
opinion of the Engineer, should be removed, the Contractor shall excavate and
remove such unsuitable material to the width and depth recommended by the
Engineer.
a. Prepare subgrade, prior to installing pipe, by backfilling with aggregate
material, in uncompacted 3-inch thickness layers, thoroughly tamped. Place
bedding as previously specified.
b. Aggregate Backfill, when used at the direction of the Engineer, to stabilize
trench subgrade, will be paid in accordance with the unit price bid for
Miscellaneous Aggregate Backfill at the trench pay-line width specified,
exclusive of the pipe bedding.
c. Additional excavation required to remove unstable material will be paid in
accordance with the unit price bid for Miscellaneous Unclassified
Excavation.
3. Special Foundations: Where the bottom of the trench at the subgrade is found to
consist of material which is unstable to such a degree that, in the opinion of the
6508.22 02221-8 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
Engineer, it cannot be removed and replaced with an approved material
thoroughly compacted in place to support the pipe properly, the Contractor shall
construct a foundation for the pipe in accordance with plans prepared by the
Engineer. Compensation for such additional work shall be in accordance with the
Conditions of the Contract.
4. Excavation in Fill: When the pipe is laid in fill, the compacted embankment shall
be brought to a height of at least 9 inches above the proposed top of the pipe
before the trench is excavated.
C. Backfilling Methods:
1. General: Backfilling shall not be done in freezing weather except by permission
of the Engineer, and it shall not be done with frozen material. Do not backfill
when the material already in the trench is frozen.
a. Where aggregate backfill is not indicated on the Drawings or specified, but
in the opinion of the Engineer it should be used in a part of the Work, the
Contractor shall furnish and backfill with aggregate as directed.
b. Payment will be made in accordance with the unit price bid for
Miscellaneous Aggregate Backfill.
D. Pipe Bedding Beneath and to Centerline of Pipe: All trenches shall be backfilled, from
the bottom of the trench to the centerline of the pipe with bedding material placed in
uncompacted 4 inches thickness layers and compacted by tamping or other approved
mechanical methods. Bedding material shall be deposited in the trench for its full width
on each side of the pipe and fittings simultaneously.
E. Initial Backfill Over Pipe: From the centerline of the pipe and fittings to a depth of one
(1) foot above the top of the pipe, the trench shall be backfilled by hand or by approved
mechanical methods. The Contractor shall use special care in placing this portion of the
backfill so as to avoid injuring or moving the pipe. The backfill shall be placed in
uncompacted 4-inch thickness layers and compacted by tamping or other approved
mechanical methods.
F. Aggregate Backfill to Restoration Depth (Roadways, Driveways and Other Paved
Areas): From one (1) foot above the top of the pipe to restoration depth, the trench shall
be backfilled by hand or by approved mechanical methods. Backfill in this section of
the trench shall be coarse aggregate material subject to limitations specified and
consolidated by tamping in four (4) inch layers or other approved mechanical methods
unless otherwise specified. Any consolidation method utilizing water such as jetting or
puddling shall not be permitted. Consolidation shall proceed from the center of the
trench to the sides to prevent arching.
G. Backfill Material to Restoration Depth (Seeded Areas): From one (1) foot above the top
of the pipe to restoration depth, the trench shall be backfilled by hand or by approved
mechanical methods. Backfill in this section of the trench shall be excavated material
subject to limitations specified and consolidated by tamping in eight (8) inch layers or
other approved mechanical methods unless otherwise specified. Any consolidation
6508.22 02221-9 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
method utilizing water, such as jetting or puddling shall not be permitted.
Consolidation shall proceed from the center of the trench to the sides to prevent arching.
No extra payment for excavated material backfill will be given the Contractor.
H. Flowable Backfillill: Place as specified in MDOT SHA Standard Specifications for
Construction Materials.
I. Underground Warning Tape: Provide continuous identification tape in trenches for the
purposes of early warning and identification of buried pipes during future excavation.
Install in tape accordance with manufacturer’s instructions. Bury tape 12 inches below
finished grade or as shown on the Drawings.
1. Provide in trenches for utilities indicated in Part 2.
J. Backfilling Trenches for Electrical Work:
1. Perform trench backfilling for conduits by methods, which will result in thorough
compaction of backfill material without displacement of the conduit and
minimum settlement of backfilled material. Settlement of backfill shall be
considered evidence of improper workmanship or inclusion of unsuitable backfill
materials, or both, and will require removing and recompacting settled material at
no expense to the Owner.
2. Backfill conduits, not encased in concrete, to the level of planned subgrade using
Excavated Backfill Material, placed in layers not exceeding 6-inches in thickness
after compaction.
3. Backfill concrete encased conduits using Excavated Backfill Material placed in
layers not exceeding 6-inches in thickness after compaction.
a. In trenches under paved areas, use Aggregate Backfill of classification by
methods of placement as that specified previously for piping.
K. Compacting: During the course of backfilling and compacting work, the Engineer may,
at any location or depth of trench, make tests to determine whether compaction
operations meet specified requirements. Compact trench backfill as follows:
1. Lawn Areas: Use mechanical tampers to compact backfill materials in trench to
produce a density of backfill, at the bottom of each layer, of not less than 90
percent of maximum density obtained at optimum moisture content as determined
by AASHTO T99.
2. Paved Areas: Place material in lifts not exceeding 8 inches in loose thickness and
compact to a 95% maximum dry density based on ASTM D1557, modified
proctor.
3. Perform field determinations of density, when requested by the Engineer, in
accordance with AASHTO T191.
3.03 RESTORATION AND CLEAN-UP OF SURFACE
A. Replacement or Restoration of Surface Items: The Contractor shall restore (unless
otherwise stipulated) all sidewalks, curbings, gutters, shrubbery, fences, poles, sod or
other property and surface structures removed or disturbed as a part of the work to a
6508.22 02221-10 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
condition equal to or better than that before the work began, furnishing all incidental
labor and materials.
1. Replacement of curbs and sidewalks, shall be in accordance with the materials
and methods specified in Section 02500 and as detailed on the Drawings.
B. Pavement Replacement: As specified in Section 02500 - Paving and Surfacing.
C. Clean-Up and Maintenance of Surfaces:
1. General: During construction, the surfaces of all areas including, but not limited
to, roadways and driveways shall be maintained on a daily basis to produce a safe,
desirable, and convenient condition. Streets shall be swept and flushed after trench
backfilling, and recleaned as dust, mud, stones and debris, caused by or related to
the Work, again accumulates. Failure of the Contractor to perform this work shall
be cause for the Engineer to order others perform the work, and backcharge all
costs to the Contractor.
a. Surplus materials and temporary structures furnished by the Contractor shall
be removed from the site by the Contractor.
b. Construction debris and excess excavated material shall be disposed of by
the Contractor in a manner and place acceptable to all governing agencies.
c. The construction site shall be left clean at the end of each working day to the
satisfaction of the Engineer.
d. Surplus materials furnished by the Owner and delivered to the site by the
Contractor shall be removed and delivered by the Contractor to a location
designated by the Owner.
2. Repair or Correction of Unsatisfactory Conditions: All unsatisfactory conditions
resulting from the work shall be corrected.
3. Abnormal or dangerous condition caused by the Work, on any surface, shall be
repaired or corrected within two hours of observance or notification of its
existence. Failure of the Contractor to perform this work within this period shall
be cause for the Engineer to order others perform the work, and backcharge all
costs to the Contractor.
a. There will be no additional payment made for maintenance work.
D. Restoration of Lawns, Meadows, and Cultivated Fields:
1. General: Final restoration of all areas shall be performed in accordance with the
specifications for the particular land use.
a. Final restoration shall be performed no later than the start of the next
planting season following construction. The planting season shall be as
established on the drawings.
b. Topsoil shall be screened free from subsoil, brush, weeds, or other litter, clay
lumps and stones, but may contain decaying vegetable matter as is present in
good topsoil.
c. Precautions shall be exercised to conform with laws relating to erosion and
sediment control.
6508.22 02221-11 ARRO
TOWN OF INDIAN HEAD –TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
d. Seed shall be not more than two (2) years old. Germination tests of seeds
shall be made not more than six (6) months prior to seeding. Seed, which
has become wet, moldy or otherwise damaged, shall not be used.
e. Submit all seed mixtures to the Engineer for approval prior to seeding.
f. Contractor shall be responsible to produce a stand of grass in all seeded
areas. Erosion, drought, or any other condition encountered shall not relieve
the Contractor of this requirement.
E. Lawn Restoration: All disturbed areas, whether inside or outside the pay-lines shall
receive a minimum of 6-inches of topsoil, and the surface hand raked, stones removed
and natural drainage features provided and/or restored prior to the application of seed.
The Contractor shall restore all disturbed areas to a condition equal to or better than
prior to construction.
END OF SECTION
6508.22 02221-12 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
SECTION 02400
SITE DRAINAGE
PART 1 - GENERAL
1.01 SECTION INCLUDES
A. Drainage facilities on site
1.02 RELATED SECTIONS
A. Trenching, Backfilling, and Compacting: Section 02221.
B. Division 3 - Concrete.
1.03 REFERENCES
A. American Society for Testing and Materials (ASTM):
1. ASTM C76, Reinforced Concrete Culvert, Storm Drain, and Sewer Pipe, Spec.
for.
2. ASTM D1248, Standard Spec. for Polyethylene Plastics Molding and Extrusion
Materials.
3. ASTM D1785, Poly (Vinyl Chloride) (PVC) Plastic Pipe Schedules 40, 80 and
120, Spec. for.
4. ASTM D2466, Poly (Vinyl Chloride) (PVC) Plastic Pipe Fittings, Schedule 40,
Spec. for.
5. ASTM D2564, Solvent Cements for Poly (Vinyl Chloride) (PVC) Plastic Pipe and
Fittings, Spec. for.
1.04 SUBMITTALS
A. Shop Drawings and Product Data:
1. Submit shop drawings with information necessary for fabrication and installation.
2. Submit manufacturer’s descriptive literature covering the piping and those
products to be used in its installation.
PART 2 - PRODUCTS
2.01 MATERIALS
A. Concrete Work Products: Formwork, Reinforcement, and Cast-In-Place Concrete per
requirements of Division 3 - Concrete.
6508.22 02400-1 ARRO
TOWN OF INDIAN HEAD –TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
B. Polyvinyl Chloride (PVC): Schedule 40, Type I PVC soil and waste pipe,
ASTM D1785; and fittings, ASTM D2466. Solvent-weld joints, ASTM D2564.
PART 3 - EXECUTION
3.01 PREPARATION
A. Inspection: Prior to pipe installation inspect each section of pipe for defects before
actual use. Pipe already laid and later found defective will not be accepted and shall be
replaced with new materials and relayed at the Contractor’s expense.
3.02 CONSTRUCTION
A. Earthwork: Perform earthwork for buried piping and associated concrete structures as
specified previously in Trenching, Backfilling and Compacting: Section 02221.
B. Concrete Work: Perform concrete work incidental to the site improvements
construction as specified previously in Division 3 - Concrete.
C. Site Piping Installation:
1. Following trench preparation, install pipe bedding, and lay pipe proceeding
up-grade true to lines and grades given.
2. Rest each pipe section on bedding for the full length of its barrel. Make recesses
to facilitate joint band installation. Backfill recesses with bedding material
immediately following pipe joining operations.
D. Pipe Joining:
1. Push-On Joints: To make push-on joints, properly seat sealing gasket, evenly and
sufficiently lubricate the spigot end of pipe, and fully enter joint until joint line is
visible. Make deflection, if required, only after the joint has been assembled
properly.
F. Connections To Existing Precast Concrete Structures (if indicated on the drawings):
1. Cut required opening or openings by such methods so as to prevent cracking and
spalling of existing concrete.
2. Make openings of sufficient size to accommodate the pipe and one inch of annular
mortar space. Fill such annular space with Waterproofed Mortar thoroughly
compacted in place.
3. Set pipes entering such existing concrete structures flush with inside face of such
structures.
4. If required, fill bottom of structures with 3000 psi concrete to invert of new pipe
and slope surface 1-inch to outlet pipe.
G. Underdrain Installation (if indicated on the drawings): Install underdrain using bedding
and backfill materials specified previously in Section 02221. Perform trench
preparation, backfilling, and compaction in accordance with Section 02221. Provide
6508.22 02400-2 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
materials indicated in underdrain installation details on the Drawings and install such to
conform to the details indicated.
END OF SECTION
6508.22 02400-3 ARRO
TOWN OF INDIAN HEAD –TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
SECTION 02480
LANDSCAPING
PART 1 - GENERAL
1.01 SECTION INCLUDES
A. Seeding and/or sodding required for disturbed areas
1.02 RELATED SECTIONS
A. Site Grading: Section 02210.
1.03 QUALITY ASSURANCE
A. Source Quality Control:
1. Packaged Products shall indicate the manufacturer's guaranteed analysis on each
package and arrive on-site as originally packaged and unopened.
2. For freshly dug plants, use nursery grown stock acclimated to the soil and climatic
conditions in the local area of intended planting.
3. Use plants grown under good nursery practices for a period of two full growing
seasons in a State certified nursery.
1.04 REFERENCES
A. American Association of Nurserymen, AAN American Standard for Nursery Stock.
B. American National Standards Institute, ANSI Z60.1 Standard for Nursery Stock.
C. American Society for Testing and Materials (ASTM):
1. ASTM A53, Pipe, Steel, Black and Hot-Dipped, Zinc-coated Welded and
Seamless.
2. ASTM C602, Agricultural Liming Materials.
D. Standardized Plant Names, latest edition, American Joint Committee on Horticultural
Nomenclature.
E. American Association of State Highways and Transportation Officials, AASHTO M140,
Emulsified Asphalt.
6508.22 02480-1 ARRO
TOWN OF INDIAN HEAD –TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
1.05 SUBMITTALS
A. Test Reports: Submit laboratory test reports of the soil analysis and supplement
recommendations to the Engineer for approval prior to adding any soil supplements to
the topsoil.
1. Laboratory reports shall recommend both grade and application rates of fertilizer
and such other soil supplements as required.
2. Take sufficient quantity of topsoil samples to give a representative analysis of
on-site topsoil and topsoil from outside sources, if any.
B. Soil Supplement Product Certification: Submit certificates certifying such products to
have a guaranteed analysis in conformity with the Engineer approved laboratory soil
supplement recommendations report.
C. Landscape Furniture: Submit manufacturer's descriptive product data and current
specifications covering the prefabricated products and installation instructions for such.
D. Seed Certification: Submit certificates or certifying tags indicating lawn seed mixture,
seed purity percentage, seed germination percentage and weed seed content percentage
to certify conformity with the Specifications.
E. Sod Certification: Submit certificates certifying sod as complying with requirements of
the Commonwealth of Pennsylvania, Department of Agriculture.
F. Plant Certifications: Submit plant material certificates certifying the plants to be typical
of the species or variety and in conformity to the current edition of American Standard
for Nursery Stock of the AAN.
1.06 DELIVERY, STORAGE AND HANDLING
A. Deliver packaged products to the site in unopened containers with labels intact and
legible.
B. Deliver plant materials to the site in a protected condition to prevent wind damage and
drying. Plant material exhibiting a heated or sweated condition due to tight packing or
poor ventilation is subject to rejection.
C. Deliver plants with a securely attached waterproof tag legibly indicating the name and
size in accordance with the AAN standards of practice. Provide at least one tagged plant
in each bundle or lot. In all cases, botanical names shall take precedence over common
names.
D. Store packaged products in such a manner to prevent moisture damage and other forms
of contamination.
6508.22 02480-2 ARRO
TOWN OF INDIAN HEAD –TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
E. Store balled or wrapped and potted plants in accordance with the AAN practices to
prevent drying out. Store bare rooted plants by the heeling-in-method immediately after
delivery, or permanently plant such bare rooted plant, immediately after delivery.
F. Prepare dug plants for handling and shipment with balled and burlapped (B&B) root
systems. Perform B&B work in accordance with AAN Standards and in accordance
with ANSI Z60.1 concerning diameter and depths of balls on B&B plants. B&B plants
arriving at the site with broken, loose or fractured balls are subject to rejection.
G. When handling sod during wet weather, allow sod to dry sufficiently to prevent tearing
during handling and placing. During dry weather, water sod before lifting to ensure its
vitality and to prevent soil dropping off in handling.
1.07 PROJECT CONDITIONS
A. Environmental Requirements: Do not perform Work of this Section when soil or
weather conditions are unsuitable. Unsuitable conditions include moisture saturated or
frozen in place soil and precipitation of any kind present or occurring during the Work.
B. Seeding Dates: The following dates shall govern except when environmental conditions
warrant, the Engineer may extend the seeding dates.
1. Spring: March 1 to June 1.
2. Fall: August 1 to October 1.
C. Sodding Dates. The following dates shall govern except when environmental conditions
warrant, the Architect may extend the sodding dates.
1. Do not place sod between dates June 1 and August 15 inclusive nor times when
ambient temperature is below 32 degrees F.
D. Plant Setting Dates: The following dates shall govern except when environmental
conditions warrant, the Engineer may extend the plant setting dates.
1. Deciduous Trees (and Shrubs): October 15 to May 15.
2. Evergreen Trees (and Crown Vetch): Spring - March 1 to May 15; Fall - August 1
to September 15
3. Seedlings and Seedling Transplants: March 1 to May 15.
4. Crown Vetch Seeding: Do not seed between dates September 1 and October 31,
inclusive, nor times when ambient temperature is below 32 degrees F.
E. Protection:
1. Protect seeded areas from washouts by one of the methods specified in this
Section. Should washouts and bare spots develop resulting from inadequate
protection or otherwise, perform such reseeding as required until a healthy,
complete coverage stand of grass is obtained.
6508.22 02480-3 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
2. Protect sodded areas from becoming loose, torn or undermined by using
stabilization products specified herein. Make repairs to sodded areas immediately
and to the Engineer's satisfaction.
3. Use temporary barricades to protect lawn areas from foot traffic or other uses until
a healthy, total coverage stand of grass is obtained. Barricade materials subject to
Engineer's approval.
4. After plant setting work, install stake and guy supports on those plants indicated as
being staked to prevent uprooting by wind or otherwise. Do not locate stakes and
guy supports where pedestrian safety would be endangered.
1.08 WARRANTY
A. Warranty trees and shrubs, for a period of one year after date of contract completion,
against defects including death and unsatisfactory growth, except for defects resulting
from neglect by Owner, abuse or damage by others, or unusual phenomena or incidents
which are beyond Contractor's control.
B. Remove and replace trees, shrubs, or other plants found to be dead or in unhealthy
condition during warranty period. Make replacements during growth season following
end of warranty period. Replace trees and shrubs which are in doubtful condition at end
of warranty period.
1. Replacement specimens shall be warranted for a period of one year after
acceptance by Owner, in accordance with the Conditions of the Contract.
PART 2 - PRODUCTS
2.01 SOIL SUPPLEMENT MATERIALS
A. Agricultural Liming Materials: Products containing calcium and magnesium compounds
capable of neutralizing soil acidity and containing not less than 80 percent of total
carbonates. Use liming material meeting requirements of ASTM Designation C602 and
conforming to applicable state liming material regulations.
B. Fertilizer: Commercial fertilizer of uniform composition. free-flowing and in
conformity with applicable state fertilizer laws.
1. Analysis: As recommended by laboratory soil supplement recommendations
report.
C. Bone Meal: Horticultural grade, pulverized bone meal containing minimums of 4
percent nitrogen and 8 percent phosphoric acid.
D. Peat: Commercially available material consisting of shredded sedge peat and reed peat
or sphagnum moss peat, or combinations of such, from fresh water sites. Peats in
advanced stages of decay (parent material not identifiable) not permitted. Use peat
6508.22 02480-4 ARRO
TOWN OF INDIAN HEAD –TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
having a minimum organic content of 80 percent organic matter by weight, a pH value of
4.5 to 6.0 and a maximum ash content of 15 percent.
2.02 LAWN AND SEED MATERIALS
A. Grass Seed: As shown on plans.
2.03 PLANT MATERIAL
A. Plant Stock: Provide plants of species indicated on the Drawings and true to type and
name in accordance with the current edition of Standardized Plant Names, American
Joint Committee of Horticulture Nomenclatures. Provide healthy plants free from insect
infestations, typical of the species or variety, and which conform to the current edition of
American Standard for Nursery Stock of the AAN for grading requirements; and
ANSI Z60.1 for plant quality and minimum root spread.
B. Minimum Acceptable Plant Sizes: Measure plants before pruning with branches in
normal position; plant size shall conform to measurements indicated on the Drawings.
Plants larger in size than indicated may be used, but at no change in Contract Price. If
larger plants are used, proportionately increase the root ball or spread of roots in
accordance with AAN rules.
C. Container Grown Plants: Provisions of ANSI Z60.1 shall also govern container-grown
plants. Provide container-grown plants of at least one year but not more than two years
growth in the same container.
D. Collected Plants: Provide collected plants of species and sizes indicated on the drawings
and of such quality conforming to AAN Standards, except the root system or ball of
collected plants shall be at least 25 percent larger than that specified for nursery grown
stock.
E. Refer to “Plant Schedule” on the plans.
2.04 MULCHING MATERIAL
A. Lawn Mulch: Straw Stalks of any threshed grain or tall hay grass stalks free from seed
bearing stalks or roots harmful to lawn growth. Mulch material containing noxious
weeds, decomposed material or brittle weed material is not acceptable.
B. Plant Mulch: Tanbark, a by-product of the tanning process, or Hardwood and Pine Bark
consisting of ground or shredded bark, a fibrous material free from foreign material and
substances toxic to plant growth.
6508.22 02480-5 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
C. Mulch Binder: Emulsified asphalt conforming to the requirements of AASHTO M140,
Grade RS-1 and which does not contain solvents or other diluting agents toxic to plant
life.
2.05 PROTECTIVE MATERIALS
A. Guard Posts: Schedule 20 black steel pipe conforming to ASTM A53 and concrete filled
with Class B concrete conforming to the requirements as specified in Section 03300.
B. Stakes and Wires: Rough-sawn straight-grained hardwood stakes, free of serious defect
and of dimensions indicated on the Drawings. Use wires no smaller than No. 12 gauge
galvanized steel with fabric reinforced rubber hose not less than 5/8-inch nor more than
one inch O.D. of sufficient length to protect trees from damage by wire.
C. Tree Wrap: Krinkle-kraft waterproof paper 30-30-30 in four-inch widths minimum.
Use lightly tarred medium or coarse sisal yarn twine to tie tree wrap.
2.06 LANDSCAPE FURNISHINGS
A. As shown on plans or approved equal.
PART 3 - EXECUTION
3.01 PREPARATION
A. Tillage: Perform tillage of finish graded soil over areas indicated for lawn regardless of
type of lawn work performed. Use equipment and methods common to such work, and
till soil to a two-inch depth minimum.
B. Soil Supplement Addition: The soil supplements for lawn areas, as required according
to the Engineer approved laboratory test reports, may be incorporated into the soil during
tillage operations.
C. Plant Pits: Prepare planting beds, plant trenches and plant pits to the depths required
below finished grade according to the recommended practices of the AAN. However,
the following minimum plant pit dimensions shall take precedence over the AAN if in
conflict.
1. Excavate plant pits with vertical sides and flat bottoms.
2. Excavate plant pits large enough to allow a minimum of 12 inches beyond the
circumference of the root system or ball and six to eight inches beneath the root
system or ball.
6508.22 02480-6 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
3. Excavate pits and trenches for bare root shrubs, vines or seedlings large enough to
accommodate the root without crowding and to allow space for six inches
minimum of backfill mix around the root system.
D. Plant Beds: Prepare plant beds for ground cover by incorporating peat and the required
soil supplements into the top 6 inches of existing topsoil. Incorporate peat into the
topsoil in quantity equal to three inches of peat spread uniformly over the plant bed.
E. Backfill Mix For Plant Pits: Prepare a mix consisting of one part peat to three parts
excavated topsoil by volume and one pound of bone meal added for each cubic yard of
excavated topsoil.
3.02 PERFORMANCE
A. Seeding: Sow seed mixtures when air current is low and not more than five days after
soil supplements have been applied. Sow seeds in two applications using either
mechanical power seeders or mechanical hand seeders. Sow one-half of the seed
mixtures in one direction over designated areas and the remainder at right angles to the
first sowing.
B. Seed Cover: Imbed seed mixtures into topsoil 1/4-inch using a light drag or rake and
moving in directions parallel to the contour lines. Immediately after dragging or raking,
compact seeded areas using a cultipacker or similar design lawn roller, weighing 60
to 90 pounds per linear foot of roller, and roll at right angles to existing slopes.
C. Lawn Mulching: Evenly apply mulch over seeded areas not more than 48 hours after
seeding. Start mulching at windward side of relatively flat areas, or at the upper part of
slopes. Spread mulch in a total coverage at a depth not less than 1½ inches nor more
than three inches.
D. Mulch Binding: Immediately following mulch spreading, apply mulch binder to anchor
mulch to the soil. The number of passes over the mulch as needed to secure it firmly
shall not exceed three passes with maximum applied binder not exceeding ten gallons
per 1,000 square feet.
E. Sodding: Place sod on lightly irrigated soil during periods of high ambient temperature,
otherwise lay sod as follows:
1. Lay the first row of sod in a straight line with subsequent rows placed parallel and
tightly against one another. Stagger lateral joints in all rows. Exercise care not to
stretch sod or overlap joints.
2. Immediately after placing sod, saturate sod with water to its full depth. After
initial watering, tamp sod to firmly close seams using a tamper weighing not
over 15 pounds with a face area of approximately one hundred square inches.
Where sod slippage is evident, correct such without additional compensation.
6508.22 02480-7 ARRO
TOWN OF INDIAN HEAD –TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
F. Sodding Drainage Areas: Place sod strips at right angles to water flow. At the point
where water flow starts, turn the upper edge of the strip sod into the soil and compact a
layer of topsoil over the juncture so as to conduct water over the sod.
G. Sodding Slopes: Place sod strip lengths parallel to the slope contours starting at the
bottom of the slope. Securely stake sod with 1/2 x 1 x 8 to 12-inch wood stake placed
one stake for each two square feet of sod. Drive stake flush with top of sod and with
wide face parallel to slope contour.
H. Plant Setting Operations: Set plants to ensure that after settlement the plant stem
projects from the soil as much as before transplanting. Set plants plumb and straight
with allowance for settlement and in accordance with following:
1. Ground Cover Plants: Set each plant in a slight depression for catching rainwater
and top-off such depressions with two inches of mulch spread uniformly and
compacted. Thoroughly water groundcover bed immediately following planting.
2. Balled & Potted Plants: Set each plant in prepared circular pits deep enough to
accommodate a bed of topsoil not less than six inches deep under the ball or pot of
shrubs and 12 inches under the ball of trees. Remove burlap from the top third of
root balls, and completely remove ropes, twine and wires from root balls.
Completely remove containers from potted plants, however, the earth shall remain
unbroken around roots. Place Backfill Mix in plant pits under and around root
balls in six-inch layers and tamp to eliminate voids. At the half-way point in
backfilling, flood pit with water and continue backfilling after water dissipates.
Backfill pits to grade, and build up a ring of soil three inches deep over edge of
plant pit to facilitate maintenance watering. Place a two-inch layer of plant mulch
within the ring prior to watering.
3. Bare Root Plants: Set plants with root system properly spread out and work
Backfill Mix among the roots. Cut off clean any broken or frayed roots. Backfill
in six inch layers to grade using water to settle each layer. Form a ring of soil three
inches deep over edge of plant pit to facilitate maintenance watering. Place a two-
inch layer of plant mulch within the ring prior to watering.
3.03 PROTECTION INSTALLATION
A. Wrapping: Immediately after planting, wrap the trunks of deciduous shade and
flowering trees with Tree Wrap waterproof paper overlapping 1½ inches between the
lowest main branches and the ground line. Tie wrapping at five places along the trunk
including top, middle and bottom.
B. Staking Trees: Within three days after planting, stake trees as detailed at perimeter line
of root ball and to sufficient depth to hold tree rigid. Drive stakes vertically and not
twisted or pulled. Place wire ties as indicated with protection (hose) at points of contact
with bark. Stake trees as follows:
1. Stake trees up to two inches caliper with two stakes.
2. Stake trees two inches caliper and larger with three stakes.
6508.22 02480-8 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
3. Stake evergreen plants six feet and taller with two stakes.
3.04 PRUNING
A. Prune new plant material to minimum necessary to remove injured twigs and branches
and to compensate for loss of roots during transplanting, but never to exceed more than
half of the branch structure. Pruning may be done before delivery of plants, but not
before plants have been inspected and approved. Paint cuts over 3/4-inch in diameter
with an approved tree-wound paint.
B. Prune existing trees indicated to remain to remove all dead and interfacing branches.
Remove lower branches to provide a minimum clearance five feet from finished grade.
Paint cuts over 3/4-inch in diameter with an approved tree-wound paint.
C. To repair small decay cavities in existing trees, remove decayed material to a depth
which exposes healthy tissue. Shape cavities to provide drainage. Cover exposed
cambium layers with clear shellac or tree-wound paint, to prevent drying and leave
cavities open.
3.05 MAINTENANCE
A. Maintenance operations shall begin immediately after seeding and planting is performed
and shall continue throughout the guaranty period. In general, maintenance shall include
weeding, applying mulch as needed, controlling insects and diseases and performing
other particular operations as follows:
1. Seeded Areas: Keep seed moist continually for proper germination and water
thereafter as necessary to prevent drying out or burning. Reseed areas not showing
a prompt catch of grass, correct depressions and irregularities and reseed; repeat
until a complete coverage is obtained. Cut seeded areas at required intervals to
maintain grass at a maximum height of 21/3 inches.
2. Sod: Perform daily watering if necessary for the establishment of the sod; water
thereafter at frequencies required to maintain growth. Cut sod at required intervals
to maintain a maximum height of 2½ inches.
3. Plants: Water the plant root systems at regular intervals and keep surrounding soil
in condition for promotion of root growth. Maintain and adjust stake wires if
necessary and rewrap tree trunks when necessary. Perform pruning, other than
initial pruning, as necessary to remove dead leaders and branches. Replace plants
that are dead, unhealthy or in a badly damaged condition with like species plants.
Do not make replacements during seasons definitely unfavorable for planting.
B. At conclusion of construction period, the Engineer shall make an inspection of the
landscaping work to determine condition of acceptance. Make such additional repairs
and replacements as required by the Engineer. Perform such work at no expense to the
Owner.
END OF SECTION
6508.22 02480-9 ARRO
TOWN OF INDIAN HEAD –TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
SECTION 02520
PORTLAND CEMENT CONCRETE PAVING
PART 1 - GENERAL
1.01 SECTION INCLUDES
A. Concrete sidewalks and curbs.
B. Reinforcement.
C. Surface Finish.
D. Curing.
1.02 RELATED SECTIONS
A. Concrete Formwork: Section 03100.
B. Concrete Reinforcement: Section 03200.
C. Cast-In-Place Concrete: Section 03300.
D. Joint Sealers: Section 07900.
1.03 REFERENCES
A. ACI 301 - Specifications for Structural Concrete for Buildings.
B. MDOT SHA Standards Specifications for Construction Materials, July 2023 and
latest edition
1.04 QUALITY ASSURANCE
A. Perform work in accordance with ACI 301 and SHA Specifications.
B. Obtain materials from same source throughout.
C. Conduct testing as specified for Quality Control in Section 03300.
6508.22 02520-1 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
1.05 SUBMITTALS
A. Submit product data, laboratory test reports, and material certificates under submittals
requirements of Division 3 - Concrete.
PART 2 - PRODUCTS
2.01 MATERIALS
A. Concrete Work Products: Formwork, reinforcement, joint fillers and cast-in-place
concrete per requirements of Division 3 - Concrete.
B. Coarse Aggregate Base: AASHTO No. 57 Coarse Aggregate conforming to SHA
Specifications.
PART 3 - EXECUTION
3.01 INSPECTION
A. Verify compacted coarse aggregate base is ready to support paving and imposed loads.
B. Verify gradients and elevations of base are correct.
C. Beginning of installation means acceptance of existing conditions.
3.02 PREPARATION
A. Moisten base to minimize absorption of water from fresh concrete.
B. Notify Engineer minimum 24 hours prior to commencement of concreting operations.
3.03 PLACING
A. Perform forming, reinforcing, concrete placement, and curing methods in accordance
with Division 3 - Concrete. Additional requirements as follows.
B. Interrupt reinforcement at expansion joints.
C. Place expansion joints at 20-foot intervals to correct elevation and profile. Align curb
and sidewalk joints.
D. Place joint filler between paving components and building or other appurtenances.
E. Provide tooled contraction joints at 5-foot intervals of sidewalk.
6508.22 02520-2 ARRO
TOWN OF INDIAN HEAD –TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
F. Ensure reinforcement, inserts, embedded parts, and formed joints are not disturbed
during concrete placement.
3.04 FINISHING
A. Sidewalk Paving: Light broom, radiused and trowel joint edges.
B. Curbs: Light broom.
3.05 PROTECTION
A. Immediately after placement, protect concrete from premature drying, excessive hot or
cold temperatures, and mechanical injury.
END OF SECTION
6508.22 02520-3 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
SECTION 02700
PIPED UTILITIES
PART 1 - GENERAL
1.01 SECTION INCLUDES
A. Piped utilities are those underground piped services, as listed below, which extend from
the off-site location indicated on the Drawings to within five (5) feet of a structure.
1. Water Service
2. Wastewater Sewer Service Lateral.
B. The extension of such services from the point five (5) feet outside a structure to and
within a structure is the work of the Plumbing Contractor.
1.02 RELATED SECTIONS
A. Trenching, Backfilling and Compacting: Section 02221.
B. Division 3 - Concrete.
C. Plumbing: Section 15400.
1.03 QUALITY ASSURANCE
A. Source Quality Control:
1. Shop Tests: In accordance with Article 4, Paragraph 4.5 of the General
Conditions. Each pipe manufacturer must have facilities to perform listed tests.
The Engineer reserves the right to require the manufacturer to perform such
additional number of tests, as the Engineer may deem necessary to establish the
quality of the material offered for use. Factory test the following pipe material:
B. Requirements Of Regulatory Agencies:
1. General Requirement: Comply with construction requirements of State, County,
or other political subdivision, which requirements exceed these Specifications.
2. Water Service: Consult the Town of Indian Head for specific requirements
concerning the work of connecting into the public water system and materials and
methods to be used for such connection.
3. Wastewater Sewer Service: Consult the Town of Indian Head for specific
requirements concerning the work of connecting into the public sewer system and
materials and methods to be used for such connection.
6508.22 02700-1 ARRO
TOWN OF INDIAN HEAD- TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
1.04 REFERENCES
A. American National Standards Institute (ANSI):
1. ANSI A21.4, Cement-Mortar Lining for Cast-Iron and Ductile-Iron Pipe and
Fittings for Water.
2. ANSI A21.10, Gray-Iron and Ductile-Iron Fittings, 2 through 48 in., for Water
and Other Liquids.
3. ANSI A21.11, Rubber Gasket Joints for Cast Iron and Ductile Pressure Pipe and
Fittings.
4. ANSI A21.50, Thickness Design of Ductile-Iron Pipe.
5. ANSI A21.51, Ductile-Iron Pipe, Centrifugally Cast, in Metal Molds or Sand
Lined Molds for Water or Other Liquids.
6. ANSI B16.21, Nonmetallic Gaskets for Pipe Flanges.
7. ANSI B16.26, Cast Copper Alloy Fittings for Flared Copper Tubes.
8. ANSI B18.2.1, Square and Hex Bolts and Screws, Including Askew head Bolts,
Hex Cap Screws, and Lag Screws.
9. ANSI B18.2.2, Square and Hex Nuts.
10. ANSI B31.8, Gas Transmission and Distribution Piping Systems.
B. American Society for Testing and Materials (ASTM):
1. ASTM A48, Gray Iron Castings, Spec. for.
2. ASTM A53, Pipe, Steel, Black and Hot-Dipped Zinc-Coated (Galvanized)
Welded and Seamless, Spec. for.
3. ASTM A74, Cast Iron Soil Pipe and Fittings, Spec. for.
4. ASTM A120; Black and Hot-Dipped Zinc-Coated (Galvanized) Welded and
Seamless Steel Pipe for Ordinary Uses.
5. ASTM B62, Composition Bronze Castings.
6. ASTM B88, Seamless Copper Water Tube, Spec. for.
7. ASTM B371, Copper-Zinc-Silicon Alloy Rod.
8. ASTM B584, Copper Alloy Sand Castings for General Applications.
9. ASTM C12, Installing Vitrified Clay Pipe Lines, Rec. Practice for.
10. ASTM C32, Sewer and Manhole Brick (Made from Clay or Shale), Spec. for.
11. ASTM C76, Reinforced Concrete Culvert, Storm Drain and Sewer Pipe.
12. ASTM C361, Reinforced Concrete Low-Head Pressure Pipe, Spec. for.
ASTM C425, Compression Joints for Vitrified Clay Pipe and Fittings, Spec. for.
13. ASTM C564, Rubber Gaskets for Cast Iron Soil Pipe and Fittings, Spec. for.
14. ASTM C700, Vitrified Clay Pipe, Extra Strength, Standard Strength and
Perforated, Spec. for.
15. ASTM D1785, Poly (Vinyl Chloride) (PVC) Plastic Pipe, Schedules 40, 80, and
120, Spec. for.
16. ASTM D2321, Underground Installation of Flexible Thermoplastic Sewer Pipe,
Rec. Practice for.
17. ASTM D2467, Socket-Type Poly (Vinyl Chloride) (PVC) Plastic Pipe Fittings,
Schedule 80, Spec. for.
18. ASTM D2564, Solvent Cements for Poly (Vinyl Chloride) (PVC) Plastic Pipe and
Fittings, Spec. for.
6508.22 02700-2 ARRO
TOWN OF INDIAN HEAD-TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
19. ASTM D3034, Type PSM Poly (Vinyl Chloride) (PVC) Sewer Pipe and Fittings,
Spec. for.
20. ASTM D3212, Joints for Drain and Sewer Plastic Pipes Using Flexible
Elastomeric Seals, Spec. for.
21. ASTM F477, Elastomeric Seals (Gaskets) for Joining Plastic Pipe, Spec. for.
C. American Water Works Association (AWWA):
1. AWWA C100, Cast-Iron Pressure Fittings.
2. AWWA C500, Gate Valves - 3 In. through 48 In. - for Water and Other Liquids.
3. AWWA C600, Installation of Gray and Ductile Cast-Iron Water Mains and
Appurtenances.
4. AWWA C800, Threads for Underground Service Line Fittings (with Appendix on
Collected Standards for Service Line Materials).
1.05 SUBMITTALS
A. Shop Drawings and Product Data:
1. Manufacturer’s published detail drawings, modified to suit design conditions if
required, and Contractor prepared drawings as applicable.
2. Manufacturer’s descriptive literature and specifications covering the product
specified. Include installation information.
B. Certificates: Certified records or reports of the results of shop tests; such records or
reports to contain a sworn statement that shop tests have been made on the products
specified in order to be in compliance with the Referenced Standard for each particular
product.
1.06 PRODUCT DELIVERY, STORAGE AND HANDLING
A. Transport and handle products specified herein in a manner recommended by the
respective manufacturers of such to prevent damage and defects.
B. Store Products in accordance with manufacturer’s recommendations to avoid shock or
prevent physical damage and defects.
1.07 SITE CONDITIONS
A. Environmental Requirements:
1. Keep trenches dewatered until pipe joints have been made and concrete work, if
any, has cured.
2. Under no circumstances lay pipe in water or on bedding containing frost.
3. Do not lay pipe when weather conditions are unsuitable, as determined by the
Engineer, for pipe laying work.
B. Protection:
6508.22 02700-3 ARRO
TOWN OF INDIAN HEAD- TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
1. Exercise care during piped utility uncovering and connecting work to confine
operations to the facilities as indicated on the Drawings. The physical means and
methods used for protection are at the Contractor’s option. However, the
Contractor will be completely responsible for replacement and restitution work of
whatever nature to adjacent structures and construction.
2. Exercise every precaution against flotation of both existing and new pipe and
in-line or on-line structures. Correct damage from flotation to the satisfaction of
the Engineer.
PART 2 - PRODUCTS
2.01 WATER SERVICE PIPE AND PIPE FITTINGS
A. Copper Tubing (Cu Water Service Branches):
1. Installed Underground:
a. Tubing: ASTM B88 Type K Annealed.
b. Joints: Flared Only.
c. Fittings: Cast Copper Alloy Fared Tube Fittings ANSI B16.26.
B. Cu Service Connector and Stops:
1. Service Saddles: Designed to conform to AWWA C100.
a. Malleable iron casting with forged steel strap. Malleable iron casting
heavily galvanized and strap/bolt and nut assembly heavily cadmium plated.
2. Corporation Stop: Designed to conform to AWWA Standard C800.
a. All bronze construction, key operated, with gasket and eight-bend coupling.
3. Curb Stop and Box: Designed to conform to AWWA Standard C800.
a. All bronze construction, inverted key stop.
b. Extension type arch pattern base of two-piece cast iron construction coated
inside and out with tar base enamel and topped with cast iron lid secured by
bronze bolt.
4. Acceptable Manufacturers: Provide only those CU service connectors and stops
by manufacturers as approved by the Town of Indian Head, or approved equal.
C. Potable Water Meter Pit:
1. Copper Tubing: As specified previously.
2. Water Meter Yoke: As required by the Town.
3. Gate Valve:
a. Design working water pressure at 200 psi for valves 12 inches in diameter
and smaller.
b. Markings factory cast on the bonnet or body of each valve indicating
manufacturer’s name or mark, year of valve casting, size of valve,
directional flow arrow and designation of working water pressure.
c. Solder type joints.
d. Valve shall open to left (counterclockwise).
6508.22 02700-4 ARRO
TOWN OF INDIAN HEAD-TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
e. Valve stuffing box of such design that valve can be packed under pressure
when in fully open position.
f. Solid bronze with tapered split wedge disc.
g. Physical properties of brass pressure containing parts shall conform to
ASTM B62.
h. Stems fabricated of ASTM B371, Alloy A (rolled silicon brass),
ASTM B584 Copper Alloy No. 876 (silicon bronze + silicon brass), or other
material equally resistant to dezincification.
4. Brick: Commercially manufactured brick made from clay or shale and burned,
meeting requirements of ASTM C32, Grade MS.
5. Aggregate: Size No. 57 Coarse Aggregate.
6. Double Lid Cover: Gray iron castings conforming to ASTM A48, Class No. 30,
designed for AASHTO Highway Loading Class HS-20. Provide castings of
uniform quality, free from blowholes, porosity, hard spots, shrinkage distortion or
other defects. Frame and cover design and dimensions as indicated on Drawings.
a. Finish: Bearing surfaces machined to prevent rocking and rattling under
traffic. Casting surfaces shotblast cleaned and coated with asphalt paint,
non-tacky drying.
b. Identification: Cast the words “Water Meter” integrally on cover.
7. Meter furnished by the Town of Indian Head.
2.02 WASTEWATER SEWER SERVICE PIPE AND FITTINGS
A. Polyvinyl Chloride Pipe (PVC): Type PSM SDR-35, ASTM D3034.
1. Fittings: Conforming to same applicable ASTM Specifications requirements for
pipe.
2. Joints: Push-on elastomeric ring gasket, ASTM D3212; and ASTM F477 for
material specifications.
B. Polyvinyl Chloride Pipe (PVC): ASTM D1785 Schedule 40 manufactured from
Class 12454-B Rigid PVC Compounds with a hydrostatic design stress of 13.8 MPa
(2000 psi) designated as PVC 1120.
1. Socket Type Fittings: ASTM D2467 manufactured from Class 12454-B Rigid
PVC Compound.
2. Solvent: ASTM D2564.
C. Saddle Connection: Correctly contoured for outside diameter of pipe and incorporating
a gasket and band assembly.
1. Saddle Body: Cast iron, ASTM A48, Class 35, coated inside and out with heavy
coat of black asphaltum type paint.
2. Gasket: Compound rubber (neoprene) tubular O-ring design, ASTM C361.
3. Band: Type C304 stainless steel band assembled with two 3/4-inch Type C304
stainless steel T-bolts, washers and hex nuts.
4. Provide spigot or bell inlet and proper adaptor or coupling suitable for connection
of the type and size of wastewater building sewer connection pipe.
6508.22 02700-5 ARRO
TOWN OF INDIAN HEAD- TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
5. Acceptable Manufacturer: The General Engineering Company; Sealtite; Fernco;
or equal.
PART 3 - EXECUTION
3.01 INSPECTION
A. Inspect each section or length of pipe, and each fitting, before laying in conformance
with the inspection requirements of the appropriate referenced standard.
B. Promptly remove rejected Products from the Project site.
3.02 PREPARATION
A. Field Measurement:
1. The Drawings are in general indicative of the Work with symbols and notations
for clarity. However, the Drawings are not an exact representation of all
conditions involved, therefore, layout piping to suit actual field measurements.
No extra compensation will be made for Work due to differences between
indicated and actual dimensions.
2. Submit details of proposed departures necessitated by field conditions or other
causes to Engineer for approval.
B. Earthwork: Perform earthwork for buried piping as specified in Trenching, Backfilling
and Compaction: Section 02221.
1. Rest each section of pipe on pipe bedding for the full length of its barrel, with
recesses excavated for pipe joints so joints can easily be made.
2. Backfill recesses with bedding material immediately following pipe joining
operations.
3.03 INSTALLATION
A. General Requirements:
1. Use only the proper and suitable tools and apparatus for proper and safe handling,
lowering into trench and laying of pipes.
2. Clean piping interior prior to installation and following installation. Keep open
ends of piping and pipe attachment openings on equipment capped or plugged
until actual connection.
3. Construct Piping from full lengths of pipe using short sections only for runs of
less than full pipe length.
4. Use reducing fittings where reduction in pipe sizes is necessary. Bushings will
not be accepted.
6508.22 02700-6 ARRO
TOWN OF INDIAN HEAD-TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
5. Take up and relay pipe that is not laid true to required alignment or grade or has
its joints disturbed after laying. No deviation from the required line and grade
permitted, except with approval of the Engineer.
6. Pipe Joining: Exercise care when making the pipe joints and make joints in
accordance with the pipe material manufacturer’s recommendations and the
following requirements. In each instance of pipe joining, those portions of pipes
involved must be absolutely clean just prior to assembly. If a joint is extremely
difficult to assemble or sealing is not affected, disassemble the joint and correct
the difficulty if possible. Remake the joint using new materials when necessary.
a. Laying Specified Types of Plastic Pipe: Installation and joint assembly
according to ASTM D2321 for Class I bedding material.
B. Water Service Pipe Installation:
1. Unless indicated otherwise, install piping with not less than 3.5 feet of cover.
2. Setting Valves, Stops and Boxes:
a. Unless otherwise directed by the Engineer, set valves, curb stops. and boxes
truly vertical.
b. Set valve and curb stop boxes neatly to grade and in such a way that the box
does not transfer shock or stress to the valve or stop. Exercise care to center
the box over the wrench nut of the valve or stop.
3. Setting Water Meter Pit:
a. Unless otherwise directed by the Engineer, set pit truly vertical and as shown
on the Drawing.
b. Set pit neatly to grade and in such a way that the pit does not transfer shock
or stress to the meter or pipe. Exercise care to center the pit over the meter.
4. Connection to Existing Water Main: Make connection in conformance with
Water Service utility requirements exercising necessary precaution to prevent
contamination to the existing main.
a. DIP Pipe Connection: Use tapping sleeve and valve to make connection.
b. CU Pipe Connection: Use corporation stop to make connection.
C. Wastewater Sewer Service Pipe Installation:
1. Lay pipe proceeding upgrade true to line and grades indicated. Lay bell and spigot
pipe with bell end upgrade. Lay tongue and groove pipe with groove end upgrade.
2. Exercise care to ensure that each length abuts against the next in such manner that
no shoulder or unevenness of any kind occurs along inside bottom half of
pipeline.
3. No wedging or blocking permitted in laying pipe unless by written order of
Engineer.
4. Where necessary to field cut pipe use approved pipe cutter, milling cutter or
abrasive wheel saw.
5. Before joints are made, bed each section of pipe full length of barrel with recesses
excavated so pipe invert forms continuous grade with invert of pipe previously
laid. Do not bring succeeding pipe into position until the preceding length is
embedded and securely in place.
6508.22 02700-7 ARRO
TOWN OF INDIAN HEAD- TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
6. Walking or working on completed pipe line, except as necessary in tamping and
backfilling, not permitted until trench is backfilled one-foot deep over top of
pipes. Connections of pipes to new or existing manholes shall be as specified in
Section 02601. In the case where the Wastewater Service utility has no
requirements concerning such connections, make connections as follows:
a. Cut required pipe opening by such methods so as to prevent cracking and
spalling of manhole material.
b. Make opening of sufficient size to accommodate the pipe with an installed
PVC Waterstop and one (1) inch of annular grout space.
c. PVC Waterstop of gasket design and composed of virgin polyvinyl chloride
(PVC); similar to CMA Concrete Manhole Adapter by Fernco Joint Sealer
Co. (distributed by The General Engineering Co., Frederick, Maryland).
Alternative manufactures include Sika and Henry Co. or approved equal.
d. Grout annular space using a non-shrink non-metallic grout ready-mix
product such as Master Builders Masterflow 713, Sonneborn Sonogrout;
W.R. Grace & Company Darex Non-Metallic Grout, U.S. Grout Corp.,
Five-Star; Duragrout bu L&M Construction Chemicals; or approved equal.
e. Form a new invert channel in the existing manhole base to properly conduct
the flow through the existing manhole.
7. Sewer Tap: In the case where the existing Wastewater Service utility has no
requirements concerning sewer taps, make taps as follows:
a. Make sewer tap matching 0.8 flowing full points of the sewer main at point
of sewer tap.
b. Under no circumstances shall the sewer main be tapped directly through the
top of the crown of the main.
c. Make sewer main tap incorporating a Saddle Connection. Use a hole-cutting
machine specifically designed for the purpose as appropriate to the type of
pipe material being cut. No other means of making the hole permitted.
Install saddle in accordance with manufacturer’s installation instructions and
to form a completely leak-free installation.
d. If sewer main being tapped is PVC or other plastic compounds, provide a
solvent weld type sewer saddle connection of the appropriate plastic
compound formulation as compatible with the sewer main pipe.
8. Drop Connections: In the case where a drop connection is required, make such
connection as indicated on the Drawings.
a. Use the same pipe material to construct the drop connection as is used to
construct the wastewater building sewer of this Contract.
3.04 FIELD QUALITY CONTROL
A. General Requirements: Conduct tests specified herein so that each pipeline installed in
the Project is tested to the Engineer’s satisfaction.
1. Provide tools, materials (including water), apparatus and instruments necessary
for pipeline testing.
2. Conduct tests of every kind in the presence of and to the satisfaction of the
Engineer.
6508.22 02700-8 ARRO
TOWN OF INDIAN HEAD- TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
3. Repair and Retest: When a pipeline fails to meet test requirements specified
herein, conform to the following:
a. Determine source or sources of leakage.
b. Repair or replace defective material, and if a result of improper
workmanship, correct such.
c. Conduct additional tests to demonstrate that pipeline meets specified test
requirements.
4. Accuracy Proof: Furnish acceptable proof to the Engineer that testing apparatus,
pressure gauges, etc. have been recently checked and calibrated as applicable prior
to use on this Project.
5. Notification: Give the Engineer a minimum of three (3) days advance notice of
the times when pipe line acceptance testing will be conducted.
B. Water Service Pipe Line Testing and Disinfecting:
1. General: Conduct testing and disinfecting in accordance with the Water Service
utility requirements, or in accordance with the following requirements, whichever
is more stringent.
a. Prior to testing, allow those installed sections of water piping protected by
concrete reaction blocking to stand undisturbed for at least seven (7) days
from concrete pour. Provide temporary blocking as required.
b. The Contractor may, at his option, completely backfill the trench or partially
backfill the trench over the center section of each pipe length prior to
performing the pressure test.
c. Fill the section of installed water piping being tested with water a minimum
of twenty-four (24) hours prior to testing. During filling, ensure the piping is
free of air. Use potable water for filling.
2. Line Acceptance Test:
a. After the water line is constructed, backfilled (as stated above), and
successfully cleaned, perform a hydrostatic line acceptance test as follows:
1) Seal water line at downstream end with a suitable pipe plug.
2) Fill water line with potable water (as stated above).
3) Raise hydrostatic pressure to 150 psi.
4) Maintain test pressure for a period of not less than one (1) hour.
b. Also conduct a leakage test for a duration of two (2) uninterrupted hours at
the same pressure specified for the hydrostatic test and provide a means for
measuring leakage. Piping being tested will not be accepted if leakage is
greater than that determined by the following formula:
ND P
L=
7,400
in which L is the allowable leakage in gallons per hour; N is the number of
joints in the length of pipeline tested; D is the nominal diameter of the pipe
in inches; and P is the average test pressure in pounds per square inch (based
on test pressure indicated above, measured at the low point).
6508.22 02700-9 ARRO
TOWN OF INDIAN HEAD- TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
c. The leakage test may be conducted simultaneously with the pressure test,
provided a suitable means of measuring leakage is provided and a record of
water added to the piping being tested is kept for the two (2) hour test
period.
d. The Engineer will record the actual pressure at one-half hour intervals and
will record the make-up water required to regain the specified test pressure
during the 2-hour test period
e. Should testing of pipe indicate leakage greater than that specified above, the
Contractor shall, at no additional cost, locate, repair, and replace the
defective joints, pipe, or fittings until the leakage is within the specified
allowance.
3. Disinfection of Water Line: Disinfect the pipe, and connections installed as
follows:
a. Observe every precaution during the installation of the connection to prevent
foreign material and trench water from entering the pipe and fittings during
their installation.
b. Swab the interior of pipe and fittings with a 5 percent hypochlorite solution.
A 5 percent hypochlorite solution can be obtained by mixing approximately
3 pounds of granulated calcium hypochlorite with 5 gallons of water.
c. After the pipe, fittings, and valves have been swabbed, then thoroughly flush
with potable water.
C. Wastewater Sewer Service Pipe Line Testing:
1. General: Conduct testing in accordance with the Wastewater Sewer Service
utility requirements, or in accordance with the following requirements, whichever
is more stringent.
a. Partially backfill the trench over the center section of each Pipe length prior
to performing line acceptance test.
2. Line Acceptance Test:
a. After the sewer line is constructed, backfilled (as stated above), and
successfully cleaned, perform a hydrostatic head line acceptance test as
follows:
1) Seal sewer line by insertion of a test plug at point of connection with
the public sewer.
2) Fill sewer line with water.
3) Apply a head of water of not less than ten (10) feet.
4) Maintain head for a period of not less than fifteen (15) minutes and
longer as required to inspect each pipe joint in the sewer line.
b. A test will be considered successful when the head of water is maintained
unaided for fifteen (15) minutes continuously and every joint in the sewer
line is proven leak free.
END OF SECTION
6508.22 02700-10 ARRO
TOWN OF INDIAN HEAD-TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
SECTION 02855
PAVEMENT MARKING
PART 1 - DESCRIPTION
1.01 SECTION INCLUDES
A. This work shall consist of furnishing and installing heat applied preformed
thermoplastic pavement marking symbols, legends, and lines as specified in the
Contract Documents or as directed by the Engineer.
PART 2 – MATERIALS
2.01 MATERIALS.
A. Preformed Thermoplastic is a durable pavement marking material. All Preformed
Thermoplastic Pavement Marking material shall be selected from the Qualified
Products List.
Heat Applied Permanent Preformed
Thermoplastic Pavement Marking Material (951.06 of MD SHA Specifications)
PART 3 – EXECUTION
3.01 CONSTRUCTION.
A. Quality Assurance/Quality Control. (Refer to 549 of the MD SHA Specifications)
B. Application. The location, width, and type of marking, shall be as specified in the
Contract Documents or as directed by the Engineer.
Applying pavement markings over longitudinal joints is prohibited; they shall
preferably be offset 2 in. from them.
C. Thermoplastic Pavement Marking shall conform to the following:
1. Temperature. The markings shall be applied when the thermoplastic,
ambient, and surface temperature, and relative humidity conform to the
manufacturer’s recommendations.
6508.22 02855-1 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
2. Color. The color of the dry markings shall match Federal Standard 595
(13538 - yellow or 17886 - white). The Contractor shall supply the
specified color chips for the Engineer’s use to visually determine that the
thermoplastic material matches the specified color.
3. Primer. When specified by the manufacturer, a primer shall be used if
thermoplastic is applied to Portland cement concrete.
4. Retroreflectance. The minimum retroreflectance shall be 150
millicandelas/lux/square meter for yellow and 250
millicandelas/lux/square meter for white as determined in conformance
with 549.03.
D. Packaging. The material shall be handled for shipping, unloading and storage as
recommended by the manufacturer. Each shipping package shall be marked with
the following information:
1. Manufacturer's name.
2. Description of item.
3. Date of manufacture.
4. Contractor's name.
5. Purchase order number.
6. Lot number.
7. Color.
END OF SECTION
6508.22 02855-2 ARRO
TOWN OF INDIAN HEAD –TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
DIVISION 3 - CONCRETE
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
SECTION 03100
CONCRETE FORMWORK
PART 1 - GENERAL
1.01 SECTION INCLUDES
A. Formwork for cast-in-place concrete including form coating and form ties.
1.02 RELATED SECTIONS
A. Cast-in-Place Concrete: Section 03300.
1.03 QUALITY ASSURANCE
A. Design Criteria:
1. Design, erect, support, brace, and maintain formwork according to the guidelines
of ACI 347R to support vertical and lateral, static, and dynamic loads that might
be applied until such loads can be supported by concrete structure. Contractor
shall be fully responsible for any damage or injury caused by inadequacy or failure
of formwork.
2. Maintain formwork construction tolerances complying with ACI 117.
3. Design formwork to be readily removable without impact, shock, or damage to
cast-in-place concrete surfaces and adjacent materials.
1.04 REFERENCES
A. Comply with the latest published version for the following referenced standards.
B. American Concrete Institute (ACI):
1. ACI 117; Standard Specification for Tolerances for Concrete Construction and
Materials.
2. ACI 301; Standard Specification for Structural Concrete.
3. ACI 318; Building Code Requirements for Structural Concrete.
4. ACI 347R; Guide to Formwork for Concrete.
C. APA-Engineered Wood Association (APA): APA Grade-Trademarks.
D. U.S. Department of Commerce Product Standards:
1. PS-1 For Construction and Industrial Plywood.
6508.22 03100-1 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
1.05 SUBMITTALS
A. Product Data: Submit data for proprietary materials and items, including forming
accessories, coatings, and others as requested by Engineer.
PART 2 - PRODUCTS
2.01 FORM MATERIALS
A. Forms:
1. Forms (Exposed Finish Concrete): Plywood, metal, metal-framed plywood faced
or other acceptable panel-type materials, to provide continuous, straight, smooth,
exposed surfaces. Furnish in largest practicable sizes to minimize number of
joints and to conform to joint system shown on drawings.
a. Use overlaid plywood complying with U.S. Product Standard PS-1 “A-C or
B-B High Density Overlaid Concrete Form,” Class I.
b. Use plywood complying with U.S. Product Standard PS-1 “B-B (Concrete
Form) Plywood”, Class I, Exterior Grade or better, mill-oiled and
edge-sealed, with each piece bearing legible inspection trademark.
2. Forms (Unexposed Finish Concrete): Plywood, lumber, metal or other acceptable
material. Provide lumber dressed on at least 2 edges and one side for tight fit.
3. Earth cuts shall not be used as forms for vertical surfaces, unless approved by
Engineer.
B. Form Coatings: Provide commercial formulation form-release compound to prevent
bonding and facilitate form stripping that will not bond with, stain nor adversely affect
concrete surfaces, and will not impair subsequent treatments of concrete surfaces. Form
release for steel forms shall include rust-inhibitors.
C. Form Ties: Factory-fabricated, adjustable-length, removable or snap-off metal form
ties, designed to prevent form deflection and to prevent spalling concrete upon removal.
1. Provide units which will leave no metal closer than 1½" to surface.
2. Provide ties which, when removed, will leave holes not larger than 1" diameter in
concrete surface.
PART 3 - EXECUTION
3.01 PREPARATION
A. Cleaning and Tightening: Thoroughly clean forms and adjacent surfaces to receive
concrete. Remove chips, wood, sawdust, dirt or other debris just before concrete is
placed. Retightening forms and bracing after concrete placement is required to
eliminate mortar leaks and maintain proper alignment.
6508.22 03100-2 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
B. Clean re-used forms of concrete matrix residue, repair and patch as required to return
forms to acceptable surface condition.
C. Coat contact surfaces of forms with a form-release compound before reinforcement is
placed.
1. Apply in compliance with manufacturer’s written instructions. Thin form-release
compounds only with thinning agent of type, amount, and under conditions of
manufacturer’s written instructions.
2. Coat steel forms with a non-staining, rust-preventative form oil or otherwise
protect against rusting. Rust-stained steel formwork is not acceptable.
D. Do not allow excess form-release material to accumulate in forms or to come into
contact with in-place concrete surfaces against which fresh concrete will be placed.
3.02 ERECTION
A. General: Construct forms in accordance with guidelines set forth in ACI 347R.
1. Construct formwork so concrete members and structures are of correct size, shape,
alignment, elevation and position, within tolerance limits of ACI 117.
2. Coordinate formwork construction materials and installation such that concrete
surface irregularities, designated by ACI 347R meets the requirements of Class A,
B, or C indicated as final finish in Section 03300.
3. Provide for openings, offsets, sinkages, keyways, recesses, moldings, rustications,
reglets, chamfers, blocking, screeds, bulkheads, anchorages, inserts, and other
features required in work.
4. Solidly butt joints and provide back-up at joints to prevent leakage of cement
paste.
5. Fabricate forms for easy removal without hammering or prying against concrete
surfaces. Provide crush plates or wrecking plates where stripping may damage
cast concrete surfaces. Provide top forms for inclined surfaces steeper than 1.5
horizontal to 1.0 vertical and where the slope, in the opinion of the Contractor, is
too steep to place concrete with bottom forms only. Kerf wood inserts for
forming keyways, reglets, recesses, and the like, to prevent swelling and for easy
removal.
B. Openings: Provide temporary openings where interior area of formwork is inaccessible
for cleanout, for inspection before concrete placement, and for placement of concrete.
Securely brace temporary openings and set tightly to forms to prevent loss of concrete
mortar. Locate temporary openings on forms at inconspicuous locations.
C. Screed Strips: Set edge forms, bulkheads, and intermediate screed strips for slabs to
achieve required elevations and slopes in finished concrete surfaces. Provide and secure
units to support screed strips.
6508.22 03100-3 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
D. Exposed Corners: Chamfer exposed corners and edges on all permanently exposed
concrete and as indicated elsewhere on Drawings, using wood, metal, PVC or rubber
chamfer strips fabricated to produce uniform smooth lines and tight edge joints.
Provide 3/4" by 3/4" chamfer, unless indicated otherwise on Drawings.
E. Provisions for Other Trades: Provide openings in concrete formwork to accommodate
work of other trades. Determine size and location of openings, recesses and chases
from trades providing such items. Accurately place and securely support items built into
forms.
3.03 REMOVAL OF FORMS
A. Formwork not supporting weight of concrete, such as sides of beams, walls, columns,
and similar parts of the work, may be removed after cumulatively curing at not less
than 50 deg F for 48 hours after placing concrete, provided concrete is sufficiently hard
to not be damaged by form removal operations, and provided curing and protection
operations are maintained.
B. Formwork supporting weight of concrete, such as beam soffits, joints, slabs and other
structural elements, may not be removed in less than 14 days and until concrete has
attained design minimum compressive strength at 28 days. Determine potential
compressive strength of in-place concrete in accordance with ACI 301 by averaging the
test results of two field-cured specimens representative of concrete location or members.
C. Form facing material may be removed 4 days after placement, only if shores and other
vertical supports have been arranged to permit removal of form facing material without
loosening or disturbing shores and supports.
3.04 RE-USE OF FORMS
A. Clean and repair surfaces of forms to be re-used in work. Split, frayed, delaminated or
otherwise damaged form facing material will not be acceptable for exposed surfaces.
Apply new form coating compound as specified for new formwork.
B. When forms are extended for successive concrete placement, thoroughly clean surfaces,
remove fins and laitance, and tighten forms to close joints. Align and secure joint to
avoid offsets. Do not use “patched” forms for exposed concrete surfaces, except as
acceptable to Engineer.
END OF SECTION
6508.22 03100-4 ARRO
TOWN OF INDIAN HEAD –TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
SECTION 03200
CONCRETE REINFORCEMENT
PART 1 - GENERAL
1.01 SECTION INCLUDES
A. Reinforcement bars for cast-in-place concrete
1.02 RELATED SECTIONS
A. Concrete Formwork: Section 03100.
B. Cast-in-Place Concrete: Section 03300.
C. Metal Fabrications: Section 05500.
1.03 QUALITY ASSURANCE
A. Codes and Standards: Comply with provisions of the following standards, except where
more stringent requirements are specified:
1. ACI 318 “Building Code Requirements for Reinforced Concrete”.
2. Concrete Reinforcing Steel Institute (CRSI), “Manual of Standard Practice”.
3. Quality Assurance/Quality Control (Refer to 520 of the SHA MD Specifications).
1.04 REFERENCES
A. Comply with the following American Concrete Institute (ACI) referenced standards,
latest edition:
1. ACI 117; Standard Specifications for Tolerances for Concrete Construction and
Products
2. ACI 315; Details and Detailing of Concrete Reinforcement.
3. ACI 318; Building Code Requirements for Structural Concrete.
B. American Society for Testing and Products (ASTM):
1. ASTM A82; Steel Wire, Plain, for Concrete Reinforcement, Spec. for.
2. ASTM A185; Steel Welded Wire Fabric, Plain for Concrete Reinforcement, Spec.
for.
3. ASTM A497; Steel Welded Wire Fabric, Deformed, for Concrete Reinforcement,
Spec. for.
6508.22 03200-1 ARRO
TOWN OF INDIAN HEAD –TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
4. ASTM A615; Deformed and Plain Billet-Steel Bars for Concrete Reinforcement,
Spec for.
5. ASTM A663; Steel Bars, Carbon, Merchant Quality, Mechanical Properties, Spec.
for.
6. ASTM A767; Zinc-Coated (Galvanized) Steel Bars for Concrete Reinforcement,
Spec. for.
7. ASTM A775; Epoxy-Coated Reinforcing Steel Bars, Spec. for.
8. ASTM A780; Repair of Damaged and Uncoated Areas of Hot-Dip Galvanized
Coatings.
9. ASTM D412; Vulcanized Rubber and Thermoplastic Rubber and Thermoplastic
Elastomers in Tension, Test Methods for.
10. ASTM D3963; Fabrication and Job-site Handling of Epoxy-Coated Steel
Reinforcing Bars, Spec. for.
C. Concrete Reinforcing Steel Institute (CRSI):
1. Manual of Standard Practice
2. Manual of Placing Reinforcing Bars
1.05 SUBMITTALS
A. Product Data: Submit data for proprietary Products and items, including reinforcement,
accessories, and others as requested by Engineer.
B. Shop Drawings: Submit shop drawings for fabrication, bending, and placement of
concrete reinforcement. Comply with ACI 315 showing bar schedules, stirrup spacing,
diagrams of bent bars, arrangement of concrete reinforcement. Include special
reinforcement required for openings through concrete structures.
1. Reinforcing Shop Drawings shall reflect the approved concrete pour sequence
submittal as specified in Section 03300.
1.06 DELIVERY, STORAGE AND HANDLING
A. Deliver, store and handle steel reinforcing to prevent bending and damage.
1. Avoid damaging coatings on steel reinforcement
2. Repair damaged epoxy coatings on steel reinforcement according to ASTM
D3963.
PART 2 - PRODUCTS
2.01 PRODUCTS
A. Reinforcing Steel:
1. Reinforcing Bars: ASTM A615, Grade 60, deformed.
6508.22 03200-2 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
2. Galvanized Reinforcing Bars: ASTM A767, Class II (2.0 oz. zinc psf) hot-dip
galvanized, after fabrication and bending.
3. Steel Wire: ASTM A82, plain, cold-drawn, steel.
4. Plain Steel Welded Wire Fabric: ASTM A185, welded steel wire fabric.
5. Deformed Steel Welded Wire Fabric: ASTM A497.
B. Supports for Reinforcement: Bolsters, chairs, spacers and other devices for spacing,
supporting and fastening reinforcing bars and welded wire fabric in place. Use wire bar
type supports complying with CRSI specifications.
1. For footings, foundation mats and slabs-on-grade, use chairs with sand plates,
horizontal runners, or precast concrete blocks.
a. Any metal chairs or spacers in contact with the ground shall be galvanized,
epoxy-coated or stainless steel.
b. Concrete masonry units or bricks are not acceptable.
2. For exposed-to-view concrete surfaces, where legs of supports are in contact with
forms, provide supports with legs which are plastic protected (CRSI, Class 1) or
stainless steel protected (CRSI, Class 2).
C. Mechanical Splice Coupler: Designed to meet ACI 318 Building Code Requirements in
axial tension for the grade of reinforcing bar specified. Positive locking manufactured
from high quality steel and designed for connections to taper threaded bar ends where
one bar can be turned.
1. Internal Coupler Protector: Provide coupler manufacturer’s plastic internal
coupler protector where couplers are provided for anticipated future additions.
2. Bar End Protectors: Plastic solid sleeve for placement over bar ends to protect
threading from damage, contamination and rust.
3. Contractor may request to use coupler to facilitate masonry reinforcing placement
for Engineer’s approval prior to shop drawing submittal.
4. Acceptable Manufacturer:
a. Erico Products, Inc.; Lenton Standard Couplers – A2
b. BarSplice Products, Inc.
c. NBK America LLC
d. Or Approved Equal.
D. Dowel Bars: Structural grade steel conforming to requirements of ASTM A663, Grade
70 or better. Cut bars to length with ends square and free of burrs.
1. Coating of high density Polyethylene and adhesive meeting tensile strength test
requirements of ASTM D412.
a. Coating thickness: 0.017-inch ±20 percent.
b. Elongation: 100 percent minimum.
c. Adhesive thickness: 0.004-inch nominal.
d. Thickness of coating plus adhesive: 0.021-inch ±20 percent.
2. Graphite paste composed of a vehicle (35-45 percent by weight) containing not
less than 52 percent of fixed oils and remainder of volatile thinners and dryers,
thoroughly mixed with flake graphite composed of Graphitic Carbon (85 percent
6508.22 03200-3 ARRO
TOWN OF INDIAN HEAD –TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
min. by weight) or Graphitic Carbon passing number 100 sieve (84-92 percent by
weight) or Graphitic Carbon passing number 325 sieve (46-50 percent by weight).
E. Anti-Corrosion Compound (for existing reinforcing exposed and to remain):
Manufactured product specifically designed to bond patching mortar or fresh concrete to
existing reinforcing steel and concrete and to protect rebar from further rusting and
corrosion. Acceptable products include:
1. Sika Corp.; Armatec 110 EpoCem
2. StoCorp. Concrete Restoration Division; Bonding/Anti-Corrosion Agent (CR246)
3. SpecChem, LLC; SpecPrep EZ
4. Or Approved Equal.
PART 3 - EXECUTION
3.01 FABRICATION
A. Fabricate steel reinforcement according to CRSI’s “Manual of Standard Practice.”
B. Fabrication tolerances shall conform to ACI 117 requirements.
3.02 INSPECTION
A. Notify Engineer 48 hours before placing concrete so an inspection of the reinforcing
placement can be made
3.03 PREPARATION
A. Coordinate the installation of joint Products and vapor retarders with placement of
reinforcing steel.
B. Verify that items to be embedded in concrete are secured in place and block-outs in
formwork are secured in place as required. Formwork installed as work of
Section 03100.
3.04 INSTALLATION
A. Comply with CRSI’s “Manual for Placing Reinforcing Bars”, for details and methods of
reinforcement placement and supports, and as herein specified.
1. Clean reinforcement of loose rust and mill scale, earth, ice, and other Products
which reduce or destroy bond with concrete.
2. Accurately position, support and secure reinforcement against displacement by
formwork, construction, or concrete placement operations. Locate and support
reinforcing by metal chairs, runners, bolsters, spacers, and hangers, as required.
6508.22 03200-4 ARRO
TOWN OF INDIAN HEAD –TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
3. Place reinforcement to obtain at least minimum coverages for concrete protection.
Arrange, space and securely tie bars and bar supports to hold reinforcement in
position during concrete placement operations. Set wire ties so ends are directed
into concrete, not toward exposed concrete surfaces.
4. Welding of reinforcement including tack welds are not permitted on this project.
5. A blowtorch shall not be used to facilitate field cutting or bending or any other
reinforcing work.
6. Bars shall not be spliced, except where shown on approved Shop Drawings,
unless approved by Engineer.
7. Continue reinforcement across construction joints, except as otherwise indicated.
8. Reinforcement shall not be bent after partially embedded in hardened concrete.
9. Install welded wire fabric in as long lengths as practicable. Lap adjoining pieces at
least one full mesh and lace splices with wire. Offset end laps in adjacent widths
to prevent continuous laps in either direction. Lace overlaps with wire.
10. Avoid cutting or puncturing vapor retarder during reinforcement placement and
concrete operations.
B. Zinc-Coated Reinforcement: Use galvanized steel wire ties to fasten zinc-coated
reinforcement. Repair cut and damaged coatings with zinc repair material.
C. Mechanical Splice Coupler Installation:
1. Follow manufacturer’s requirements to taper and thread reinforcing bar ends.
2. Make mechanical connection in accordance with coupler manufacturers
installation instructions.
D. Dowel Bar Installation:
1. Prepare graphite lubricant, place approximately 3 to 4 pounds of graphite paste
and 40 percent by weight of a 60/40 mixture of carbon tetrachloride and naphtha
in a suitable container and thoroughly mix.
2. Apply lubricant to the free end of dowels by daubing, mopping, or gloved hand to
produce a thorough coating approximately 1/16-inch thick. Do not use brushes
for application of lubricant.
3. Mix and apply lubricant at least one hour before the concrete is placed around the
dowel assembly.
E. Place the Anti-Corrosion compound on any exposed reinforcing (20 mils min.) in
accordance with the manufacturer’s requirements. Apply the concrete within the
manufacturer’s stated “open” time.
F. Anchor Bolts Setting: Set at locations indicated on Drawings and secure in place to
prevent movement during concrete pours.
END OF SECTION
6508.22 03200-5 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
SECTION 03300
CAST-IN-PLACE CONCRETE
PART 1 - GENERAL
1.01 SECTION INCLUDES
A. Cast-in place concrete, including concrete Products, mix design, placement procedures,
and finishes.
B. Concrete Admixtures.
C. Curing Products and Methods.
D. Testing.
1.02 RELATED SECTIONS
A. Concrete Formwork: Section 03100.
B. Concrete Reinforcement: Section 03200.
C. Grout: Section 03600.
D. Vapor Retarder: Section 07190.
E. Insulation: Section 07200.
F. Joint Sealers: Section 07900.
1.03 QUALITY ASSURANCE
A. Concrete Installer: An experienced installer who has completed concrete Work similar
in material, design, and extent to that indicated for this Project and whose work has
resulted in construction with a record of successful in-service performance. Provide at
least 5 references in the last 24 months with project description, concrete work, contact
names and phone numbers.
B. Ready-Mix Supplier: A firm experienced in manufacturing ready-mixed concrete
product complying with ASTM C94 requirements for production facilities and
equipment. Manufacturer must be certified according to the National Ready Mixed
Concrete Association’s Certification of Ready Mixed Concrete Production Facilities.
Provide certification.
6508.22 03300-1 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
C. Concrete Testing Service: Engage a testing laboratory to perform material evaluation
tests. Testing Agency shall be an independent testing agency qualified according ASTM
C1077 and ASTM E329 to conduct the testing indicated.
1. Testing Agency shall provide evidence that its facilities have passed inspection
within the last 24 months by Cement and Concrete Reference Laboratory or
similar independent organization.
2. Testing Agency shall provide evidence that it is accredited by the AASHTO
Accreditation Program, the National Voluntary Laboratory Accreditation Program
or the American Association of Laboratory Accreditation.
3. Testing Agency used for field quality monitoring shall not be used for any other
aspect of the project’s concrete work.
4. Personnel conducting field tests shall be qualified as ACI Concrete Field Testing
Technician, Grade 1 according to ACI CP-1 or an equivalent certification
program.
D. Work Specified Under Other Sections: Items to be embedded in concrete are as
specified in the various Sections of these specifications. The responsibility for
coordinating concrete pours with embedded items rests solely with the Contractor.
E. Products and Installed Work Testing: The Engineer may require testing and retesting at
anytime during progress of work.
1. Allow free access to material stockpiles and facilities.
2. Tests not specifically indicated to be done at Owner’s expense shall be done at
Contractor’s expense, including re-testing of rejected Products and installed work
F. Contractor shall keep a record at the job site showing time and place of each pour of
concrete together with transit-mix delivery slip certifying contents of pour, delivery
time, other data specified in ASTM C94 and amount of water added in the field.
1. These records shall be made available to the Engineer and Resident Project
Representative upon request.
2. Upon completion of concrete work, Contractor shall deliver the record and
delivery slips to the Engineer.
1.04 REFERENCES
A. Comply with the following referenced standards, latest edition.
1. American Association of State Highway and Transportation Officials, AASHTO
M182 Burlap cloth made from Jute or Kenaf.
2. American Concrete Institute (ACI):
a. ACI 117; Standard Specifications for Tolerances for Concrete Construction
and Products
b. ACI 301; Standard Specifications for Structural Concrete.
c. ACI 302.1R; Guide for Concrete Floor and Slab Construction.
6508.22 03300-2 ARRO
TOWN OF INDIAN HEAD –TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
d. ACI 304R; Guide for Measuring, Mixing, Transporting and Placing
Concrete.
e. ACI 305R; Hot Weather Concreting.
f. ACI 306.1; Standard Specification for Cold Weather Concreting.
g. ACI 308; Standard Specification for Curing Concrete.
h. ACI 309R; Guide for Consolidation of Concrete.
i. ACI 318; Building Code Requirements for Structural Concrete.
j. ACI 350R; Environmental Engineering Concrete Structures.
3. American Society for Testing and Products (ASTM):
a. ASTM C31; Making and Curing Concrete Test Specimens in the Field,
Standard Practice for.
b. ASTM C33; Concrete Aggregates, Spec. for.
c. ASTM C39; Compressive Strength of Cylindrical Concrete Specimens,
Test Method for.
d. ASTM C94; Ready-Mixed Concrete, Spec. for.
e. ASTM C138; Unit Weight, Yield, and Air Content (Gravimetric) of
Concrete, Test Method for.
f. ASTM C143; Slump of Hydraulic Cement Concrete, Test Method for.
g. ASTM C150; Portland Cement, Spec. for.
h. ASTM C171; Sheet Products for Curing Concrete, Spec. for.
i. ASTM C172; Sampling Freshly Mixed Concrete, Standard Practice for.
j. ASTM C173; Air Content of Freshly Mixed Concrete by the Volumetric
Method, Test Method for.
k. ASTM C231; Air Content of Freshly Mixed Concrete by the Pressure
Method, Test Method for.
l. ASTM C260; Air Entraining Admixtures for Concrete, Spec. for.
m. ASTM C309; Liquid Membrane - Forming Compounds for Curing
Concrete, Spec. for.
n. ASTM C330; Lightweight Aggregates for Structural Concrete, Spec. for.
o. ASTM C331; Lightweight Aggregates for Concrete Masonry Units, Spec.
for.
p. ASTM C494; Chemical Admixtures for Concrete, Spec. for.
q. ASTM C495; Compressive Strength of Lightweight Insulating Concrete,
Test Method for.
r. ASTM C567; Density Structural Lightweight Concrete, Test Method for.
s. ASTM C881; Epoxy Resin-Based Bonding Systems for Concrete, Std
Spec. for.
t. ASTM C1064; Temperature of Freshly Mixed Portland Cement Concrete,
Test Method for.
u. ASTM C1077; Laboratories Testing Concrete and Concrete Aggregate for
Use in Construction and Criteria for Laboratory Evaluation, Practice for.
v. ASTM C1315; Liquid Membrane-Forming Compounds having Special
Properties for Curing and Sealing Concrete, Spec for.
6508.22 03300-3 ARRO
TOWN OF INDIAN HEAD –TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
w. ASTM D1544; Color of Transparent Liquids (Gardner Color Scale), Std.
Test Method for.
x. ASTM D1751; Pre-formed Expansion Joint Fillers for Concrete Paving
and Structural Construction (Nonextruding and Resilient Bituminous
Types), Spec. for.
y. ASTM E329; Agencies Engaged in Testing and/or Inspection of Products
used in Construction, Spec. for.
z. ASTM E1155; Determining Floor Flatness and Levelness Using the F-
Number System, Test Method for.
4. Concrete Reinforcing Steel Institute (CRSI); Manual of Standard Practice.
1.05 SUBMITTALS
A. General: Submit the following in accordance with Section 01300 - Submittals:
B. Concrete Pour Sequence: Submit revised pour layout or sequence for all new concrete
structures where the Contractor is proposing a change from what is shown on the
Drawings.
C. Laboratory Test Reports: Submit laboratory test reports for concrete Products and mix
design test as specified. Includes concrete mix design and proof of performance
complying with ACI 301 and ACI 318. Do not begin concrete production until approved
by Engineer.
D. Products Certificates: Provide Products certificates in lieu of Products laboratory test
reports when permitted by Engineer. Material certificates shall be signed by
manufacturer and Contractor, certifying that each material item complies with, or
exceeds, specified requirements.
E. Method of curing to be used on the project. If more than one method, indicate locations
for each method. If curing compound is submitted, provide certification that it will not
interfere with any toppings/coating applied with this project work. Include description
for intended method of protecting the concrete against rapid drying at the end of final
curing period.
F. Qualifications: Submit qualifications of the party performing concrete work, the
concrete testing agency performing field monitoring, the field technician(s) performing
the on-site testing, and the ready-mix supplier’s certification.
G. Samples: Submit samples of Products as requested by Engineer, including names,
sources and descriptions.
6508.22 03300-4 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
PART 2 - PRODUCTS
2.01 MATERIALS
A. Portland Cement: ASTM C150 of the following Type:
1. Type II, Moderate Sulfate Resistance.
B. Normal Weight Aggregates: Meeting requirements of ASTM C33, and as specified
herein. Provide aggregates from a single source for exposed concrete.
1. Do not use fine or coarse aggregates containing spalling-causing deleterious
substances.
2. Coarse aggregate acceptable size number 57 or 467, in accordance with the
following:
a. For walls and slabs: 1½-inch maximum size, number 467.
b. For beams, columns and thin slabs and walls where use of coarse aggregate
size number 467 would not meet requirements of ACI-318-3.3.2, use coarse
aggregates number 57 upon approval by Engineer.
3. Coarse Aggregate for 3000 psi concrete as specified in 2.02C.2 of this section: 1”
maximum size, number 57.
C. Water: Potable quality, clean and free of injurious amounts of oil, acid, alkali, organic
matter, suspended matter, and other deleterious substances.
D. Concrete Admixtures:
1. Air-Entraining Admixture: Use a product conforming to ASTM C260, certified by
manufacturer to be compatible with other required admixtures.
a. Acceptable Manufacturers:
1) Sika Aer; Sika Corp.
2) MB-VR or MB-AE; Master Builders.
3) Darex AEA or Daravair; W. R. Grace.
4) Or Approved Equal.
2. Water-Reducing Admixture: ASTM C494, Type A, and containing not more than
0.1 percent chloride ions.
a. Acceptable Manufacturers:
1) WRDA Hycol; W. R. Grace.
2) Pozzolith Normal; Master Builders.
3) Plastocrete 160; Sika Chemical Corp.
4) Or Approved Equal.
6508.22 03300-5 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
3. High-Range Water-Reducing Admixture (Super Plasticizer): ASTM C494, Type F
or Type G and containing not more than 0.1 percent chloride ions.
a. Acceptable Manufacturers:
1) WRDA 19 or Daracem; W. R. Grace.
2) Sikament; Sika Chemical Corp.
3) Rheobuild; Master Builders.
4) Or Approved Equal.
4. Water-Reducing, Non-Chloride Accelerator Admixture: ASTM C494, Type E,
and containing not more than 0.1 percent chloride ions.
a. Acceptable Manufacturers:
1) Accelguard 80; Euclid Chemical Co.
2) Pozzolith High Early; Master Builders.
3) Plastocrete 161FL; Sika Chemical Corp.
4) Or Approved Equal.
5. Water-Reducing, Retarding Admixture: ASTM C494, Type D, and containing not
more than 0.1 percent chloride ions.
a. Acceptable Manufacturers:
1) Pozzolith Retarder; Master Builders.
2) Daratard; W.R. Grace.
3) Plastiment; Sika Chemical Co.
4) Or Approved Equal.
6. Prohibited Admixtures: Calcium chloride thyocyanates or admixtures containing
more than 0.1 percent chloride ions are not permitted.
E. Preformed Expansion Joint Fillers:
1. Nonextruding and Resilient Bituminous Fiber Types (Exterior Use): ASTM
D1751.
2. Sponge Rubber Type: ASTM D1752, Type I (Interior Use).
F. Chemical Hardener: Colorless aqueous solution containing a blend of magnesium
fluosilicate and zinc fluosilicate combined with a wetting agent, containing not less than
2 lbs. of fluosilicates per gallon.
1. Acceptable Manufacturers:
a. Lapidolith; Sonneborn-Rexnord.
b. MasterKure; Master Builders.
c. Diamond; Kaufman Products, Inc.
d. Or Approved Equal.
G. Moisture-Retaining Cover: One of the following, complying with ASTM C171.
6508.22 03300-6 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
1. Waterproof paper.
2. Polyethylene film.
3. Polyethylene-coated burlap.
H. Liquid Membrane-Forming Curing Compound: High solids, liquid type membrane-
forming curing compound complying with ASTM C309, Type I, Class A. The
compound shall have 30% minimum solids content. Moisture loss not more than 0.039
gr./sq. cm. when applied at 200 sq ft./gal.
1. Acceptable Manufacturers:
a. L & M Construction Chemicals; Dress & Seal.
b. Master Builders; Masterseal.
c. Euclid Chemical Company; Super Aqua Cure VOX or Super Diamond Clear
VOX.
d. Or Approved Equal.
I. Epoxy Bonding Adhesive: ASTM C881, two component material suitable for use on
dry or damp surfaces. Provide material "Type", "Grade", and "Class" to suit project
requirements.
1. Acceptable Manufacturers:
a. W. R. Grace; Thiopoxy.
b. A. C. Horn, Inc.; Epoxtite.
c. Sika Chemical Corp.; Sikadur Hi-Mod.
d. Or Approved Equal.
J. For other items scheduled to be cast-in-concrete, see individual specifications sections.
K. Joint Sealant: Two-component, premium grade, polyurethane-based elastomeric
sealant meeting ASTM C920 and Federal Specification TT-S-00227E.
1. Acceptable Manufacturers:
a. Sika Chemical Corp., Sikaflex – 2C, NS, SL
b. W.R. Meadows; Pourthane – NS or SL
c. VersaFlex, Inc.; Polyurea
d. Or Approved Equal.
2.02 PROPORTIONING AND DESIGN OF MIXES:
A. Prepare design mixes for each type and strength of concrete by either laboratory trial
batch or field experience methods as specified in ACI 301. If trial batch method used,
use an independent testing facility acceptable to Engineer for preparing and reporting
6508.22 03300-7 ARRO
TOWN OF INDIAN HEAD –TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
proposed mix designs. The testing facility shall not be the same as used for field
quality control testing.
B. Submit detailed written reports to Engineer of each proposed mix for each class of
concrete at least 30 days prior to start of work. Do not begin concrete production until
mixes have been reviewed by Engineer.
C. Design Mixes: Provide normal weight concrete with the following properties, unless
otherwise noted on drawings and schedules:
1. 4000 psi 28-day compressive strength; all cast-in-place concrete at Project Site
with the exception of those items in Paragraph 2.02.C.2 below; the 4000 psi
concrete items include, but are not limited to, structural slabs, beams, walls,
columns, mat slabs, footings, slabs on grade.
2. 3000 psi 28-day compressive strength; sidewalks, curbs, inside tankages fill
concrete, cast-in-place concrete piles.
3. 2500 psi 28-day compressive strength; pipe collars, thrust blocks, pipe encasement.
D. Adjustment to Concrete Mixes: Mix design adjustments may be requested by
Contractor when characteristics of materials, job conditions, weather, test results, or
other circumstances warrant; at no additional cost to Owner and as accepted by
Engineer. Laboratory test data for revised mix design and strength results must be
submitted to and accepted by Engineer before using in work.
E. Admixtures:
1. Use water-reducing admixture or high range water-reducing admixture (super
plasticizer) in concrete as required for placement and workability.
2. Use non-chloride accelerating admixture in concrete slabs placed at ambient
temperatures below 50F (10C).
3. Use high-range water-reducing admixture in pumped concrete, concrete for
industrial slabs, architectural concrete, parking structure slabs, concrete required to
be watertight, and concrete with water/cement ratios below 0.50.
4. Use air-entraining admixture in exterior exposed concrete, unless otherwise
indicated. Add air-entraining admixture at manufacturer's prescribed rate to result
in concrete at point of placement having total air content with a tolerance of ±1½
percent with following limits:
a. Concrete structures and slabs exposed to freezing and thawing, deicer
chemicals, or subjected to hydraulic pressure:
6508.22 03300-8 ARRO
TOWN OF INDIAN HEAD –TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
1) 5.5 percent, 1½" max. aggregate.
2) 6.0 percent, 1" max. aggregate.
3) 6.0 percent, 3/4" max. aggregate.
4) 7.0 percent, 1/2" max. aggregate.
b. Other Concrete (not exposed to freezing, thawing, or hydraulic pressure): 2
percent to 4 percent air.
F. Use admixtures for water-reducing and set-control in strict compliance with
manufacturer's directions. Admixtures must be included in initial mix design approved
by Engineer and cannot be either added or deleted from the mix without prior approval
of Engineer.
G. Water-Cement Ratio: Provide concrete for following conditions with maximum water-
cement (W/C) ratios as follows:
1. 4000 psi W/C Ratio: 0.44 maximum.
2. 3000 psi W/C Ratio: 0.56 maximum.
3. 2500 psi W/C Ratio: 0.67 maximum.
H. Slump Limits: Proportion and design mixes to result in concrete slump at point of
placement as follows:
1. Ramps, slabs, and sloping surfaces: Not more than 3".
2. Reinforced foundation systems: Not less than 1" and not more than 3".
3. Concrete containing HRWR admixture (super-plasticizer): Not more than 8" after
addition of HRWR to site-verified 2"-3" slump concrete.
4. 3000 psi concrete: minimum of 4” and maximum of 6”.
5. Other concrete: Not less than 1" nor more than 4".
I. Maximum Water Content for 4000 PSI Concrete:
1. For size number 467 coarse aggregate: 29 gallons per cubic yard.
2. For size number 57 coarse aggregate: 30 gallons per cubic yard.
2.03 CONCRETE MIXES
A. Job-Site Mixing: Mix materials for concrete in appropriate drum type batch machine
mixer. For mixers of one cubic yard, or smaller capacity, continue mixing at least 1½
6508.22 03300-9 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
minutes, but not more than five minutes after ingredients are in mixer, before any part
of batch is released. For mixers of capacity larger than one cubic yard, increase
minimum 1½ minutes of mixing time by 15 seconds for each additional cubic yard, or
fraction thereof.
1. Provide batch ticket for each batch discharged and used in work, indicating project
identification name and number, date, mix type, mix time, quantity, and amount of
water introduced.
B. Ready-Mix Concrete: Comply with requirements of ASTM C94, and as herein
specified.
1. During hot weather, or under conditions contributing to rapid setting of concrete, a
shorter mixing time than specified in ASTM C94 may be required.
2. When air temperature is between 85F (30C) and 90F (32C), reduce mixing and
delivery time from 1½ hours to 75 minutes, and when air temperature is above
90F (32C), reduce mixing and delivery time to 60 minutes.
PART 3 - EXECUTION
3.01 PREPARATION
A. Coordinate the installation of joint materials with placement of forms and reinforcing
steel.
B. Prepare formwork in advance and remove snow, ice, water and debris from within
forms. Formwork as specified in Section 03100.
C. Pre-position reinforcement in advance of concrete pours. Concrete reinforcement as
specified in Section 03200.
D. Pre-position vapor retarder for those concrete slabs where indicated on Drawings.
Vapor retarder as specified in Section 07190.
E. Pre-position joint materials, anchors and embedded items.
3.02 JOINTS AND EMBEDDED ITEMS
A. Construction Joints: Locate and install construction joints as indicated or, if not
indicated, locate so as not to impair strength and appearance of the structure, as
acceptable to Engineer.
6508.22 03300-10 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
1. Provide keyways 1½" deep (unless indicated otherwise on Drawings) and width
equal to 1/3 of the joint width in construction joints in walls, slabs and between
walls and footings; accepted bulkheads designed for this purpose may be used for
slabs.
2. Place construction joints perpendicular to main reinforcement. Continue
reinforcement across construction joints, except as otherwise indicated.
3. Walls shall be placed in continuous sequence sections unless shown otherwise on
the Drawings. At least three (3) days shall elapse before concrete is placed against
an adjacent joint.
4. Provide water stops at construction joints for all liquid retaining structures.
5. Provide joint sealants on both exposed faces of construction joints.
B. Isolation Joints in Slabs-on-Ground: Construct isolation joints in slabs-on-ground at
points of contact between slabs-on-ground and vertical surfaces, such as column
pedestals, foundation walls, grade beams and elsewhere as indicated.
1. Expansion joint filler as specified previously under Part 2 - Products.
2. Joint sealant materials are as specified previously under Part 2 – Products.
C. Contraction (Control) Joints in Slabs-on-Ground: Construct contraction joints in slabs-
on-ground to form panels of patterns as shown. Use saw cuts 1/8" x 1/4 slab depth or
inserts 1/4" wide x 1/4 of slab depth, unless otherwise indicated.
1. Form contraction joints by inserting premolded plastic, hardboard or fiberboard
strip into fresh concrete until top surface of strip is flush with slab surface. Tool
slab edges round on each side of insert. After concrete has cured, remove inserts
and clean groove of loose debris.
2. Contraction joints in floor slabs may be formed by saw cuts as soon as possible
after slab finishing as may be safely done without dislodging aggregate.
3. If joint pattern not shown, provide joints not exceeding 15' in either direction and
located to conform to bay spacing wherever possible (at column centerlines, half
bays, third-bays).
4. Joint sealant material is specified under Part 2 – Products.
D. Contraction joints in mat slabs, slabs and walls: Locate contraction joints at locations
shown on the Drawings. A contraction joint is the same as construction joint except:
6508.22 03300-11 ARRO
TOWN OF INDIAN HEAD –TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
1. Every other bar (50%) running perpendicular to the joint shall be cut 2 inches
before the joint. However, the longitudinal bars in beams shall not be cut at the
intersected contraction joints.
2. See Drawings contraction joint detail for other differences.
E. Sidewalks:
1. Place expansion joints at 20-foot intervals to correct elevation and profile. Align
sidewalk and curb (if any) joints.
2. Provide tooled joints at 5-foot intervals unless directed otherwise by Engineer.
F. Embedded Items: Set and build into work anchorage devices and other embedded items
required for other work that is attached to, or supported by, cast-in-place concrete. Use
setting drawings, diagrams, instructions and directions provided by suppliers of items to
be attached thereto.
3.03 CONCRETE PLACEMENT
A. Preplacement Inspection: Before placing concrete, inspect and complete formwork
installation, reinforcing steel, and items to be embedded or cast-in.
1. Apply temporary protective covering to lower 2' of finished walls adjacent to
poured floor slabs and similar conditions, and guard against spattering during
placement.
2. Notify other crafts to permit installation of their work; cooperate with other trades
in setting such work.
3. Moisten wood forms immediately before placing concrete where form coatings are
not used.
B. General: Comply with ACI 304 "Recommended Practice for Measuring, Mixing,
Transporting, and Placing Concrete", and as herein specified.
1. Deposit concrete continuously or in layers of such thickness that no concrete will
be placed on concrete which has hardened sufficiently to cause the formation of
seams or planes of weakness.
2. If a section cannot be placed continuously, provide construction joints as herein
specified.
3. Deposit concrete as nearly as practicable to its final location to avoid segregation.
6508.22 03300-12 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
C. (1)Placing Concrete in Forms: Deposit concrete in forms in horizontal layers not
deeper than 24" and in a manner to avoid inclined construction joints. Where
placement consists of several layers, place each layer while preceding layer is still
plastic to avoid cold joints. (2) Placing Concrete for Cast-in-Place Concrete Piles:
Rapid and continuous pour. Do not pour concrete with ground water present in pile
holes.
D. Consolidate placed concrete by mechanical vibrating equipment supplemented by hand-
spading, rodding or tamping. Use equipment and procedures for consolidation of
concrete in accordance with ACI 309.
1. Do not use vibrators to transport concrete inside forms. Insert and withdraw
vibrators vertically at uniformly spaced locations not farther than visible
effectiveness of machine.
2. Place vibrators to rapidly penetrate placed layer and at least 6" into preceding layer.
3. Do not insert vibrators into lower layers of concrete that have begun to set.
4. At each insertion, limit duration of vibration to time necessary to consolidate
concrete and complete embedment of reinforcement and other embedded items
without causing segregation of mix.
E. Placing Concrete Slabs: Deposit and consolidate concrete slabs in a continuous
operation, within limits of construction and contraction joints, until the placing of a
panel or section is completed.
1. Consolidate concrete during placing operations so that concrete is thoroughly
worked around reinforcement and other embedded items and into corners.
2. Bring slab surfaces to correct level with straightedge and strikeoff. Use bull floats
or darbies to smooth surface, free of humps or hollows. Do not disturb slab
surfaces prior to beginning finishing operations.
3. Maintain reinforcing in proper position during concrete placement operations.
F. Cold Weather Placing: Protect concrete work from physical damage or reduced
strength which could be caused by frost, freezing actions, or low temperatures, in
compliance with ACI 306.1 and as herein specified.
1. When air temperature has fallen to or is expected to fall below 40F (4C),
uniformly heat water and aggregates before mixing to obtain a concrete mixture
temperature of not less than 50F (10C), and not more than 80F (27C) at point
of placement.
6508.22 03300-13 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
2. Do not use frozen materials or materials containing ice or snow. Do not place
concrete on frozen subgrade or on subgrade containing frozen materials.
3. Do not use calcium chloride, salt and other materials containing antifreeze agents
or chemical accelerators, unless otherwise accepted in mix designs.
4. Keep concrete at a temperature not lower than 50F for a period of seven days after
placing the concrete and at a temperature not lower than 40F for a period of four
days thereafter.
5. Protect concrete during cold weather by means of heated enclosure or by
insulation.
G. Hot Weather Placing: When hot weather conditions exist that would seriously impair
quality and strength of concrete, place concrete in compliance with ACI 305 and as
herein specified.
1. Cool ingredients before mixing to maintain concrete temperature at time of
placement below 90F (32C). Mixing water may be chilled, or chopped ice may
be used to control temperature provided water equivalent of ice is calculated to
total amount of mixing water. Use of liquid nitrogen to cool concrete is
Contractor's option.
2. Cover reinforcing steel with water-soaked burlap if it becomes too hot, so that steel
temperature will not exceed the ambient air temperature immediately before
embedment in concrete.
3. Fog spray forms, reinforcing steel and subgrade just before concrete is placed.
4. Use water-reducing retarding admixture (Type D) when required by high
temperatures, low humidity, or other adverse placing conditions.
3.04 FINISH OF FORMED SURFACES
A. Rough Form Finish: For formed concrete surfaces not exposed-to-view in the finish
work or by other construction, unless otherwise indicated. This is the concrete surface
having texture imparted by form facing material used, with tie holes and defective areas
repaired and patched and fins and other projections exceeding 1/4" in height rubbed
down or chipped off.
B. Smooth Form Finish: For formed concrete surfaces exposed to view or covered with a
coating material applied directly to concrete, or a covering material applied directly to
concrete, such as waterproofing, dampproofing, veneer plaster, painting or other similar
system. This is as-cast concrete surface obtained with selected form facing material,
6508.22 03300-14 ARRO
TOWN OF INDIAN HEAD –TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
arranged orderly and symmetrically with a minimum of seams. Repair each defective
areas with fins or other projections completely removed and smoothed.
C. Smooth Rubbed Finish: Provide smooth rubbed finish to concrete surfaces exposed to
view including uncoated inside vertical surfaces of tank type structures, inside vertical
surfaces of troughs, channels and such other passages for the flow of liquids.
1. Provide smooth rubbed finish to concrete surfaces, which have received smooth
form finish treatment, not later than one day after form removal.
2. Moisten concrete surfaces and rub with carborundum brick or other abrasive until a
uniform color and texture is produced.
3. Do not apply cement grout other than that created by the rubbing process.
D. Related Unformed Surfaces: At tops of walls, horizontal offsets, and similar unformed
surfaces occurring adjacent to formed surfaces, strike-off smooth and finish with a
texture matching adjacent formed surfaces. Continue final surface treatment of formed
surfaces uniformly across adjacent unformed surfaces, unless otherwise indicated.
3.05 MONOLITHIC SLAB FINISHES
A. Float Finish: Apply float finish to monolithic slab surfaces to receive trowel finish and
other finishes as hereinafter specified.
1. After screeding, consolidating, and leveling concrete slabs, do not work surface
until ready for floating.
2. Begin floating when surface water has disappeared or when concrete has stiffened
sufficiently to permit operation of power-driven floats, or both.
3. Consolidate surface with power-driven floats, or by hand-floating if area is small or
inaccessible to power units.
4. Check and level surface plane to tolerances of FF 18 - FL 15. Cut down high spots
and fill low spots.
5. Uniformly slope surfaces to drains.
6. Immediately after leveling, refloat surface to a uniform, smooth, granular texture.
B. Trowel Finish: Apply trowel finish to monolithic slab surfaces to be exposed-to-view.
6508.22 03300-15 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
1. After floating, begin first trowel finish operation using a power-driven trowel.
Begin final troweling when surface produces a ringing sound as trowel is moved
over surface.
2. Consolidate concrete surface by final hand-troweling operation, free of trowel
marks, uniform in texture and appearance, and with surface leveled to tolerances of
FF 20 - FL 17, in accordance with ASTM E1155.
C. Non-Slip Broom Finish: Apply non-slip broom finish to concrete surfaces where
people could possibly walk including exterior concrete platforms, steps, and elsewhere
as indicated. Immediately after trowel finishing, slightly roughen concrete surface by
brooming with fiber-bristle broom.
3.06 CONCRETE CURING AND PROTECTION
A. General: Protect freshly placed concrete from premature drying and excessive cold or
hot temperatures.
1. Start initial curing as soon as free water has disappeared from concrete surface
after placing and finishing. Weather permitting, keep continuously moist for not
less than seven days.
2. Begin final curing procedures immediately following initial curing and before
concrete has dried. Continue final curing for at least seven days in accordance with
ACI 301 procedures. Avoid rapid drying at end of final curing period.
B. Curing Methods: Perform curing of concrete by curing and sealing compound, by moist
curing, by moisture-retaining cover curing, and by combinations thereof, as herein
specified.
1. Provide moisture curing by following methods.
a. Keep concrete surface continuously wet by covering with water.
b. Continuous water-fog spray.
2. Provide moisture-cover curing as follows:
a Cover concrete surfaces with moisture-retaining cover for curing concrete,
placed in widest practicable width with sides and ends lapped at least 3" and
sealed by waterproof tape or adhesive. Immediately repair any holes or tears
during curing period using cover material and waterproof tape.
3. Provide curing and sealing compound to exposed interior slabs and to exterior
slabs, walks, and curbs, as follows:
a. Apply specified curing and sealing compound to concrete slabs as soon as
final finishing operations are complete (within two hours).
6508.22 03300-16 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
b. Apply uniformly in continuous operation by power-spray or roller in
accordance with manufacturer's directions.
c. Recoat areas subjected to heavy rainfall within three hours after initial
application.
d. Maintain continuity of coating and repair damage during curing period.
4. Do not use membrane curing compounds on surfaces which are to be covered with
coating material applied directly to concrete, liquid floor hardener, waterproofing,
dampproofing, painting, and other coatings and finish materials, unless otherwise
acceptable to Engineer. Do not use curing compounds on surfaces of tanks used to
store potable water.
C. Curing Formed Surfaces: Cure formed concrete surfaces, including undersides of
beams, supported slabs and other similar surfaces by moist curing with forms in place
for full curing period or until forms are removed. If forms are removed during the
initial curing period, continue curing by moisture and then moisture-cover to the end of
final curing period.
D. Curing Unformed Surfaces: Cure unformed surfaces, such as slabs, floor topping, and
other flat surfaces by application of appropriate curing method.
3.07 MISCELLANEOUS CONCRETE ITEMS
A. Filling-In: Fill-in holes and openings left in concrete structures for passage of work by
other trades, unless otherwise shown or directed, after work of other trades is in place.
Mix, place, and cure concrete as herein specified, to blend with in-place construction.
Provide the Engineer with the method of repair and details. Watertightness is required
for water retaining structures Provide other miscellaneous concrete filling shown or
required to complete work.
3.08 CONCRETE SURFACE REPAIRS
A. Patching Defective Areas: Repair and patch defective areas with cement mortar
immediately after removal of forms, when acceptable to Engineer. Use specified non-
shrink grout for tie rods and bolts for water retaining structures.
1. Cut out honeycomb, rock pockets, voids over 1/4" in any dimension, and holes left
by tie rods and bolts, down to solid concrete but, in no case to a depth of less than
1". Make edges of cuts perpendicular to the concrete surface.
2. Thoroughly clean, dampen with water and brush-coat the area to be patched with
specified bonding adhesive agent. Place patching mortar after bonding compound
has dried.
6508.22 03300-17 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
3. For exposed-to-view surfaces, blend white Portland cement and standard Portland
cement so that, when dry, patching mortar will match color surrounding. Provide
test areas at inconspicuous location to verify mixture and color match before
proceeding with patching. Compact mortar in place and strike-off slightly higher
than surrounding surface.
B. Repair of Formed Surfaces: Remove and replace concrete having defective surfaces if
defects cannot be repaired to satisfaction of Engineer. Surface defects, as such, include
color and texture irregularities, cracks, spalls, air bubbles, honeycomb, rock pockets;
fins and other projections on surface; and stains and other discolorations that cannot be
removed by cleaning.
1. Flush out form tie holes, fill with dry pack mortar, or precast cement cone plugs
secured in place with bonding agent. For water retaining structures, follow non-
shrink grout manufacturer's instructions to fill tie holes.
2. Repair concealed formed surfaces, where possible, that contain defects that affect
the durability of concrete. If defects cannot be repaired, remove and replace
concrete.
C. Repair of Unformed Surfaces: Test unformed surfaces, such as monolithic slabs, for
smoothness and verify surface plane to tolerances specified for each surface and finish.
Correct low and high areas to satisfaction of Engineer. Test unformed surfaces sloped
to drain for trueness of slope, in addition to smoothness, using a template having
required slope.
1. Repair finished unformed surfaces that contain defects which affect durability of
concrete. Surface defects, as such, include crazing cracks in excess of 0.01" wide
or which penetrate to reinforcement or completely through non-reinforced sections
regardless of width, spalling, pop-outs, honeycomb, rock pockets, and other
objectionable conditions.
2. Correct high areas in unformed surfaces by grinding, after concrete has cured at
least 14 days.
3. Correct low areas in unformed surfaces during, or immediately after completion of
surface finishing operations by cutting out low areas and replacing with fresh
concrete. Finish repaired areas to blend into adjacent concrete. Proprietary
patching compounds may be used when acceptable to Engineer.
4. Repair defective areas, except random cracks and single holes not exceeding 1"
diameter, by cutting out and replacing with fresh concrete. Remove defective areas
to sound concrete with clean, square cuts and expose reinforcing steel with at least
3/4" clearance all around. Dampen concrete surfaces in contact with patching
concrete and apply bonding compound. Mix patching concrete of same materials
6508.22 03300-18 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
to provide concrete of same type or class as original concrete. Place, compact and
finish to blend with adjacent finished concrete. Cure in same manner as adjacent
concrete.
5. Repair isolated random cracks and single holes not over 1" in diameter by dry-pack
method. Groove top of cracks and cut-out holes to sound concrete and clean of
dust, dirt and loose particles. Dampen cleaned concrete surfaces and apply
bonding compound. Mix dry-pack, consisting of one part Portland cement to 2½
parts fine aggregate passing a No. 16 mesh sieve, using only enough water as
required for handling and placing. Place dry pack after bonding compound has
dried. Compact dry-pack mixture in place and finish to match adjacent concrete.
Keep patched area continuously moist for not less than 72 hours.
6. Perform structural repairs with prior approval of Engineer for method and
procedure, using specified epoxy adhesive and mortar.
7. Repair methods not specified above may be used, subject to acceptance of
Engineer.
3.09 QUALITY CONTROL
A. Testing shall be performed by an independent testing laboratory in accordance with the
General Conditions for Testing Laboratory.
B. Sampling and testing for quality control during placement of concrete may include the
following, as directed by Engineer.
1. Sampling Fresh Concrete: ASTM C172, except modified for slump to comply
with ASTM C94.
2. Slump: ASTM C143; one test at point of discharge for each day's pour of each
type of concrete; additional tests when concrete consistency seems to have
changed.
3. Air Content: ASTM C173, volumetric method for lightweight or normal weight
concrete; ASTM C231 pressure method for normal weight concrete; one for each
day's pour of each type of air-entrained concrete.
4. Concrete Temperature: Test hourly when air temperature is 40F (4C) and below,
and when 80F (27C) and above; and each time a set of compression test
specimens made.
5. Compression Test Specimen: ASTM C31; one set of four standard cylinders for
each compressive strength test, unless otherwise directed. Mold and store
6508.22 03300-19 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
cylinders for laboratory cured test specimens except when field-cure test specimens
are required.
6. Compressive Strength Tests: ASTM C39; one set for each day's pour exceeding 5
cu. yds. plus additional sets for each 50 cu. yds. over and above the first 25 cu. yds.
of each concrete class placed in any one day; one specimen tested at seven days,
two specimens tested at 28 days, and one specimen retained in reserve for later
testing if required.
a. When frequency of testing will provide less than five strength tests for a given
class of concrete, conduct testing from at least five randomly selected batches
or from each batch if fewer than five are used.
b. When total quantity of a given class of concrete is less than 50 cu. yds.,
strength test may be waived by Engineer if, in his judgment, adequate
evidence of satisfactory strength is provided.
c. When strength of field-cured cylinders is less than 85 percent of companion
laboratory-cured cylinders, evaluate current operations and provide corrective
procedures for protecting and curing the in-place concrete.
d. Strength level of concrete will be considered satisfactory if averages of sets of
three consecutive strength test results equal or exceed specified compressive
strength, and no individual strength test result falls below specified
compressive by more than 500 psi.
C. Test results will be reported in writing to Engineer and Contractor within 24 hours after
tests. Reports of compressive strength tests shall contain the project identification
name and number, date of concrete placement, name of concrete testing service,
concrete type and class, location of concrete batch in structure, design compressive
strength at 28 days, concrete mix proportions and materials; compressive breaking
strength and type of break for both 7-day tests and 28-day tests.
D. Additional Tests: The testing service will make additional tests of in-place concrete
when test results indicate specified concrete strengths and other characteristics have not
been attained in the structure, as directed by Engineer. Testing service may conduct
tests to determine adequacy of concrete by cored cylinders complying with ASTM C42,
or by other methods as directed. Contractor shall pay for such tests when unacceptable
concrete is verified.
END OF SECTION
6508.22 03300-20 ARRO
TOWN OF INDIAN HEAD –TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
SECTION 03400
PRECAST CONCRETE
PART 1 - GENERAL
1.01 SECTION INCLUDES
A. Lintels.
B. Column cap
1.02 RELATED SECTIONS
A. Concrete Formwork: Section 03100.
B. Concrete Reinforcement: Section 03200.
C. Cast-In-Place Concrete: Section 03300.
D. Mortar: Section 04100.
E. Unit Masonry: Section 04200.
1.03 QUALITY ASSURANCE
A. Source Quality Control:
1. Contractor Option: Certain reinforced concrete structural members indicated on
the Drawings maybe either pre-cast products or field cast-in-place at the
Contractor’s option. Specified compressive strength shall be attained in both
options and Contractor shall submit certified test results indicating such level of
compressive strength requirements as being met.
2. Tests: Conduct compressive strength test as specified for Field Quality Control in
Section: 03300.
B. Field Cast Option: Should Contractor elect to field cast the reinforced concrete
structural members, the work shall conform to the requirements of Sections 03100,
03200 and 03300.
6508.22 03400-1 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
1.04 REFERENCES
A. American Society for Testing and Materials (ASTM):
1. ASTM A185; Steel Welded Wire Fabric, Plain, for Concrete Reinforcement, Std.
Spec. for.
2. ASTM A615; Deformed and Plain Billet-Steel Bars For Concrete Reinforcements,
Std. Spec. for.
3. ASTM C33; Concrete Aggregates, Std. Spec. for.
4. ASTM C150; Portland Cement, Std. Spec. for.
5. ASTM C330, Lightweight Aggregates for Structural Concrete, Std. Spec. for.
1.05 SUBMITTALS
A. Shop Drawings: Content (Precast Structural Members) shall indicate the following:
1. Dimensions.
a. Details of reinforcing, inserts, anchors, connections, accessories, joints, and
openings.
b. Setting details based on fabricator’s shop drawings and Engineer’s Drawings.
2. Quantities, location, and fabricator mark – numbers.
3. Fabricator’s instructions for handling, transporting, and lifting.
B. Product Data: Shop drawings shall indicate types of materials, dimensions, and details
including location of reinforcement.
1.06 DELIVERY, STORAGE AND HANDLING
A. Follow manufacturer’s instructions for handling and transporting.
B. Do not place, handle, or store members in positions that will cause overstressing,
warping, twisting, or cracking.
C. Protect members from dirt, staining, or damage. Store all members off the ground using
wood sleepers, or similar means.
D. Lift precast concrete members with slings of nylon, steel cable, or chain looped to
balance and properly carry the members. Lift members at designated points only.
PART 2 - PRODUCTS
2.01 MATERIALS
A. Portland Cement: ASTM C150, Type III.
6508.22 03400-2 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
B. Aggregates: ASTM C33 or ASTM C330.
C. Deformed Steel Bars: ASTM A615, Grade 60.
D. Welded Wire Fabric: ASTM A185.
E. Metal Accessories: CRSI Manual of Standard Practice for Reinforcing Concrete
Construction.
F. Concrete Inserts: Malleable iron casting with wedge shaped holding face and askew
head bolt, designed to hold shelf angle. Casting provided with integral anchor
provisions. Manufactured by Long Peerless by Richmond; Hilti; American Fastener; or
equal.
G. Precast Concrete Lintels: Steel bar reinforced precast concrete lintels manufactured by
York Lintel & Cast Stone, Inc., Nitterhouse Concrete Products, Inc., Penna. Precast
Concrete Co., Associated Products Co., or approved equal.
H. Mortar: As specified in Section 04100. Of the same type and strength used in the
adjacent masonry construction work.
2.02 FABRICATION
A. Cast precast concrete members in forms constructed to required dimensions, plumb and
straight and mortar tight.
1. Cast members of concrete which shall attain minimum 4,000 psi compaction
strength at 28 days when tested in accordance with the applicable requirements of
Section 03300.
B. Cast and cure precast concrete members in accordance with the American Concrete
Institute recommended practices referenced in Section 03300.
PART 3 - EXECUTION
3.01 PREPARATION
A. Clean bearing surfaces free of obstructions that will interfere with the proper seating of
precast concrete members.
3.02 ERECTION
A. Set precast concrete members in fresh Mortar applied as a leveling medium to provide
full bearing under members.
6508.22 03400-3 ARRO
TOWN OF INDIAN HEAD –TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
B. Trim excess Mortar from joints between bearing surface and precast concrete members.
Perform mortar placement and tooling as specified in Section 04200.
3.03 INSTALLATION
A. Set lintels as masonry work progresses providing not less than 8-inch minimum bearing
on unit masonry.
3.04 CLEANING
A. Clean exposed surfaces of precast concrete units after installation to remove markings,
dirt, stains, grout, caulking, mortar, or other materials.
1. Wash and rinse according to precast concrete fabricator’s written
recommendations. Protect other work during cleaning process.
2. Do not use cleaning materials or processes that could change the appearance of
concrete finish.
END OF SECTION
6508.22 03400-4 ARRO
TOWN OF INDIAN HEAD –TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
SECTION 03600
GROUT
PART 1 - GENERAL
1.01 SECTION INCLUDES
A. Fill Grout.
B. Masonry Grout.
C. Non-Shrink, Non-Metallic Grout.
D. Epoxy-Resin Grout.
E. Patching Grout.
F. Manufactured Anchoring System.
1.02 RELATED SECTIONS
A. Concrete Formwork: Section 03100.
B. Cast-In-Place Concrete: Section 03300.
C. Joint Sealer: Section 07900
D. Individual grouting requirements as specified in various other Sections of these
Specifications.
1.03 QUALITY ASSURANCE
A. Testing Service: Engage a testing laboratory to perform material evaluation tests.
Testing Agency shall be an independent testing agency qualified according ASTM
C1077 and ASTM E329 to conduct the testing indicated.
1. Testing Agency shall provide evidence that its facilities have passed inspection
within the last 24 months by Cement and Concrete Reference Laboratory or
similar independent organization.
2. Testing Agency shall provide evidence that it is accredited by the AASHTO
Accreditation Program, the National Voluntary Laboratory Accreditation Program
or the American Association of Laboratory Accreditation.
6508.22 03600-1 ARRO
TOWN OF INDIAN HEAD –TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
1.04 REFERENCES
A. American Concrete Institute (ACI):
1. ACI 305R; Hot Weather Concreting.
2. ACI 306.1; Standard Specification for Cold Weather Concreting.
3. ACI 308.1; Standard Specification for Curing Concrete.
4. ACI 530.1; Specification for Masonry Structures
B. American Society for Testing and Materials (ASTM):
1. ASTM C33; Concrete Aggregates, Spec. for.
2. ASTM C150; Portland Cement, Spec. for.
3. ASTM C109; Compressive Strength of Hydraulic Cement Mortars (Using two-
inch or 50-mm Cube Specimens), Test Method for.
4. ASTM C144; Aggregate for Masonry Mortar, Std. Spec. for
5. ASTM C404; Aggregates for Masonry Grout, Standard Spec. for.
6. ASTM C476; Grout for Masonry, Standard Spec. for.
7. ASTM C579; Compressive Strength of Chemical-Resistant Mortars, Grouts,
Monolithic Surfacings, and Polymer Concretes, Std. Test Method for.
8. ASTM C1019; Sampling and Testing Grout, Test Method for.
9. ASTM C1077; Laboratory Testing Concrete and Concrete Aggregate for Use in
Construction and Criteria for Laboratory Evaluation, Std. Practice for.
10. ASTM C1090; Measuring Changes in Height of Cylindrical Specimens from
Hydraulic-Cement Grout, Test Method for.
11. ASTM C1107; Packaged Dry, Hydraulic-Cement Grout (Non-Shrink), Std. Spec
for.
12. ASTM C1181; Compressive Creep of Chemical-Resistant Polymer Machinery
Grout, Std. Test Method for.
13. ASTM D790; Flexural Properties of Unreinforced and Reinforced Plastics and
Electrical Insulating Materials, Test Methods for.
14. ASTM E329; Agencies Engaged in the Testing and/or Inspection of Materials
Used in Construction, Std. Spec. for.
1.05 SUBMITTALS
A. Design Mix (for Fill Grout, Joint Grout for Precast Concrete Units, and Masonry
Grout): Prior to production of each grout type, submit for approval a design mix
indicating:
1. Materials and its ASTM compliance certification.
2. Material proportions.
3. Water-cement ratio.
4. ASTM compliance of design mix for masonry grout.
B. Product Data: Submit manufacturer’s product data, application limitations, installation
instructions and warranties for proprietary materials and items named herein.
6508.22 03600-2 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
C. Curing Method (for Fill Grout, Joint Grout, and Patching Grout).
1.06 DELIVERY, STORAGE AND HANDLING
A. Prevent moisture damage and contamination of materials.
B. Store materials in undamaged condition with seals and labels intact as packaged by the
manufacturer.
1.07 PROJECT CONDITIONS
A. Fill Grout, Neat Cement, and Joint Grout for Precast Concrete Units: Follow cold
weather placing and hot weather placing requirements as specified in Section 03300.
B. Masonry Grout: Comply with ACI 530.1 for cold and hot weather construction
protection.
C. Non-Shrink, Non-Metallic Grout, Epoxy-Resin Grout, Patching Grout, and
Manufactured Anchoring System: Comply with manufacturer’s written instructions.
PART 2 - PRODUCTS
2.01 MATERIALS
A. Fill Grout:
1. Portland Cement: ASTM C150.
A. Use Type I (Normal) or Type III (High-Early Strength) cement for grout
applications.
2. Sand: ASTM C33, fine aggregate.
3. Aggregate: Provide reduced size aggregate conforming to AASHTO No. 8 size
and meeting material quality requirements of ASTM C33.
4. Water: Potable quality, free from deleterious amounts of acids, alkalis, and
organic substances.
B. Masonry Grout (for reinforced masonry and bond beams): “Coarse” type grout
conforming to ASTM C476.
1. Portland Cement: ASTM C150 Type I (Normal).
2. Aggregates: ASTM C404.
3. Water: Potable quality, free from deleterious amounts of acids, alkalis, and
organic substances.
4. Do not use admixtures unless approved by Engineer.
C. Non-Shrink, Non-Metallic Grout: Structural flowable cementitious grout complying
with ASTM C1107 Grade B or C and specifically manufactured to produce high
6508.22 03600-3 ARRO
TOWN OF INDIAN HEAD –TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
strength and controlled positive expansion that is free of iron aggregates, gypsum,
carbon, chlorides and corrosive-type materials.
1. Compressive Strength (ASTM C109) at Fluid Consistency: 7,000 psi minimum at
28-days
2. Grout shall be non-shrink before initial set and show positive expansion, but no
more than 0.06% expansion at 28 days when tested in accordance with ASTM
C1090.
3. Acceptable Manufacturers:
a. L & M Construction Chemicals; Crystex.
b. The Euclid Chemical Company; NS-Grout
c. Sakrete; Non Shrink Grout
d. Or Approved Equal.
D. Epoxy-Resin Grout: High performance, flowable epoxy-resin grout specifically
manufactured to produce high strength, low creep, full bonding to concrete and steel and
be chemically inert.
1. Compressive Strength (ASTM C579): 13,000 psi minimum at 7-days.
2. Flexural Strength (ASTM D790): 4,000 psi minimum at 28 days.
3. Creep (ASTM C1181): 3.6 x 10-4 in/in maximum at 28 days.
4. Acceptable manufacturers:
a. L & M Construction Chemicals; Epogrout 758.
b. The Euclid Chemical Company; E3-HP.
c. Sika Corp; Sikadur 42 Grout-Pak LE
d. Or Approved Equal.
E. Patching Grout: Polymer-modified cementitious grout specifically designed for
exterior, horizontal, vertical, and overhead concrete repair patches greater than 1/4-inch
deep. Acceptable products include:
1. Sika Repair SHB with Latex R or Sika Top 122 by Sika Corp.
2. Trowel Grade Mortar (CR701) or Overhead Mortar (CR702) by StoCorp.
Concrete Restoration Division.
3. Concrete Top Supreme by The Euclid Chemical Company
4. Or Approved Equal.
F. Manufactured Anchoring System:
1. Factory premixed adhesive specifically designed for anchoring reinforcing bars
into existing solid base materials.
2. Acceptable Manufacturers:
a. Hilti Corp; HIT HY-150.
b. ITW RedHead; A7
c. Quikrete high strength epoxy
d. Or Approved Equal.
1) If a specific design allowable is indicated on the Drawings, provide
documentation that Equal meets or exceeds that value incorporating all
adjustment factors for edge clearances and spacing distances.
6508.22 03600-4 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
2) If a specific design allowable is not indicated on the Drawings, provide
documentation that Equal meets or exceeds Hilti table values for the
same conditions as shown on the Drawings.
2.02 GROUT QUALITY
A. Fill Grout: Mixture of portland cement, fine aggregate and water in the same
proportions used in 3,000 psi cast-in-place concrete (Section 03300) with coarse
aggregate omitted. Water-cement ratio to be 0.50 maximum.
B. Joint Grout for Precast Concrete Units: 2.5 parts sand to 1.0 part portland cement by
volume. Minimal water for placement and hydration. Consistency shall be such that
joints can be substantially filled without seepage over adjacent surfaces.
C. Masonry Grout: Proportioned such that compressive strength at 28-days shall be 2,000
psi minimum when tested in accordance with ASTM C1019 and have a slump
between 8-inch (minimum) and 11-inch (maximum) at point of placement.
D. Non-Shrink Grout, Epoxy-Resin Grout, Patching Grout and Manufactured Anchoring
System: Do not add other materials. Water requirement proportions shall conform to
manufacturer’s specifications for the desired mix consistency.
PART 3 - EXECUTION
3.01 PREPARATION
A. Forming:
1. Comply with Section 03100.
2. Remove supports only after grout has sufficiently hardened and will not be
damaged.
B. Preparation of Surface:
1. General: Areas to receive grout shall be cleaned and free of oil, grease, laitance,
dirt and other contaminants. Remove loose material. Remove rust, paint, and oil
from metal components in contact with grout.
2. General: Surface to be damp but free of standing water (SSD, saturated surface
dry).
3. Masonry Grout: Comply with ACI 530.1
4. Non-Shrink Grout, Epoxy-Resin Grout, and Patching Grout: Perform additional
surface preparation in accordance with manufacturer’s instructions.
3.02 MIXING AND HANDLING
A. Project-Site Mixing: Measure, batch and mix materials according to ((ASTM C94 for
Fill Grout, Neat Cement and Joint Grout)) ((and ACI 530.1/ASTM C476 for Masonry
6508.22 03600-5 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
Grout)). Mix materials for concrete grout in appropriate drum-type batch machine
mixer.
1. For mixers of one cu. yd., or smaller capacity, continue mixing at least 1½
minutes, but not more than 5 minutes after ingredients are in mixer, before any
part of batch is released.
2. For mixers of capacity larger than one cu. yd., increase minimum 1½ minutes of
mixing time by 15 seconds for each additional cu. yd., or fraction thereof.
3. Provide batch ticket for each batch discharged and used in work, indicating
project identification name and number, date, location of pour, mix type, mix
time, quantity, and amount of water introduced.
B. Ready-Mix Concrete Grout: Comply with requirements of ((ASTM C94 for Fill Grout,
Neat Cement, and Joint Grout)) ((and ACI 530.1/ASTM C476 for Masonry Grout)).
1. During hot weather, or under conditions contributing to rapid setting of concrete
grout, a shorter mixing time than specified in ASTM C94 may be required.
2. During hot weather conditions, the mixing speed of the truck mixer shall be set to
the minimum to avoid unnecessary heat gain of the concrete grout and still allow
for proper mixing.
3. Contractor shall keep a record at the job site showing time and place of each pour
of concrete grout together with transit-mix delivery slip certifying contents of
pour, delivery time, other data specified in ASTM C94 and amount of water added
in the field.
C. Non-Shrink Grout, Epoxy-Resin Grout and Patching Grout: In accordance with
manufacturer’s instructions.
3.03 PLACING
A. Fill Grout (Form and Place):
1. Following surface preparation, saturate the concrete with water; then remove
excess water and standing water (saturated surface dry).
2. Apply epoxy bonding compound as specified in Section 03300.
3. Place grout in a single pour and consolidate. Straight-edge exposed grout surface
for trueness and provide a steel trowel finish.
4. Cure in accordance with ACI 308.1.
B. Joint Grout for Precast Concrete Units: After precast concrete units have been placed
and secured as specified in Section 03410, grout open spaces at keyways, connections,
and joints.
1. Provide forms or other approved method to retain grout in place until hard enough
to support itself.
2. Pack spaces with stiff grout material, tamping until voids are completely filled.
3. Place grout to finish smooth, level, and plumb with adjacent concrete surfaces.
4. Keep grouted joints damp for not less than 24 hours after initial set.
5. Promptly remove grout material from exposed surfaces before it hardens.
6508.22 03600-6 ARRO
TOWN OF INDIAN HEAD –TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
C. Masonry Grout: Place, consolidate and cure in accordance with ACI 530.1 and
ASTM C476.
1. Grout pour height shall comply with ACI 530.1 based on grout type and minimum
clear cross-sectional dimensions for that pour.
D. Non-Shrink, Non-Metallic Grout and Epoxy-Resin Grout:
1. Place in accordance with the manufacturer’s written instructions.
2. Pack grout solidly between bearing surface and base plates such that no voids
remain.
3. Trowel finish exposed surface.
4. Cure in accordance with the manufacturer’s written instructions. Do not load base
plate or operate equipment until grout is fully cured.
E. Patching Grout: Follow manufacturer’s written instructions and guidelines for applying
their products.
1. Method of application such as trowel, spray, or brush is subject to the
manufacturer’s written instructions. Any method not specifically described in the
product literature must have written authorization by the manufacturer to ensure
that the warranty is not invalidated.
2. Provide a trowel finish.
3. Provide the proper curing and protection from rain as dictated by the
manufacturer. Do not apply the next product until the minimum curing time and
temperature has past for the current product.
F-. Manufactured Anchoring System: Place in accordance with manufacturer’s written
instructions.
END OF SECTION
6508.22 03600-7 ARRO
TOWN OF INDIAN HEAD –TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
DIVISION 4 - MASONRY
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
SECTION 04100
MORTAR
PART 1 - GENERAL
1.01 SECTION INCLUDES
A. Mortar materials and mixes for masonry construction.
1.02 RELATED SECTIONS
A. Grout: Section 03600.
1.03 REFERENCES
A. American Concrete Institute (ACI):
1. ACI 530; Building Code Requirements for Masonry Structures.
2. ACI 530.1; Specifications for Masonry Structures.
B. American Society for Testing And Materials (ASTM):
1. ASTM C91; Masonry Cement, Spec. for.
2. ASTM C144; Aggregate for Masonry Mortar, Spec. for.
3. ASTM C150; Portland Cement, Spec. for.
4. ASTM C207; Hydrated Lime for Masonry Purposes, Spec. for.
5. ASTM C270; Mortar for Unit Masonry, Spec. for.
C. Brick Institute of America (BIA): Technical Notes on Brick Construction.
1.04 QUALITY ASSURANCE
A. Codes and Standards: Comply with provisions of following codes, specifications and
standards, except where more stringent requirements are shown or specified:
1. ACI 530, Building Code Requirements for Masonry Structures.
2. ACI 530.1, Specifications for Masonry Structures.
6508.22 04100-1 ARRO
TOWN OF INDIAN HEAD –TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
1.05 DELIVERY, STORAGE AND HANDLING
A. Deliver and store mortar products in original unopened containers.
B. Store cementitious ingredients in weather-tight enclosures and protect against
contamination and premature set.
C. Stockpile and handle aggregates prior to and after delivery to the site in a manner to
prevent contamination from foreign materials.
D. Store mortar admixtures to prevent contamination or material damage from excessive
temperature changes.
E. Keep mixing water free of harmful and staining substances and such other contaminants
as specified.
1.06 PROJECT CONDITIONS
A. Environmental Requirements: Heat mixing water when air temperature is below 40
degrees F., and heat both mixing water and aggregates when air temperature is below 32
degrees F., to assure mortar temperatures between 40 degrees F. and 120 degrees F. until
used. Do not heat water or sand above 120 degrees F.
B. Produce subsequent mortar batches within ±10 degrees F. of the first batch of mixing
mortar.
C. Maintain mortar temperature on boards above freezing when air temperature falls below
25 degrees F.
D. Where Grout is indicated on the Drawings for filling of concrete (hollow) masonry units
do not use Mortar as grout fill. Grout material requirements as specified in
Section 03600.
PART 2 - PRODUCTS
2.01 MATERIALS
A. Portland Cement: ASTM C150, Type I.
B. White Masonry Cement: ASTM C91, Nonstaining to limestone.
C. Hydrated Lime: ASTM C207, Type S.
6508.22 04100-2 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
D. Sand: ASTM C144, except grading shall comply with BIA Ml-72. Submit sand sample
for color approval when submitting for masonry unit approval.
E. Admixtures: No air-entraining admixtures permitted. No antifreeze compounds
permitted. No calcium chloride or admixtures containing calcium chloride permitted.
F. Coloring Agents: Mortar color meeting requirements of and used in amounts not
exceeding BIA Ml-72. Mortar color selected with Submittal approval.
G. Water: Clean and free from deleterious amounts of acids, alkalis, and organic materials.
2.02 MIXES
A. Mix mortar materials to produce mortar Types as follows when tested according to
ASTM C270 compressive strength test:
1. Type N, 750 psi (Parts by volume include: 1 part cement, over 1/2 to 1¼ parts
lime, and sand at not less than 2¼ nor more than 3 times the sum of the volumes of
cement and lime used.)
2. Type S, 1800 psi (Parts by volume include: 1 part cement, over 1/4 to 1/2 parts
lime, and sand at not less than 2¼ nor more than 3 times the sum of the volumes of
cement and lime used.)
3. Type M, 2500 psi (Parts by volume include: 1 part cement, 1/4 part lime, and sand
at not less than 2¼ nor more than 3 times the sum of the volumes of cement and
lime used.)
B. Pointing Mortar: Use only prehydrated mortar, duplicating the original mortar
proportions. Prepare pointing mortar in accordance with instructions outlined in
BIA M1-72.
PART 3 - EXECUTION
3.01 PERFORMANCE
A. Mix ingredients in clean mechanical batcher for at least three but not over five minutes.
B. Control batching procedure to ensure proper proportions by measuring materials by
volume, or equivalent weight. DO NOT MEASURE BY SHOVEL.
C. Control water in mixing to the minimum required to produce workable consistency.
D. Retemper stiffened mortar only within 2½ hours after initial mixing. Use and place
mortar in final position within 2½ hours after initial mixing.
6508.22 04100-3 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
3.02 APPLICATION
A. Apply mortar in accordance with the following use requirements:
1. Use Type N mortar for general uses in exposed masonry above grade subject to
elemental exposure.
2. Use Type N mortar for non-loadbearing partition masonry wall construction in
structure interior.
3. Use Type S mortar for general uses in exposed masonry above grade subject to
wind velocities exceeding 80 mph; for unreinforced masonry where maximum
flexural strength is required; and where mortar is the sole bond between facing and
back-up work.
4. Use Type S mortar for loadbearing interior and exterior masonry wall construction.
5. Use Type M mortar for masonry below grade in contact with earth, for foundations,
and for retaining walls.
END OF SECTION
6508.22 04100-4 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
SECTION 04150
MASONRY ACCESSORIES
PART 1 - GENERAL
1.01 SECTION INCLUDES
A. Joint reinforcement and installation
B. Bar and rod vertical reinforcement.
C. Anchors.
D. Expansion and control joint materials.
1.02 RELATED SECTIONS
A. Unit Masonry: Section 04200.
B. Metal Fabrications: Section 05500.
1.03 QUALITY ASSURANCE
A. Codes and Standards: Comply with provisions of following codes, specifications and
standards, except where more stringent requirements are shown or specified:
1. ACI 530, Building Code Requirements for Masonry Structures.
2. ACI 530.1, Specifications for Masonry Structures.
1.04 REFERENCES
A. American Concrete Institute (ACI):
1. ACI 530; Building Code Requirements for Masonry Structures.
2. ACI 530.1; Specifications for Masonry Structures.
B. American Society for Testing and Materials (ASTM):
1. ASTM A82; Cold-Drawn Steel Wire for Concrete Reinforcement, Spec. for.
2. ASTM A153; Zinc Coating (Hot-Dip) on Iron and Steel Hardware, Spec. for.
3. ASTM A307; Carbon Steel Externally Threaded Standard Fasteners, Spec. for.
4. ASTM A615-81 (S1); Deformed and Plain Billet-Steel Bars for Concrete
Reinforcement, including Supplementary Requirements (S1).
5. ASTM D1752; Preformed Sponge Rubber and Cork Expansion Joint Fillers for
Concrete Paving and Structural Construction, Spec. for.
6508.22 04150-1 ARRO
TOWN OF INDIAN HEAD –TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
6. ASTM D2000; Rubber Products in Automotive Applications, Classification
System for.
7. ASTM D2240; Rubber Property-Durometer Hardness, Test Method for.
1.05 SUBMITTALS
A. Product Data: Submit manufacturer's descriptive literature and specifications indicating
product compliance with project design.
1.06 DELIVERY, STORAGE AND HANDLING
A. Deliver and store masonry accessories protected from the elements.
B. Maintain masonry accessory materials in a dry condition by stockpiling on planks or
other supports off the ground and covering with waterproof coverings.
PART 2 - PRODUCTS
2.01 MATERIALS
A. Joint Reinforcement: Provide welded-rod units prefabricated with deformed No. 9
continuous side rods and plain, cold drawn steel ASTM A82, cross rods into straight
lengths of not less than 10-feet with prefabricated corner and tee units, and complying
with requirements indicated below.
1. Width: Fabricate joint reinforcement in units with widths of
approximately 2 inches less than nominal width of walls and partitions as required
to provide mortar coverage of not less than 5/8-inch on joint faces exposed to
exterior and 1/2 inch elsewhere.
2. Single-Wythe Masonry: Provide type as follows, with Class 1 mill galvanizing,
and single pair of side rods.
a. Ladder design with perpendicular cross rods spaced not more
than 16 inches o.c.
b. Truss design with continuous diagonal cross rods spaced not more
than 16 inches o.c.
3. Multi-Wythe Masonry: Provide type as follows with Class 3 mill galvanizing.
a. Ladder design with perpendicular cross-spaced not more than 16 inches o.c.
and number of side rods as follows:
b. Truss design with diagonal cross rods spaced not more than 16 inches o.c.
and number of side rods as follows:
1) Number of Side Rods for Cavity Wall Construction: One side rod for
each face shell of concrete masonry back-up and one rod for brick
wythe.
6508.22 04150-2 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
2) Number of Side Rods for Composite Construction: One side rod for
each face shell of concrete masonry back-up and one rod for brick
wythe.
3) Number of Side Rods for Multiple-Wythe Concrete Masonry: One
side rod for each face shell of concrete masonry back-up and of
concrete masonry facing wythe.
4) Number of Side Rods for Multiple-Wythe Brick Masonry: One side
rod for each wythe.
c. Tab design with single pair of side rods and rectangular box-type cross ties
spaced not more than 16 inches o.c.; with side rods spaced for embedment
within each face shell of back-up wythe and ties extended to within 1-inch of
exterior face of facing wythe.
4. Acceptable Manufacturers:
a. Dur-O-Wall; Truss Type
b. Hohmann & Barnard, Inc.
c. Masonry Reinforcing Corp. of America.
d. Or Approved equal.
B. Bar and Rod Reinforcement: ASTM A615 (S1), Grade 60, Deformed.
C. Beam & Wall Anchors: Manufactured of 1/8 x 1-inch painted steel, formed to hook
over beam flange with masonry anchoring end corrugation formed 4-inches minimum.
D. Column & Wall Anchors: Manufactured of 14 gauge 1 x 1¼-inch plain steel
with 3/16-inch deep by 3/4-inch wide offset to receive a 14 gauge by 3/4-inch wide
galvanized corrugated wall tie.
E. Corrugated Veneer Ties: Manufactured of 22-gauge minimum galvanized flat steel
corrugated veneer ties, ASTM A153; 7/8-inch wide minimum by 6-inches long
minimum.
F. Dovetail Anchor Slots & Anchors: Slots manufactured of 22 gauge galvanized steel
Standard Dovetail Anchor Slots; and anchors 16 gauge galvanized steel Dovetail
Standard Brick Anchor with mortar lug.
G. Steel Anchor Bolts: Shapes as indicated, ASTM A307 with galvanized finish
conforming to ASTM A153.
H. Expansion Joint Material: Composed of cork granules in a resin binder, ASTM D1752.
I. Rubber Control Joint Material: Preformed extruded rubber gasket, ASTM D2000
2AA-805, with a durometer hardness of approximately 80 when tested per
ASTM D2240; RAPID CONTROL JOINT Regular as manufactured by Dur-O-Wall
Incorporated or HB Standard Hohmann & Barnard, Inc., or Ty-Wal Control Joint
Regular by Jim Taylor, Inc. or approved equal.
J. Wall Cavity Drainage System: As specified in Section 04200.
6508.22 04150-3 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
K. Weep Holes: As specified in Section 04200.
L. Through-Wall Flashing: As specified in Section 07600.
PART 3 - EXECUTION
3.01 PREPARATION
A. Clean reinforcing before placing. Remove loose rust, ice, dirt and other bond-breaking
coatings.
3.02 REINFORCING INSTALLATION
A. Wall and Partition Reinforcing: Install masonry reinforcing as work of Section 04200 is
in progress.
1. Install masonry reinforcing continuously in horizontal rows every 16-inches in
height, and closer where so indicated on the Drawings and stated herein. Use
preformed members at corners and intersections. Lap splices at least 8-inches.
Do not extend reinforcing through control joints or removable panel joints.
2. Install Masonry Reinforcing continuously in the first course over and under all
openings and extend 24-inches beyond each side of openings.
B. Install bar and rod reinforcing in Unit Masonry work at locations indicated on
Drawings.
3.03 ANCHOR INSTALLATION
A. Beam & Wall Anchors: Extend anchors from the inside edge of the bottom flange of
steel spandrel beams, under the beam to within 1 to 2 inches of the outside face of
masonry walls. Space anchors no greater than 4 feet o.c. for the length of the beams.
B. Column & Wall Anchors: Install anchors spaced 16 inches o.c. vertically.
C. Corrugated Veneer Ties: Attach masonry veneer to backing with one tie for each four
square feet of wall area.
1. Maximum spacing between adjacent ties: 24-inches vertically and horizontally.
2. Provide additional ties at openings and install within 12-inches of openings.
Space ties 36-inches o.c. maximum around perimeter of opening.
D. Dovetail Anchors Slots & Anchors: Use to anchor exterior masonry walls facing or
abutting concrete members.
1. Maximum anchor spacing: 24-inches vertically and 36-inches horizontally.
2. Maintain a space not less than 1/2-inch wide between masonry wall and concrete
members.
6508.22 04150-4 ARRO
TOWN OF INDIAN HEAD –TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
E. Anchor Bolts Installation: Build in anchor bolts as masonry work Progresses.
Accurately align bolts and set to planned elevation as indicated on Drawings.
3.04 MOVEMENT JOINTS
A. Install Expansion Joint Material within exterior masonry walls located where indicated
on the Drawings. Leave that portion of the expansion joints, as indicated to receive
sealant, in a condition acceptable to receive such.
B. Install Rubber Control Joint Material within exterior masonry walls located where
indicated on the Drawings. Leave that portion of the joints, as indicated to receive
sealant, in a condition acceptable to receive such.
END OF SECTION
6508.22 04150-5 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
SECTION 04200
UNIT MASONRY
PART 1 - GENERAL
1.01 SECTION INCLUDES
A. Hollow load-bearing concrete masonry units
B. Brick installation
1.02 RELATED SECTIONS
A. Cast-In-Place Concrete: Section 03300.
B. Grout: Section 03600.
C. Mortar: Section 04100.
D. Masonry Accessories: Section 04150.
1.03 QUALITY ASSURANCE
A. Job Mock-Up: Construct on-site a sample panel approximately four feet square to show
the proposed color range, texture, bond, mortar and workmanship. Do not proceed with
masonry work until the Engineer has approved the panel.
1. Erect separate panels for each type of unit masonry work.
2. Use panels as standard of comparison for all unit masonry work.
3. Do not destroy or move panel until work is completed and accepted by the
Engineer.
B. Codes and Standards: Comply with provisions of following codes, specifications and
standards, except where more stringent requirements are shown or specified:
1. ACI 530, Building Code Requirements for Masonry Structures.
2. ACI 530.1, Specifications for Masonry Structures.
1.04 REFERENCES
A. American Concrete Institute (ACI):
1. ACI 530; Building Code Requirements for Masonry Structures.
2. ACI 530.1; Specifications for Masonry Structures.
B. American Society for Testing and Materials (ASTM):
1. ASTM C55; Concrete Building Brick, Spec. for.
6508.22 04200-1 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
2. ASTM C62; Building Brick (Solid Masonry Units Made From Clay or Shale),
Spec. for.
3. ASTM C67; Sampling and Testing Brick and Structural Clay Tile, Methods of.
4. ASTM C90; Hollow Load-Bearing Concrete Masonry Units, Spec. for.
5. ASTM C129; Hollow Non Load-Bearing Concrete Masonry Units, Spec. for.
6. ASTM C145; Solid Load-Bearing Concrete Masonry Units, Spec. for.
7. ASTM C216; Facing Brick (Solid Masonry Units Made from Clay or Shale),
Spec. for.
8. ASTM C578; Preformed Cellular Polystyrene Thermal Insulation, Spec. for.
9. ASTM C629; Slate Building Stone, Spec. for.
10. ASTM C744; Prefaced Concrete and Calcium Silicate Masonry Units, Spec. for.
C. Brick Institute of America: BIA M 1-72, Portland Cement-Lime Mortar for Brick
Masonry.
1.05 SUBMITTALS
A. Samples: Submit five individual samples of unit masonry, except solid and hollow
concrete masonry units, showing extremes in color and texture variations.
B. Certificates: Prior to delivery, submit to the Engineer certificates attesting compliance
with the applicable specifications for grades, types or classes of masonry units included
in these Specifications.
1.06 DELIVERY, STORAGE AND HANDLING
A. Deliver and store unit masonry materials protected from the elements.
B. Store unit masonry off ground to prevent contamination by mud, dust or materials likely
to cause staining or other defects.
1.07 PROJECT CONDITIONS
A. Environmental Requirements: Comply with the following construction requirements
while work is in progress which are in addition to the environmental requirements
previously specified in Section 04100 for Mortar.
1. Air Temperature 25 degrees F. to 20 degrees F.: Use temporary heat source on
both sides of masonry wall or other forms of vertical masonry work under
construction. In addition, use windbreaks when wind is in excess of 15 mph.
2. Air Temperature 20 degrees F. and below: Provide enclosures and temporary heat
to maintain air temperature above 32 degrees F. in the enclosure. In addition, the
minimum temperature of units when laid: 20 degrees F.
6508.22 04200-2 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
B. Protection: During unit masonry erection, cover top of wall with strong waterproof
membrane at the end of each day or shutdown. Cover partially completed walls when
work is not in progress. Extend the covering a minimum of 24-inches down both sides.
Hold coverings securely in place.
C. Load Application:
1. Do not apply uniform (floor) (or) (roof) loading for at least 12 hours after building
walls.
2. Do not apply concentrated loads for at least three days after building masonry
walls.
D. Staining:
1. Prevent mortar stains on the face of masonry work to be left exposed or painted by
immediately removing misplaced mortar in contact with the face of such masonry
work.
2. Protect sills, ledges and projections from mortar droppings. Protect door jambs
and corners from damage during construction.
E. Freeze Protection: Protection requirements for completed masonry work and extended
shutdowns on partially completed construction are as follows:
1. Mean daily air temperature 40 degrees F.: Protect newly laid-up masonry from
rain or snow for 24 hours by covering with weather-resistive membrane.
2. Mean daily air temperature 25 degrees F. to 20 degrees F.: Protect newly laid-up
masonry from the elements for 24 hours by covering with weather-resistive
insulating blankets.
3. Mean daily air temperature 20 degrees F. and below: Protect newly laid-up
masonry by enclosure and temporary heat or weather-resistive heating blankets for
24 hours minimum.
PART 2 - PRODUCTS
2.01 MATERIALS
A. Concrete Masonry Units: Use commercially manufactured blocks meeting requirements
of the pertinent referenced standards specified. A water repellent admixture shall be
added to the CMUs during manufacture.
1. Provide special shapes where required for lintels, corners, jambs, sash, control
joints, headers, bonding and other special conditions.
2. Provide bullnose units for corners exposed to view and at openings where the in-
wall unit ( door/window/louver/damper etc ) is recessed and its framework is not
flush with the face of the wall; unless otherwise indicated on the Drawings or
specified herein.
3. Provide square-edged units for outside corners, except where indicated as
bullnose.
6508.22 04200-3 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
4. Hollow Load-Bearing Normal Weight Concrete Masonry Units, ASTM C90,
Grade N-I.
5. Hollow Non-Load-Bearing Concrete Masonry Units, ASTM C129, Grade N-I.
6. Solid Load-Bearing Concrete Masonry Units, ASTM C145, Grade N-I.
7. Hollow Non-Load-Bearing Concrete Masonry Units, ASTM C129, Lightweight,
Type 1.
8. Hollow Non-Load-Bearing FLUTED Concrete Masonry Units, ASTM C90,
Grade N-I.
B. Split Face Load-Bearing Concrete Fluted Masonry Units; ASTM C90, Grade N-I,
Type and Color to match existing pavilion building.
1. Sound-absorbing Concrete Masonry Units: ASTM C90, Type RR SOUNDBLOX
as manufactured by The Proudfoot Company, Inc.; Trenwyth Acoustical Products;
Echelon; or approved equal.
2. Ground Face Masonry Units: ASTM C90 or ASTM C145 Grade N, Type 1 as
applicable. Masonry unit surfaces ground, polished and coated with factory
applied heat treated acrylic coating conforming to requirements of ASTM C744
with respect to adhesion, abrasion, color change, resistance to crazing, and
conform to ASTM C67 with respect to freezing and thawing.
C. Molded CMU Core Insulation: Provide concrete masonry units with expanded
polystyrene insulation conforming to ASTM C578, and installed in the block cores at
the block manufacturer’s plant.
D. Face Brick: ASTM C216, Grade SW, Type FBS. Style, color and dimensions as
follows:
1. Match existing brick for other building in Village Green Park.
E. Cleaning Agents: Do not use cleaning agents other than water on masonry, except with
concurrence of the Engineer. When cleaning agents are permitted, use only those
brands as recommended by the unit masonry manufacturers.
F. Mortar: As specified in Section 04100.
G. Reinforcing, Anchors and Ties: As specified in Section 04150.
H. Masonry Grout: As specified in Section 03600.
I. Ground Face Masonry Sealer: High solids content clear acrylic masonry sealer.
1. Coverage: 200 to 300 square feet per gallon.
2. Flash Point: Above 100° F.
3. Normal Cure Time: 1 Hour @ 77 - 50% RH.
4. Solids Content: 25% 2.
5. Weight: Approx. 8 lbs. per gallon.
6508.22 04200-4 ARRO
TOWN OF INDIAN HEAD –TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
J. Head, Sill and Through Wall Flashing: Utilized flashing system consisting of flexible
thermoplastic sheet; with attached drainage mat, weep tabs, stainless steel drip edge, and
termination bar along top edge. Provide three-inch minimum overlaps at joints between
adjacent pieces, prefabricated stainless steel corners, flexible one-piece thermoplastic
corner boots and end-dams, fasteners, adhesives and sealants. All components shall be
by a single manufacturer.
K. Pea Gravel: Aggregate stone conforming to AASHTO No. 10 grade for passing a sieve
test.
L. Weep Hole: Flexible polypropylene venting device for cavity walls. Dur-O-Wall Cell
Vent D/A 1006; Hohmann & Barnard, Inc. QV Quadro-Vent; Advanced Building
Products, Inc. Mortar Maze Weep Vents; or approved equal.
PART 3 - EXECUTION
3.01 INSPECTION
A. Examine masonry units for cracks and chipping exceeding permissible limits of the
referenced ASTM Specifications and Tests, and dispose of same off-site.
B. Examine the Drawings and other Sections of the Specifications for such work, items and
materials to be built-in. Coordinate performance of masonry work to incorporate such
other work, items and materials.
3.02 PREPARATION
A. If ice or snow has formed on masonry bed, remove by carefully applying heat until the
top surface is dry to the touch. Remove masonry that is frozen or damaged.
B. Wet those brick having absorption rates in excess of 20 grams/30 sq. in./min. as
determined per ASTM C67, so that rate of moisture absorption when laid does not
exceed permissible amount. However, brick surface shall be dry to the touch when laid.
C. Wet, but do not saturate, concrete masonry units immediately before using.
3.03 GENERAL ERECTION REQUIREMENTS
A. Mix and place mortar as specified in Section 04100.
B. Cut exposed masonry by an approved saw cut method. Do not use chipped or broken
masonry units in exposed masonry work. Lay exposed masonry to a uniform facing
plane.
6508.22 04200-5 ARRO
TOWN OF INDIAN HEAD –TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
C. Install reinforcing, anchors and ties as specified in Section 04150.
D. Where adjustments must be made in laid-up masonry work after mortar has taken its
initial set, remove the mortar and replace with fresh.
E. Pattern Bond:
1. Lay exposed masonry in running bond except where indicated otherwise on the
Drawings.
2. Bond unexposed masonry units in wythe as indicated and where not indicated lay
units in running bond.
F. Joining Work:
1. Where fresh masonry joins partially set masonry, remove any loose masonry units
and mortar and clean and lightly wet the set masonry surfaces.
2. Stop off horizontal runs of masonry by racking back 1/2 length of unit in each
course.
3. Toothing is not permitted in new work except upon written acceptance of the
Engineer.
G. Tooling:
1. Tool joints when mortar is thumb-print hard using a round jointer slightly larger
than width of joint.
a. Tool exposed and unexposed joints concave, except in interior areas
scheduled to be painted.
b. Joints in interior areas scheduled to be painted shall be flush cut to
produce a smooth flat surface.
c. Tool fluted masonry work with a flat jointer to compact the joint surface in a
slight depression.
2. Tuck Pointing: Rake mortar joints to a depth of not less than 1/2-inch nor more
than 3/4-inch, saturate joints with clean water and fill solidly with prehydrated
pointing mortar. Tool filled joints to match existing.
H. Sealant Recesses: Make sealant recesses at points indicated on the Drawings. Make
joints a uniform 3/4-inch deep by 1/4 to 3/8-inch wide. Leave sealant recesses in a
condition acceptable to receive such.
I. Flashing: Clean surface of masonry smooth and free from projections that might
puncture flashing material. Place through-wall flashing on bed of mortar and cover
flashing with mortar.
J. Weep Holes: Extend weep holes to exterior in the first full masonry course above
finished grade by placing and leaving sash cord in joint. Space weep holes 32-inches
O.C. Additional weep hole provisions as follows:
1. Provide weep holes in head joints in first course immediately above flashings.
2. Maximum spacing of weep holes: 32-inches O.C. and a minimum of two per head
joint over openings less than 32-inches.
6508.22 04200-6 ARRO
TOWN OF INDIAN HEAD –TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
3. Provide weep holes wherever flashing is used.
K. Pea Gravel: Place pea gravel over flashing continuously behind the weep holes to a
height of 6-inches above the bottom of the flashing.
L. Wall Cavity Drainage System: Install in accordance with manufacturer’s instructions.
3.04 CONCRETE MASONRY UNIT (CMU) INSTALLATION
A. Hollow CMU Installation:
1. Set units plumb and true including corners and reveals. Embed units in face-shell
mortar bed. Furrowing is prohibited. For vertical joints, apply mortar to the lips
on vertical ends of block. A course of CMU (1 CMU plus 1 joint) shall equal
8-inches in height. Wedge units tightly at underside of floor slabs and structural
members, then slush solidly with mortar.
2. Align all vertical cells to maintain a clear, unobstructed system of flues. Do not
use units less than one half block or chipped or broken block.
3. Where concrete masonry units are finished with thin-set ceramic wall tile, the
maximum surface variation shall not exceed 1/8-inch in 8-feet from the required
plane.
B. Solid CMU Installation:
1. Lay units plumb and true to lines with completely filled mortar joints including
bed joints.
2. Rock closures into place with head joints thrown against two adjacent units in
place. Do not pound corners and jambs to fit stretcher units after they are set in
position.
3. Keep cavity in cavity walls clean by slightly beveling mortar bed to incline toward
cavity; or as work progresses, trowel protruding mortar fins in cavity flat on to
inner face of the wythe.
C. CMU Lintel and Vertical Wall Reinforcement Installation: Lay in accordance with
requirements for Hollow CMU. Additionally, place the required Bar or Rod
Reinforcement within the cavity and fill cavity with the following:
1. Masonry Grout, as specified in Section 03600.
2. Reduced aggregate concrete, 3000 psi as specified in Section 03300.
3.05 BRICK INSTALLATION
A. Lay bricks plumb and true to lines with full vertical and longitudinal joints by shoving
alone. Do not furrow bed joints. Three course of brick-work (3 bricks plus 3 joints)
shall equal 8-inches in height.
B. Butter ends of bricks with sufficient mortar to fill head joints. Rock closure into place
with head joints thrown against the two adjacent bricks in place.
6508.22 04200-7 ARRO
TOWN OF INDIAN HEAD –TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
C. Fill vertical and longitudinal joints, except in cavity walls, by parging either the face of
backing or the back of the bricks.
D. Keep cavity in cavity walls clean by slightly beveling mortar bed to incline toward
cavity; or as work progresses, trowel protruding mortar fins in cavity flat on to inner
face of the wythe.
3.06 CLEANING
A. Prior to cleaning, examine exposed masonry work and cut out defective joints, damaged
areas and holes and tuck point as previously specified.
B. As work progresses, dry-clean laid up masonry using soft-wood paddles or scrapers to
remove excess mortar, mortar smears and drippings. At completion of masonry work,
clean exposed masonry work with clean water and stiff bristle brushes.
C. Apply cleaning agent, when permitted, to a sample wall area of approximately ten
square feet in a location acceptable to the Engineer. Do not proceed with cleaning until
sample area is approved by the Engineer.
D. Use cleaning agent in accordance with brick manufacturer’s recommendations. Do
small sections at a time working from top to bottom. Remove green efflorescence in
accordance with brick manufacturer’s recommendations.
E. Protect all sash, metal items and other corrodible parts of the structure when masonry is
cleaned with corrosive solutions.
F. If care is taken during laying unit masonry and dry-cleaning masonry is acceptable to the
Engineer, the Engineer may at his option delete the water-cleaning requirement.
END OF SECTION
6508.22 04200-8 ARRO
TOWN OF INDIAN HEAD –TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
DIVISION 5 - METALS
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
SECTION 05100
STRUCTURAL METAL FRAMING
PART 1 - GENERAL
1.01 SECTION INCLUDES
A. Structural Steel Columns
1.02 RELATED SECTIONS
A. Section 03600 - Grout.
B. Work Specified But Not Installed:
1. Anchor Bolts for Structural Steel: Specified under this Section for installation as
work of Division 3 - Concrete.
1.03 QUALITY ASSURANCE
A. Qualifications:
1. Fabricator: Continuous experience in fabrication of structural steel.
2. Erector: Continuous experience in erection of structural steel.
3. Welder, Tacker, and Welding Operator Qualifications: Use welders, tackers, and
welding operators who have been previously qualified by tests as prescribed in the
Structural Welding Code, AWS D1.1 of the American Welding Society to
perform type of work required.
1.04 REFERENCES
A. American Society of Civil Engineer’s Standards (ASCE) concerning rail weights and
materials.
B. American Institute of Steel Construction (AISC):
1. AISC Code of Standard Practice for Steel Buildings and Bridges.
2. AISC Specifications for Design, Fabrication and Erection of Structural Steel for
Buildings.
C. American National Standards Institute: ANSI B18.22.1, Plain Washers.
D. American Society For Testing and Materials (ASTM):
1. ASTM A36, Structural Steel, Spec. for.
2. ASTM A123, Zinc (Hot-Galvanized) Coatings on Products Fabricated from
Rolled, Pressed, and Forged Steel Shapes, Plates, Bars, and Strip, Spec. for.
6508.22 05100-1 ARRO
INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
3. ASTM A153, Zinc Coating (Hot-Dip) on Iron and Steel Hardware, Spec. for.
4. ASTM A164, Electrodeposited Coatings of Zinc on Steel, Spec. for.
5. ASTM A307, Carbon Steel Bolts, and Studs, 60,000 PSI Tensile Strength,
Standard Spec. for.
6. ASTM A325, High-Strength Bolts for Structural Steel Joints, Spec. for.
7. ASTM A386, Zinc Coating (Hot-Dip) on Assembled Steel Products, Spec. for.
8. ASTM A490, Quenched and Tempered Alloy Steel Bolts for Structural Steel
Joints, Spec. for.
9. ASTM A500, Cold-Formed Welded and Seamless Carbon Steel Structural Tubing
in Rounds and Shapes, Spec. for.
10. ASTM A563, Carbon and Alloy Steel Nuts, Spec. for.
11. ASTM A572, High-Strength Low Alloy Columbium-Vanadium Steels of
Structural Quality, Spec. for.
12. ASTM A668, Steel Forgings, Carbon and Alloy, for General Industrial Use, Spec.
for.
13. ASTM F436, Hardened Steel Washers, Spec. for.
E. American Welding Society: AWS D1.1 Structural Welding Code.
F. Federal Specifications:
1. Fed. Spec. A-A-1922A, Shield, Expansion; Nail, Expansion; and Nail, Drive
Screw (Devices, Anchoring, Masonry) Group II (Shield, Expansion Bolt Anchor)
Type 4 (Wedge Expansion Anchors) Class 1.
G. Steel Structures Painting Council (SSPC):
1. Surface Preparation Specifications:
a. SSPC-SP1, Solvent Cleaning.
b. SSPC-SP2, Hand Tool Cleaning.
c. SSPC-SP3, Power Tool Cleaning.
d. SSPC-SP6, Commercial Blast Cleaning.
e. SSPC-SP8, Pickling.
f. SSPC-SP10, Near-White Blast Cleaning.
2. Paint Application Specifications: SSPC-PA1, Shop, Field and Maintenance
Painting.
1.05 SUBMITTALS
A. Shop Drawings and Product Data:
1. Shop drawings shall identify the detail as indicated on Contract Drawings and be
complete as to detail of product and its location in the project, the size and
weights of members, the methods of joining various components, the quantity,
finish, the location and type of anchors and necessary measurements.
2. Shop assemblies, which require markings for erection identification, shall have
easy-to-read markings on shop and erection drawings.
3. Note on shop drawings variations in tolerances or clearances between various
products.
6508.22 05100-2 ARRO
INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
4. Use standard welding symbols of the American Welding Society on shop
drawings.
5. Furnish setting diagrams, templates, and directions for the installation of
structural framing anchor bolts, bearing plates, and other embedded items.
6. Submit product data on type of finish paint system for both shop Painting and
field touch up painting.
1.06 DELIVERY, STORAGE AND HANDLING
A. Store steel on platforms, skids, blocking or other supports to prevent dirt and debris
contact. Protect from exposure to conditions that produce rust.
B. Handle steel so no parts are bent, broken or otherwise damaged and avoid damage to
other material and work. Store beams with webs vertical. Exercise care to avoid
scraping and overstressing the steelwork.
C. Ship small parts, such as rivets (if any), bolts, nuts, washers, pins, fillers, and small
connecting plates and anchors, in boxes, crates, or barrels. Pack separately each length
and diameter of bolt and each size of nut and washer. Plainly mark an itemized list and
description of the contents on the outside of each container.
PART 2 - PRODUCTS
2.01 STEEL MATERIALS
A. Carbon Steel: ASTM A36.
B. High Strength Steel: ASTM A572, Grade 50.
C. Structural Steel Tubing: Carbon steel in accordance with ASTM A500; Grade as
indicated on Drawings.
2.02 FASTENERS
A. High-Strength Structural Steel Bolts, Nuts and Washers:
1. ASTM A325 Specification for Bolts.
2. ASTM A563 Specification for Carbon and Alloy Steel Nuts.
3. ASTM F436 Specification for Hardened Steel Washers for Use with
High-Strength Bolts.
4. Bolts, nuts and washers galvanized in accordance with ASTM A153.
B. Standard Steel (Low Carbon) Bolts, Nuts and Washers: ASTM A307.
1. Bolts, nuts and washers galvanized in accordance with ASTM A153.
C. Round Washers, other than those in contact with high-strength bolt heads and nuts:
ANSI B18.22.1, Type B.
6508.22 05100-3 ARRO
INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
D. Beveled Washers: Square, smooth and sloped to make contact surface of bolt head and
nut parallel.
E. Headed Stud Type Shear Connectors: Cold finished carbon steel, ASTM A668, Class
Designation B; similar to Nelson Stud Welding Systems, Tru-Weld, Sinoars or
approved equal.
F. Lubricant for Bolts: Molybdenum disulfide base.
G. Anchor Bolts: Shapes as indicated, ASTM A307.
H. Expansion Anchors: Provide products conforming to Fed. Spec. A-A-1922A, Type 4,
Class 1, such as Hilti Kwik-Bolt, Phillips Red-Head Wedge-Anchor, and Molly
Parabolt; or approved equal.
1. High tensile steel (125,000 psi) standard.
2. Stainless steel (#303 bolt, #304 nut and washer).
2.03 PROTECTIVE COATINGS
A. Galvanizing: Hot-dip galvanize steel products which are specified to be galvanized
after fabrication in accordance with the requirements listed below:
1. Specification for zinc (hot-galvanized) coatings on products fabricated from
rolled, pressed and forged steel shapes, plates and strip; ASTM A123.
2. Specification for zinc coating (hot-dip) on iron and steel hardware; ASTM A153.
3. Specification for zinc coating (hot-dip) on assembled steel products;
ASTM A386.
B. Electro-Plated Zinc Coating: ASTM A164 for the type specified.
C. Shop Paint:
1. Type of shop paint used must be compatible with paint applied in the field.
2. Rust-inhibitive alkaline primer.
D. Field Paint (Protection Coating): Field applied protective coating for installed steel in
soil buried location; Heavy Bodied Bituminous Paint.
2.04 FABRICATION
A. Fabricate structural steel in accordance with Drawings and referenced AISC standards.
B. Punch and drill steel for attachment of other materials.
6508.22 05100-4 ARRO
INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
2.05 SHOP PAINTING
A. Surface Preparation (blast clean): Before blast cleaning remove weld splatter and grind
smooth to a rounded contour sharp edges and welds.
B. Painting:
1. Apply shop paint to prepared steel before surface starts to rust.
2. Apply shop paint in accordance with SSPC-PA1.
3. Minimum dry mil thickness of shop paint shall be 1.5 mils. Paint steel which is
exposed to weather in its installed location with rust-inhibitive shop paint.
4. Do not shop paint the following areas of structural steel members:
a. Areas of structural members indicated as being encased in concrete.
b. Weld areas as required for indicated welded member to member
connections.
c. Top flanges of structural members indicated to receive stud shear
connectors.
PART 3 - EXECUTION
3.01 ERECTION
A. Erect structural steel in accordance with the Drawings, pertinent regulations and
referenced AISC standards.
1. Allow concrete foundations to reach a minimum of 14 days curing time before
torquing of anchor bolts.
2. Grouting of column base plates performed as specified in Section 03600.
3. Prior to installation of stud shear connectors and/or metal decking, clean the
unpainted top flanges of structural steel members to be free of heavy rust, mill
scale, dirt or such other substances detrimental to welding.
B. Expansion Anchor Installation:
1. General: In general, install expansion anchors in strict accordance with
manufacturer’s instructions and in accordance with the following.
2. Drilling Holes: Use rotary hammer type drill and make drill holes to the required
diameter and depth as consistent with anchor manufacturer’s instructions for size
of anchors being installed.
3. Minimum Embedment: Embed expansion anchors to four and one-half bolt
diameters, unless otherwise indicated on Drawings.
3.02 FIELD TOUCH-UP PAINTING (SHOP COATS)
A. General: Touch-up paint field installed bolt heads and nuts, field welds and adjacent
areas of shop coat as damaged by welds. Touch up abrasions in the shop coat.
B. Surface Preparation: Use methods at least as effective as those specified for the
structure itself but in no case less than SSPC-SP3 for removal of handling marks and
SSPC-SP6 for areas showing rust.
6508.22 05100-5 ARRO
INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
C. Paint: Use those individual products as specified for Shop Paint.
END OF SECTION
6508.22 05100-6 ARRO
INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
SECTION 05500
METAL FABRICATIONS
PART 1 - GENERAL
1.01 SECTION INCLUDES
A. Steel plates, angles and anchors.
1.02 RELATED SECTIONS
A. Individual miscellaneous metal items as specified in various other Sections of the
general construction specifications.
1.03 QUALITY ASSURANCE
A. Welder Qualifications: Welds shall be made only by welders, tackers, and welding
operators who have been previously qualified by tests as prescribed in the Structural
Welding Code, AWS D1.1 of the American Welding Society to perform the type of
work required.
B. Anchor and Fastener Design Requirements:
1. Sizing: Provide anchors and fasteners for Product installations of such diameters
and lengths as recommended by the particular Product manufacturer involved.
a. When sizing recommendations are not obtainable, size fasteners in the
largest diameter that will pass through bolt holes as provided in the Products
for anchoring and fastening purposes.
2. Safety Factor: Determine the lengths of anchors and fasteners based on substrate
materials at points of anchor installation and to provide a safety factor of four to
one.
3. Materials Compatibility: Where anchors and fasteners contact dissimilar metal
Products provide anchors and fasteners of compatible material so that neither will
have a deteriorating action on the other.
1.04 REFERENCES
A. American National Standards Institute (ANSI):
1. ANSI A14.3; Ladders - Fixed - Safety Requirements.
B. American Society For Testing and Materials (ASTM):
1. ASTM A36; Structural Steel, Spec. for.
2. ASTM A47; Malleable Iron Castings, Spec. for.
3. ASTM A48; Gray Iron Castings, Spec. for.
6508.22 05500-1 ARRO
INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
4. ASTM A53; Black and Hot-Dipped Zinc-Coated (Galvanized) Welded and
Seamless Pipe for Ordinary Uses, Spec. for.
5. ASTM A123; Zinc (Hot-Galvanized) Coatings on Products Fabricated from
Rolled, Pressed and Forged Steel Shapes, Plates, Bars and Strip, Spec. for.
6. ASTM A153; Zinc Coating (Hot-Dip) on Iron and Steel Hardware, Spec. for.
7. ASTM A167; Stainless and Heat-Resisting Chromium-Nickel Steel Plate, Sheet
and Strip, Spec. for.
8. ASTM A276; Stainless and Heat-Resisting Steel Bars and Shapes, Spec. for.
9. ASTM A307; Carbon Steel Bolts, and Studs, 60,000 PSI Tensile Strength,
Standard Spec. for.
10. ASTM A320; Alloy-Steel Bolting Materials for Low-Temperature Service, Spec.
for.
11. ASTM A325; High-Strength Bolts for Structural Steel Joints, Spec. for.
12. ASTM A480; Flat-Rolled Stainless and Heat-Resisting Steel Plate, Sheet, and
Strip; Spec. for General Requirements.
13. ASTM A489; Carbon Steel Eyebolts, Spec. for.
14. ASTM A500; Cold-Formed Welded and Seamless Carbon Steel Structural Tubing
in Rounds and Shapes, Spec. for.
15. ASTM A501; Hot Formed Welded and Seamless Carbon Steel Structural Tubing,
Spec. for.
16. ASTM A563; Carbon and Alloy Steel Nuts, Spec. for.
17. ASTM A569; Steel, Carbon (0.15 Maximum Percent), Hot-Rolled Sheet and
Strip, Commercial Quality, Spec. for.
18. ASTM A603; Zinc-Coated Steel Structural Wire Rope, Spec. for.
19. ASTM A668; Steel Forgings, Carbon and Alloy, for General Industrial Use, Spec.
for.
20. ASTM B454; Mechanically Deposited Coatings of Cadmium and Zinc on Ferrous
Metals, Spec. for.
21. ASTM F436; Hardened Steel Washers, Spec. for.
C. American Welding Society: AWS D1.1 Structural Welding Code.
D. Federal Specifications:
1. Fed. Spec. FF-S-92b, Screws, Machine: Slotted, Cross-Recessed or Hexagon
Head.
2. Fed. Spec. A-A-1922A, Shield, Expansion; Nail, Expansion; and Nail, Drive
Screw (Devices, Anchoring, Masonry) Group II (Shield, Expansion Bolt Anchor)
Type 4 (Wedge Expansion Anchors) Class 1 (One-Piece Steel Expander with
Cone Taper Integral with Stud).
E. Steel Structures Painting Council (SSPC):
1. Surface Preparation Specifications:
a. SSPC-SP1, Solvent Cleaning.
b. SSPC-SP2, Hand Tool Cleaning.
c. SSPC-SP3, Power Tool Cleaning.
d. SSPC-SP6, Commercial Blast Cleaning.
e. SSPC-SP8, Pickling.
6508.22 05500-2 ARRO
INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
f. SSPC-SP10, Near-White Blast Cleaning.
2. Paint Application Specifications: SSPC-PA1, Shop, Field and Maintenance
Painting.
1.05 SUBMITTALS
A. Shop Drawings and Product Data:
1. Shop drawings shall identify the detail as indicated on the Engineer’s Drawings
and be complete as to the detail of the product and location in the project, the size
of members, the methods of joining various components, the quantity, finish, the
location and type of anchors and necessary measurements.
2. Shop assemblies which require markings for erection identification shall have
easy-to-read markings on the shop and erection drawings.
3. Note on shop drawings variations in tolerances or clearances between various
products.
4. Use standard welding symbols of the American Welding Society on shop
drawings.
5. Furnish setting diagrams, templates, and directions for the installation of metal
fabrications.
6. Submit product data on type of finish paint system for both shop painting and
field touch up painting.
1.06 DELIVERY, STORAGE AND HANDLING
A. Store steel products above the ground surface on platforms, skids, blocking or other
supports.
B. Protect steel products from exposure to conditions that produce rust on the product.
C. Store steel beams with webs vertical.
D. Handle steel so no parts are bent, broken or otherwise damaged and avoid damage to
other material and work during handling and erection.
PART 2 - PRODUCTS
2.01 MATERIALS
A. Miscellaneous Metal: Steel used for miscellaneous metal applications shall conform to
ASTM A36.
1. Steel Shapes, Plates and Bars: ASTM A36.
2. Stainless Steel Shapes and Bars: ASTM A276, AISC Type 304 and 316.
B. Stainless Steel Plate, Sheet and Strip: ASTM A167 and A480, Type ((304)) ((316)).
6508.22 05500-3 ARRO
INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
D. Shop Paint:
1. Alkyd-phenolic primer; Tnemec 37-77 or equal. ((Universal primer for epoxy,
alkyd, oil-base topcoats))
3. Type of shop paint used must be compatible with paint applied in the field.
2.02 ANCHORS AND FASTENERS
A. Miscellaneous Screws and Bolts:
1. Machine Screws: AISC Type 304 stainless steel conforming to Fed. Spec.
FF-S-92b.
2. Stainless Steel Bolts, Nuts and Washers: ASTM A320 Grade B8, AISC Type
304.
3. Standard Steel Bolts, Nuts and Washers: ASTM A307.
4. U-Bolts: Carbon steel with National Coarse Threads and zinc coated finish.
5. Eyebolts: Carbon steel with National Coarse Threads and zinc coated finish:
ASTM A489.
B. High-Strength Structural Steel Bolts, Nuts and Washers:
1. ASTM A325 Specification for Bolts.
2. ASTM A563 Specification for Carbon and Alloy Steel Nuts.
3. ASTM F436 Specification for Hardened Steel Washers for Use with
High-Strength Bolts.
C. Steel Anchor Bolts: Shapes as indicated, ASTM A307.
D. Anchor Bolts (Pre-Set): Where anchor bolts are indicated or required as Pre-set in
cast-in-place concrete, provide anchor bolts of lug or bent shape design.
1. Galvanized Anchor Bolts: ASTM A307 for bolts, nuts and washers; and
ASTM B454 or A 153 for galvanizing.
E. Drilled-In Expansion Anchors and Fasteners:
1. Applications In Masonry (and Precast Concrete Hollow-Core Structural
Elements):
a. Anchors: Provide anchors designed to accept both machine bolts and/or
threaded rods. Such anchors shall consist of an expansion shield and
expander nut contained inside the shield. Expander nut fabricated and
designed to climb the bolt or rod thread and simultaneously expand the
shield as soon as the threaded item, while being tightened, reaches and bears
against the shield bottom.
1) Shield Body: Consisting of four legs, the inside of each tapered toward
shield bottom (or nut end). The end of one leg is elongated and turned
across shield bottom. Outer surface of shield body ribbed for
grip-action.
2) Expander Nut: Square design with sides tapered inward from bottom
to top.
6508.22 05500-4 ARRO
INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
3) Material: Die cast Zamac No. 3 zinc alloy of 43,000 psi minimum
tensile strength. Shield and nut made in conformance with S.A.E. 90 3
ASTM XI.
b. Fasteners: Machine bolts conforming to S.A.E. Grade 2, for use with above
anchors; nuts and washers conforming to ASTM A563.
2. Applications in Cast-in-Place Concrete (and Solid Precast Concrete Structural
Elements):
a. Anchor/Fastener: UL Listed and one-piece stud (bolt) with integral
expansion wedges, nut and washer, and meeting physical requirements of
Fed. Spec. A-A-1922A, Group II, Type 4, Class 1.
b. Stainless Steel Anchor/Fastener: UL Listed one-piece stud (bolt) with
integral expansion wedges, nut and washer, and meeting physical
requirements of Fed. Spec. A-A-1922A, Group II, Type 4, Class 1. Stud of
AISI Type 303 or 304 stainless and nut and washer of AISI Type 316
stainless.
2.03 FABRICATION
A. Insofar as possible, fit and shop assemble metal fabrications, ready for installation.
B. Fabricate in accordance with details, approved shop drawings and referenced standards.
C. Drill or punch holes required for the attachment of work of other trades and for bolted
connections. Burned holes are not acceptable.
D. Welding shall be in accordance with AWS D1.1.
E. Dress smooth welds and sharp corners.
F. Make work square, plumb, straight and true.
2.04 SHOP PAINTING
A. Surface Preparation (Sandblasting): Before sandblasting, remove weld splatter and
grind smooth to a rounded contour sharp edges and welds.
1. Sandblasting:
a. Metal Submerged or Intermittently Submerged in Liquid: SSPC-SP10 or
SSPC-SP8.
b. Metal Non-Submerged and Directly Connected to Submerged or
Intermittently Submerged Metal: SSPC-SP6.
c. Remove dust and spent sand from surface by brushing or vacuum cleaning.
B. Surface Preparation (Mechanically Cleaned):
1. Clean steelwork of loose mill scale, loose rust, weld slag or flux deposit, dirt and
other foreign matter by Hand Cleaning (SSPC-SP2) or Power Cleaning
(SSPC-SP3).
2. Remove grease, oils, tars and other contaminants by Solvent Cleaning
(SSPC-SP1).
6508.22 05500-5 ARRO
INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
C. Painting:
1. Apply shop paint to prepared steel before surface starts to rust.
2. Apply shop paint in accordance with SSPC-PA1.
3. Minimum dry mil thickness of shop paint, 1.5 mils.
4. Steel encased in concrete will not require shop paint.
PART 3 - EXECUTION
3.01 INSPECTION
A. Inspect the installed work of other trades and verify that such work is complete to the
point where this work may properly commence.
3.02 PREPARATION
A. Field Measurements: Verify measurements in field before fabrication.
3.03 ERECTION
A. Erect and install miscellaneous metal and metal fabrications in accordance with details,
approved shop drawings and referenced standards aligning straight, plumb and level
within a tolerance of one in 200.
B. Provide suitable temporary braces and stays to hold metal fabrications in position until
permanently secured.
C. Draw threaded connections up tight with lock washers or other means to prevent
loosening. Screw type fasteners installed in exposed finished surfaces may be slot-head
or phillips-head type, but in either case, screws must be countersunk design.
D. Drilled-In Expansion Anchor Installation:
1. General: In general, install expansion anchors in strict accordance with
manufacturer’s instructions and in accordance with the following.
2. Drilling Holes: Use rotary hammer type drill and make drill holes to the required
diameter and depth as consistent with anchor manufacturer’s instructions for size
of anchors being installed.
3. Minimum Embedment: Embed expansion anchors to four and one-half bolt
diameters, unless otherwise indicated on Drawings.
E. Erect miscellaneous structural steel in accordance with the Drawings, pertinent
regulations and referenced AISC standards.
6508.22 05500-6 ARRO
INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
3.04 FIELD TOUCH-UP PAINTING
A. General: Paint field bolt heads and nuts, field welds and areas within 2 inches of welds
and touch up abrasions in the shop coat.
B. Surface Preparation: Use methods at least as effective as those specified for the
structure itself.
C. Paint: Specified shop paint.
END OF SECTION
6508.22 05500-7 ARRO
INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
DIVISION 6 – WOOD AND PLASTICS
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
SECTION 06100
ROUGH CARPENTRY
PART 1 - GENERAL
1.01 SECTION INCLUDES
A. Lumber materials.
B. Plywood.
C. Fasteners.
1.02 RELATED SECTIONS
A. Individual rough carpentry work items as specified in various other Sections of the
general construction Specifications.
1.03 REFERENCES
A. American Society for Testing and Materials (ASTM):
1. ASTM A307; Carbon Steel Bolts and Studs, 60,000 PSI Tensile Strength, Std.
Spec. for.
2. ASTM C208; Insulating Board (Cellulosic Fiber) Structural and Decorative, Spec.
for.
3. ASTM D226; Asphalt-Saturated Organic Felt Used in Roofing and
Waterproofing, Spec. for.
4. ASTM D2559; Adhesives for Structural Laminated Wood Products for Use Under
Exterior (Wet Use) Exposure Conditions, Spec. for.
5. ASTM F1667; Nails, Brads, Staples and Spikes; Wire, Cut and Wrought
B. APA-Engineered Wood Association (APA): APA Grade-Trademarks.
C. American Wood Preserves Association: AWPA Standard U1-10: User Specifications
for Treated Wood.
D. Federal Specifications:
1. Fed. Spec. A-A-1922A, Shield, Expansion; Nail, Expansion; and Nail, Drive
Screw (Devices, Anchoring, Masonry) Group II (Shield, Expansion Bolt Anchor)
Type 4 (Wedge Expansion Anchors) Class 1 (One-Piece Steel Expander with
Cone Taper Integral with Stud).
6508.22 06100-1 ARRO
INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
E. Southern Pine Inspection Bureau: SPIB Standard Grading Rules for Southern Pine.
F. U. S. Department of Commerce Product Standards:
1. PS-20-70 The American Softwood Lumber Standard.
G. Western Wood Products Association: WWPA Catalog A PRODUCT USE MANUAL.
1.04 DELIVERY, STORAGE AND HANDLING
A. Deliver materials to the site in an undamaged condition. Exercise care when
off-loading lumber to prevent splitting and breaking. In the event of damage, make
replacements at no increase in Contract Price.
B. Keep materials under cover and dry. Protect against exposure to weather and contact
with damp or wet surfaces. Stack lumber as well as plywood and other panels; provide
for air circulation within and around stacks and under temporary coverings including
polyethylene and similar materials.
C. For lumber and plywood pressure treated with waterborne chemicals, place spacers
between each bundle to provide air circulation.
D. Store rolled building paper on end.
1.05 SUBMITTALS
A. Submit material certificates for dimensional lumber specified to comply with minimum
allowable unit stresses. Indicate species and grade selected for each use as well as
design values approved by the Board of Review of American Lumber Standards
Committee.
B. Submit wood treatment data as follows including chemical treatment manufacturer’s
instructions for handling, storing, installation, and finishing of treated material:
1. For each type of preservative treated wood product include certification by
treating plant stating type of preservative solution and pressure process used, net
amount of preservative retained, and compliance with applicable standards.
2. For water-borne treated products include statement that moisture content of
treated materials was reduced to levels indicated prior to shipment to project site.
3. For fire-retardant-treated wood products include certification by treating plant that
treated material complies with specified standard and other requirements.
4. Material test reports from qualified independent testing laboratory indicating and
interpreting test results relative to compliance of fire-retardant-treated wood
products with requirements indicated.
5. Warranty of chemical treatment manufacturer for each type of treatment.
6508.22 06100-2 ARRO
INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
PART 2 - PRODUCTS
2.01 LUMBER MATERIALS
A. General: Provide lumber of allowable species, surfaced four sides (grade stamp S4S),
with moisture content not exceeding 19 percent (grade stamp S-DRY), and grade
stamped with the appropriate WWPA or SPIB stamp indicating product compliance
with PS 20-70.
1. Lumber Standards: Furnish lumber manufactured to comply with PS 20
“American Softwood Lumber Standard” and with applicable grading rules of
inspection agencies certified by American Lumber Standards Committee’s
(ALSC) Board of Review.
2. Grade Stamps: Provide lumber with each piece factory-marked with grade stamp
of inspection agency evidencing compliance with grading rule requirements and
identifying grading agency, grade, species, moisture content at time of surfacing,
and mill.
B. Dimension Lumber: Two-inch nominal thickness and greater (widths per Drawings)
lumber for the following uses:
1. Light (non load-bearing) Framing: Construction grade, for studs, plates, sills,
let-in bracing and blocking.
2. Structural Light Framing - No. 2 grade, for load bearing studs and similar
load-bearing framing.
3. Structural Joists & Planks - No. 2 grade, for joists, rafters and similar load-bearing
framing.
4. Appearance Framing: Appearance framing, for exposed framing where so
indicated on the Drawings.
2.02 PRESERVATIVE WOOD TREATMENT BY PRESSURE PROCESS
A. General: Where lumber or plywood is indicated , or specified as preservative-treated
comply with applicable requirements of AWPA Standards U1-10. Mark each treated
item with the AWPA.
B. Aboveground items shall be treated with preservatives to a minimum retention
of 0.25 pcf. For interior uses, after treatment, kiln-dry lumber and plywood to a
maximum moisture content, respectively, of 19 percent and 15 percent. Treat indicated
items and the following:
1. Wood cants, nailers, curbs, equipment support bases, blocking, stripping, and
similar members in connection with roofing, flashing, vapor barriers, and
waterproofing.
2. Wood sills, sleepers, blocking, furring, stripping, and similar concealed members
in contact with masonry or concrete.
3. Wood framing members less than 18-inches above grade.
4. Wood floor plates installed over concrete slabs directly in contact with earth.
6508.22 06100-3 ARRO
INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
C. Members in contact with the ground or fresh water shall be treated with water-borne
preservatives to a minimum retention of 0.40 pcf.
D. Chemicals containing arsenic are not permitted.
2.03 FIRE-RETARDANT TREATMENT BY PRESSURE PROCESS
A. General: Where fire-retardant-treated wood is indicated, pressure impregnate lumber
with fire-retardant chemicals to comply with AWPA U1-10 for treatment type
indicated; identify “fire-retardant-treated wood” with appropriate classification marking
of Underwriters Laboratories, Inc., U. S. Testing, Timber Products Inspection, Inc., or
other testing and inspecting agency acceptable to authorities having jurisdiction.
1 Use treatment that does not promote corrosion of metal fasteners.
2 Provide Exterior type for exterior locations and where indicated.
3 Provide Interior Type A High Temperature (HT), unless otherwise indicated.
4 Use treatment for which chemical manufacturer publishes physical properties of treated
wood after exposure to elevated temperatures, when tested by a qualified independent
testing agency according to ASTM D 5664, for lumber and ASTM D 5516, for plywood.
2.04 SHEATHING
A. Wood Fiber Insulation Sheathing: Sheathing shall meet requirements for regular
density sheathing conforming to ASTM C208.
B. Sheathing Lumber: One-inch nominal thickness (widths per Drawings),
CONSTRUCTION grade; uses as required in construction practices and as indicated on
the Drawings.
2.05 PLYWOOD
A. General: Provide plywood meeting requirements of the latest voluntary Product
Performance Standards and identified with the appropriate grade-trademark of the APA-
Engineered Wood Association. Panel thickness, span rating and Type use application
as indicated on the Drawings.
B. Exterior Type:
1. Roof Sheathing: APA Rated Sheathing, Exterior.
2. Wall Sheathing: APA Rated Sheathing, Exterior.
C. Equipment Back-boards and In-wall Blocking:
A. Sheathing: APA C-D (with intermediate or exterior glue); Group 3 or better.
6508.22 06100-4 ARRO
INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
2.06 FASTENERS
A. General: Provide fasteners as indicated on the Drawings of the quality specified herein,
and where not indicated, provide fasteners appropriate to conditions at points of use and
according to standard accepted Carpentry Trade practices.
1. Nails (Common, Flooring & Finishing) and Spikes: Conforming to ASTM
F1667.
2. Lag Bolts and Shields: Conforming to Fed. Spec. A-A-1922A.
3. Screw Type Expansion Anchors: Conforming to Fed. Spec. A-A-1922A, Group
II, Type 4, Class 1, such as U. S. E. Diamond Sup-R-Stud, Hilti Kwik-Bolt,
Phillips Red Head Wedge-Anchor or Molly Parabolt.
4. Powder Actuated Fasteners: Drive pin/washer fasteners of design and size as
recommended by Hilti or Ramset; uses as indicated on the Drawings.
5. Standard Steel Bolts, Nuts and Washers: ASTM A307.
6. Fasteners for preservative – treated or fire – retardant wood shall be of hot –
dipped zinc – coated galvanized steel, stainless steel, silicon bronze or copper.
PART 3 - EXECUTION
3.01 INSTALLATION
A. Workmanship: Perform rough carpentry work in accordance with current accepted
Carpentry Trade practices and to dimensions and details as indicated on the Drawings.
1. Install vertical and horizontal work accurately set to the required lines and levels.
2. Make cuts square, and join members tightly in a rigid and substantial manner.
3. Pre-drill members for bolting and screw applications.
4. Perform rough carpentry temporary construction with the same degree of
workmanship as exercised in permanent construction where temporary
construction is intended for support and bracing.
B. General Framing: In addition to performing framing operations normal to the
fabrication and erection indicated on the Drawings, install blocking and backings
required for work of other Trades.
1. Do not notch, bore or cut members for mechanical and electrical services except
as indicated or when permitted by the Engineer.
2. Splicing in vertical support framing not permitted.
3. Make bearings full in general framing unless indicated otherwise on the
Drawings.
4. Construct bearing surfaces to give sure and even support for structural members.
5. Where framing members slope, cut or notch the ends to give uniform bearing
surface.
6. Construct general framing, which is to receive surface finish materials; aligned to
vary not more than 1/8-inch from the common plane of the whole.
6508.22 06100-5 ARRO
INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
C. Sheathing Application:
1. Prior to sheathing application correct framing members to a true plane and to
accurate spacing.
2. Install headers, trimmers, bracing or blocking as required to receive panels.
3. Apply panels with joints butted and centered over framing members.
D. Plywood Applications: Install plywood in accordance with recommendations of the
APA-Engineered Wood Association, with respect to nailing and fastening in the areas
of intended plywood application.
1. Unless indicated otherwise on the Drawings, install plywood continuous over two
or more spans, with face grain across supports.
2. Provide 1/8-inch spacing at panel ends and edges.
3. Center joints over supports and, unless specifically indicated otherwise on the
Drawings, stagger end joints of plywood panels in an equal pattern.
4. Following plywood application install protection over same to prevent moisture
damage until the succeeding covering materials or finish is applied.
5. In-Wall Bracing: Install plywood between studs as back-bracing; cut to sufficient
size to provide solid anchorage area behind drywall for surface-mounted
architectural accessories (i.e., corridor railing).
6. Back-boards: Surface-apply plywood back-boards for mechanical and electrical
equipment sized to accommodate such or of sizes as indicated on the Drawings.
3.02 FASTENING
A. Nailing:
1. Provide penetration into the member receiving the nail point of not less than
one-half the length of the nail being driven. Drive nails home solidly.
2. Perform nailing without splitting the material, pre-boring when required, and
replacing split members.
3. In all instances use the proper nail, according to accepted Trade practices, for the
material being attached, joined, etc., with respect to material versus substrates and
like materials nailing.
B. Bolting:
1. Pre-drill holes 1/16-inch larger in diameter than the bolts being used; drilling from
one side only; draw bolts up tight.
2. Bolt threads shall not bear on wood; use washers under bolt head and nut where
both bear on wood.
3. Use washers under all nuts.
C. Screw Fastening:
1. For lag screws and wood screws, pre-drill holes same diameter as root of thread;
enlarge holes to shank diameter for length of shank; draw screws up tight.
2. Where screws are grouped in multiples, set all screws but draw up tight starting
with screws in the center of the group and proceed in sequence toward ends.
6508.22 06100-6 ARRO
INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
D. Expansion Anchor Installation:
1. General: In general, install expansion anchors in strict accordance with
manufacturer’s instructions and in accordance with the following.
2. Drilling Holes: Use rotary hammer type drill and make drill holes to the required
diameter and depth as consistent with anchor manufacturer’s instructions for size
of anchors being installed.
3. Minimum Embedment: Embed expansion anchors to four and one-half bolt
diameters, unless otherwise indicated on Drawings.
END OF SECTION
6508.22 06100-7 ARRO
INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
SECTION 06190
WOOD TRUSSES
PART 1 - GENERAL
1.01 SECTION INCLUDES
A. Wood Trusses.
1.02 RELATED SECTIONS
A. Unit Masonry: Section 04200.
B. Metal Fabrications: Section 05500.
C. Rough Carpentry: Section 06100.
1.03 REFERENCES
A. Truss Plate Institute (TPI):
1. TPI-78; Design Specifications for Light Metal Plate Connected Wood Trusses.
2. BWT-76; Bracing Wood Trusses by the Truss Plate Institute.
3. QCM-77; Quality Control Manual.
B. Building Codes:
2. FHA, Federal Housing Administration.
3. SBCC, Southern Building Code Congress International, Inc.
4. VA, Veterans Administration.
5. IBC (2006), International Building Code.
C. American Society for Testing and Materials (ASTM):
1. ASTM A167; Stainless and Heat-Resisting Chromium-Nickel Steel Plate, Sheet
and Strip, Spec. for.
2. ASTM A653/A653M; Steel Sheet, Zinc-Coated (Galvanized) or Zinc-Iron Alloy
Coated (Galvannealed) by the Hot-Dip Process, Spec. for.
D. American Wood Preserves Association: AWPA Standard U1-10.
E. Southern Pine Inspection Bureau: SPIB Standard Grading Rules for Southern Pine.
F. Western Wood Products Association: WWPA Catalog A PRODUCT USE MANUAL.
6508.22 06190-1 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
1.04 SUBMITTALS
A. Submit engineering drawings of the proposed wood trusses for approval. Such drawings
shall bear the seal of a registered professional engineer and be submitted prior to
fabrication.
B. Product Data: Submit manufacturer’s descriptive Product data and current specifications
covering the lumber and associated metal anchoring products. Descriptive Product data
shall also include installation instructions.
1.05 DELIVERY, STORAGE AND HANDLING
A. Use extreme care in the off-loading, storing and erecting wood trusses. Dropping of
trusses not permitted. Trusses that have been dropped may not be used in the work.
B. During construction period do not allow concentrated loads on the structure so that the
carrying capacity of any one joist is not exceeded.
C. Store trusses off the ground and protected from the weather.
PART 2 - PRODUCTS
2.01 MATERIALS
A. Trusses: Fabricated with wood chords and wood webs in accordance with designs
prepared under the supervision of a Registered Professional Engineer.
1. Galvanized Steel Connector Plates: Teeth, prong, or nail type fabricated from
galvanized steel, minimum thickness of 0.036-inch, conforming to requirements of
ASTM A653 Grade 33 and galvanized according to ASTM A653, Coating
Designation G 60.
2. Stainless Steel Connector Plates: Teeth, prong, or nail type fabricated from
Type 302 or 304 stainless steel plate conforming to requirements of ASTM A167.
Metal thickness gauge according to manufacturer’s standard.
3. Standard Wood: Provide lumber, surfaced four sides (grade stamp S4S) with
moisture content not exceeding 19 percent (grade stamp S-DRY) and grade
stamped with appropriate WWPA or SPIB stamp indicating product compliance
with PS-20-70. Lumber defects such as wane or knots occurring in connector plate
area shall not affect more than ten percent of required plate area or number of
effective teeth required for each truss member.
6508.22 06190-2 ARRO
TOWN OF INDIAN HEAD –TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
4. Treated Wood: Provide treated lumber, surfaced four sides (grade stamp S4S) with
moisture content not exceeding 19 percent (grade stamp S-DRY) and grade
stamped with appropriate WWPA or SPIB stamp indicating product compliance
with PS-20-70. Lumber defects such as wane or knots occurring in connector plate
area shall not affect more than ten percent of required plate area or number of
effective teeth required for each truss member.
a. Preservative treatment by pressure process, at .25 pound per cubic foot of
wood as determined by AWPA.
2.02 DESIGN AND FABRICATION
A. Truss manufacturer shall be responsible for design. Truss design shall bear the signature
and seal of a Professional Engineer registered in the State of Maryland.
B. Fabricate wood trusses to conform to specified codes for materials, allowable stress
increase, deflection limits and applicable local code criteria. Design trusses for loading
specified or indicated on the Drawings.
1. Cut and fabricate wood members so that members have good bearing and
completed truss units are uniform. Open joint tolerances shall be in accordance
with TPI Quality Control Manual QCM-77.
2. Metal connector plates shall securely fasten each joint on both faces of truss in
accordance with accepted TPI standards and procedures.
Provide stainless steel connector plates on those trusses where indicated on
Drawings.
3. Loads: Per IBC requirements for Indian Head, Maryland.
4. Roof Truss Type: see plans
2.03 FRAMING ACCESSORIES
A. Fasteners: Installation fasteners as specified previously in Section 05500 for bolting
materials and Section 06100 for nails.
B. Metal Framing Accessories: Hot dipped galvanized steel factory fabricated light gauge
metal products.
1. Framing Anchor: 18-gauge and designed for use with 10-8d x 1½-inch truss nails.
2. Tie Down Straps: 26-gauge 1½-inch by 10-inch or 20-inch as required for member
size.
3. Truss Spacers: 20-gauge 1½-inch by designed truss spacing centers.
C. Factory or Shop Fabricated Miscellaneous Metal Framing Accessories: Steel plate and
shapes as specified in Section 05500.
6508.22 06190-3 ARRO
TOWN OF INDIAN HEAD –TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
PART 3 - EXECUTION
3.01 ERECTION
A. Set trusses on solid bearing, on centers indicated, and at elevations indicated on the
Drawings.
B. Securely brace trusses both during erection and after permanent installation in
accordance with Bracing Wood Trusses (BWT-76) published by the Truss Plate
Institute.
C. Erection bracing shall hold trusses straight and plumb and in safe condition until decking
and permanent truss bracing are installed.
D. Install both erection and permanent bracing on trusses and permanently fasten in place
prior to application of loads.
E. Install permanent structural cross-bracing to ensure overall rigidity of truss system in
accordance with manufacturers drawings.
END OF SECTION
6508.22 06190-4 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
SECTION 06200
FINISH CARPENTRY
PART 1 - GENERAL
1.01 SECTION INCLUDES
A. Plywood ceiling in open pavilion area
B. Laminate lavatory counter
1.02 RELATED SECTIONS
A. Rough Carpentry: Section 06100.
1.03 REFERENCES
A. American Society for Testing and Materials (ASTM):
1. ASTM F1667; Nails, Brads, Staples and Spikes; Wire, Cut and Wrought.
B. APA-Engineered Wood Association (APA): APA Grade-Trademarks
C. Federal Specifications:
1. Fed. Spec. A-A-1922A, Shield, Expansion; Nail, Expansion; and Nail, Drive Screw
(Devices, Anchoring, Masonry) Group II (Shield, Expansion Bolt Anchor) Type 4
(Wedge Expansion Anchors) Class 1 (One-Piece Steel Expander with Cone Taper
Integral with Stud).
D. National Electrical Manufacturers Association (NEMA):
1. LD-3; High Pressure Decorative Laminates.
2. LD-3.1; Performance, Application, Fabrication, and Installation of High Pressure
Decorative Laminates.
E. U.S. Department of Commerce Product Standards:
1. PS-1-74 For Construction and Industrial Plywood.
2. PS-20-70 The American Softwood Lumber Standard.
F. Western Wood Products Association: WWPA Catalog A PRODUCT USE MANUAL.
6508.22 06200-1 ARRO
INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
1.04 DELIVERY, STORAGE AND HANDLING
A. Deliver materials to the site in an undamaged condition. Exercise care when off-loading
lumber to prevent splitting and breaking. In the event of damage, make replacements at
no increase in Contract Price.
B. Store lumber and wood products in such a manner as to ensure proper ventilation and
drainage and to protect against damage and the weather.
1.05 SUBMITTALS
A. Shop Drawings: Submit detail drawings of shop fabricated work indicating necessary
information for fabrication and erection. Drawings shall indicate materials, sizes,
thickness, fastenings and profiles.
B. Product Data: Submit manufacturer’s literature showing details of construction and
information necessary for erection.
PART 2 - PRODUCTS
2.01 LUMBER MATERIALS
A. General: Provide soft-wood species lumber, surfaced four sides (S4S), with moisture
content not exceeding 15 percent (grade stamp MC 15) and stamped with the appropriate
WWPA stamp indicating product compliance with PS 20-70.
1. Use hardwood species for reinforcing, bracing and blocking requirements in
casework construction.
B. Board Lumber: One inch nominal thickness and less (widths per Drawings), No. 2
COMMON (IWP STERLING) grade; uses as indicated on the Drawings.
C. Mouldings: Commercially available stock mouldings shapes in single lengths
(finger-jointed material not permitted); shapes as indicated on the Drawings.
D. Dimensions Lumber: Two inch nominal thickness and more (widths per Drawings),
APPEARANCE grade; use for exposed framing where so indicated on the Drawings.
2.02 PLYWOOD
A. General: Provide plywood meeting requirements of Product Standard PS 1-74 and
identified with the appropriate grade-trademark of the American Plywood Association.
Panel thickness and Type use application as indicated on the Drawings or specified
herein.
1. Interior Type:
a. Shelving and Built-ins (Stained): APA A-D Interior.
b. Shelving and Built-ins (Painted): APA B-B Interior.
6508.22 06200-2 ARRO
INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
c. Hardboard/Plywood Shelving: APA PLYRON Interior.
d. Plywood Backing: APA B-D Interior.
2.03 FASTENERS
A. Fasteners as specified in Section 06100.
2.04 PLASTIC LAMINATE MATERIALS
A. Plastic Laminate: Grade -10/HGS conforming to NEMA LD-3 performance
requirements for Type GP 50.
1. Color, pattern, and surface finish selected upon submittal approval.
B. Plastic Laminate Backing: High-pressure paper base laminate without a decorative
finish; 0.020-inch thick, smooth surface finish.
C. Adhesives: Provide contact adhesives of the neoprene type in solvent-based brushable
and sprayable formulas; or rigid setting adhesives of the urea formaldehyde, polyvinyl
and phenol-resorcinol types. However, use adhesives of the above types as
recommended by the plastic laminate manufacturer.
PART 3 - EXECUTION
3.01 INSTALLATION
A. Workmanship: Perform finish carpentry work to produce solidly fastened materials with
tight and true joints and with members assembled and installed to dimensions and details
as indicated on the Drawings.
1. Install vertical and horizontal work accurately set, level, plumb, and true.
2. Make cuts square and clean.
3. Use materials in the maximum lengths practical.
4. Leave material surfaces free of marks that will impair the finish.
B. Exterior Finish Work:
1. In exposed work, construct joints to exclude water. Construct flat work to shed
water, unless indicated otherwise on the Drawings. USE GALVANIZED NAILS
IN EXTERIOR FINISH WORK.
2. In built-up work, use water-proof construction adhesive, in addition to nailing, to
construct joints. Distribute end joints in built-up members to avoid joint lining.
3. Reinforce joint and miters in wide face work by installing cleats or metal rings on
the concealed side.
C. Interior Finish Work:
1. Install trim, except window stools and aprons, using members with channeled
backs. Install window and door trim in single lengths.
6508.22 06200-3 ARRO
INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
2. Set door frames plumb and square providing solid blocking for jambs spaced not
more than 16 inches on centers. Position blocking to occur behind hinges and lock
strikes. Double wedge and fasten frames with finishing nails.
3. Provide thresholds, shaped as indicated, in clear grade White or Red Oak and cut to
fit jambs. Install thresholds with casing nails.
4. Install base trim in a two-piece member consisting of the base member as detailed
and an oak or other hardwood shoe mold. Fasten base to framing or grounds with
shoe nailed to the base.
D. Plywood Application: Install plywood in accordance with recommendations of the
American Plywood Association, with respect to nailing and fastening in the areas of
intended plywood application.
E. Application of Plastic Laminates:
1. Apply plastic laminates to substrates in accordance with procedures, practices and
recommendations specified by NEMA LD-3.1.
2. Apply plastic laminate finishes where indicated. Adhere with adhesive over entire
surface. Make joints and corners hairline. Match patterns. Slightly bevel arrises.
Cap exposed edges with plastic laminate of same finish and pattern. Apply
laminate backing sheet on reverse side of plastic laminate finished surfaces.
3.02 FASTENING
A. Nailing:
1. Provide penetration into the member receiving nail point of not less than one-half
the length of the nail being driven. Drive nails home solidly.
2. Perform nailing without splitting the material, preboring when required and
replacing split members.
3. In all instances use the proper nail, according to accepted Trade practices, for the
material being attached, joined, etc., with respect to material versus substrates and
like materials nailing.
4. On finish surfaces set nails for putty stopping.
B. Bolting:
1. Pre-drill holes 1/16-inch larger in diameter than the bolts being used; drilling from
one side only; draw bolts up tight.
2. Bolt threads shall not bear on wood; use washers under bolt head and nut where
both bear on wood.
3. Use washers under all nuts.
C. Screw Fastening:
1. For lag screws and wood screws, pre-drill holes same diameters as root of thread;
enlarge holes to shank diameter for length of shank; draw screws up tight.
2. Where screws are grouped in multiples, set all screws but draw up tight starting
with screws in the center of the group and proceed in sequence toward ends.
6508.22 06200-4 ARRO
INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
D. Expansion Anchor Installation:
1. General: In general, install expansion anchors in strict accordance with
manufacturer’s instructions and in accordance with the following:
2. Drilling Holes: Use rotary hammer type drill and make drill holes to the required
diameter and depth as consistent with anchor manufacturer’s instructions for size
of anchors being installed.
3. Minimum Embedment: Embed expansion anchors to four and one-half bolt
diameters, unless otherwise indicated on the drawings.
END OF SECTION
6508.22 06200-5 ARRO
INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
DIVISION 7 – THERMAL AND MOISTURE PROTECTION
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
SECTION 07190
VAPOR RETARDERS
PART 1 - GENERAL
1.01 SECTION INCLUDES
A. Underslab Vapor Retarder
B. Roofing Retarder
1.02 RELATED SECTIONS
A. Division 2 - Site Work.
B. Division 3 - Concrete.
C. Insulation: Section 07200.
1.03 REFERENCES
A. American Society for Testing and Materials (ASTM):
1. ASTM D226; Asphalt-Saturated Organic Felt Used in Roofing and
Waterproofing, Spec. for.
2. ASTM D312; Asphalt Used in Roofing, Spec. for.
3. ASTM D448; Sizes of Aggregate, Classification for.
4. ASTM E154; Water Vapor Retarders used in Contact with Earth under Concrete
Slabs, on Walls, or as Ground Cover, Test Methods for.
5. ASTM E1643; Installation of Water Vapor Retarders used in Contact with Earth
or Granular Fill under Concrete Slabs, Std. Practice for.
6. ASTM E1745; Water Vapor Retarders Used in Contact with Soil or Granular Fill
under Concrete Slabs, Std. Spec for.
B. U.S. Department of Commerce Product Standard: PS 17-69 for Moistureproof
Construction Products.
1.04 SUBMITTALS
A. Samples: Include in submission an individual sample of vapor retarder materials
presented in Product Data submission.
B. Product Data: Submit manufacturer’s descriptive product data and current
specifications covering vapor retarder materials and installation instructions for such.
6508.22 07190-1 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
PART 2 - PRODUCTS
2.01 UNDER SLAB VAPOR RETARDER MATERIALS
A. Provide either the Vapor Retarder with Granular Fill Protection or the Vapor Retarder
with “Built-in” Protection. Once submittal has been approved, Contractor cannot
change selection without a new submittal. If both are selected, submittal must indicate
which areas each system will be used.
B. Vapor Retarder with Granular Fill Protection.
1. Vapor Retarder: ASTM E1745, Class B, 5-ply, nylon- or polyester-cord-
reinforced, high density polyethylene sheet; minimum 10 mils (0.25mm) thick.
Griffolyn T-85 by Reef Industries, Inc.; Perminator by W.R. Meadows, Inc;
VaporBlock by Raven Industries; or Approved Equal.
2. Granular Fill: ASTM D448, Size 57, clean mixture of crushed stone and/or gravel
(crushed or uncrushed), with 100% passing a 1½-inch sieve and 0-5% passing a
No. 8 sieve.
C. Vapor Retarder with “Built-in” Protection: 110 mils (2.80mm) thick, semi-flexible,
7-ply sheet membrane consisting of reinforced core and carrier sheet with fortified
asphalt layers, protective weathercoating, and removable plastic release liner.
1. Water-Vapor Permeance (ASTM E154): 0.00 grains/h x sq.ft. x inches Hg
2. Tensile Strength (ASTM E154): 140 lbf/in minimum
3. Puncture Resistance (ASTM E154): 90 lbf minimum
4. Furnish all necessary manufacturer’s accessories including bonding asphalt,
pointing mastics and self-adhering joint tape.
D. Lap and Penetration Sealers: Use t only those products recommended by the vapor
retarder manufacturer.
2.02 ROOFING MOISTURE BARRIER MATERIALS
A. Moisture barrier as recommended by metal roof panel supplier.
PART 3 - EXECUTION
3.01 INSPECTION
A. Aggregate Backfill Conditions: Inspect subbase and verify that leveling of such has
been completed prior to installation of the vapor retarder. Aggregate backfilling
performed as work of Division 2 - Site Work.
B. Roof Deck Conditions:
1. Verify that work which penetrates roof deck or requires persons or equipment to
traverse roof deck has been completed.
6508.22 07190-2 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
2. Examine surfaces for inadequate anchorage, unevenness and debris which would
affect application of vapor retarder.
3. Observe vapor retarder manufacturer’s recommendations regarding surface
conditions affecting application.
3.03 INSTALLATION
A. Underslab Vapor Retarder Installation:
1. General: Place, protect and repair vapor retarder sheets in accordance with
ASTM E1643 and manufacturer’s written instructions.
2. Place vapor retarder sheeting in position with longest dimension parallel with
direction of pour.
3. Lap joints 12-inches and seal with manufacturer’s recommended mastic or
pressure-sensitive tape.
4. Any penetration through the vapor retarder shall be sealed per manufacturer’s
written instructions.
5. Cover vapor retarder (that does not have built-in protection) with granular fill,
moisten and compact with mechanical equipment to elevation tolerances of plus
0-inch and minus ¾-inch.
6. Avoid cutting or puncturing vapor barrier during reinforcement placement and
concrete operations. Repair damages before placing concrete.
B. Roofing Moisture Barrier Installation:
1. Install per manufacturer’s instructions
END OF SECTION
6508.22 07190-3 ARRO
TOWN OF INDIAN HEAD –TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
SECTION 07200
INSULATION
PART 1 - GENERAL
1.01 SECTION INCLUDES
A. Above ceiling installation in restroom/utility room.
1.02 RELATED SECTIONS
A. Rough Carpentry: Section 06100.
B. Vapor Retarders: Section 07190.
1.03 REFERENCES
A. American Society for Testing and Materials (ASTM):
1. ASTM C150; Portland Cement, Spec. for.
2. ASTM C177; Steady-State Thermal Transmission Properties by Means of the
Guarded Hot Plate, Test Method for.
3. ASTM C203; Breaking Load and Flexural Properties of Block-Type Thermal
Insulation, Test Method for.
4. ASTM C208; Insulating Board (Cellulosic Fiber), Structural and Decorative,
Spec. for.
5. ASTM C209; Insulating Board (Cellulosic Fiber) Structural and Decorative,
Methods of Testing.
6. ASTM C272; Water Absorption of Core Materials for Structural Sandwich
Constructions, Test Method for.
7. ASTM C303; Density of Preformed Block-Type Thermal Insulation, Test Method
for.
8. ASTM C332; Lightweight Aggregates for Insulating Concrete, Spec. for.
9. ASTM C355; Water Vapor Transmission of Thick Materials, Test for.
10. ASTM C518; Steady-State Thermal Transmission Properties by Means of Heat
Flow Meter, Test Method for.
11. ASTM C665; Mineral Fiber Blanket Thermal Insulation for Light Frame
Construction and Manufactured Housing, Spec. for.
12. ASTM D312; Asphalt used in Roofing, Spec. for.
13. ASTM D450; Coal-Tar Pitch used in Roofing, Dampproofing and Waterproofing,
Spec. for.
14. ASTM D696; Coefficient of Linear Thermal Expansion of Plastics, Test Method
for.
6508.22 07200-1 ARRO
INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
15. ASTM D1621; Compressive Properties of Rigid Cellular Plastics, Test Method
for.
16. ASTM D1622; Apparent Density of Rigid Cellular Plastics, Test Method for.
17. ASTM D2126; Response of Rigid Cellular Plastics to Thermal and Humid Aging,
Test Method for.
18. ASTM E84; Surface Burning Characteristics of Building Materials, Test Method
for.
19. ASTM E96; Water Vapor Transmission of Materials, Test Methods for.
20. ASTM C578; Type IV, Insulation Board, Thermal (Polystyrene).
21. ASTM C1289; Insulation Board Thermal Polyurethane or Isocyanurate Faced
with Aluminum on Both Sides of Foam.
B. Thermal Insulation Manufacturers Association (TIMA), Technical Bulletin 281-1.
C. Factory Mutual Research Corporation (FM): Approvals.
D. Underwriters' Laboratories (UL): Listings and Approvals.
1.04 SUBMITTALS
A. Samples: Include in submission an individual sample of each type of insulation
required on the Project and presented in Product Data submission.
B. Product Data: Submit manufacturer's descriptive product data and current
specifications covering insulation materials and those associated products used for
installation. Include installation instructions.
C. Shop Drawings: Submit shop drawings indicating roof deck insulation installation
details. Manufacturer's published details modified to suit design conditions may be
submitted.
1.05 DELIVERY, STORAGE AND HANDLING
A. Deliver products in original packages and containers bearing manufacturer's name and
brand designation.
B. Store and transport insulation materials in such a manner to protect from damage and
moisture absorption during entire construction period.
1.06 PROJECT CONDITIONS
A. Environmental Requirements: Apply insulation during dry weather and when there is
no ice, frost, surface moisture or dampness present on substrates.
6508.22 07200-2 ARRO
INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
PART 2 - PRODUCTS
2.01 BUILDING INSULATION
A. Batt Insulation: Asphalted kraft paper faced fibrous glass batts conforming to
ASTM C665 and of thickness indicated on Drawings with vapor barrier rated at one
perm or less and provided with stapling flanges.
B. Unfaced Batt Insulation: Fibrous glass batts conforming to ASTM C665 and of
thickness indicated on Drawings and designed for friction-fit installation.
PART 3 - EXECUTION
3.01 INSPECTION
A. Surface Conditions: Install insulation on dry, smooth, clean, rigid surfaces free from
debris, loose materials, projections and holes.
3.02 BUILDING INSULATION INSTALLATION
A. Batt Insulation Installation: Install batt insulation in accordance with manufacturer's
instructions with respect to positioning in cavities.
1. Install faced batt insulation free of punctures, cuts or tears in insulation vapor
barrier.
2. Install faced batt insulation to be tight fitting but not compressed in cavities and
free of sags.
3. Install faced batt insulation with vapor barrier facing room or heated side.
END OF SECTION
6508.22 07200-3 ARRO
INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
SECTION 07415
PREFORMED METAL ROOF AND WALL PANEL SYSTEMS
PART 1 - GENERAL
1.01 SECTION INCLUDES
A. Preformed aluminum roof panels.
B. Preformed aluminum wall panels.
C. Roof underlayment materials.
D. Flashings, fasteners, and accessories.
E. Soffit.
1.02 RELATED SECTIONS
A. Submittals: Section 01300
B. Project Closeout: Section 01700.
C. Flashing and Sheet Metal: Section 07600
D. Joint Sealers: Section 07900.
1.03 REFERENCES
A. American Society for Testing and Materials:
1. ASTM B209 - Standard Specification for Aluminum and Aluminum-Alloy Sheet
and Plate.
1.04 PERFORMANCE REQUIREMENTS
A. System Movement: Accommodate movements due to thermal expansion and
contraction, dynamic loading, and deflection of substrate without damage to panel
system or loss of weatherproofing capability.
B. Drainage: Provide positive drainage to exterior for moisture entering building enclosure
or condensation occurring within exterior building envelope.
6508.22 07415-1 ARRO
TOWN OF INDIAN HEAD –TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
C. Provide a complete engineered metal roof and wall panel system where indicated on the
Drawings. System shall include all supplementary structural framing and supports,
fasteners, accessories, and trim necessary for a complete installation.
1. System shall include the following components:
a. Standing seam metal roof.
b. Soffit and Fascia.
c. Wall panels.
d. Accessories and trim.
e. Roof vent
f. Vent boot
D. Coordination: The Contract Drawings are generally indicative of the minimum
installation expected and required. It is not intended that they show every component
and accessory necessary for a complete and proper installation. The materials provided
shall be adaptable to the intended use. Any variations to the engineered metal roof and
wall panel system design necessary to accommodate the system of a specific
manufacturer shall be the responsibility of the Contractor and the modifications shall be
made only after approval by the Engineer and at no additional expense to the Owner. It
shall be the responsibility of the Contractor to coordinate with the Product
manufacturer/installer all the details required for a complete system such as specialty
components and devices needed but not shown; supports and guides; protective
coatings; sealants; and accessories. The Contractor shall be responsible for providing a
system that has been properly engineered and designed for the intended use.
1.05 SUBMITTALS
A. Submit under provisions of Section 01300.
B. Product Data: Submit manufacturer's current product specifications and installation
instructions.
C. Shop Drawings: Include plans, elevations and details, as required to completely
illustrate and describe the installation. Show details of trim and flashing conditions,
fastening and anchorage methods, weatherproofing techniques, termination, and
penetrations.
1. Shop Drawings shall completely detail all products and the location of such in the
product.
2. Shop Drawings shall indicate size of all components, the methods of joining the
various components, the location and type of anchors, and the necessary installation
reference measurements.
3. Shop Drawings shall indicate fabricated part number of all panels and components
and its location in the overall installation.
4. Submit "Letter of Assurance" in compliance with Section 01300.
6508.22 07415-2 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
D. Selection Samples: Submit actual metal samples with full range of colors (not just
standard colors) available for Owner's selection.
E. Verification Samples: Submit two samples each of type of metal roof and wall panels
required, not less than 12 inches, and illustrating finished panel profile, color, sheen, and
texture.
F. Test Reports: Submit copies of test reports verifying performance capability of panel
system.
1.06 QUALITY ASSURANCE
A. Installer: Company specializing in the type of work required for this project, with not
less than 2 years of documented experience.
B. Pre-Installation meeting: Convene meeting not less than one week prior to beginning
installation.
1.07 DELIVERY, STORAGE, AND HANDLING
A. Do not deliver materials of this section to project site until suitable facilities for storage
and protection are available.
B. Protect materials from damage during transit and at project site. Store under cover but
sloped to provide positive drainage. Do not expose materials with strippable protective
film to direct sunlight or extreme heat.
1.08 PROJECT CONDITIONS
A. Take field measurement prior to fabrication of panel system. If schedule will not permit
prior field measurement, allow adequate tolerances in fabricated components to
accommodate anticipated variation in project conditions.
1.09 DESIGN REQUIREMENT
A. Design and fabricate wall system for following windloads:
1. Wall Loading: 20 lbs. per sq. ft. outward.
2. Water Penetration: No significant, uncontrolled leakage at 4 lbs. per sq. ft.
pressure with spray test.
3. Air Infiltration: 0.02 cfm per sq. ft. for gross roof/wall areas, with 4 lbs. per sq. ft.
differential pressure.
6508.22 07415-3 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
1.10 WARRANTY
A. Comply with provisions of Section 01700.
B. Submit manufacturer's standard 20-year finish warranty for color retention, adhesion,
and freedom from chalking.
C. Submit 2-year weather-tightness and workmanship warranty from installer.
PART 2 - PRODUCTS
2.01 MANUFACTURERS
A. ATAS Aluminum Corp., 6612 Snowdrift Road, Allentown, PA 18106.
B. American Buildings, A Nucor Co., 501 Golden Eagle Drive, La Crosse, VA 23950
C. Petersen Aluminum Corp., 9060 Junction Dr, Annapolis Junction, MD 20701
D. Or Equal
2.02 MATERIALS
A. Roof: ASTM B 209, minimum yield strength 17,000 psi, 0.040 inches Aluminum or
ASTM A792 0.034 inches Aluminum-Zinc coated steel.
1. Standards: ASTM E 1646, ASTM E 1592, and ASTM E 1680.
2. Panel Style: Monarch Roof Panels with Dutch Seam.
a. Width: 12 inches to 16 inches.
b. Panel depth: 1 inch to 1-1/2 inches.
3. Panel Length: As indicated on drawings.
a. Provide stiffening ribs for panel length over 20 feet.
4. Texture: Smooth.
5. Finish: PVDF coating
a. Color: As selected by Owner from manufacturer's full range of colors.
6. Roof materials must come with a minimum 20-year manufacturer’s performance
warranty.
B. Wall: ASTM B 209, minimum yield strength 17,000 psi, 0.040 inches Aluminum or
ASTM A792 0.034 inches Aluminum-Zinc coated steel.
1. Panel Style: Board and Batten.
2. Panel Length: To suit installation.
3. Texture: Smooth.
4. Finish: PVDF coating
a. Color: As selected by Owner from manufacturer's full range of colors.
C. Roof Panel Underlayment Materials:
6508.22 07415-4 ARRO
TOWN OF INDIAN HEAD –TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
1. 30# Felt.
2. Red Rosin Sheathing.
D. Soffit: ASTM B 209, minimum yield strength 17,000 psi., 0.032 inch Aluminum or
ASTM A792 0.034 inches Aluminum-Zinc coated steel.
1. Panel Style: provide smooth panels except where vented panels are required as
integral part of design.
a. Width: 12 inches to 16 inches.
b. Panel depth: 7/16 inches.
2. Panel Length: As indicated on drawings.
3. Texture: Smooth.
4. Finish: PVDF coating
a. Color: As selected by Owner from manufacturer's full range of colors.
E. Supplementary Structural Framing:
1. Hat-Section, U-Section, and Subgirth: Roll-formed of galvanized steel or heavy-
duty aluminum.
2. Metal Studs and Channel Runners: Roll-formed of galvanized steel.
F. Accessories:
1. Provide formed accessories of same gage and finish as the primary panel system,
unless otherwise indicated on the drawings.
2. Snow Guards: Manufactured of cast aluminum designed to be adhered to the pan
surface with high strength construction adhesive. Guards shall be SM type.
G. Sealants: As specified in Section 07900.
H. Fasteners: As recommended by manufacturer for project conditions and panel type.
I. Gutters, Downspouts and Miscellaneous Flashing: As specified in Section 07600.
PART 3 - EXECUTION
3.01 EXAMINATION
A. Inspect substrate to verify that it is in proper condition, plumb, and ready to receive
work of this section. Do not proceed with installation until unsatisfactory conditions
have been corrected.
3.02 INSTALLATION
A. Install roof panel underlayment materials in accordance with manufacturers' instruction
and as indicated on Drawings.
6508.22 07415-5 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
B. Install roof and wall metal panels and accessories in strict accordance with
manufacturer's instructions.
C. Protect surfaces in contact with dissimilar metals with bituminous paint or other coating
approved by panel manufacturer.
D. Fasten roof panels to substrate with fasteners provided or approved by panel
manufacturer. Install panels plumb, level, and true to line.
E. Fasten wall panels and snap-on battens at top with pop rivets or other method
recommended by manufacturer.
F. Fully interlock panels with adjacent panels. Apply sealants as recommended by panel
manufacturer to achieve weathertight installation.
G. Install flashing and counterflashing around roof penetrations and trim as required for a
weatherproof installation.
H. Install snow guards as shown on the Drawings using adhesive recommended by the
manufacturer.
3.03 ADJUSTING AND CLEANING
A. Dispose of excess materials and remove debris from site.
B. Clean work in accordance with recommendations of roofing panel manufacturer.
C. Touch up minor scratches and abrasions with the paint provided or approved by panel
manufacturer.
D. Protect work against damage. Replace any work that becomes damaged prior to final
acceptance.
END OF SECTION
6508.22 07415-6 ARRO
TOWN OF INDIAN HEAD –TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
SECTION 07600
FLASHING AND SHEET METAL
PART 1 - GENERAL
1.01 SECTION INCLUDES
A. Gutters and downspouts.
1.02 RELATED SECTIONS
A. Preformed metal roof and wall panel systems: Section 07415.
B. Joint Sealers: Section 07900.
1.03 REFERENCES
A. American Society for Testing and Materials (ASTM):
1. ASTM A167; Stainless and Heat-Resisting Chromium-Nickel Steel Plate, Sheet
and Strip, Spec. for.
2. ASTM A526; Steel Sheet, Zinc-Coated (Galvanized) by the Hot-Dip Process,
Commercial Quality, Spec. for.
3. ASTM D822; Operating Light- and Water-Exposure Apparatus (Carbon-Arc
Type) for Testing Paint, Varnish, Lacquer, and Related Products, Practice for.
B. Federal Specification:
1. Fed. Spec. QQ-L-201 Lead Sheet.
2. Fed. Spec. TT-P-645 Primer, Paint Zinc Chromate, Alkyd Type.
C. Sheet Metal and Air Conditioning Contractors National Association, Incorporated
(SMACNA) Architectural Sheet Metal Manual.
1.04 SUBMITTALS
A. Samples: Include in submission an individual sample of flashing materials presented in
Shop Drawings and Product Data submission.
B. Shop Drawings: Submit shop drawings indicating each flashing condition in the
project. Drawings shall indicate metal thickness, dimensions, seam styles and types,
fastening and anchoring methods and provisions required to provide for thermal
expansion and contraction.
6508.22 07600-1 ARRO
TOWN OF INDIAN HEAD –TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
C. Product Data: Submit manufacturer’s descriptive product data and current
specifications covering the prefabricated products and installation instructions for such.
PART 2 - PRODUCTS
2.01 MATERIALS
A. Metal Flashings: Fabricate formed flashing shapes to conform to those indicated on the
Drawings, except for the particular requirements of the SMACNA Architectural Sheet
Metal Manual exceeding the designs indicated.
1. Fabricate metal flashings from Type 302 or 304 stainless steel sheet or strip
conforming to ASTM A167, in 2D finish, dead soft temper and fully annealed.
Metal thicknesses for various flashings as follows:
a. Counter Flashings: .015-inch thick.
b. Thru-Wall Scuppers: .063-inch thick.
c. Base Flashings: .015-inch thick.
d. Valley Flashings: .015-inch thick.
e. Bitumen Dams: .016-inch thick.
f. Formed Metal Coping: .0179-inch thick.
g. Control Joint Flashing: .015-inch thick.
h. Drip Edge Flashing: 26 gauge.
2. Fabricate metal flashings from galvanized sheet steel or strip conforming to
ASTM A526. Metal thickness for various flashing as follows:
a. Counter Flashings: 26 gauge
b. Base Flashings: 26 gauge
c. Valley Flashings: 24 gauge
d. Scuppers: 24 gauge
e. Conductor Heads: 24 gauge
B. Fasteners: Use like material fasteners or a fastener of material compatible with the
metal item being fastened. Use aluminum or stainless steel screw fasteners with
aluminum or stainless steel flashings for attachment to the structure.
C. Gun Grade Sealants: As specified in Section 07900.
2.02 PREFABRICATED PRODUCTS
A. Fascia & Soffit System: Factory pre-finished formed aluminum in shapes as indicated
on Drawings.
B. Ridge Vent: Factory pre-finished formed aluminum vent shape with integral weather
baffle strip. Baffle strip factory punched for drainage. Vent provided with factory
formed end plugs. Ridge vent shall meet or exceed FHA ventilation standards.
6508.22 07600-2 ARRO
TOWN OF INDIAN HEAD –TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
C. Pre-Finished Gutters and Downspouts: Factory pre-finished formed aluminum
gutters 0.032-inch thick and downspouts 0.024-inch thick. Use over-the-roof deck
concealed style gutter hangers (Alcoa Combination- Strap D). Color; same as roof
panels.
1. Acceptable Manufacturers:
a) Alcoa Building Products, Inc.,
b) Reynolds,
c) American Construction Metals,
d) or equal.
PART 3 - EXECUTION
3.01 INSPECTION
A. Verify that other construction which may affect the work of this Section is complete to
the extent that flashing work may be performed in accordance with roofing system
manufacturer’s requirements for a guaranteed flashing installation.
B. Surface Conditions: Apply flashings over smooth, even, sound, dry and clean surfaces
free from projecting nails or other defects that would affect application.
3.02 PREPARATION
A. Dissimilar Metals: Where stainless steel or aluminum abuts or members into adjacent
dissimilar metals, prepare the juncture in a manner that will eliminate possible galvanic
or electrolytic action.
1. Aluminum to Steel: Coat aluminum surfaces to be placed in contact with steel
with zinc chromate primer, Fed. Spec. TT-P-645.
2. Aluminum to Wood, Concrete or Masonry: Coat aluminum surfaces coming in
contact with wood, concrete or masonry with a heavy coat of an alkali-resistant
bituminous paint.
B. Cutting Reglets: Use a reglet cutting tool to make new reglets at least two brick courses
above the existing abandoned reglets, unless indicated otherwise on the Drawings. Cut
new reglet to the depth required to accommodate the recommended SMACNA Counter
Flashing shape.
3.03 INSTALLATION
A. Flashing For Head, Sills and Through Wall: Make end lap joints six inches minimum,
side lap joints four inches minimum and seal with companion cement. Roll laps with a
heavy hand roller until beads of cement appear on the edges. Set flashings as follows:
1. Place drip edge flashing on steel lintel angle to receive through-wall flashing.
Install per manufacturer’s instructions.
6508.22 07600-3 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
2. For heads and sills start flashing ½-inch from outside face of wall and carry
through wall to point of termination indicated in Drawing details. Carry head wall
flashing up over (not suspended) lintels and secure in back wall mortar joint six
inches or as detailed. Extend head flashing six inches beyond lintel ends and sill
flashing six inches beyond openings. Turn up sides of flashings to form a pan,
and fold all corners; do not cut corners. Install weep holes immediately on top of
flashing at two-foot centers.
3. Lay through wall flashing in a slurry of fresh mortar and top with a full bed of
mortar. Start flashing ½-inch from outside face of cavity wall, and carry through
wall upward across cavity (if any) a minimum of six inches, and secure in back
wall mortar joint.
B. Metal Flashings Installation: Install sheet and strip metal flashing items as indicated on
the Drawings and in accordance with SMACNA Architectural Sheet Metal Manual
requirements exceeding the indicated requirements.
1. Shop Forming: Form sheet metal items with true and sharp angles, lines and
arrises. Keep exposed surfaces free from visible wave, warp and buckle, as well
as free of tool marks. Fold exposed edges back neatly to form a ½-inch hem on
the concealed side of the various shapes.
2. Expansion and Contraction: Provide for expansion and contraction in metal
flashing items at ten-foot intervals maximum, except where the distance between
the last joint and the end of a continuous run is more than half the required
spacing, then provide an additional expansion joint. Space expansion joints
evenly in any one run.
3. Flashing For Vents and Other Projections: Behind Lead Sleeves and beneath
roofing membrane next to deck, install Bitumen Dam as indicated on Drawings.
Over Bitumen Dams, install Lead Sleeve cemented to surface of roofing felt with
a mopping of appropriate hot bitumen. Over the Lead Sleeve, flange apply the
appropriate strip flashing system as specified in Section 07510.
4. Flashing For Roof Drains: Install sheet lead flashing flange to extend at least
twelve inches beyond roof drain opening. Install lead flashing in built-up
bituminous roofing system in accordance with roofing system product
manufacturer’s guarantee requirements as specified in Section 07510.
C. Prefabricated (Factory) Products (Including Expansion Joint) Installations: Install
prefabricated flashing products in accordance with manufacturer’s installation
instructions and to meet requirements of Factory Mutual Research Corporation.
D. Make flashings watertight as indicated on Drawings using Sealants as specified in
Section 07900. Sealers to be compatible with flashing material.
6508.22 07600-4 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
3.04 CLEANING AND REPAIRS
A. Clean exposed fascia and gutter and downspouts at completion of installation. Remove
handling marks, grease, oily films, etc., from finish using materials and methods
recommended by product manufacturer.
B. Scratches, abrasions and minor surface defects in finishes may be repaired in accordance
with the manufacturer’s printed instructions and as approved by Engineer.
END OF SECTION
6508.22 07600-5 ARRO
TOWN OF INDIAN HEAD –TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
SECTION 07900
JOINT SEALERS
PART 1 - GENERAL
1.01 SECTION INCLUDES
A. Exterior and Interior Sealants.
B. Pourable Sealant.
C. Sealant Accessories.
1.02 RELATED SECTIONS
A. Division 3 - Concrete.
B. Individual sealant and caulking requirements as specified in various other Specifications
Sections.
1.03 SYSTEM DESCRIPTION
A. Definitions: The terms Sealant and Caulking are defined as follows:
1. Sealant: Refers to compounds used to seal exterior vertical and horizontal joints.
2. Caulking: Refers to compounds used to seal interior vertical and horizontal joints
except horizontal interior floor joints which will be treated on an individual basis.
1.04 REFERENCES:
A. American Society for Testing and Materials (ASTM):
1. ASTM C834; Latex Sealing Compounds, Spec. for.
2. ASTM D412; Rubber Properties in Tension, Test Methods for.
3. ASTM C920; Sealing Compound Elastomeric Type, Single Component (For
Caulking, Sealing and Glazing in Buildings and Other Structures).
1.05 SUBMITTALS
A. Samples: Include in submission an individual sample of Sealants and Caulking
materials presented in Product Data submission.
B. Product Data: Submit manufacturer's descriptive product data and current specifications
covering Sealants and Caulking products and application instructions for such.
6508.22 07900-1 ARRO
INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
C. Color Selection: Submit manufacturer's standard color charts in submittal for Engineer's
color selections. Color to match adjacent surfaces.
1.06 DELIVERY, STORAGE AND HANDLING
A. Deliver compound products in manufacturer's original, unopened packages and
containers bearing manufacturer's name and brand designation.
B. Store compounds in sealed containers in a dry protected area and protect from freezing.
C. Do not use compounds that have been stored for a period of time exceeding the
maximum recommended shelf life of the materials.
1.07 PROJECT CONDITIONS
A. Environmental Requirements: Apply compounds during dry weather when air and
surface temperatures are within manufacturer's recommended limitations.
1. Do not proceed with compounds installation when joint substrates are damp, wet or
frozen.
2. Consult the compound manufacturer for specific environmental instructions before
proceeding.
B. Joint Conditions: In general, joint configuration and joint surfaces are as indicated on
the Drawings.
1. Do not proceed with compound installation if a joint width is less than designed.
2. The trade performing the work of this Section shall inform the Contractor of above
stated condition and await written acknowledgement with an order to proceed.
3. The Contractor shall inform the Engineer in writing of joint width conditions stated
above and await his determination for corrective measures.
PART 2 - PRODUCTS
2.01 MATERIALS
A. Gun-Grade Sealant:
1. Structure Joint Sealant: Moisture cured, one component, polyurethane base,
non-sag elastomeric sealant compound meeting requirements of ASTM C920,
Type II Class A, with following properties:
a. 100 percent modulus: 132 psi cured and tested after 21 days at 73 degrees F
according to ASTM D412.
b. Shore A Hardness: Minimum 30 plus/minus 3 cured and tested after 21 days
at 73 degrees F.
6508.22 07900-2 ARRO
INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
c. Tensile Strength (at break): Minimum 175 psi cured and tested after 21 days
at 73 degrees F according to ASTM D412.
d. Elongation (at break): Minimum 700 percent when cured and tested after 21
days at 73 degrees F. according to ASTM D412.
e. Sealants in potable water structures shall be NSF approved.
2. Acceptable Manufacturers:
a. Sika Corporation; Sikaflex - 1a.
b. Tremco, Inc.; Spectrem 900 SL
c. Sonneborn Building Products Division; Sonolastic NP-1
b. Or Approved Equal.
B. Pourable-Grade Sealant:
1. Horizontal Joint Sealant: Self-leveling, moisture cured, one component,
polyurethane base, elastomeric sealant compound meeting requirements of ASTM
C920, Type I Class A, with following properties:
a. 100 percent modulus: 65 plus/minus 5 psi cured and tested after 21 days at 73
degrees F. according to ASTM D412.
b. Shore A Hardness: 25 plus/minus 5 cured and tested after 21 days at 73
degrees F.
c. Tensile Strength (at break): 250 psi cured and tested after 21 days at 73
degrees F. according to ASTM D412.
d. Elongation (at break): 500 percent when cured and tested after 21 days at 73
degrees F. according to ASTM D412.
2. Acceptable Manufacturers:
a. Sika Corporation; Sikaflex - 12SL.
b. Pecora Corporation.
c. Sonneborn Building Products Division.
d. Or Approved Equal.
C. Sealant Application Products:
1. Sealant Primer: Suitable to substrate surfaces and as recommended by the sealant
manufacturer. Obtain directions from manufacturer whether primer is staining or
non-staining prior to application.
2. Joint Backing: Preformed compressible, resilient, non-waxing, non-extruding,
non-staining strips (polyethylene foam, urethane foam, butyl) as recommended by
sealant manufacturer. Provide backing of sizes and shapes to suit the various joint
conditions encountered. Backing must be compatible with sealant, primers and
substrates.
3. Bond Breaker: As recommended by sealant manufacturer.
4. Cleaning Agent: As recommended by sealant manufacturer.
D. Non-Meltable Mastic Waterstop Sealant:
1. Pressure Grade (Medium-stiff), for locations where movement is slow and
expected temperature range is 30-130 degrees F.; IGAS Joint Sealant, Sikaflex 405.
6508.22 07900-3 ARRO
INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
2. Knife Grade (Medium-soft), for locations where temperature changes rapidly and
expected range is 10-110 degrees F.; IGAS Joint Sealant, Sikaflex 406.
3. Primer, black asphaltic liquid; Sikaflex 409.
4. Acceptable Manufacturers:
a. Sika Corporation;
b. Greenstreak;
c. Krystol Group
d. Or Approved Equal.
E. Gun-Grade Caulking:
1. Structure Joint Caulking: Provide a one-part gun grade acrylic latex base caulking
compound conforming to requirements of ASTM C834.
2. Provide caulking in white color suitable for paint concealment.
3. Acceptable Manufacturers:
a. Dap, Inc., DAP Acrylic Latex Caulk.
b. Pecora Corporation, AC-20 Acrylic Latex Caulk.
c. Woodmont Products, Inc., Chem-Calk 600.
d. Or Approved Equal.
4. Caulking Joint Backing: Preformed compressible resilient, non-waxing,
non-extruding, non-staining rope forms of polyethylene or urethane foam. No
closed-cell foam products permitted. Provide backing of sizes and shapes to suit
the various joint conditions encountered.
PART 3 - EXECUTION
3.01 PREPARATION
A. Surface Conditions:
1. Prepare joint surfaces to a sound, smooth, clean and dry condition free of visible
contaminants.
2. In the construction of joint surfaces, control applications of non-visible coatings or
contaminants to surfaces of rabbet area prior to applications of compounds.
B. Preparation of Surfaces:
1. Priming: Thoroughly clean joints and apply primer (if recommended by compound
manufacturers) to dry surfaces.
2. Joint Backing: In joints where depth of joint exceeds the required depth of
compound, install joint backing to provide backing and uniform depth of sealant.
Install joint backing with approximately 30 percent compression. Do not stretch,
twist, puncture, or tear joint backing. Butt joint backing at intersections.
3. Bond Breaker: Install bond breaker tape smoothly at back of joint where joint
backing is not required or cannot be installed.
6508.22 07900-4 ARRO
INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
3.02 INSTALLATION
A. Application: Apply compound in accordance with manufacturer's application manual
and instructions, using hand guns or pressure equipment, with proper nozzle size, on
clean, dry, properly prepared substrates.
1. Force compound into joint and against sides of joint to make uniform. Avoid
pulling of the compound from the sides. Fill joint space completely.
2. Compounds shall adhere only to the sides and not to the back of the joint so as to
eliminate three-sided adhesion.
B. Tooling: Tool compounds to ensure firm contact with joint interfaces and to form
smooth, uniform beads with slightly concave surfaces. Finish joints to form a straight,
uniform, smooth neat finish.
1. Tooling agents should only be used if recommended by compound manufacturers.
C. Masking: Where an irregular surface or sensitive joint border exists apply masking tape
at joint edges to ensure joint neatness and Protection. Remove tape following
completion of work.
D. Pourable-Grade Sealant Application: Observe manufacturer's technical notes for sealant
application concerning air entrapment, moisture curing and tooling.
1. To ensure best performance of sealant, pour sealant into joint when joint slot is at
mid-point of its designed expansion and contraction.
E. Locations: The following is a listing of certain joint locations. The list is included for
convenience only and is not to be construed as complete. The responsibility for all joint
treatment rests solely with the Contractor.
1. Exterior Structure Joints:
a. Use Gun-Grade Sealant to seal exterior structure joints.
b. Seal exterior joints in the structure as indicated on Drawings, and also such
joints not indicated, to render the structure leak free from wind, water, dust
and weather.
2. Interior Structure Joints:
a. Use Gun-Grade Caulking to seal interior structure joints.
b. Caulk interior joints between aluminum frames and opening substrates. Color
match Caulking to the aluminum finish.
3. Exterior Trafficked and Non-Trafficked Horizontal Working Joints:
a. Use Pourable-Grade Sealant to seal exterior trafficked joints.
4. Interior Trafficked Horizontal Working Joints:
a. ONLY where indicated in structure interior use Pourable-Grade Sealant to
seal trafficked joints.
6508.22 07900-5 ARRO
INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
5. Mastic Waterstop Sealant Application:
a. Use the hot-trowel application method.
b. Apply waterstop into joint in three or more separate layers, allowing each
layer to cool.
c. Compact tightly during application and after cooling.
F. Cleaning: Clean off excess compounds or smears with cleaning agents as recommended
by the compound manufacturers.
END OF SECTION
6508.22 07900-6 ARRO
INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
DIVISION 8 – DOORS AND WINDOWS
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
SECTION 08110
STEEL DOORS AND FRAMES
PART 1 - GENERAL
1.01 SECTION INCLUDES
A. Hollow Metal Doors.
B. Hollow Metal Frames.
C. Door Hardware.
1.02 RELATED SECTIONS
A. Metal Fabrications: Section 05500.
B. Joint Sealers: Section 07900.
C. Glazing: Section 08800.
1.03 QUALITY ASSURANCE
A. Requirements of Regulatory Agencies:
1. Construction details and hardware applications required to meet Label requirements
shall take precedence over Drawing details or Specifications.
B. Component Compatibility: Provide hollow metal frames and doors of one
manufacturer's products.
1.04 REFERENCES
A. American Society for Testing and Materials (ASTM):
1. ASTM A366; Steel, Sheet, Carbon, Cold-Rolled, Commercial Quality, Spec. for.
2. ASTM A569; Steel, Sheet and Strip, Carbon (0.15 Maximum Percent), Hot-Rolled
Commercial Quality, Spec. for.
B. Builders' Hardware Manufacturers' Association (BHMA):
1. BHMA 101, Butts and Hinges.
2. BHMA 301, Door Controls (Closers).
C. Steel Door Institute: SDI 100 and SDI 111-C.
6508.22 08110-1 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
D. Underwriters' Laboratories (UL) Listings and Approvals; Fire Resistance and
Temperature Rise Ratings for Label Door Construction.
1.05 SUBMITTALS
A. Shop Drawings and Product Data: Manufacturer's published details modified to suit
Project design conditions. Manufacturer's descriptive literature and specifications
covering products specified. Include installation information.
1.06 DELIVERY, STORAGE AND HANDLING
A. Deliver, store and handle steel doors and frames in such manner to prevent damage and
also deterioration from the elements.
B. Store doors and frames at the site upright on wood runners or skids and in a protected
area to prevent damage by construction activities.
PART 2 - PRODUCTS
2.01 MATERIALS
A. Anchors and Fasteners: As specified in Section 05500.
B. Gun Grade Caulking: As specified in Section 07900.
C. General Requirements: Provide doors and frames of standard construction conforming
to SDI 100 and such additional requirements as specified herein. Provide steel doors
and frames fabricated from commercial grade cold rolled steel conforming to
ASTM A366, or commercial grade hot rolled and pickled steel conforming to
ASTM A569.
D. Welded Frames: Welded construction with integral stops and rabbets, single return on
the back bend and fabricated with mitered corners, securely welded and welds ground
smooth.
1. Frame face of 16 gauge minimum for frames less than four feet wide and 14 gauge
for frames over four feet wide.
2. Hinge reinforcement of seven gauge minimum and screw-tapped for mortised
hinges.
3. Universal type strike reinforcement of 12 gauge minimum and screw-tapped.
4. Closer reinforcement of 12-gauge minimum.
5. Steel mortar boxes behind tapped or punched holes in frame.
6508.22 08110-2 ARRO
TOWN OF INDIAN HEAD –TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
6. Jamb to header joints internally reinforced and continuously face welded as one
piece and dressed to an even plane.
7. Frame anchors include welded in place floor anchors and three loose intermediate
anchors. Floor anchors 14 gauge minimum.
8. Factory installed rubber silencers; three per strike jamb and two per head for pair
openings.
E. Doors: Flush seamless design with no visible seams on faces or edges (no plastic,
liquid, or putty filling of seams) and fabricated in 1 3/4-inch thickness.
1. Door face sheets shall conform to SDI 100 as follows:
a. Interior doors 18 gauge minimum (Exceptions as specified hereinafter).
b. Exterior doors 16 gauge minimum.
2. Door face sheets 18 gauge minimum for doors up to three feet wide and 16 gauge
minimum for doors wider than three feet. Top and bottom edge reinforcing 16
gauge minimum. Top and bottom reinforcing provided with closing channels or
filler channels. Hinge reinforcement 3/16-inch thick and drilled and tapped for
mortise hinges.
3. Lock reinforcing 16 gauge minimum.
4. Closer and panic hardware reinforcing 12 gauge minimum.
5. Core material for exterior doors of one piece high density urethane (U factor of
0.09) securely bonded under heat and pressure to both face sheets.
6. Equip doors with astragals where required by Door Type.
F. Door and Frame Finish: Steel components factory cleaned, phosphatized and prime
painted in manufacturer's standard rust-inhibitive primer.
G. Acceptable Manufacturers:
1. Pioneer Industries, Inc.
2. Curries.
3. Ceco Corporation.
4. Fenestra, Div., Marmon Group, Inc.
5. Steelcraft Mfg. Co.
6. Or Approved Equal.
2.02 ACCESS DOORS
A. General Construction: Door size as indicated on the Drawing.
1. Frame of 16 gauge leveled sheet steel and door of 13 gauge, minimum.
2. Frame flange arc welded and ground smooth, ¾-inch wide minimum.
3. Finish of factory applied rust inhibitive primer.
4. Hinges of concealed continuous piano type.
5. Lock of stainless steel, flush design, screwdriver-operated with stainless steel
cam and studs.
6508.22 08110-3 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
B. Access Doors in Acoustical Tile: Angle frame design for screw attachment to
ceiling grid and metal sides to prevent damage to tile; recessed design door to
accept adhesive mastic applied tile.
1. Acceptable Manufacturers
a. Inryco/Milcor; Style AT.
b. Karp Associates, Inc.
c. Boico.
d. Or Approved Equal.
2.03 HARDWARE
A. Fasteners: Use fasteners furnished with the hardware by the manufacturer. However,
exposed surfaces of fasteners shall match finish of the hardware item. Where fasteners
are not factory furnished, provide such which meet above stated finish requirements
also. In each case, use fasteners of the type recommended by the BHMA as best suited
to the anchoring substrate.
B. Hinges:
1. Type: BHMA 101, five knuckle, non-ferrous metal or stainless steel hinges, flush
ball bearing design (chrome alloy bearings) with non-removable security pins.
a. Stanley Hardware Div., Class No. FBB191.
b. Soss Manufacturing Co.
c. TruDoor.
d. Or Approved Equal.
2. Sizes: Hinge width for steel doors at 4½-inches. Hinge height determined as
follows:
a. Door widths to 36-inches; 4½-inches high hinge.
b. Door widths from 36 to 48-inches; 5-inches high hinge.
c. Door widths over 48-inches; 6-inches high hinge.
3. Finish: US 26D.
C. Locks:
1. Schlage D Series; Sparta lever trim.
2. TruDoor
3. Sargent
4. or Approved Equal.
D. Mortise Cylinders: Non-ferrous metal or stainless steel with six pin tumbler security
and finished in US28.
E. Door Closers: Provide closers of rack and pinion construction with both rack and pinion
of heat-treated steel and mounted in a cast iron case suitable for hydraulic operation and
of such design to receive a rectangular cover. BHMA 301, Norton, Series 1600 with
Stop and Hold-open; USA Fire Door; . Closers by other manufacturers will be
6508.22 08110-4 ARRO
TOWN OF INDIAN HEAD –TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
considered provided type, size and finish are equal.
1. Closers for steel doors finished in silver lacquer.
F. Panic Devices:
1. Steel Doors: Rim type, non-handed, UL listed, with horizonal push bar of wrought
steel channels, extruded brass latch bolts, nylon bearings and stainless steel return
springs. Provide exit device with outside pull device; Corbin Model No. D26NT
(Fortune 29 Series); USA Fire Door; Russwin, or approved equal.
G. Head and Jamb Weatherproofing (Steel Doors): Zero Weather Stripping Co., Inc.,
Series 3300 extruded aluminum; Mastercraft; Schuham; or approved equal.
H. Threshold: Pemko 2005AV S/ES, US28; K.N. Crowder Mrg. Inc.; C. R. Laurence Co.
Inc.; or Approved Equal.
I. Hardware Schedule (Each Door):
1. Single Door:
2 - Pair Hinges
1 - Lockset
1 - Mortise Cylinder
1 - Panic Device
1 - Closer
1 - Threshold
1 – Stainless Steel Kickplate (Interior Side)
2. Double Door:
4 - Pair Hinges
1 - Lockset
1 - Mortise Cylinder
1 - Threshold
1 – Stainless Steel Kickplate on Active Leaf
J. Keying: Extend existing system. Keys to match Owner’s existing system. Provide five
(5) duplicate keys and two (2) grand masters.
PART 3 - EXECUTION
3.01 INSPECTION
A. Inspect steel products for material defects and appearance defects such as corner
misalignment, uneven seams and similar fabrication defects. Replace with new at no
increase in Contract Price.
6508.22 08110-5 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
B. Verify that the steel products specified herein may be installed in strict accordance with
pertinent codes and regulations, approved shop drawings and manufacturer's
recommendations exceeding specified requirements. Install products to meet SDI 100
recommendations and installation procedures.
3.02 INSTALLATION
A. Locations:
1. Welded Frames: Install welded type door frames in masonry walls, in concrete
wall construction and in each exterior door location.
B. Setting Frames:
1. Set frames accurately to established lines and elevations, in true alignment, plumb,
level, square and properly anchored in place.
2. Build-in intermediate jamb anchors as masonry work progresses, and in addition,
backfill said frames with mortar as masonry work progresses.
3. Anchor and fastener installation as specified in section 05500.
4. Sealing Frames: Seal welded frames against substrates in accordance with
requirements of Section 07900.
C. Hanging Doors:
1. Hang doors in true alignment, free of warp, with all clearances accurately
maintained. Hang doors so as to eliminate hinge-binding over entire length of
travel.
2. Install and fit doors with a uniform clearance of 1/16-inch at heads and jambs and
5/8-inch clearance at floor unless otherwise indicated on Drawings.
3. Hang doors with screws inserted and hinges adjusted so that doors swing free and
do not rattle when closed. Drill and tap for surface applied hardware. Holes and
mortises shall fit snugly to provide as much support as possible to hardware.
4. Install hardware accurately fitted, securely applied and carefully adjusted. Install in
accordance with manufacturer's instructions. Use care not to injure other Work
when installing hardware.
END OF SECTION
6508.22 08110-6 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
DIVISION 9 – FINISHES
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
SECTION 09510
ACOUSTICAL CEILINGS
PART 1 - GENERAL
1.01 SECTION INCLUDES
A. Acoustical ceiling tile.
B. Suspension grid system and attachments.
1.02 RELATED SECTIONS
A. Metal Fabrications: Section 05500.
1.03 REFERENCES
A. American Society for Testing and Materials (ASTM):
1. ASTM C423, Sound Absorption and Sound Absorption Coefficients by the
Reverberation Room Method, Test Method for.
2. ASTM C635, Metal Suspension Systems for Acoustical Tile and Lay-In Panel
Ceilings, Spec. for.
3. ASTM C636, Installation of Metal Ceiling Suspension Systems for Acoustical
Tile and Lay-In Panels, Practice for.
4. ASTM E84, Surface Burning Characteristics of Building Materials, Test Method
for.
5. ASTM E1264; Sound Controlling Blocks Boards Acoustical Tiles, Panels
Prefabricated.
1.04 SUBMITTALS
A. Shop Drawings and Product Data: Manufacturer’s published details modified to suit
design conditions. Manufacturer’s descriptive literature and specifications covering the
products specified. Descriptive literature shall include installation information.
B. Submit shop drawings indicating ceiling tile layout. Drawings to indicate locations of
lighting fixtures, mechanical diffusers and grills.
C. Extra Stock: Leave extra ceiling tiles on the premises at completion of Work of the
Project. Store extra tiles where directed by the Engineer. Quantity of same shall equal
two percent of the total acoustical ceiling areas.
6508.22 09510-1 ARRO
INDIAN HEAD –TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
1.05 PROJECT CONDITIONS
A. Environmental Requirements:
1. Maintain ambient temperature of 50 degrees F. or above during and thereafter the
installation of the Suspended Ceiling Work.
2. Areas to receive Suspended Ceilings shall be dry and with no more dampening
materials or construction work to be installed or performed.
PART 2 - PRODUCTS
2.01 TILE MATERIALS
A. Mineral-Fiber Acoustical Tile: Fissured design face of dimensions indicated on the
Drawings, in 5/8-inch thickness with a factory-applied white paint finish. Tile material
shall meet requirements of ASTM E1264 and rated ASTM E84, Class 25
non-combustible. Armstrong Minaboard Item No. 755B.
B. Acceptable Manufacturers:
1. Armstrong Cork Company.
2. The Celotex Corporation.
3. Conwed Corp.
4. Or Approved Equal.
2.02 GRID MATERIALS
A. Supplemental Support Material: Miscellaneous metal as specified in Section 05500.
B. Hanger Wire: Use galvanized soft-annealed No. 12 gauge mild steel wire.
1. Exposed Suspension Grid System: Roll-formed steel system conforming to
requirements of Intermediate-Duty (12 lb./L.F.) structural classification
ASTM C635. Steel grid components both chemically and mechanically cleaned,
electro-galvanized and zinc phosphate bonderized and enameled in white vinyl
prior to roll forming. Armstrong Direct Hung T.
2. Provide corners with radii at bullnose masonry where required.
C. Acceptable Manufacturers:
1. National Rolling Mills Co.
2. Chicago Metallic Corporation.
3. DONN Products, Inc.
4. Armstrong Cork Company.
5. Or Approved Equal.
6508.22 09510-2 ARRO
INDIAN HEAD –TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
PART 3 - EXECUTION
3.01 INSPECTION
A. Inspect areas to receive suspended acoustical ceilings to determine if they are
sufficiently closed and protected from the weather prior to start of ceiling work.
3.02 INSTALLATION
A. Install suspension system according to the Drawings and in accordance with
ASTM C636 and the following additional requirements.
1. Do not support suspended ceiling grid members from metal decks. Support ceiling
grid from structural steel and provide supplemental support material
(miscellaneous metal) where support wires fall between structural support.
2. Provide upper attachments when supporting suspended ceiling grid from concrete
structural elements.
3. Ensure borders of ceiling are even.
B. Thoroughly examine the Mechanical and Electrical Drawings and provide supplemental
support to allow for the installation of items of their Work being supported by ceiling
grid system. Provide supplemental support as necessary of Miscellaneous Metal as
specified in Section 05500.
1. Install air boot/diffusers in suspension system framing according to Mechanical
Drawings.
2. Finished ceiling shall accommodate sprinkler heads within the grid line at grid
intersection where indicated on Drawings.
3. Install acoustical panels according to manufacturer’s recommendations.
C. Following installation, clean soiled or discolored panels and exposed grid members.
Remove and replace all materials damaged or improperly installed.
END OF SECTION
6508.22 09510-3 ARRO
INDIAN HEAD –TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
SECTION 09900
PAINTING
PART 1 - GENERAL
1.01 SECTION INCLUDES
A. Surface Preparation
B. Paint Schedules
1.02 RELATED SECTIONS
A. Prefinishing or shop priming requirements as specified in various other Sections of these
Specifications.
1.03 REFERENCES
A. Steel Structures Painting Council Surface Preparation Specifications:
1. SSPC-SP1, Solvent Cleaning.
2. SSPC-SP6, Commercial Blast Cleaning.
3. SSPC-SP1O, Near-White Blast Cleaning.
1.04 SUBMITTALS
A. Samples: Submit sample color chips of standard colors and samples of any intermixes
required to match colors indicated in Finish Schedule on Drawings.
B. Operation and Maintenance Data: Upon approval of painting schedule, submit five
copies of a detailed maintenance manual including the following information:
1. Name, address and telephone number of manufacturer and local distributor.
2. Product name, number and technical data sheet for each type of paint.
3. Detailed procedures for routine maintenance and cleaning.
4. Detailed procedure for light repairs such as chips, scratches and staining.
C. Maintenance Materials: Turn over to Owner upon completion of the Project a full set of
pipe line identification stencils.
1.05 DELIVERY, STORAGE AND HANDLING
A. Deliver paint materials to job site in their original, sealed containers with labels intact
and legible at time of use.
B. Store approved materials at the job site in a suitable and designated area restricted to
6508.22 09900-1 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
storage of paint and coating materials and related equipment.
C. Use all means necessary to ensure safe storage and use of paint and coating materials
and the prompt and safe disposal of waste. Store paint and coating products protected
from weather when such products may be affected by freezing.
1.06 PROJECT CONDITIONS
A. Field and Shop Coat Compatibility: To ensure satisfactory paint and coating
performance, it is a Contract requirement that products applied in the shop and field be
mutually compatible.
1. Contractor shall require fabricators and equipment manufacturers to apply shop
coats that are compatible with field coats specified herein.
B. Painting Factory-Finished Items:
1. Equipment, such as motors, pumps and other such items, which when installed
become an integral part of a system and which may be delivered fully
factory-finished (that is, having finish coatings in addition to the prime coating)
shall not require repainting in the field unless:
a. Factory finish is unacceptable to the Engineer, that is, not having generic type
of paint or proper mil thickness to withstand corrosive atmosphere,
immersion, severe exposure; or,
b. Factory finish is damaged.
2. On factory-finished items requiring repainting, first sand existing paint to a dull
finish and then repaint in scheduled finish system for the installed location of such
factory-finished items.
3. Factory finished building structure components, both exterior and interior and fully
factory finished general construction products, appliances and panels shall not
require field painting.
C. Painting Caulking Compound: Do not apply paint over caulking compound until
integral solvents have been released from the compound.
D. Color:
1. All colors to be selected by owner after review of color charts provided by
Contractor.
2. Paint equipment not furnished with a factory finish, or not finished with an
acceptable factory finish, and piping and conduits the same color as adjacent
surface.
3. Final work shall match Engineer approved samples.
E. Placing Into Service: Do not place painted items into service until paints and coatings
are fully cured (dry-hard).
6508.22 09900-2 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
F. Environmental Requirements:
1. Adhere to manufacturer's data on air and surface temperature limits and relative
humidity during application and curing of coatings.
2. Do not spray apply paint when wind velocity is above 15 mph.
3. Schedule coating work to avoid dust and airborne contaminants.
4. Apply exterior finishes during daylight hours only.
5. When painting must be done in confined spaces, or because of unfavorable ambient
conditions, longer drying times will be necessary.
6. Provide supplementary ventilation such as fans and blowers in confined or enclosed
areas to carry off solvents during the evaporation stage.
G. Protection:
1. Protect paint materials before, during and after application, and protect other work
and materials with drop cloths or other impervious material.
2. Clean up or otherwise remedy without additional cost, damage by paint and
coatings to public or private property.
3. Provide in-place protection for fully factory finished general construction products,
appliances and panels.
4. Provide DUST-TIGHT in-place protective covering, or masking, on such items as
motors, controls, bearings and similar items which may be damaged internally by
the inclusion of blast cleaning debris and dust created by blast cleaning or abrasive
blasting operations.
PART 2 - PRODUCTS
2.01 ACCEPTABLE MANUFACTURERS
A. Paint materials listed in the Paint Schedule are products of Tnemec Company, Inc.
Equivalent products of the following manufacturers may be used subject to approval.
1. M.A. Bruder & Sons, Inc.
2. SCM Glidden Coating & Resins.
3. Sherwin Williams.
4. Or Approved Equal.
2.02 MATERIALS
A. Paint: As specified in the PAINT SCHEDULE included herein.
B. Thinners: Only those thinners recommended for that purpose by the manufacturer of
material to be thinned.
PART 3 - EXECUTION
3.01 APPLICATION
A. General:
6508.22 09900-3 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
1. Strictly follow paint manufacturer's label instructions for mixing, thinning, proper
spreading rate and drying time. In no case shall film thickness be less than
manufacturer's recommendations nor shall area coverage per gallon exceed
manufacturer's recommendations.
2. If material has thickened or must be diluted for application, the coating shall be
built up to the same film thickness achieved with undiluted material. Do not use
thinner to extend coverage of the paint.
3. Regardless of the surface, it shall be the painter's responsibility to achieve a
protective and decorative finish either by decreasing the coverage rate or by
applying additional coats of paint.
B. Method of Application:
1. Workmanship: In general, finished surface regardless of method of paint
application shall show no evidence of improper application according to accepted
trade practice. Do not use paint rollers having nap exceeding 3/8 inch.
2. Multi-coat Application:
a. Succeeding coats of paint shall show visual difference from Preceding coats.
Each coat shall have a uniform appearance and be tinted to the final coat. The
final coat shall present solid hiding with edges of paint adjoining other paint
or materials made clean and sharp without overlap. Wipe or otherwise render
undercoats dust free just prior to application of succeeding coatings.
b. Do not apply additional coats of paint until the film to be recoated is
sufficiently cured to receive the next coat.
c. If the time limit is exceeded for coatings that have a maximum recoat time,
consult paint manufacturer before proceeding with next coat.
C. Painting Exposed/Concealed Surfaces:
1. It is a requirement of this specification that all exposed interior and exterior
surfaces be painted except as specified herein and elsewhere in the Specifications.
2. In interior exposed areas of structures, paint mechanical and electrical systems,
including pipe, duct and conduit systems, except for full factory finished items as
defined previously.
3. In interior concealed areas no painting is required including mechanical and
electrical systems therein, except that pipe identification is required on piping in
concealed but accessible areas.
4. Paint above stated exposed mechanical and electrical systems the same color as
adjacent wall and/or ceiling color. Paint materials as scheduled herein.
5. Do not paint exposed aluminum surfaces.
3.02 CLEANING
A. Upon completion of work, remove paint and coating spots, oil and grease stains from
floors, walls, fixtures, hardware and equipment, leaving their finishes in a satisfactory
condition. Remove materials and debris from the site of work, and leave in a clean
condition so far as this work is concerned.
B. Keep site free from accumulation of paint containers, solvents, thinner and used
6508.22 09900-4 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
cleaning cloths and legally dispose of same off premises daily.
3.03 PAINT SCHEDULE
A. General: Engineer shall select painting system from the Schedule and the color for such
surfaces, items, apparatus, materials or equipment not specifically named herein, but
requiring paint according to the Engineer's direction in the field.
B. Concrete and Masonry Surfaces:
1. Interior non-submerged walls above grade-porous block: See Section 09940 for
Hard Glaze Epoxy Finish
2. Interior floors and walks - poured or precast concrete:
Dry Film-Mils
Surface Preparation: Acid Etch or Brush-off Blast Cleaning
First Coat: 2-part Epoxy
Second Coat: 2-part Epoxy
C. Metal Surfaces:
1. Interior - Nonsubmerged:
Dry Film-Mils
Surface Preparation: SSPC-SP6 Commercial Blast
Cleaning
Shop Primer 161-1211 TNEME-FASCURE 2.0 - 3.0
First Coat: 161-1211 TNEME-FASCURE 2.0 - 3.0
Second Coat: 161-Color TNEME-FASCURE 4.0 - 6.0
6.0 –9.0
6508.22 09900-5 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
2. Interior - Galvanized Steel:
Dry Film-Mils
Surface Preparation: SSPC-SP1 Solvent Cleaning
First Coat: 161 Color ENDUR-SHIELD III 3.0 - 5.0
Note: For immersion, specify 161-1211 as prime coat @ 3.0 - 5.0 DFT
3. Exterior-Galvanized Steel:
Dry Film-Mils
Surface Preparation: SSPC-SP1 Solvent Cleaning
First Coat: 161-Color TNEME-FASCURE * 3.0 - 5.0
Second Coat: 73-Color Endura-Shield III 2.5 - 3.5
5.5 - 8.5
D. Wood Surfaces:
1. Interior - Nonsubmerged, when color is required:
Dry Film-Mils
Surface Preparation: Surface shall be clean and dry
First Coat: 36-603 Undercoater 2.0 - 2.5
Second Coat: 23-Color Enduratone 2.0 - 2.5
Third Coat: 23-Color Enduratone 2.0 - 2.5
6.0 - 7.5
2. Exterior - Non-submerged, when color is required:
Dry Film-Mils
Surface Preparation: Surface shall be clean and dry
First Coat: 36-603 Undercoater 2.0 - 2.5
Second Coat: 2H-Color Hi-Build Tneme-Gloss 2.0 - 2.5
6508.22 09900-6 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
Dry Film-Mils
Third Coat: 2H-Color Hi-Build Tneme-Gloss 2.0 - 2.5
5.0 –10.5
E. Plaster and Gypsum Wallboard:
Dry Film-Mils
Surface Preparation: Surface shall be clean and dry
First Coat: 51-792 PVA Sealer 1.0 - 2.0
Second Coat: 113-Color Tneme-Coat 2.0 - 2.5
Third Coat: 113-Color Tneme-Coat 2.0 - 2.5
5.0 - 7.0
END OF SECTION
6508.22 09900-7 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
SECTION 09940
HARD GLAZE EPOXY WALL FINISH
PART 1 - GENERAL
1.01 SECTION INCLUDES
A. Interior walls of restrooms and utility room.
1.02 RELATED SECTIONS
A. Section 04200 - Masonry
1.03 REFERENCES
A. American Society for Testing and Materials (ASTM):
1. ASTM D1737; Elongation of Attached Organic Coatings with Cylindrical Mandrel
Apparatus; Stand. Test Method for.
2. ASTM D2486; Scrub Resistance of Interior Latex Flat Wall Paints, Test Method
for.
3. ASTM D3363; Film Hardness by Pencil Test, Test Method for.
4. ASTM D4060; Abrasion Resistance of Organic Coatings by the Taber Abraser,
Test Method for.
1.04 SYSTEM DESCRIPTION
A. Hard glazed wall finish shall provide “tile-like” surface, to provide durability, cleaning
qualities and resistance to staining and deterioration. Products shall conform to
ASTM D1737, ASTM D3363, ASTM D4060, ASTM D2486.
B. Color shall be as selected by the Engineer.
1.05 QUALITY ASSURANCE
A. Quality Control:
1. All materials shall be a compatible system produced by a single manufacturer.
2. Manufacturer shall guarantee finish surface to be free of “pinholes” and
imperfections. Repairs requiring additional coats shall be made at no additional
cost to Owner.
6508.22 09940-1 ARRO
INDIAN HEAD –TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
B. Sample Area:
1. Contractor shall prepare a sample area with hard glaze wall finish, where
designated.
2. One wall of sample area shall have minimum 2-ft. wide sections indicating each
of 3 coats. This wall shall be finished to final full covering when other hard glaze
wall finishing is completed.
3. Walls shall indicate the degree of finish surface attainable and shall be applied to a
substrate constructed on job site. A factory-applied sample is not acceptable.
4. Sample area shall be examined by the Owner and be approved before proceeding
with other hard glaze work.
5. Finish and workmanship for hard glaze work throughout Project shall meet or
exceed standards and workmanship of the established sample area.
1.06 SUBMITTALS
A. Manufacturer’s Literature:
1. Manufacturer’s latest publications of descriptive literature and product data. Detail
mixing, thinning and application instructions, minimum and maximum application
temperature, and curing and drying times between coats shall be furnished for
epoxy coatings. Instructions shall also include surface preparation requirements
and the number and types of coats required for each surface.
B. Samples:
1. Contractor shall furnish samples of filler coat, intermediate coat and color coat
which will be used on job. Also submit 2 labeled samples of each color, pattern
and texture of hard glaze to be used. The contents of sampled containers shall be
thoroughly mixed to ensure that the sample is representative. Samples shall be
identified by designated name, batch number, project contract number and name,
intended use, and quantity involved.
1.07 PRODUCT DELIVERY, STORAGE, AND LABELING
A. Product Delivery and Storage:
1. Deliver all materials in good condition. Store in dry place, off ground, and keep
from freezing and dry at all times.
2. Store all materials used on the job in a single place designated by the Owner or
Engineer. Such storage place shall be kept neat and clean, and all damage thereto
or its surroundings shall be made good. Soiled or used rags, waste and trash must
be removed from the building every night, and every precaution taken to avoid the
danger of fire.
B. Labeling:
1. Paints shall be in sealed containers that legibly show the designated name, formula
or specification number, batch number, color, quantity, date of manufacture,
6508.22 09940-2 ARRO
INDIAN HEAD –TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
manufacturer’s formulation number, manufacturer’s directions including any
warnings and special precautions, and name of manufacturer.
PART 2 - PRODUCTS
2.01 MATERIALS
A. Acceptable Paint Systems:
1. Pittsburgh Paints:
High Solids Polyester - Epoxy
1st Coat: Masonry -
Pitt-Glaze, High Performance Acrylic Latex Block
Filler 16-90
Wet Film, 25 mils; Dry Film, 12.5 mils
Gypsum Wallboard or Gypsum Plaster -
Pitt-Glaze, High Solids Polyester-Epoxy, Gloss Finish
Wet Film, 6 to 9 mils; Dry Film, 5 mils
Recoat Time, overnight
2nd Coat: Pitt-Glaze, High Solids Polyester-Epoxy, Gloss Finish
Wet Film, 6 to 9 mils; Dry Film, 5 mils
Recoat Time, overnight
3rd Coat Pitt-Glaze, high Solids Polyester-Epoxy, Gloss Finish
Wet Film, 6 to 9 mils; Dry Film, 5 mils
6508.22 09940-3 ARRO
INDIAN HEAD –TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
2. Sherwin Williams:
Two Component Polymide/Epoxy Resin
1st Coat: Masonry -
Heavy-duty Block Filler, B24W46
Wet Film, 34 mils; Dry Film, 20 mils
Gypsum Wallboard or Gypsum Plaster -
Tile-Clad II Epoxy Enamel, B62, Gloss Finish Color
Coat
Wet Film, 9 mils; Dry Film, 4 mils
Recoat Time, 6 hours minimum - 30 days maximum
2nd Coat: Tile-Clad II Epoxy Enamel, B62, Gloss Finish Color
Coat
Wet Film, 9 mils; Dry Film, 4 mils
Recoat Time, 6 hours minimum - 30 days maximum
3rd Coat Tile-Clad II Epoxy Enamel, B62/B60V70, Gloss Finish
Wet Film, 9 mils; Dry Film, 4 mils
3. Products manufactured by Glidden or MAB conforming to stated quality and
performance characteristics for purpose intended. Shall be gloss finish. Second
and third coats combined shall be 8 to 10 mils dry. Filler shall be suited for
moderate service, and as recommended by manufacturer for conditions intended.
PART 3 - EXECUTION
3.01 INSTALLATION
A. Preparation:
1. Before starting any work, surfaces to receive paint finished shall be examined
carefully for defects which might prevent satisfactory painting results. Work shall
not proceed until such damages are corrected. The commencing of work in a
specific area shall be construed as acceptance of the surfaces, and thereafter the
painting contractor shall be fully responsible for satisfactory work as required
herein.
2. New surfaces and previously painted surfaces shall be prepared in accordance with
coating manufacturer’s instructions. The Contractor shall forward a copy of
manufacturer’s preparation instructions to the Owner and the Engineer.
3. Surfaces to be covered with hard glaze system shall be properly conditioned to
receive finish before application begins. Alkali concentration on masonry must be
neutralized with muriatic acid, rinsed with clean hot water and allowed to dry.
Surfaces shall be clean, dry and free from any foreign material that would weaken
bond and imperfections that would detract from appearance or impair performance
of finished work.
6508.22 09940-4 ARRO
INDIAN HEAD –TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
4. Before application is started in any area, broom clean and remove excessive dust.
5. Adequate illumination shall be provided in all areas where painting operations are
in progress.
6. Coatings shall not be badly settled or thickened in the container, shall be readily
dispersed and shall have excellent application properties.
7. It shall be the responsibility of the Contractor to see that all mixed colors match the
color selection made by the Engineer prior to application of the coating.
B. Workmanship:
1. The Contractor shall protect his work at all times, and shall protect all adjacent
work and materials by suitable covering or other method during progress of his
work.
2. All areas in which hard glaze work is being performed shall be properly ventilated,
as recommended by manufacturer, to rid area of fumes. Area shall be closed off
from adjacent areas where work is not being performed.
3. Workman applying hard glazed system shall be factory-trained and approved by
manufacturer. He must have had previous experience with the particular system
being used. He shall use equipment, materials and methods in strict accordance
with manufacturer’s instructions.
4. Surfaces that have been cleaned, pretreated, and otherwise prepared for painting
shall be given a coat of the specified first coat as soon as practical after such
pretreatment has been completed, but prior to any deterioration of the prepared
surface.
5. Manufacturer’s instructions for application, curing and drying time between coats
will be followed.
6. When using fillers, surface voids shall be filled; however, surface irregularities
need not be completely filled. The filler shall not be applied over caulking
compound.
3.02 INSPECTION
A. Inspection:
1. Contractor shall conduct frequent checks with a wet film gauge during daily
operations to assure proper application.
2. The Owner may enlist the service of a representative of the paint manufacturer to
conduct field inspections during periods of application, and within the first year
following acceptance of work.
3.03 CLEAN UP
A. Clean Up:
1. After painting operations begin in a given area, broom cleaning will not be
allowed; cleaning shall then be done only with commercial vacuum cleaning
equipment.
6508.22 09940-5 ARRO
INDIAN HEAD –TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
2. Cloths, cotton waste and other debris that might constitute a fire hazard shall be
placed in closed metal containers and removed at the end of each day. Upon
completion of the work, staging and containers shall be removed from the site.
Paint and other deposits on adjacent surfaces shall be removed and the entire job
left clean and acceptable.
3. Upon completion of work, Contractor shall provide the Owner detailed
maintenance instructions as printed by the hard glaze finish manufacturer.
END OF SECTION
6508.22 09940-6 ARRO
INDIAN HEAD –TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
DIVISION 10 - SPECIALTIES
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
SECTION 10160
TOILET PARTITIONS AND ACCESSORIES
PART 1 - GENERAL
1.01 SECTION INCLUDES
A. Toilet partitions for restrooms
B. Accessories
1.02 RELATED SECTIONS
A. Metal Fabrications: Section 05500.
1.03 REFERENCES
A. Federal Specifications:
1. Fed. Spec. A-A-1922A, Shield, Expansion; Nail, Expansion and Nail Drive Screw
(Devices, Anchoring, Masonry).
1.04 SUBMITTALS
A. Shop Drawings and Product Data:
1. Submit manufacturer’s published details modified to suit design conditions. Such
details shall include anchoring details.
2. Submit partition manufacturer’s product descriptive literature and color chips for
partition style and color compliance.
1.05 DELIVERY, STORAGE AND HANDLING
A. Adequately protect finished products from damage during shipping and storage at the
Project site. Protect installed products until acceptance by the Engineer.
B. Package each toilet accessory item in such a way as to adequately protect it from
damage in shipping and storage at the Project site. Identify each item on protective
cover.
6508.22 10160-1 ARRO
INDIAN HEAD –TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
PART 2 - PRODUCTS
2.01 TOILET PARTITIONS
A. Laminated Plastic Toilet Partitions:
1. Flush style, one-inch minimum finished thickness (pilasters 1¼-inches thick min.)
constructed of seamless high-pressure plastic laminate 1/16-inch thick minimum,
NEMA LD-1 or equal, over a solid particleboard core. Laminates applied to both
sides and edges of core with the highest quality urea-resin adhesive under
continuous pressure until cured.
2. Door hardware cast in one-piece non-ferrous castings and chrome plated.
Attachment hardware of heavy, heat-treated, etched and anodized extruded
aluminum shapes or one-piece non-ferrous, chrome-plated castings. Mount
hardware, except coat hook and bumper, thru-bolted with theft-proof design
fasteners. Stiles fitted with 3-inches high minimum, stainless steel plinth. Colors
as indicated on the Drawings.
3. Acceptable Manufacturers:
a. Global Steel Products Corp., EMBASSY, Overhead-Braced.
b. Sanymetal Products Co., Inc., ACADEMY Sanyplastic.
c. Robart Partitions Co., Div., Overhead-Braced Type ARW.
d. General Partitions Mfg. Corp., 40 Series Plastic Laminated.
e. Or Approved Equal.
B. Prepare toilet partitions to receive partition-mounted Toilet Accessories, if any. Provide
integral bracing for surface-mounted accessories, if any.
1. Miscellaneous Metal Supports: Concealed support steel for toilet partition
installations in shapes as indicated and as specified in Section 05500.
C. Installation Hardware: Provide concealed anchoring hardware of types indicated in
partition manufacturer’s approved shop drawings but of the following minimum
requirements.
1. Screw Type Expansion Anchors: Fed. Spec. A-A-1922A.
2. Exposed Fasteners: Tamperproof, one-way head screws and bolts.
3. Fiber composition and wood plugs not permitted.
2.02 TOILET ACCESSORIES
A. General Requirements: Provide the products of one manufacturer for toilet accessories
and not a collection of products of several manufacturers.
1. Product names and catalog numbers shown on the Drawings are for indication of
design intent.
2. Installation hardware factory-furnished with the toilet accessories.
3. Toilet accessory construction of solid type 304, or equal, stainless steel in satin
finish. Exposed edges of hemmed or rolled fabrication.
6508.22 10160-2 ARRO
INDIAN HEAD –TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
4. Provide individual Toilet Accessories as scheduled on the Drawings.
5. Acceptable Manufacturers:
a. Bobrick Washroom Equipment, Inc.
b. Accessory Specialties, Inc.
c. Bradley Washfountain Co.
d. Charles Parker.
e. American Dispenser Co.
f. Or Approved Equal.
PART 3 - EXECUTION
3.01 TOILET PARTITION INSTALLATION
A. Install materials accurately in designated locations with all parts securely fastened and
with each member plumb and in true alignment. Check and ascertain that each piece of
hardware is in satisfactory operating condition. Execute installation in accordance with
directions, recommendations and specifications of the manufacturer.
3.02 INSTALLING TOILET ACCESSORIES
A. Install toilet accessories to mounting heights as indicated on Drawings or as directed by
the Engineer.
B. Type surface to which accessories are to be fastened or recessed into shall determine the
method of installation of various types of accessories and the types of fasteners to be
used.
1. In all cases, the entire installation shall conform to the best recommendations,
directions and installation specifications of the manufacturer for the specific
construction to or in which accessories are to be installed.
2. Install each item plumb, level, secure and in proper relation to floor, partitions,
plumbing fixtures, etc.
3.03 CLEANING AND TOUCH-UP
A. At completion of installation, clean partitions and compartments. Use materials and
methods that will not cause damage to Work or to adjacent materials.
B. Touch-Up those spots in the finish that have been damaged and which can be
job-repaired to satisfactory condition, subject to approval of the Engineer; otherwise
replace them with new sections.
6508.22 10160-3 ARRO
INDIAN HEAD –TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
C. At completion of project, clean each toilet accessory completely taking care to avoid
damaging adjacent materials. Replace any units that are damaged beyond state where
they may be acceptably repaired in place.
END OF SECTION
6508.22 10160-4 ARRO
INDIAN HEAD –TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
SECTION 10200
LOUVERS AND VENTS
PART 1 - GENERAL
1.01 SECTION INCLUDES
A Louvers and vents.
1.02 RELATED SECTIONS
A. Unit Masonry: Section 04200.
B. Metal Fabrications: Section 05500.
C. Joint Sealers Section 07900.
D. Division 16 - Electrical.
1.03 REFERENCES
A. Air Moving and Conditioning Association, Inc. Standards for Air Performance and
Water Penetration.
B. Federal Specifications:
1. Fed. Spec. TT-P-645B, Primer, Paint, Zinc-Chromate, Alkyd Type.
1.04 SUBMITTALS
A. Shop Drawings and Product Data: Submit manufacturer’s published details modified as
required to suit design conditions. Submit manufacturer’s descriptive literature and
specifications covering the Products specified herein. Descriptive literature shall include
installation information.
1.05 DELIVERY, STORAGE AND HANDLING
A. Deliver, store, and handle Products in such a manner that they will not be damaged and
to prevent deterioration to Products from the elements.
B. Store Products at the site in a protected area to prevent damage to them by construction
activities.
6508.22 10200-1 ARRO
INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
1.06 SEQUENCING/SCHEDULING
A. Electrical Interface:
1. Install or mount, as work of this Section, such electrical components or apparatus
as provided by Product manufacturer’s specified under this Section.
2. Power wiring, including final connections of such to electrical components or
apparatus of Products specified herein, not performed as work of this Section but
as work of Division 16 – Electrical.
PART 2 - PRODUCTS
2.01 MATERIALS
A. Fixed Louver: Extruded aluminum 6063-T5 alloy construction, with 12 gauge
minimum, blades and frame. Frame depth of 4-inches, of box frame and jamb design
with perimeter caulking slot and rain sill to extend over wall opening.
1. Multiple sections shall incorporate vertical exposed mullions arranged in the
pattern indicated on the Drawings.
2. Provide back braces where required in continuous blade construction.
3. Provide bird screen of 1/2-inch hemmed aluminum mesh mounted on backside of
louver.
4. Acceptable Manufacturers:
a. Dowco Corp.; Series DBE.
b. Air Balance, Inc.
c. Construction Specialties, Inc.
d. Greenheck
e. Or Approved Equal.
B. Installation Hardware: Anchors and Fasteners for setting louvers as specified in
Section 05500, except that such fasteners provided in a corrosion resistant finish.
C. Gun-Grade Sealant: Moisture cured, one component, polyurethane base, non-sag
elastomeric sealant compound meeting requirements of ASTM C920, Type II Class A.
1. Acceptable Manufacturers:
a. Sika Corporation; Sikaflex - la.
b. Sonneborn Building Products Division; Sonolastic NP-1.
c. Tremco, Inc.; Spectrem 900 SL
d. Or Approved Equal.
PART 3 - EXECUTION
3.01 INSTALLATION
A. Clean those surfaces coming in contact with the louver or gasket material. Use only
those cleaning materials which will not harm louver or framing finishes.
6508.22 10200-2 ARRO
INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
B. Install extruded aluminum louvers in prepared openings with corrosion-resistant
fasteners. Set louvers in a manner that will eliminate electrolytic action in accordance
with the following.
1. Aluminum to Steel: Coat aluminum surfaces to be placed in contact with steel with
zinc chromate primer, Fed. Spec. TT-P-645B, or set louver in gasket material on
its entire perimeter.
2. Aluminum to Wood, Concrete or Masonry: Coat aluminum surfaces coming in
contact with wood, concrete or masonry with a heavy coat of an alkali-resistant
bituminous paint meeting requirements of U. S. Military Specification
MIL-P-6883.
3. Seal louver perimeter with gun-grade sealant to provide watertight installation.
Sealant as specified in Section 07900.
END OF SECTION
6508.22 10200-3 ARRO
INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
SECTION 10400
IDENTIFYING DEVICES
PART 1 - GENERAL
1.01 SECTION INCLUDES
A. Identification Signs, Nameplates and Safety Signs.
1.02 RELATED SECTIONS
A. Metal Fabrications: Section 05500.
1.03 SUBMITTALS
A. Shop Drawings and Product Data:
1. Submit manufacturer’s fabrication details with proposed lettering for Engineer’s
approval prior to fabrication.
1.04 DELIVERY, STORAGE AND HANDLING
A. Adequately protect signs and mountings from damage during shipping and storage at the
Project site. Protect installed products until acceptance by the Engineer.
PART 2 - PRODUCTS
2.01 MATERIALS
A. Safety Signs: Provide safety signs constructed of butyrate plastic backed with 20 gauge
galvanized steel, and furnished with a 1/4-inch ID eyelet in each corner.
1. Provide signs as detailed on the Drawings and mounted at locations indicated in the
sign schedule on the Drawings or as directed by the Engineer.
2. Acceptable Manufacturers
a. Emed Co., Inc.
b. Seton.
c. Brimar Industries, Inc.
d. Or Equal.
6508.22 10400-1 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
PART 3 - EXECUTION
3.01 INSTALLATION
A. Install signs level, plumb, square and correctly positioned on the structure with respect to
the visible lines of the structure.
B. Anchors and Fasteners: As specified in Section 05500.
C. Emergency Exit Sign Installations: Install directly over doorways for those doors as
indicated on the Drawings. Center signs over doorway to clear door frame and
associated closer hardware.
3.02 CLEANING AND TOUCH-UP
A. At completion of installations, clean surfaces free of handling marks and all other forms
of dirt. Use materials and methods that will not cause damage to the installed material
surfaces or to adjacent structure surfaces.
END OF SECTION
6508.22 10400-2 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
SECTION 10520
FIRE EXTINGUISHERS
PART 1 - GENERAL
1.01 SECTION INCLUDES
A. Fire extinguisher for restroom facility (1 required).
1.02 RELATED SECTIONS
A. Rough Carpentry: Section 06100.
1.03 QUALITY ASSURANCE
A. Reference Standards:
1. National Fire Protection Association: NFPA 10 Standard for Portable Fire
Extinguishers.
2. Underwriters’ Laboratories (UL) Listings and Approvals on Portable Fire
Extinguishers, UL-299, Dry Chemical.
1.04 SUBMITTALS
A. Product Data: Submit manufacturer’s descriptive literature and specifications covering
the products specified.
1. Include in Product Data submission such evidence of portable fire extinguisher
acceptance as Listed products in accordance with NFPA 10.
2. Include manufacturer’s printed installation instructions covering the products
specified.
PART 2 - PRODUCTS
2.01 MATERIALS
A. Dry-Chemical Fire Extinguishers: UL Listed multi-purpose dry-chemical, stored
pressure, of the UL rating specified herein, and in accordance with prevailing fire codes:
1. UL Rating: Tri-Class, 4-A:60-B:C, minimum. ((10 lb. size))
2. Red enamel cylinder with chrome plated valve and large pressure indicating gauge,
flexible hose, and corrosion resistant material discharge horn.
6508.22 10520-1 ARRO
TOWN OF INDIAN HEAD –TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
3. Provide manufacturer’s standard mounting hardware as suited to extinguisher
installation requirements.
4. Acceptable Manufacturers:
a. J. L. Industries; Cosmic E Series.
b. Larsen’s Manufacturing Company.
c. Ansul Company.
d. Or Approved Equal.
PART 3 - EXECUTION
3.01 INSTALLATION
A. Prior to installation store fire extinguishers at the site in a protected area to prevent
damage by construction activities.
B. Unpack, mount in place where indicated and provide permanent mountings as required
for installation.
1. Locate extinguishers and mount within rooms indicated in accordance with
NFPA 10.
2. Appropriate mounting hardware as specified in Section 06100.
-. Provide support brackets with bolted anchors and install brackets plumb and level
to (columns) (and) (walls) where indicated on the Drawings.
C. After extinguisher installation, provide protective covering until construction work is
completed. Remove and dispose of protective covering just prior to acceptance.
END OF SECTION
6508.22 10520-2 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
DIVISION 12 - FURNISHINGS
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
SECTION 12300
MANUFACTURED CABINETS AND CASEWORK
PART 1 - GENERAL
1.01 SECTION INCLUDES
A. Factory-finished countertop components including tops, ledges and back and end
splashes and all standard equipment, accessories and fixtures, matching filler panels or
installation of items scribed to the wall where required with suitable hardwood scribing
strips furnished by the manufacturer of the casework.
1.02 RELATED SECTIONS
A. Division 15 - Mechanical.
B. Division 16 - Electrical.
C. Rough Carpentry: Section 06100.
1.03 QUALITY ASSURANCE
A. Manufacturer Qualifications:
1. Furniture and items specified herein establishes the quality, type and quantity
required.
1.04 REFERENCES
A. American National Standards Institute (ANSI):
1. ANSI 135.4; Basic Hardboard.
B. American Society of Testing and Materials (ASTM):
1. ASTM D1037; Standard Methods of Evaluating the Properties of Wood-Base Fiber
and Particle Board Materials.
C. National Electrical Manufacturer’s Association (NEMA):
1. NEMA LD3; High Pressure Decorative Laminates.
6508.22 12300-1 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
1.05 SUBMITTALS
a. Shop Drawings and Product Data:
1. Submit manufacturer’s prepared shop drawings detailing location of cabinet and
unit dimensions versus field checked installation area dimensions.
2. Submit manufacturer’s product descriptive literature and color chips for laminate
countertop.
3. Submit detailed installation instructions and anchoring details.
1.06 DELIVERY, STORAGE AND HANDLING
A. Arrange for proper delivery, store and handle cabinets and casework items in a manner
to prevent damage and deterioration from the elements.
B. Remove damaged or deteriorated cabinets and casework items from the job site and
replace with new.
C. Do not store or install casework in building until concrete, masonry and plaster work is
dry.
1.07 JOB CONDITIONS
A. The Contractor shall provide and install all items, articles and materials in accordance
with operations, methods listed, noted, or scheduled on the Drawings, or as specified
herein.
B. Furnish all framing or reinforcements required for walls, floors and ceilings to
adequately support equipment and/or all grounds required for proper anchoring of
equipment.
C. Contract Interface:
1. Plumbing, electrical fixtures and ventilating devices which are built-in or mounted
in casework are part of this Section, unless otherwise noted, shall be furnished,
installed, connected to mechanical and electrical work of other Contracts, made
ready to operate for purposes intended. These shall include fittings, faucets,
strainers, tailpieces, traps, connecting piping, stops on all supply lines, electrical
switches, conduit, fixtures, fluorescent tubes, light bulbs, vent blowers and
connection ductwork to stubbed in ducts and any other appurtenances which are an
integral part of the cabinets.
6508.22 12300-2 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
PART 2 - PRODUCTS
2.01 MATERIALS
A. High Performance Particle Board Core:
1. Particleboard to be of 47 lb. density, and balanced construction with moisture
content not to exceed 8%. All particleboards shall meet or exceed the
requirements for its type and classification under ASTM D1037.
2. Particle Board shall meet the following Performance Requirements. Submit
compliance data from the manufacturer prior to fabrication.
Screw Holding, Face 371 lbs.
Modulus of Rupture 2,400 psi.
Modulus of Elasticity 450,000 psi.
Internal Bond 90 psi.
Surface Hardness 900 lbs.
B. Hardboard: Hardboard shall meet or exceed ANSI 135.4. Tempered hardboard 1/4-inch
thick - smooth both sides.
C. Countertops:
1. High-pressure plastic laminate bonded to particleboard core. Thickness as
indicated on Drawings. Underside to be properly balanced with heavy gauge
backing sheet. Edges to be high pressure plastic laminate to match horizontal
surface color. Furnish countertops for counter type cabinets fixed in a line.
2. Plastic laminate applied directly to the wall shall be properly secured to wall and
the joint sealed with stainless steel molding to ensure against water leakage. Top
and sides of backsplashes shall be trimmed with plastic edging.
3. Backsplashes and sidesplashes shall be properly secured to the countertop deck
with wood dowels or metal screws. A bead of mold resistant sealant shall be
placed between the adjoining members to ensure against water leakage.
a. Sidesplashes shall be provided where a counter abuts a wall or taller cabinet
unless otherwise indicated.
PART 3 - EXECUTION
3.01 INSTALLATION
A. Install all sinks, fixtures, accessories, switches and outlets, and connect to mechanical
and electrical stubs. Properly place sight divided cabinets and screens in correct
locations as shown on drawings. All connections - plumbing, heating and electrical -
shall be by equipment supplier.
6508.22 12300-3 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
3.02 REPAIR AND ADJUSTMENT
A. Repair surfaces damaged by installation of work in this Section to prior condition as
approved.
B. After final connections have been made to mechanical and electrical systems, the
contractor shall carefully examine and adjust all operating parts of equipment, (and
instruct proper personnel in correct operation and maintenance of equipment).
C. Repair of surfaces damaged by the work of Divisions 15 and 16 will be the responsibility
of those performing that work.
3.03 CLEANING
A. Upon completion of installations clean installed laminate surfaces. Use materials and
methods that will not cause damage to finishes or to adjacent surfaces.
B. As soon as work is completed in any one room or area, remove off-site any debris
resulting from work under this Section; leave area “Broom Clean”.
END OF SECTION
6508.22 12300-4 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
DIVISION 15 - MECHANICAL
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
SECTION 15010
BASIC MECHANICAL REQUIREMENTS
PART 1 - GENERAL
1.01 SECTION INCLUDES
A. Basic mechanical requirements specifically applicable to Division 15 Sections.
1.02 RELATED SECTIONS
A. Submittals: Section 01300.
B. Contract Closeout: Section 01700.
C. Painting: Section 09900.
D. Division 15 Sections as Included.
E. Division 16 - Electrical.
1.03 QUALITY ASSURANCE
A. Requirements of Regulatory Agencies: Comply with construction requirements of
State, County, and such other local political subdivision specifications as may exceed
the requirements of the codes, standards, and approving bodies referenced herein.
1. Comply with requirements of the National Fire Protection Association (NFPA)
Standards referenced in the various Specifications Sections, and as directly
appropriate to the work and workmanship.
2. Comply with requirements for both the Underwriters’ Laboratories, Inc. (UL)
Listings, Labels, and Approvals and the National Electrical Manufacturer’s
Associations (NEMA) Stamps or Seals as applicable to electrical equipment or
apparatus forming parts of the Mechanical Equipment.
B. Certificates and Permits: Upon completion of work, and prior to final payment, furnish
formal certification of final inspections to the Engineer from authorities having
jurisdiction and secure required permits, if any, from such authorities. Additionally,
prepare detailed diagrams and drawings which may be required by those authorities
having jurisdiction.
C. Source Quality Control: Products used throughout these specifications, and as indicated
on the drawings, are those of companies having established reputations in the
manufacture of the particular materials, equipment, or apparatus specified. Such
6508.22 15010-1 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
products may be of their own make, or products of others for which they assume full
responsibility when used in said outfits (which are not manufactured completely by
them), and with replacement parts available.
D. Workmen’s Qualifications: In acceptance or rejection of completed work, no allowance
will be made for lack of skill on the part of the Contractor’s forces performing such
work.
1. Provide certified pipe welder(s) capable of welding in accordance with
ANSI B31.1, Power Piping (Pressure Piping). Show proof of certification when
requested by the Engineer.
1.04 REFERENCES
A. Steel Structures Painting Council (SSPC) Surface Preparation Specifications:
1. SSPC-SP2, Hand Tool Cleaning.
2. SSPC-SP6, Commercial Blast Cleaning.
3. SSPC-SP8, Pickling.
B. Paint Application Specifications; SSPC-PA1, Shop, Field and Maintenance Painting.
1.05 SUBMITTALS
A. Shop Drawings and Product Data: Submit in compliance with Section 01300.
1. Submit shop drawings certified for construction by Product manufacturers, and
approved by the Contractor, which include location of electrical connections;
wiring diagrams; anchor bolt layout; details indicating construction and materials
of construction; diameter of shafting; dimensions; rated horsepower of motors;
gear and bearing ratings; service factors and weights of principal parts and the
completely assembled item.
B. Operation and Maintenance Manuals: Submit to the Engineer for review and approval,
manuals prepared by the manufacturer/supplier in compliance with Section 01700. The
submission and approval of each set of manuals will be considered to be an integral part
of furnishing and installation of the respective equipment or system. The Contractor
will be informed if manuals submitted are incomplete and will supply the information
necessary for completion. Each manual shall be supplied with a Table of Contents and
subjected matter should be indexed categorically.
1. Include the following elements in each manual:
a. Installation and operating instructions.
b. Start-up procedures.
c. Recommended and alternative operating procedures.
d. Schedule of preventive maintenance requirements.
e. Schedule of recommended spare parts to be stocked, complete with part
number, inventory quantity, and ordering information.
6508.22 15010-2 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
f. Detailed maintenance procedures.
g. Schedule of lubrication requirements.
h. Corrected and approved control and wiring diagrams.
i. Data sheet listing pertinent equipment or system information, as well as the
addresses and telephone numbers of the nearest sales and service
representatives.
j. Manufacturer’s Warranty Certificate.
2. Operation and Maintenance Manuals are required for each of the following items
of equipment or systems:
a. Water heater.
b. Electric water cooler.
c. Flush valves.
d. Heaters, Cabinet and Unit.
e. Fans, Centrifugal and Propeller.
f. Automatic Temperature Control System.
1.06 DELIVERY, STORAGE, AND HANDLING
A. Deliver materials and equipment to the Project site in a clean condition with openings
plugged or capped (or otherwise sealed by packaging) both during shipping and during
temporary storage.
B. Store materials and equipment, both on and off-site, in accordance with manufacturer’s
written instructions.
1.07 SEQUENCING/SCHEDULING
A. Interferences:
1. The Drawings are generally diagrammatic and indicative of the work. The
Contractor is responsible for modifying the work with offsets, bends or other
fittings to avoid minor interferences and structural obstruction. Perform such
modifications at no increase in Contract Price.
2. Perform work for Mechanical Systems at such times and in a manner as to not
delay or interfere with other operations of Work in the Project.
3. Coordinate Mechanical work locations with other operations of work, Prior to
making Mechanical installations, especially in congested areas, such as
mechanical equipment rooms and above hung ceilings (if any).
4. Contractor will not be entitled to additional compensation for relocation of
Mechanical Products, due to interferences, which result from Contractor’s lack of
coordination with other contractors, subcontractors, or other parties.
6508.22 15010-3 ARRO
TOWN OF INDIAN HEAD –TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
B. Electrical Interface:
1. Install as work of Division 15 - Mechanical, such electrical components as
furnished by Product manufacturers specified under the various Sections of this
Division 15.
2. Power and, if applicable, control and signal wiring, including final connections of
such to electrical components or apparatus of Products specified shall be
performed as work of Division 16 - Electrical.
1.08 WARRANTIES
A. Assigned Warranties: Manufacturer’s warranties on material and equipment (including
internal components) exceeding the Correction Period as stated in the Conditions of the
Contract, shall be assigned directly to the Owner.
1. Such assigned warranties shall begin not earlier than the date of Substantial
Completion and so dated.
2. Submit warranties along with submission of Shop Drawings and Product Data.
PART 2 - PRODUCTS
2.01 MATERIALS
A. General: Submittals for Substitutions or “Equal” Products or methods may be
acceptable after award of the Contact in accordance with the General Conditions, and
subject to Engineer’s approval.
B. Products:
1. Products and requirements are as specified in the various Sections under Division
15 – Mechanical or on the plans.
2. Provide Products of new and recent manufacture.
3. For each category of materials and equipment (Products), provide Products of the
same manufacturer and type.
PART 3 - EXECUTION
3.01 INSTALLATIONS
A. General Requirements: Installation requirements are as specified in the various
Specification Sections under Division 15 - Mechanical.
1. Perform required mechanical interconnection of the various mechanical Products
regardless of where such Products are specified throughout Division 15.
Contractor shall be responsible for the operational completeness of mechanical
systems.
6508.22 15010-4 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
2. Install Products level, unless indicated or directed otherwise.
B. Field Painting: As specified in Section 09900.
3.02 FIELD QUALITY CONTROL
A. General: Perform cleaning, testing, adjusting and balancing operations as specified in
the various Specification Sections under Division 15 - Mechanical.
1. Provide instruments, testing equipment, and such other required materials to
perform the Field Quality Control Work.
END OF SECTION
6508.22 15010-5 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
SECTION 15050
BASIC MATERIALS AND METHODS
PART 1 - GENERAL
1.01 SECTION INCLUDES
A. Basic mechanical materials and methods
1.02 RELATED SECTIONS
A. Basic Mechanical Requirements: Section 15010.
B. Supports, Anchors, and Seals: Section 15090.
1.03 REFERENCE
A. American National Standards Institute (ANSI):
1. ANSI A21.4, Cement-Mortar Lining for Cast-Iron and Ductile-Iron Pipe and
Fittings for Water.
2. ANSI A21.10, Gray-Iron and Ductile-Iron Fittings, 2 through 48 in, for Water and
Other Liquids.
3. ANSI A21.11, Rubber Gasket Joints for Cast Iron and Ductile Pressure Pipe and
Fittings.
4. ANSI A21.50, Thickness Design of Ductile-Iron Pipe.
5. ANSI A21.51, Ductile-Iron Pipe, Centrifugally Cast, in Metal Molds or
Sand-Lined Molds for Water or Other Liquids.
6. ANSI B1.1, Unified Inch Screw Threads.
7. ANSI B2.1, Pipe Threads.
8. ANSI B16.1, Cast Iron Pipe Flanges and Flanged Fittings, Class 25, 125, 250 and
800.
9. ANSI B16.3, Malleable-Iron Screwed Fittings, 150 and 300 lb.
10. ANSI B16.4, Cast-Iron Screwed Fittings, 125 and 250 lb.
11. ANSI B16.5, Steel Pipe Flanges, Flanged Valves, and Fittings.
12. ANSI B16.9, Factory-Made Wrought Steel Buttwelding Fittings.
13. ANSI B16.10, Face-to-Face and End-to-End Dimensions of Ferrous Valves.
14. ANSI B16.11, Fittings, Flanges, and Valves.
15. ANSI B16.12, Cast-Iron Threaded Drainage Fittings.
16. ANSI B16.18, Cast Bronze Solder Joint Pressure Fittings.
17. ANSI B16.21, Nonmetallic Gaskets for Pipe Flanges.
18. ANSI B16.22, Wrought Copper and Bronze Solder-Joint Pressure Fittings.
19. ANSI B16.23, Cast Bronze Solder Joint Drainage Fittings -- DWV.
20. ANSI B16.26, Cast Copper Alloy Fittings for Flared Copper Tubes.
6508.22 15050-1 ARRO
INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
21. ANSI B16.29, Wrought Copper and Wrought Copper Alloy Solder-Joint
Drainage Fittings.
22. ANSI B18.2.1, Square and Hex Bolts and Screws, Including Askew Head Bolts,
Hex Cap Screws, and Lag Screws.
23. ANSI B18.2.2, Square and Hex Nuts.
24. ANSI B31.1, Power Piping (Pressure Piping).
B. American Society for Testing and Materials (ASTM):
1. ASTM A47, Malleable Iron Castings, Spec. for.
2. ASTM A53, Pipe, Steel, Black and Hot-Dipped, Zinc-Coated Welded and
Seamless, Spec. for.
3. ASTM A74, Cast Iron Soil Pipe and Fittings, Spec. for.
4. ASTM A106, Seamless Carbon Steel Pipe for High-Temperature Service, Spec.
for.
5. ASTM A126, Gray Iron Castings for Valves, Flanges and Pipe Fittings, Spec. for.
6. ASTM A183, Heat-Treated Carbon Steel Track Bolts and Carbon Steel Nuts,
Spec. for.
7. ASTM A153, Zinc Coating (Hot-Dip) on Iron and Steel Hardware, Spec. for.
8. ASTM A234, Piping Fittings of Wrought Carbon Steel and Alloy Steel for
Moderate and Elevated Temperatures, Spec. for.
9. ASTM A518, Corrosion-Resistant High Silicon Cast Iron, Spec. for.
10. ASTM A536, Ductile Iron Castings, Spec. for.
11. ASTM A714, High-Strength Low-Alloy Welded and Seamless Steel Pipe, Spec.
for.
12. ASTM B6, Zinc (Slab Zinc), Spec. for.
13. ASTM B32, Solder Metal, Spec. for.
14. ASTM B61, Steam or Valve Bronze Castings, Spec. for.
15. ASTM B62, Composition Bronze or Ounce Metal Castings, Spec. for.
16. ASTM B88, Seamless Copper Water Tube, Spec. for.
17. ASTM B306, Copper Drainage Tube (DWV), Spec. for.
18. ASTM B371, Copper-Zinc-Silicon Alloy Rod, Spec. for.
19. ASTM C76, Reinforced Concrete Culvert, Storm Drain, and Sewer Pipe, Spec.
for.
20. ASTM C564, Rubber Gaskets for Cast Iron Soil Pipe and Fittings, Spec. for.
21. ASTM D1785, Poly (Vinyl Chloride) (PVC) Plastic Pipe Schedules 40, 80 and
120, Spec. for.
22. ASTM D2000, Rubber Products in Automotive Applications, Classification
System for.
23. ASTM D2310, Machine-Made Reinforced Thermosetting Resin Pipe,
Classification for.
24. ASTM D2466, Poly (Vinyl Chloride) (PVC) Plastic Pipe Fittings, Schedule 40,
Spec. for.
25. ASTM D2564, Solvent Cements for Poly (Vinyl Chloride) (PVC) Plastic Pipe and
Fittings, Spec. for.
26. ASTM D2665, Poly (Vinyl Chloride) (PVC) Plastic Drain, Waste and Vent Pipe
and Fittings, Spec. for.
6508.22 15050-2 ARRO
INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
27. ASTM D3034, Type PSM Poly (Vinyl Chloride) (PVC) Sewer Pipe and Fittings,
Spec. for.
28. ASTM D3212, Joints for Drain and Sewer Plastic Pipes Using Flexible
Elastomeric Seals, Spec. for.
29. ASTM F437, Threaded Chlorinated Poly (Vinyl Chloride) (CPVC) Plastic Pipe
Fittings, Schedule 80, Spec. for.
30. ASTM F439, Socket Type Chlorinated Poly (Vinyl Chloride) (CPVC) Plastic
Pipe Fittings, Schedule 80, Spec. for.
31. ASTM F441, Chlorinated Poly (Vinyl Chloride) (CPVC) Plastic Pipe, Schedules
40 and 80, Spec. for.
32. ASTM F477, Elastomeric Seals (Gaskets) for Joining Plastic Pipe, Spec. for.
C. American Water Works Association, AWWA C302 Standard for Reinforced Concrete
Water Pipe - Noncylinder Type Not Prestressed.
E. Manufacturer’s Standardization Society of the Valve and Fittings Industry, MSS-SP-70
and MSS-SP-71.
1.04 SUBMITTALS
A. Product Submissions: As specified in Section 15010.
PART 2 - PRODUCTS
2.01 PIPE AND PIPE FITTINGS
A. Type L Copper: Hard-drawn, ASTM B88; joined with:
1. Wrought copper or bronze fittings, ANSI B16.22 or cast bronze fittings, ANSI
B16.18; (mixtures of fitting materials not permitted) solder sealed with 95/5
Tin-Antimony, ASTM B32.
2. Cast copper alloy flare-type fittings, ANSI B16.26.
B. Type K Copper: Soft-temper, ASTM B88; joined with:
1. Cast copper alloy flare-type fittings, ANSI B16.26.
2. Wrought copper or bronze fittings, ANSI B16.22 or cast bronze fittings, ANSI
B16.18; (mixtures of fitting materials not permitted) solder sealed with 95/5
Tin-Antimony, ASTM B32.
C. Type DWV Copper: Hard-temper, ASTM B306; joined with:
1. Wrought copper fittings, ANSI B16.29 or cast bronze fittings, ANSI B16.23;
(mixtures of fitting materials not permitted) solder sealed with 95/5
Tin-Antimony, ASTM B32.
D. Galvanized Steel: Schedule 40, ASTM A53 and B 6 for zinc-coating; joined with:
1. Galvanized cast iron screwed fittings, ASTM A153 and ANSI B16.4.
2. Galvanized cast iron drainage screwed fittings, ASTM A153 and ANSI B16.12.
6508.22 15050-3 ARRO
INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
E. Polyvinyl Chloride (PVC) (Up to 6-inch inclusive) Underground: Schedule 40, Type I
PVC soil and waste pipe, ASTM D1785, and fittings, ASTM D2466, with solvent
cemented joints, ASTM D2564.
F. Polyvinyl Chloride (PVC) (Over 6-inch) Underground:
1. Pipe: Type PSM SDR-35, ASTM D3034.
2. Fittings and Adaptors: ASTM D3034, joint design for elastomeric gasket.
3. Joints: Push-on elastomeric ring gasket, ASTM D3212; and ASTM F477 for
material specification.
G. Polyvinyl Chloride (PVC), Aboveground: Drain, waste and vent pipe and fittings,
ASTM D2665, with solvent cemented joints, ASTM D2564.
2.02 PIPING SPECIALTIES
A. Mechanical Joint Retainer Gland: Ductile cast iron gland with cup-point, square head,
heat treated parkerized steel set screws, up to six inch size 350 psi rated and over six
inch size 250 psi rated.
B. Flexible Connectors: Connector construction of corrugated bronze or stainless inner
liner covered by wire braid of same alloy. End connections threaded on 2½-inch and
smaller diameters, and flanged on three-inch and larger diameters. Connector length at
2½ times nominal pipe diameter on piping smaller than 10 inches diameter, and 2 times
on piping 10 inches and larger.
1. Acceptable Manufacturers:
a. Keflex Incorporated, Type KFC.
b. The Metaflex Company, Type ML.
c. Anaconda Metal Hose Division, Anaconda American Brass Company,
Series PCM.
d. Or Approved Equal.
C. Non-ferrous Metal Unions: Sweat type cast bronze, ANSI B16.18, or wrought copper,
ANSI B16.22; full size of pipe at point of installation.
D. Ferrous Metal Unions: Threaded type, 250 pound W.0.G. rated malleable iron,
ASTM A47 Grade 32510 casting; full size of pipe at point of installation.
E. Dielectric (Insulated) Unions: Threaded type, 150 pound W.0.G. rated malleable iron,
ASTM A47 Grade 32510 casting, with vulcanized fiber insulating sleeve and neoprene
gasket; full size of pipe at point of installation.
F. Bronze Strainers: Threaded type, 250 pound non-shock and 406°F. temperature rated,
with stainless steel screen; use for applications two inches and under.
1. Acceptable Manufacturers:
a. Sarco Company.
b. Crane Company, No. 9881/2 and No. 9891/2.
c. ITT Hoffman Specialty.
6508.22 15050-4 ARRO
INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
d. Or Approved Equal.
G. Ferrous Metal Strainers: Threaded for flanged type, 125 pound steam and 350°F.
temperature rated, with stainless steel or monel screen and bolted screen chamber cap.
1. Acceptable Manufacturers:
a. Sarco Company, Inc., Type AF-125.
b. Crane Company, No. 9881/2 and No. 9891/2.
c. ITT Hoffman Specialty.
d. Or Approved Equal.
2.03 BASIC VALVES
A. General Material Requirements: Provide valves of the same type, by the same
manufacturer, except where specifically specified otherwise herein. Each valve shall
bear maker’s trademark, flow arrow and reference symbol indicating conditions for
which it is guaranteed. Pressure-temperature ratings of valves shall be not less than the
design criteria applicable to all components of the system. Use solder type valves in
copper piping and threaded-end, ANSI B2.1, or flange-end, ANSI B16.1 Class 125
Series, for all other applications under 2½ inches.
1. Bronze Valves: Provide 125 psi or 150 psi rated valves with Pressure containing
parts of material of minimum physical properties per ASTM B62. Metallic seated
bronze globe, angle, check and gate valves with 200 psi or 300 psi ratings shall
have pressure containing parts of material of minimum physical properties per
ASTM B61.
2. Iron Body Valves: Provide valves conforming to ANSI B16.10 for face-to-face
and end-to-end dimensions. Design, workmanship, materials and testing shall
conform to MSS-SP-70 and MSS-SP-71 with pressure containing parts material
also conforming to ASTM A126 Grade B.
3. Valve Stems: Silicon brass, ASTM B371, Alloy A, or other material equally
resistant to dezincification.
4. Acceptable Manufacturers for Gate and Globe Valves:
a. The Lunkenheimer Company.
b. Jenkins Bros. Corporation.
c. Crane Company.
d. ITT Grinnell.
e. Or Approved Equal.
B. Gate and Globe Valves: Provide valves designed for repacking under Pressure when
fully opened, and equipped with packing suitable for the intended service. When the
valve is fully opened, the back seal shall protect both packing and stem threads from the
fluid. Provide valves having pressure/temperature ratings equal to the design criteria
applicable to all components of the system.
1. Use tapered solid wedge type gate valves having rising stem on valves two inches
and smaller, with solder, threaded, socket, or flanged end to suit service. Use
OS&Y gate valves with flanged ends for application 2½ inches and larger.
6508.22 15050-5 ARRO
INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
2. Use disc suited for intended service on composition disc globe valves and
hardened stainless steel disc and seat ring on metal seated globe valves. Globe
valves two inches and smaller shall have threaded, flanged, solder end or socket
end, to suit service. Use globe valves with flanged end for applications 2½ inches
and larger.
C. Ball Valves: Bolted body construction, non-lubricated valve of full-port, in-line
repairable design.
1. Construction: Valve body and threaded or solder ends of bronze construction.
Ball and stem of 316 stainless steel. Seats and Packing of R.T.F.E. Bolt and
lever assemblies of plated steel construction. Lever handle grip area vinyl
covered.
2. Testing: Each valve tested 100% in accordance with MSS SP-72.
PART 3 - EXECUTION
3.01 PREPARATION
A. Field Measurement: The Drawings are in general indicative of the Work, with symbols
and notations for clarity. However, the Drawings are not an exact representation of all
conditions involved, therefore, layout Piping to suit actual field measurements. No
extra compensation will be made for Work due to difference between indicated and
actual dimensions.
3.02 INSTALLATION
A. General: Run piping concealed in those areas of the structures having hung ceilings and
exposed in all other areas, except where indicated otherwise on the Drawings.
1. Run piping parallel or perpendicular to the lines of the building structure. Keep
piping a sufficient distance from other work to permit clearance of not less than
one inch between the piping or insulated piping and adjacent work.
2. Install piping as close as possible to walls, overhead construction, columns, and
similar to facilitate insulating work and removal of piping later.
3. Clean piping prior to installation and following installation to prepare for
painting. Keep open ends of piping and pipe attachment openings on equipment
capped or plugged until actual connections.
B. Interferences: Run piping to compensate for structural interferences, to preserve
headroom, and not to interfere with openings, passageways and equipment. Do not
install piping with joints and fittings over motors, switchboards, panels, or similar
electrical apparatus.
6508.22 15050-6 ARRO
INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
3.03 CONSTRUCTION METHODS
A. General:
1. Construct pipe runs from full lengths of pipe using short sections only for runs of
less than full pipe length. Make changes in directions of pipe runs with fittings
only.
2. Install unions and flanges in accessible locations and whether indicated or not,
install union adjacent to all equipment and wherever removal of equipment for
repair or replacement is required. Use dielectric unions at points of connection of
copper tubing and piping to ferrous metal piping or equipment.
3. Use reducing fittings where reduction in pipe sizes is necessary. Bushings will not
be accepted.
4. Cut pipe accurately to measurements established in the field and assemble in
place without springing, forcing, excessive cutting or weakening of the structure.
B. Underground Piping:
1. Keep trenches dewatered until pipe joints have been made and concrete bedding
and blocking, if any, have hardened. Under no circumstances lay pipe in water or
on subgrade containing frost.
2. Rest each section of pipe on pipe bedding for the full length of its barrel, with
recesses excavated for pipe bells so joints can easily be made. Backfill recesses
with bedding material immediately following pipe joining operations.
3. Take up and relay pipe that is not laid true to required alignment or grade or has
its joints disturbed after laying. No deviations from the required line and grade
permitted, except with approval of the Engineer.
3.04 PIPE JOINING
A. General: Exercise care when making pipe joints and make joints in accordance with the
pipe material manufacturer’s recommendations and the following requirements.
1. In each instance of pipe joining, those portions of pipes involved must be
absolutely clean just prior to assembly.
2. If a joint is extremely difficult to assemble or sealing is not affected, disassemble
the joint and correct the difficulty if possible. Remake the joint using new
materials when necessary.
B. Copper Tubing and Pipe Joints: Cut tubing and piping ends square, deburr, and ream to
size of original bore.
1. Solder: Prior to sweating, clean pipe ends and fitting surfaces involved in the
joint, to bright metal without marring surfaces. Finished joints shall show no
evidence of hard-temper due to over-heating, no evidence of improper solder
draw, and excess solder must be removed.
2. Flared: Cut tubing and piping ends square, deburr and ream to size of original
bore. Finished joints shall show evenness of flaring and proper seating of joining
parts.
6508.22 15050-7 ARRO
INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
C. Ferrous Metal Piping Joints: Cut pipe ends square, deburr and ream to size of original
bore.
1. Threaded: Cut threads to standard gage depth and length and clean threads free of
oil and cuttings. Use Teflon (DUPONT) formulation joint tape or Teflon joint
paste to aid in joint lubrication and sealing in joining operation.
2. Welded: Responsibility for quality of welding, competency of welding operators
and their ability to make sound welds rests with the Contractor. Technique of
welding employed, appearance and quality of welds made and methods used in
correcting defective work shall conform with requirements of ANSI B31.1 and its
Supplements.
3. Flanged: Face accurately, install gaskets and draw up square and tight to ensure
full gasket flow and seal.
D. Solvent-Weld (PVC Pipe) Joints: Use chemical solvent welding components as
recommended by the pipe material manufacturer and comply with said pipe
manufacturer’s cleaning and joining instructions.
3.05 PIPE LINE SUPPORT
A. Installation: Place and support piping runs as specified in Section 15090.
END OF SECTION
6508.22 15050-8 ARRO
INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
SECTION 15090
SUPPORTS, ANCHORS, AND SEALS
PART 1 - GENERAL
1.01 SECTION INCLUDES
A. Supports, anchors, and seals
1.02 RELATED SECTIONS
A. Division 3 - Concrete.
B. Metal Fabrications: Section 05500.
C. Basic Mechanical Requirements: Section 15010.
1.03 QUALITY ASSURANCE
A. Design Criteria:
1. Pipe Support Systems: Provide adequate pipe support systems designed in
accordance with recognized engineering practices using, where possible, standard,
commercially accepted pipe hangers and accessories.
a. Pipe hangers and supports shall conform to the latest requirements of
American National Standards Institute Standard ANSI B31.1. Code for
Pressure Piping, Manufacturers Standardization Society Standard Practice
MSS SP-58 Pipe Hangers and Supports - Materials, Design and
Manufacturer and MSS SP-69 Pipe Hangers and Supports - Selection and
Application.
2. Duct Support Systems: Provide adequate duct suspension and/or support systems
designed in accordance with SMACNA HVAC standards except for restrictions
as specified herein.
3. Equipment Support Systems: Provide adequate equipment suspension and/or
supports designed in accordance with recognized engineering practices using,
where possible, standard commercially accepted products and systems.
a. Design and size equipment suspension and/or supports based on installation
instruction or information as obtained from equipment manufacturer.
B. Anchor and Fastener Design Requirements:
1. Sizing: Provide anchors and fasteners for Product installations of such diameters
and lengths as recommended by the particular Product manufacturer involved.
a. When sizing recommendations are not obtainable, size fasteners in the
largest diameter that will pass through bolt holes as provided in the Products
for anchoring and fastening purposes.
6508.22 15090-1 ARRO
INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
2. Safety Factor: Determine the lengths of anchors and fasteners based on substrate
materials at points of anchor installation and to provide a safety factor of four to
one.
C. Materials Compatibility: Where pipe supports contact bare piping or in-line devices,
provide supports of compatible material so that neither will have a deteriorating action
on the other.
1.04 REFERENCES
A. American National Standards Institute (ANSI): ANSI B31.1, Code for Pressure Piping.
1. American Society For Testing and Materials (ASTM):
2. ASTM A36; Structural Steel, Spec. for.
3. ASTM A47; Ferritic Malleable Iron Castings, Spec. for.
4. ASTM A48; Gray Iron Castings, Spec. for.
5. ASTM A120; Pipe, Steel, Black and Hot-Dipped Zinc-Coated (Galvanized)
Welded and Seamless, for Ordinary Uses, Spec. for.
6. ASTM A153; Zinc Coating (Hot-Dip) on Iron and Steel Hardware, Spec. for.
7. ASTM A167; Stainless and Heat-Resisting Chromium-Nickel Steel Plate, Sheet
and Strip, Spec. for.
8. ASTM A181; Forgings, Carbon Steel, for General-Purpose Piping, Spec. for.
9. ASTM A307; Carbon Steel Externally Threaded Standard Fasteners, Spec. for.
10. ASTM A320; Alloy Steel Bolting Materials for Low-Temperature Service, Spec.
for.
11. ASTM A563; Carbon and Alloy Steel Nuts, Spec. for.
12. ASTM A576; Steel Bars, Carbon, Hot-Wrought, Special Quality, Spec. for.
13. ASTM B454; Mechanically Deposited Coatings of Cadmium and Zinc on Ferrous
Metals, Spec. for.
14. ASTM C665; Insulation Blankets, Thermal (Mineral Fiber, For Ambient
Temperatures).
B. American Welding Society (AWS): AWS D1.1 Structural Welding Code.
C. Federal Specifications (Fed. Spec.):
1. Fed. Spec. A-A-1922A, Shield, Expansion; Nail, Expansion and Nail Drive Screw
(Devices, Anchoring, Masonry) Group II (Shield, Expansion Bolt Anchor) Type 4
(Wedge Expansion Anchors) Class 1 (One-Piece Steel Expander with Cone Taper
Integral with Stud).
D. Manufacturer’s Standardization Society (MSS) of the Valve and Fittings Industry:
1. MSS SP-58, Pipe Hangers and Supports - Materials, Design and Manufacturer.
2. MSS SP-69, Pipe Hangers and Supports - Selection and Application.
E. Sheet Metal and Air-Conditioning Contractors’ National Association, Inc. (SMACNA):
1. SMACNA HVAC Duct Construction Standards, Metal And Flexible.
6508.22 15090-2 ARRO
INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
1.05 SUBMITTALS
A. Product Data: As specified in Section 15010; submittals required for the following
items:
1. Pipe Supports.
2. Sleeve and Seal Materials.
3. Duct Supports.
B. Shop Drawings: As specified in Section 15010; shop drawings required for the
following:
1. Submit completely dimensioned shop drawings of piping layouts; indicating the
type, design and location of pipe hangers, supports, anchors and guides required
for piping installation.
2. Submit completely dimensioned shop drawings of duct layouts indicating
hanger/support locations.
PART 2 - PRODUCTS
2.01 MATERIALS
A. Concrete Inserts: For upper attachments in cast-in-place concrete structures provide
cast-in inserts made of carbon steel ASTM A36 or malleable iron ASTM A47.
1. Where attached loads exceed the recommended load for an individual insert,
provide multiple inserts with a trapeze-type connecting member below the
concrete.
B. Beam Clamps: For upper attachments on structural steel provide beam clamps of
carbon steel ASTM A36 or forged steel ASTM A181.
1. Holes drilled in structural steel for hanger support rods will not be permitted.
2. Provide clamps with hardened steel cup-point set screw and lock-nut for
anchoring in place.
3. Base clamp size selection on required load being supported.
-C Connectors to Wood Structural Members: For upper attachment in wood structural
members provide side beam connectors of malleable iron or carbon steel construction.
1. Provide connectors of angle knee bracket for lag screw anchoring, or malleable
iron connector for pair of drive screw anchoring.
2. Fasteners: Lag screws shall conform to Fed. Spec. FF-B-561D.
3. Base connector and screw size selections or required load being supported.
D. Hanger Rods: Carbon steel conforming to ASTM A576.
1. Diameter of rods for piping system support shall conform to ANSI B31.1.
a. In no case shall hanger rods less than 3/8-inch diameter be provided for
support of pipe sizes two inches and smaller, or less than 1/2-inch diameter
rod for supporting pipe sizes 2½-inch and larger.
2. Size hanger rods for duct work systems in accordance with SMACNA standards.
6508.22 15090-3 ARRO
INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
3. Size hanger rods for mechanical equipment support based on installation
instructions as obtained from equipment manufacturers.
a. All-thread hanger rods not permitted for equipment supports.
2.02 PIPE SUPPORTS
A. Base Supports:
1. Metal (for non-submerged pipes): Where base supports are indicated for valves,
pipe, and fittings, provide saddles supported by adjustable pipe columns.
Constructed of galvanized steel, with U-bolt and nuts, and baseplate.
2. Concrete (for submerged pipes): Cast-in-place concrete with stainless steel,
straps, and/or bolts and nuts.
B. Riser Clamps: Support vertical runs of piping at each floor, or closer where required,
with carbon steel clamps ASTM A36 bolted around pipes and attached to the building
construction.
1. Provide copper plated clamps for copper tubing support.
2. Provide two bolt type clamps designed for installation under insulation on
insulated pipe runs.
C. Hangers: Fabricated of malleable iron ASTM A47, or carbon steel ASTM A36.
1. Provide coated or plated hangers to isolate steel hangers from dissimilar metal
tube or pipe.
2. Hangers for pipe sizes 2½ inches or larger shall incorporate a means of vertical
adjustment after erection while supporting the load.
3. Adjustable Band Hangers: Carbon steel band type hangers designed for
suspension on hanger rods with provisions for vertical adjustments and locking in
position using supporting and locknuts. Provide band hangers to support
non-insulated pipe.
4. Clevis Hangers for Insulated Pipe: Carbon steel yoke and U-strap type hanger
designed for installation under insulation with cross bolt outside the insulation.
5. UL and NFPA Approved Hangers: Clevis type, adjustable swivel type, and/or
adjustable flat-iron type. Where adjustable flat iron hangers cannot be used,
hangers may be universal channel type or C-type with retaining strap.
D. Brackets: Where piping is run adjacent to walls or steel columns, Provide welded steel
brackets ASTM A36 and pre-punched with a minimum of two fastener holes.
E. Racks: Multiple pipe racks or trapeze hangers fabricated from steel ASTM A36, and
designed to suit conditions at points of installation.
1. Keep pipes in their relative positions to each other by the use of clamps or clips.
Lines subject to thermal expansion must be free to slide or roll.
F. Pipe Anchors, Guides and Sliding Supports (For Heating System Piping):
1. Anchors fabricated from carbon steel, ASTM A36.
2. Guides fabricated from carbon steel, ASTM A36, or cast iron, ASTM A48.
3. Sliding supports fabricated of cast iron, ASTM A48.
6508.22 15090-4 ARRO
INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
4. Provide anchors, guides and supports where necessary to keep pipes in accurate
alignment, to direct the expansion movement and to prevent buckling and
swaying and undue strain.
2.03 DUCT SUPPORTS
A. Materials: Hanging and/or support system materials shall conform to the requirements
of referenced SMACNA Standards specified under other Sections of the Specifications,
but subject to the following limitations.
1. Wire hangers in lieu of rod or strap hangers not acceptable.
2. Provide hanging and/or support system in materials and finishes matching that of
the ductwork.
2.04 ANCHORS AND FASTENERS
A. As specified in Section 05500.
2.05 SLEEVES AND SEALS
A. Pipe Sleeve Sizing:
1. Uninsulated Pipes: Size sleeves two pipe sizes larger than pipe passing through,
or size sleeves for a minimum of 1/2-inch clearance between inside of sleeve and
outside diameter of pipe passing through.
2. Insulated Pipes: Size sleeves for a minimum of 1/2-inch clearance between inside
of sleeve and outside diameter of insulation covering on pipes passing through.
3. Sleeve Length:
a. Wall and Partitions: Equal to total thickness of wall or partitions and
terminated flush with finished surfaces.
b. Floors: Equal to total depth of floor construction including finish and
extending a minimum of one inch above floor level.
B. Sleeve Materials:
1. Pipe Sleeves In Cast-In-Place Concrete:
a. Fabricate from Schedule 10 black steel pipe and weld a 2-inch wide
intermediate anchoring flange of 3/16-inch steel midway on pipe sleeve; or
provide sleeve product similar to Fig. 204 as manufactured by F & S
Manufacturing Corporation, E.J. Prescott; Henry Company; or approved
equal.
b. High impact thermoplastic sleeves formed with anchor and waterstop collar,
and provided with nailer end caps to position sleeve exactly in form.
Provide sleeve similar or equal to Century-Line sleeve as manufactured by
Thunderline Corporation.
2. Pipe Sleeves In Masonry: No. 18 gage galvanized sheet steel.
6508.22 15090-5 ARRO
INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
C. Wall Pipe: Cast iron construction with an integral intermediate anchoring flange
midway on the pipe exterior.
1. Wall pipe ends of type indicated on Drawings, and where not indicated, pipe end
shall match that of adjoining pipe.
2. Provide wall pipes similar to those manufactured by American Cast Iron Pipe Co.,
U. S. Pipe and Foundry Co., McWane Ductile, or approved equal.
D. Seals and Plates:
1. Wall Seal: Hydrostatic seal designed to seal opening between pipes and a through
structure opening. Provide Link-Seal by Thunderline Corp., GPT, Flexicraft, or
approved equal, with stainless steel nuts and bolts. Caulking, mastic sealants,
lead/oakum; not equal.
2. Wall and Ceiling Plates: Cast metal with integral set screw or similar anchoring
screw. Hinged or split design plates may be provided.
3. Escutcheons: Provide chrome plated stamped steel hinged plates to close pipe
penetrations through structure interior in finished areas. Provide plates designed
to lock on pipes using set screws.
PART 3 - EXECUTION
3.01 PIPING SYSTEM SUPPORT INSTALLATION
A. General:
1. Install pipe supports and anchors to hold piping straight and true to line both
vertically and horizontally.
2. Where thermal movement in piping systems will occur, provide piping system
supports capable of supporting the line in all operating conditions.
3. The supporting force at each hanger shall prevent excessive stress in the pipe and
connected equipment.
4. Install pipe supports anchored directly to or suspended directly from structural
supports. Where pipe hangers fall between structural members provide auxiliary
steel supports to carry pipe hangers.
5. Do not support piping from metal decks.
B. Spacing of Hangers and Supports:
1. General:
a. Space hangers and supports as stated herein and in ANSI B31.1, MSS SP 58
and SP 69, and as indicated on the Drawings.
b. Give special consideration to spacing of hangers and supports where
components such as fittings and valves impose concentrated loads.
C. Plastic Piping: Provide hangers at locations and spacing limitations in accordance with
pipe manufacturer’s installation specifications.
D. Pipe Sleeve Installation:
1. Set pipe sleeves in concrete formwork, walls, partitions, floors and ceilings as
construction work progresses. Provide sleeve for each pipe individually.
6508.22 15090-6 ARRO
INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
2. Provide and set sleeves to avoid delaying construction activities of other trades.
Perform any additional cutting and boring required due to improperly located or
omitted openings without cost to the Owner and perform such additional work
under the observation of the Engineer.
E. Seals and Plates Installation:
1. Following pipe installation through sleeves in exterior walls below grade, install
Wall Seal to render installation leak free. Wall Seal not required in interior walls,
partitions, floor and ceilings.
2. Install wall seal as close to outside surface of wall as possible to provide a
watertight seal below grade. Apply a coating of coal tar paint or other type
approved coating on bolt heads and other metal parts on below grade wall seals
prior to backfilling.
3. Install wall and ceiling plates to close pipe sleeve openings.
4. Install escutcheons to close pipe sleeve openings in finished areas.
3.02 DUCT SUPPORT INSTALLATION
A. General: Install duct hanging and/or support systems in conformance with
requirements of referenced SMACNA Standards specified under other Sections of the
Specifications, but subject to the following limitations.
1. Use upper attachments and anchors and fasteners as specified herein. Do not
support ductwork from metal decks.
3.03 ANCHOR AND FASTENER INSTALLATIONS
A. As specified in Section 05500.
END OF SECTION
6508.22 15090-7 ARRO
INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
SECTION 15400
PLUMBING
PART 1 - GENERAL
1.01 SECTION INCLUDES
A. Installation and materials.
1.02 RELATED SECTIONS
A. Trenching, Backfilling, and Compacting: Section 02221.
B. Basic Mechanical Requirements: Section 15010.
C. Basic Materials and Methods: Section 15050.
D. Supports, Anchors, and Seals: Section 15090.
1.03 REFERENCES
A. American Society of Mechanical Engineers (ASME) Pressure Vessel Code and
Interpretations as applies to specified Products.
B. American Society of Sanitary Engineering, Stds. ASSE 1011, 1012 & 1013.
C. International Building Code, Plumbing, 2006 or latest edition adopted by the Town.
D. Plumbing and Drainage Institute: Standard P.D.I. - WH201.
E. Underwriters’ Laboratories (UL) Listings and Approvals on specified Products.
F. National Electric Manufacturer’s Association (NEMA) Standards as apply to specified
Products.
G. National Fire Protection Association (NFPA).
1.04 SUBMITTALS
A. Product Submission: As specified in Section 15010.
6508.22 15400-1 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
B. Operations and Maintenance Data:
1. Manufacturer’s of plumbing fixtures, trim and fittings shall include complete
instructions with their products giving directions for replacing renewable parts of
their products as well as instructions for cleaning the finished surfaces of such
products.
2. Include above stated data as part of the Submittals of Section 15010.
1.05 JOB CONDITIONS
A. Protection:
1. Use non-marring tools when making up plated piping to prevent scarring or other
surface damage.
2. Provide adequate protective covering on fixtures and trim to prevent damage or
defacement. Maintain such protection until completed work is accepted by the
Engineer.
3. Store fixtures and trim at the site and elsewhere, protected from the elements.
4. Protect motors and electrical apparatus from construction debris and water during
plumbing work in the vicinity of such equipment. Such protection may be
afforded by using impervious membrane material sheets or other impervious
materials of Contractor’s choosing.
PART 2 - PRODUCTS
2.01 MATERIALS
A. Basic Piping Materials: Pipe and pipe fitting materials, and associated installation
materials as specified in Section 15050.
1. Piping system material types for this Section are as abbreviated herein with
material particulars specified in Section 15050.
B. Pipe Supports, Anchors and Seals: Materials as specified in Section 15090.
C. Contractor Option: Several types of pipe materials are listed herein at the Contractor’s
option for the various piping systems. However, mixing of pipe materials in a system
will not be permitted; except where specified otherwise herein or where directed
otherwise by the Engineer. No piping option permitted where only one pipe material is
specified for a piping system.
D. Domestic Hot and Cold Potable Water Piping:
1. Type L Copper with SOLDER joints, aboveground.
2. Type K Copper with FLARED joints, underground.
E. Soil or Waste and Vent Piping:
1. Plastic (PVC) with SOLVENT WELDED joints, aboveground.
6508.22 15400-2 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
F. Rainwater Conductor Piping:
1. Plastic (PVC) with SOLVENT WELDED joints, aboveground.
2.02 PIPING SPECIALTIES
A. Flexible Connectors: As specified in Section 15050.
1. Ferrous Metal and Non-Ferrous Metal Unions and Strainers: As specified in
Section 15050.
B. Backflow Preventer (1/2- & 3/4-inch): Sweat type bronze body, double check valve
pressure design with intermediate atmospheric vent. Suitable for continuous pressure
use, approved under ASSE Standard 1012.
C. Backflow Preventer (1-inch and larger): Threaded type bronze construction, stainless
steel internal parts and flange bolts, and tight-sealing rubber check valve assemblies.
Suitable for supply to 175 psi and 140°F. temperature.
1. Complete assembly includes supply strainer, gate valves before and after the
device and device composed of a pressure differential relief valve between two
positive seating check valves and an intermediate atmospheric vent.
2. Backflow preventer approved under ASSE Standard 1013.
3. Acceptable Manufacturers:
a. Watts Regulator Company, No. 909.
b. Hersey-Products, Inc.
c. ITT Lawler.
d. Or Approved Equal.
D. Water Hammer Arrestors: Threaded type of corrosion-resistant construction and
pneumatic displacement, elastomer bellows design.
1. Arrestors tested, certified and sized per P.D.I. Standard WH 201.
2. Acceptable Manufacturers:
a. Josam Manufacturing Co., No. 1485-1 to 1485-6.
b. Zurn Industries, Inc., No. Z-1700-100 to 400.
c. Wade.
d. Smith.
e. Or Approved Equal.
2.03 VALVES
A. Basic Valves: As specified in Section 15050.
B. Balancing Valve: Solid Bronze construction for applications 1¼-inch and under, and
iron body bronze plug for applications 1-inch and above. Valve rated 200 psi water
non-shock, 240°F maximum water temperature. Balance position set and locked by
allen screw.
1. Acceptable Manufacturers:
a. Sarco Company, Inc.; Type V Sarcoflow.
6508.22 15400-3 ARRO
TOWN OF INDIAN HEAD –TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
b. Crane Company.
c. ITT Hoffman Specialty.
d. DeZurik.
e. Or Approved Equal.
C. Hose Bibbs (Interior): Solid bronze construction, angle pattern, renewable washer,
sweat copper to standard 3/4-inch hose end outlet.
D. Non-Freeze Hose Bibbs: Provide non-freeze design wall hydrant for standard 3/4-inch
hose end outlet and of length suited to wall thickness.
1. Hydrant of cast bronze construction with removable T handle operator, brass
operating mechanism, adjustable locknut, removable nylon seat, 3/4-inch sweat
inlet, polished brass face, and supplied with vacuum breaker, ASSE Standard
1011.
2. Acceptable Manufacturers:
a. Josam Manufacturing Co., No. 71200(-53) (-81).
b. Zurn Industries, Inc., No. Z-1315-5.
c. Wade.
d. Smith.
e. Or Approved Equal.
2.04 TRAPS, DRAINS, AND CLEANOUTS
A. Pipe Traps: Provide traps in piping systems, as required by local prevailing code,
composed of fittings of materials as specified for the particular system piping.
1. This requirement does not apply to plumbing fixtures where the trap is specified
in the plumbing fixture description.
B. Drains:
1. Materials: Gray iron castings produced to PDI standards and having a 25,000 psi
minimum tensile strength. Castings finished in manufacturer’s standard rust
inhibitive coating except for plated surfaces.
2. Acceptable Manufacturers:
a. Josam Manufacturing Co.
b. Zurn Industries, Inc.
c. Wade Division-Tyler Pipe.
d. Jay R. Smith Manufacturing Co.
e. Or Approved Equal.
C. Drain Accessories: Provide the following for those drains as indicated on Drawings.
1. Backwater Valve: Similar to Josam No. 11000 Series with extension to finished
floor.
2. Trap Seal Primer Valve: Similar to Josam No. 1465 Series.
6508.22 15400-4 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
D. Cleanouts, Cover Plates and Caps: Designed for inside caulked connection with lead
sealed brass plugs, adjustable housing, and heavy scoriated brass cover.
1. Floor Cleanout (CONCRETE); Josam Series No. 56040-2.
2. Wall Cleanout Cover Plate; Josam Series No. 58600-18.
3. Cleanout Ferrule; Josam Series No. 58500.
4. Cleanout Tee; Josam Series No. 58790-18.
5. Wall Cleanout and Access Cover; Josam Series No. 58710-18.
6. Or Approved Equal.
2.05 PLUMBING FIXTURES
A. General: Provide glazed finish fixtures free from discoloration, chips, flaws, craze and
absorbency. Vitreous ware shall be fired first quality china, thoroughly fused and
homogeneous in color, close grained and free from pores.
B. Fittings and Trim:
1. Provide fixture fittings and trim of chrome plated brass, and unless specified
otherwise, of the same manufacturer as the fixtures, including P-traps, supply
pipes, supply stops, union connections and escutcheons.
2. Use fixture trim of such design that working threads, seats and discs are easily
renewed without taking the body of the fitting apparatus from the fixture or supply
lines.
C. Fixture Supports and Carriers: Provide fixture supports and carriers designed to
accommodate the fixture types as specified and as suited to the particular installation
requirements of such fixtures.
1. Acceptable Manufacturers:
a. Josam Manufacturing Co.
b. Zurn Industries, Inc.
c. Wade Division-Tyler Pipe.
d. Jay R. Smith Manufacturing Co.
e. Or Approved Equal.
D. Fixture Color: White except where indicated otherwise in the Fixture Schedule.
E. The following gallons per flush or flow in gallons per minute are required water use
baseline for project:
Water Closets Flushometer Valve 1.28 gallons per flush
Urinals Flushometer Valve 0.125 gallons per flush
Lavatory Faucet 0.5 gallons per minute at 60 psi
Provide automatic (electronic hand free) capacitive-sensor-operated controls for all
fixtures. Sensor module shall be water-conserving, vandal resistant, capacitive-sensing
with omni-directional sensing zone, timing turn-off delay and stationary object
automatic timed cutoff.
6508.22 15400-5 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
Fixtures shall be water conservation type, in accordance with ASHRAE 189.1 Section
6.3.2.1 (Plumbing Fixtures and Fittings). Fixtures for use by the physically handicapped
shall be in accordance with ADA/ANSI A117.1.
F. Fixture Schedule:
P-1 Water Closet:
a. Bowl: Water-saver, wall-mounted, elongated bowl, vitreous china, siphon
jet action, back outlet with flushometer. Acceptable Manufacturers:
1) American Standard; 2477.016 AFWALL (3.5) ((OR)) 2257.103
AFWALL (1.6).
2) Kohler; K-4430-ET KINGSTON.
3) Eljer; 111-0405 AUBURN.
4) Or Approved Equal.
b. Seat: White, hydraulically compressed plastic, elongated open front less
cover, self-sustaining, with stainless steel hinge posts and concealed check.
Acceptable Manufacturers:
1) Church; 5320.536.
2) Kohler; K-4666-SC.
3) Olsonite; 95CC-SS.
4) Or Approved Equal.
c. Flush Valves: Chrome plated, metal oscillating non-hold-open handle,
1-inch I.P.S. screwdriver angle stop, with protective cap, adjustable tailpiece,
vacuum breaker flush connection and spud coupling for 1½-inch top spud,
wall and spud flanges and override button. Acceptable Manufacturers:
1) Sloan; Royal 110-3.
2) Delany; Flushboy 402-35VB.
3) Watrous; W-100-PYV.
4) Or Approved Equal.
P-2 Water Closet (For Physically Handicapped):
a. Bowl: Water-saver, wall-mounted, vitreous china, siphon jet action,
elongated bowl, 1½-inch top spud. Acceptable Manufacturers:
1) American Standard; 2477.016 AFWALL.
2) Kohler; K-4430-ET KINGSTON.
3) Eljer; 111-0405 AUBURN.
4) Or Approved Equal.
b. Seat: White, hydraulically compressed plastic, elongated open front less
cover, self-sustaining, with stainless steel hinge posts and concealed check;
Acceptable Manufacturers:
1) Church; 5320.536.
2) Kohler; K-4666-SC.
3) Olsonite; 95CC-SS.
4) Or Approved Equal.
c. Flush Valve: Chrome plated, metal oscillating non-hold-open handle, 1-inch
I.P.S. screwdriver angle stop, with protective cap, adjustable tailpiece,
6508.22 15400-6 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
vacuum breaker flush connection and spud coupling for 1½-inch top spud,
wall and spud flanges and override button; Acceptable Manufacturers:
1) Sloan; Royal 110-3.
2) Delany; Flushboy 402-35VB.
3) Watrous; W-100-PYV.
4) Or Approved Equal.
P-3 Urinal:
a. Shell: Vitreous china washout, wall hung, siphon jet type, integral trap,
extended side shields, 3/4-inch inlet spud, outlet connection threaded 2-inch
inside. Acceptable Manufacturers:
1) American Standard; 6501.010 WASHBROOK (1.0 GPF).
2) Kohler; K-4980-T BARDON.
3) Eljer; 161-1030 CORRECTO.
4) Or Approved Equal.
b. Flush Valve: Chrome-plated, metal oscillating non-hold-open handle,
3/4-inch I.P.S. screwdriver bak-chek angle stop with protective cap,
adjustable tailpiece, vacuum breaker, flush connection and spud coupling for
3/4-inch top spud, wall and spud flanges. Acceptable Manufacturers:
1) Sloan; Royal 186-11.
2) Delany; Flushboy 451-VB.
3) Watrous; W-101.
4) Or Approved Equal.
P-4 Urinal (For Physically Handicapped):
a. Shell: Vitreous china washout, wall hung, siphon type, integral trap,
3/4-inch inlet spud, outlet connection threaded 2-inch inside; Acceptable
Manufacturers:
1) American Standard; 6501.010 WASHBROOK (1.0 GPF).
2) Kohler; K-4960-T BARDON.
3) Eljer; 161-1030 CORRECTO.
4) Or Approved Equal.
b. Flush Valve: Chrome-plated, metal oscillating non-hold-open handle,
3/4-inch I.P.S. screwdriver bak-chek angle stop with protective cap,
adjustable tailpiece, vacuum breaker, flush connection and spud coupling for
3/4-inch top spud, wall and spud flanges; Acceptable Manufacturers:
1) Sloan; Royal 186-11.
2) Delany; Flushboy 451 VB.
3) Watrous; W-101.
4) Or Approved Equal.
P-5 Lavatory:
a. Bowl: Countertop design, self-rimming lavatory, fitting ledge, enameled
cast iron construction with front overflow and 8-inch centers punch, deck
mounted faucets and 32 oz. liquid soap dispensers mades of stainless steel,
oval configuration (20 x 17-inches).Acceptable Manufacturers:
1) American Standard; 3302.015 OVAL HORIZON.
2) Kohler; K-2905 FARMINGTON.
6508.22 15400-7 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
3) Eljer; 052-2078.
4) Or Approved Equal.
b. Faucet: 4 inch center set metering Lavatory with hot cold indicators, 1.5
GPM, automatic shutoff and ADA compliant. Acceptable Manufacturers:
1) American Standard; 1340225.002
2) Kohler
3) Eljer
4) Or Approved Equal.
c. Supply Piping: 3/8-inch angle valve, wheel handle, 3/8-inch male threaded
inlet, escutcheon, flexible tube riser, chrome finish.
d. Drain: Adjustable cast brass ‘P’-trap, swivel-ell, 1¼-inch inlet, 1¼-inch
outlet, cleanout plug, chrome finish.
P-6 Lavatory (For Physically Handicapped):
a. Bowl: Countertop design with fitting ledge, front overflow, acid-resisting
enameled cast iron, 8-inch centers; Acceptable Manufacturers:
1) American Standard; 3210.044 LEDGELYN.
2) Kohler; K-2902 FARMINGTON.
3) Eljer; 052-0248 CLEMENT.
4) Or Approved Equal.
b. Faucet: 4 inch center set metering Lavatory with hot cold indicators, 1.5
GPM, automatic shutoff and ADA compliant. Acceptable Manufacturers:
1) American Standard; 1340225.002
2) Kohler
3) Eljer
4) Or Approved Equal.
P-7 Service Sink:
a. Sink: Wall-mounted design, enameled cast iron service sink with wall
hanger for through-back faucet, rim guard and standard P-trap with
enameled strainer; Acceptable Manufacturers:
1) American Standard; 7692.049 LAKEWELL.
2) Kohler; K-6716.
3) Eljer; 242-0135.
4) Or Approved Equal.
b. Faucet: Renewable seats, hose outlet spout end, bucket hook, indexed lever
handles, inlets 1/2-inch female adjustable union couplings; Acceptable
Manufacturers:
1) American Standard; 8340.234.
2) Kohler; 8924.
3) Eljer; 749-0500.
4) Or Approved Equal.
G. Dual Accessible Water Fountain:
1. Easy-Touch Push bar activation
2. Extra deep basin to minimize splashing; with integral drain
6508.22 15400-8 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
3. Vandal resistant bubbler
4. Valve with built-in flow regulator to provide constant stream from 20 to 105 psi water
pressure.
5. For outdoor applications.
6. Bubbler outlet orifice shall be located within 36” of the floor.
7. Bubbler outlet orifice shall be located within 6” of the front edge of the drinking
fountain.
8. The water stream from the bubbler shall be substantially parallel to the front edge of
the drinking fountain – or – for round or oval fountains, positioned so that the flow of
water is within 3” of the front edge of the drinking fountain.
9. The spout shall provide a flow of water at least 4” high so as to allow the insertion of
a cup or glass under the flow of water.
H. Hand Blower
1. Wall mount, 110 volt hand blow dryer, vandal resistant of stainless steel construction.
I. Baby Changing Station
1. Fixed-type baby changing station constructing of maintenance free solid surface
material.
2.06 PLUMBING EQUIPMENT
A. Small Capacity Electric Water Heater: UL Listed electric heater with high carbon steel
glass or stone lined tank suitable for 150 psig working pressure with ¾” inlet and ¾”
outlet and front-mounted drain valve.
1. Tank protected with high-density magnesium anode and an ASME rated pressure
temperature relief valve. Tank insulated with 1-inch minimum, dense glass fiber
and encased in an enameled steel jacket.
2. UL Listed electric heating elements of low watt density immersion type, zinc-
plated copper sheathed and flange-mounted with no-simultaneous element
operation control, immersion type thermostat set at 120°F., high limit cut-off, and
factory wired from an integral junction box.
3. Acceptable Manufacturers:
a. A.O. Smith Pro-Max EJC-6
b. W. L. Jackson Mfg. Co., Inc.
c. Rudd Mfg. Co.
d. Or Approved Equal.
PART 3 - EXECUTION
301 INSPECTION
A. Condition of Rough-Ins: Inspect rough-ins and determine exact fixture location with
respect to the Drawings.
6508.22 15400-9 ARRO
TOWN OF INDIAN HEAD –TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
B. Do not proceed until fixture positions are verified, or any adjustments in fixture
locations are approved by the Engineer.
3.02 PERFORMANCE
A. Installation Instructions: Install those Products, as specified previously under PART 2
and not specifically covered for installation herein under PART 3, in strict accordance
with manufacturer’s installation instructions and at locations indicated on the Drawings.
B. Electrical Interface: As specified in Section 15010.
C. Equipment Start-Up: Perform equipment start-up and ensure its proper operation prior
to acceptance of Work by the Engineer.
3.03 PIPING INSTALLATION
A. Fabrication: Make up piping runs as specified in Section 15050.
B. Installation: Place and support piping runs as specified in Section 15090.
C. Trenching: Perform earthwork for buried piping as specified in Section 02221.
D. Piping Pitch: Unless otherwise indicated, pitch piping not less than the following:
1. Potable Water: One inch in fifty feet.
2. Soil or Waste and Vent: One inch in four feet.
3. Horizontal Rainwater: One inch in four feet.
E. Reduced Pitch: Where overhead runs of sanitary, waste and vents and rainwater piping
reduce headroom substantially, the pitch may be reduced to 1/8-inch per foot, when
approved by the Engineer. In no case shall horizontal piping runs be installed lower
than 7 feet above finished floor.
F. Supply Piping Installation Requirements:
1. Cross and Inter-Connections: Do not install piping in a manner which can create
a direct cross connection or an inter-connection between potable water and
polluted water, or in a manner whereby a backflow of polluted water into the
potable water system could occur.
2. Valve Installation: Install a valve where each branch leaves the main and at
Plumbing Fixtures to facilitate repairs or replacements of such while the system is
in operation. Unless indicated otherwise on the Drawings install gate valves in
water lines. Install globe valves in water lines where throttling, control or bypass
is required.
3. In the case where fixture fittings are equipped with screw drive stops, and supply
pipes are equipped with stops, such stops shall serve as the shut-off valve.
6508.22 15400-10 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
4. Hose Bibb Installation:
a. Interior: 30 inches above finished floor.
b. Non-Freeze: Unless indicated otherwise, 30 inches above grade.
5. Water Hammer Control: Install Water Hammer Arrestors on each Plumbing
fixture supply branch and for individual runs to remote fixtures or items of
equipment in accordance with P.D.I.-WH201.
G. Soil or Waste and Vent Piping Installation Requirements:
1. Changes in Direction: Make changes in direction in soil or waste piping using the
appropriate sanitary fittings according to the International Plumbing Code; except
that sanitary tees may be used on vertical stacks, and short quarter bends or
elbows may be used where the change in direction of flow is from horizontal to
vertical.
2. Where it becomes necessary to use short radius fittings because of space
limitations, do so only with prior approval of the Engineer.
3. Slip Joints: Slip joints permitted only in factory fabricated chrome plated trap
seals for fixtures. Use drainage fitting unions for making union connections
wherever practicable. The use of continuous thread bushings is prohibited.
4. Traps: Provide a trap at the connection of each plumbing fixture, drain (except
roof and outside drains) and piece of equipment requiring connection to soil or
waste piping except where noted on the Drawings. Install traps as close as
possible to the fixture, drain or piece of equipment; double trapping not permitted.
5. Test Tees: Install test tees at the base of vertical soil or waste piping runs and at
the base of vertical rainwater conductor runs. Install threaded brass or bronze
plug to close test opening. Test Tees may be omitted where cleanouts are required
at test tee locations.
6. Cleanout Locations: Install cleanouts at locations indicated on the Drawings and
as follows:
a. No more than 50 feet apart in horizontal soil or waste lines of four-inch
nominal diameter or less and not more than 100 feet apart for larger pipes.
b. At each change of direction greater than 45 degrees in soil or waste lines.
c. Locate cleanouts on piping three inches and larger to provide 24 inches of
clearance from obstruction and 18 inches clearance on piping less than three
inches. Where such minimum clearances cannot be obtained report the
situation to the Engineer for further instruction.
d. Size cleanouts same size as the pipe up to and including four inches, and not
less than four inches for larger piping.
7. Vents: Extend vent pipes to not less than 10 inches nor more than 18 inches
above the roofline. Additional installation requirements as follows:
a. Where vents extend to the roofline in less than four-inch pipe size, increase
such to four inches at least one foot below the roof and extend through the
roof.
b. Vents on grade, or in a high foot-traffic area on the roof, shall terminate in a
180° bend with bird screen cap on the end; or extend such vents straight and
install a Hooded Vent Cap on the end.
6508.22 15400-11 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
c. Where vents are taken on horizontal runs of soil or waste piping make such
connections above the center line of the piping, either on the top or at 45
degree angle. Additionally, make such vent connections at least six inches
above the flood-level rim at the highest fixture served by the same piping
run.
3.04 PLUMBING FIXTURE INSTALLATION
A. Fixture Supports: Securely anchor surface-mounted fixture hangers and supports into
the structure using Fasteners as specified in Section 15090.
1. Install fixture Carriers according to manufacturer’s installation instructions using
Fasteners as previously referenced.
2. Provide chrome-plated nuts, cap nuts, screw heads and washers where such are
required in an exposed installation.
B. Fixture Installation:
1. Install wall hung fixtures plumb and square with respect to the visible structure
lines.
2. Set floor-mounted fixtures securely anchored in position symmetrical with the
floor plan.
3. Install water closets with sponge rubber closet flange gaskets; substitutes not
permitted.
3.05 FIELD QUALITY CONTROL
A. Tests: Do not conceal piping systems in any manner until such have been tested and
approved.
1. Furnish tools, materials (including water), equipment and instruments necessary
for pipe testing as specified herein.
2. Repair leaks discovered during testing and repeat the particular test involved.
Repairs and retesting at no increase in Contract price.
3. Perform tests involving water in the test, only when the structure is sufficiently
heated to prevent freezing.
4. Locate test pressure source on upstream side on lines containing check valves.
B. Potable Water Piping Test: Hydrostatic at 50 percent over the system working pressure,
but not less than 100 pounds per square inch. Prior to pressure testing take the following
precautions.
1. Free piping of trapped air prior to testing.
2. Locate test pressure source on upstream sides on lines containing check valves, if
any, and set control valves in open position for test duration.
3. Do not subject equipment, piping specialties or plumbing fixtures to test
pressures.
4. Isolate all such items in lines that may be damaged by test pressures.
6508.22 15400-12 ARRO
TOWN OF INDIAN HEAD –TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
5. Maintain test pressure to within 3 psi of initial test pressure, without introduction
of additional pressure, until a visual examination is made of every joint and
connection, but in no case less than 4 hours actual test time.
C. Soil or Waste and Vent System Tests: Perform tests in accordance with applicable
requirements of International Plumbing Code.
D. Rainwater Conductor Test: Perform same tests on rainwater conductors as used for
sanitary and waste and vent piping testing.
E. Potable Water Systems Disinfection: Following successful testing of systems, perform
disinfection of piping from shut-off valve at source of supply throughout the systems
including connected plumbing fixtures and equipment. Disinfect in accordance with the
following:
1. Flush systems until sediment free.
2. Fill systems with solution of calcium hypochlorite and water containing 50 parts
per million of available chlorine. Use H.T.H., Perchlore, Maxochlor, or equal.
3. Retain solution in systems for at least 24 hours, then drain and thoroughly flush
systems until potable water is test proven comparable to water quality in the
municipal water main.
END OF SECTION
6508.22 15400-13 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
SECTION 15800
AIR DISTRIBUTION
PART 1 - GENERAL
1.01 SECTION INCLUDES
A. Ceiling mounted exhaust fans
B. Stationary exhaust louvers
C. Motor operated intake louvers
D. Duct work
1.02 RELATED SECTIONS
A. Basic Mechanical Requirements: Section 15010.
B. Supports, Anchors, and Seals: Section 15090.
1.03 REFERENCES
A. Air Movement and Control Association (AMCA):
1. AMCA Standards 210 and 300, Capacity Ratings.
2. AMCA Standards 300 and 301, Sound Ratings.
B. American Society for Testing and Materials (ASTM):
1. ASTM A525; General Requirements for Steel Sheet, Zinc-Coated (Galvanized) By
The Hot-Dip Process, Spec. for.
2. ASTM A527; Steel Sheet, Zinc-Coated (Galvanized) by the Hot-Dip Process,
Lock-Forming Quality, Spec. for.
C. Sheet Metal and Air-Conditioning Contractors’ National Association, Inc. (SMACNA):
1. SMACNA HVAC Duct Construction Standards.
2. SMACNA HVAC Systems - Testing, Adjusting and Balancing.
D. Underwriters’ Laboratories, Inc. (UL): Listings and Labels shall govern the quality and
performance of certain Products as specified herein.
1. UL 181; Factory-Made Air Ducts and Connectors.
6508.22 15800-1 ARRO
TOWN OF INDIAN HEAD –TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
1.04 SUBMITTALS
A. Product Data: As specified in Section 15010; submittals required for the following
items:
1. Prefabricated HVAC Ductwork.
2. Ductwork Accessories.
3. Fans/Lights
4. Louvers/Dampers
PART 2 - PRODUCTS
2.01 MATERIALS
A. Auxiliary Steel, Rods, Duct Supports, and Anchors and Fasteners: As specified in
Section 15090.
2.02 SHOP FABRICATED HVAC DUCTWORK
A. Sheet Steel Low Pressure Duct: Shop fabricate ductwork of galvanized sheet steel
conforming to the requirements of ASTM A527. Galvanizing shall conform to the
requirements of ASTM A525, Coating Designation G 90.
1. Fabricate ducts in accordance with SMACNA Low Pressure Duct Construction
Standards.
2. Fabricate ducts square, rectangular, or round, as indicated on the Drawings.
3. Sheet Steel gauges and duct construction in accordance with Section I Basic Duct
Construction of above referenced SMACNA Manual concerning duct construction
for Project design static pressure requirements.
2.03 PREFABRICATED HVAC DUCTWORK
A. Prefabricated Flexible Metal Duct: Non-insulated helical corrugated aluminum round
duct designed to retain its round shape, as well as its strength and cross section, while
being bent to almost any configuration. Duct shall remain rigid before and after
bending.
1. Acceptable Manufacturers:
a. United Sheet Metal Division of United McGill Corporation.
b. Manville Products Corp.
c. Zen Industries.
d. Or Equal.
2.04 DUCTWORK ACCESSORIES
A. Ductwork Interior Air Control Devices: Provide devices constructed of the same
material used in ductwork where such devices are installed.
6508.22 15800-2 ARRO
TOWN OF INDIAN HEAD –TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
B. Flexible Duct Connectors: Prefabricated connector composed of a glass fiber fabric base
coated for indoor and outdoor use and secured by double-lock seam to three inches of
aluminum flange.
C. Access Doors: Use Standard Reach-thru Door, butt-hinged and sash-locked (both of
non-ferrous metal), SMACNA Plate 30 Fig. B. Provide insulated doors in insulated
duct; otherwise, use uninsulated doors.
D. Volume Damper: Shall be of the same material as the ductwork in which it is installed,
and shall be of the opposed blade type with operators exterior to the ductwork.
2.05 FANS
A. Ceiling-mounted Exhaust Fan (Light-duty): UL labeled moisture and corrosion resistant
construction as shown on the plans.
B. Intake Louvers/Dampers: As shown on the plans.
PART 3 - EXECUTION
3.01 PERFORMANCE
A. Installation Instructions: Install those Products, as specified previously under PART 2
and not specifically covered for installation herein under PART 3, in strict accordance
with manufacturer’s installation instructions and at locations indicated on the Drawings.
1. When manufacturer’s installation instructions do not exist, and when installed
locations are not specifically indicated, perform work in accordance with current
accepted Trade practices concerning installation of such Products.
2. Equipment support and anchoring, as specified in Section 15090.
B. Electrical Interface: As specified in Section 15010.
C. Equipment Start Up: Perform equipment start up in accordance with Section 01650 and
ensure its proper operation prior to acceptance of Work by the Engineer.
3.02 HVAC DUCTWORK INSTALLATION
A. Shop Fabricated Ductwork Installation: Install ductwork in accordance with the
SMACNA manual as previously referenced under PART 2 - PRODUCTS.
1. Support and install ductwork in accordance with the methods of the appropriate
SMACNA Manuals.
2. Install Distribution Devices using stainless steel sheet metal screws and sponge
rubber or neoprene sealing gasket.
6508.22 15800-3 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
3. Install Flexible Duct Connectors on ductwork connections to mechanical
equipment as indicated.
B. Prefabricated Duct Installation: Install prefabricated duct in accordance with
manufacturer’s Assembly and Installation Manual.
1. Install Flexible Duct Connectors on ductwork connections to mechanical
equipment as indicated.
C. Ventilation Fan Installation:
1. Install wall-mounted ventilation fans using stainless steel anchors and fasteners as
specified in Section 15090. Size and quantity required as recommended by fan
manufacturer.
D. Materials and Equipment Exposed to Weather: Provide stainless steel fasteners for both
exposed and concealed attachments. Install gaskets and seals, when provided with
materials and equipment, to ensure weatherproof installations.
E. Balancing and Adjusting: Perform air distribution system balancing and adjusting work
in accordance with the procedures and standards described in the SMACNA Manual For
The Balancing And Adjusting Of Air Distribution Systems. Additional precautions and
requirements as follows:
1. Do not run equipment or distribution systems incorporating filters until filters have
been installed.
2. Examine equipment and distribution systems to see that they are free from
obstructions. Determine that air control equipment is open, that moving equipment
is lubricated, that filters are functioning, and perform other before-start up
inspections and maintenance activities as required by the respective equipment
manufacturers for proper operation of their equipment.
3. Adjust external air control devices and duct internal air control devices so that each
air outlet and inlet delivers and removes, respectively, the designed CFM of air as
indicated.
4. Tabulate the results of the final balancing, adjusting and testing on copies of the
SMACNA Forms (forms as included in the SMACNA Manual herein referenced)
or similar forms meeting with Engineer’s approval. Submit completed forms in
duplicate.
5. Deficiencies and defects manifested by above stated balancing and adjusting work
forms must be rectified immediately at no increase in Contract Price.
6. Finally, leave equipment and distribution systems in operation under their
respective controls.
END OF SECTION
6508.22 15800-4 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
DIVISION 16 - ELECTRICAL
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
SECTION 16010
BASIC ELECTRICAL REQUIREMENTS
PART 1 - GENERAL
1.01 SECTION INCLUDES
A. Basic electrical requirements specifically applicable to Division 16 Sections, in addition
to Division 1 - General Requirements.
1.02 RELATED SECTIONS
A. Submittals: Section 01300.
B. Project Closeout: Section 01700.
C. Painting: Section 09900.
D. Earthwork: Division 2.
E. Concrete: Division 3.
F. Division 16: Sections as Included.
1.03 QUALITY ASSURANCE
A. Requirements of Regulatory Agencies: Comply with electrical construction code
requirements of State, County, and such other local political subdivision specifications
as may exceed the requirements of national codes, standards and approving bodies.
Modify electrical construction work to conform to such laws, ordinances, rules,
regulations and specifications, and at no increase in Contract Price for such
modifications.
B. Code Compliance Inspection: All electrical work shall be inspected by a State-licensed
and Client-authorized inspection agency for compliance with National Electrical Code.
C. Certificates and Permits: Upon completion of work, and prior to final Payment, furnish
formal certification of final inspections to the Engineer from authorities having
jurisdiction and secure required permits or certificates (if any) from such authorities.
Additionally, prepare detailed diagrams and drawings which may be required by those
authorities having jurisdiction.
D. Source Quality Control: Products used throughout these Specifications, and as
indicated on the Drawings, are those of companies having established reputations in the
manufacture of these Products. Such products shall be manufactured by those
companies specified, or may be the product of other companies for which the specified
6508.22 16010-1 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
company assumes full responsibility and for which replacement parts are made
available by the specified company.
1.04 REFERENCES
A. Basic References: The following codes, standards, and approvals as referenced
throughout the Sections of Division 16, shall serve as the minimum standards and
quality requirements.
1. American National Standards Institute (ANSI): ANSI C2; National Electrical
Safety Code.
2. National Electric Manufacturer’s Association (NEMA) Standards as apply to
specified Products.
3. National Fire Protection Association (NFPA): NFPA 70; National Electrical
Code, and current amendments.
4. Underwriters’ Laboratories, Inc. (UL) Listings, Labels, and Approvals shall
govern the quality and performance of certain specified Products.
1.04 DEFINITIONS
A. The following definitions apply when used in the context of these Specifications.
1. Provide: Furnish and install, complete and ready for intended use.
2. Furnish: Supply and deliver to project site ready for installation..
3. Install: Place in position for service or use.
4. Dedicated: Means one circuit in one metal conduit between device and circuit
breaker.
1.06 SUBMITTALS
A. Shop Drawings and Product Data: In compliance with Section 01300.
1. Product Data: Include manufacturer’s descriptive literature, product
specifications, published details, performance/capacity rating schedules or charts
and installation instructions, all as applicable to items listed under Submittals in
each Section of Division 16; and such items as may be scheduled on the
Drawings. For control panels, include component descriptive literature.
2. Shop Drawings: Submit drawings certified for construction by Product
manufacturers, and approved by the Contractor. Include location of electrical
connections, wiring diagrams, anchor bolt layout, details indicating construction
and materials of construction, dimensions, and weight of the completely
assembled item.
a. Submit shop drawings applicable to items listed under Submittals in each
Section of Division 16 and such items as may be scheduled on the Drawings.
3. Items pertinent to this project must be identified or the shop submittals will be
returned without review. Also items submitted for reviews that have not been
requested for review will be returned to the Contractor without comment.
6508.22 16010-2 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
B. Operation and Maintenance Data: Submit for approval the number of sets required by
Section 01700 of Product manufacturer’s operating and maintenance instructions bound
in a hard cover binder with index and index tabs. Manufacturer’s advertising literature
or advertising catalogs will not be acceptable as operating and maintenance instructions.
C. Record (As-Built) Drawings: Maintain and mark a set of drawings with all changes and
deviations from the original design. Use red markings. This set of drawings with
accurate field changes shall be submitted to the engineer at the completion of the
project.
1. Refer to Section 01700-Contract Closeout for Record Drawing requirements.
1.07 DELIVERY, STORAGE, AND HANDLING
A. Deliver Products to the Project site in a clean condition with openings plugged or
capped (or otherwise sealed by packaging) both during shipping and during temporary
storage.
B. Handle materials and equipment in accordance with manufacturer’s written instructions.
C. Store Products, both on and offsite, in accordance with manufacturer’s written
instructions.
1.08 JOB CONDITIONS
A. Interferences:
1. The Drawings are generally diagrammatic and indicative of the work. The
Contractor is responsible for modifying the work with offsets, bends or other
fittings to avoid interferences and structural obstruction. Perform such
modifications at no increase in Contract Price.
2. Construct electrical systems in a manner not to delay or interfere with other
operations of the work of others.
3. Prior to making electrical installations, coordinate electrical work locations with
the work of others, especially in congested areas, such as mechanical equipment
rooms and above hung ceilings (if any).
4. In the event that interferences develop, the Engineer’s decision will be final and
no additional compensation will be allowed for relocation of electrical Products.
5. Do not locate electrical components below water lines, or if there is no choice,
install a drain pan between the water line(s) and the electrical equipment. Such
protection must be above the 6’-0 dedicated space.
B. Electrical Interface:
1. Work Performed In Cooperation With Other Divisions: Electrical Contractor
shall be responsible for coordination of electrical work in cooperation with other
contractors.
6508.22 16010-3 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
1.09 WARRANTIES
A. Assigned Warranties: Manufacturers’ Product warranties on Products (including
internal components) exceeding the Correction Period as stated in the Conditions of the
Contract, shall be assigned directly to the Owner.
1. Such assigned warranties shall be dated to begin not earlier than the date of
Substantial Completion.
PART 2 - PRODUCTS
2.01 MATERIALS
A. Products: Basic Electrical Materials and Methods as specified in Section 16050.
1. Provide Products of new and recent manufacture.
2. For each category of materials and equipment (Products), provide Products of the
same manufacturer and type.
B. Contractor shall be responsible for resolving any interferences incurred as a result of
size changes in equipment when products of other manufacturers are utilized, and
Contractor shall pay for any design fees that may be encountered due to manufacturer or
product changes.
PART 3 - EXECUTION
3.01 INSTALLATIONS
A. General Requirements: Specific installation instructions and other requirements are as
specified in the various Sections included under Division 16.
1. Perform required interconnection of the differing electrical systems to the various
electrical Products, regardless of where such Products are specified throughout
Division 16, in order to ensure the completeness of such electrical systems.
B. Field Painting: As specified in Section 09900.
C. Headroom Maintenance: If mounting heights or other location criteria are not
indicated, arrange and install components and equipment to provide the maximum
possible headroom.
D. Floor-mounted equipment, such as Motor Control Centers, Transformers, etc., shall be
mounted on a 3” housekeeping pad. The pad shall be constructed by the Electrical
Contractor and shall extend 2” beyond the outside dimensions of the equipment on the
front and sides, unless the Drawings indicate additional space for future expansion.
6508.22 16010-4 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
3.02 FIELD QUALITY CONTROL
A. General:
1. Unless waived in writing by the Engineer, the Contractor shall be present during
performance testing.
B. Electrical Systems Testing:
1. Unless waived in writing by the Engineer, perform tests and trials in the presence
of an authorized representative of the Engineer.
2. Testing: Test all Products incorporated in the Work in conformity with the most
currently approved method for the particular type and class of work.
a. Include costs of tests in the Contract Price.
b. Render the entire installation free from short circuits and improper grounds.
Test feeders disconnected from the branch with the power equipment
connected for proper operation.
c. Perform electrical system tests using Meggers, ammeters, voltmeters,
insulation resistance testers, and high-pot testers prior to placing electrical
systems into complete operation.
1) Use Meggers with an adjustable 2.5/5.0 KV range which will permit
reading of 0.05 to 100,000 Megohms. Minimum testing voltage
obtained by adding 1000 volts to twice the rated voltage of cable,
device, apparatus or equipment. In no case shall the insulation
resistance be less than 100 Megohms. However, the recommended
insulation resistance measurements of each test shall conform to IEEE
and ANSI Standards.
d. Correct failure in a manner satisfactory to the Engineer or Engineer’s
authorized representative.
C. Grounding Testing:
1. Test the grounding in accordance with specification section 16450.
END OF SECTION
6508.22 16010-5 ARRO
TOWN OF INDIAN HEAD –TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
SECTION 16050
BASIC ELECTRICAL MATERIALS AND METHODS
PART 1 - GENERAL
1.01 SECTION INCLUDES
A. Basic electrical materials and methods common to more than one section of Division 16.
1.02 RELATED SECTIONS
A. Trenching, Backfilling, and Compaction: Section 02221.
B. Division 3 - Concrete.
C. Metal Fabrications: Section 05500.
D. Supports, Anchors, and Seals: Section 15090.
E. Basic Electrical Requirements: Section 16010.
1.03 SUBMITTALS
A. Shop Drawings and Product Data: As specified in Section 16010. Submittals required
for all electrical equipment.
PART 2 - PRODUCTS
2.01 CONDUIT SYSTEM MATERIALS
A. Rigid Metal Conduits: Fabricated of mild steel piping, galvanized inside and outside,
and protected against corrosion by a dichromate rinse or a zinc chromate coating. Each
conduit shall bear the UL label, be defect free, furnished in 10 ft. lengths minimum, and
of the following types:
1. Electrical Metallic Tubing (EMT) and Fittings: Products meeting requirements of
NEC Article 358 for materials and uses.
2. Intermediate Metal Conduit (IMC) and Fittings: Products meeting requirements
of NEC Article 342 for materials and uses.
3. Rigid Metal Conduit and Fittings: Product meeting requirements of NEC
Article 344 for materials and uses.
4. Corrosion Protection: Heat shrinkable vinyl tubing designed to shrink tightly on
conduit exterior to shield against moisture, dirt, corrosives and other
contaminants.
6508.22 16050-1 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
a. Acceptable Manufacturers:
1) AMP Incorporated.
2) W. H. Brady Company.
3) Ideal Industries.
4) Industrial Electrical Products Division of 3M.
5) Or Approved Equal.
B. Flexible Metal Conduit (Type FMC): Use Flexible Metal Conduit as allowed by the
NEC as follows:
1. Flexible Metal Conduit and Fittings meeting requirements of NEC Article 348 for
materials and uses.
C. PVC Coated Flexible Metal Conduit (Type LFMC): Conduit meeting the requirements
of NEC Article 350 for materials and uses. Each conduit length shall bear NEC
inscription stamp, manufacturer’s trademark, and shall conform to the following:
1. Flexible, galvanized, interlocking spiral strip steel core having a smooth,
liquid-tight polyvinyl chloride jacket designed to withstand temperatures
from -50ºF to +220ºF.
2. Interlocking spiral strip construction of such to permit bending of conduit to a
minimum radius of five times its diameter without deforming the spiral strips,
both inside and outside of the conduit.
3. Interior and exterior of flexible conduit finished smooth and free from burrs,
sharp edges, and other defects which may injure wires.
4. Conduit sizes 1/2-inch through 1¼-inch furnished with an integral continuous
copper ground. Install flexible conduit sizes 1½-inch through 3-inch using a
separate ground conductor.
5. Acceptable Manufacturers:
a. Anaconda American Brass Company, Sealtite, Type H.C.
b. Ortac.
c. RCCN.
d. Or Approved Equal.
D. Liquidtight Flexible Nonmetallic Conduit (Type LFNC): Conduit meeting the
requirements of NEC Article 356 for materials and uses. Each conduit length shall bear
NEC inscription stamp, manufacturer’s trademark, and shall conform to the following:
1. Flexible, flame resistant having a smooth seamless inner core and cover bonded
together and having one or more reinforcement layers between the core and
covers.
2. Not for hazardous areas.
3. Fittings for use with LFNC only shall be used
4. Acceptable Manufacturers:
a. Carlon.
b. Southwire Co.
c. Electri-flex.
d. Or Approved Equal.
6508.22 16050-2 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
E. Rigid PVC Conduit: High impact PVC (polyvinyl chloride) Conduit and Fittings
conforming to NEMA Spec. TC-2, as Listed and Labeled by UL, and meeting the
requirements of NEC Article 352 for PVC materials and uses. Provide schedule 40
conduit and fittings, except where required by NEC use schedule 80.
F. PVC-Coated Galvanized Conduit: Galvanized conduit, prior to coating shall conform
to ANSI C80.1, UL#6, and conform to the following for plastic coating:
1. Preparation: Conduit conditioned for plastic coating with chromic acid; threads
hot-dipped galvanized prior to plastic coating operation. Conduit coated inside
and out with a heat polymerizing lacquer, such as an epoxy acrylic, to
approximately 0.005-inch thick as final preparation for liquid plastic coating.
2. Plastic coating bonded to conduit the full length, except the threads, at thickness
between 0.035-inch and 0.045-inch. A plastic coupling, having a plastic sleeve
extending one pipe diameter or 2 inches (whichever is less) beyond the end of the
coupling, factory furnished with each conduit length. All plastic coating shall
have 3,500-psi tensile strength.
3. Sleeve inside diameter same as outside diameter of the conduit used with it.
Sleeve wall thickness the same as the plastic jacket on conduit.
4. Bond between conduit and plastic and conduit sleeves and plastic equal to or
greater than tensile strength of plastic coating.
5. Provide Plastic coated condulets, fittings, unions, hubs, couplings and Plastic
coated supports as necessary to form a complete system.
6. Acceptable Manufacturers:
a. KorKap Products.
b. Perma-Cote.
c. Plasti-Bond RedH2ot.
d. Thomas & Betts Ocal.
e. Or Approved Equal.
G. Aluminum Rigid Conduits and Couplings: UL Labeled conduit, couplings, elbows and
bends fabricated of Alloy 6063 aluminum. Products meeting requirements of NEC
Article 344 for materials and uses.
1. Conduit Length: 10-feet, threaded both ends, one end fitted with coupling.
2. Threads: Conduit, elbows with American Standard Tapered pipe Thread,
ASA B2.1; Couplings tapped with straight threads.
3. Approval: Underwriters Laboratories.
4. Acceptable Manufacturer:
a. Kaiser Aluminum.
b. Allied Tube & Conduit.
c. Cooper Industries.
d. Or Approved Equal.
H. Stainless Steel Conduit and Fittings: Fabricate of 316SS meeting ASTM A-321/SA-
312 and UL6A, threaded, rigid, furnished in 10 ft lengths. Products meeting
requirements of NEC Article 344 for materials and uses.
1. Fittings and Couplings: Heavy-duty cast stainless steel conduit bodies with
threaded fittings; couplings threaded.
6508.22 16050-3 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
2. Acceptable Manufacturers:
a. Cal Conduit Products.
b. Gibson Stainless and Specialty Inc.
c. Cooper Industires.
d. Or Approved Equal.
I. Aluminum, Device Boxes and Fittings: UL Labeled device boxes and angle fittings
cast of copper free aluminum (maximum copper content of 3/10 of 1 percent) with cast
aluminum covers as appropriate to devices contained therein.
1. Threads: Boxes and fittings with straight threads to accept American Standard
Tapered Pipe Thread.
2. Acceptable Manufacturer:
a. Appleton Electric Products.
b. Crouse-Hinds Company.
c. Cooper Industires.
d. Or Approved Equal.
J. Conduit Expansion Joints: Telescoping sleeve type designed for 4-inch maximum
expansion; galvanized, weatherproof, vaportight, with insulated bushing and lead-wool
packing.
1. Acceptable Manufacturers:
a. Crouse-Hinds, Type XJ, with ground strap GC100, and brass clamps
GC102.
b. Appleton.
c. Cooper Industires.
d. Or Approved Equal.
K. Electrical Non-metallic Tubing (ENT): Rigid polyvinyl chloride (PVC) corrugated
raceway conforming to NEMA TC-3, as listed and labeled by UL, and meeting the
requirements of NEC Article 362. Not permitted in overhead suspended ceilings
utilized as ventilation return air plenum as stated in the NEC.
L. Conduit Unions: Erickson Couplings where necessary to complete a conduit run when
neither end can be turned.
1. Acceptable Manufacturers:
a. Thomas and Betts Company.
b. Appleton.
c. Cooper Industires.
d. Or Approved Equal.
M. Conduit Seal-Off Fittings:
1. Fittings shall conform to classification as defined in NEC Article 500 for Wiring
in Hazardous Locations as specified herein. Seal with approved compound and
fiber dam materials as recommended by the manufacturer for the installation
location of the fitting.
2. Acceptable manufacturers:
a. Crouse-Hinds.
6508.22 16050-4 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
b. Appleton Electric Company.
c. Cooper Industires.
d. Or Approved Equal.
N. Metallic Outlet, Switch, Junction, and Pull Boxes, and Fittings: Provide such products
meeting requirements of NEC Article 314 for materials and uses in conduit systems.
No set-screw or indented type couplings or connectors permitted on this project.
1. Provide cast steel outlet boxes, with integrally cast conduit hubs, for surface-
mounted or exposed installations.
2. Provide NEMA Type 4 construction outlet pull or junction boxes for outdoor and
below grade installations, complete with required fittings and hubs.
3. Provide NEMA Type 6 or 6P construction pull, termination or junction boxes
where indicated on the drawings or for locations subject to submersion (at or
below 100-year Flood Stage).
4. Provide NEMA Type 12 construction pull or junction boxes where indicated on
the drawings complete with required fittings or hubs.
5. Provide NEMA Type 7 construction pull or junction boxes with required fittings
or hubs in Class I, Divisions 1 and 2 environments protected from the elements,
even if not mentioned.
6. Provide NEMA Type 8 construction pull or junction boxes with required fittings
or hubs in Class I, Divisions 1 and 2 outdoor environments, even if not
mentioned.
O. Non-metallic Outlet, Switch, Junction, and Pull Boxes, and Fittings:
1. Provide such products meeting requirements of NEC Article 314 for materials and
uses in conduit systems. Provide manufacturer’s approved bonding agent utilized
for permanently securing two devices or material together.
2. Non-metallic boxes, fittings and devices fabricated from molded, high impact
strength, fiberglass reinforced polyester. Boxes, fittings, and devices shall meet or
exceed a Class 1 flame spread rating of less than 25 and a smoke rating of 5.
2.02 LOW VOLTAGE CONDUCTORS
A. Low Voltage Copper Wire (600 Volts Maximum) : UL Listed conductors of 98 percent
conductivity copper with type THWN and THHN insulation rated 600 volts. Type
XHHW insulation also acceptable for sizes No. 8 AWG and larger. Provide conductors
of proper size and ampacity ratings according to NEC Article 310 except for the
following modifications:
1. Minimum Conductor size:
a. No. 12 AWG in power and branch feeder circuits.
b. No. 14 AWG in control and alarm circuits.
-. No. 18 AWG in HVAC control circuits.
2. Maximum Number of Conductors In Raceways or Conduits: Not to exceed three
conductors except. for control wires when so indicated on the Drawings.
(Exclude grounding and neutral conductors from conductor count.)
3. Conductors #10 and smaller shall be solid conductors; conductors #8 and larger
shall be stranded.
6508.22 16050-5 ARRO
TOWN OF INDIAN HEAD –TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
4. Instrumentation wiring shall be stranded regardless of the size.
5. ROMEX and BX Cable not permitted for use in this Project.
6. ROMEX and BX Cable permitted for use in this Project except where not
permitted by Code.
B. Shielded VFD Cable: Cable fabricated using stranded tinned copper, crosslinked
polyethylene insulated, three conductors plus full sized ground and shielded with
aluminum polyester or aluminum mylar plus 80% dual layer shield and full sized tinned
copper drain wire. Provide cable with insulation rated 1000 volts. Extra flexible, low
capacitance, sunlight resistance, direct burial, 6 x cable diameter bending radius.
1. One shielded twisted pair of control wires.
2. Two shielded twisted pair of control wires.
3. Acceptable Manufacturers:
a. Lutze Driveflex
b. Belden Corporation
c. Anixter.
d. Or Approved Equal.
C. Underground Feeder/Branch-Circuit Cable, Type UF: Multi-conductor cable with each
conductor of annealed uncoated copper and individual color-coded PVC insulation.
Conductors assembled flat with grounding wire and encased in gray sunlight resistant
PVC approval imprinted jacket. Standards compliance as follows:
1. UL listed as Type NMC Cable per Standard 719 for Nonmetallic-Sheathed
Cables.
2. UL listed as sunlight resistant Type UF cable per Standard 493 for underground
Feeder and Branch-Circuit Cables.
3. Conforming to National Electrical Code, Article 340.
D. Twisted-Pair Cable: 16-gauge cable fabricated using tinned copper, stranded
conductors, unshielded, excellent water resistant 600 volt insulation; terminations as
required.
E. Shielded Cable: 18-gauge cable fabricated using tinned copper, polyethylene insulated
conductors of the gauge and number indicated, and shielded with aluminum polyester or
aluminum mylar incorporating a tinned copper drain wire or other features as required
by the instruments on the project. Provide cable with insulation rated 300 volts.
1. May not be combined with 600-volt wiring in same conduit systems.
2. Acceptable Manufacturers:
a. Belden Corporation, Beldfoil #9341.
b. Eaton Corporation, Dekoron.
c. Mouser Electronics.
d. Or Approved Equal.
2.03 WIRING DEVICES
A. Switches and Receptacles: UL Listed, Heavy-duty, Specification Grade meeting UL
Listed Specification WD-1-3. Switches and receptacles shall have SCREW
6508.22 16050-6 ARRO
TOWN OF INDIAN HEAD –TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
TERMINALS and be of voltages indicated. A mixture of manufacturers products not
permitted.
1. Toggle Handle Snap Switches: 20-amp, single-pole, 3-way or 4-way as indicated,
poles as required, Specification Grade, 120/277 volt, quiet design Hubbell 1220
Series, BROWN color with satin finish No. 302, (18/8) stainless steel wall plate.
2. Weatherproof Snap Switch: Toggle snap switch of quality as previously
specified; in a cast aluminum weatherproof box with clear weatherproof in-use
cover.
3. Standard Face Design Receptacles: 20-amp, two pole, 3-wire, 125-volt grounding
duplex, Hubbell Series 5262, BROWN color with satin finish No. 302 (18/8)
stainless steel wall plate.
4. Ground Fault Interrupter Receptacle: 20-amp, UL 943, solid-state circuitry,
NEMA 5-20 duplex, Hubbell GF5362 with satin finish No. 302 (18/8) stainless
steel wallplates (indoor); or outdoor weather-resistant in-use covers.
5. Power Outlet Receptacles: Single type rated at amperage indicated, heavy-duty
design, polarized, Hubbell Twist-Lock and Straight Blade, BROWN color with
stainless steel single gang plate.
6. Weatherproof Receptacles: Standard face receptacle as previously specified in a
cast aluminum weatherproof box with clear weatherproof in-use cover.
7. In-use Weatherproof Receptacles: Clear heavy-duty cover that will accept cords
plugged in when the cover is closed. TayMac, Intermatic, Thomas & Betts,
Hubbell, or equal.
8. Corrosion Resistant Wiring Device: 20-amp, two-pole, 3-wire, grounding duplex,
nickel-plated metal parts, Hubbell Model HBL53CM62 yellow color with satin
finish No. 302 (18/8) stainless steel wall plate or as shown on Drawings; or equal.
Use where noted “CR” on Drawings.
9. Lighted handle toggle snap switch: 20-amp, single-pole, 3-way or 4-way as
indicated, 120/277 volt, extra heavy duty rated, quiet design, clear polycarbonate
lighted toggle on when the load is off, Hubbell Series 1220, brown color with
satin finish No. 302 (18/8) stainless steel wall plate.
B. Dimmer Switch: UL Listed solid-state/electronic design unit for use on 120 VAC, 60
Hz, to control incandescent lighting circuits.
1. Unit protected against current and voltage surges. Unit shall contain silver
contacts, oversize heat sink, rotary on-off single-pole switching assembly rated
for 2000 watts. Switch furnished with brushed gold tone colored faceplate.
2. Acceptable Manufacturers:
a. Slater, DAF Series.
b. Lutron.
c. Leviton.
d. Or Approved Equal.
2.04 SUPPORTS, ANCHORS, FASTENERS AND SEALS
A. Anchors and Fasteners: As specified in Section 15050
6508.22 16050-7 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
2.05 GROUNDING PRODUCTS
A. General: Provide Products conforming to UL requirements for grounding applications
as specified in NEC Article 250. Materials as follows:
1. Bare Ground Wire: UL Listed soft drawn copper, Class A or Class B stranded,
meeting the requirements of ASTM B8, and sized in accordance with the NEC
except where the sizes specified herein or indicated on the Drawings are larger
than those required by the NEC.
2. Insulated Ground Wire: UL Listed, copper, Class B stranded, 600 volt 90 degrees
C insulated and jacketed according to NEC. Sizes as indicated on the Drawings.
3. Clamps and Connectors: UL Listed and of materials conforming to use
requirements of NEC Article 250.
a. Multi-bolt Solderless Compression Clamps: High strength electrical bronze
with silicon bronze clamping bolts and hardware. Bolts, nuts, lockwashers,
and similar hardware designed not to damage ground wire.
4. Conduit Ground Bushings: Galvanized malleable iron with screw pressure
connector; insulated throat where required.
5. Ground Rods: UL Listed rods of medium carbon steel core and copper clad by
molten weld casting process.
a. Provide ground rods of 3/4-inch diameter by ten feet long, unless indicated
otherwise on Drawings.
b. Provide copper clad couplers for joining ground rods to obtain longer length
rods.
2.06 CONDUCTOR AND WIRING IDENTIFYING PRODUCTS
A. Provide permanent heavy-duty vinyl cloth material tape, pressure sensitive labels or
markers, which when applied to conductors are easily read. Tape and labels as
manufactured by W. H. Brady Co., Len Products Inc., or Stanco Products, Inc.
2.07 NAMEPLATES
A. Provide laminated plastic nameplates such that the background is black with white
letters showing through, letters shall be ½” in height for control panels, panelboards,
disconnect switches, circuit breakers, combination starters, and other larger
components, and ¼” letter height for smaller components such as contactors, starters,
relay enclosures, etc. Drill and secure nameplates to the substrate with self-locking
screws.
B. Back-of-Panel Mounted: Use plastic markers with white letters on a black background
in the panel interior to identify each device mounted on the panel exterior or interior.
Locate the markers adjacent to, but not on, the given device and do not obstruct
visibility by wire bundles or other equipment. Include device identification number as
well as descriptive name on all nameplates.
6508.22 16050-8 ARRO
TOWN OF INDIAN HEAD –TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
C. Provide laminated plastic WARNING nameplates such that the background is red with
white letters showing through. Letters height shall be as required. Use for warning and
precautionary labels. Fasten with stainless steel screws.
PART 3 - EXECUTION
3.01 INSPECTION
A. Carefully inspect the structural and other construction work which may affect the work
of this Section. Coordinate performance of electrical work accordingly and furnish
such Products as required to accommodate conditions and to preserve access to other
equipment, or areas.
B. Prior to performance of work required by Division 16, submit detailed drawings of
proposed departures from original design, due to field conditions, or other cause, and
submit for Engineer’s approval.
C. Inspect installed conduit and remove obstructions, dirt, and debris if present.
3.02 PREPARATION
A. Field Measurement: The Drawings are generally diagrammatic and indicative of the
work. Contractor is responsible for modifying the work as needed to accommodate
offsets and other structural obstructions. Perform such modifications at no increase in
the Contract Price.
B. Obtain roughing-in dimensions of electrically-operated Products being installed in other
construction work. Set conduit and boxes only after receiving approved dimensions and
checking such equipment locations.
C. Install electrical Products to suit actual field measurements and according to accepted
trade standard practice. All electrical work shall conform to NEC 300 for wiring
methods general requirements, and to all other applicable Articles of the NEC
governing methods of wiring.
3.03 INSTALLATION
A. Methods of Wiring: In general fabricate conduit and raceway systems in accordance
with accepted trade standard practice. The following installation requirements are in
addition to requirements set forth in Article 300 of the NEC.
1. Cut conduits and raceways square and deburr cuts to the same degree as cuts
made by the material manufacturer. Ream cuts of conduits per NEC requirements
with openings not restricted more than cuts made by the material manufacturer.
6508.22 16050-9 ARRO
TOWN OF INDIAN HEAD –TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
2. Conduit smaller than 3/4-inch trade size is not permitted, unless indicated
otherwise. Running threads are not permitted; provide approved threaded
couplings and connectors for metal conduits where such are required.
3. Avoid bending conduits as much as possible and practical; use an approved
conduit bending tool or machine when bends are required. Do not install crushed
or deformed conduits, and remove same from the site. Use flexible conduit only
to the extent permitted by NEC.
4. Mount or suspend conduit and raceway systems directly on structural members,
except where indicated as being wall-mounted. Space supports in accordance
with NEC requirements.
5. Attach wall-mounted conduit and raceway runs tight to walls, following contour
of walls and securely attach anchors into walls.
6. Do not attach conduit or raceway systems to suspended ceiling members or to the
suspending mediums.
7. Do not weaken the structure by excessive or unnecessary cutting.
8. Make provisions for expansion in conduit and raceway runs where same cross
building expansion joints.
9. Make connections to motors and controls with an outlet located as close as
possible to motor. Make final connections from metal conduit to motors with
neat, flexible, liquid-tight conduit in lengths not to exceed eighteen inches.
10. Conceal conduits and raceways in the structure construction where practicable
unless otherwise indicated on the Drawings or required by the Engineer.
11. The means and methods are the responsibility of the Contractor.
12. Use the properly sized fittings based on the wire size, quantity of conductors, and
bending radii of conductors.
13. Low voltage, digital in or analog (48 volts or less) wires shall be installed within
dedicated conduit.
14. Digital out (120 volts) wires shall be installed within dedicated conduit.
15. Connect both ends of telephone cables within termination boxes to termination
blocks and label where the other end is located.
B. Concealed Work: Make conduit and raceway runs in concealed work grouped as much
as practical to avoid congesting the concealed spaces. The quality of workmanship in
electrical work in such spaces shall not be less than that exercised in exposed work.
C. Exposed Work: Make conduit and raceway runs in exposed work parallel to centerlines
and structure surfaces, and perpendicular to centerlines where required, with right angle
turns consisting of symmetrical bends or fittings. Maintain at least 6-inches clearance
between conduit and raceway runs and mechanical systems pipes, ducts, flues, etc. or
provide approved pipe covering over conduit for length of run.
D. Building Under-Floor Conduit Runs: Use Rigid Schedule 40 PVC conduits under
floors in slab-on-grade type construction.
1. Where conduits pass under building support walls encase such conduits in a
minimum of 3-inches of concrete.
2. Where two or more conduits are encased together provide a separation of not less
than two inches of concrete between them.
6508.22 16050-10 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
3. Install conduit placed in floor slab in the reinforced area of the slab.
4. Where conduit size prohibits in floor slab placement install conduits under the
slab and encase in a minimum of 3-inches of concrete.
E. Underground Systems: Install underground conduit systems in accordance with
Article 300-5 of the NEC, in accordance with previous requirements of this Section, and
the following requirements exceeding NEC:
1. Earthwork: Perform earthwork for buried conduit as specified previously for
electrical work under Trenching, Backfilling, and Compacting: Section 02221.
2. Install Concrete Encasement as indicated and detailed. Use 3,000 psi concrete as
specified in Section 03300.
3. Where concrete encasement is used on both single and banked conduits, crossings
under roadways, through soft fill, parking lots, or over other utility mains,
reinforce same as detailed on the drawings.
4. Bank conduits to the extent indicated and secure same in place with approved
separators installed at 5-foot intervals. Separators shall have sufficient strength to
prevent displacement of conduits when placing backfill or pouring concrete
encasement.
5. Where conduits are not encased in concrete coat with two coats of bitumastic
paint such as Tnemec Company, Inc. No. 46-449 Heavy-duty Black; Larson;
Carboline; or approved equal. Rigid Steel only.
6. Lay conduit lines to grade a minimum of four inches per 100 feet. Grade conduit
lines away from buildings except for conduit lines from one building to another,
in which case lay conduit lines level.
7. Where conduit lines run to underground structures, grade conduits to drain to
such.
8. Construct underground conduit lines to be absolutely watertight. Stagger conduit
couplings in banks of conduits.
9. Where conduits change direction or turn up at equipment, buildings, etc., use long
sweep elbows.
10. Provide two feet minimum cover over conduit or concrete encasement of conduit,
unless indicated otherwise on the Drawings.
11. Bring conduit concrete encasement up to grade at buildings and extend 4 inches
above grade in a neatly finished rectangular pad around conduits. Make a 3/4-
inch chamfer around all edges of the pad.
F. Conduit Installation Schedule:
1. Underground; under concrete slabs: Schedule 40 PVC.
2. In concrete slabs: Schedule 40 PVC.
3. Exposed Outdoor Locations: Schedule 40 PVC.
4. Exposed Dry Interior Locations: Schedule 40 PVC.
5. Exposed Wet Interior Locations: Schedule 40 PVC.
6. Interior Corrosive Atmosphere Locations: Schedule 40 PVC.
7. All corrosive atmosphere locations such as wet wells, open tanks (within and to
18-inches above the tank wall), headworks, grit chamber, gas digester, chemical
building, etc: PVC-coated rigid steel
6508.22 16050-11 ARRO
TOWN OF INDIAN HEAD –TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
8. Above Gypsum Board or Suspended Ceilings, or above 10’-0 height in dry
unclassified locations; In Gypsum Board Partition Walls: EMT or rigid steel
conduit.
9. Connections to motors, transformers, instruments, and control devices:
Liquidtight flexible conduit not more than 24 inches long for 1½-inch conduit and
less, and not more than 48 inches long for two-inch conduit and greater.
10. Signal and Instrumentation Cables: Rigid Steel (PVC-coated Rigid Steel in
corrosive atmosphere locations) in all locations, no exceptions.
11. Where penetrating or exiting a concrete slab or floor, use rigid steel conduit or
PVC coated rigid steel conduit, as the condition dictates, regardless of the conduit
type used within or under the slab. Extend above the slab at least 6” with the rigid
steel conduit.
12. Connections to motors, transformers, instruments, and control devices:
Liquid-tight flexible conduit, LFNC, not more than 24 inches long for 1½-inch
conduit and less, and not more than 48 inches long for 2-inch conduit and greater.
a. May not be used in Class 1, Division 2 locations except where allowed.
13. Signal and instrumentation wires and cables: Rigid steel or IMC in all locations
except PVC-coated rigid steel in corrosive or wet atmospheres; LFMC or LFNC
where flex is required.
a. LFMC may be used in Class 1, Division 2 locations where approved.
G. Corrosion Protection Installation: Install heat shrinkable tubing according to
manufacturer’s directions including selection of correct unshrunk tubing sizes, accurate
positioning of tubing on conduit, and shrinkage techniques. Provide Corrosion
Protection at structure penetrations, at concrete pads and through floor penetrations of
conduit.
H. Wiring: Install wiring in conduit unless indicated otherwise on the Drawings.
1. Do not perform wiring until work which might cause damage to the wires, cables
or conduits has been completed. Take the necessary precautions to prevent the
accumulation of water, dirt or other foreign material in the conduits during the
execution of the work.
2. Before installing wires or cables thoroughly clean conduits of foreign, gritty or
other matter that would in any way damage the sheath materials or the wire or
cable. Abrasions to wires, cables, or sheaths will not be acceptable, and shall be
replaced at the Contractor’s expense.
3. Color code wiring as recommended in NEC Article 210.5.
4. Make wire and cable splices in outlet or junction boxes per NEC, and install such
boxes in accessible locations.
5. A common neutral wire may be used on multiple circuits, within code limitations,
provided the neutral conductor is equal to the capacity of the phase wires in the
circuit.
I. Mounting Heights: Unless otherwise specifically instructed, locate mounting heights
from finished floor to centerline of box or cabinet of devices or apparatus, as stated
hereinafter. Those dimensions stated or indicated as clear are to the top or bottom of
the device, apparatus, plate or trim.
6508.22 16050-12 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
1. Lighting Control Switches: 48-inches maximum to top of switch box above
finished floor and on strike side of door, unless indicated otherwise on the
Drawings. Mount switches in tandem where not possible to mount side-by-side
with a common device plate.
2. Duplex Convenience Outlets in general locations: 18-inches to bottom of outlet
above finished floor, unless indicated otherwise on the Drawings. Locate outlets
in concrete block walls to fall in top of second course and in top center of
respective block in which they occur.
3. Duplex Convenience Outlets in garages and industrial facilities: 24-inches to
bottom of outlet above finished floor, unless indicated otherwise on the Drawings.
Locate outlets in concrete block walls to fall in top of third course.
4. Telephone Outlets: 18-inches to centerline of outlet above finished floor, unless
indicated otherwise on the Drawings.
5. Motor Safety Disconnect Switches: 48-inches to centerline of switch above
finished floor, unless indicated otherwise on the Drawings.
6. Lighting Fixtures: Locate as indicated on the Drawings.
7. Interior Wall-mounted Lighting Fixtures: 7 ft. 6-inches above finished floor,
unless indicated otherwise on the Drawings. Mount exterior fixtures as indicated
on the Drawings.
8. The Engineer shall have the option to require the Contractor to move outlets
(outlets as defined in NEC) a distance of ten feet or less before roughing-in,
without incurring additional expense to the Owner.
J. Grounding: Perform grounding of conduit systems, metal enclosures, equipment
frames, motors and receptacles in accordance with Article 250 of the NEC.
1. In addition to grounding and bonding requirements of NEC as referenced in the
preceding paragraph, the following shall also apply:
a. Make equipment grounds in spaces accessible to authorized personnel only.
Leave in-place made-grounds open until inspection and approval.
Equipment grounds shall have resistance not to exceed the limits set by
NEC.
2. Use approved grounding connectors only. Clean the surfaces involved in the
made-grounds before connecting and finish the installation with touch up painting
or other protective coating to prevent corrosion.
3.04 IDENTIFICATION
A. Feeder/Conductor Identification: Identify each cable of every feeder originating in a
main distribution panel, branch panel, motor control center, etc. with a nameplate, and
in every panel, cabinet, and pull box through which such feeder passes, enters or leaves.
1. Nameplates shall indicate the load served by the feeder, where it is from, where it
is going, the conductor size, and type of conductor insulation.
2. Provide laminated plastic (micarta) plates of 1-inch width minimum and drilled
and secured to the conductors with self-locking tie manufactured by Thomas and
Betts, Ideal Industries, Panduit Corp., or approved equal.
6508.22 16050-13 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
B. Contractor Option: In lieu of the above, provide heavy-duty vinyl cloth material tape,
pressure sensitive labels or markers as described under PRODUCTS.
C. In pull and splice boxes and such other places where feeders and branch circuits may
not be readily identified by nameplate markings on the equipment to which they
connect, permanently identify all such conductors. Prior to identifying such conductors,
lace the individual conductors together which form a feeder or branch circuit.
D. Instrumentation and Control Wiring Identification: Identify wire and cable at both ends
of the circuit with the wire or cable number, point of origin and point of termination.
1. Provide as-built information on control system wiring diagrams regarding wire or
cable identification numbering.
3.05 FIELD QUALITY CONTROL
A. Electrical Systems Test: As specified in Section 16010.
END OF SECTION
6508.22 16050-14 ARRO
TOWN OF INDIAN HEAD –TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
SECTION 16400
SERVICE AND DISTRIBUTION
PART 1 - GENERAL
1.01 SECTION INCLUDES
A. Service Entrance Equipment.
1.02 RELATED SECTIONS
A. Division 2 - Site Work.
B. Division 3 – Concrete.
C. Basic Electrical Requirements: Section 16010.
D. Basic Electrical Materials and Methods: Section 16050.
1.03 SUBMITTALS
A. Product Data: As specified in Section 16010, submittal information as required for the
items mentioned in this section.
B. Shop Drawings: As specified in Section 16010, submittals shall include required
information for the items mentioned in this section.
C. Operation and Maintenance Manuals: Provide operation and maintenance manuals as
specified in Section 16010.
D. Surge Protection Warranty.
1.05 PROJECT CONDITIONS
A. Utility Company:
1. Serving Utility Company: SMECO
B. Coordination of Service Installation: The following information is provided to assist the
Contractor in planning and is not to be construed to provide all details for the electrical
service installation. Contractor shall be responsible for all coordination with the electric
utility of details specified to this project.
1. Electric Utility Company’s Responsibility:
a. Furnish and Install:
6508.22 16400-1 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
(1) Pad-mounted transformer.
(2) Rate meter, current transformers, voltage transformers.
(3) Primary and Secondary Service Conductors.
b. Terminate and Energize:
(1) All SMECO cables.
2. Contractor’s Responsibility:
a. Provide trenching and backfill. Trenching shall be done in accordance with
electric utility company specifications.
b. Provide conduits, which shall be Schedule 40 PVC encased in concrete and
shall be installed in accordance with electric utility company specifications.
(1) A 1/4” pull rope shall be installed in spare conduits.
c. Provide underground conduit with long sweep elbows where conduit turns up
at equipment and building.
d. Provide conduit from C/T cabinet to meter.
e. Provide meter base.
f. Provide metering C/T cabinet.
g. Provide precast concrete transformer base.
h. Provide grounding ring for the transformer.
i. Provide a 200-amp service switch.
j. Provide protective barriers if required by the electric utility.
k. Contractor shall perform all installations in accordance with electric utility’s
rules for electric meter and service installations and any other requirements as
identified by electric utility.
l. Provide a red warning tape over the conduit banks.
C. Electrical Parameters:
1. Restroom:
a. 120/240V, 1-phase, 3-Wire service will be required.
b. 200-amp service.
D. SMECO charges shall be paid by the Town of Indian Head.
E. All other costs associated with the service, such as fees and inspection charges, shall be
included in the Contract Price.
PART 2 - PRODUCTS
2.01 MATERIALS
A. Basic Electrical Materials: Those Products such as conduit, wireways, wire and
connectors, cable (other than that as specified in this Section), support devices,
fasteners, and similar devices, as required for the Work of this Section are as specified
in Section 16050.
2.02 SERVICE EQUIPMENT
6508.22 16400-2 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOMTY
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
A. Surge Protective Device (SPD): Provide the SPD protection on each phase in
accordance with Article 280 of the National Electrical Code. The SPD unit shall meet
ANSI/IEEE C62.41 Location C, B & A; UL 1449 3rd edition; UL 1283 Tracking Filter;
NEMA LS1 Compliances, 2.2-9 and 3-9; component level fusing, NEMA 4x enclosure;
25-year unlimited free replacement warranty.
1. Main Service Entrance:
a. Maximum Rated Surge Current: 240kA per phase; 120kA per mode.
b. Acceptable Manufacturer:
1) Total Protection Solutions; Model SurgeTrack TK-ST240-3Y480-L.
2) Surge Suppression Inc.
3) Square D.
4) Or Equal; equal means it must meet or exceed the above requirements
and those of the SurgeTrack published data with confirmation of such.
The warranty period must extend for 25-years and provide complete
unlimited replacement due to defect in workmanship, materials, or any
electrical anomaly including lightning.
2.03 DISTRIBUTION EQUIPMENT
A. As shown on drawings
PART 3 - EXECUTION
3.01 INSPECTION
A. Verify other construction work is complete to the extent that substrates on which
electrical apparatus is to be installed is ready to receive same.
B. Refer to wire and cable sizes on single line diagrams to determine size and configuration
of lugs, compression terminal connectors, or pig-tail splices required.
C. Refer to panel schedules for breaker requirements, auxiliary contacts, and other
accessories and modifications that may be required for equipment ordering.
D. Obtain the full load running current and service factor for all motors and size the
overload relays in accordance with this data.
E. Verify direction of motor rotation in equipment before making final connections to
electrically operated equipment.
3.02 INSTALLATION
6508.22 16400-3 ARRO
TOWN OF INDIAN HEAD –TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
A. General: Install or mount the PRODUCTS of this Specifications Section, at locations
indicated, square and plumb with respect to visible structures lines, with power
connections made, and such PRODUCTS left in proper operating condition.
B. Perform concrete work indicated for service and distribution equipment installation as
specified in Division 3 – Concrete.
C. Methods of Wiring: Perform wiring as specified in Section 16050.
D. Cleaning: Clean installed PRODUCTS of this Specifications Section where deposits of
oil, grease, dirt, dust, mud, or debris is present after installation. Use detergent-water
solution, solvents where necessary, or other liquid cleaners not harmful to material and
equipment finishes.
E. Grounding: Perform grounding of service and distribution equipment as specified in
Section 16050.
3.03 SERVICE WIRING
A. Service installation as indicated on the Drawings except that the entire installation shall
conform to the latest rules and regulations of the serving Electric Utility Company.
B. Install the service entrance and surge arrester with the shortest leads and ground
connection as possible.
3.04 FIELD QUALITY CONTROL
A. Electrical Systems Test: As specified in Section 16010.
END OF SECTION
6508.22 16400-4 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
SECTION 16450
GROUNDING
PART 1 - GENERAL
1.01 SECTION INCLUDES
A. Grounding.
1.02 RELATED SECTIONS
A. Division 2 - Site Work.
B. Basic Electrical Requirements: Section 16010.
1.03 REFERENCES
A. National Electrical Code (NFPA 70), Article 250.
1.04 SUBMITTALS
A. General: In addition to the submittal requirements of Section 16010, submit product
literature on exothermic weld material.
PART 2 - PRODUCTS
2.01 MATERIALS
A. Bare Ground Wire: UL Listed soft drawn copper, Class A or Class B stranded, meeting
the requirements of ASTM B8, and sized in accordance with the NEC except where the
sizes indicated on the Drawings are larger than those required by the NEC.
B. Insulated Ground Wire: UL Listed, copper, Class B stranded, 600 volt, 90 degrees C
insulated and jacketed according to NEC. Sizes as indicated on the Drawings.
C. Clamps and Connectors: UL Listed and having materials conforming to use
requirements of NEC Article 250.
1. Multi-Bolt Solderless Compression Clamps: High strength electrical bronze with
silicon bronze clamping bolts and hardware. Bolts, nuts, lockwashers, and similar
hardware designed not to damage ground wire.
6508.22 16450-1 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
2. Exothermically Welded Connectors: Exothermically welded type, and products of
one manufacturer to ensure product compatibility. Connectors may be Cadweld or
Thermoweld, or equal. Connector types include:
a. Cable to tee splices and X connectors.
b. Structural steel to ground connectors.
c. Ground rod connectors.
d. Bus bar connectors.
D. Ground Rods: UL Listed rods of medium carbon steel core and copper clad.
1. Use ground rods of 3/4-inch diameter by ten feet long, unless indicated otherwise
on the Drawings.
E. Conduit Ground Bushings: Galvanized malleable iron with screw pressure connector;
insulated throat where required.
F. Ground Bus: Minimum 1/4-inch by two-inch size, rectangular copper bars designed to
receive bolted connections. Provide silicon bronze bolts and hardware, and tinned
copper compression terminals for ground wire connections to bus.
PART 3 - EXECUTION
3.01 INSTALLATION
A. General:
1. Ground metallic conduits, wiring channels, armored cables continuously from
outlet to outlet and from outlets to cabinets, junction or pull boxes.
2. Secure grounds to boxes in such a manner that each system is mechanically secure
and electrically continuous from the point of service to each outlet.
3. Provide termination of conduits with double locknuts and bushings.
4. Clean paint, grease, and such other insulating materials from contact points of
grounds.
B. Exothermically Welded Connections:
1. Make grounding connections of conductors to conductors, to ground rods, to steel
structures including reinforcing bars, to lugs, and other applications as indicated
or specified by the exothermically welded process using manufacturer’s
recommended molds, weld metal and accessory items for the application.
2. Test completed exothermic welds by striking with two-pound hammer. If cracks
develop, replace welds at no additional expense to the Owner. When required by
the Engineer, test the electrical continuity of bonds.
C. Underground Systems: Perform earthwork for buried grounding systems as specified
for electrical work under Section 02221.
6508.22 16450-2 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
3.02 GROUNDING
A. Grounding: In addition to grounding and bonding requirements of NEC, the following
shall also apply:
1. Make grounds in spaces accessible to authorized personnel only. Leave in-place
made-grounds open until inspection and approval. Service ground resistance not
to exceed 5 ohms even though the NEC allows 25 ohms.
2. If more than one ground rod is required to obtain 5 ohms or less, space those rods
no less than 10'-0" apart from each other.
3. Use approved grounding connectors only. Clean the surfaces involved in the
made-grounds before connecting and finish the installation with touch up painting
or other protective coating to prevent corrosion.
4. Ground Structural Steel In Buildings: Provide ground rod adjacent to columns
and attach No. 4/0 grounding conductor to column web below level of finished
floor. Bond building steel at expansion joints using a steel wire braid with
permanent attachment to the steel members involved at the joint.
5. The ground bus in the service entrance equipment shall be bonded to metallic
piping and building steel (if any) as required by Article 250.92 of the National
Electrical Code, Bonding Jumpers are not shown on layout drawings and shall be
installed to suit actual field conditions.
6. Two or more buildings, structures, or equipment supplied from a common service
shall adhere to Article 250.32.
B. Ground conduit systems, metal enclosures, equipment frames, motors, and receptacles
in accordance with Article 250 of the NEC.
C. Equipment Grounds: Make such grounds not to exceed the limits set by NEC.
1. Terminate grounds with closed lugs (spade lugs not permitted) and star washers
on both sides with minimum 1/4-20 bolt and nut. Do not install grounding lugs
on flanges, mounting screws or standoffs in switches, distribution boxes or panels.
2. Ground light fixtures according to requirements of NEC Article 410.V.
3. The equipment Grounding Conductor shall never be a system neutral or a current
carrying conductor.
4. Provide portable electrical equipment with a cord having equipment grounding
conductor and a NEMA and UL approved cord cap.
5. Electrical and electronic equipment shall not ground neutral to chassis, racks,
equipment ground conductor or any non-current carrying conductor.
6508.22 16450-3 ARRO
TOWN OF INDIAN HEAD –TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
D. Ufer Ground (Concrete-Encased Grounding Electrode): Fabricate according to
NFPA 70, Paragraph 250-52(A)(3), using a minimum of 20 feet of bare copper
conductor not smaller than No. 4 AWG, or 20 feet of electrically conductive coated steel
rebar of not less than 1/2 inch in diameter. If concrete foundation is less than 20 feet
(6m) long, coil excess conductor within the base of the foundation. Bond grounding
conductor to reinforcing steel in at least four locations and to anchor bolts. Extend
grounding conductor below grade and connect to building grounding grid or to a
grounding electrode external to concrete.
3.03 FIELD QUALITY CONTROL
A. General Field Test: Furnish tools, materials, equipment and instruments required and
conduct tests to demonstrate to the satisfaction of the Engineer the following
requirements.
1. That all grounding materials and systems installed are in useable condition and are
as represented on the Drawings.
END OF SECTION
6508.22 16450-4 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
SECTION 16500
LIGHTING
PART 1 - GENERAL
1.01 SECTION INCLUDES
A. Lighting materials and installation
1.02 RELATED SECTIONS
A. Division 2 - Site Work.
B. Division 3 - Concrete.
C. Painting: Section 09900.
D. Basic Electrical Requirements: Section 16010.
E. Basic Electrical Materials and Methods: Section 16050.
F. Grounding: Section 16450.
1.03 QUALITY ASSURANCE
A. Source Quality Control: When requested by the Engineer, show proof that materials,
apparatus, or devices used in lighting for this Project meet the requirements of UL as
regards fire and casualty hazards.
B. Design Criteria:
1. Fixture manufacturers and corresponding model numbers, as included in the
LIGHTING FIXTURE SCHEDULE, indicated on the Drawings, constitute the
Project design.
2. Lighting fixtures as scheduled are correct for the Project design with respect to
visible style, number of lamps and lenses desired. The Engineer assumes no
responsibility for clearances, dimension tolerances, or exact hanging frame
dimensions.
1.04 REFERENCES
A. American National Standards Institute (ANSI):
1. ANSI 05.1; Wood Poles, Specifications and Dimensions.
6508.22 16500-1 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
2. ANSI 011.1; Coal-Tar Creosote for the Preservative Treatment of Piles, Poles,
and Timbers for Land and Fresh Water Use.
3. ANSI C29; Wet-Process Porcelain Insulators.
B. American Society for Testing and Materials (ASTM):
1. ASTM A36; Structural Steel, Spec. for.
2. ASTM A153; Zinc Coating (Hot-Dip) on Iron and Steel Hardware, Spec. for.
3. ASTM A595; Steel Tubes, Low-Carbon, Tapered for Structural Use, Spec. for.
1.05 SUBMITTALS
A. Product Data: As specified in Section 16010; submittals required for the following
items:
1. Light Fixtures and Mounting Accessories.
2. Light Standards.
3. Timed Control.
B. Shop Drawings: As specified in Section 16010; submittals required for the following:
1. Specially-fabricated supporting and fastening devices.
2. Details of assemblies and sub-assemblies.
C. Any lighting fixture requested for substitution in or on the restroom/pavilionbuilding
must meet the 2006 International Building Code requirements. Any substitute must be
accompanied with the indoor watts/sq ft number equaling or being less than 1.3-watts/sq
ft.; and the outdoor wall mounted fixtures for general lighting being less than 5-
watts/linear foot of the perimeter wall being lit. Exterior door lights may not be greater
than 30-watts/linear foot of door. This will have to be shown on the submittals.
1. Submittals will be rejected if there is not enough information for the Engineer to
make a complete evaluation without having to calculate any values.
2. It shall be entirely up to the Engineer whether the lighting fixtures submitted as
substitutes will be approved as equals.
D. Extra Stock: Provide ten percent extra compliment of each lamp type specified on the
Project. Store extra stock where directed by the Engineer.
1.06 DELIVERY, STORAGE AND HANDLING
A. In addition to the requirements of Section 16010, deliver Light Fixtures and Mounting
Accessories fully packaged and clearly identified as to product content.
B. Handle and store the packaged products in a manner which will prevent breakage of
packaging and damage to contents, and store such products out of damage by the
environment.
6508.22 16500-2 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
PART 2 - PRODUCTS
2.01 MATERIALS
A. Basic Electrical Materials: As specified in Section 16050.
1. Saddle Clamps: Composed of a single-piece open design bar steel loop and
high-strength cast steel saddle, both plated for corrosion resistance. Saddle
designed to grip-lock in place by means of locking bolt. Use ROTA LOCKS by
Up-Right Scaffolds; Pentair; Global Truss; or Approved Equal.
2. Fixture Supports: In addition to Supporting Devices and Fasteners specified in
Section 16050, provide with lighting equipment and luminaries specified, or
indicated, suspension accessories, canopies, casing, sockets, holders, reflectors,
plaster frames, recessing boxes, etc., as required for support.
B. Underground Service (Lighting) Cable: UL Listed AWG No. 8 stranded conductors of
98 percent conductivity copper Type THWN insulated and rated at 600 volts.
C. Waterproof Splice Kit: Molded rubber composition and designed to create a watertight
seal on the cable jacket as well as the splice.
1. Elastimold Division Amerace-Esna Corp.; Fused and Single & Multi-Conductor
Connector Kits.
2. Joy Manufacturing Company.
3. 3M
4. Or Approved Equal.
D. Grout Materials: As specified in Section 03600.
2.02 LIGHT FIXTURES AND MOUNTING ACCESSORIES
A. Lamps: Provide proper type lamps for lighting fixtures indicated or scheduled on
Drawings and having proper sockets to suit such fixtures.
1. Incandescent lamps of 120 VAC.
2. Fluorescent lamps matching voltages to installed fixtures.
3. Sodium vapor lamps matching voltages to installed fixtures.
4. Mercury vapor lamps matching voltages to installed fixtures.
5. Metal Halide lamps matching voltages to installed fixtures.
B. Lighting Fixture Ballasts: Provide UL approved and certified ballasts. Certification by
Certified Ballast Manufacturers (CBM) Association in accordance with standard ballast
specifications established by ANSI.
1. Fluorescent Fixture Ballasts: Provide fixtures equipped with high-power-factor,
multi-lamp capacity, rapid-start, low noise level, stroboscopic corrected ballasts.
Ground ballasts in accordance with NEC and provide in-fixture automatic
resetting thermal protection for ballasts and Capacitors. Provide energy saving
ballasts suitable for fluorescent energy saving lamps.
6508.22 16500-3 ARRO
TOWN OF INDIAN HEAD –TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
C. Exterior Fixtures: Fixtures factory equipped with waterproof gaskets and anodized
aluminum frames, unless indicated otherwise on the Drawings, and designed to be
completely waterproof.
1. Brackets: Of type and style as specified or required and color matched to the light
fixture. Provide outlet boxes, cork-buna gaskets and stainless steel hardware to
render installation waterproof.
2. Finish: Free of scratches and other surface blemishes.
D. Emergency Light Unit: Underwriters’ Laboratory approved to provide emergency light
automatically and instantaneously upon failure or interruption of normal electric power.
1. Charger: Solid-state, designed to restore battery to full charge in 12 hours after
discharge up to 1.5 hours with a 100-watt load. Charger components design
overrated to 50 percent for extended life.
2. Battery: 3-cell, 6 volt, lead-acid, calcium-alloy grid type in a sealed high-impact,
heat-resistant, transparent case, and capable of unattended operation for 10 years
(guaranteed).
3. Case: Seam welded and ground 14-gauge sheet steel with 7-gauge rear mounting
lugs. Door continuous hinged, held by two screw bolts and neoprene gasketed.
Case finished inside and out with baked enamel over phosphatized metal
treatment.
4. Lamps: Both case-mounted and remotes specially designed for class 12 use.
Lamps capable of both vertical and horizontal adjustment. Lamps finished equal
to case.
5. Acceptable Manufacturers:
a. Exide, ESB Incorporated; Model FSS Class 12, Lamps: 25W.
b. Yorklite Electronics, Inc.
c. Tork Time Controls.
d. Or Equal.
E. Illuminated Exit Signs: Brushed satin aluminum stencil-face units with color permanent
fiberglass, or equal, letter panels and directional arrows as required.
1. Extended life lamps included (50,000 hrs, 20 watt, 120 volt); downlight provided.
2. Units adaptable to single or double circuit.
3. Positive-position doors, no springs or screws; knockout provisions for emergency
socket.
4. Cast aluminum canopy; extruded aluminum housing; matte black finish; Provide
end, ceiling or back mounting hardware as suited to position indicated on
Drawings.
5. Acceptable Manufacturers:
a. Perfeclite, Incorporated.
b. Cooper Industries.
c. Lithonia Lighting
d. Or Approved Equal.
6508.22 16500-4 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
F. Lighting Contactors: Single-or multi-pole, electrically-operated mechanically held type,
continuous duty for all type of lamp loads. Number of poles per contactor, amperages
and load voltages as indicated on the Drawings.
1. Construction: Flush dead back design with arc shields and barriers to prevent
pole-to-pole flashover. All parts accessible for inspection and maintenance.
Contacts readily replaceable from front of panels. Contactors suited for
non-inductive 1 ads. Interrupting capacity 150 percent of rating with no derating
for high inrush loads.
2. Enclosure: NEMA 1 surface type, unless indicated otherwise on Drawings, with
provision for padlocking.
3. Acceptable Manufacturer:
a. Automatic Switch Co.; ASCO 1038 Series.
b. Square D Company.
c. Allen-Bradley.
d. Or Equal.
PART 3 - EXECUTION
3.01 INSPECTION
A. Verify that other construction work is complete to the extent that light fixtures may be
installed over substrates or incorporated into integrated systems.
B. Verify locations and clearances of other installed or proposed work and coordinate
lighting fixture installations accordingly.
C. Prior to ordering flush-mounted or lay-in installed lighting fixtures, verify their
locations and clearances to be coordinated with other construction work.
3.02 INSTALLATION
A. General: Assemble where required, wire and install lighting fixtures, supports, brackets,
and accessories at locations and mounting heights indicated on the Drawings.
1. Methods of Wiring: Perform wiring as specified previously in Section 16050.
2. Ground light fixtures according to requirements of NEC Article 410.E.
3. Ground light fixtures according to requirements of Section 16450.
4. Lamp those permanent light fixtures, as used for temporary lighting during
construction, with Contractor’s own lamps. Remove temporary lamps at
acceptance of Work and install new proper lamps in each fixture. New lamps
shall be in perfect working order.
5. Provide emergency light unit power source breaker with a locking device.
Provide locking device compatible with breakers provided.
6508.22 16500-5 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
B. Recessed Fixtures: Support recessed fixtures on ceiling system structural elements
rather than its surface materials such as tiles, plaster, drywall, etc.
1. Use mounting yokes furnished with the fixtures and where required, use supports
as specified in Section 16050.
2. Locate fixtures in center of panel where installed in modular tile ceilings, unless
indicated otherwise. Refer to Reflected Ceiling Plan.
3. Install suitable sealing gaskets where light leaks occur through gaps between the
recessed fixture trim and adjacent surface.
C. Exposed Fixtures: Install surface-mounted and exposed fixtures where indicated on the
Drawings.
1. Hang suspended fixtures plumb, with continuous rows of fixtures in alignment.
2. Unless indicated otherwise on the Drawings, mount suspended fixtures in each
room or area at the same height regardless of varying clear height conditions.
3. Install surface-mounted fixtures drawn up tight against the substrate to eliminate
gaps, except where NEC or local code restrictions require a separation between
fixtures and substrate.
4. Install Exit fixtures directly over doorways, for those doors as indicated on the
Drawings. Center fixtures over doorway and install fixtures to clear door and
associated hardware.
D. Fixture Cleaning:
1. Follow the cleaning procedures as recommended by the fixture manufacturer with
respect to new fixture cleaning for construction work practice.
2. Use only those products for cleaning as outlined in the fixture manufacturer’s
literature.
3.03 FIELD QUALITY CONTROL
A. Electrical Systems Test: As specified in Section 16010.
1. Additionally, render lighting fixtures operational according to manufacturer’s
specifications.
END OF SECTION
6508.22 16500-6 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
SECTION 16850
ELECTRIC RESISTANCE HEATING
PART 1 - GENERAL
1.01 SECTION INCLUDES
A. Wall Heaters.
1.02 QUALITY ASSURANCE
A. Source Quality Control: When requested by the Engineer, show proof that materials,
apparatus, or devices used in the electric heating equipment for the Project meet the
requirements of UL as regards fire and casualty hazards.
B. Manufacturer’s Guarantee: In addition to the guarantee requirements stated in the
Conditions of the Contract provide an additional manufacturer’s five-year guarantee
covering the heating element.
1.03 SUBMITTALS
A. Product Data: As specified in Section 16010; submittals required for the following
items:
1. Electric Unit Heater (Corrosion-Resistant).
B. Submit control diagrams indicating control devices and interconnecting wiring.
PART 2 - PRODUCTS
2.01 MATERIALS
A. Basic Electrical Materials: As specified in Section 16050.
B. Supports: In addition to the Supporting Devices and Fasteners as previously specified
in Section 16050, provide with the heating equipment specified, suspension accessories
and other apparatus as may be required for support.
2.02 ELECTRIC UNIT HEATER
A. Wall Insert Electric Heater: Provide UL Listed forced air heater units (and optional
accessory controls) of capacities indicated on the Drawings.
1. Acceptable Manufacturers:
a. Trane Model UHWA, Series 20
6508.22 16850-1 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
b. Electromode, Division of Singer.
c. Berko; Type FRA.
d. Or Equal.
PART 3 - EXECUTION
3.01 INSPECTION
A. Verify other construction work is complete to the extent that electric heating equipment
may be installed.
B. Verify locations and clearances of other construction work and coordinate installation of
electric heating equipment.
3.02 INSTALLATION
A. General: Assemble where required, provide electric heating equipment, accessories,
supports and brackets at their respective locations as indicated on the Drawings.
B. Installation Instructions: Install those Products, as specified previously under PART 2
and not specifically covered for installation herein under PART 3, in strict accordance
with manufacturer’s installation instructions and at locations indicated on the Drawings.
C. Methods of Wiring: Perform wiring as specified in Section 16050.
3.03 FIELD QUALITY CONTROL
A. Electrical Systems Test: As specified in Section 16010.
1. Additionally, render electric heating equipment operational according to
manufacturer’s specifications.
END OF SECTION
6508.22 16850-2 ARRO
TOWN OF INDIAN HEAD – TRAILHEAD RESTROOM
SHA Contract No. CH257B51
F.A.P Contract No. AC-TAP-3(871)E
EXHIBITS – WATER AND SEWER DETAILS
IMPORTANT PLEASE NOTE: All publications located within the Planning and Growth Management
section of the web site are believed to be accurate as of their posting date. However, they may not be
accurate on the day you view them. To verify whether these documents are the most current official
document, please contact the division associated with the document in question.
SECTION 02553
WATER SERVICES, WATER METER SETTINGS, AND VAULTS
02553.01 GENERAL
A. Description
Water services, water meter setting, and vault installation shall include, but not necessarily be limited
to, furnishing and placing water services with appurtenant meter housings, backflow prevention
assembly/device, and connection to the water main in accordance with the Contract Documents.
B. Related Work Included Elsewhere
1. Trench excavation, backfill, and compaction; Section 02250.
2. Water main installation and chlorination; Section 02551.
3. Water valve and appurtenance installation; Section 02552.
4. Cast-in-place concrete; Section 03300.
5. Precast concrete utility structure installation; Section 03400.
6. Abandonment; Section 02150.
C. Quality Assurance
1. Materials
The County will inspect all materials before and after installation to ensure compliance with the
Contract Documents. Any unauthorized material shall be marked and removed from the site
immediately.
2. Field Tests
Water services and water meter settings will be visually inspected for leakage by the County at
the existing water main line pressure before the excavation is backfilled. The corporation stop,
service laterals and valves shall be tested in accordance with the water main at 150 psi. Meter
settings, piping, and connections shall be leak free under line pressure.
D. Submittals
1. Shop Drawings
Shop drawings shall be submitted as specified in the "General Provisions" for the following
materials, and include the following information:
SPECIFICATIONS – MAY 1996 REVISED-NOVEMBER 2015
WATER SERVICES, WATER METER SETTINGS, AND VAULTS 02553-2
a. Aluminum access hatches: product description, parts and materials list, and load rating.
b. Water meters larger than 2-inch and 5/8-inch to 2-inch meter setting appurtenances:
materials list naming manufacturer, model number, and any applicable options specified
herein.
c. Couplings for 3-inch or larger meter settings: product description and parts and materials
list
2. Certificates of Compliance
Certificates of compliance shall be submitted as specified in the "General Provisions" for the
following:
a. Contractor furnished meters: stating the manufacturer has tested the meter for accuracy of
registration and that it complies with the accuracy requirements of the applicable AWWA
standard.
02553.02 MATERIALS
A. Materials Furnished by the County
1. The County will furnish and install meters for all services requiring 5/8-inch through 4-inch
meters. The County will furnish for installation, only to a master plumber, meter bottoms in
excess of 1 inch with the meter head set by the County.
2. The master plumber will furnish and install meter appurtenances for all water service
connections in accordance with Federal and State Lead Free regulations.
B. Contractor's Options
1. The Contractor may furnish precast concrete or plastic water meter vaults for 5/8-inch (single
and twin meter settings) through 1-inch water services.
C. Detailed Material Requirements
1. Water Meters
a. Water meters for water service shall be Badger or other County acceptable meters only.
b. Inside water meters or in-ground water meters will be used for commercial and industrial
services.
c. In-ground water meters will be the only approved meter to be used for residential services.
d. In-ground water meter vaults will be installed at the property line or easement line as
specified in the Standard Details.
SPECIFICATIONS – MAY 1996 REVISED - NOVEMBER 2015
WATER SERVICES, WATER METER SETTINGS, AND VAULTS 02553-3
e. In-ground water meter vaults shall not be installed in sidewalks, driveways, traffic areas,
paved areas, areas where access to the meters can be restricted by shrubbery, vehicles,
fences, or equipment.
f. In-ground water meter covers: All covers shall be Ford Company electronic meter cover with
removable plug or County approved equal, as specified in the Standard Details.
2. Water Service
a. Water services for 1-inch through 2-inch shall be Copper tubing Type K, annealed, and shall
meet the material, chemical, and mechanical requirements of ASTM B 88.
b. Minimum single domestic water and fire service size shall be 1-½ inch.
c. Single domestic water services in length of 100 feet to 850 feet, as measured from the main
to the dwelling, shall be 1-½ inches in size.
d. Single domestic water services in excess of 850 feet shall be 2-inches in size.
e. All other water service connections shall be submitted to the County for approval.
f. All water service connections shall be protected from backflow as outlined in the Charles
County Water and Sewer Ordinance
3. Service pipes and fittings 3-inch diameter and larger for water shall be as specified in Section
02551.02.
4. Gate valves, roadway valve boxes, and tapping sleeves for water services shall be as specified in
Section 02552.02.
5. Pipe for meter support in 2-inch metered water supplies shall be galvanized steel as specified in
Section 02552.02.
6. Corporation stops with flared coupling nuts shall be Mueller Catalog Number H-15000, or
County approved equal.
7. Copper tube couplings shall be flared type per Mueller Catalog Number H- 15400, or County
approved equal.
8. Meter settings
a. Outside setting - All fittings, yokes, appurtenances, dual check valves, pressure reducing
valves, backflow preventors, shall be manufactured by the Ford Company, provided and
installed by a master plumber and as specified in the Standard Details. All backflow
prevention assemblies/devices are required to be ASSE certified and installed by a Maryland
Master Plumber with current backflow certification. Plumbers are required to register with
the Cross Connection Control Specialist prior to performing any work within Charles County.
SPECIFICATIONS – MAY 1996 REVISED - NOVEMBER 2015
WATER SERVICES, WATER METER SETTINGS, AND VAULTS 02553-4
Inlet service line, angle valve, meter vault, lids and covers shall be provided and installed by
the contractor as specified in the Standard Details.
b. Inside setting - All yokes, fittings, isolation valves, pressure reducing valves, backflow
preventors, appurtenances, and wire to be provided by the plumber and set per the
Standard Details. Yokes shall be compatible with and capable of accepting current Badger
or other County acceptable meter models used by the County.
Fittings, yokes, and appurtenances for 5/8 through 2-inch metered water supplies shall be
manufactured by the Ford Meter Box Company. The meter fittings and the meter pit
frames, lids, and covers shall be as specified on the Standard Details.
c. All water service connections shall be protected by a County approved ASSE certified
backflow prevention assembly or device as outlined in the Charles County Water and Sewer
Ordinance
9. Aluminum access hatches for 3-inch or larger meter vaults shall be designed to withstand a live
load of 300 pounds per square foot or a H-20 wheel load when specified on the contract
documents. Door leaf shall be 1/4-inch aluminum diamond or safety tread pattern plate.
Channel frame shall be 1/4-inch aluminum with concrete anchor flange around the perimeter,
bituminous coated where in contact with concrete, and a 1 ½-inch drainage coupling. Doors
shall be equipped with brass hinges, stainless steel pins, spring operators, and an automatic
hold-open arm with release handle. The door shall have a snap lock with a removable handle.
The door shall be operable by a force not to exceed 30 pounds. Access hatches shall be Bilco
model J-4AL, or County approved equal.
10. Pipe couplings for 3-inch or larger meter settings shall be a gasketed, sleeve-type. Couplings
shall consist of one steel middle ring, two steel followers, two rubber-compounded wedge
section gaskets suitable for use with potable water, and sufficient track-head steel bolts to
compress the gaskets. Couplings shall be factory coated with rust inhibitive paint.
11. Tapping saddles shall be manufactured of stainless steel or lead free bronze. Saddles shall be
furnished with stainless steel straps, with a minimum 2 1/2-inch wide bearing area, and a rubber
gasket suitable for potable water.
12. Portland cement concrete for cast-in-place meter vault lids and bases shall be Mix No. 3 as
specified in Section 03310.
13. Concrete reinforcement shall be as specified in Section 03200.02.
14. Link seals by Thunderline Corporation with stainless steel option for pipe wall penetrations
shall be as specified in Section 02562.
15. Precast meter vaults shall be precast concrete vaults of the size indicated on the Standard
Details furnished and installed as specified in Section 03400.
16. Round prefabricated polyvinyl chloride (PVC) plastic water meter vaults shall be used in high
groundwater locations in lieu of precast meter vaults outside of traffic bearing areas. They shall
SPECIFICATIONS – MAY 1996 REVISED - NOVEMBER 2015
WATER SERVICES, WATER METER SETTINGS, AND VAULTS 02553-5
be manufactured by the DFW Plastics, Mueller Company, or County approved equal for the
following sizes:
5/8, ¾, 1-inch service with single meter 18-inch diameter vault
1 ½ or 2-inch service with single meter 24-inch diameter vault
5/8, ¾, and 1-inch service & sprinkler system with 30-inch diameter vault
single meter
1 ½ or 2-inch service & sprinkler system with single 30-inch diameter vault
meter
Above 2 inch service Submit shop drawings to County Engineer for
approval
The prefabricated meter vaults shall also comply with the following:
a. Prefabricated water meter vaults shall be furnished with a standard Charles County Meter
Frame and Cover as shown on the Standard Details.
b. The meter setting shall be furnished with a bleed valve on the outlet side of the setting.
c. The angle meter valve and angle meter coupling shall be as shown on the Standard Detail to
assure interchangeability of County standard meters.
d. The meter yoke will not be required for prefabricated meter vaults using a rigid moveable
internal platform which permits the meter to be raised to the surface for reading and
servicing without disconnecting any piping.
17. Brick and concrete masonry units for meter vaults shall be as specified in Section 04200.02.
02553.03 EXECUTION
A. Water Services, Water Meter Settings, and Vaults
Water services, water meter settings, and vaults shall be installed in accordance with the requirements
for the specific materials indicated above, in accordance with the Contract Documents, and the
following:
1. Water services shall be jacked or driven under paving unless otherwise directed by the Engineer.
Where open cutting is authorized, trench widths shall not exceed 24 inches. Water services
installed in areas other than paving areas may be open cut or driven at the Contractor's option.
2. All services shall be laid to the grade and lines in accordance with the Contract Documents or as
directed by the County.
3. All meter vaults shall be set at the location, and constructed of the materials shown in the
Contract Documents.
4. All meter vaults shall be set at the location, and constructed of the materials shown in the
Contract Documents. Grading shall be provided such that the frame and cover is flush around
SPECIFICATIONS – MAY 1996 REVISED - NOVEMBER 2015
WATER SERVICES, WATER METER SETTINGS, AND VAULTS 02553-6
the perimeter with final proposed grades to allow for maintenance and not to create a public
safety hazard.
5. Special care shall be taken to insure that the services are well bedded on a solid foundation.
Any defects resulting from settlement shall be repaired by the Contractor at the Contractor's
expense. All meter vaults shall be bedded on firm undisturbed earth. The pipe and fittings shall
be thoroughly cleaned before being installed, and shall be kept clean until the acceptance of the
complete work.
6. All services shall be thoroughly flushed with potable water. Services larger than 2-inch diameter
shall be chlorinated as specified in Section 02551.
7. Water services shall be constructed only to those existing houses shown on the Plans or as
directed by the County. All service ends not immediately connected to house service shall be
provided with a cap to prevent any foreign matter from entering the pipe. Crimping of service
ends will not be allowed.
8. Meter settings shall be level and the long axis of the setting shall be perpendicular to the
proposed curb and gutter or edge of pavement in the case of open section roadways. Where
the setting is remote from the roadway the long axis of the meter setting shall be aligned with
the center line of the water service.
B. Connections to Water Mains
1. Service connections to existing water mains shall be made with tapping saddles or sleeves
except for connections 1-inch and less to ductile or cast iron pipe which may be made by direct
tap. Direct taps larger than 1-inch to ductile or cast iron pipe shall be allowed only where
authorized by the County.
2. Service connections to new water mains shall be made by direct tapping ductile iron water
mains for up to 1-inch services only, by installing appropriate outlet fittings and valves as the
water main is being constructed, or by installing approved tapping saddles, tees, or sleeves.
3. Corporation taps or tapping sleeves and service laterals with curb stops shall be installed on new
water mains before the water mains have been chlorinated and tested in accordance with the
Specifications.
02553.04 METHOD OF MEASUREMENT
RESERVED FOR FUTURE USE
02553.05 BASIS OF PAYMENT
A. General
RESERVED FOR FUTURE USE
B. Water Services
SPECIFICATIONS – MAY 1996 REVISED - NOVEMBER 2015
WATER SERVICES, WATER METER SETTINGS, AND VAULTS 02553-7
RESERVED FOR FUTURE USE
C. Meter Settings and Vaults
RESERVED FOR FUTURE USE
D. Meter Relocation
RESERVED FOR FUTURE USE
SPECIFICATIONS – MAY 1996 REVISED - NOVEMBER 2015
012045167897 44 27 47784704 4
!"#$%&#'$%&(!)%*+*,-.!&/,0(+*12
3.#45657877#49:8#;
3*9#</!!/%1#3%=>#?@*,-.!&%,&A#?BCDA#'<3%=>6(+*,-.!&%,&)1=*&(1%>!%,=(0*E2
@+9#B.-%,#B*!*#?@*,-.!&%,&A#'BB*!*(+*,-.!&%,&)1=*&(1%>!%,=(0*E2F#@G/-&>#H,%!#'@H,%!)1=*&(1%>!%,=(0*E2F#H/&,>#I%+-*,
'HI%+-*,4)1=*&(1%>!%,=(0*E2
JKLMKNNO
PQLRSTLSLUNVSTWXVLTUVSYKZ[LRKQ\L]^W_L̀VTOL]^WLSXVLa^XXVaQ_Lb\VLTa^UVLcVTaXKUd^ZLT\^RLKZLbSeNVLfLSZcLQ\VLVZgKX^ZhVZQSNLKhUSaQLTWhhSX]LT\^RZLKZ
bSeNVLiLSXVLa^ZTKTQVZQLRKQ\LQ\VLaWXXVZQLcVTK[ZL^jLQ\VLUX^kVaQ_Lb\VXVL\STLeVVZLSeT^NWQVN]LZ^LcVTK[ZLa\SZ[VTLQ^LQ\VLUX^kVaQ_
b\SZYL]^WLSZcL\SgVLSL[^^cLSlVXZ^^Zm
L
nopqrsqtuqvwrxyz{r
|}}~}popr~qr{tq}~qprrtqqt~ur~qrsooqt
| r}vp~wryr
ro}r}rt~qwrz~pqrr
tqqt~uwrsrrr
rrrsr
¡LMKNNKShLbSXc]L¢£^ZTWNQSZQ¤L¢¥J¦¤L§MbSXc]f_a^ZTWNQSZQ¨hc^Q_hSX]NSZc_[^g©LL
ª«¬¡LbWVTcS]OL®SXa\L̄fOLi¯iiL°±f²L³®L
´¡L®VXYVNOLµSQVL§µSQV_®VXYVN̈SXX^a^ZTWNdZ[_a^h©L
¶·¡L¥WTSZL¥^N^L¢£^ZTWNQSZQ¤L§¥¥^N^_a^ZTWNQSZQ¨hc^Q_hSX]NSZc_[^g©Ļ£\XKTQ]L¹VXZSNL§£¹VXZSN̈hc^Q_hSX]NSZc_[^g©Ļ¹XKQZV]LºSaYT^Z
§¹ºSaYT^Z°¨hc^Q_hSX]NSZc_[^g©L
ª»¼½«·¡L¾V¿ÀgSNWSd^ZL¥aXVVZKZ[L±LPZcKSZLJVScLbXSKN\VScL¾VTQX^^hLÁLb¦³L³X^kVaQ
L
ÂÃÄÅÆÇÈÆÉÊËÌÍÎÏÐÊËÏËÑÒÌÑÓÏÐÔÏÕÖÑÏ×ÍØÌÙÍÏÚÑÙØÏÛËÙÌÜÖÑÙØÏÝÑÞÕËÐÐßÏàÏÛáâÏâËÐãÑäÕåÏæÐÊÏÌÍØÌäÙÕÑØÏÕÖÙÕÏÕÖÑÏÞäÐçÑÏØÑÞäËÌçÕÌÐÍÏÞÖÐÓÍÏÌÍ
ÛÙèÜÑÏéÏÙÍØÏÕÖÑÏÑÍÒÌËÐÍßÑÍÕÙÜÏÌßçÙäÕÏÞÊßßÙËæÏÞÖÐÓÍÏÌÍÏÛÙèÜÑÏêÏÙËÑÏäÐÍÞÌÞÕÑÍÕÏÓÌÕÖÏÕÖÑÏäÊËËÑÍÕÏØÑÞÌÎÍÏÐÔÏÕÖÑÏçËÐãÑäÕëÏìÖÑÍÏæÐÊÏÖÙÒÑ
ÙÏßÐßÑÍÕåÏçÜÑÙÞÑÏäÐÍÔÌËßÏÕÖÌÞÏäÐÍäÜÊÞÌÐÍÏèæÏçËÐÒÌØÌÍÎÏÙÏäÐÍÔÌËßÙÕÌÐÍÏÑßÙÌÜëÏÆÏ
È
r
|íîïrrðr{ ïrz {ïrr
{tñqprnoqrr ×ÍØÌÙÍÏÚÑÙØÏÛËÙÌÜÖÑÙØÏÝÑÞÕËÐÐßÏàÏÛáâÏâËÐãÑäÕÏÏ
{t~otòrpqrr óôáÏÏ
nï{|ð|õõtqrzõqrröturr ÛÖÑÏÛÐÓÍÏÐÔÏ×ÍØÌÙÍÏÚÑÙØÏÌÞÏçËÐçÐÞÌÍÎÏÕÐÏÊÞÑÏÔÑØÑËÙÜÏÔÊÍØÞÏÕÐÏäÐÍÞÕËÊäÕÏÙÏÍÑÓ
÷øÐÊËäÑùÏâúûüêýéþëýÿëýé0Ïrr
áßÑËÌäÙÍÞÏÓÌÕÖÏÉÌÞÙèÌÜÌÕÌÑÞÏáäÕÏ÷áÉá0ÏÙääÑÞÞÌèÜÑÏËÑÞÕËÐÐßÏÔÙäÌÜÌÕæÏÜÐäÙÕÑØÏÓÌÕÖÌÍÏÕÖÑ
óÙÒÙÜÏ1ËØÌÍÙÍäÑÏøÕÙÕÌÐÍÏ÷úÚÏ2þé0ÏÓÖÌäÖÏÞÊËËÐÊÍØÞÏÕÖÑÏ×ÍØÌÙÍÏÚÑÙØÏÝÑÞÌØÑÍÕÌÙÜ
ÚÌÞÕÐËÌäÏÉÌÞÕËÌäÕÏ÷úÚÏ3ÿý0ëÏÛÖÑÏçÊËçÐÞÑÏÐÔÏÕÖÑÏçËÐãÑäÕÏÌÞÏÕÐÏÞÑËÒÑÏÕÖÑÏçÊèÜÌäÜæÏÐÓÍÑØ
ÙÍØÏÊÞÑØÏ4ÌÜÜÙÎÑÏ5ËÑÑÍÏâÙË6ÏÙÍØÏÕÖÑÏ×ÍØÌÙÍÏÚÑÙØÏÛËÙÌÜëÏÛÖÑÏÍÑÓÏÔÙäÌÜÌÕæÏÓÐÊÜØÏèÑ
äÐÍÞÕËÊäÕÑØÏÕÐÏÙääÑÞÞÏÕÖÑÏÔÙäÌÜÌÕæÏÔËÐßÏ7ÌÜØËÑØÏÝÌäÑÏÝÐÙØåÏìÙÜÕÑËÏÛÖÐßÙÞÏÝÐÙØå
ÙÍØÏâæÑÏøÕËÑÑÕëÏâËÐãÑäÕÏÜÐäÙÕÌÐÍÏÙÍØÏÌßçÙäÕÏßÙççÌÍÎÏÙËÑÏÌÍäÜÊØÑØÏÌÍÏÕÖÑÏÙÕÕÙäÖßÑÍÕ
ÕÌÕÜÑØÏ8×ÍØÌÙÍÏÚÑÙØÏÛËÙÌÜÖÑÙØÏÝÑÞÕËÐÐßÏøÑäÕÌÐÍÏ3÷Ô0ÏØÐäÊßÑÍÕÙÕÌÐÍÏÙÍØÏßÙççÌÍÎë9
ÛÖÑÏçËÐçÐÞÑØÏçËÐãÑäÕÏÌÞÏÙÏÛËÙÍÞçÐËÕÙÕÌÐÍÏáÜÕÑËÍÙÕÌÒÑÞÏâËÐÎËÙßÏ÷Ûáâ0ÏçËÐãÑäÕÏÙÍØÏÌÞ
ÔÊÜÜæÏÔÊÍØÑØÏÔÐËÏäÐÍÞÕËÊäÕÌÐÍëÏÛáâÏÌÞÏÙÏËÑÌßèÊËÞÙèÜÑåÏÔÑØÑËÙÜÏÙÌØÏÔÊÍØÌÍÎÏçËÐÎËÙßÏÔÐË
ÕËÙÍÞçÐËÕÙÕÌÐÍÏËÑÜÙÕÑØÏäÐßßÊÍÌÕæÏçËÐãÑäÕÞÏÊÍØÑËÏÚìáÞÏøÊËÔÙäÑÏÛËÙÍÞçÐËÕÙÕÌÐÍ
âËÐÎËÙßëÏÏ
oq}rz~qrîo}pr|õõtovrr óÐÍÑÏÏ
ÏÏÏ
r
0123467489 8 48013 10 1
0 84171 34 543 16
!"#$%&'()*+,-./01//1-.2
789:;; )<%=><?@ABCD>@>DE' H# H#?'
F'E$G'A
IDAJ#%D&F'A#$%&'A H# H#?'
KLMNOLPQR;; SC*T,E$?@'@U%#U'%JD'A H# H#?'
)V",E$?@'@U%#U'%JD'A H# H#?'
*<UU'%*%<WJ#?,E$?@'@ H# H#?'
U%#U'%JD'A
XYOZYMLO;[\R]YM^\R _DAJ%D&JA H# H#?'
;
"J%$&J$%'A H# H#?'
`%&a'#>#GD&<>F'A#$%&'A H# H#?'
[bcdZ;]9;eLf;; )%Dg<J'>hI'>@S<?@A H# H#?'
)$i>D&>hI'>@S<?@A H# H#?'
KYjOb^;kPl]Ol\m\PZ )$i>D&n''JD?GA )$i>D&D?g#>g'W'?Jo#$>@i'%'p$D%'@ H#?'
; U%D#%J#Ja'<@g'%JDA'W'?J#EJa'
U%#q'&J1)$i>D&D?g#>g'W'?JAa#$>@
D?&>$@'%'>'g<?JD?E#%W<JD#?<i#$JJa'
U%#q'&JrD?&>$@D?Gi$J?#J>DWDJ'@J#Ja'
A&#U'#Eo#%=r<?JD&DU<J'@DWU<&JAr
>#&<JD#?#EAD@'o<>=A<?@%'AJ%##Wr
<?@<?JD&DU<J'@AJ<%J#E&#?AJ%$&JD#?1
H#JD&'<i#$JJa'U%#q'&Jo#$>@i'
U#AJ'@#?Ja's#o?#Et?@D<?I'<@uA
o'iADJ'<JJa'g'%h>'<AJ
vLZYMLO;[\R]YM^\R T>##@U><D?A H# H#?'
;
C'J><?@A H# H#?'
s%''F'W#g<> H# H#?'
*%DJD&<>`%'< H# H#?'
F<%'rsa%'<J'?'@r<?@ H# H#?'
+?@<?G'%'@"U'&D'A
*>DW<J'*a<?G' H# ?#?'
w
12345627829 2 856292912345627829 2242434462
486 2242 2584742 5124288542
5 28 59782965265994629984! "7424959462
#$#%& 385995889 496'($)* 947658 +)+$+
6,48-#.$#$#'##(./0-.)$+$1'2$$.6 /588-3442+#'$2$+
99-55!!!&7 5 256&635 !95)6769&7 5 2&63
7
8
9:;<=>:=7?:@A>7BC7D:EEBF<G7H:7:IHCHA>GB>@7DICH:E<=7C<=;BD<J7K<LL7IC7M:N7N<7A=<7G:B>@J7OLBDP7M<=<J
7
QRSTURVW8VXY8Z[R\]S[^8_``8\SRa[U[S8bVZXScR\bXVd88
eRUU8_``8XS8ab^b\f8NNNJEGghhJ:=@7
7ijkL<AC<lD:>CBG<=lHM<l<>;B=:>E<>Hlm<n:=<7o=B>p>@7HMBC7<EABL
7qr9sq7
tuvOqsuwrx7y7KM<7B>n:=EAp:>7D:>HAB><G7B>7HMBC7D:EEI>BDAp:>7zB>DLIGB>@7A>{7AFADME<>HC|7EA{7m<7D:>}G<>pAL7A>G7L<@ALL{7o=B;BL<@<GJ
KMBC7<EABL7EA{7>:H7C<=;<7AC7A7D:>H=ADHIAL7A@=<<E<>H7I>L<CC7<~oLBDBH7N=BF<>7A@=<<E<>H7n:=7HMBC7oI=o:C<7MAC7m<<>7EAG<J7un7{:I7A=<7>:H7HM<
B>H<>G<G7=<DBoB<>H7{:I7A=<7M<=<m{7>:p}<G7HMAH7A>{7GBCC<EB>Ap:>7GBCH=BmIp:>7:=7D:o{B>@7:n7HMBC7D:EEI>BDAp:>7:=7A>{7:n7BHC7D:>H<>HC7BC7CH=BDHL{
o=:MBmBH<GJ7un7{:I7MA;<7=<D<B;<G7HMBC7D:EEI>BDAp:>7B>7<==:=7oL<AC<7=<yC<>G7HMBC7D:EEI>BDAp:>7H:7HM<7C<>G<=7B>GBDAp>@7HMAH7BH7NAC7=<D<B;<G7B>
<==:=7A>G7G<L<H<7HM<7:=B@B>AL7E<CCA@<7A>G7A>{7D:o{7:n7BH7n=:E7{:I=7D:EoIH<=7C{CH<EJ
7
8
NOTICE OF INCH-POUND
VALIDATION
A-A-1922A
NOTICE 2
28 June 2006
COMMERCIAL ITEM DESCRIPTIONS (CIDS)
Shield, Expansion (Caulking Anchors, Single Lead)
A-A-1922A, dated 21 August 2001, has been reviewed and
determined to be valid for use in acquisition.
Custodians: Preparing Activity:
Army - AR DLA - IS
Navy - YD
Air Force - 99
NOTE: The activities above were interested in this document as
of the date of this document. Since organizations and
responsibilities can change, you should verify the currency of
the information above using the ASSIST Online database at
assist.daps.dla.mil.
AMSC N/A FSC 5340
NOTICE OF INCH-POUND
VALIDATION
A-A-1922A
NOTICE 1
21 August 2001
COMMERCIAL ITEM DESCRIPTIONS (CIDS)
SHIELD, EXPANSION (CAULKING ANCHORS, SINGLE LEAD)
A-A-1922A, dated 18 July 1995, has been reviewed and determined
to be valid for use in acquistion.
Custodians: Preparing activity:
Army - AR DLA - IS
Navy - YD
Air Force - 99
AMSC N/A FSC 5340
DISTRIBUTION STATEMENT A: Approved for public release; distribution
is unlimited.
Designation: C 665 – 01e1
Standard Specification for
Mineral-Fiber Blanket Thermal Insulation for Light Frame
Construction and Manufactured Housing1
This standard is issued under the fixed designation C 665; the number immediately following the designation indicates the year of
original adoption or, in the case of revision, the year of last revision. A number in parentheses indicates the year of last reapproval. A
superscript epsilon (e) indicates an editorial change since the last revision or reapproval.
This standard has been approved for use by agencies of the Department of Defense.
e1 NOTE—Section 7.6 was editorially updated in March 2002.
1. Scope Thermal Insulation Materials
1.1 This specification covers the composition and physical C 1338 Test Method for Determining Fungi Resistance of
properties of mineral-fiber blanket insulation used to thermally Insulation Materials and Facings
or acoustically insulate ceilings, floors, and walls in light frame E 84 Test Method for Surface Burning Characteristics of
construction and manufactured housing. The requirements Building Materials3
cover fibrous blankets and facings. Values for water-vapor E 96 Test Methods for Water Vapor Transmission of Mate-
permeance of facings are suggested for information that will be rials2
helpful to designers and installers. E 970 Test Method for Critical Radiant Flux of Exposed
1.2 The values stated in inch-pound units are to be regarded Attic Floor Insulation Using a Radiant Heat Energy
as the standard. The values given in parentheses are provided Source3
for information only. G 1 Practice for Preparing, Cleaning, and Evaluating Cor-
1.3 This standard does not purport to address all of the rosion Test Specimens4
safety concerns, if any, associated with its use. It is the 3. Terminology
responsibility of the user of this standard to establish appro-
priate safety and health practices and determine the applica- 3.1 Definitions—For definitions of terms defined in this
bility of regulatory limitations prior to use. specification, see Terminology C 168.
2. Referenced Documents 4. Classification
2.1 ASTM Standards: 4.1 Typical mineral-fiber thermal insulation consists of
C 167 Test Methods for Thickness and Density of Blanket three types:
or Batt Thermal Insulations2 4.1.1 Type I—Blankets without membrane coverings.
C 168 Terminology Relating to Thermal Insulation2 4.1.2 Type II—Blankets with nonreflective membrane cov-
C 177 Test Method for Steady-State Heat Flux Measure- erings.
ments and Thermal Transmission Properties by Means of 4.1.2.1 Class A—Membrane-faced surface with a flame
the Guarded Hot-Plate Apparatus2 spread of 25 or less.
C 390 Criteria for Sampling and Acceptance of Preformed 4.1.2.2 Class B—Membrane-faced surface with a flame
Thermal Insulation Lots2 propagation resistance; critical radiant flux of 0.12 W/cm2 (.11
C 518 Test Method for Steady-State Thermal Transmission Btu/ft2·s) or greater.
Properties by Means of the Heat Flow Meter Apparatus2 4.1.2.3 Class C—Membrane-faced surface not rated for
C 653 Guide for Determination of the Thermal Resistance flame propagation resistance (for use in nonexposed applica-
of Low-Density Blanket-Type Mineral-Fiber Insulation2 tions only).
C 1104/C 1104M Test Method for Determining the Water 4.1.2.4 Category 1—Membrane is a vapor retarder.
Vapor Sorption of Unfaced Mineral Fiber Insulation2 4.1.2.5 Category 2—Membrane is not a vapor retarder.
C 1304 Test Method for Assessing the Odor Emission of 4.1.3 Type III—Blankets with reflective membrane cover-
ings:
1
4.1.3.1 Class A—Membrane-faced surface with a flame
This specification is under the jurisdiction of ASTM Committee C16 on spread of 25 or less.
Thermal Insulation and is the direct responsibility of Subcommittee C16.23 on
Blanket and Loose Fill Insulation.
Current edition approved November 10, 2001. Published January 2002. Origi-
3
nally published as C 665 – 70. Last previous edition C 665 – 98. Annual Book of ASTM Standards, Vol 04.07.
2 4
Annual Book of ASTM Standards, Vol 04.06. Annual Book of ASTM Standards, Vol 03.02.
Copyright © ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959, United States.
1
C 665
4.1.3.2 Class B—Membrane-faced surface with a flame insulation without facing shall be not more than 5 % by weight,
propagation resistance; critical radiant flux of 0.12 W/cm2 (.11 when tested in accordance with 13.6.
Btu/ft2·s) or greater. 7.6 Odor Emission— A detectable odor of strong objection-
4.1.3.3 Class C—Membrane-faced surface not rated for able nature recorded by more than two of the five panel
flame propagation resistance (for use in nonexposed applica- members shall constitute rejection of the material when tested
tions only). in accordance with 13.7.
4.1.3.4 Category 1—Membrane is a vapor retarder. 7.7 Corrosiveness— When tested in accordance with 13.8,
4.1.3.5 Category 2—Membrane is not a vapor retarder. the metal plates in contact with the insulation shall show no
corrosion greater than that observed on the comparative plates
5. Ordering Information in contact with sterile cotton.
5.1 For specific installations, thermal resistance, lengths, 7.8 Fungi Resistance— When tested in accordance with
and widths suited to the intended use shall be specified by the 13.9, the insulation shall have growth no greater than that
purchaser. When desired, vapor-barrier facings may be speci- observed on the white birch tongue depressor comparative
fied. item.
6. Materials and Manufacture 8. Other Requirements
6.1 Basic Material— The basic material shall be fibers 8.1 Qualification Requirements—The following require-
made from mineral substances such as rock, slag, or glass ments are generally used for purposes of initial material or
processed from the molten state into a fibrous form. product qualification:
6.2 Manufacture— Insulation blankets shall consist of flex- 8.1.1 Thermal resistance,
ible units composed of felted, bonded, or unbonded fibers 8.1.2 Surface burning characteristics,
formed into rolls or flat cut pieces (batts), with or without 8.1.3 Critical radiant flux,
various adhered coverings, and with or without a means for 8.1.4 Water-vapor permeance,
attachment of the blanket to applicable constructions. 8.1.5 Water vapor sorption,
8.1.6 Odor emission,
7. Physical Properties 8.1.7 Corrosiveness, and
7.1 Thermal Resistance—The standard thermal resistance 8.1.8 Fungi resistance.
values in °F · h · ft2/Btu (K · m2/W) are: 4, 7, 11, 13, 19, 22, 8.2 Inspection Requirements—The following requirements
30, and 38 (0.7, 1.2, 1.9, 2.3, 3.3, 3.9, 5.3, and 6.7). The are generally used for purposes of acceptance sampling of lots
product must be produced to the label R value.The thermal or shipments of qualified thermal insulation:
resistance, R, for the average of any four randomly selected 8.2.1 Dimensional tolerances, and
samples shall not be more than 5 % below the listed R value 8.2.2 Workmanship.
when tested in accordance with 13.2, nor shall any single
specimen be more than 10 % below the listed R value. R values 9. Dimensions
other than those listed shall be agreed upon between the 9.1 The material shall conform to the standard sizes and
supplier and the purchaser. dimensions prescribed in Table 1.
7.2 Surface Burning Characteristics:
7.2.1 Insulation blankets exclusive of membrane facing, 10. Workmanship and Finish
when tested in accordance with Test Method E 84, shall have a 10.1 Although all requirements for physical properties of
flame spread classification no greater than 25, and a smoke materials such as blankets are not easily defined or stated
developed classification no greater than 50. numerically, it is understood that the insulation will essentially
7.2.2 Insulation blankets with facings and membranes in- be free of defects that adversely affect thermal performance,
tended for exposed application, when tested in accordance with such as local compressed areas, low density areas, tears, holes,
Test Method E 84, shall have a flame spread classification no etc.
greater than 25, and a smoke developed classification no 10.2 Although the general properties of the facings and
greater than 50. means for attachment are not included in this specification,
7.3 Critical Radiant Flux—Insulation blankets, when tested they may be presumed to be free of excessive tears, rips, holes,
in accordance with 13.4, shall have a critical radiant flux-flame and other defects that will adversely affect the performance.
propagation resistance $0.12 W/cm 2 (0.11 Btu/ft2·s). Blankets
with membrane coverings on both surfaces, shall be tested on 11. Significance and Use
the surface to be left exposed and shall be marked on either 11.1 This specification applies to products that are used in
surface. buildings. While products that comply with this specification
7.4 Water-Vapor Permeance—When tested in accordance may be used in various constructions, they are adaptable
with 13.5, vapor-resistant membrane coverings shall have a primarily, but not exclusively, to wood frame construction.
vapor permeance of no more than 1 perm 11.2 Since the property of thermal resistance for a specific
(5.7 3 10 −11kg·Pa−1·s−1·m 2) and vapor-permeable membrane thickness of blanket is only part of the total thermal perfor-
coverings shall have a vapor permeance of no less than 5 perm mance of a building element such as a wall, ceiling, floor, etc.,
(2.9 3 10−10kg·Pa −1·s−1·m−2). this specification states only general classifications for thermal
7.5 Water Vapor Sorption—The water vapor sorption of the resistance of the fibrous blanket itself. Facings or coverings
2
C 665
TABLE 1 Sizes and DimensionsA on the product. Always test at a thickness within the design
Element Dimension Tolerance accuracy limits of the test apparatus. For marked thicknesses
Length, in. cut pieces up to 96 in. (2 m)−1⁄2in. (13 mm), excess appreciably greater than apparatus design, some materials may
(mm) permitted be split and both sections tested, but this procedure is often
cut pieces up to 144 in. (4 m) −1.0 in. (25 mm), excess
permitted
undesirable.
rolls over 144 in. (4 m) −0.5 %, excess permitted 13.2.3 If the blanket is furnished with adhered membranes,
Width, in. (mm) pieces and rolls up to 24 in. −1⁄4in. (6 mm), + 1⁄2in. (13 remove the membranes by a means that provides a surface
(0.6 m) mm)
rolls 24 to 144 in. (0.6 to −1⁄4 in. (6 mm), + 1⁄2in. (13
equivalent to the surface that the material would have before
4 m) mm) application of the membrane.
Thickness as required for thermal resist- consistent with tolerances of 13.3 Surface Burning Characteristics—Determine the sur-
B
ance thermal resistanceC
A
face burning characteristics in accordance with Test Method
All sizes listed may not be available from all manufacturers. For sizes other
than those listed, consult manufacturers.
E 84.
B
Thicknesses of the various mineral fiber insulations available may differ to 13.4 Critical Radiant Flux—Determine the critical radiant
provide rated thermal resistance. Products are generally available in a range of flux in accordance with Test Method E 970.
thicknesses from 3 to 12 in. (75 to 305 mm). Thickness required to attain a rated
performance shall not exceed that of the cavity into which the material shall be
13.5 Water-Vapor Permeance—Test the permeance of the
installed. facing material in accordance with Test Methods E 96.
C
Blanket insulation manufactured to provide a designated thermal resistance 13.6 Water Vapor Sorption—Determine the water vapor
may be produced by varying one or more of the factors of density, thickness, or
fiber characteristics. Therefore, blankets having the same designated thermal sorption of the test specimen in accordance with Test Method
resistance but different manufacturing sources may vary in one or more of these C 1104/C 1104M.
factors. Properties of facings or coverings are not included in this specification, 13.7 Odor Emission—Determine the Odor Emission in
except that experience has shown that if a facing material is to be considered a
vapor retarder in buildings in which blankets are used, it shall have a water vapor accordance with Test Method C 1304.
permeance of not more than 1 perm (5.7 3 10 −11 kg·Pa−1·s−1·m 2). Consult 13.8 Corrosiveness:
manufacturing sources or suppliers for specific properties of blankets with facings
or coverings.
13.8.1 Scope—This method provides a qualitative measure
of the corrosiveness of mineral-fiber insulation by comparison
to a control.
may provide additional resistance to water-vapor transfer; this 13.8.2 Summary of Test Method:
resistance may affect performance. 13.8.2.1 Individually sandwich five each of specially
cleaned steel, copper, and aluminum test plates between pieces
12. Sampling
of insulation. Hold the insulation uniformly against each side
12.1 Sampling of the insulation shall be in accordance with of the test plate with wire screens and rubber bands.
Criteria C390. Specific provision for sampling shall be agreed 13.8.2.2 Sandwich an equal number of cleaned metal test
upon between the purchaser and the supplier. plates between pieces of washed sterile cotton in an identical
manner.
13. Test Methods
13.8.2.3 Vertically suspend the samples in a humidity test
13.1 Dimensions—Test in accordance with Test Methods chamber at 95 6 3 % relative humidity and temperature of 120
C 167. 6 3°F (49 6 2°C) for time periods determined by the type of
13.2 Thermal Resistance: metal being tested. Steel is tested for 96 6 2 h. Copper and
13.2.1 Test in accordance with Test Method C 177 or Test aluminum are tested for 720 6 5 h.
Method C 518 at 75 6 2°F (24 6 1°C) mean temperature. If 13.8.2.4 After the appropriate test period, compare the test
Test Method C 518 is used, the manufacturer shall certify that plates exposed to the insulation to the control plates exposed to
recent calibrations have been made. sterile cotton for severity of corrosion. The insulation is
NOTE 1—See Guide C 653. The thermal resistance is a function of considered to have passed this test if the corrosion attributed to
mean temperature. As an option, the thermal resistance may be determined the insulation is not significantly worse than that of the washed
at additional mean temperatures as agreed upon by the purchaser and the sterile cotton controls. The criterion for acceptance is prede-
manufacturer. termined through the use of non-parametric statistics and a
13.2.2 In case of question, determine referee test values in 90 % confidence level (a = 0.10).
accordance with Test Method C 177, with resistances reported NOTE 2—A task group of Subcommittee C16.31 is developing a more
at 75 6 2°F (24 6 1°C) mean temperature. The precision and quantitative insulation corrosiveness test method that when available will
bias of the apparatus used for referee tests must be verified by be considered for adoption in this specification.
measuring the R-value of a standard reference material of light
density thermal insulation obtained from the National Institute 13.8.3 Significance and Use:
of Standards and Technology.5 Determine thermal resistance at 13.8.3.1 The fiber composition and the type of binder used
the thickness marked on the product if its measured thickness in the manufacture of mineral fiber insulation can sometimes
is equal to or greater than this value. Determine thermal create a potential for corrosion on certain metals in the
resistance at actual thickness if less than the thickness marked presence of water or water vapor.
13.8.3.2 This method is used to determine the relative
corrosion potential of mineral fiber insulation on specific
5
Contact National Institute of Standards and Technology, Gaithersburg, MD metals under high humidity conditions.
20899. 13.8.4 Apparatus:
3
C 665
13.8.4.1 Test Plates— The dimensions of all metal test 13.8.6.3 Assemble 5 control specimens, each consisting of
plates shall be 1 by 4 6 1⁄4 in. (25 by 100 6 6.3 mm): one piece of metal placed between two 11⁄2 by 41⁄2 by 1⁄2-in. (38
(1) Steel Plates, shall be 0.026 0.005 in. (0.5 mm 6 0.13 by 114 by 13-mm) pieces of sterile cotton. The sterile cotton
mm) thick, bright No. 2 finish, cold-rolled low-carbon strip shall have previously been solvent extracted in reagent grade
steel, quarter hard, temper No. 3. acetone6 for 48 h, and then vacuum dried at low heat. Identify
(2) Aluminum Plates, shall be 0.025 6 0.005-in. (0.6 6 the outer surface of the cotton as rolled. After cleaning, place
0.13 mm) thick, Type 3003-0. the outer cotton surface against the metal coupons in the same
(3) Copper Plates, shall be 0.032 6 0.005-in. (0.8 6 0.13 manner as the insulation specimen. Then compress and secure
mm) thick, ASTM B152 Type ETP, No. 110 soft copper. these specimens in exactly the same manner as the insulation
13.8.4.2 Woven Wire Screen, 11⁄2 6 1⁄4 by 41⁄2 6 1⁄4 in. (38 test specimens using wire screens and No. 12 rubber bands or
6 6.3 by 114 6 6.3 mm), made of Type 304 stainless steel, other suitable means to maintain sample thickness.
0.063 6 0.005-in. (1.60 6 0.13-mm) wire, 7⁄16 6 1⁄16-in. (11 6 13.8.6.4 Vertically suspend the five test specimens and the
1.6-mm) open-square grid. five control specimens in an atmosphere free of contaminants,
13.8.4.3 Rubber Bands, No. 12. having a relative humidity of 95 6 3 %, and a temperature of
13.8.4.4 Humidity Test Chamber, clean, well maintained, 1206 3°F (49 6 2°C) for the specified test period (96 6 2 h
and capable of controlling temperature at 1206 3°F (49 6 for steel, and 720 6 5 h for copper and aluminum). If possible,
2°C), and humidity at 95 6 3 % relative humidity. close the humidity chamber for the entire test period. If the
13.8.5 Test Specimens— Two pieces of the material to be chamber must be opened, take care to ensure that the relative
tested shall comprise one specimen. Each piece shall measure humidity does not rise sufficiently high to cause condensation
11⁄26 1⁄4 by 41⁄2 6 1⁄4 in. (38 6 6.3 by 114 6 6.3 mm) by 1⁄2 within the chamber. At the conclusion of the test period,
6 1⁄8 in. (13 6 3.2 mm) thick, when compressed against the remove the specimens from the chamber, disassemble and
metal test plates. As a guideline, cut board type insulations to mark them to distinguish individual plates from each other.
a thickness of 1⁄2 6 1⁄16in (12.7 6 1.6 mm); cut blanket type 13.8.6.5 Closely examine the surfaces of each of the test and
insulations to a thickness of 1 6 1⁄16 in. (25.4 6 1.6 mm). For control plate for the following characteristics:
each type of metal tested, make five specimens out of test (1) Steel—The presence and relative severity of red rust
insulation and five control specimens out of washed sterile and pitting. Surface blush should not be weighed strongly.
cotton. (2) Aluminum—The presence and relative severity of
pitting, scaling, or other evidence of attack. The generation of
13.8.6 Test Method:
oxide is a protective mechanism of aluminum and should be
13.8.6.1 Clean the metal test plates until the surface is free
disregarded. The oxide can be removed by scrubbing with a
of water breaks. Take care to avoid excessive handling of the
nonabrasive implement of rubber under running water or
surfaces of the metal plates. Do not touch them at all once
immersing into a 70 % solution of nitric acid.
completing the final cleaning step. The use of plastic surgical
(3) Copper—Presence and relative severity of scaling,
gloves or their equivalent are recommended to facilitate the
pitting, deposits or encrustation, severe discolorations, or
handling of the plates. Specific cleansing instructions for each
general uniform attack. Surface blush and slight discolorations
type of metal is as follows:
should be ignored and can be removed by scrubbing with a
(1) Steel—First clean the test plates by vapor degreasing nonabrasive implement of rubber under running water or
for 5 min using 1-1-1 trichloroethane or chloroprene. After immersing into a 10 % solution of sulfuric acid.
degreasing, wipe the residue from both sides of the coupons
using paper laboratory wipes. Next, immerse for 15 min in a NOTE 3—Additional guidance for evaluating the plates can be found in
hot caustic solution (15 % potassium hydroxide (KOH) by Practice G 1.
weight), rinse thoroughly in distilled water, and immediately 13.8.7 Interpretation of Results:
dry using paper laboratory wipes. 13.8.7.1 Because of the subjectivity inherent in the judging
(2) Copper—Degrease the test plates in the same manner of these plates, nonparametric statistical methods are employed
as the steel plates, then clean again in a hot acidic solution to identify those materials that are conclusively more corrosive
(10 % nitric acid by volume) for 15 min. Then rinse and dry the than sterile cotton.
copper plates in the same manner as described in 13.8.6.1 ( 1). 13.8.7.2 The ten metal plates (five test, five control), should
(3) Aluminum—Clean the test plates with a 5 % solution of be examined by at least four judges with experience in
all-purpose laboratory detergent and water, then rinse in corrosion evaluation. Each judge should independently rank all
distilled water and dry with laboratory wipes. ten plates in order from least severe corrosion to most severe
(4) Wire Screens—Clean the wire screens before use in the corrosion. The judges should receive no indication as to which
same manner as the aluminum plates; that is, wash in detergent, plates are control and which are test specimens. The judges’
rinse in distilled water, and dry. rankings should be based on their own best estimate of the
13.8.6.2 Make five test specimens, each one consisting of
one piece of metal placed between two pieces of insulation. 6
Reagent Chemicals, American Chemical Society Specifications, American
Next, compress this assembly between two pieces of woven Chemical Society, Washington, DC. For suggestions on the testing of reagents not
listed by the American Chemical Society, see Analar Standards for Laboratory
wire screen and secure near each end with a No. 12 rubber
Chemicals, BDH Ltd., Poole, Dorset, U.K., and the United States Pharmacopeia
band or other means to ensure that the compressed thickness of and National Formulary, U.S. Pharmaceutical Convention, Inc. (USPC), Rockville,
this assembly measures 1 6 1⁄8-in. (25 6 3 mm). MD.
4
C 665
severity of the corrosion visible on each plate. upon by the purchaser and the manufacturer as part of the
13.8.7.3 Upon completion of the judges’ ratings, the arith- purchase agreement.
metic sum of all of the rankings for each plate should be
calculated. These sums should then be ranked from 1 (lowest 15. Product Marking
total) to 10 (highest total), with any ties being assigned the
15.1 Warning Statements—When tested in accordance with
arithmetic mean of the rankings involved (for example, two
Test Method E 84, insulation faced with a membrane covering
plates tied for third = (3 + 4)/2 = 3.5; three plates tied for
shall have the flame spread classification (FSC) printed a
fourth = (4 + 5 + 6)/3 = 5). The new rankings thus established
should then be totaled for the control plates only; if this sum is minimum of every 8 ft, 0 in. (2.4 m) on the membrane facing.
less than 21, then the control plates are judged to be signifi- If the manufacturer elects not to print the flame spread ratings,
cantly better than the test plates and the insulation tested is then a warning statement shall be printed every 8 ft, 0 in. on the
considered to have failed the test. Any sum of the rankings for membrane facing indicating that the membrane is flammable,
the five control plates $ 21 indicates that there is no statistical may burn, and should not be left exposed.
difference between the control and test plates, and the insula-
tion is considered to have passed. 16. Packaging and Package Marking
13.8.8 Precision and Bias—Assuming that there is no bias 16.1 Packaging—Unless otherwise specified, the insulation
involved in the judges’ rankings, this test method will identify shall be packaged in the manufacturer’s standard commercial
those materials that are significantly worse than sterile cotton containers.
with a statistical confidence of a = 0.10. This means that a 16.2 Packge Marking— The markings shall be clear and
material that is judged to be more corrosive to a metal than legible. Unless otherwise specified, each container shall be
sterile cotton has at most a 10 % chance of being incorrectly marked with the manufacturer’s name, the blanket width and
failed. This test method can make no estimate of the probability
length, square footage of material in the container, R (thermal
than an insulation that is more corrosive than sterile cotton will
resistance) value, the required thickness to obtain the R value,
not be identified as such.
and the facing type if a facing is employed.
13.9 Fungi Resistance—Determine fungi resistance in ac-
cordance with Test Method C 1338.
17. Keywords
14. Inspection 17.1 blanket; light frame construction; manufactured hous-
14.1 Inspection of the insulation shall be made as agreed ing; mineral fiber; thermal insulation
ASTM International takes no position respecting the validity of any patent rights asserted in connection with any item mentioned
in this standard. Users of this standard are expressly advised that determination of the validity of any such patent rights, and the risk
of infringement of such rights, are entirely their own responsibility.
This standard is subject to revision at any time by the responsible technical committee and must be reviewed every five years and
if not revised, either reapproved or withdrawn. Your comments are invited either for revision of this standard or for additional standards
and should be addressed to ASTM International Headquarters. Your comments will receive careful consideration at a meeting of the
responsible technical committee, which you may attend. If you feel that your comments have not received a fair hearing you should
make your views known to the ASTM Committee on Standards, at the address shown below.
This standard is copyrighted by ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959,
United States. Individual reprints (single or multiple copies) of this standard may be obtained by contacting ASTM at the above
address or at 610-832-9585 (phone), 610-832-9555 (fax), or service@astm.org (e-mail); or through the ASTM website
(www.astm.org).
5
ASTM C578, Types and Physical Properties for Foamular® Extruded Polystyrene ®
This table outlines the basic physical property requirements of ASTM C578* and Foamular compliance.
For complete details on board types, properties and other quality requirements see the actual ASTM standard.
Polystyrene Board Type EPS EPS EPS Foamular EPS Foamular EPS Foamular EPS Foamular EPS Foamular
150, XPS 250, XPS 400, XPS 600, XPS 1000, XPS
ASTM C578 Classification Type Type Type Type Type Type Type Type Type Type Type Type
XI I VIII X II IV IX VI XIV VII XV V
Compressive resistance at
yield or 10 % deformation,
whichever occurs first 5.0 10.0 13.0 15.0 15.0 25.0 25.0 40.0 40.0 60.0 60.0 100.0
(with skins intact) min, psi (35) (69) (90) (104) (104) (173) (173) (276) (276) (414) (414) (690)
(kPa)
Density, min, lb/ft3 (kg/m3) 0.70 0.90 1.15 1.30 1.35 1.55 1.80 1.80 2.40 2.20 2.85 3.00
(12) (15) (18) (21) (22) (25) (29) (29) (38) (35) (46) (48)
Thermal resistance of 1.00-in.
(25.4-mm) thickness, min,
F·ft2·h/Btu (K·m2/W)
Mean temperature: 3.10 3.60 3.80 5.00 4.00 5.00 4.20 5.00 4.20 5.00 4.30 5.00
75 2°(24 1°C) (0.55) (0.63) (0.67) (0.88) (0.70) (0.88) (0.74) (0.88) (0.74) (0.88) (0.76) (0.88)
10.0 25.0 30.0 40.0 35.0 50.0 50.0 60.0 60.0 75.0 75.0 100.0
Flexural strength, min, psi (kPa) (70) (173) (208) (276) (240) (345) (345) (414) (414) (517) (517) (690)
Water vapor permeance of
1.00-in. (25.4-mm) thickness, 5.0 5.0 3.5 1.5 3.5 1.1 2.5 1.1 2.5 1.1 2.5 1.1
max, perm (ng/Pa·s·m2)
(287) (287) (201) (86) (201) (63) (143) (63) (143) (63) (143) (63)
Water absorption by total 4.0 4.0 3.0 0.3 3.0 0.3 2.0 0.3 2.0 0.3 2.0 0.3
immersion, max, volume
*ASTM C578-08b, “Standard Specification for Rigid, Cellular Polystyrene Thermal Insulation”; published by ASTM International,
100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959
July 2009
Designation: C 1289 – 03
Standard Specification for
Faced Rigid Cellular Polyisocyanurate Thermal Insulation
Board1
This standard is issued under the fixed designation C 1289; the number immediately following the designation indicates the year of
original adoption or, in the case of revision, the year of last revision. A number in parentheses indicates the year of last reapproval. A
superscript epsilon (e) indicates an editorial change since the last revision or reapproval.
1. Scope 2. Referenced Documents
1.1 This specification covers the general requirements for 2.1 The following documents, of the issue in effect on the
faced thermal insulation boards composed of rigid cellular date of material purchase, form a part of this specification to
polyisocyanurate surfaced with other materials. The insulation the extent specified herein:
boards are intended for use at temperatures between −40 and 2.2 ASTM Standards: 2
200°F (−40 and 93°C). This specification does not cover C 168 Terminology Relating to Thermal Insulating Materi-
cryogenic applications. Consult the manufacturer for specific als
recommendations and properties in cryogenic conditions. For C 177 Test Method for Steady-State Heat Flux Measure-
specific applications, the actual temperature limits shall be ments and Thermal Transmission Properties by Means of
agreed upon by the manufacturer and the purchaser. the Guarded-Hot-Plate Apparatus
1.2 This standard is intended to apply to rigid cellular C 203 Test Methods for Breaking Load and Flexural Prop-
polyurethane-modified polyisocyanurate thermal insulation erties of Block Type Thermal Insulation
board products that are commercially acceptable as non- C 208 Specification for Cellulosic Fiber Insulating Board
structural panels useful in building construction. The term C 209 Test Methods for Cellulosic Fiber Insulating Board
polyisocyanurate encompasses the term polyurethane. For C 303 Test Method for Density of Preformed Block-Type
engineering and design purposes, users should follow specific Thermal Insulation
product information provided by board manufacturers regard- C 390 Criteria for Sampling and Acceptance of Preformed
ing physical properties, system design considerations and Thermal Insulation Lots
installation recommendations. C 518 Test Method for Steady-State Heat Flux Measure-
1.3 The use of thermal insulation materials covered by this ments and Thermal Transmission Properties by Means of
specification may be regulated by building codes, or other the Heat Flow Meter Apparatus
agencies that address fire performance, or both. The fire C 550 Test Method for Measuring Trueness and Squareness
performance of the material should be addressed through of Rigid Block Thermal Insulation
standard fire test methods established by the appropriate C 728 Specification for Perlite Thermal Insulation Board
governing documents. C 1045 Practice for Calculating Thermal Transmission
1.4 The values stated in inch-pound units are to be regarded Properties from Steady-State Heat Flux Measurements
as the standard. The values given in parentheses are for C 1058 Practice for Selecting Temperatures for Evaluating
information only and may be approximate. For conversion to and Reporting Thermal Properties of Thermal Insulation
metric units other than those contained in this standard, refer to C 1114 Test Method for Steady-State Thermal Transmission
IEEE/ASTM SI 10. Properties by Means of the Thin-Heater Apparatus
1.5 The following safety hazards caveat pertains only to the C 1303 Test Method for Estimating the Long-Term Change
test methods, Section 11, in this specification. This standard in the Thermal Resistance of Unfaced Rigid Closed Cell
does not purport to address all of the safety concerns, if any, Plastic Foams by Slicing and Scaling Under Controlled
associated with its use. It is the responsibility of the user of this Laboratory Conditions
standard to establish appropriate safety and health practices C 1363 Test Method for Thermal Performance of Building
and determine the applicability of regulatory limitations prior Assemblies by Means of a Hot Box Apparatus
to use. D 226 Specification for Asphalt-Saturated Organic Felt
Used in Roofing and Waterproofing
1
This specification is under the jurisdiction of ASTM Committee C16 on
2
Thermal Insulation and is the direct responsibility of Subcommittee C16.22 on For referenced ASTM standards, visit the ASTM website, www.astm.org, or
Organic and Nonhomogeneous Inorganic Thermal Insulations. contact ASTM Customer Service at service@astm.org. For Annual Book of ASTM
Current edition approved Dec. 1, 2003. Published January 2004. Originally Standards volume information, refer to the standard’s Document Summary page on
approved in 1995. Last previous edition approved in 2002 as C 1289 – 02. the ASTM website.
Copyright © ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959, United States.
1
C 1289 – 03
D 1621 Test Method for Compressive Properties of Rigid uncoated/asphalt-coated/polymer-bonded/glass fiber mat mem-
Cellular Plastics brane facer on the other major surface of the core foam.
D 2126 Test Method for Response of Rigid Cellular Plastics 4.1.5 Type V—Faced with oriented strand board or wafer-
to Thermal and Humid Aging board on one major surface of the foam and an organic/
E 84 Test Method for Surface Burning Characteristics of inorganic/asphalt-saturated/polymer-bonded/fibrous felt or
Building Materials uncoated/asphalt-coated/polymer-bonded/glass fiber mat mem-
E 96 Test Methods for Water Vapor Transmission of Mate- brane facer on the other major surface of the core foam.
rials 4.1.6 Type VI—Faced with a perlite insulation board on both
IEEE/ASTM SI 10–Standard for Use of the International major surfaces of the core foam.
System of Units (SI): (The Modernized Metric System)
2.3 ANSI Standard: NOTE 1—These general statements refer to generic composition de-
scriptions of facer materials, bonded fibrous felts, and mats that are
Voluntary Product Standard ANSI A 208.1 Wood Particle-
currently commercially accepted in the marketplace for these products,
board3 using terms common to these competing products. Felts may contain
2.4 CAN/ULC Standard: organic fibers, inorganic fibers, or mixtures of organic and inorganic fibers
CAN/ULC-S770-00 Standard Test Method for Determina- and may be suitably bonded in one of several alternative ways using
tion of Long-Term Thermal Resistance of Closed-Cell organic binders or conventional asphalt saturation to produce suitable
Thermal Insulating Foams4 membrane facers. Glass fiber mats can be used uncoated, or asphalt coated
or otherwise polymer bonded to also produce suitable membrane facers.
3. Terminology
5. Ordering Information
3.1 For complete descriptions of terms used in this specifi-
cation, refer to Terminology C 168. 5.1 Orders shall include the following information:
3.2 The term polyisocyanurate encompasses the term poly- 5.1.1 Title, designation, and year of issue of C 1289,
urethane (see 1.2). 5.1.2 Quantity of material being ordered,
5.1.3 Product name and manufacturer’s name, address, and
4. Classification telephone number,
4.1 The faced thermal insulation boards composed of rigid 5.1.4 Type or Class, or both, if Type 1; type, class, and grade
cellular polyisocyanurate covered by this specification are or type and class, if Type II, (see Section 4),
classified as follows: 5.1.5 R-value and specific thickness, as required (see 7.2),
4.1.1 Type I—Faced with aluminum foil on both major 5.1.6 Tolerance if other than specified (see 8.1),
surfaces of the core foam. 5.1.7 Size(s) required (see 8.6),
4.1.1.1 Class 1—Non-reinforced core foam. 5.1.8 Type of edge (see 8.3 and 8.4),
4.1.1.2 Class 2—Glass fiber reinforced core foam.
5.1.9 Sampling, if different (see 10.1),
4.1.2 Type II:
5.1.10 If a certificate of compliance is required (see 10.2,
4.1.2.1 Class 1—Faced with organic/inorganic/
10.3, 10.4, 11.1.3.1, Table 1 and Table 2),
asphaltsaturated/polymer-bonded/fibrous felt or uncoated/
asphaltcoated/polymer-bonded/glass fiber mat membrane fac- 5.1.11 If packaging is other than specified (see 13.1), and
ers on both major surfaces of the core foam. 5.1.12 If marking is other than specified (see 13.2).
4.1.2.1.1 Grade 1—16 psi (110 kPa), min, compressive
strength. 6. Materials and Manufacture
4.1.2.1.2 Grade 2—20 psi (138 kPa), min, compressive 6.1 Cellular Material—Rigid polyisocyanurate thermal in-
strength. sulation boards shall be based upon the reaction of an isocy-
4.1.2.1.3 Grade 3—25 psi (172 kPa), min, compressive anate with a polyol, or the reaction of an isocyanate with itself,
strength. or both, using a catalyst and blowing agents to form a rigid
4.1.2.2 Class 2—Faced with polymer-bonded glass fiber closed-cell-structured polyisocyanurate foam. The insulation
mat membrane facers on both major surfaces of the core foam. foam core shall be homogeneous and of uniform density.
4.1.3 Type III—Faced with a perlite insulation board on one 6.2 Facing Materials— The facing material incorporated
major surface of the core foam and an organic/inorganic/ into the design of the faced thermal insulation board shall be as
asphalt-saturated/polymer-bonded/fibrous felt or uncoated/ follows:
asphalt-coated/polymer-bonded/glass fiber mat membrane 6.2.1 Aluminum Foil— Aluminum foil is plain or coated
facer on the other major surface of the core foam. aluminum foil, or foil laminated to a supporting membrane.
4.1.4 Type IV—Faced with a cellulosic fiber insulating
6.2.2 Polymer-Bonded Organic/Inorganic Fibrous Felt—
board on one major surface of the core foam and an organic/
This organic/inorganic fibrous felt shall consist of an organic
inorganic/asphalt-saturated/polymer-bonded/fibrous felt or
fiber felt containing inorganic fibers, internally bonded with
organic polymer binders.
3
6.2.3 Asphalt-Saturated Organic Fibrous Felt—The
Available from American National Standards Institute, 11 W. 42nd St., 13th
asphalt-saturated organic fibrous felt shall conform to the
Floor, New York, NY 10036.
4
Available from Underwriter’s Laboratories of Canada (ULC), 7 Crouse Road, material and physical properties requirements specified in
Toronto, Ontario, M1R 3A9. Specification D 226.
2
C 1289 – 03
TABLE 1 Physical PropertiesA
Product Type I Type I Type II Type II
Type III Type IV Type V Type VI
Type Class 1 Class 2 Class 1 Class 2
Facer covering aluminum aluminum fibrous felt or polymer-bonded perlite cellulosic oriented strand perlite
one surface foil foil glass fiber glass fiber mat insulation fiber board or insulation
mat membrane board insulating wafer-board board
membrane board
Facer covering aluminum aluminum fibrous felt or polymer-bonded fibrous felt or fibrous felt fibrous felt or perlite
opposite surface foil foil glass fiber glass fiber glass fiber or glass fiber insulation
mat mat membrane mat glass fiber mat membrane board
membrane membrane mat or aluminum
membrane foil
Physical Property
Compressive 16 (110) 16 (110) Grade 1 16 16 (110) 16 (110) 16 (110) 16 (110) 16 (110)
strength, psi (110)
(kPa), minB Grade 2 20
(138)
Grade 3 25
(172)
Dimensional
stabilityB
Percent linear
change,
thickness, max
−40°F (−40°C) 2.0 1.5 2.0 2.0 2.0 2.0 2.0 2.0
amb, RH
158°F (70°C)/ 2.0 1.5 4.0 4.0 4.0 4.0 4.0 4.0
97 % RH
200°F (93°C)/ 4.0 1.5 4.0 4.0 4.0 4.0 4.0 4.0
amb RH
Percent linear
change, length
and width, max
−40°F (−40°C) 2.0 1.5 2.0 2.0 2.0 2.0 2.0 2.0
amb, RH
158°F (70°C)/ 2.0 1.5 2.0 2.0 4.0 4.0 4.0 4.0
97 % RH
200°F (93°C) 4.0 1.5 2.0 2.0 4.0 4.0 4.0 4.0
amb, RH
Flexural strength
(modulus of
rupture)B
psi (kPa), min 40 (275) 40 (275) 40 (275) 40 (275) 40 (275) 40 (275) 40 (275) 50 (345)
(Break load) lbf 8 (35) 8 (35) 17 (75) 17 (75) 17 (75) 17 (75) 17 (75) 33 (147)
(N), min
Tensile strength, 500 (24) 500 (24) 500 (24) 500 (24) 500 (24) 500 (24) 500 (24) 500 (24)
psf (kPa), minB
Perpendicular to
board surface
Water absorption 1.0 1.0 1.5 1.5 1.0 2.0 1.0 1.5
2h percent by
volume, maxB
Water vapor 0.3 (17.2)B 0.3 (17.2)B 1.0 (57.2)B 4.0 (228.8)B C C C C
transmission,
perm
(ng/Pa·s·m2),
max
A
Because core foam thickness and facer type, thickness, and permeability can all influence the magnitude of values measured for these physical properties, a nominal
1 in. foam core product has been described for referee purposes. Consult manufacturers regarding specific foam-facer composite products and other product thicknesses.
When appropriate, physical property values as agreed between buyer and seller shall replace those listed in Table 1 as qualification requirements described in 10.3.
B
Nominal 1-in. (25.4-mm) product.
C
Not applicable.
3
C 1289 – 03
TABLE 2 Thermal Resistance PropertiesA,B
Type II Class 1
Product Type Type I Class 1 Type I Class 2 Type II Class 2 Type III Type IV Type V Type VI
Grades 1, 2, 3
Facer Covering Aluminum Foil Aluminum Foil Fibrous Felt or polymer-bonded Perlite Insulation Cellulosic Fiber Oriented Strand Perlite
One Surface Glass Fiber Mat glass fiber mat Board Insulating Board Board, or Wafer- Insulation
Membrane membrane Board Board
Facer Covering Aluminum Foil Aluminum Foil Fibrous Felt or polymer-bonded Fibrous Felt or Fibrous Felt or Fibrous Felt or Perlite
Opposite Glass Fiber Mat glass fiber mat Glass Fiber Mat Glass Fiber Mat Glass Fiber Mat Insulation
Surface Membrane membrane Membrane Membrane Membrane or Board
Aluminum
Foil
Minimum Thermal
Resistance @
406 2°F (4 6
1°C) mean temp.
°F ft2 h⁄Btu (Km2/W)
1 in. (25.4 mm) 7.2 (1.26)C 7.2 (1.26)C 6.2 (1.10)C 5.8 (1.02)
product
D D D
1.5 in. (38.1 mm) 10.8 (1.90) 10.8 (1.90) 9.2 (1.62) 8.7 (1.53) 8.1 (1.42)C 8.0 (1.40)C 7.1 (1.25)C
product
2 in. (50.8 mm) 14.3 (2.52)E 14.3 (2.52)E 12.3 (2.17)E 11.7 (2.06) 12.5 (2.20)D 12.4 (2.18)D 11.5 (2.02)D 8.6 (1.52)D
product
Minimum Thermal
Resistance @
756 2°F (24 6
1°C) mean temp.
°F ft2 h⁄Btu (Km2/W)
1 in. (25.4 mm) 6.5 (1.14)C 6.5 (1.14)C 5.6 (0.97)C 5.3 (0.93)
product
1.5 in. (38.1 mm) 9.8 (1.72)D 9.8 (1.72)D 8.4 (1.48)D 8.0 (1.41) 7.4 (1.30)C 7.3 (1.28)C 6.5 (1.14)C
product
2 in. (50.8 mm) 13.0 (2.29)E 13.0 (2.29)E 11.2 (1.97)E 10.6 (1.87) 11.4 (2.00)D 11.3 (1.99)D 10.5 (1.85)D 7.5 (1.32)D
product
Minimum Thermal
Resistance @
1106 2°F (43 6
1°C) mean temp.
°F ft2 h⁄Btu (Km2/W)
1 in. (25.4 mm) 5.9 (1.04)C 5.9 (1.04)C 5.0 (0.88)C 4.8 (0.85)
product
D D D
1.5 in. (38.1 mm) 8.8 (1.55) 8.8 (1.55) 7.6 (1.34) 7.2 (1.26) 6.7 (1.18)C 6.6 (1.16)C 5.9 (1.04)C
product
2 in. (50.8 mm) 11.7 (2.06)E 11.7 (2.06)E 10.1 (1.78)E 9.5 (1.67) 10.3 (1.81)D 10.2 (1.80)D 9.5 (1.67)D 6.7 (1.18)D
product
A
Because core foam thickness and facer type, thickness, and permeability can all influence product R-values, three faced product thicknesses have been described
for referee purposes. Consult manufacturers regarding specific foam-facer composite products and other thicknesses. When appropriate, thermal resistance values as
agreed between buyer and seller shall replace those listed in Table 2 as qualification requirements described in 10.3.
B
Determined in accordance with Section 11.
C
Nominal 1-in. (25.4-mm) product.
D
Nominal 1.5-in. (38.1-mm) product.
E
Nominal 2.0-in. (50.8-mm) product.
6.2.4 Polymer-Bonded Organic Fibrous Felt—The either the 1⁄2-in. board listed in Specification C 728, which has
polymer-bonded organic fibrous felt shall consist of organic a higher core density and modified formulation (as agreed upon
fiber felt bonded with organic polymer binders. between buyer and seller) than the thicker products, or may be
6.2.5 Asphalt-Coated Glass Fiber Mat—The asphalt-coated a 1⁄2-in. thickness (available only to manufacturers of laminated
glass fiber mat shall consist of fibrous glass mats coated with rigid foam products) of the 3⁄4 to 3 in. formulation perlite board
asphalt or asphalt emulsion. listed in Specification C 728.
6.2.6 Polymer-Bonded Glass Fiber Mat—The polymer- 6.2.8 Cellulosic Fiber Insulation Board—The cellulosic
bonded glass fiber mat shall consist of fibrous glass mats fiber insulating board shall conform to the material and
bonded with organic polymer binders coated or not with physical properties requirements specified in Specification
organic polymer, clay, or other inorganic substances. C 208.
6.2.7 Perlite Insulation Board—The perlite insulation board 6.2.9 Oriented Strand Board and Waferboard—The ori-
shall conform to the material and physical property require- ented strand board and waferboard shall conform to the
ments specified in Standard Specification C 728, either type 1 material and physical properties requirements specified in
or type 2 may be used. The perlite insulation board may be ANSI A208.1.
4
C 1289 – 03
7. Physical Properties 8.4.1 The nominal depth of each shiplap shall be the sum of
7.1 The thermal insulation board shall conform to the its thickest facer dimension plus one half the thickness of its
properties stated in Table 1. core foam dimension.
8.4.2 For boards 2 in. (50.8 mm) or greater in nominal
7.1.1 The physical properties stated in Table 1 shall not be
thickness, the width of the shiplap shall be 1 in. (25.4 mm). For
used as design or engineering values unless this recommenda-
boards less than 2 in. (50.8 mm) in thickness, the nominal
tion is made in writing by the product manufacturer. It remains
width of the shiplap shall be one half the thickness of the faced
the buyer’s responsibility to specify design requirements and
board product.
obtain supporting physical properties documentation from each
8.4.3 All fabrication tolerances shall provide for a dimen-
product manufacturer and supplier.
sionally stable, smooth, and uniform shiplap joint in installa-
7.2 Thermal Resistance (R-value)—When ordering, specify tion and in service.
the R-value; thickness shall be specified if there is a specific 8.5 Flatness—The thermal insulation boards shall not de-
thickness requirement and R-value is not specified. The values part from absolute flatness more than 1⁄8 in./ft (10 mm/m) of
specified shall be for the faced insulation product only, and length or width when examined in accordance with Practice
shall not include any additional thermal resistances from C 550.
reflective facer surfaces and adjacent air spaces or from other 8.6 Available Sizes—The thermal insulation boards are
components of the building system. The mean thermal resis- normally supplied in sizes of 2 by 8 ft (0.61 by 2.44 m), 3 by
tance of the material tested shall not be less than the minimum 4 ft (0.91 by 1.22 m), 4 by 4 ft (1.22 by 1.22 m), and 4 by 8
relevant value prescribed in Table 2. The thermal resistances of ft (1.22 by 2.44 m). Additional sizes may be available from the
individual specimens tested shall not be less than 90 % of the manufacturer or may be specified by the purchaser.
minimum value identified in Table 2. Values in Table 2 8.7 Crushings and Depressions—The thermal insulation
determined in accordance with Section 11. boards shall have no crushed or depressed areas on any surface
NOTE 2—Thermal characteristics of cellular plastics may be signifi- exceeding 1⁄8 in. (3.2 mm) in depth on more than 10 % of the
cantly influenced by installation and service-related variables such as age, total surface area.
encapsulation within gas barrier materials, environmental conditions,
mechanical abuse, etc. and may be reduced from measured values after 9. Workmanship
exposure to conditions of use. For specific design recommendations, 9.1 The thermal insulation boards shall have no defects that
consult the manufacturer or qualified professionals, such as architects or
engineers.
will adversely affect their service qualities. The boards shall be
of uniform texture and facer integrity, free from the accumu-
7.2.1 Long-Term Thermal Resistance (LTTR)—Determine, lation of unexpanded materials, foreign materials, broken
and report values, in accordance with practice and details in edges and corners, slits, delaminations, and objectionable
Annex A1. odors.
7.3 Fire Characteristics—Polyisocyanurate thermal insula-
tion boards are organic materials and are combustible. They 10. Sampling
should not be exposed to open flames or other ignition sources. 10.1 Unless otherwise specified, the product shall be
The fire performance of the material should be addressed sampled and inspected for acceptance of material in accor-
through fire test requirements established by the appropriate dance with Criteria C 390.
governing authority, which are specified to the end use and 10.2 The following physical requirements are defined as
occupancy. inspection requirements in accordance with Criteria C 390:
7.3.1 Surface Burning Characteristics—Determine, if re- 10.2.1 All dimension requirements as described in Section
quired, in accordance with Test Method E 84. 8.
10.2.2 All workmanship, finish, and appearance require-
8. Dimensions ments as described in Section 9.
10.3 The following physical properties are defined as quali-
8.1 Dimensional Tolerances—The length and width toler- fication requirements in accordance with Criteria C 390.
ances shall not exceed 61⁄4 in. (6.4 mm), the thickness 10.3.1 Thermal resistance as described in Section 11.2 and
tolerance shall not exceed 1⁄8 in. (3.2 mm), and the thickness of Table 2.
any two boards shall not differ more than 1⁄8 in. (3.2 mm) when 10.3.2 Compressive strength as described in Section 11.3
measured in accordance with Test Method C 303. and Table 1. Five equally spaced specimens are to be taken for
8.2 Board Squareness—The thermal insulation boards shall testing along a cross-machine board traverse (perpendicular to
not be out of square more than 1⁄16 in./ft (5.2 mm/m) of width the machine direction.
or length, when examined in accordance with Practice C 550. 10.3.3 Dimensional stability as described in Section 11.4
8.3 Straight Edges—Unless otherwise specified, the thermal and Table 1.
insulation board shall be furnished with straight edges and 10.3.4 Flexural strength as described in Section 11.5 and
edges shall not deviate more than 1⁄32 in./ft (2.6 mm/m) when Table 1.
examined in accordance with Practice C 550. 10.3.5 Tensile strength perpendicular to board surface as
8.4 Shiplap Edges—When specified, the insulation board described in Section 11.6 and Table 1.
shall be fabricated with shiplap edges along its longest dimen- 10.3.6 Water absorption as described in Section 11.7 and
sions. Table 1.
5
C 1289 – 03
10.3.7 Water vapor transmission as described in Section dance with 3.2.4 of Test Method C 1303 This test method is not applicable
11.8 and Table 1. to Specification C 1289 Type I products.
10.4 For lots of 150 units or less not subject to tightened The thermal transmission properties of closed-cell insulation products
vary with temperature, temperature gradient, moisture content, thickness,
inspection, the supplier’s certificate of compliance or third- age, and shape. Apparent thermal transmission properties contained herein
party’s certificate of compliance shall be sufficient basis for are based upon specimens tested under laboratory conditions specified
acceptance of the lot. The certificate shall state that compliance herein. These thermal transmission properties are comparative values for
to inspection requirements has been verified by actual inspec- establishing specification compliance. These thermal transmission prop-
tion of material of the same type, class, size, and thickness erties may not represent the installed performance of the insulation under
manufactured within the same production period as the mate- use conditions differing substantially from test conditions.
rial offered. 11.3 Compressive Strength—All material covered by this
specification shall be conditioned and tested in accordance with
11. Test Methods the Cross-Head Motion procedure in Test Method D 1621 to
11.1 Conditioning: 10 % thickness deformation or yield, whichever occurs first on
11.1.1 Sample boards shall be conditioned at 73 6 4°F (23 a full-thickness faced specimen. Faced product compressive
6 2°C) and 50 6 5 % relative humidity for a minimum of 24 strength shall be determined across the thickness dimension of
h prior to the start of tests or as specified in the applicable test the board product.
procedure. 11.4 Dimensional Stability—The thermal insulation boards
11.1.2 Thermal Resistance Conditioning: shall be tested in accordance with Test Method D 2126 except
11.1.2.1 Time Conditioning Option—Thermal insulation that each specimen shall be 12 by 12 in. (300 by 300 mm) by
boards to be tested for thermal resistance shall be conditioned the full-faced thickness.
for 1806 5 days at 73 6 4°F (23 6 2°C) and 50 6 5 % relative 11.4.1 The standard environmental schedule shall be as
humidity prior to testing. follows:
11.1.2.2 Thermal Conditioning Option—Thermal insulation Temperature Relative Exposure Time,
boards to be tested for thermal resistance may alternatively be °F °C Humidity days
+200 6 4 (93 6 2) ambient 7
conditioned for at least 90 days at 140 6 2°F (60 6 1°C) dry −40 6 6 (−40 6 3) ambient 7
heat prior to testing. +158 6 4 (70 6 2) 97 6 3 % 7
11.1.3 Waiver for Thermal Resistance Conditioning—The 11.5 Flexural Strength—Insulation boards shall be tested in
requirements for thermal resistance conditioning may be accordance with Test Method C 203, Method 1, Procedure B,
waived provided that the following conditions are met: at a moving head speed of 0.1 in./min/in. (2.5 mm/min/25.4
11.1.3.1 The same type board offered must have been mm) of thickness with facings intact, on 3 by 12 in. (76.2 by
conditioned as specified within the past 2-year period, and 304.8 mm) by full thickness replicate specimens conditioned in
there shall have been no changes in the manufacturing tech- accordance with 11.1.1.
nique or the materials that would affect the physical properties 11.6 Tensile Strength Perpendicular to Board Surface—
of the board during or since the conditioning was performed. Tensile strength perpendicular to the major board surfaces of
11.1.3.2 Records that verify and support that the condition- the faced board product shall be tested in accordance with Test
ing was performed as specified must be maintained and must Method C 209, Tensile Strength Perpendicular to Surface,
be made available for review by the purchaser’s representative. utilizing a 250°F (121°C) hot melt adhesive system for sample
11.1.3.3 Unless otherwise specified, a written statement preparation. Molten adhesive5 shall be uniformly applied over
from the supplier that the conditions for the waiver have been each faced sample surface and allowed to cool in 73°F (23°C)
met will be acceptable evidence of compliance of the condi- laboratory air for 24 h before testing.
tioning requirements. 11.7 Water Absorption— Insulation boards shall be tested in
11.2 Thermal Resistance—After conditioning in accordance accordance with Test Method C 209, Water Absorption.
with 11.1.2, insulation boards will be further conditioned in 11.8 Water Vapor Transmission—Insulation boards shall be
accordance with Test Method C 518 and shall be tested in tested in accordance with Test Method E 96, desiccant method
accordance with Test Methods C 177, C 518, C 1114, or at 73 6 2°F (23 6 1°C), with facings intact.
C 1363 and Practices C 1045 and C 1058. The mean reference
testing temperature shall be 75 6 2°F (24 6 1°C). In addition, 12. Rejection and Resubmittal
thermal resistance values shall be provided at 40 6 2°F (4 6 12.1 Failure to conform to the requirements in this specifi-
1°C), or 110 6 2°F (43 6 1°C), or both, at the buyer’s request; cation shall constitute cause for rejection. Rejection shall be
but shall not be required to establish compliance with this promptly reported to the manufacturer.
specification. All thermal resistance testing shall be conducted 12.2 The manufacturer shall have the option to reinspect
with a minimum temperature differential of 40°F (22°C). Cut rejected shipments and resubmit the entire lot for inspection
samples for testing after the conditioning period. and resampling after the removal and replacement of noncon-
NOTE 3—When an estimate of the long-term change in thermal resis- forming portions.
tance is desired by the buyer for engineering or design requirements, or
both, and agreed upon between the buyer and the seller, Test Method
C 1303 provides an alternative technique for estimating long-term 5
Cascomelty hot melt adhesive manufactured by the Borden Chemical Co. and
changes in thermal resistance. This alternative technique only applies Bostik Glue Stix #6363-15y hot melt adhesive manufactured by the Bostik Co.,
when the material meets the homogeneous material definition in accor- Middleton, MA have been found suitable for use in this procedure.
6
C 1289 – 03
13. Packaging and Marking 14. Keywords
13.1 Packaging—Unless otherwise specified, the insulation 14.1 cellular plastic insulation; cellulosic fiber insulating
shall be supplied in the manufacturer’s standard commercial board; composite foam insulation board; faced foam board;
packages. foam plastic insulation; oriented strand board; perlite board;
13.2 Marking—Unless otherwise specified, each package or polyiso board; polyisocyanurate; polyisocyanurate foam; poly-
board shall be marked with the insulation specification number; urethane; polyurethane foam; thermal insulation; waferboard
type; manufacturer’s name or trademark, address, and tele-
phone number; lot number; and thermal resistance (R-value).
ANNEX
(Mandatory Information)
A1. LONG-TERM THERMAL RESISTANCE
A1.1 Background A1.3 Sampling
A1.1.1 Rigid closed cell plastic foams, including polyiso- A1.3.1 A 2.0 6 0.2 in. (50 6 5 mm) product shall be used.
cyanurate foam insulation, experience a reduction in thermal Select a minimum of three samples, at least two hours apart,
resistance with time. The theory behind this change is well from the production run. Deliver these samples to the labora-
understood but until the introduction of slicing and scaling tory such that the lab receives them in 14 days or less from the
technology, developed for estimating and predicting standard- date of manufacture. The actual size of the sample shall be
ized time-aged values, long term values were unobtainable or agreed between the testing laboratory and the proponent.
imprecise at best. A recently developed standard, Test Method However, the minimum dimension of each sample shall be 3 by
C 1303 provides a procedure for rapidly estimating for selected 4 ft (0.91 by 1.22 m).
time frames the long-term thermal resistance of closed cell
plastic foams without facings. A derivative procedure, CAN/ A1.4 Thermal Testing
ULC-S770, has subsequently been developed in Canada as a A1.4.1 The standard test conditions shall be in accordance
standard that allows slicing and scaling technology to be with Test Method C 518 using 75 6 2°F (24 6 2°C) and a
applied to permeably faced polyisocyanurate closed-cell foam temperature differential of 40 6 2°F (22 6 2°C).
insulation. It is simple to use and very prescriptive as it defines
what is long term and from where to cut the slices, their A1.5 Initial Thermal Resistance
thickness, and how to prepare and measure them. Neither of A1.5.1 After delivery of the samples to the testing labora-
these methods is applicable to impermeable faced products. tory, cut three specimens, 24 by 24 in. (600 by 600 mm) (or
five specimens, 12 by 12 in. (300 by 300 mm), depending on
A1.2 Scope the size of the heat flow meter apparatus used), at least one
A1.2.1 This practice is based on CAN/ULC-S770. It defines from each board. If the major surfaces of the test specimens are
the Long-Term Thermal Resistance (LTTR) of polyisocyanu- not parallel, a maximum thickness of 0.2 in. (5 mm) shall be
rate foam product as the value measured after 5-year storage in removed from each surface to make them parallel. In no case
standard laboratory conditions (73 6 4°F (23 6 2°C) and 50 6 shall the total thickness removed exceed 15 % of the product
10 % RH). It has been demonstrated6 that the thermal resis- thickness.
tance value measured after 5 years is approximately equivalent A1.5.2 The initial thermal resistance measurements on the
to a 15-year time weighted average age value. above three (or five if using 12 by 12 in. (300 by 300 mm)
A1.2.2 The user of this practice shall determine if the rate of specimens) specimens shall be completed within 7 to 14 days
aging of the surface layers compared to the core layers of the after the production date. Calculate the initial thermal resistiv-
product tested limits the use of this practice for the specific ity of the samples given for testing as an average of these three
application. (or five) specimens.
A1.2.3 This practice is applicable to products with perme-
A1.6 Slicing
able facers only (Type II to VI). A 2.0 6 0.2 in. (50 6 5 mm)
product shall be selected and used to determine the LTTR of A1.6.1 On the same day, denoted as Day 1 for subsequent
1.0 in. (25.4 mm), 2.0 in. (50.8 mm) and 3.0 in. (76.2 mm). The calculation of the testing periods, select one of the three 24 by
proponent shall be able to select and test a specific thickness of 24 in. (600 by 600 mm) specimen and cut into four 12 by 12
product in order to predict the LTTR of that specific product. in. (300 by 300 mm) (or select two of the five 12 by 12 in. (300
by 300 mm) specimens as already prepared above). From each
of these, slice two layers adjacent to the surfaces (called
6
Kumaran, M. K. and Bomberg, M. T., “Thermal Performance of Sprayed
“surface layers”) with thickness between 0.25 in. (6 mm) and
Polyurethane Foam Insulation with Alternative Blowing Agents,” Journal of 0.50 in. (12 mm), and two layers with the same thickness as the
Thermal Insulation, Vol 14, July 1990, p. 43. surface layers from the middle part (called “core layers”). Thus
7
C 1289 – 03
TABLE A1.1 Interlaboratory Imprecision—Permeably Faced Polyisocyanurate
Interlaboratory Imprecision at the Two Standard Deviation Level (%)
Equivalent Number of
Thickness Laboratories Initial Aging
LTTR
ResistivityA Factor
75 mm (3.0 in.) 7 5.5 8.7 5.3
50 mm (2.0 in.) 9 7.5 9.4 6.5
25 mm (1.0 in.) 8 8.0 10.4 8.5
A
The Precision Statement in Test Method C 518 quotes results from several round robins on thermal resistance measurements made on Fibreglass and loose fill. At
the two standard deviation level they are 2 to 3.7 % for fibreglass and from 5 to 10 % for different loose fills. No results for foamboard.
there will be four surface layers and four core layers available stacks of surface and core layers. If the layers were re-
for further testing. If the required number of core layers cannot measured individually, calculate the average aging factors for
be sliced from two specimens (as restricted by the total the surface layers and for the core layers. If the measurements
thickness of the 12 by 12 in. (300 by 300 mm) specimens), a are done using a stack of four, the aging factor will be derived
third specimen shall be used for completing the total 8 thin from the thermal resistivity of the whole stack. The aging
layers for subsequent testing. factor is derived by dividing the thermal resistivity of the layers
at the testing point by the initial thermal resistivity, as obtained
A1.7 Testing the Thin Layers from A1.7.2.
A1.7.1 Measure and record the thicknesses of each of the A1.8.2 If the difference between the average aging factor of
eight thin layers using a minimum of 5 uniformly spaced the surface layers and that of the cores layers does not exceed
points, one center point and four other uniformly spaced points. 12 % of their mean value, use the higher of these two values as
Separate thickness measurements shall be within 5 % of the the effective aging factor. If the difference is more than 12 %,
mean of the five thicknesses. If the thicknesses of the layers are the test is considered invalid, and cannot be used for determin-
not within 5 % of their mean value, they shall be tested ing LTTR.
separately. A1.8.3 Establish LTTR as a product of the average initial
A1.7.2 Measure the initial thermal resistance and calculate thermal resistivity of the product (see A1.5.2), the thickness
resistivity of the layers. The layers may be tested in stacks. under consideration and the effective aging factor as defined
Surface layers can be stacked to get an average thickness for above.
the surface layers. The same can be done for the core layers.
A1.9 Reporting
The surface layers and the core layers shall not be mixed to
form a stack. It is essential that this be done within 2 h of A1.9.1 The LTTR shall be determined and reported for 1.0
cutting because the thin layers will age very rapidly. in. (25.4 mm), 2.0 in. (50.8 mm) and 3.0 in. (76.2 mm). For
A1.7.3 From the thickness of the layers (which can be the other product thickness, from 0.5 in. (12 mm) to 4.5 in. (115
average thickness if they are stacked), calculate the testing mm), the LTTR value can be calculated from these three
periods when the layers must be retested to correspond to the points, using a best curve fitting equation. Report age in days
five year aging of the product at the various thicknesses (see of the product tested when initial thermal resistivity is mea-
A1.2.3). The scaling equation [(t1/ t2) = (L1/ L2)2] shall be used sured.
for this purpose.
A1.10 Precision and Bias
For example,
H J
A1.10.1 This procedure is applicable to permeably faced
t 10 mm 2
polyisocyanurate closed-cell foam insulation. Previous preci-
1826 days 5 25 mm (A1.1)
sion information on another slicing and scaling technique for
As an example, for a 2.0 in. (50.8 mm) insulating product unfaced polyisocyanurate insulation has been reported in Test
and for a 0.3937 in. (10 mm) thin layer, the testing periods for Method C 1303, Section 11, Precision and Bias.
various product thickness shall be as follows: A1.10.2 The precision of the procedure in this Annex has
Slice sample test period as it relates to 5-year product aging period been determined in a round-robin study for CAN/ULC-S770,
Product Thickness, in. (mm) Testing Period, day
L1 t2
the method used as the basis for this Annex. Table A1.1 has
1.0 (25.4) 283.0 been prepared from Table 2 in Technical Report, CAN/ULC-
2.0 (50.8) 70.8 S770-XX Round Robin Test Programme.7 Other references8,9
3.0 (76.2) 31.4
pertaining to precision and bias of the LTTR method are
Between testing periods, the slices shall be stored in a available.
laboratory environment such that both major surfaces of all
slices are exposed to the ambient air (73 6 5°F (23 6 5°C) and 7
Martin Hofton & Associates Inc., Technical Report, CAN/ULC-S770-XX Round
50 6 20 % RH). Robin Test Programme, Canadian Plastics Industry Association, April 2001.
8
Singh, S. N., Ntiru, M., and Dedecker, K., “Long Term Thermal Resistance of
A1.8 Calculating LTTR Pentane Blown Polyisocyanurate Laminate Boards,” Polyurethanes Conference
2002, October , 2002.
A1.8.1 Within 24 h of the prescribed testing periods (that is, 9
Stovall, T. K., Fabian, B. A., Nelson, G. E., and Beatty, D. R., “A Comparison
the calculated scaled aging time), remeasure the thermal of Accelerated Aging Test Protocols for Cellular Foam Insulation,” Insulation
resistivity of each surface layer and of each core layer or the Materials Testing and Applications, Fourth Volume, ASTM STP 1426, 2002.
8
C 1289 – 03
A1.10.3 As stated in Section A21.3.1, Form of ASTM Test information on the bias of this procedure can be presented.
Methods, “Bias is a systemic error that contributes to the Preliminary data from industry sources indicates there could be
difference between the mean of a large number of test results a bias. A study to determine bias is being conducted by the
and an accepted reference value.” Since niether a large number manufacturers of polyisocyanurate foam insulation utilizing
of test results nor an accepted reference value are available no permeably faced product only.
ASTM International takes no position respecting the validity of any patent rights asserted in connection with any item mentioned
in this standard. Users of this standard are expressly advised that determination of the validity of any such patent rights, and the risk
of infringement of such rights, are entirely their own responsibility.
This standard is subject to revision at any time by the responsible technical committee and must be reviewed every five years and
if not revised, either reapproved or withdrawn. Your comments are invited either for revision of this standard or for additional standards
and should be addressed to ASTM International Headquarters. Your comments will receive careful consideration at a meeting of the
responsible technical committee, which you may attend. If you feel that your comments have not received a fair hearing you should
make your views known to the ASTM Committee on Standards, at the address shown below.
This standard is copyrighted by ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959,
United States. Individual reprints (single or multiple copies) of this standard may be obtained by contacting ASTM at the above
address or at 610-832-9585 (phone), 610-832-9555 (fax), or service@astm.org (e-mail); or through the ASTM website
(www.astm.org).
9
Designation: E 1264 – 98
Standard Classification for
Acoustical Ceiling Products1
This standard is issued under the fixed designation E 1264; the number immediately following the designation indicates the year of
original adoption or, in the case of revision, the year of last revision. A number in parentheses indicates the year of last reapproval. A
superscript epsilon (e) indicates an editorial change since the last revision or reapproval.
This standard has been approved for use by agencies of the Department of Defense.
1. Scope E 1414 Test Method for Airborne Sound Attenuation Be-
1.1 This classification covers ceiling products that provide tween Rooms Sharing a Common Ceiling Plenum2,4
acoustical performance and interior finish in buildings. Prod- E 1477 Test Method for Luminous Reflectance Factor of
ucts used in performance spaces and other special applications Acoustical Materials by Use of Integrating-Sphere Reflec-
may require more detailed specification than provided by this tometers5
classification.
3. Terminology
1.2 This classification classifies acoustical ceilings by type,
pattern, and certain ratings for acoustical performance, light 3.1 Definitions—For definitions of terms used in this clas-
reflectance, and fire safety. It does not cover the aspects of sification, see Terminology C 634.
acoustical ceilings when used as a component of a system or 3.2 Definitions of Terms Specific to This Standard:
assembly tested for fire endurance or floor/ceiling sound 3.2.1 acoustical panel—a form of a prefabricated sound
transmission. absorbing ceiling element used with exposed suspension sys-
1.3 This classification does not include physical properties, tems.
such as structural hardness, friability, sag, linear expansion and 3.2.2 acoustical tile—a form of a prefabricated sound ab-
contraction, and transverse strength, which may affect the sorbing ceiling element used with concealed or semi-exposed
handling, installation, and use of acoustical ceiling products suspension systems, stapling, or adhesive bonding.
(see Test Methods C 367). 3.2.3 butt—a joint detail for acoustical tile, butt bevel, or
butt square edge, without kerfing of the edges, intended for
2. Referenced Documents adhesive bonding to solid backing.
2.1 ASTM Standards: 3.2.4 edge and joint detail—various edge and joint details
C 367 Test Methods for Strength Properties of Prefabricated are available in accordance with Table 1 and Fig. 1 for
Architectural Acoustical Tile or Lay-In Ceiling Panels2 acoustical ceiling products.
C 423 Test Method for Sound Absorption and Sound Ab- 3.2.5 excelsior—long, thin wood shavings.
sorption Coefficients by the Reverberation Room Method2 3.2.6 fissured pattern—a surface with irregular depressions
C 634 Terminology Relating to Environmental Acoustics2 of varying lengths, widths, and depths extending below the
E 84 Test Method for Surface Burning Characteristics of basic product face.
Building Materials3 3.2.7 flush reveal edge—acoustical lay-in panels are in-
E 413 Classification for Rating Sound Insulation2 tended for use in direct hung exposed suspension systems with
E 795 Practices for Mounting Test Specimens During a narrow exposed edge that is flush with the panel face.
Sound Absorption Tests2 3.2.8 glass fiber base—ceilings composed principally of
E 1110 Classification for Determination of Articulation glass in fiber form with appropriate binders.
Class2 3.2.9 kerfed and rabbeted—joint detail for acoustical tile.
E 1111 Test Method for Measuring the Interzone Attenua- Tile with kerfed and rabbeted edges on all four sides, with or
tion of Ceiling Systems2 without beveled edges, are intended for concealed suspension
system or adhesive bonding.
1
This classification is under the jurisdiction of ASTM Committee E-33 on
Environmental Acoustics and is the direct responsibility of Subcommittee E33.04 on
Application of Acoustical Materials and Systems.
Current edition approved November 10, 1998. Published March 1999. Originally
4
published as E 1264 – 88. Last previous edition E 1264 – 96. Test Method E 1414 is an adaptation of the AMA-1-II-1967 Test Method for
2
Annual Book of ASTM Standards, Vol 04.06. Ceiling Sound Transmission Test by Two-Room Method.
3 5
Annual Book of ASTM Standards, Vol 04.07. Annual Book of ASTM Standards, Vol 06.01.
Copyright © ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959, United States.
1
E 1264
TABLE 1 Edge and Joint Detail, Types I, II, III, IV, VIII, IX, X, XI, 3.2.13 reveal edge—acoustical lay-in panels with step-
and XII down edge are intended for use in direct hung exposed
Acoustical Unit Edge Detail Joint Detail suspension systems.
Tile Beveled Kerfed and Rabbeted or Tongue 3.2.14 square edge—acoustical lay-in panels with square
and Groove or Butt edges are intended for use in direct hung exposed suspension
Square Kerfed and Rabbeted or Tongue
and Groove or Butt systems.
Beveled Long Edges, Kerfed and Rabbeted Long 3.2.15 Discussion—Reveal, flush reveal, and square edged
Square Edge Trimmed on Edges Only, Ends Trimmed.
Ends (For Semi-concealed System)
panels are laid in place and can easily be pushed upward for
removal or access to the plenum above.
Panels Square 3.2.16 textured pattern—granular or raised (fine, coarse, or
Reveal
Flush Reveal
a blend), felted or matted surface as an integral part of the basic
Narrow Reveal product or superimposed on the product surface.
Narrow Flush Reveal 3.2.17 tongue and groove—joint detail for acoustical tile.
Metal Pan Square Tile with tongue and groove edges are intended for stapling,
Reveal concealed suspension system, or adhesive bonding.
Flush Reveal
Narrow Reveal
Narrow Flush Reveal
4. Significance and Use
Metal Strip Varies with Manufacturer 4.1 This classification is used to classify and aid in the
selection of acoustical ceiling products.
5. Basis of Classification
5.1 Acoustical ceiling products described using this classi-
fication may be of one or more of the following types, forms,
patterns, acoustical ratings, light reflectance values, and fire
classes, as specified.
5.2 Ceiling Types:
5.2.1 Type I—Cellulose base with painted finish.
5.2.2 Type II—Cellulose base with membrane-faced over-
lay.
5.2.3 Type III—Mineral base with painted finish.
5.2.3.1 Form 1—Nodular.
5.2.3.2 Form 2—Water felted.
5.2.3.3 Form 3—Dry felted.
5.2.3.4 Form 4—Cast or molded.
5.2.4 Type IV—Mineral base with membrane-faced overlay.
5.2.4.1 Form 1—Nodular.
5.2.4.2 Form 2—Water felted.
5.2.4.3 Form 3—Dry felted.
5.2.4.4 Form 4—Cast or molded.
5.2.5 Type V—Perforated steel facing (pan) with mineral or
glass fiber base backing.
5.2.6 Type VI—Perforated stainless steel facing (pan) with
mineral or glass fiber base backing.
FIG. 1 Edge and Joint Details 5.2.7 Type VII—Perforated aluminum facing (pan) with
mineral or glass fiber base backing.
5.2.8 Type VIII—Cellulose base with scrubbable pigmented
3.2.10 kerfed and rabbeted long edges, ends trimmed— or clear finish.
acoustical tile, 2 ft or longer, is intended for installation in 5.2.9 Type IX—Mineral base with scrubbable pigmented or
semi-exposed, or semi-exposed direct hung suspension sys- clear finish.
tems. 5.2.9.1 Form 1—Nodular.
3.2.11 metal facings (pans)—metal facing (pan) ceiling 5.2.9.2 Form 2—Water felted.
systems with mineral or glass fiber base backings are intended 5.2.9.3 Form 3—Dry felted.
for use where sound absorption is needed and where durable 5.2.9.4 Form 4—Cast or molded.
and easily maintainable surfaces are a necessity. 5.2.10 Type X—Mineral base with plastic or aluminum
3.2.12 mineral base—ceilings composed principally of membrane-faced overlay, or both.
mineral materials such as fibers manufactured from rock or 5.2.11 Type XI—Mineral base with fabric-faced overlay.
slag, with or without binders. 5.2.11.1 Form 1—Nodular.
2
E 1264
5.2.11.2 Form 2—Water felted. lighting fixtures can impair the AC rating, depending upon the area of the
5.2.11.3 Form 3—Dry felted. hard surface and its location relevant to occupants in the space.)
5.2.11.4 Form 4—Cast or molded. 7.1.3 Ceiling Attenuation Class (CAC)—An acoustical ceil-
5.2.12 Type XII—Glass fiber base with membrane-faced ing may meet a CAC rating, derived in accordance with Test
overlay. Method E 1414 and Classification E 413. Typical CAC values
5.2.12.1 Form 1—Plastic. may range from 5 to 55.
5.2.12.2 Form 2—Cloth.
NOTE 4—Ceiling Attenuation Class (CAC) is a single number rating
5.2.12.3 Form 3—Other. obtained according to Test Method E 1414 and Classification E 413. The
5.2.13 Type XIII—Aluminum or steel strip with mineral or Normalized Ceiling Attenuation (Dn,c) values, obtained according to
glass fiber base backing. E 1414 are used instead of Transmission Loss (TL) values in Classifica-
5.2.13.1 Form 1—Perforated. tion E 413. Test Method E 1414 is a two-room method of test in which a
5.2.13.2 Form 2—Non-perforated. suspended ceiling and common plenum space overlay a two-room suite
5.2.14 Type XIV—Excelsior bonded with inorganic binders. separated by a massive dividing wall. Sound must travel up through the
source room ceiling, across the plenum, and down through the receive
5.2.14.1 Form 1—No backing. room ceiling. Modifications to the plenum space such as overlays and
5.2.14.2 Form 2—Backed with mineral or glass fiber base barriers must be specified. STC ratings obtained from Test Method E 90 or
backing. E 336 data are not acceptable.
5.2.15 Type XX—Other types (describe). 7.2 Light Reflectance (LR) Coeffıcient—An acoustical ceil-
NOTE 1—The facings specified in Type II, Type IV, Type X, Type XI, ing may meet a LR coefficient, measured in accordance with
and Type XII shall be separate overlays and not coatings similar to paint. Test Method E 1477. Typical values may range from 0.60 to
NOTE 2—The minimum thickness of metallic facings (pans) specified 0.80.
in Type V, Type VI, and Type VII shall be sufficient to support the length 7.3 Fire Class/Surface Burning Characteristics—
of the facing, or instead thereof, stiffeners or ribs may be provided to
ensure rigidity.
Acoustical ceiling products may be classified by flame spread
and smoke developed indexes, tested in accordance with Test
6. Ceiling Pattern Method E 84, as follows:
6.1 Acoustical ceilings may be one of or a combination of 7.3.1 Class A—The flame spread rating of Class A ceiling
two or more of the following patterns: products shall not exceed 25, nor shall the material show
Pattern Designation Pattern Description
evidence of continued progressive combustion after the test
A Perforated, regularly spaced large holes flame has been extinguished. All surfaces, including those that
B Perforated, randomly spaced large holes would be exposed by cutting through the material in any way,
C Perforated, small holes
D Fissured
shall meet these requirements. In addition, Class A ceiling
E Lightly textured products shall have a smoke developed rating not to exceed 50.
F Heavily textured 7.3.2 Class B—The flame spread of Class B ceiling prod-
G Smooth
H Printed
ucts shall not exceed 75 on the face side.
I Embossed 7.3.3 Class C—The flame spread of Class C Ceiling prod-
J Embossed-in-register ucts shall not exceed 200 on the face side.
K Surface scored
L Random swirl NOTE 5—Classes A, B, and C are equivalent, respectively, to Classes I,
Z Other patterns (describe) II, and III of various building code authorities.
7. Ratings 8. Test Methods
7.1 Acoustical Ratings—an acoustical ceiling may meet one 8.1 Acoustical Performance Ratings:
or more of the following acoustical performance requirements: 8.1.1 Noise Reduction Coeffıcient (NRC)—Test according to
7.1.1 Noise Reduction Coeffıcient (NRC)—An acoustical Test Method C 423 using Type E-400 mounting as defined in
ceiling may meet a NRC rating measured in accordance with Practices E 795 unless special means of installation are re-
Test Method C 423. NRC values are to be expressed in quired. Special means of installation shall be explicitly noted in
increments of 0.05 as specified by Test Method C 423. Typical test reports and in publications of test data.
values may range from 0.40 to 1.00.
7.1.2 Articulation Class (AC)—An acoustical ceiling may NOTE 6—Plenum: The depth of air space has considerable effect on
NRC using mechanically mounted acoustical tiles and panels. Because
meet the minimum AC rating derived in accordance with Test
there are unlimited variations that are possible, it has been established that
Method E 1111 and Classification E 1110. AC values are to be Practices E 795 mounting Type E-400 (formerly AMA Mounting No. 7) is
expressed to the nearest multiple of 10 as specified by the most consistent with normal usage and existing technology of testing.
Classification E 1110. Typical values may range from 150 to Some manufacturers publish data for depths of mountings other than 400
250. mm, designated by an E, followed by numbers which indicate the
mounting depth in millimeters. For selecting NRC for mechanically
NOTE 3—Specify AC rating only when rating the acoustical perfor- mounted acoustical tiles and panels, mounting Type E-400 is preferred. If
mance of ceilings designed to accommodate open-plan areas. AC is a plenum will not be used, a report of how the product performs with the
applicable for any ceiling material used as part of an acoustically designed appropriate mounting should be obtained.
system incorporating background sound masking and speech privacy
space dividers. AC is the preferred rating scheme for selecting ceiling 8.1.2 Articulation Class (AC)—Test according to Test
products for open-plan in lieu of the NRC rating scheme. (The addition of Method E 1111 and determine AC rating according to Classi-
hard surfaced elements in the ceiling, such as surface mounted or recessed fication E 1110, subject to the following:
3
E 1264
8.1.2.1 The reported AC rating shall be the minimum 8.3 Fire Class—Test according to Test Method E 84.
articulation class as defined in Test Method E 1111.
8.1.2.2 The ceiling to be tested shall be installed as normally 9. Format of Classification
used with its recommended means of installation, no less than 9.1 The ceiling classification shall conform to the following
8 ft and no more than 9 ft above the floor, or as otherwise format:
specified and explicitly noted in test reports and in publications 9.1.1 Type [Form]; Pattern; NRC or AC (specify); CAC;
of test data. LR; Fire Class.
8.1.2.3 The plenum depth measured from the specimen
surface to the underside of the deck above shall be 2 ft, 6 in. NOTE 7—For example, a lightly textured, water felted mineral base
ceiling with painted finish, having an NRC 0.65, AC 180, CAC 42, LR
unless specified otherwise. The extended surface of the under-
0.75, and a flame spread rating of 50 would be designated as either:
side of the deck shall be acoustically hard. Type III, Form 2; Pattern E; NRC 0.65; CAC 42; LR 0.75; Fire Class
8.1.3 Ceiling Attenuation Class (CAC)—Test according to B, or
Test Method E 1414 and determine CAC rating according to Type III, Form 2; Pattern E; AC 180; CAC 42; LR 0.75; Fire Class B.
Classification E 413. Special plenum details or additions shall
be explicitly noted in test reports and publications of test data. 10. Keywords
8.2 Light Reflectance (LR) Coeffıcient—Test according to 10.1 acoustical ceilings; acoustical ratings; acoustical tile;
Test Method E 1477. light reflectance
ASTM International takes no position respecting the validity of any patent rights asserted in connection with any item mentioned
in this standard. Users of this standard are expressly advised that determination of the validity of any such patent rights, and the risk
of infringement of such rights, are entirely their own responsibility.
This standard is subject to revision at any time by the responsible technical committee and must be reviewed every five years and
if not revised, either reapproved or withdrawn. Your comments are invited either for revision of this standard or for additional standards
and should be addressed to ASTM International Headquarters. Your comments will receive careful consideration at a meeting of the
responsible technical committee, which you may attend. If you feel that your comments have not received a fair hearing you should
make your views known to the ASTM Committee on Standards, at the address shown below.
This standard is copyrighted by ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959,
United States. Individual reprints (single or multiple copies) of this standard may be obtained by contacting ASTM at the above
address or at 610-832-9585 (phone), 610-832-9555 (fax), or service@astm.org (e-mail); or through the ASTM website
(www.astm.org).
4
Designation: C 920 – 02
Standard Specification for
Elastomeric Joint Sealants1
This standard is issued under the fixed designation C 920; the number immediately following the designation indicates the year of
original adoption or, in the case of revision, the year of last revision. A number in parentheses indicates the year of last reapproval. A
superscript epsilon (e) indicates an editorial change since the last revision or reapproval.
This standard has been approved for use by agencies of the Department of Defense.
1. Scope C 1193 Guide for Use of Joint Sealants2
1.1 This specification covers the properties of a cured C 1246 Test Method for Effects of Heat Aging on Weight
single- or multicomponent cold-applied elastomeric joint seal- Loss, Cracking and Chalking of Elastomeric Sealants After
ant for sealing, caulking, or glazing operations on buildings, Cure2
plazas, and decks for vehicular or pedestrian use, and types of C 1247 Test Method for Durability of Sealants Exposed to
construction other than highway and airfield pavements and Constant Immersion in Liquids2
bridges. 3. Terminology
1.2 A sealant meeting the requirements of this specification
shall be designated by the manufacturer to be one or more of 3.1 Definitions—Refer to Terminology C 717 for definitions
the types, classes, grades, and uses defined in Section 7. of the following terms used in this specification: adhesive
1.3 The values stated in SI units are to be regarded as the failure, caulking, chemically curing sealant, cohesive failure,
standard. The values given in parentheses are for information cure, cured, elastomeric, glazing, joint, primer, seal, sealant.
only. 4. Classification of Sealants
1.4 This standard is similar, but not identical, to ISO 11600.
4.1 A sealant qualifying under this specification shall be
2. Referenced Documents classified as to type, grade, class, and use as follows:
2.1 ASTM Standards: 4.1.1 Type S—A single-component sealant.
C 510 Test Method for Staining and Color Change of 4.1.2 Type M—A multicomponent sealant.
Single- or Multicomponent Joint Sealants2 4.1.3 Grade P—A pourable or selfleveling sealant that has
C 639 Test Method for Rheological (Flow) Properties of sufficient flow to form a smooth, level surface when applied in
Elastomeric Sealants2 a horizontal joint at 4.4°C (40°F).
C 661 Test Method for Indentation Hardness of 4.1.4 Grade NS—A nonsag or gunnable sealant that permits
Elastomeric-Type Sealants by Means of a Durometer2 application in joints on vertical surfaces without sagging or
C 679 Test Method for Tack-Free Time of Elastomeric slumping when applied at temperatures between 4.4 and 50°C
Sealants2 (40 and 122°F).
C 717 Terminology of Building Seals and Sealants2 4.1.5 Class 100/50—A sealant that when tested for adhesion
C 719 Test Method for Adhesion and Cohesion of Elasto- and cohesion under cyclic movement (8.8) shall withstand an
meric Joint Sealants Under Cyclic Movement (Hockman increase of at least 100 % and a decrease of at least 50 % of the
Cycle)2 joint width as measured at the time of application, and, in
C 793 Test Method for Effects of Accelerated Weathering addition, meet all the requirements of this specification.
on Elastomeric Joint Sealants2 4.1.6 Class 50—A sealant that when tested for adhesion and
C 794 Test Method for Adhesion-in-Peel of Elastomeric cohesion under cyclic movement (8.8) shall withstand an
Joint Sealants2 increase and decrease of at least 50 % of the joint width as
C 1183 Test Method for Extrusion Rate of Elastomeric measured at the time of application, and, in addition, meet all
Sealants2 the requirements of this specification.
4.1.7 Class 35—A sealant that when tested for adhesion and
cohesion under cyclic movement (8.8) shall withstand an
1
This specification is under the jurisdiction of ASTM Committee C24 on increase and decrease of at least 35 % of the joint width as
Building Seals and Sealants and is the direct responsibility of Subcommittee C24.10 measured at the time of application, and, in addition, meet all
on Specifications, Guides and Practices.
Current edition approved Jan. 10, 2002. Published March 2002. Originally
the requirements of this specification.
published as C 920 – 79. Last previous edition C 920 – 01.
2
Annual Book of ASTM Standards, Vol 04.07.
Copyright © ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959, United States.
1
C 920 – 02
4.1.8 Class 25—A sealant that when tested for adhesion and 6.3 The sealant shall be intended for use only on clean, dry
cohesion under cyclic movement (8.8) shall withstand an surfaces. Where a primer is recommended by a manufacturer
increase and decrease of at least 25 % of the joint width as for a specific surface, all tests on that surface shall include the
measured at the time of application, and, in addition, meet all primer.
the requirements of this specification. NOTE 1—The proper use of primers (or surface conditioners) in
4.1.9 Class 121⁄2 —A sealant that when tested for adhesion connection with the application of sealants is described in detail in Guide
and cohesion under cyclic movement (8.8) shall withstand an C 1193. This guide also describes proper methods for joint design,
increase and decrease of at least 121⁄2 % of the joint width as back-up materials, surface preparation, tooling of sealant, and other
measured at the time of application, and, in addition, meet all important procedures in sealant application in buildings.
the requirements of this specification. 6.4 The same conditions of time, temperature, and humidity
4.1.10 Use T—A sealant designed for use in joints in shall be used for cure of test specimens for Test Methods
pedestrian and vehicular traffic areas such as walkways, plazas, C 661, C 719, C 794, and C 1247.
decks and parking garages.
4.1.11 Use NT—A sealant designed for use in joints in 7. Significance and Use
nontraffic areas. 7.1 This specification covers several classifications of seal-
4.1.12 Use I—A sealant designed for use in joints which are ants as described in Section 4 for various applications. It
submerged continuously in a liquid. should be recognized by the purchaser or design professional
4.1.13 Use M—A sealant that meets the requirements of this that not all sealants meeting this specification are suitable for
specification when tested on mortar specimens in accordance all applications and all substrates. It is essential, therefore, that
with 9.9 and 9.10. the applicable type, grade, class, and use be specified so that
4.1.14 Use G—A sealant that meets the requirements of this the proper classification of sealant is provided for the intended
specification when tested on glass specimens in accordance use. Test methods relate to special standard specimen sub-
with 9.9-9.11. strates of mortar, glass, and aluminum. If tests are required
4.1.15 Use A—A sealant that meets this specification when using substrates in addition to or other than the standard, they
tested on aluminum specimens in accordance with 9.9 and should be so specified for testing.
9.10.
4.1.16 Use O—A sealant that meets this specification when 8. Physical Requirements
tested on substrates other than the standard substrates in 8.1 Rheological Properties:
accordance with 9.9 and 9.10. 8.1.1 Grade P (pourable or selfleveling) sealant shall have
flow characteristics such that when tested in accordance with
5. Materials and Manufacture Test Method C 639 it shall exhibit a smooth, level surface.
(Refer to Types I and III in the test.)
5.1 A single-component sealant shall be a uniform mixture
8.1.2 Grade NS (nonsag) or gunnable sealant shall have
of a consistency suitable for immediate application by hand or
flow characteristics such that when tested in accordance with
pressure caulking gun or by hand tool. The sealant when
Test Method C 639 it does not sag more than 4.8 mm (3⁄16 in.)
completely cured shall form an elastomeric solid capable of
in vertical displacement. Also the sealant shall show no
maintaining a seal.
deformation in horizontal displacement. (Refer to Types II and
5.2 A multicomponent chemically curing sealant shall be IV in the test.)
furnished in two or more components. The resulting mixture 8.2 Extrusion Rate:
shall be uniform and of a consistency suitable for immediate 8.2.1 Type S (single component), Grade P (pourable or
application by hand or pressure caulking gun, or by hand tool. selfleveling) sealant shall have an extrusion rate of not less than
The sealant when completely cured shall form an elastomeric 10mL/min when tested in accordance with Test Method
solid capable of maintaining a seal. C 1183.
8.2.2 Type S (single component), Grade NS (nonsag or
6. General Requirements gunnable sealant) shall have an extrusion rate of not less than
6.1 Stability: 10 mL/min when tested in accordance with Test Method
6.1.1 A single-component sealant, when stored in the origi- C 1183.
nal unopened container at temperatures of not more than 27°C 8.3 Application Life:
(80°F) shall be capable of meeting the requirements of this 8.3.1 Type M (multicomponent), Grade P (pourable or
specification for at least 6 months after date of delivery. selfleveling) sealant, when tested in accordance with Test
6.1.2 A multicomponent sealant, when stored in the original Method C 1183 shall be extrudable at a rate of not less than 10
unopened container at temperatures of not more than 27°C mL/min 3 h after mixing.
(80°F) shall be capable of meeting the requirements of this 8.4 Hardness:
specification for at least 6 months after date of delivery. 8.4.1 Use T (traffic) sealant shall have a hardness reading,
6.2 Color—The color of the sealant, after curing 14 days in after being properly cured, of not less than 25 or more than 50
a laboratory controlled at 23 6 2°C (73.4 6 3.6°F) and 50 6 when tested in accordance with Test Method C 661.
5 % relative humidity, shall be that color which has been NOTE 2—In applications of proper design, some sealants with less than
agreed upon between the purchaser and the supplier. 25 hardness may be used in traffic-bearing areas if recommended for use
2
C 920 – 02
by the manufacturer and accepted by the purchaser. 8.12 Effects of Continuous Immersion for Use I Sealants:
8.4.2 Use NT (nontraffic) sealant shall have a hardness 8.12.1 Class 1—After 6 weeks exposure, the total loss in
reading, after being properly cured, of not less than 15 or more bond and cohesion areas among the specimens tested for each
than 50 when tested in accordance with Test Method C 661. substrate shall be no greater than 9.5 cm2(1.5 in.2) when tested
8.5 Effects of Heat Aging—The sealant shall not lose more according to Test Method C 1247 with standard glass, alumi-
than 7 % of its original weight or show any cracking or num, or any other substrate specified.
chalking when tested in accordance with Test Method C 1246. 8.12.2 Class 2—After 10 weeks exposure, the total loss in
8.6 Tack-Free Time—There shall be no transfer of the bond and cohesion areas among the specimens tested for each
sealant to the polyethylene film when tested at 72 h in substrate shall be no greater than 9.5 cm2(1.5 in.2) when tested
accordance with Test Method C 679. according to Test Method C 1247 with standard glass, alumi-
8.7 Stain and Color Change—The sealant shall not cause num, or any other substrate specified.
any visible stain on the top surface of a white cement mortar 9. Test Methods
base when tested in accordance with Test Method C 510.
9.1 Standard Conditions for Laboratory Tests—All tests
8.8 Adhesion and Cohesion Under Cyclic Movement—The
described in the following paragraphs shall be performed in a
total loss in bond and cohesion areas among the three speci-
laboratory controlled at 23 6 2°C (73.4 6 3.6°F) and 50 6
mens tested for each surface shall be no more than 9 cm2(11⁄2
5 % relative humidity. The sealant sample shall be conditioned
in.2) when tested in accordance with Test Method C 719 with
at this temperature and relative humidity for at least 24 h before
standard mortar, glass, and aluminum or any other specified
laboratory tests are made.
substrates.
9.2 Rheological Properties—Test Method C 639.
8.9 Adhesion-in-Peel—The peel strength for each indi-
9.3 Extrusion Rate—Test Method C 1183.
vidual test shall not be less than 22.2 N (5 lbf) when tested in
9.4 Application Life—Test Method C 1183.
accordance with Test Method C 794 with standard mortar,
9.5 Hardness—Test Method C 661.
glass, and aluminum or any other specified substrate. In
9.6 Effects of Heat Aging—Test Method C 1246
addition, the sealant shall show no more than 25 % adhesive
9.7 Tack-Free Time—Test Method C 679.
bond loss for each individual test.
9.8 Stain and Color Change—Test Method C 510.
NOTE 3—Curing conditions are specified by all of the test methods 9.9 Adhesion and Cohesion After Cyclic Movement—Test
cited. The manufacturer may request other conditions than those specified Method C 719.
for the curing period provided they meet the following requirements: ( 1) 9.10 Adhesion-in-Peel—Test Method C 794.
the curing period shall extend for 21 days; ( 2) the temperature during the
curing period shall not exceed 50°C (122°F); and (3) the amended curing
9.11 Adhesion-in-Peel After Ultraviolet Exposure Through
conditions recommended by the manufacturer shall also be applied to the Glass—Test Method C 794.
durability, adhesion in peel, and ultraviolet radiation exposure tests. 9.12 Effects of Accelerated Weathering— Test Method
C 793.
8.10 Adhesion-in-Peel for Use G Exposed to Ultraviolet
9.13 Sealants Exposed to Continuous Immersion—Test
Exposure Through Glass—The peel strength for each indi-
Method C 1247.
vidual test shall not have less than 22.2 N (5 lbf) and the
compound shall be no more than 25 % adhesive bond loss for 10. Packaging and Marking
each individual test when tested in accordance with Test 10.1 Packaged materials that are certified by the manufac-
Method C 794. turer to be in compliance with this specification shall be labeled
8.11 Effects of Accelerated Weathering— The sealant shall as to type, class, grade, and use, in accordance with Section 7.
show no cracks greater than those shown in Example #2 of Fig. 10.2 All certification to this specification shall state time,
1 in Test Method C 793 after the specified ultraviolet exposure temperature, and humidity of cure used in the tests.
and shall show no cracks greater than those shown in Example
#2 of Fig. 2 in Test Method C 793 after exposure at cold 11. Keywords
temperature and the bend test when tested in accordance with 11.1 continuous immersion; elastomeric sealants; joint seal-
Test Method C 793. ants; sealants; specification
ASTM International takes no position respecting the validity of any patent rights asserted in connection with any item mentioned
in this standard. Users of this standard are expressly advised that determination of the validity of any such patent rights, and the risk
of infringement of such rights, are entirely their own responsibility.
This standard is subject to revision at any time by the responsible technical committee and must be reviewed every five years and
if not revised, either reapproved or withdrawn. Your comments are invited either for revision of this standard or for additional standards
and should be addressed to ASTM International Headquarters. Your comments will receive careful consideration at a meeting of the
responsible technical committee, which you may attend. If you feel that your comments have not received a fair hearing you should
make your views known to the ASTM Committee on Standards, at the address shown below.
This standard is copyrighted by ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959,
United States. Individual reprints (single or multiple copies) of this standard may be obtained by contacting ASTM at the above
address or at 610-832-9585 (phone), 610-832-9555 (fax), or service@astm.org (e-mail); or through the ASTM website
(www.astm.org).
3
Designation: F 1667 – 97
AMERICAN SOCIETY FOR TESTING AND MATERIALS
100 Barr Harbor Dr., West Conshohocken, PA 19428
Reprinted from the Annual Book of ASTM Standards. Copyright ASTM
Standard Specification for
Driven Fasteners: Nails, Spikes, and Staples1
This standard is issued under the fixed designation F 1667; the number immediately following the designation indicates the year of
original adoption or, in the case of revision, the year of last revision. A number in parentheses indicates the year of last reapproval. A
superscript epsilon (e) indicates an editorial change since the last revision or reapproval.
This standard has been approved for use by agencies of the Department of Defense. The Commercial and Government Entity (Cage)
Code for ASTM: 81346.
1. Scope F 1575 Test Method for Bending Yield Moment of Nails5
1.1 This specification covers nails, spikes, staples, and other 3. Terminology
driven fasteners, as listed in Table 1.
3.1 Definitions—The definitions used in this specification
NOTE 1—Fastener ductility information is presented in Table 2 and are those of common commercial acceptance and usage and
deimensional information in Tables 3-64
also appear in Terminologies F 547 and F 592.
1.2 Fasteners described in this specification are driven by
hand tool, power tool, or mechanical device in single or 4. Classification
multiple strikes and may be positioned for striking by hand, 4.1 The fasteners and their Table 1 classification are iden-
tool, or machine. tified as follows:
1.3 The values stated in inch-pound units are to be regarded
NOTE 2—The identification of fasteners, classified by style and type
as the standard. (alpha indicators) followed by a dash number (numerical code) based on
1.4 This standard does not purport to address all of the Tables 3-64, identifies dimensions specifically and establishes a PIN (part
safety concerns, if any, associated with its use. It is the identifying number) system when preceded by the F 1667 ASTM desig-
responsibility of the user of this standard to establish appro- nator of this specification. For example:
priate safety and health practices and determine the applica-
bility of regulatory limitations prior to use.
2. Referenced Documents
2.1 ASTM Standards:
A 153 Specification for Zinc Coating (Hot-Dip) on Iron and
Steel Hardware2
A 510 Specification for General Requirements for Wire
Rods and Coarse Round Wire, Carbon Steel3
A 641 Specification for Zinc-Coated (Galvanized) Carbon
Steel Wire2
B 695 Specification for Coatings of Zinc Mechanically 4.2 The trade designation, S, pennyweight, used in commer-
Deposited on Iron and Steel4 cial practice is referenced in Tables 3-64 wherever it applies.
F 547 Terminology of Nails for Use with Wood and Wood-
Base Materials5 5. Ordering Information
F 592 Terminology of Collated and Cohered Fasteners and 5.1 Orders for driven fasteners under this specification shall
Their Application Tools5 include the following information:
F 680 Test Methods for Nails5 5.1.1 Quantity or weight;
5.1.2 Part identifying number (PIN) or product description
(see 4.1 and appropriate table);
1
This specification is under the jurisdiction of ASTM Committee F-16 on 5.1.3 Special material requirements, if specified, including
Fastenersand is the direct responsibility of Subcommittee F16.05 on Driven and coatings or finishes;
Other Fasteners. 5.1.4 ASTM designation;
Current edition approved Oct. 10, 1997. Published June 1998. Originally
published as F 1667–95. Last previous edition F 1667–95.
5.1.5 Packaging requirements;
2
Annual Book of ASTM Standards, Vol 01.06. 5.1.6 A producer’s or supplier’s certification that the mate-
3
Annual Book of ASTM Standards, Vol 01.03. rial and the finished fastener are in compliance with this
4
Annual Book of ASTM Standards, Vol 02.05.
5
Annual Book of ASTM Standards, Vol 15.08.
1
F 1667
TABLE 1 Classification and Identification Index TABLE 2 Bend Angles for Fasteners Using the Test Methods
Type Style Style Identification Table F 680 Bend Test
I—Nails (NL) 1. Brads BR 3 Fastener Material Bend
2. Barrel BL 4 Angle, °
3. Boat BTH/BTL 5 1. Steel wire: (low-carbon, medium-low 180
4. Box A BXA 6 carbon, medium-carbon) (unhardened)
Box B BXB 7 2. Stainless steel wire 180
5. Broom BM 8 3. Hardened steel fasteners 20
6. Casing CN 9 4. Sheet steel for cut nails, Type II, 90
7. Cooler CL 10 and cut spikes, Type III
8. Sinker SK 11 5. Copper (min 98 %) 180
9. Corker CK 12 6. Copper clad wire (min 20 %) 180
10. Common CMA 13 7. Aluminum alloy wire 90
Common CMC 14 8. Brass wire 180
Common CMS 15
Common CMM 16
11. Concrete CTS/CTM 17
12. Double-headed DH 18
13. Fine FN 19 shall be of low-carbon, medium-low carbon, or medium-high
14. Finishing FH 20 carbon.
15. Flooring FL 21
16. Lath LHF 22 6.2 Stainless steel wire used in the manufacture of driven
Lath LHH 23 fasteners shall be of Types 302, 304, 305, or 316.
17. Masonry MR/MRH 24
18. Pallet PL 25
6.3 Carbon steel wire for the manufacture of hardened steel
19. Gypsum wallboard GWS 26 nails shall be suitable for heat treatment to a minimum
Gypsum wallboard GWM 27 hardness of 37 HRC.
20. Roofing RFA 28
Roofing RFS 29 6.4 Sheet steel used in the manufacture of cut nails (Type II)
Roofing RFC 30 and cut spikes (Type III) shall be a medium-carbon sheet steel.
Roofing RFL 31
Roofing RFR 32
6.5 Copper used in the manufacture of driven fasteners shall
Roofing RFD 33 contain a minimum of 98 % pure copper.
Roofing RFZB/RFZR 34
Roofing RFNS/RFND 35
6.6 Copper-clad steel wire used in the manufacture of
21. Shingle SHAD/SHAS 36 driven fasteners shall contain not less than 20 % copper by
Shingle SHSS/SHNSB 37 weight. The average thickness of copper on the steel wire shall
22. Siding SDF/SDC/SDK 38
23. Slating SLA/SLC/SLS 39
be not less than 10 % of the radius of the clad wire; the
24. Rubber heel RH 40 minimum thickness of copper on the steel wire shall be not less
25. Underlayment UL 41 than 8 % of the radius of the clad wire.
26. Square-barbed SB 42
27. Masonry drive MD 43 6.7 Aluminum alloy wire used in the manufacture of fas-
28. Escutcheon ES 44 teners shall conform to Alloy 2024, 5056, 6061, or 6110 and
29. Glulam rivet GR 45 have a minimum ultimate tensile strength of 60 000 psi.
II—Cut nails (CN) 1. Common CM 46
2. Basket BK 47 Smooth shank nails may be chemically treated to remove all
3. Clout CL 48 grease, oil, and foreign matter and to roughen the surface
4. Trunk TR 49 microscopically. Mechanically deformed nails may be cleaned
5. Cobblers CB 50
6. Extra-iron clinching EC 51 to remove all grease and foreign matter.
7. Hob HB 52 6.8 Brass wire used in the manufacture of fasteners shall be
III—Spikes (SP) 1. Common CM 53
2. Gutter GRF/GRO 54
of good commercial quality suitable for the purpose.
3. Round RDC/RDF 55
4. Barge and boat BB 56 7. Physical Properties
IV—Staples (ST) 1. Fence FN 57
2. Poultry netting PN 58 7.1 Ductility—The fasteners shall be sufficiently ductile to
3. Flat top crown FC 59
Flat top crown FCC 60
withstand cold bending without fracture, as specified in Table
4. Round or V crown RC 61 2 for various materials used in the manufacture of fasteners
5. Preformed PC 62 utilizing the conventional bend test described in Test Methods
6. Electrical RE 63
7. Preformed hoop PH 64
F 680. The cold bend test shall not apply to unhardened nails
with deformed shanks.
7.2 Tensile Strength—Finished driven fasteners are not
specification, furnished only when specified in the purchase normally subject to tension testing. However, the wire or sheet
order; used to manufacture the fastener is tested as required for
5.1.7 Supplementary requirements, if any; and control in the production process during manufacture.
5.1.8 Any additions agreed upon between the purchaser and
the supplier. 8. Dimensions and Tolerances
8.1 Nominal dimensions of nails and spikes shall be as
6. Material Requirements shown in Tables 3-5. The following dimensional designations
6.1 Steel wire used in the manufacture of driven fasteners shall apply:
2
F 1667
TABLE 3 Type I, Style 1—BradsA
NOTE—Steel wire, brad head, diamond point, round smooth shank, bright finish. When specified, brads shall have a modified brad head with a blunt
or chiseled point for use with mechanical drivers.
8.2.2 Shank diameter tolerances shall be 60.002 in. for
S 5 trade designation (reference in penny weight), diameters smaller than 0.076 in. and 60.004 in. for diameters
L 5 length, in., 0.076 in. and larger.
H 5 head diameter or width, in., 8.2.3 Head Diameter Tolerances:
D 5 shank diameter, in.,
B 5 head separation, in. (Table 18), and 8.2.3.1 Hand Driven—Tolerances on head diameters of
No./lb 5 approximate count per pound. roofing nails shall be +0, −10 % of the nominal head diameter
8.1.1 The lengths, L, of nails and spikes with flat heads or (the mean of two readings 90° apart). For other brads, nails,
parallel shoulders under the head shall be measured from under and spikes, the tolerance shall be 610 % of the nominal head
the head or shoulder to the tip of the point. All other nails and diameter (individual measurement). The difference in diameter
spikes shall be measured overall. across the long axis of a roofing nail shall not exceed that
8.1.2 The diameter, D, of smooth shank nails and spikes across the short axis by more than 20 %. For other brads, nails,
shall be measured away from the gripper marks. The diameter, and spikes, the difference in diameter across the long axis shall
D, of formed or deformed shanks shall be measured before not exceed that across the short axis by more than 10 %. A fillet
deformation, or, if specified, the thread crest diameter after shall be provided under the head if not otherwise specified.
deformation, or both. All diameter dimensions shall be taken 8.2.3.2 Power Driven—Tolerances on head diameters of
prior to the application of or after the removal of any coatings power-driven nails shall comply with the manufacturer’s speci-
or finish. fications and shall be suitable for use in the make and model of
8.2 Tolerances on Nominal Dimensions for Nails and
the tool specified.
Spikes:
8.2.1 Length tolerances shall be 61⁄32in. for lengths up to 8.3 Nominal dimensions of staples shall be as shown in
and including 1 in.; 61⁄16 in. for lengths over 1 in., up to and Tables 57-64, and the following dimensional designations shall
including 21⁄2in.; 63⁄32 for lengths over 21⁄2 in., up to and apply:
including 7 in.; and 61⁄8 in. for all lengths over 7 in. 8.3.1 Hand Tool-Driven Nominal Dimensions:
3
F 1667
TABLE 4 Type I, Style 2—Barrel NailsA
NOTE—Steel wire, flat head, diamond point, round smooth shank, bright, zinc or cement coated as specified.
TABLE 5 Type I, Style 3—Boat nailsA
NOTE—Steel wire, oval countersunk head, chisel point, round smooth shank, bright or zinc coated as specified.
L 5 leg length, inside, in., D 5 round leg diameter, in.,
D 5 round leg diameter, in., L 5 leg length, outside, in.,
C 5 crown width, inside, in., and T 5 leg thickness, in. (see Table 58),
No./lb 5 approximate count per pound. W 5 leg width, in. (see Table 58),
8.3.2 Power Tool-Driven Nominal Dimensions: C 5 crown width, outside, in., and
G 5 steel wire gage.
4
F 1667
TABLE 6 Type I, Style 4A—Box NailsA
NOTE—Steel wire, flat head, diamond point, round, barbed or smooth shank, bright or cement coated as specified. When specified, box nails shall have
an altered or T-head with a diamond, blunt, or chisel point for use with mechanical drivers.
TABLE 7 Type I, Style 4B—Box NailsA
NOTE—Steel wire, flat head, diamond point, round smooth shank, cement coated.
8.4 Tolerances on Nominal Dimensions for Staples: shall be suitable for use in the make and model tool specified
8.4.1 Leg length, L, tolerances shall be +1⁄32, −1⁄64in. for (see Tables 56-63).
both hand tool-driven and power tool-driven staples. 8.4.4 Crown width tolerances are 61⁄32 in. unless otherwise
8.4.2 Diameter tolerances for hand tool-driven round staples specified.
shall be 60.002 in. for diameters smaller than 0.076 in. and 8.5 Nominal Dimensions for Cut Nails, Type II—Unless
60.004 in. for diameters 0.076 in. and larger. otherwise specified, cut nails shall be sheared from medium
8.4.3 Thickness and width tolerances on power-driven carbon sheet steel and shall have a wedge-shaped shank with a
staples shall comply with the manufacturer’s specification and sheared square point end narrower than the upset head end. The
5
F 1667
TABLE 8 Type I, Style 5—Broom NailsA
NOTE—Steel wire, flat or star head, diamond point, round smooth shank, bright finish, as specified.
TABLE 9 Type I, Style 6—Casing NailsA
NOTE—Steel wire, flat countersunk cupped head, diamond point, round smooth shank, bright finish.
designation T in Tables 46-51 refers to sheet thickness in corrosion. Mechanically driven collated items shall be uniform
finished product. Other designations shall be the same as those and aligned properly in their assembled form for use in power
for nails in 8.1. tools.
8.6 When gage is used for a nominal diameter dimension in
the application of this specification, it shall be in accordance 10. Protective Coatings and Finishes
with the decimal equivalents as shown in Specification A 510,
unless otherwise specified. 10.1 Zinc Coating:
10.1.1 Driven fasteners required to be zinc coated shall be
9. Workmanship cut and formed from hot-dip, hard-wiped, galvanized steel
9.1 Fasteners covered by this specification shall be true to wire, electrogalvanized steel wire, or zinc flake/chromate
shape, well-finished, free from imperfections, clean, and free of dispersion-coated steel wire; or they shall be cut from uncoated
6
F 1667
TABLE 10 Type I, Style 7—Cooler NailsA
NOTE—Steel wire, flat head, diamond point, round smooth shank, cement coated. When specified, coolers shall have an altered or T-head for use with
mechanical drivers.
TABLE 11 Type I, Style 8—Sinker NailsA
NOTE—Steel wire, flat countersunk head, diamond point, round smooth shank, bright or cement coated. When specified, sinkers shall have an altered
or T-head for use with mechanical drivers.
(bright) steel wire and shall be hot-dip galvanized, electrode- ing shall have a coating weight in accordance with Specifica-
posited zinc coated, mechanically deposited zinc coated, or tion A 153, Class D, when a heavier coating for exterior use is
zinc flake/chromate dispersion coated after forming. Power- specified. If not otherwise specified, the coating weight shall be
driven staples are not normally zinc coated after forming. in accordance with Specification A 641, Supplementary Re-
10.1.2 Hot-dip galvanized or electrogalvanized steel wire quirements, Class 1.
for the manufacture of fasteners shall have a coating weight in 10.1.4 Mechanically deposited zinc coatings applied to
accordance with Specification A 641, Supplementary Require- fasteners after forming shall have a thickness in accordance
ments, Class 1. with Specification B 695, Class 40, unless otherwise specified.
10.1.3 Hot-dip galvanized steel fasteners coated after form- 10.2 Other Coatings and Finishes (When Specified):
7
F 1667
TABLE 12 Type I, Style 9—Corker NailsA
NOTE—Steel wire, flat countersunk head, diamond point, round smooth shank, cement coated. When specified, corkers shall have an altered or T-head
for use with mechanical drivers.
TABLE 13 Type I, Style 10—Common NailsA
NOTE—Aluminum alloy wire, flat head, diamond point, round smooth shank, or, when specified, square barbed shank.
10.2.1 Cement coating shall be applied by tumbling, me- tion and roughen the surface microscopically.
chanical dispensing device, or immersion in resin or other 10.2.3 Blued nails shall be heated to form a thin, colored
similar material and shall not be tacky or gummy. Cement oxide on the surface.
coatings on power-driven fasteners shall be uniform and may 10.2.4 Miscellaneous finishes, such as tin plating, liquor,
be applied before, during, or after the fasteners are cohered into brass plating, copper plating, phosphate coating, or oil coating,
strips, clips, or coils. shall be applied.
NOTE 3—Cement coatings increase the holding strength in withdrawal 10.3 Altered Shapes and Deformations:
of a driven fastener, depending on the fastener size, amount of cement 10.3.1 Mechanically formed or deformed nail shanks shall
coating applied, and method of driving. have barbs, flutes, threads, or angular serrations formed onto
10.2.2 Chemical etching shall remove the polish of fabrica- the wire from which the nail is manufactured. Mechanically
8
F 1667
TABLE 14 Type I, Style 10—Common NailsA
NOTE—Copper wire, flat head, diamond point, round smooth shank.
TABLE 15 Type I, Style 10—Common NailsA
NOTE—Steel wire, flat head, diamond point, round smooth shank, bright, zinc or cement coated as specified.
deformed shanks shall have vertical or helical flutes or screw- around the shank body, resulting in expanded ridges and
type or annular (ring)-type deformations rolled onto the shank. depressions. Nails with formed or deformed shanks may be
Symmetrical helical shank deformations shall be obtained by fabricated from round or square wire.
twisting square wire. The deformations shall pass entirely 10.3.2 Mechanically formed or deformed nail heads shall be
9
F 1667
TABLE 16 Type I, Style 10—Common NailsA
NOTE—Aluminum alloy wire, or steel wire, (bright, zinc coated or cement coated), altered or T-head, diamond or chisel point, round smooth shank,
as specified. For use with mechanical drivers.
round or T-headed; or they shall be altered round for suitable the contents in good condition and to ensure acceptance and
use in a given make and model of a power-driving fastening safe delivery by common or other carriers to the point of
system. delivery. In addition, the containers shall be so made that the
10.3.3 Staples manufactured for intended use in power tools contents can be removed partially without destroying the
shall comply with the tool manufacturer’s specification or Type container’s ability to serve as a receptacle for the remainder of
IV, Style 3 (Table 59 or Table 60). the contents.
12.2 When specified, individual packages and shipping
11. Certification containers shall be marked with the part identifying number
11.1 When specified in the purchase order, a producer’s or and type; length; diameter (or gage, as applicable) of the
supplier’s certification shall be furnished to the purchaser, fastener; the name of the manufacturer or distributor; and the
indicating that the fasteners are in compliance with this net mass. Individual packages shall also be marked with the
specification and the purchase order. name of the manufacturer or distributor and the quantity or
weight of the contents.
12. Packaging and Package Marking
12.1 Unless otherwise specified, fasteners shall be in sub- 13. Keywords
stantial commercial containers of the type, size, and kind 13.1 diameter; driven fasteners; head; length; nails; point;
commonly used for the purpose, so constructed as to preserve spikes; staples
10
F 1667
TABLE 17 Type I, Style 11—Concrete NailsA
NOTE—Harded steel, flat countersunk head, diamond point, smooth or mechanically deformed shank formed from round or square stock, as specified,
bright finish.
TABLE 18 Type I, Style 12—Double-Headed NailsA
NOTE—Steel wire, flat heads, diamond point, round smooth shank, bright finish or cement coated.
11
F 1667
TABLE 19 Type I, Style 13—Fine NailsA
NOTE—Steel or copper wire, flat head, diamond point, round smooth shank, bright finish.
TABLE 20 Type I, Style 14—Finish NailsA
NOTE—Steel wire, brad head, altered or clipped T-head for use with mechanical drivers, diamond or chisel point, smooth or barbed shank formed from
round or square stock, as specified, bright finished.
12
F 1667
TABLE 21 Type I, Style 15—Flooring NailsA
NOTE—Harded steel or steel wire, casing head or flat-cupped countersunk head, diamond or blunt point, round, smooth or mechanically deformed
shank, dark (hardened), bright (steel wire) or cement coated, as specified.
TABLE 22 Type I, Style 16—Lath NailsA
NOTE—Steel wire, flat head, diamond point, round smooth shank, blued finish.
13
F 1667
TABLE 23 Type I, Style 16—Lath NailsA
NOTE—Steel wire, flat hook-head, diamond point, round smooth shank, bright, blued, or zinc coated as specified.
TABLE 24 Type I, Style 17—Masonry NailsA
NOTE—Hardened steel, flat or flat countersunk head, diamond point, mechanically deformed shank, bright finish.
14
F 1667
TABLE 25 Type I, Style 18—Pallet NailsA
NOTE—Hardened steel or steel wire (for mechanical drivers), flat head, altered or T-Head (for mechanical drivers), diamond point, round, mechanically
deformed shank, bright finish (steel wire), or dark (hardened), as specified.
TABLE 26 Type I, Style 19—Gypsum-Wallboard NailsA
NOTE—Steel wire, flat head, diamond point, round smooth or deformed shank, bright or blued finish.
15
F 1667
TABLE 27 Type I, Style 19—Gypsum-Wallboard NailsA
NOTE—Steel wire, flat slightly countersunk head, long diamond point, round mechanically deformed shank, bright or blued finish.
TABLE 28 Type I, Style 20—Roofing NailsA
NOTE—Aluminum alloy wire, flat head, diamond point, round smooth shank, or, when specified, square-barbed shank.
16
F 1667
TABLE 29 Type I, Style 20—Roofing NailsA
NOTE—Steel wire, flat head, diamond point, round, smooth or barbed shank, bright or zinc coated, as specified.
17
F 1667
TABLE 30 Type I, Style 20—Roofing NailsA
NOTE—Copper-clad wire, flat head, diamond point, round smooth shank.
TABLE 31 Type I, Style 20—Roofing NailsA
NOTE—Steel wire, leak-resistant convex head, diamond point, round smooth shank, zinc coated.
18
F 1667
TABLE 32 Type I, Style 20—Roofing NailsA
NOTE—Steel wire, flat reinforced head, needle or diamond point, round smooth shank, bright or zinc coated, as specified. (For prepared felt roofing.)
TABLE 33 Type I, Style 20—Roofing NailsA
NOTE—Steel wire, 1–in. flat integral steel cap, diamond point, round mechanically deformed shank, bright finsih for roofing felts.
19
F 1667
TABLE 34 Type I, Style 20—Roofing NailsA
NOTE—Steel wire, cast lead head, diamond point, round, barbed or ringed shank, bright finish.
TABLE 35 Type I, Style 20—Roofing NailsA
NOTE—Aluminum alloy wire, flat head with neoprene washer (for aluminum roofing sheet), diamond point, round, smooth, or mechanically deformed
shank, as specified.
20
F 1667
TABLE 36 Type I, Style 21—Shingle NailsA
NOTE—Aluminum Alloy wire, flat head, diamond point, round, smooth or mechanically deformed shank, as specified.
TABLE 37 Type I, Style 21—Shingle NailsA
NOTE—Steel wire, flat head, diamond point, round, smooth (standard) or barbed (for special shingles) shank, bright or zinc coated, as specified.
21
F 1667
TABLE 38 Type I, Style 22—Siding NailsA
NOTE—Aluminum alloy wire, flat head (insulated), casing or countersunk head (wood), as specified, diamond point, round smooth shank or, when
specified, square-barbed shank.
22
F 1667
TABLE 39 Type I, Style 23—Slating NailsA
NOTE—Aluminum alloy, copper or steel wire as specified. Aluminum and copper nails shall have a flat head (0.312 to 0.375–in. diameter), diamond
point, and round smooth shank or, when specified, square-barbed shank. Steel nails shall have a flat, slightly countersunk head, diamond point, round
smooth shank, zinc coated.
23
F 1667
TABLE 40 Type I, Style 24—Rubber Heel NailsA
NOTE—Steel wire, flat or countersunk head, as specified, needle point, round smooth shank, bright finish.
TABLE 41 Type I, Style 25—Underlayment NailsA
NOTE—Steel wire, flat or flat, slightly countersunk head, diamond point, round, mechanically deformed shank, bright finish.
24
F 1667
TABLE 42 Type I, Style 26—Barbed NailsA
NOTE—Steel wire, flat head, diamond point, square barbed shank, bright finish.
TABLE 43 Type I, Style 27—Masonry Drive NailsA
NOTE—Hardened steel, flat head, cone pilot point, round, high pitch, multiple-start threaded shank, bright finish. When specified, masonry drive nails
shall be proof lead tested.
25
F 1667
TABLE 44 Type I, Style 28—Escutcheon NailsA
NOTE—Steel or brass wire, as specified, oval head, diamond point, round smooth shank.
TABLE 45 Type I, Style 29—Glulam RivetA
NOTE—Hardened steel, flat countersunk head, diamond point, smooth shank, zinc coated, as specified.
26
F 1667
TABLE 46 Type II, Style 1—Common Cut NailsA
NOTE—Steel or copper, flat head, bright finish.
TABLE 47 Type II, Style 2—Basket Cut NailsA
NOTE—Steel, flat head, bright finish.
27
F 1667
TABLE 48 Type II, Style 3—Clout Cut NailsA
NOTE—Steel, flat head, bright finish, blued or zinc coated, as specified (see 5.1).
TABLE 49 Type II, Style 4—Common Cut NailsA
NOTE—Steel, oval head, bright finish, blued, brass or copper plated, as specified.
28
F 1667
TABLE 50 Type II, Style 5—Cobblers Cut NailsA
NOTE—Steel casing head, clinch point, bright finish or brass plated, as specified.
TABLE 51 Type II, Style 6—Extra-Iron Clinching Cut NailsA
NOTE—Steel, casing head, clinch point, bright finish or blued, as specified.
29
F 1667
TABLE 52 Type II, Style 7—Hob Cut NailsA
NOTE—Steel, square grooved head, clinch point, bright finish, or blued, as specified.
TABLE 53 Type III, Style 1—Common SpikesA
NOTE—These spikes shall be sheared from medium carbon sheet steel and shall have a wedged-shaped shank with a square point end narrower than
the upset head end. They shall have a flat head, bright finish, or zinc coated, as specified.
30
F 1667
TABLE 54 Type III, Style 2—Gutter SpikesA
NOTE—Steel wire, oval head, chisel point, flat head, diamond point, bright finish or zinc coated, as specified.
31
F 1667
TABLE 55 Type III, Style 3—Round SpikesA
NOTE—Steel wire, oval countersunk head, chisel point, flat head, diamond point, bright finish or zinc coated, as specified.
32
F 1667
TABLE 56 Type III, Style 4—Barge and Boat SpikesA
NOTE—Wrought iron, hot rolled steel rod or steel wire, square, diamond or oval head, chisel point, bright finish or zinc coated, as specified.
33
F 1667
TABLE 57 Type IV, Style 1—Fence StaplesA
NOTE—Steel wire, bright finish or zinc coated, as specified.
TABLE 58 Type IV, Style 2—Poultry Netting StaplesA
NOTE—Steel wire, zinc coated.
34
F 1667
TABLE 59 Type IV, Style 3—Flat Top Crown StaplesA
NOTE—Steel wire, aluminum alloy wire, bright finish, zinc coated, cement coated or chemically etched, as specified. (For use in power tools for
fastening wood and other materials to wood.).
35
F 1667
36
F 1667
TABLE 60 Type IV, Style 3—Flat Top Crown StaplesA
NOTE—Steel wire, chisel point, tin plated, zinc coated or lacquer finish, as specified, cohered together in strips. (For use in staple tackers or machines.)
The number per strip shall be as specified and shall be suitable for use in the make and model of tool specified.
TABLE 61 Type IV, Style 4—Round or “V” Crown Staple A
NOTE—Steel wire or copper-clad wire, bright finish, zinc coated, cement coated or chemically etched, as specified. (For use in power tools for fastening
wood and other materials to wood.)
37
F 1667
TABLE 62 Type IV, Style 5—Preformed StaplesA
NOTE—Steel wire, chisel point, zinc or cement coated, as specified. Copper-clad wire, chisel point, tinned or other plated finish, as specified. (Hand
driven.)
TABLE 63 Type IV, Style 6—Electrical StaplesA
NOTE—Insulated or uninsulated, as specified.
38
F 1667
TABLE 64 Type IV, Style 7—Preformed Hooped StapleA
SUPPLEMENTARY REQUIREMENTS
The following supplementary requirements shall apply only when specified in the order or contract
(5.1.7). Details of these supplementary requirements shall be agreed upon in writing between the
manufacturer and the purchaser.
S1. Nail Bending Yield Strength bending yield strengths shall meet, as a minimum, the yield
S1.1 When specified as a supplementary requirement for strengths used in determining the lateral design loads tabulated
nails used for engineered construction, the nail’s average
39
F 1667
in the AF&PA National Design Specification6 for Wood Con- TABLE S1.2 Medium Carbon Steel Nails—Hardened
struction, NDS,6 Part XII: Nails and Spikes.
S1.2 The minimum average bending yield strengths used by Nominal Diameter, in. Bending Yield, psi
the NDS6 as a function of the material and diameter of the nail 0.120 # 0.142 130 000
>0.142 # 0.192 115 000
are given in Table S1.1 and Table S1.2. >0.192 # 0.207 100 000
6
Available from American Forest and Paper Association (AF&PA), 1111 19th
Street, NW, Suite 800, Washington, DC 20036, National Design Specificationt, S1.3 Test Method for Yield Strength—In order to conform
(NDSt), for Wood Construction. with the supplementary requirements of S1, the procedure of
Test Method F 1575 shall be conducted on nail samples.
TABLE S1.1 Low to Medium Carbon Steel Nails and Spikes S1.4 At least five nails from each lot of 100 individual
containers shall be examined and tested to determine conform-
Nominal Diameter, in. Bending Yield, psi ance with this supplementary requirement.
0.099 # 0.142 100 000 S1.5 Nails that meet the requirements of this supplementary
>0.142 # 0.177 90 000
>0.177 # 0.254 80 000
section, in addition to all other requirements of this specifica-
>0.254 # 0.273 70 000 tion, shall be labeled on individual packages and shipping
>0.273 # 0.344 60 000 containers as follows: “Engineered Construction Nails, ASTM
>0.344 # 0.375 45 000
F 1667.”
The American Society for Testing and Materials takes no position respecting the validity of any patent rights asserted in connection
with any item mentioned in this standard. Users of this standard are expressly advised that determination of the validity of any such
patent rights, and the risk of infringement of such rights, are entirely their own responsibility.
This standard is subject to revision at any time by the responsible technical committee and must be reviewed every five years and
if not revised, either reapproved or withdrawn. Your comments are invited either for revision of this standard or for additional standards
and should be addressed to ASTM Headquarters. Your comments will receive careful consideration at a meeting of the responsible
technical committee, which you may attend. If you feel that your comments have not received a fair hearing you should make your
views known to the ASTM Committee on Standards, 100 Barr Harbor Drive, West Conshohocken, PA 19428.
40
ASME B18.2.1-2010
[Revision of ASME B18.2.1-1996 (R2005)]
Square, Hex, Heavy
Hex, and Askew Head
Bolts and Hex, Heavy
Hex, Hex Flange,
Lobed Head, and Lag
Screws (Inch Series)
A N A M E R I C A N N AT I O N A L STA N DA R D
INTENTIONALLY LEFT BLANK
标准分享网 www.bzfxw.com 免费下载
ASME B18.2.1-2010
[Revision of ASME B18.2.1-1996 (R2005)]
Square, Hex, Heavy
Hex, and Askew Head
Bolts and Hex, Heavy
Hex, Hex Flange,
Lobed Head, and Lag
Screws (Inch Series)
www.bzfxw.com
A N A M E R I C A N N AT I O N A L S TA N D A R D
Three Park Avenue • New York, NY • 10016 USA
Date of Issuance: October 13, 2010
This Standard will be revised when the Society approves the issuance of a new edition. There will
be no addenda issued to this edition.
ASME issues written replies to inquiries concerning interpretations of technical aspects of this
Standard. Interpretations are published on the ASME Web site under the Committee Pages at
http://cstools.asme.org as they are issued.
www.bzfxw.com
ASME is the registered trademark of The American Society of Mechanical Engineers.
This code or standard was developed under procedures accredited as meeting the criteria for American National
Standards. The Standards Committee that approved the code or standard was balanced to assure that individuals from
competent and concerned interests have had an opportunity to participate. The proposed code or standard was made
available for public review and comment that provides an opportunity for additional public input from industry, academia,
regulatory agencies, and the public-at-large.
ASME does not “approve,” “rate,” or “endorse” any item, construction, proprietary device, or activity.
ASME does not take any position with respect to the validity of any patent rights asserted in connection with any
items mentioned in this document, and does not undertake to insure anyone utilizing a standard against liability for
infringement of any applicable letters patent, nor assumes any such liability. Users of a code or standard are expressly
advised that determination of the validity of any such patent rights, and the risk of infringement of such rights, is
entirely their own responsibility.
Participation by federal agency representative(s) or person(s) affiliated with industry is not to be interpreted as
government or industry endorsement of this code or standard.
ASME accepts responsibility for only those interpretations of this document issued in accordance with the established
ASME procedures and policies, which precludes the issuance of interpretations by individuals.
No part of this document may be reproduced in any form,
in an electronic retrieval system or otherwise,
without the prior written permission of the publisher.
The American Society of Mechanical Engineers
Three Park Avenue, New York, NY 10016-5990
Copyright © 2010 by
THE AMERICAN SOCIETY OF MECHANICAL ENGINEERS
All rights reserved
Printed in U.S.A.
标准分享网 www.bzfxw.com 免费下载
CONTENTS
Foreword . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . iv
Committee Roster . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . vii
Correspondence With the B18 Committee . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . viii
1 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
2 General Data for Both Bolts and Screws . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
3 Bolts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
4 Screws . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
5 Lag Screws . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20
Figures
1 Underhead Fillet for Long Screws . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15
2 Underhead Fillet for Short Screws Threaded Full Length . . . . . . . . . . . . . . . . . . . . . . . . . . . 15
3 LG, Maximum and LB, Minimum for Short Screws Threaded Full Length . . . . . . . . . . . 15
Tables
1 Dimensions of Square Head Bolts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
2 Dimensions of Hex Bolts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
www.bzfxw.com
3 Dimensions of Heavy Hex Bolts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
4 Dimensions of Askew Head Bolts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
5 Length Tolerances for Bolts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
6 Dimensions of Hex Cap Screws . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
7 Dimensions of Heavy Hex Screws . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
8 Dimensions of Hex Flange Screws . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12
9 Dimensions of Lobe Head Screws . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14
10 Dimensions of Underhead Fillets . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15
11 LG, Maximum and LB, Minimum Limitations for Short Screws Threaded
Full Length . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16
12 Maximum Grip Gaging Lengths, LG, and Minimum Body Lengths, LB,
for Screws . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
13 Length Tolerances for Screws . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20
14 Dimensions of Square Lag Screws . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21
15 Dimensions of Hex Lag Screws . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22
16 Dimensions of Lag Screw Threads . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22
Mandatory Appendix
I Gage and Gaging Practices for External Lobed Head Drive System . . . . . . . . . . . . . . . . 23
Nonmandatory Appendices
A Formulas for Bolt and Screw Head Dimensions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26
B Weight in Pounds of 100 Steel Hex Cap Screws for Given Diameter/Length
Combination . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28
C Countersunk Center Holes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29
iii
FOREWORD
American National Standards Committee B18 for the standardization of bolts, screws, nuts,
rivets, and similar fasteners was organized in March 1922, as Sectional Committee B18, under
the aegis of the American Engineering Standards Committee (later the American Standards
Association, then the United States of America Standards Institute, and, as of October 6, 1969,
the American National Standards Institute, Inc.), with the Society of Automotive Engineers and
The American Society of Mechanical Engineers as joint sponsors. Subcommittee 2 was subse-
quently established and charged with the responsibility for technical content of standards covering
wrench head bolts and nuts.
Subcommittee 2, after appraisal of the requirements of industry, developed a proposed standard
series of bolt head and nut dimensions. This proposal was finally approved and designated a
tentative American Standard in February 1927.
A first revision of the document was designated as an American Standard in March 1933 and
was followed by a second revision that was granted approval as an American Standard in
January 1941.
Following reorganization of the B18 Committee in 1947, Subcommittee 2 was asked to expand
the standard on head proportions into a complete product standard. A proposal covering square
and hexagon head bolts and nuts, hexagon head cap screws, and automotive hexagon head bolts
was prepared and submitted to the B18 Committee in April 1950. While this draft was under
consideration, the B18 Committee received a proposal from the British Standards Institution for
www.bzfxw.com
unification of dimensions on products incorporating Unified screw threads. The Committee
welcomed the opportunity of discussing the proposals and an American-British-Canadian
Conference was held in New York, June 1 and 2, 1950.
It was agreed in the conference that the essentials of unification could be accomplished by
selection of mutually satisfactory across-the-flats dimensions, since this would permit the use of
the same wrenches and because other features would rarely affect interchangeability. After due
consideration, suitable existing across-the-flats dimensions were selected for the hexagon products
affected.
In its meeting of October 13, 1950, Subcommittee 2 agreed to incorporate in the proposed
standard the conference recommendations on 1⁄4-in. hexagon head bolts, 5⁄8-in. hexagon head cap
screws and automotive hexagon head bolts, 5⁄16-in. and 3⁄8-in. regular hexagon and square nuts,
and 7⁄16-in. light and regular hexagon and square nuts. At a subsequent meeting of Subcommittee
2, further changes were adopted in order to combine the light and regular series of nuts and to
combine the automotive hexagon head bolt, hexagon head cap screw, and regular hexagon head
close tolerance bolt.
In view of the progress made in the United States and the urgency of standardization for
mutual defense, the British Standards Institution sponsored a second conference in London in
April 1951, to complete the unification of certain hexagon bolts and nuts.
At a meeting on June 8, 1951, Subcommittee 2 reaffirmed its acceptance of the unified dimen-
sions, which corresponded with those in the March 1951 draft, but attempted to select better
nomenclature for the unified products. A final draft incorporating the nomenclature “Finished
Hexagon Bolts and Nuts” and containing numerous editorial changes was submitted for letter
ballot in September 1951. Following approval by the B18 Committee and the sponsors, the
proposal was presented to the American Standards Association for approval and designation as
an American Standard. This was granted on March 24, 1952.
Recognizing the Standard was in need of additional refinements, Subcommittee 2 began immedi-
ately to revise it, removing inconsistencies with respect to fillets, improving the length tolerances
on heavy hexagon bolts, and incorporating numerous other corrections and clarifications. The
most noteworthy editorial change was a decision to combine the coverage for hexagon cap screws
and square head set screws from the B18.2 Standard with the coverage for slotted head cap
screws and slotted headless set screws from the B18.6 Standard and publish them in a separate
iv
标准分享网 www.bzfxw.com 免费下载
document. The requirements for the unified hexagon cap screws and finished hexagon bolts
being identical in the overlapping sizes, these data would now be available in two publications.
Following approvals by the B18 Committee and sponsor organizations, the proposal was submitted
to the American Standards Association and declared an American Standard on February 2, 1955.
A revision of this document comprised of numerous editorial corrections, and inclusion of an
appendix for grade markings was duly approved and designated an American Standard on
April 18, 1960.
At a meeting in February 1960, Subcommittee 2 approved a recommendation to reduce the head
heights for heavy, heavy semifinished, and heavy finished hexagon bolts that was subsequently
approved by letter ballot of the B18 Committee on August 16, 1960. A proposed Standard for
heavy hexagon structural bolts submitted and accepted by Subcommittee 2 at its October 17,
1960 meeting was approved by letter ballot of the B18 Committee on May 9, 1961. To meet the
urgent needs of the steel construction industry, it was considered necessary to publish the Standard
for the structural bolts immediately. Consequently, Appendix IV to ASA B18.2-1960 containing
coverage for the revised heavy hexagon bolts and the new heavy hexagon structural bolts was
released in 1962. In October of 1961, Subcommittee 2 appointed a subgroup to review all product
standards for square and hexagon bolts, screws, and nuts and to recommend simplifications that
would be compatible with technical, production, and distribution advances that had occurred
over the prior several years. The subgroup presented its recommendations at a meeting of
Subcommittee 2 in October of 1962. It was agreed that the internally and externally threaded
products should be published in separate documents as suggested, and draft proposals for each
were completed.
The proposed revision for square and hex bolts and screws incorporated the following subgroup
recommendations: consolidation of hexagon head cap screws and finished hexagon bolts into a
single product, consolidation of heavy semifinished hexagon bolts and heavy finished hexagon
bolts into a single product, elimination of regular semifinished hexagon bolts, a new length
www.bzfxw.com
tolerancing pattern for all bolts and screws, documentation of a positive identification procedure
for determining whether an externally threaded product should properly be designated a bolt
or a screw, and an abbreviated and purified set of product nomenclature reflecting application
of the identification procedure. Letter ballot of this proposal to the B18 Committee in March,
1964 resulted in several comments that were resolved to the satisfaction of the committee in June
of 1964. Following acceptance by the sponsor organizations, the revision was submitted to the
American Standards Association and was designated American Standard ASA B18.2.1 on
September 8, 1965.
Subcommittee 2 continued to further develop refinements initiated by the simplification sub-
group and revisions reflecting changes in manufacturing practices and consumer requirements.
This work culminated in Subcommittee acceptance of a 1970 proposal incorporating, in addition
to numerous editorial changes, revisions in the following significant areas: addition of coverage
for askew head bolts and hex head lag screws, addition of straightness requirements to applicable
products, addition of minimum fillet to square and hex bolts and lag screws, application of UNR
threads and new concepts for controlling thread length on products having Unified threads, and
clarification of grade markings, thread runout gages, and formulas for dimensions. Also included
were refinements to hex cap screw and heavy hex screw requirements consisting of the addition
of wrenching height and revision of underhead fillets, washer face thicknesses, and controls on
angularity of bearing face. The proposed revision, after approval by letter ballot of the B18
Committee in March 1970, was subsequently approved by the sponsors and submitted to the
American National Standards Institute for designation as an American National Standard. This
was granted on January 18, 1972.
Numerous user complaints on interference of the elliptical fillet added in the 1972 revision
resulted in the appointment of a subcommittee to study the problem. They recommended reverting
back to the max./min. radius fillet specified in the 1965 version with the elliptical fillet retained
for use when specified by the user. Further refinements in the definition of the fillet for short
length screws were added to “Hex Cap and Heavy Hex Screws.” Geometric tolerancing was
updated to conform to American National Standard Y14.5, Dimensioning and Tolerancing. The
transition length of the hex cap screw was changed to equal 5 coarse (UNC) threads. Few, if any,
users accepted the 1972 values that were designed to reduce tooling by providing the same body
v
length for adjacent lengths. On screws, separate straightness requirements have been deleted,
and the combination thread runout and straightness gage described in Appendix I is specified.
Straightness as a variable based on length has been applied to bolts with gaging described in
Appendix 11. Acceptability of screw threads based on gaging systems established by American
National Standard B1.3-1979 has been added to each type of screw or bolt, except lag screws.
This proposal was approved by letter ballot of the Subcommittee and B18 in January 1980.
Following acceptance by the secretariat organizations, the revision was referred to the American
National Standards Institute and granted recognition as an American National Standard on
June 24, 1981.
In 1991, it was recognized that B18.2.1 required extensive revision to better meet the needs of
conformance with Public Law 101-592. Included in these considerations were improved definition
of a full body versus a reduced body and those dimensions that should be certified to ensure
product fit, form, and function. Other dimensions given for each product would only be examined
in the event of a dispute. Also, the term “finished hex bolt,” which is today’s cap screw, should
be dropped. Additionally, a weight table has been included to assist users.
Furthermore, it was felt that the heavy hex structural bolt, heavy hex nut, hardened steel
washers, and compressible washer-type direct tension indicators should be included in a new
standard for fasteners intended for use in structural applications. For this reason, the heavy hex
structural bolt was removed from this Standard. The new table for maximum grip gaging lengths
and minimum body lengths for cap screws and heavy hex screws was included for the first time
in the 1996 edition to assist users and is similar to the pattern used for metric bolts and screws.
The Subcommittee 2 agreed to undertake the revision of B18.2.1 during the first quarter of
2008. The Standard was updated to incorporate the new format and additional sections as refined
in ASME B18.12.1. The notes that had followed every table were reorganized into the body of
the Standard to eliminate the redundancy created by repeating the same table notes under
numerous tables. This revision adds flange head and lobed head screws and extends the size
www.bzfxw.com
range of heavy hex head cap screws from 3 in. to 6 in. in diameter. The thread details for lag
screws were redefined to align with the way all other spaced threads are defined. Designated
inspection characteristics were eliminated from each product type, and a general section on
quality assurance was created stating that all products must meet the requirements in the Standard
according to ASME B18.18.2. The title of the Standard was revised to indicate that the flange
head and lobed head screws have been added to the Standard.
Suggestions for improvement of this Standard will be welcomed. They should be sent to The
American Society of Mechanical Engineers, Secretary, B18 Main Committee, 3 Park Avenue,
New York, NY 10016-5990.
This revision was approved as an American National Standard on July 8, 2010.
vi
标准分享网 www.bzfxw.com 免费下载
ASME B18 COMMITTEE
Standardization of Bolts, Nuts, Rivets, Screws,
Washers, and Similar Fasteners
(The following is the roster of the Committee at the time of approval of this Standard.)
STANDARDS COMMITTEE OFFICERS
J. Greenslade, Chair
D. S. George, Vice Chair
R. D. Strong, Vice Chair
C. J. Gomez, Secretary
STANDARDS COMMITTEE PERSONNEL
V. Cartina, Autocraft Industrial W. H. Kopke, Consultant
D. A. Clever, Consultant W. J. Lutkus, Emhart Teknologies
A. P. Cockman, Ford Motor Co. D. A. McCrindle, Canadian Fasteners Institute
C. A. D. de la Garza, TSP M. D. Prasad, Contributing Member, Global M & F Solutions, Inc.
D. S. George, ND Industries S. Savoji, ITW Medalist
C. J. Gomez, The American Society of Mechanical Engineers W. R. Schevey, Contributing Member, BGM Fastener Co., Inc.
Q. M. Smith III, Oregon DOT
J. Greenslade, Industrial Fasteners Institute
W. R. Stevens, Ramco
www.bzfxw.com
J. J. Grey, Contributing Member, Fastener Consulting Services, Inc.
R. D. Strong, GM Vehicle Engineering Center
B. Hasiuk, Contributing Member, Defense Supply Center S. W. Vass, Consultant
Philadelphia C. B. Wackrow, MNP Corp.
A. Herskovitz, Consultant W. K. Wilcox, Consultant
J. Hubbard, Leland-Powell Fasteners, Inc. C. B. Williamson, Fastenal Co.
J. Jennings, Contributing Member, Naval Surface Warfare Center C. J. Wilson, Consultant
W. H. King, Porteous Fastener Co. R. B. Wright, Contributing Member, Wright Tool Co.
J. F. Koehl, Contributing Member, Spirol International Corp. J. G. Zeratsky, National Rivet and Manufacturing Co.
SUBCOMMITTEE 2 – EXTERNALLY DRIVEN FASTENERS
J. Greenslade, Chair, Industrial Fasteners Institute J. F. McCarrick, Defense Supply Center Philadelphia
C. B. Williamson, Vice Chair, Fastenal Co. D. A. McCrindle, Canadian Fasteners Institute
T. Anderson, Bay Bolt R. B. Meade, Atrona Material Testing Laboratories, Inc.
V. Cartina, Autocraft Industrial S. Savoji, ITW Medalist
L. Claus, ATF, Inc. R. M. Serabin, Freundlich Supply Co.
D. A. Clever, Consultant D. F. Sharp, GMS Structural Engineers
A. P. Cockman, Ford Motor Co. G. M. Simpson, Semblex Corp.
C. A. D. de la Garza, TSP Q. M. Smith III, Oregon DOT
B. A. Dusina, Federal Screw Works D. J. Soscia, General Dynamics Electric Boat Corp.
M. A. Elmi, Consultant W. R. Stevens, Ramco
J. S. Foote, Trade Association Management, Inc. R. D. Strong, Consultant
M. C. Friel, Haydon Bolts, Inc. R. L. Tennis, Consultant
D. S. George, ND Industries S. W. Vass, Consultant
A. Herskovitz, Consultant B. Vines, Birmingham Fastener
M. W. Holubecki, Electric Boat Corp. C. B. Wackrow, MNP Corp.
J. Hubbard, Leland-Powell Fasteners, Inc. K. Westphal, Kamax
J. Jennings, Contributing Member, Naval Surface Warfare Center W. K. Wilcox, Consultant
W. H. King, Porteous Fastener Co. C. J. Wilson, Consultant
R. Leemans, John Deere D. Winn, Kamax
vii
CORRESPONDENCE WITH THE B18 COMMITTEE
General. ASME Standards are developed and maintained with the intent to represent the
consensus of concerned interests. As such, users of this Standard may interact with the Committee
by requesting interpretations, proposing revisions, and attending Committee meetings. Corre-
spondence should be addressed to:
Secretary, B18 Standards Committee
The American Society of Mechanical Engineers
Three Park Avenue
New York, NY 10016-5990
Proposing Revisions. Revisions are made periodically to the Standard to incorporate changes
that appear necessary or desirable, as demonstrated by the experience gained from the application
of the Standard. Approved revisions will be published periodically.
The Committee welcomes proposals for revisions to this Standard. Such proposals should be
as specific as possible, citing the paragraph number(s), the proposed wording, and a detailed
description of the reasons for the proposal, including any pertinent documentation.
Proposing a Case. Cases may be issued for the purpose of providing alternative rules when
www.bzfxw.com
justified, to permit early implementation of an approved revision when the need is urgent, or to
provide rules not covered by existing provisions. Cases are effective immediately upon ASME
approval and shall be posted on the ASME Committee Web page.
Requests for Cases shall provide a Statement of Need and Background Information. The request
should identify the Standard, the paragraph, figure or table number(s), and be written as a
Question and Reply in the same format as existing Cases. Requests for Cases should also indicate
the applicable edition(s) of the standard to which the proposed Case applies.
Interpretations. Upon request, the B18 Standards Committee will render an interpretation of
any requirement of the Standard. Interpretations can only be rendered in response to a written
request sent to the Secretary of the B18 Standards Committee.
The request for interpretation should be clear and unambiguous. It is further recommended
that the inquirer submit his/her request in the following format:
Subject: Cite the applicable paragraph number(s) and the topic of the inquiry.
Edition: Cite the applicable edition of the Standard for which the interpretation is
being requested.
Question: Phrase the question as a request for an interpretation of a specific requirement
suitable for general understanding and use, not as a request for an approval
of a proprietary design or situation. The inquirer may also include any plans
or drawings that are necessary to explain the question; however, they should
not contain proprietary names or information.
Requests that are not in this format may be rewritten in the appropriate format by the Committee
prior to being answered, which may inadvertently change the intent of the original request.
ASME procedures provide for reconsideration of any interpretation when or if additional
information that might affect an interpretation is available. Further, persons aggrieved by an
interpretation may appeal to the cognizant ASME Committee or Subcommittee. ASME does not
“approve,” “certify,” “rate,” or “endorse” any item, construction, proprietary device, or activity.
Attending Committee Meetings. The B18 Standards Committee regularly holds meetings, which
are open to the public. Persons wishing to attend any meeting should contact the Secretary of
the B18 Standards Committee.
viii
标准分享网 www.bzfxw.com 免费下载
ASME B18.2.1-2010
SQUARE, HEX, HEAVY HEX, AND ASKEW HEAD BOLTS AND
HEX, HEAVY HEX, HEX FLANGE, LOBED HEAD, AND LAG
SCREWS (INCH SERIES)
1 INTRODUCTION that is required to be threaded for full length, whereas
“long bolt” or “long screw” means a bolt or screw of a
1.1 Scope
diameter-length combination that is not threaded for
1.1.1 This Standard covers the dimensional full length.
requirements for nine product types of inch series bolts
body length, LB: the distance measured parallel to the
and screws recognized as American National Standard.
axis of the bolt or screw from the underhead bearing
Also included are appendices covering gaging proce-
surface to the last scratch of thread or, for rolled threads,
dures, grade markings for bolts and screws, formulas
to the top of the extrusion angle. Where specified, the
on which dimensional data are based, and a specification
minimum body length (L B , min.) is a criterion for
to assist in identifying a product as being a screw or a
inspection.
bolt. Where questions arise concerning acceptance of
product, the dimensions in the tables shall govern over grip gaging length, LG: the distance measured parallel to
recalculation by formula. Heavy hex structural bolts, the axis of the bolt or screw from the underhead bearing
formerly covered in ASME B18.2.1, are now covered in surface to the face of a noncounterbored, noncount-
ASME B18.2.6. ersunk standard GO thread ring gage assembled by
hand as far as the thread will permit. The maximum
1.1.2 The inclusion of dimensional data in this
grip gaging length (LG, max.) is a criterion for inspection.
Standard is not intended to imply that all of the products
described herein are stock production sizes. Consumers point length: the length from the pointed end to the first
should consult with suppliers concerning lists of stock fully formed thread at major diameter as determined
production sizes. by the distance that the point enters into a cylindrical
NOT GO major diameter ring gage (refer to Gage 3.1
1.2 Comparison With ISO Standards in ASME B1.2).
Since these are inch fastener standards, there are no thread length: the length from the extreme point of the
comparable ISO standards. bolt or screw to the last complete (full form) thread. For
1.3 Dimensions bolts and screws in this Standard, other than lag screws,
the nominal thread length (LT) is a reference dimension
All dimensions in this Standard are in inches and intended for calculation purposes only.
apply to unplated or uncoated product. When plating
or coating is specified, the finished product dimensions transition thread length, Y: the length that includes the
shall be as agreed upon between supplier and purchaser. length of incomplete threads, the extrusion angle on
Where nominal sizes are expressed in decimals, zeros rolled threads, and tolerances on grip length. Where
preceding the decimal and zeros in the fourth decimal specified, transition thread length is a reference dimen-
place shall be omitted. sion intended for calculation purposes only.
Symbols specifying geometric characteristics are in For definitions of terminology not specified in this
accord with ASME Y14.5. Standard, refer to ASME B18.12.
1.4 Options 1.6 Referenced Standards
Where specified, options shall be at the discretion of The following is a list of publications referenced in
the manufacturer, unless otherwise agreed upon by the this Standard.
manufacturer and purchaser.
ASME B1.1, Unified Inch Screw Threads (UN and UNR
1.5 Terminology Thread Form)
As used in this Standard, “short bolt” or “short screw” ASME B1.2, Gages and Gaging for Unified Inch Screw
means a bolt or screw of a diameter-length combination Threads
1
ASME B18.2.1-2010
ASME B1.3, Screw Thread Gaging Systems for 2 GENERAL DATA FOR BOTH BOLTS AND SCREWS
Acceptability: Inch and Metric Screw Threads (UN, 2.1 Heads
UNR, UNJ, M, and MJ)
ASME B18.2.6, Fasteners for Use in Structural 2.1.1 Top of Head. Top of head shall be full form
Applications and chamfered, with the diameter of chamfer circle equal
ASME B18.2.8, Clearance Holes for Bolts, Screws, and to the maximum width across flats, on square or hex
Studs head products and the “B” dimension shown in Table 11
for lobed head screws with a tolerance of −15%.
ASME B18.2.9, Straightness Gage and Gaging for Bolts
and Screws 2.1.2 Width Across Flats. The width across flats of
ASME B18.12, Glossary of Terms for Mechanical head shall be the overall distance measured perpendicu-
Fasteners lar to the axis of product between two opposite sides
ASME B18.18.2, Inspection and Quality Assurance (QA) of the head in accordance with the notes in respective
for High Volume Machine Assembly Fasteners dimensional tables.
ASME B18.24, Part Identifying Number (PIN) Code 2.1.3 Head Height. The head height shall be the
System for B18 Fastener Products overall distance measured parallel to the axis of product
ASME B94.11M, Twist Drills from the top of the head to the bearing surface and shall
ASME Y14.5, Dimensioning and Tolerancing include the thickness of the washer face where provided.
Publisher: The American Society of Mechanical 2.1.4 Position of Head. The runout of the flats or
Engineers (ASME), 3 Park Avenue, New York, NY lobes of the head shall be no greater than 6% of the
10016-5990; Order Department: 22 Law Drive, P.O. Box maximum width across flats or lobes. For reference pur-
2900, Fairfield, NJ 07007-2900 (www.asme.org) poses, the evaluation shall be made by indicating on the
flats or outer surface of lobes while holding the body
one bolt diameter from under the head and rotating
ASTM A 6/A 6M, General Requirements for Rolled the part.
Structural Steel Bars, Plates, Shapes, and Sheet Piling
ASTM A 307, Standard Specification for Carbon Steel 2.2 Bolt or Screw Length
Bolts and Studs, 60 000 PSI Tensile Strength The bolt or screw length shall be the distance mea-
ASTM A 354, Standard Specification for Quenched and sured parallel to the axis of product from the bearing
Tempered Alloy Steel Bolts, Studs, and Other surface of the head to the extreme end of the bolt or
Externally Threaded Fasteners screw, including the point if the product is pointed.
ASTM A 449, Standard Specification for Hex Cap
Screws, Bolts and Studs, Steel, Heat Treated, 120/105/ 2.3 Body Diameter
90 ksi Minimum Tensile Strength, General Use The body diameter minimum/maximum limits are
ASTM F 468, Nonferrous Bolts, Hex Cap Screws, and defined in each of the respective applicable tables.
Studs for General Use Unless otherwise specified by the purchaser, the body
ASTM F 593, Standard Specification for Stainless Steel style supplied shall be full-size body.
Bolts, Hex Cap Screws, and Studs NOTES:
ASTM F 788/F 788M, Specification for Surface (1) Only bolts and lag screws are permitted to have die seams on
their body that exceed the body diameter. Die seams on the
Discontinuities of Bolts, Screws, and Studs, Inch and
body and all other styles of screws that exceed the body diame-
Metric Series ter are not permitted.
ASTM F 1941, Standard Specification for (2) For recommended clearance of hole sizes for bolts and screws,
Electrodeposited Coatings on Threaded Fasteners refer to ASME B18.2.8.
[Unified Inch Screw Threads (UN/UNR)]
2.4 Points
Publisher: American Society for Testing and Materials Unless otherwise specified, bolts need not be pointed.
(ASTM International), 100 Barr Harbor Drive, Products designated as screws, with the exception of
P.O. Box C700, West Conshohocken, PA 19428-2959 lag screws, are required to have a chamfered point. The
(www.astm.org) chamfer angle may vary depending on the manufactur-
ing process. When specified, the chamfer angle should
SAE J429, Mechanical and Material Requirements for be considered a reference dimension only. The presence
Externally Threaded Fasteners of a point is to reduce the possibility of damage to the
leading threads and promote assembleability with a
Publisher: Society of Automotive Engineers (SAE tapped hole or nut. Point features not defined in a given
International), 400 Commonwealth Drive, product standard are at the discretion of the
Warrendale, PA 15096 (www.sae.org) manufacturer.
2
标准分享网 www.bzfxw.com 免费下载
ASME B18.2.1-2010
2.5 Threads 2.9 Finish
2.5.1 Thread Standard. Threads on all products in Unless otherwise specified, bolts and screws shall be
this Standard, except lag screws, shall meet the require- supplied with a plain (as processed) finish, unplated,
ments of ASME B1.1. Lag screw thread dimensions are or uncoated. Light oil on the surface is permissible to
specified in Table 16. avoid corrosion during transportation, packaging, and
further handling.
2.5.2 Thread Class. Unless otherwise specified, size
limits for standard external thread Class 2A apply prior 2.10 Workmanship
to coating. The external thread allowance may be used to Surface discontinuities shall be in accordance with the
accommodate the coating thickness on plated or coated requirements of the applicable fastener material stan-
parts, provided that the maximum coating thickness is dard. The purchaser may specify additional surface dis-
no more than one-fourth of the allowance. Thus, the continuity requirements for screws and bolts when
thread after plating or coating is subject to acceptance tighter control of surface discontinuities is required or
using a basic size Class 3A GO size thread gage and a when discontinuity limits are not specified in the appli-
Class 2A NOT GO size thread gage. cable fastener material standard.
2.5.3 Thread Series. Thread series on all bolts and 2.11 Designation
screws may be coarse (UNC), fine (UNF), or 8 thread
series (8 UN), except askew head bolts, which shall be 2.11.1 Bolts and screws shall be designated by the
unified coarse (UNC) only, and lag screws, which are following data in the sequence shown: product name;
specified in Table 16. nominal size (fractional or decimal equivalent); threads
per inch (omit for lag screws); product length (fractional
2.5.4 Incomplete Thread Diameter. The major diam- or two-place decimal equivalent); material, including
eter of incomplete thread shall not exceed the actual specification where necessary; and protective finish, if
major diameter of the full form thread. required. See the following examples:
EXAMPLES:
2.5.5 Thread Acceptability. Unless otherwise speci-
(1) Square Bolt per ASME B18.2.1, 3⁄8 – 16 ⴛ 11⁄2. Steel per ASTM
fied by the purchaser, dimensional acceptability of screw A 307 Grade A, Zinc plated per ASTM F 1941 Fe/Zn 3A
threads shall be determined using thread gaging (2) Hex Cap Screw per ASME B18.2.1. 1⁄2 – 13 ⴛ 4. ASTM A 354
System 21 in ASME B1.3. Grade BD, plain finish
(3) Hex Lag Screw per ASME B18.2.1, 0.75 ⴛ 5.00, Stainless Steel
2.6 Straightness per ASTM F 593, Group 1, Condition CW (304)
Shanks of bolts and screws shall be straight within the 2.11.2 For a recommended part identification
following limits at maximum material condition (MMC). number (PIN) system for B18 fasteners, see
For bolts with nominal lengths up to and including ASME B18.24.
12 in., the maximum camber shall be 0.006 in. per inch
(0.006L) of bolt or screw length. For bolts and screws 2.12 Grade and Manufacturer’s Identification
with nominal lengths over 12 in. up to and including 2.12.1 Identification Symbols. Identification mark-
24 in., the maximum camber shall be 0.008 in. per inch ing symbols on products included in this Standard shall
(0.008L) of bolt or screw length. A typical gage and be raised or indented at the manufacturer ’s option
gaging procedure for checking bolt and screw unless otherwise specified. Markings shall be legible to
straightness are given in ASME B18.2.9. the unaided eye with the exception of corrective lenses.
When raised, the height of the marking may not exceed
2.7 Countersunk Center Holes 0.015 in. over the specified maximum head height for
For parts that require machining, it may be necessary bolts 5⁄8 in. and smaller. For bolts larger than 5⁄8 in., the
marking may not project more than 0.030 in. over the
to provide support with a countersunk center hole in
specified maximum head height. When indented, the
the threaded end. Unless otherwise specified by the pur-
depth of the marking shall not reduce the load-carrying
chaser, the drill size and depth shall be in accordance
capacity of the fastener.
with Nonmandatory Appendix C.
2.12.2 Grade Symbols. Each of the products
2.8 Materials included in this Standard shall be marked in accordance
with the requirements of the applicable specification for
Standard materials for various configurations of bolts
its material, mechanical, or performance requirements.
and screws are identified in paras. 3.9, 4.9, and 5.7. When
materials and/or grades, other than those in the applica- 2.12.3 Source Symbols. Each of the products
ble notes, are required, the purchaser must clearly spec- included in this Standard shall be marked in accordance
ify them in the purchase documents. with the requirements of the applicable specification for
3
ASME B18.2.1-2010
Table 1 Dimensions of Square Head Bolts
H A H A G
H
See para. 2.6 See para. 2.6
E E
R R LT (nom.) R LT (nom.) F
25 deg LG See para. 3.7 25 deg LG See para. 3.7
approx. L approx. L
See para. 2.1.4 A
See para. 3.3 A See para. 3.3 A
Bolt With Cut Thread Rolled Thread
Reduced Diameter
Body
Thread Length for
Bolt Lengths, LT
Full-Size Body
Diameter, E (See Para. 3.7)
Nominal Size
or Basic (See Paras. 3.4 Width Across Flats, F Width Across Radius of 6 in. and Over
Product and 3.5) (See Para. 2.1.2) Corners, G Head Height, H Fillet, R Shorter 6 in.
Diameter Max. Min. Basic Max. Min. Max. Min. Basic Max. Min. Max. Min. Nom. Nom.
1 3 11
⁄4 0.2500 0.260 0.237 ⁄8 0.375 0.362 0.530 0.498 ⁄64 0.188 0.156 0.03 0.01 0.750 1.000
5 1 13
⁄16 0.3125 0.324 0.298 ⁄2 0.500 0.484 0.707 0.665 ⁄64 0.220 0.186 0.03 0.01 0.875 1.125
3 9 1
⁄8 0.3750 0.388 0.360 ⁄16 0.562 0.544 0.795 0.747 ⁄4 0.268 0.232 0.03 0.01 1.000 1.250
7 5 19
⁄16 0.4375 0.452 0.421 ⁄8 0.625 0.603 0.884 0.828 ⁄64 0.316 0.278 0.03 0.01 1.125 1.375
1 3 21
⁄2 0.5000 0.515 0.482 ⁄4 0.750 0.725 1.061 0.995 ⁄64 0.348 0.308 0.03 0.01 1.250 1.500
5 15 27
⁄8 0.6250 0.642 0.605 ⁄16 0.938 0.906 1.326 1.244 ⁄64 0.444 0.400 0.06 0.02 1.500 1.750
3
⁄4 0.7500 0.768 0.729 11⁄8 1.125 1.088 1.591 1.494 1
⁄2 0.524 0.476 0.06 0.02 1.750 2.000
7
⁄8 0.8750 0.895 0.852 15⁄16 1.312 1.269 1.856 1.742 19
⁄32 0.620 0.568 0.06 0.02 2.000 2.250
1 1.0000 1.022 0.976 11⁄2 1.500 1.450 2.121 1.991 21
⁄32 0.684 0.628 0.09 0.03 2.250 2.500
11⁄8 1.1250 1.149 1.098 111⁄16 1.688 1.631 2.386 2.239 3
⁄4 0.780 0.720 0.09 0.03 2.500 2.750
11⁄4 1.2500 1.277 1.223 17⁄8 1.875 1.812 2.652 2.489 27
⁄32 0.876 0.812 0.09 0.03 2.750 3.000
13⁄8 1.3750 1.404 1.345 21⁄16 2.062 1.994 2.917 2.738 29
⁄32 0.940 0.872 0.09 0.03 3.000 3.250
11⁄2 1.5000 1.531 1.470 21⁄4 2.250 2.175 3.182 2.986 1 1.036 0.964 0.09 0.03 3.250 3.500
GENERAL NOTE: Refer to section 3 for further information.
its material, mechanical, or performance requirements minimum across flats and corners requirements. (This
to identify its source, manufacturer, or private label is not applicable to askew head bolts.)
distributor.
3.3 Bearing Surface
2.13 Quality Assurance A die seam across the bearing surface of bolts is per-
Unless otherwise specified, products shall be fur- missible. Bearing surface shall be perpendicular to the
nished in accordance with ASME B18.18.2. axis of the body within a tolerance of 3 deg for 1 in.
size and smaller and 2 deg for sizes larger than 1 in.
3 BOLTS Angularity measurement shall be taken at a location to
Square head, hex, heavy hex, and askew head bolts avoid interference with die seams. When specified by
are presented in Tables 1 through 4, respectively. the purchaser, the die seam shall be removed. Upon
completion of the machining, all dimensions and geo-
3.1 Surface Condition metric requirements specified for the bearing surface
Bolts need not be finished on any surface except and head shall be met. For askew head bolts, see Note (1)
threads. in Table 4.
3.2 Head Taper 3.4 Body Diameter
Maximum width across flats and corners shall not Any swell or fin under the head or any die seam on
be exceeded. No transverse section through the head the body shall not exceed the basic bolt diameter by
between 25% and 75% of actual head height, as mea- more than the following:
sured from the bearing surface, shall be less than the (a) 0.030 in. for sizes up through 1⁄2 in.
4
标准分享网 www.bzfxw.com 免费下载
ASME B18.2.1-2010
Table 2 Dimensions of Hex Bolts
See para. 2.1.4 A
H A H A
H F
See para. 2.6 M See para. 2.6 M
E E G
R R LT (nom.) R LT (nom.)
LG See para. 3.7 LGSee para. 3.7
+0 L L
30 deg +0
–15 See para. 3.3 A 30 deg See para. 3.3 A
–15
Bolt With Cut Thread Rolled Thread
Reduced Diameter
Body
Thread Length for
Full-Size Body Bolt Lengths, LT
Diameter, E (See Para. 3.7)
Nominal Size
or Basic (See Paras. 3.4 Width Across Flats, F Width Across Radius of 6 in. and Over
Product and 3.5) (See Para. 2.1.2) Corners, G Head Height, H Fillet, R Shorter 6 in.
Diameter Max. Min. Basic Max. Min. Max. Min. Basic Max. Min. Max. Min. Nom. Nom.
1 7 11
⁄4 0.2500 0.260 0.237 ⁄16 0.438 0.425 0.505 0.484 ⁄64 0.188 0.150 0.03 0.01 0.750 1.000
5 1 7
⁄16 0.3125 0.324 0.298 ⁄2 0.500 0.484 0.577 0.552 ⁄32 0.235 0.195 0.03 0.01 0.875 1.125
3 9 1
⁄8 0.3750 0.388 0.360 ⁄16 0.562 0.544 0.650 0.620 ⁄4 0.268 0.226 0.03 0.01 1.000 1.250
7 5 19
⁄16 0.4375 0.452 0.421 ⁄8 0.625 0.603 0.722 0.687 ⁄64 0.316 0.272 0.03 0.01 1.125 1.375
1 3 11
⁄2 0.5000 0.515 0.482 ⁄4 0.750 0.725 0.866 0.826 ⁄32 0.364 0.302 0.03 0.01 1.250 1.500
5 15 27
⁄8 0.6250 0.642 0.605 ⁄16 0.938 0.906 1.083 1.033 ⁄64 0.444 0.378 0.06 0.02 1.500 1.750
3
⁄4 0.7500 0.768 0.729 11⁄8 1.125 1.088 1.299 1.240 1
⁄2 0.524 0.455 0.06 0.02 1.750 2.000
7
⁄8 0.8750 0.895 0.852 15⁄16 1.312 1.269 1.516 1.447 37
⁄64 0.604 0.531 0.06 0.02 2.000 2.250
1 1.0000 1.022 0.976 11⁄2 1.500 1.450 1.732 1.653 43
⁄64 0.700 0.591 0.09 0.03 2.250 2.500
11⁄8 1.1250 1.149 1.098 111⁄16 1.688 1.631 1.949 1.859 3
⁄4 0.780 0.658 0.09 0.03 2.500 2.750
11⁄4 1.2500 1.277 1.223 17⁄8 1.875 1.812 2.165 2.066 27
⁄32 0.876 0.749 0.09 0.03 2.750 3.000
13⁄8 1.3750 1.404 1.345 21⁄16 2.062 1.994 2.382 2.273 29
⁄32 0.940 0.810 0.09 0.03 3.000 3.250
11⁄2 1.5000 1.531 1.470 21⁄4 2.250 2.175 2.598 2.480 1 1.036 0.902 0.09 0.03 3.250 3.500
15⁄8 1.6250 1.658 1.591 27⁄16 2.438 2.356 2.815 2.616 13⁄32 1.116 0.978 0.09 0.03 3.500 3.750
13⁄4 1.7500 1.785 1.716 25⁄8 2.625 2.538 3.031 2.893 15⁄32 1.196 1.054 0.12 0.04 3.750 4.000
17⁄8 1.8750 1.912 1.839 213⁄16 2.812 2.719 3.248 3.099 11⁄4 1.276 1.130 0.12 0.04 4.000 4.250
2 2.0000 2.039 1.964 3 3.000 2.900 3.464 3.306 111⁄32 1.388 1.175 0.12 0.04 4.250 4.500
21⁄4 2.2500 2.305 2.214 33⁄8 3.375 3.262 3.897 3.719 11⁄2 1.548 1.327 0.19 0.06 4.750 5.000
21⁄2 2.5000 2.559 2.461 33⁄4 3.750 3.625 4.330 4.133 121⁄32 1.708 1.479 0.19 0.06 5.250 5.500
23⁄4 2.7500 2.827 2.711 41⁄8 4.125 3.988 4.763 4.546 113⁄16 1.869 1.632 0.19 0.06 5.750 6.000
3 3.0000 3.081 2.961 41⁄2 4.500 4.350 5.196 4.959 2 2.060 1.815 0.19 0.06 6.250 6.500
31⁄4 3.2500 3.335 3.210 47⁄8 4.875 4.712 5.629 5.372 23⁄16 2.251 1.936 0.19 0.06 6.750 7.000
31⁄2 3.5000 3.589 3.461 51⁄4 5.250 5.075 6.062 5.786 25⁄16 2.380 2.057 0.19 0.06 7.250 7.500
33⁄4 3.7500 3.858 3.726 55⁄8 5.625 5.437 6.495 6.198 21⁄2 2.572 2.241 0.19 0.06 7.750 8.000
4 4.0000 4.111 3.975 6 6.000 5.800 6.928 6.612 211⁄16 2.764 2.424 0.19 0.06 8.250 8.500
GENERAL NOTE: Refer to section 3 for further information.
5
ASME B18.2.1-2010
Table 3 Dimensions of Heavy Hex Bolts
Thread Length for
Full-Size Body Bolt Lengths, LT
Diameter, E (See Para. 3.7)
Nominal Size
or Basic (See Paras. 3.4 Width Across Flats, F Width Across Radius of 6 in. and Over
Product and 3.5) (See Para. 2.1.2) Corners, G Head Height, H Fillet, R Shorter 6 in.
Diameter Max. Min. Basic Max. Min. Max. Min. Basic Max. Min. Max. Min. Nom. Nom.
3 11 1
⁄8 0.3750 0.388 0.360 ⁄16 0.688 0.669 0.794 0.763 ⁄4 0.268 0.226 0.03 0.01 1.000 1.250
1 7 11
⁄2 0.5000 0.515 0.482 ⁄8 0.875 0.850 1.010 0.969 ⁄32 0.364 0.302 0.03 0.01 1.250 1.500
5 11 27
⁄8 0.6250 0.642 0.605 ⁄16 1.062 1.031 1.227 1.175 ⁄64 0.444 0.378 0.06 0.02 1.500 1.750
3
⁄4 0.7500 0.768 0.729 11⁄4 1.250 1.212 1.443 1.383 1
⁄2 0.524 0.455 0.06 0.02 1.750 2.000
7
⁄8 0.8750 0.895 0.852 17⁄16 1.438 1.394 1.660 1.589 37
⁄64 0.604 0.531 0.06 0.02 2.000 2.250
1 1.0000 1.022 0.976 15⁄8 1.625 1.575 1.876 1.796 43
⁄64 0.700 0.591 0.09 0.03 2.250 2.500
11⁄8 1.1250 1.149 1.098 113⁄16 1.812 1.756 2.093 2.002 3
⁄4 0.780 0.658 0.09 0.03 2.500 2.750
11⁄4 1.2500 1.277 1.223 2 2.000 1.938 2.309 2.209 27
⁄32 0.876 0.749 0.09 0.03 2.750 3.000
13⁄8 1.3750 1.404 1.345 23⁄16 2.188 2.119 2.526 2.416 29
⁄32 0.940 0.810 0.09 0.03 3.000 3.250
11⁄2 1.5000 1.531 1.470 23⁄8 2.375 2.300 2.742 2.622 1 1.036 0.902 0.09 0.03 3.250 3.500
15⁄8 1.6250 1.658 1.591 29⁄16 2.562 2.481 2.959 2.829 13⁄32 1.116 0.978 0.09 0.03 3.500 3.750
13⁄4 1.7500 1.785 1.716 23⁄4 2.750 2.662 3.175 3.035 15⁄32 1.196 1.054 0.12 0.04 3.750 4.000
17⁄8 1.8750 1.912 1.839 215⁄16 2.938 2.844 3.392 3.242 11⁄4 1.276 1.130 0.12 0.04 4.000 4.250
2 2.0000 2.039 1.964 31⁄8 3.125 3.025 3.608 3.449 111⁄32 1.388 1.175 0.12 0.04 4.250 4.500
21⁄4 2.2500 2.305 2.214 31⁄2 3.500 3.388 4.041 3.862 11⁄2 1.548 1.327 0.19 0.06 4.750 5.000
21⁄2 2.5000 2.559 2.461 37⁄8 3.875 3.750 4.474 4.275 121⁄32 1.708 1.479 0.19 0.06 5.250 5.500
23⁄4 2.7500 2.827 2.711 41⁄4 4.250 4.112 4.907 4.688 113⁄16 1.869 1.632 0.19 0.06 5.750 6.000
3 3.0000 3.081 2.961 45⁄8 4.625 4.475 5.340 5.102 2 2.060 1.815 0.19 0.06 6.250 6.500
GENERAL NOTE: Refer to section 3 for further information.
6
标准分享网 www.bzfxw.com 免费下载
ASME B18.2.1-2010
Table 4 Dimensions of Askew Head Bolts
H H1
25 deg 25 deg
approx. approx.
R A R A G
E E
S LT (nom.) S LT (nom.)
9.45 deg 9.45 deg F
± 2 deg LG See para. 3.7 ± 2 deg LG See para. 3.7
See para. 2.1.4 A
H L H L
[Note (1)]
Cut Thread Rolled Thread
Thread Length for
Bolt Lengths, LT
Nominal Size [Note (4)]
Body Mid-
or Basic Maximum
Diameter, E Width Across Flats, F Width Across Head Height, height, H Radius of 6 in. and Over
Product Unthreaded
(See Para. 3.5) (See Para. 2.1.2) Corners, G H [Note (3)] [Note (3)] Fillet, R Shorter 6 in.
Diameter Length, S
[Note (2)] Max. Min. Basic Max. Min. Max. Min. Max. Min. Ref. Max. Min. [Note (4)] Nom. Nom.
3 9
⁄8 0.3750 0.388 0.360 ⁄16 0.562 0.544 0.795 0.747 0.317 0.277 0.250 0.03 0.01 0.250 1.000 1.250
1 3
⁄2 0.5000 0.515 0.482 ⁄4 0.750 0.725 1.061 0.995 0.411 0.371 0.328 0.03 0.01 0.312 1.250 1.500
5 15
⁄8 0.6250 0.642 0.605 ⁄16 0.938 0.906 1.326 1.244 0.520 0.480 0.422 0.06 0.02 0.344 1.500 1.750
3
⁄4 0.7500 0.768 0.729 11⁄8 1.125 1.088 1.591 1.494 0.614 0.574 0.500 0.06 0.02 0.406 1.750 2.000
7
⁄8 0.8750 0.895 0.852 15⁄16 1.312 1.269 1.856 1.742 0.723 0.683 0.594 0.06 0.02 0.438 2.000 2.250
1 1.0000 1.022 0.976 11⁄2 1.500 1.450 2.121 1.991 0.801 0.761 0.656 0.09 0.03 0.500 2.250 2.500
NOTES:
(1) Bearing Surface. A die seam across the bearing surface is permissible. Angle of bearing surface with respect to shank is based on the
2 in. 12 slope of the inner flange of American Standard beams and channels.
(2) Thread Series. Askew head bolts are only available with unified course (UNC) threads.
(3) Head Height. Midheight, H, is a reference dimension and equals the basic head height of square bolts as given in Table 2. Head
height, H1, is computed as midheight, H, + 0.0833 times the specified maximum width across flats, F. Tolerance on head height, H1, is
±0.020 in. from computed head height.
(4) Thread Length. All askew head bolts of nominal lengths equal to or shorter than the nominal thread length, LT, plus the unthreaded
length, S, shall be threaded for full length. The distance from the bearing surface of the head, as measured at midheight of head to
the last scratch of thread, shall not exceed the unthreaded length, S. The distance from the bearing surface of the head, as measured
at midheight, to the first complete (full form) thread, as measured with a nonchamfered GO thread ring gage assembled by hand as far
as the thread will permit, shall not exceed the unthreaded length, S, plus a length of 21⁄2 threads.
Table 5 Length Tolerances for Bolts
Nominal Size
1
Nominal Length ⁄4 to 3⁄8 ⁄16 and 1⁄2
7 9
⁄16 to 3⁄4 7
⁄8 and 1 11⁄8 to 11⁄2 Over 11⁄2
+0.02 +0.02 +0.02 ... ... ...
Up to 1 in., incl.
−0.03 −0.03 −0.03 ... ... ...
+0.02 +0.04 +0.06 +0.08 +0.12 +0.18
Over 1 in. to 21⁄2 in., incl.
−0.04 −0.06 −0.08 −0.10 −0.12 −0.18
+0.04 +0.06 +0.08 +0.10 +0.16 +0.20
Over 21⁄2 in. to 4 in., incl.
−0.06 −0.08 −0.10 −0.14 −0.16 −0.20
+0.06 +0.08 +0.10 +0.12 +0.18 +0.22
Over 4 in. to 6 in., incl.
−0.10 −0.10 −0.10 −0.16 −0.18 −0.22
+0.10 +0.12 +0.14 +0.16 +0.22 +0.24
Longer than 6 in.
−0.18 −0.18 −0.18 −0.20 −0.22 −0.24
7
ASME B18.2.1-2010
(b) 0.050 in. for sizes over 1⁄2 in. through 3⁄4 in. All bolts of nominal lengths equal to or shorter than
(c) 0.060 in. for sizes over 3⁄4 in. through 11⁄4 in. the nominal thread length, LT, plus a length equivalent
(d) 0.090 in. for sizes over 11⁄4 in. through 11⁄2 in. to 2.5 times the thread pitch for sizes up to and including
(e) 0.090 in. for sizes over 11⁄2 in., unless otherwise 1 in. and 3.5 times the thread pitch for sizes larger than
agreed to between purchaser and supplier 1 in. shall be threaded for full length.
The diameter of the unthreaded length on bolts that
3.8 Material
are threaded for full length shall not be less than the
minimum pitch diameter of the thread nor greater than Unless otherwise specified, chemical and mechanical
the maximum body diameter, E, max., specified in properties of steel bolts shall conform to ASTM A 307
Tables 1 through 4. Grade A, except for heavy hex bolts, which shall conform
to ASTM A 307 Grade B. Other materials and grades
3.5 Reduced Diameter Body shall be as agreed upon by supplier and purchaser.
When specified by the purchaser, bolts may be sup- 3.9 Additional Requirements
plied in the reduced diameter body style. These shall
have a body diameter of not less than the minimum pitch For additional requirements, see sections 1 and 2.
diameter of the thread and not exceeding the minimum
body diameter, E, min., shown in Tables 1 through 4. 4 SCREWS
Any swell or fin under the head or any die seam on
the body shall not exceed E, min. by more than the 4.1 General
following: Hex cap, heavy hex, hex flange, and lobe head screws
(a) 0.030 in. for sizes up through 1⁄2 in. are presented in Tables 6 through 9, respectively.
(b) 0.050 in. for sizes over 1⁄2 in. through 3⁄4 in.
(c) 0.060 in. for sizes over 3⁄4 in. through 11⁄4 in. 4.2 Top of Head
(d) 0.090 in. for sizes over 11⁄4 in. through 11⁄2 in. 4.2.1 Hex Cap and Heavy Hex Cap Screws. Top of
(e) 0.090 in. for sizes over 11⁄2 in., unless otherwise head shall be full form and chamfered, with the diameter
agreed to between purchaser and supplier of chamfer circle being equal to the maximum width
across flats within a tolerance of −15%.
3.6 Length Tolerance
4.2.2 Hex Flange and Lobe Head Screws. Top of
Bolt length tolerances are given in Table 5. head may be full form or indented at the option of
the manufacturer. If full form, the top of head shall be
3.7 Thread Length chamfered or rounded with the diameter of chamfer
Nominal thread length, LT, is a reference dimension circle or start of rounding being equal to the maximum
intended for calculation purposes only. Nominal thread width across flats, within a tolerance of −15%. If the top
length equals twice the basic thread diameter +0.25 in. of head is indented, the periphery may be rounded.
for nominal bolt lengths up to and including 6 in. and
4.3 Washer Face
twice the basic thread diameter +0.50 in. for nominal
lengths over 6 in. Thickness of the washer face shall be not less than
The length of thread on bolts shall be controlled by 0.015 in. or greater than 0.025 in. for screw sizes 3⁄4 in.
the grip gaging length. The maximum grip gaging and smaller and not less than 0.015 in. nor greater than
length, LG, as calculated and rounded to two decimal 0.035 in. for sizes larger than 3⁄4 in. The washer face is
places for any bolt not threaded full length, shall be not applicable to hex flange or lobe head screws.
equal to the nominal bolt length minus the nominal The washer face diameter shall be equal to the maxi-
thread length (LG, max. p L, nom. − LT) with a tolerance mum width across flats with a tolerance of −10%. Mea-
of minus a length equal to five coarse thread pitches. surement of the washer face diameter shall be taken
This represents the minimum design grip length of the 0.004 in. below the bearing surface plane toward the
joint and shall be used as the criterion for inspection head of the screw.
and determining thread availability when selecting bolt Die seams are not allowed on the washer faces of
lengths, even though usable threads may extend beyond screws.
this point.
For bolts that are threaded full length, LG, max. defines 4.4 Bearing Surface Runout
the unthreaded length under the head and shall not Runout of the bearing surface with respect to the axis
exceed the length of 2.5 times the thread pitch for sizes of the body shall be within the full indicator measure-
up to and including 1 in. and 3.5 times the thread pitch ment (FIM) limits specified. Measurement of FIM shall
for sizes larger than 1 in. It shall be used as the criterion be made as close to the periphery of the bearing surface
for inspection. as possible while the screw is held in a collet or other
8
标准分享网 www.bzfxw.com 免费下载
Table 6 Dimensions of Hex Cap Screws
See para. 4.4 A See para. 4.4 A
H R (See para. 4.5) H R (See para. 4.5)
J A J A See para. 2.1.4 A
See para. 4.3 See para. 4.3 F
See para. 2.6 B M See para. 2.6 B M
See para. 2.6 B See para. 2.6 B
See para. 2.4 See para. 2.4
E E G
Y (nom.) LT (nom.) Y (nom.) LT (nom.)
+0 LB +0
30 deg 30 deg LB See para. 4.7
–15 See para. 4.7 –15
LG LG
L L
ASME B18.2.1-2010
Cut Thread Rolled Thread
Thread Length for Transition Maximum
Screw Lengths, LT Thread
9
Nominal Size Total Runout
Body Diameter, E Width Across Flats, F Width Across (See Para. 4.7) Length, Y
or Basic Minimum of Bearing
Product (See Para. 4.6) (See Para. 2.1.2) Corners, G Head Height, H Wrenching 6 in. and Over (See Para. 4.7) Surface FIM
Diameter Max. Min. Basic Max. Min. Max. Min. Basic Max. Min. Height, J Shorter 6 in. Reference (See Para. 4.4)
1 7 5
⁄4 0.2500 0.2500 0.2450 ⁄16 0.438 0.428 0.505 0.488 ⁄32 0.163 0.150 0.106 0.750 1.000 0.250 0.010
5 1 13
⁄16 0.3125 0.3125 0.3065 ⁄2 0.500 0.489 0.577 0.557 ⁄64 0.211 0.195 0.140 0.875 1.125 0.278 0.011
3 9 15
⁄8 0.3750 0.3750 0.3690 ⁄16 0.562 0.551 0.650 0.628 ⁄64 0.243 0.226 0.160 1.000 1.250 0.312 0.012
7 5 9
⁄16 0.4375 0.4375 0.4305 ⁄8 0.625 0.612 0.722 0.698 ⁄32 0.291 0.272 0.195 1.125 1.375 0.357 0.013
1 3 5
⁄2 0.5000 0.5000 0.4930 ⁄4 0.750 0.736 0.866 0.840 ⁄16 0.323 0.302 0.215 1.250 1.500 0.385 0.014
9 13 23
⁄16 0.5625 0.5625 0.5545 ⁄16 0.812 0.798 0.938 0.910 ⁄64 0.371 0.348 0.250 1.375 1.625 0.417 0.015
5 15 25
⁄8 0.6250 0.6250 0.6170 ⁄16 0.938 0.922 1.083 1.051 ⁄64 0.403 0.378 0.269 1.500 1.750 0.455 0.017
3
⁄4 0.7500 0.7500 0.7410 11⁄8 1.125 1.100 1.299 1.254 15
⁄32 0.483 0.455 0.324 1.750 2.000 0.500 0.020
7
⁄8 0.8750 0.8750 0.8660 15⁄16 1.312 1.285 1.516 1.465 35
⁄64 0.563 0.531 0.378 2.000 2.250 0.556 0.023
1 1.0000 1.0000 0.9900 11⁄2 1.500 1.469 1.732 1.675 39
⁄64 0.627 0.591 0.416 2.250 2.500 0.625 0.026
11⁄8 1.1250 1.1250 1.1140 111⁄16 1.688 1.631 1.949 1.859 11
⁄16 0.718 0.658 0.461 2.500 2.750 0.714 0.029
11⁄4 1.2500 1.2500 1.2390 17⁄8 1.875 1.812 2.165 2.066 25
⁄32 0.813 0.749 0.530 2.750 3.000 0.714 0.033
13⁄8 1.3750 1.3750 1.3630 21⁄16 2.062 1.994 2.382 2.273 27
⁄32 0.878 0.810 0.569 3.000 3.250 0.833 0.036
11⁄2 1.5000 1.5000 1.4880 21⁄4 2.250 2.175 2.598 2.480 15
⁄16 0.974 0.902 0.640 3.250 3.500 0.833 0.039
15⁄8 1.6250 1.6250 1.6130 27⁄16 2.438 2.356 2.815 2.686 1 1.038 0.962 0.694 3.500 3.750 0.909 0.043
Table 6 Dimensions of Hex Cap Screws (Cont’d)
Thread Length for Transition Maximum
标准分享网 www.bzfxw.com 免费下载
Screw Lengths, LT Thread
Nominal Size Total Runout
or Basic Body Diameter, E Width Across Flats, F Width Across Minimum (See Para. 4.7) Length, Y of Bearing
(See Para. 4.6) (See Para. 2.1.2) Corners, G Head Height, H (See Para. 4.7)
Product Wrenching 6 in. and Over Surface FIM
ASME B18.2.1-2010
Diameter Max. Min. Basic Max. Min. Max. Min. Basic Max. Min. Height, J Shorter 6 in. Reference (See Para. 4.4)
3 5 3
1 ⁄4 1.7500 1.7500 1.7380 2 ⁄8 2.625 2.538 3.031 2.893 1 ⁄32 1.134 1.054 0.748 3.750 4.000 1.000 0.046
17⁄8 1.8750 1.8750 1.8630 213⁄16 2.812 2.719 3.248 3.099 15⁄32 1.198 1.114 0.802 4.000 4.250 1.000 0.049
10
2 2.0000 2.0000 1.9880 3 3.000 2.900 3.464 3.306 17⁄32 1.263 1.175 0.825 4.250 4.500 1.111 0.052
21⁄4 2.2500 2.2500 2.2380 33⁄8 3.375 3.262 3.897 3.719 13⁄8 1.423 1.327 0.933 ... 5.000 1.111 0.059
21⁄2 2.5000 2.5000 2.4880 33⁄4 3.750 3.625 4.330 4.133 117⁄32 1.583 1.479 1.042 ... 5.500 1.250 0.065
23⁄4 2.7500 2.7500 2.7380 41⁄8 4.125 3.988 4.763 4.546 111⁄16 1.744 1.632 1.151 ... 6.000 1.250 0.072
3 3.0000 3.0000 2.9880 41⁄2 4.500 4.350 5.196 4.959 17⁄8 1.935 1.815 1.290 ... 6.500 1.250 0.079
GENERAL NOTE:
(a) See Table 10 for underhead fillet dimensions and Table 11 for LG, max. and LB, min. dimensions for fully threaded short screws.
(b) Refer to section 4 for further information.
Table 7 Dimensions of Heavy Hex Screws
Thread Length for
Screw Lengths, LT
Transition Maximum
(See Para. 4.7)
Thread
Nominal Size Total Runout
Body Diameter, E Width Across Flats, F Width Across 6 in. and Over Length, Y
or Basic Minimum of Bearing
(See Para. 4.6) (See Para. 2.1.2) Corners, G Head Height, H Shorter 6 in. (See Para. 4.7)
Product Wrenching Surface FIM
Diameter Max. Min. Basic Max. Min. Max. Min. Basic Max. Min. Height, J Nom. Nom. Reference (See Para. 4.4)
3 11 15
⁄8 0.3750 0.3750 0.360 ⁄16 0.688 0.669 0.794 0.763 ⁄64 0.243 0.226 0.160 1.000 1.250 0.312 0.014
1 7 5
⁄2 0.5000 0.5000 0.482 ⁄8 0.875 0.850 1.010 0.969 ⁄16 0.323 0.302 0.215 1.250 1.500 0.385 0.016
5 25
⁄8 0.6250 0.6250 0.605 11⁄16 1.062 1.031 1.227 1.175 ⁄64 0.403 0.378 0.269 1.500 1.750 0.455 0.019
3 15
⁄4 0.7500 0.7500 0.729 11⁄4 1.250 1.212 1.443 1.383 ⁄32 0.483 0.455 0.324 1.750 2.000 0.500 0.022
7 35
⁄8 0.8750 0.8750 0.852 17⁄16 1.438 1.394 1.660 1.589 ⁄64 0.563 0.531 0.378 2.000 2.250 0.556 0.025
39
1 1.0000 1.0000 0.976 15⁄8 1.625 1.575 1.876 1.796 ⁄64 0.627 0.591 0.416 2.250 2.500 0.625 0.028
11
11⁄8 1.1250 1.1250 1.098 113⁄16 1.812 1.756 2.093 2.002 ⁄16 0.718 0.658 0.461 2.500 2.750 0.714 0.032
25
11⁄4 1.2500 1.2500 1.223 2 2.000 1.938 2.309 2.209 ⁄32 0.813 0.749 0.530 2.750 3.000 0.714 0.035
27
13⁄8 1.3750 1.3750 1.345 23⁄16 2.188 2.119 2.526 2.416 ⁄32 0.878 0.810 0.569 3.000 3.250 0.833 0.038
15
11⁄2 1.5000 1.5000 1.470 23⁄8 2.375 2.300 2.742 2.622 ⁄16 0.974 0.902 0.640 3.250 3.500 0.833 0.041
15⁄8 1.6250 1.6250 1.591 29⁄16 2.562 2.481 2.959 2.829 1 1.038 0.962 0.694 3.500 3.750 0.909 0.044
13⁄4 1.7500 1.7500 1.716 23⁄4 2.750 2.662 3.175 3.035 13⁄32 1.134 1.054 0.748 3.750 4.000 1.000 0.048
17⁄8 1.8750 1.8750 1.839 215⁄16 2.938 2.844 3.392 3.242 15⁄32 1.198 1.114 0.802 4.000 4.250 1.000 0.052
11
2 2.0000 2.0000 1.964 31⁄8 3.125 3.025 3.608 3.449 17⁄32 1.263 1.175 0.825 4.250 4.500 1.111 0.055
21⁄4 2.2500 2.2500 2.214 31⁄2 3.500 3.388 4.041 3.862 13⁄8 1.423 1.327 0.933 ... 5.000 1.111 0.061
ASME B18.2.1-2010
21⁄2 2.5000 2.5000 2.4610 37⁄8 3.8750 3.750 4.474 4.275 17⁄32 1.583 1.479 1.042 ... 5.500 1.250 0.068
23⁄4 2.7500 2.7500 2.7110 41⁄4 4.2500 4.112 4.907 4.688 11⁄16 1.744 1.632 1.151 ... 6.000 1.250 0.074
3 3.0000 3.0000 2.9610 45⁄8 4.6250 4.475 5.340 5.102 17⁄8 1.935 1.815 1.290 ... 6.500 1.250 0.081
31⁄4 3.2500 3.2500 3.2100 5 5.0000 4.838 5.774 5.515 2 2.126 1.998 1.399 ... 7.000 1.250 0.091
31⁄2 3.5000 3.5000 3.4610 53⁄8 5.3750 5.200 6.207 5.928 21⁄4 2.256 2.120 1.484 ... 7.500 1.250 0.098
33⁄4 3.7500 3.7500 3.7109 53⁄4 5.7500 5.562 6.640 6.341 23⁄8 2.447 2.303 1.612 ... 8.000 1.250 0.105
4 4.0000 4.0000 3.9609 61⁄8 6.1250 5.925 7.073 6.755 21⁄2 2.576 2.424 1.697 ... 8.500 1.250 0.112
41⁄4 4.2500 4.2500 4.2228 61⁄2 6.5000 6.288 7.506 7.168 23⁄4 2.768 2.608 1.826 ... 9.000 1.250 0.119
41⁄2 4.5000 4.5000 4.4727 67⁄8 6.8750 6.650 7.939 7.581 27⁄8 2.896 2.728 1.910 ... 9.500 1.250 0.126
43⁄4 4.7500 4.7500 4.7227 71⁄4 7.2500 7.012 8.372 7.994 3 3.088 2.912 2.038 ... 10.00 1.250 0.133
5 5.0000 5.0000 4.9726 75⁄8 7.6250 7.375 8.805 8.408 31⁄8 3.217 3.033 2.123 ... 10.500 1.250 0.14
51⁄4 5.2500 5.2500 5.2226 8 8.0000 7.738 9.238 8.821 33⁄8 3.408 3.216 2.251 ... 11.000 1.250 0.147
51⁄2 5.5000 5.5000 5.4726 83⁄8 8.3750 8.100 9.671 9.234 31⁄2 3.538 3.338 2.337 ... 11.500 1.250 0.154
53⁄4 5.7500 5.7500 5.7225 83⁄4 8.7500 8.462 10.104 9.647 35⁄8 3.729 3.521 2.465 ... 12.000 1.250 0.161
6 6.0000 6.0000 5.9725 91⁄8 9.1250 8.825 10.537 10.060 33⁄4 3.858 3.642 2.549 ... 12.500 1.250 0.168
GENERAL NOTES:
(a) Wrenching Height, J. Wrenching height is a distance measured from the bearing surface up the side of the head at the corners. The width across corners shall be within specified lim-
its for the full wrenching height.
(b) Refer to section 4 for further information.
ASME B18.2.1-2010
Table 8 Dimensions of Hex Flange Screws
See para. 2.1.4 M A M H L See para. 4.8
LG See para. 4.7
Indentation and B H1
configuration LB See para. 4.7
F
optional 15 deg − 30 deg LT See para. 4.7
(see para. 4.2) x (Y) See para. 4.7 Rp
U
G B1 E
Optional point
R2
construction
Grade and source 15 deg − 25 deg
See para. 2.6 M
identification to
appear on top of See para. 4.4 A A
head or flange Fillet
(see para. 2.11.1) K (see para. 4.5)
0.75 deg ± 0.50 deg
Contour optional
15 deg − 25 deg [Notes (1), (2)]
Ring T
R2 [Notes (1), (2)]
Required
gap
Ring B
B1
B
Detail X Head Gaging
[Notes (1), (2)]
Maximum
Nominal Size Minimum Maximum Minimum Flange
or Basic Width Across Flats, F Width Across Maximum Flange Head Hex Top
Body Diam., E (See Para. 2.1.2) Corners, G
Major Diam. Flange Thickness, Height, Height, Radius,
of Thread Max. Min. Basic Max. Min. Max. Min. Diam., B K H H1 R2
1 3
⁄4 0.2500 0.2500 0.2450 ⁄8 0.3750 0.367 0.433 0.409 0.56 0.04 0.28 0.17 0.015
5 1
⁄16 0.3125 0.3125 0.3065 ⁄2 0.5000 0.489 0.577 0.548 0.68 0.05 0.32 0.21 0.019
3 9
⁄8 0.3750 0.3750 0.3690 ⁄16 0.5625 0.551 0.650 0.618 0.81 0.06 0.39 0.25 0.022
7 5
⁄16 0.4375 0.4375 0.4305 ⁄8 0.6250 0.612 0.722 0.685 0.93 0.07 0.46 0.30 0.026
1 3
⁄2 0.5000 0.5000 0.4930 ⁄4 0.7500 0.736 0.866 0.825 1.07 0.08 0.51 0.34 0.030
9 13
⁄16 0.5625 0.5625 0.5545 ⁄16 0.8125 0.798 0.938 0.895 1.19 0.09 0.57 0.38 0.034
5 15
⁄8 0.6250 0.6250 0.6170 ⁄16 0.9375 0.922 1.083 1.034 1.33 0.10 0.62 0.42 0.038
3
⁄4 0.7500 0.7500 0.7410 11⁄8 1.1250 1.100 1.299 1.234 1.59 0.11 0.73 0.51 0.045
12
标准分享网 www.bzfxw.com 免费下载
ASME B18.2.1-2010
Table 8 Dimensions of Hex Flange Screws (Cont’d)
Maximum Thread Length, LT Ring T Ring B
Runout Maximum Transition
Nominal Size of For Screws For Screws Thread Length, Y Inside Inside
or Basic Minimum Bearing With L ≤ With L > For Screws For Screws Diameter Diameter Thickness
Major Diam. Bearing Surface 6 in. 6 in. With L ≤ With L > +0.0000 Minimum +0.0000 +0.0000
of Thread Diam., B1 FIM Basic Basic 6 in. 6 in. −0.0003 Thickness −0.0003 −0.0003
1
⁄4 0.2500 0.480 0.010 0.750 1.000 0.400 0.650 0.4380 0.500 0.4093 0.0514
5
⁄16 0.3125 0.600 0.011 0.875 1.125 0.417 0.667 0.5820 0.500 0.5483 0.0643
3
⁄8 0.3750 0.730 0.012 1.000 1.250 0.438 0.688 0.6550 0.500 0.6183 0.0771
7
⁄16 0.4375 0.850 0.013 1.125 1.375 0.464 0.714 0.7300 0.500 0.6853 0.0900
1
⁄2 0.5000 0.980 0.014 1.250 1.500 0.481 0.731 0.8750 0.500 0.8253 0.1029
9
⁄16 0.5625 1.100 0.015 1.375 1.625 0.750 0.750 0.9500 0.500 0.8953 0.1157
5
⁄8 0.6250 1.230 0.017 1.500 1.750 0.773 0.773 1.0750 0.500 1.0343 0.1286
3
⁄4 0.7500 1.470 0.020 1.750 2.000 0.800 0.800 1.3120 0.500 1.2343 0.1543
GENERAL NOTE: Refer to section 4 for further information.
NOTES:
(1) Head acceptability shall be determined using the two rings described in Table 10. Ring B shall be placed on the screw head followed
by Ring T. The head is acceptable if ring T does not contact ring B after both rings are in place on the head.
(2) The top surface of the flange shall be conical or slightly rounded (convex). Radius, R2, applies both at the corners and at the flats of
the hexagon. The contour of edge at flange periphery, between the maximum flange diameter, B, max., and the minimum bearing circle
diameter, B1, min., shall be optional provided that the minimum flange edge thickness, K, min., is maintained at the minimum bearing
circle diameter, B1, min.
gripping device at a distance of one screw diameter from No radius in the multiradius curve shall be less than
the underside of the head. R, min. specified in Table 10 (see Fig. 2), where
4.5 Fillet Ea, max. − E1, min.
Lf, max. p
Two styles of head-to-shank fillets are provided for 2
long screws in lengths longer than the maximum lengths
specified in Table 10. Style 1 will be supplied unless E1, min. p minimum specified pitch diameter of
Style 2 is specified by the purchaser. coarse thread: UNC-2A
Style 1 is a continuous radius in accordance with the
Ea, max. p maximum fillet transition diameter (see
maximum-minimum limits for R shown in Table 10.
Table 10)
Style 2 has an elliptical shape defined as a smooth,
multiradius, concave curve tangent to the underhead E1a, min. p Ea, max. − 0.5 (Ea, max. − E1, min.)
bearing surface at a point no greater than one-half of
Ea, max. or less than one-half of Ea, min. from the axis 4.6 Body Diameter
of the screw and tangent to the shank at a distance
from the underhead bearing surface within the limits The diameter of body, except for a length equal to La,
specified for La. No radius in the fillet shall be less than max. under the head, shall conform to the limits for E
R, min. (see Fig. 1 and Table 10). given in Tables 6 through 9. The diameter of the
For short screws threaded full length (Table 10), the unthreaded length on short screws that are threaded for
fillet shall be a smooth, concave curve lying within the full length shall not be less than the minimum pitch
envelope established by either diameter of the thread nor greater than the nominal
(a) a continuous radius tangent to the underhead diameter specified in Tables 6 through 9.
bearing surface and min./max. shank diameter E1, min. A die seam and swell or fin is permissible along the
(minimum pitch diameter) to E, max., whose value shall body diameter respectively for screws over 1 in. Any
be no less than R, min. as specified in Table 10 or die seam, swell, or fin shall not exceed the basic screw
(b) a continuous or muItiradius curve tangent to the diameter by more than shown below. When specified
underhead bearing surface at a point no greater than by the purchaser, the die seam and swell on the body
one-half Ea, max. from the axis of screw and tangent to shall be removed. Upon completion of the machining,
the maximum shank diameter, E, max., at a distance not all dimensions and geometric requirements specified for
exceeding Lf, max. from the bearing surface the bearing surface and body diameter shall be met.
13
ASME B18.2.1-2010
Table 9 Dimensions of Lobed Head Screws
H
C Fallaway
[Note (1)] K
G [Note (1)]
B A
[Note (1)]
Nominal Size or Width Across Maximum
Corners, G Head Height, H Flange Thickness, K Flange Diam., C
Basic Major Minor Drive
Diam. of Thread Reference Max. Min. Max. Min. Max. Min. Diam., B Size
1
⁄4 0.2500 0.2870 0.255 0.245 0.070 0.060 0.375 0.365 0.2073 E8
5
⁄16 0.3125 0.3620 0.323 0.313 0.100 0.090 0.469 0.457 0.2663 E10
3
⁄8 0.3750 0.4310 0.394 0.384 0.125 0.115 0.562 0.550 0.3103 E12
7
⁄16 0.4375 0.4990 0.472 0.462 0.155 0.145 0.656 0.642 0.3613 E14
1
⁄2 0.5000 0.5710 0.515 0.505 0.160 0.150 0.750 0.735 0.4113 E16
9
⁄16 0.5625 0.6450 0.551 0.541 0.165 0.153 0.844 0.828 0.4663 E18
5
⁄8 0.6250 0.7150 0.630 0.620 0.200 0.188 0.938 0.921 0.5183 E20
3
⁄4 0.7500 0.8600 0.787 0.777 0.255 0.243 1.125 1.107 0.6183 E24
7
⁄8 0.8750 1.0000 0.866 0.856 0.270 0.260 1.312 1.293 0.7193 E28
1 1.0000 1.1380 1.063 1.053 0.355 0.343 1.500 1.479 0.8393 E32
11⁄8 1.1250 1.2800 1.181 1.171 0.382 0.370 1.688 1.665 0.9433 E36
11⁄4 1.2500 1.4200 1.299 1.289 0.422 0.410 1.875 1.852 1.0463 E40
13⁄8 1.3750 1.5620 1.417 1.407 0.453 0.441 2.062 2.038 1.1513 E44
GENERAL NOTE: Refer to section 4 for further information.
NOTE:
(1) Fallaway, G, A, B, and other configuration characteristic acceptance shall be determined based on the gage and gaging practice in Man-
datory Appendix I.
14
标准分享网 www.bzfxw.com 免费下载
ASME B18.2.1-2010
Table 10 Dimensions of Underhead Fillets
Short Screws (See Fig. 2)
Long Screws (See Fig. 1) Long and Short
Screws Maximum
Nominal Size or Fillet Transition Fillet Maximum
Basic Product Diameter, Ea Fillet Length, La Radius of Fillet, R Transition Fillet
Diameter Max. Min. Max. Min. Max. Min. Diameter, Ea Length, Lf
1
⁄4 0.2500 0.300 0.280 0.087 0.043 0.025 0.015 0.300 0.043
5
⁄16 0.3125 0.362 0.342 0.087 0.043 0.025 0.015 0.362 0.045
3
⁄8 0.3750 0.425 0.405 0.087 0.043 0.025 0.015 0.425 0.048
7
⁄16 0.4375 0.488 0.468 0.087 0.043 0.025 0.015 0.488 0.052
1
⁄2 0.5000 0.550 0.530 0.087 0.043 0.025 0.015 0.550 0.053
9
⁄16 0.5625 0.652 0.602 0.157 0.078 0.045 0.020 0.652 0.075
5
⁄8 0.6250 0.715 0.665 0.157 0.078 0.045 0.020 0.715 0.078
3
⁄4 0.7500 0.840 0.790 0.157 0.078 0.045 0.020 0.840 0.081
7
⁄8 0.8750 1.005 0.955 0.227 0.113 0.065 0.040 1.005 0.105
1 1.0000 1.190 1.120 0.332 0.166 0.095 0.060 1.190 0.140
11⁄8 1.1250 1.315 1.245 0.332 0.166 0.095 0.060 1.315 0.146
11⁄4 1.2500 1.440 1.370 0.332 0.166 0.095 0.060 1.440 0.146
13⁄8 1.3750 1.565 1.495 0.332 0.166 0.095 0.060 1.565 0.154
11⁄2 1.5000 1.690 1.620 0.332 0.166 0.095 0.060 1.690 0.154
13⁄4 1.7500 1.940 1.870 0.332 0.166 0.095 0.060 1.940 0.166
2 2.0000 2.190 2.120 0.332 0.166 0.095 0.060 2.190 0.173
21⁄4 2.2500 2.440 2.370 0.332 0.166 0.095 0.060 2.440 0.173
21⁄2 2.5000 2.690 2.620 0.332 0.166 0.095 0.060 2.690 0.183
23⁄4 2.7500 2.940 2.870 0.332 0.166 0.095 0.060 2.940 0.183
3 3.0000 3.190 3.120 0.332 0.166 0.095 0.060 3.190 0.183
Fig. 1 Underhead Fillet for Long Screws
Style 1 Style 2
Fillet
Ea
Ea E
R
La
La
Fig. 3 LG, Maximum and LB, Minimum for Short
Screws Threaded Full Length
Fig. 2 Underhead Fillet for Short Screws Threaded
Full Length
Fillet shall lie
within this
envelope E1,
E1a,
min. E,
min. LB , min.
E a, max.
Ea max. LG , max.
R R
Lf ,
max.
Lf
15
ASME B18.2.1-2010
Table 11 LG, Maximum and LB, Minimum Limitations for Short Screws Threaded Full Length
For Nominal
Nominal Size Product Lengths LG, Max. LB, Min.
of Basic [Note (1)] [Note (2)] For Nominal Product Lengths LG, Max. [Note (3)] [Note (4)]
Product Less Than or All Thread Greater Less Than or Equal Coarse (UNC) Fine (UNF) 8 (UN) All Thread
Diameter Equal to Series Than to [Note (5)] Thread Thread Thread Series
1
⁄4 0.500 0.075 0.500 1.125 0.125 0.089 ... 0.043
5
⁄16 0.625 0.083 0.625 1.250 0.139 0.104 ... 0.045
3
⁄8 0.750 0.094 0.750 1.375 0.156 0.104 ... 0.048
7
⁄16 0.875 0.107 0.875 1.625 0.179 0.125 ... 0.052
1
⁄2 1.000 0.115 1.000 1.750 0.192 0.125 ... 0.053
9
⁄16 1.125 0.125 1.125 2.000 0.208 0.139 ... 0.075
5
⁄8 1.250 0.136 1.250 2.125 0.227 0.139 ... 0.078
3
⁄4 1.500 0.150 1.500 2.500 0.250 0.156 ... 0.081
7
⁄8 ... ... ... 2.750 0.278 0.179 ... 0.105
1 ... ... ... 3.000 0.312 0.208 ... 0.140
11⁄8 ... ... ... 3.500 0.357 0.208 0.312 0.146
11⁄4 ... ... ... 3.750 0.357 0.208 0.312 0.146
13⁄8 ... ... ... 4.250 0.417 0.208 0.312 0.154
11⁄2 ... ... ... 4.500 0.417 0.208 0.312 0.154
13⁄4 ... ... ... 5.125 0.500 ... 0.312 0.166
2 ... ... ... 5.750 0.556 ... 0.312 0.173
21⁄4 ... ... ... 6.500 0.556 ... 0.312 0.173
21⁄2 ... ... ... 7.125 0.625 ... 0.312 0.183
23⁄4 ... ... ... 7.625 0.625 ... 0.312 0.183
3 ... ... ... 8.125 0.625 ... 0.312 0.183
NOTES:
(1) Tabulated values are equal to 2 times the basic product diameter.
(2) Tabulated values are equal to 1.5 times the coarse thread (UNC) pitch.
(3) Tabulated values are equal to 2.5 times the thread pitch.
(4) LB, min. equals fillet length, Lf , max., as given in Table 10.
(5) Longest screw threaded full length.
4.7 Thread Length Body length, LB, min., is the distance measured paral-
The length of thread on screws shall be controlled lel to the axis of screw from the underhead bearing
by the grip gaging length, LG, max., and body length, surface to the last scratch of thread or to the top of the
LB, min. extrusion angle. For diameter length combinations not
For short screws threaded full length, LG, max. and included in Table 11 or 12, the minimum body length,
LB, min. are given in Table 11 (see Fig. 3). Long screws L B , min., as calculated and rounded to two decimal
not threaded full length of diameters through 11⁄2 in. places, shall be equal to the maximum grip gaging length
and lengths through 12 in. LG, max. and LB, min. are minus the maximum transition thread length (LB, min. p
specified in Table 12. LG, max. − Y). It shall be a criterion for inspection.
For diameter-length combinations not included in Transition thread length, Y, is a reference dimension
Table 11 or 12, the maximum grip gaging length, LG, equal to five coarse (UNC) pitches and intended for
max., for long screws that are not threaded full length, calculation purposes only. It includes the length of
as calculated and rounded to two decimal places, shall incomplete threads, the extrusion angle on rolled
be equal to the nominal screw length minus the nominal threads, and tolerances on grip length.
thread length (LG, max. p L, nom. − LT). It shall be used
4.8 Length Tolerances
as the criterion for inspection.
Nominal thread length, LT, is a reference dimension Screw length tolerances are given in Table 13.
intended for calculation purposes only, which represents
the distance from the extreme end of the screw to the 4.9 Material
last complete (full form) thread. Nominal thread length Unless otherwise specified, chemical and mechanical
equals twice the basic thread diameter plus 0.25 in. for properties of steel screws shall conform to ASTM A 449,
nominal screw length up to and including 6 in. and ASTM A 354, or SAE J429. Stainless steel screws shall
twice the basic thread diameter plus 0.50 in. for nominal conform to the requirements of ASTM F 593. Nonferrous
lengths over 6 in. screws shall conform to the requirements of ASTM F 468.
16
标准分享网 www.bzfxw.com 免费下载
Table 12 Maximum Grip Gaging Lengths, LG, and Minimum Body Lengths, LB, for Screws
Nominal Length
Nom.
Size 11⁄4 13⁄8 11⁄2 15⁄8 13⁄4 17⁄8 2 21⁄8 21⁄4 23⁄8 21⁄2 25⁄8 23⁄4 27⁄8 3
1
⁄4 LG, max/LB, min 0.50/0.25 0.63/0.38 0.75/0.50 0.88/0.62 1.00/0.75 1.12/0.88 1.25/1.00 1.38/1.12 1.50/1.25 1.62/1.38 1.75/1.50 1.88/1.62 2.00/1.75 2.12/1.88 2.52/2.00
5
⁄16 LG, max/LB, min Full thread 0.50/0.22 0.62/0.35 0.75/0.47 0.88/0.60 1.00/0.72 1.12/0.85 1.25/0.97 1.38/1.10 1.50/1.22 1.62/1.35 1.75/1.47 1.88/1.60 2.00/1.72 2.12/1.85
3
⁄8 LG, max/LB, min Full thread Full thread 0.50/0.19 0.62/0.31 0.75/0.44 0.88/0.56 1.00/0.69 1.12/0.81 1.25/0.94 1.38/1.06 1.50/1.19 1.62/1.31 1.75/1.44 1.88/1.56 2.00/1.69
7
⁄16 LG, max/LB, min Full thread Full thread Full thread Full thread 0.63/0.27 0.75/0.39 0.88/0.52 1.00/0.64 1.12/0.77 1.25/0.89 1.38/1.02 1.50/1.14 1.62/1.27 1.75/1.39 1.88/1.52
1
⁄2 LG, max/LB, min Full thread Full thread Full thread Full thread Full thread 0.63/0.24 0.75/0.38 0.88/0.49 1.00/0.62 1.12/0.74 1.25/0.86 1.38/0.99 1.50/1.12 1.62/1.24 1.75/1.36
17
9
⁄16 LG, max/LB, min Full thread Full thread Full thread Full thread Full thread Full thread Full thread 0.75/0.33 0.88/0.45 1.00/0.58 1.12/0.75 1.25/0.83 1.38/0.96 1.50/1.08 1.62/1.21
5
⁄8 LG, max/LB, min Full thread Full thread Full thread Full thread Full thread Full thread Full thread Full thread 0.75/0.30 0.88/0.42 1.00/0.55 1.12/0.67 1.25/0.80 1.38/0.92 1.50/1.05
3
Full thread Full thread Full thread Full thread Full thread Full thread Full thread Full thread Full thread Full thread Full thread 0.88/0.38 1.00/0.50 1.12/0.62 1.25/0.75
ASME B18.2.1-2010
⁄4 LG, max/LB, min
7
⁄8 LG, max/LB, min Full thread Full thread Full thread Full thread Full thread Full thread Full thread Full thread Full thread Full thread Full thread Full thread Full thread 0.88/0.32 1.00/0.44
1 LG, max/LB, min Full thread Full thread Full thread Full thread Full thread Full thread Full thread Full thread Full thread Full thread Full thread Full thread Full thread Full thread Full thread
11⁄8 LG, max/LB, min Full thread Full thread Full thread Full thread Full thread Full thread Full thread Full thread Full thread Full thread Full thread Full thread Full thread Full thread Full thread
11⁄4 LG, max/LB, min Full thread Full thread Full thread Full thread Full thread Full thread Full thread Full thread Full thread Full thread Full thread Full thread Full thread Full thread Full thread
13⁄8 LG, max/LB, min Full thread Full thread Full thread Full thread Full thread Full thread Full thread Full thread Full thread Full thread Full thread Full thread Full thread Full thread Full thread
11⁄2 LG, max/LB, min Full thread Full thread Full thread Full thread Full thread Full thread Full thread Full thread Full thread Full thread Full thread Full thread Full thread Full thread Full thread
Table 12 Maximum Grip Gaging Lengths, LG, and Minimum Body Lengths, LB, for Screws (Cont’d)
Nominal Length
Nom.
Size 31⁄4 31⁄2 33⁄4 4 41⁄4 41⁄2 43⁄4 5 51⁄4 51⁄2 53⁄4 6 61⁄4 61⁄2 63⁄4
1
⁄4 LG, max/LB, min 2.50/2.25 2.75/2.50 3.00/2.75 3.25/3.00 3.50/3.25 3.75/3.50 4.00/3.75 4.25/4.00 4.50/4.25 4.75/4.50 5.00/4.75 5.25/5.00 5.25/5.00 5.50/5.25 5.75/5.50
5
⁄16 LG, max/LB, min 2.38/2.10 2.62/2.35 2.88.2.60 3.12/2.85 3.38/3.10 3.62/3.35 3.88/3.60 4.12/3.85 4.38/4.10 4.62/4.35 4.88/4.60 5.12/4.85 5.12/4.85 5.38/5.10 5.62/5.35
3
⁄8 LG, max/LB, min 2.25/1.94 2.50/2.19 2.75/2.44 3.00/2.69 3.25/2.94 3.50/3.19 3.75/3.44 4.00/3.69 4.25/3.94 4.50/4.19 4.75/4.44 5.00/4.69 5.00/4.69 5.25/4.94 5.50/5.19
7
⁄16 LG, max/LB, min 2.12/1.77 2.38/2.02 2.62/2.27 2.88/2.52 3.12/2.77 3.38/3.02 3.62/3.27 3.88/3.52 4.12/3.77 4.38/4.02 4.63/4.27 4.88/4.52 4.88/4.52 5.12/4.77 5.38/5.02
1
⁄2 LG, max/LB, min 2.00/1.62 2.25/1.86 2.50/2.12 2.75/2.36 3.00/2.62 3.25/2.86 3.50/3.12 3.75/3.36 4.00/3.62 4.25/3.87 4.50/4.12 4.75/4.36 4.75/4.36 5.00/4.62 5.25/4.86
18
9
⁄16 LG, max/LB, min 1.88/1.46 2.12/1.71 2.38/1.96 2.62/2.21 2.88/2.46 3.12/2.71 3.38/2.96 3.62/3.21 3.88/3.46 4.12/3.71 4.38/3.96 4.62/4.21 4.62/4.21 4.88/4.45 5.12/4.71
5
⁄8 LG, max/LB, min 1.75/1.30 2.00/1.55 2.25/1.80 2.50/2.05 2.75/2.30 3.00/2.55 3.25/2.80 3.50/3.05 3.75/3.30 4.00/3.55 4.25/3.80 4.50/4.05 4.50/4.05 4.75/4.30 5.00/4.55
3
ASME B18.2.1-2010
⁄4 LG, max/LB, min 1.50/1.00 1.75/1.25 2.00/1.50 2.25/1.75 2.50/2.00 2.75/2.25 3.00/2.50 3.25/2.75 3.50/3.00 3.75/3.25 4.00/3.50 4.25/3.75 4.25/3.75 4.50/4.00 4.75/4.25
7
⁄8 LG, max/LB, min 1.25/0.69 1.50/0.94 1.75/1.19 2.00/1.44 2.25/1.69 2.50/1.94 2.75/2.19 3.00/2.44 3.25/2.69 3.50/2.94 3.75/3.19 4.00/3.44 4.00/3.44 4.25/3.69 4.50/3.94
1 LG, max/LB, min 1.00/0.38 1.25/0.62 1.50/0.88 1.75/1.12 2.00/1.38 2.25/1.62 2.50/1.88 2.75/2.12 3.00/2.38 3.25/2.62 3.50/2.88 3.75/3.12 3.75/3.12 4.00/3.38 4.25/3.63
11⁄8 LG, max/LB, min Full thread Full thread 1.25/0.54 1.50/0.79 1.75/1.04 2.00/1.29 2.25/1.54 2.50/1.79 2.75/2.04 3.00/2.29 3.25/2.54 3.50/2.79 3.50/2.79 3.75/3.04 4.00/3.29
11⁄4 LG, max/LB, min Full thread Full thread Full thread 1.25/0.54 1.50/0.79 1.75/1.04 2.00/1.29 2.25/1.54 2.50/1.79 2.75/2.04 3.00/2.29 3.25/2.54 3.25/2.54 3.50/2.79 3.75/3.04
13⁄8 LG, max/LB, min Full thread Full thread Full thread Full thread Full thread 1.50/0.79 1.75/1.04 2.00/1.29 2.25/1.54 2.50/1.79 2.75/2.04 3.00/2.29 3.25/2.54 3.25/2.54 3.50/2.79
标准分享网 www.bzfxw.com 免费下载
11⁄2 LG, max/LB, min Full thread Full thread Full thread Full thread Full thread Full thread 1.50/0.67 1.75/0.92 2.00/1.17 2.25/1.42 2.50/1.67 2.75/1.92 2.75/1.92 3.00/2.17 3.25/2.42
Table 12 Maximum Grip Gaging Lengths, LG, and Minimum Body Lengths, LB, for Screws (Cont’d)
Nominal Length
Nom.
Size 7 71⁄4 71⁄2 73⁄4 8 81⁄4 81⁄2 83⁄4 9 91⁄4 91⁄2 93⁄4 10 11 12
1
⁄4 LG, max/LB, min 6.00/5.75 6.25/6.00 6.50/6.25 6.75/6.50 7.00/6.75 7.25/7.00 7.50/7.25 7.75/7.50 8.00/7.75 8.25/8.00 8.50/8.25 8.75/8.50 9.00/8.75 10.00/9.75 11.00/10.75
5
⁄16 LG, max/LB, min 5.88/5.60 6.12/5.85 6.38/6.10 6.62/6.35 6.88/6.60 7.12/6.85 7.38/7.10 7.62/7.35 7.88/7.60 8.12/7.85 8.38/8.10 8.62/8.35 8.88/8.60 9.88/9.60 10.88/9.60
3
⁄8 LG, max/LB, min 5.75/5.44 6.00/5.69 6.25/5.94 6.50/6.19 6.75/6.44 7.00/6.69 7.25/6.94 7.50/7.19 7.75/7.44 8.00/7.69 8.25/7.94 8.50/8.19 8.75/8.44 9.75/9.44 10.75/10.44
7
⁄16 LG, max/LB, min 5.62/5.27 5.88/5.52 6.12/5.77 6.38/6.02 6.62/6.27 6.88/6.52 7.12/6.77 7.38/7.02 7.62/7.27 7.88/7.52 8.12/7.77 8.38/8.02 8.62/8.27 9.62/9.27 10.62/10.27
1
⁄2 LG, max/LB, min 5.50/5.12 5.75/5.36 6.00/5.62 6.25/5.87 6.50/6.12 6.75/6.36 7.00/6.62 7.25/6.86 7.50/7.12 7.75/7.36 8.00/7.62 8.25/7.86 8.50/8.12 9.50/8.12 10.50/9.12
19
9
⁄16 LG, max/LB, min 5.38/4.96 5.62/5.20 5.88/5.46 6.12/5.71 6.38/5.96 6.62/6.21 6.88/6.46 7.12/6.71 7.38/6.96 7.62/7.21 7.88/7.46 8.12/7.71 8.38/7.96 9.38/8.96 10.38/9.96
5
⁄8 LG, max/LB, min 5.25/4.80 5.50/5.05 5.75/5.30 6.00/5.55 6.25/5.80 6.50/6.05 6.75/6.30 7.00/6.55 7.25/6.80 7.50/7.05 7.75/7.30 8.00/7.55 8.25/7.80 9.25/8.80 10.25/9.80
3
ASME B18.2.1-2010
⁄4 LG, max/LB, min 5.00/4.50 5.25/4.75 5.50/5.00 5.75/5.25 6.00/5.50 6.25/5.75 6.50/6.00 6.75/6.25 7.00/6.50 7.25/6.75 7.50/7.00 7.75/7.25 8.00/7.50 9.00/8.50 10.00/9.50
7
⁄8 LG, max/LB, min 4.75/4.19 5.00/4.44 5.25/4.69 5.50/4.94 5.75/5.19 6.00/5.44 6.25/5.69 6.50/5.94 6.75/6.19 7.00/6.44 7.25/6.89 7.50/6.94 7.75/7.19 8.75/8.19 9.75/9.19
1 LG, max/LB, min 4.50/3.88 4.75/4.12 5.00/4.38 5.25/4.52 5.50/4.88 5.75/5.12 6.00/5.38 6.25/5.62 6.50/5.88 6.75/6.12 7.00/6.38 7.25/6.62 7.50/6.88 8.50/7.88 9.50/8.88
11⁄8 LG, max/LB, min 4.25/3.54 4.50/3.79 4.75/4.04 5.00/4.29 5.25/4.54 5.50/4.79 5.75/5.04 6.00/5.29 6.25/5.54 6.50/5.79 6.75/6.04 7.00/6.29 7.25/6.54 8.25/7.54 9.25/8.54
11⁄4 LG, max/LB, min 4.00/3.29 4.25/3.54 4.50/3.79 4.75/4.04 5.00/4.29 5.25/4.54 5.50/4.79 5.75/5.04 6.00/5.29 6.25/5.54 6.50/5.79 6.75/6.04 7.00/6.29 8.00/6.29 9.00/7.29
13⁄8 LG, max/LB, min 3.75/3.04 4.00/3.29 4.25/3.54 4.50/3.79 4.75/4.04 5.00/4.29 5.25/4.54 5.50/4.79 5.75/5.04 6.00/5.29 6.25/5.54 6.50/5.79 6.75/6.04 7.75/7.04 8.75/8.04
11⁄2 LG, max/LB, min 3.50/2.67 3.75/2.92 4.00/3.17 4.25/3.42 4.50/3.67 4.75/3.92 5.00/4.17 5.25/4.42 5.50/4.67 5.75/4.92 6.00/5.17 6.25/5.42 6.50/5.67 7.50/6.67 8.50/7.67
ASME B18.2.1-2010
Table 13 Length Tolerances for Screws
Nominal Size
1
Nominal Length ⁄4 to 3⁄8 ⁄16 and 1⁄2
7 9
⁄16 to 3⁄4 7
⁄8 and 1 11⁄8 to 11⁄2 Over 11⁄2
+0.00 +0.00 +0.00 ... ... ...
Up to 1 in., incl.
−0.03 −0.03 −0.03 ... ... ...
+0.00 +0.00 +0.00 +0.00 +0.00 +0.00
Over 1 in. to 21⁄2 in., incl.
−0.04 −0.06 −0.08 −0.10 −0.12 −0.18
+0.00 +0.00 +0.00 +0.00 +0.00 +0.00
Over 21⁄2 in. to 4 in., incl.
−0.06 −0.08 −0.10 −0.14 −0.16 −0.20
+0.00 +0.00 +0.00 +0.00 +0.00 +0.00
Over 4 in. to 6 in., incl.
−0.10 −0.10 −0.10 −0.16 −0.18 −0.22
+0.00 +0.00 +0.00 +0.00 +0.00 +0.00
Longer than 6 in.
−0.18 −0.18 −0.18 −0.20 −0.22 −0.24
4.10 Additional Requirements (b) 0.050 in. for sizes over 1⁄2 in. through 3⁄4 in.
For additional requirements, see sections 1 and 2. (c) 0.060 in. for sizes over 3⁄4 in. through 11⁄4 in.
5.5 Reduced Diameter Body
5 LAG SCREWS Screws may be obtained in reduced diameter body.
5.1 General Where reduced diameter body is specified, the body
diameter shall be reduced to the blank diameter before
Square lag and hex lag screws are presented in
threading, and a shoulder of full body diameter under
Tables 14 and 15.
the head shall be provided.
5.2 Head Taper
5.6 Thread
Maximum width across flats and corners shall not
be exceeded. No transverse section through the head Dimensions for lag screw threads are contained in
between 25% and 75% of actual head height, as mea- Table 16.
sured from the bearing surface, shall be less than the
5.7 Thread Length
minimum width across flats and corners. (This is not
applicable to askew head bolts.) The minimum thread length shall be equal to one-
half of the nominal screw length +0.50 in., or 6 in., which-
5.3 Bearing Surface ever is shorter. Screws too short for the formula thread
A die seam across the bearing surface is permissible. length shall be threaded as close to the head or shoulder
Bearing surface shall be perpendicular to the axis of the as practicable.
body within a tolerance of 3 deg for 1 in. size and smaller
5.8 Material
and 2 deg for sizes larger than 1 in. Angularity measure-
ment shall be taken at a location to avoid interference Unless otherwise specified, steel screws shall conform
from a die seam. When specified by the purchaser, the to the low carbon steel chemical requirements only in
die seam shall be removed. Upon completion of the ASTM A 307, Grade A. When stainless steel is specified,
machining, all dimensions and geometric requirements screws shall conform to the chemical requirements only
specified for the bearing surface and head shall be met. of Group ASTM F 593, Group 1, Condition CW (304).
When a nonferrous material is specified, screws shall
5.4 Body Diameter conform to the chemical requirements only of
Any swell or fin under the head or any die seam on ASTM F 468.
the body shall not exceed the basic bolt diameter by
more than the following: 5.9 Additional Requirements
(a) 0.030 in. for sizes up through 1⁄2 in. For additional requirements, see sections 1 and 2.
20
标准分享网 www.bzfxw.com 免费下载
ASME B18.2.1-2010
Table 14 Dimensions of Square Lag Screws
Configuration (see para. 2.1.1)
Identification (see para. 2.11.1) See para. 5.3 A
G H H
S 60 deg 60 deg
A
approx. approx.
E E
F Gimlet point
R R Cone point
See para. 5.7
Screw With Reduced
See para. 2.1.4 A Diameter Body 25 deg
approx. L
Body or
Shoulder
Diameter, E Minimum
(See Paras. 5.4 Width Across Flats, F Width Across Radius of
Nominal Size or Shoulder
Basic Product and 5.5) (See Para. 2.1.2) Corners, G Head Height, H Fillet, R
Length, S
Diameter Max. Min. Basic Max. Min. Max. Min. Basic Max. Min. (See Para. 5.5) Max. Min.
9 1
No. 10 0.1900 0.199 0.178 ⁄32 0.281 0.271 0.398 0.372 ⁄8 0.140 0.110 0.094 0.03 0.01
1 3 11
⁄4 0.2500 0.260 0.237 ⁄8 0.375 0.362 0.530 0.498 ⁄64 0.188 0.156 0.094 0.03 0.01
5 1 13
⁄16 0.3125 0.324 0.298 ⁄2 0.500 0.484 0.707 0.665 ⁄64 0.220 0.186 0.125 0.03 0.01
3 9 1
⁄8 0.3750 0.388 0.360 ⁄16 0.562 0.544 0.795 0.747 ⁄4 0.268 0.232 0.125 0.03 0.01
7 5 19
⁄16 0.4375 0.452 0.421 ⁄8 0.625 0.603 0.884 0.828 ⁄64 0.316 0.278 0.156 0.03 0.01
1 3 21
⁄2 0.5000 0.515 0.482 ⁄4 0.750 0.725 1.061 0.995 ⁄64 0.348 0.308 0.156 0.03 0.01
5 15 27
⁄8 0.6250 0.642 0.605 ⁄16 0.938 0.906 1.326 1.244 ⁄64 0.444 0.400 0.312 0.06 0.02
3
⁄4 0.7500 0.768 0.729 11⁄8 1.125 1.088 1.591 1.494 1
⁄2 0.524 0.476 0.375 0.06 0.02
7
⁄8 0.8750 0.895 0.852 15⁄16 1.312 1.269 1.856 1.742 19
⁄32 0.620 0.568 0.375 0.06 0.02
1 1.0000 1.022 0.976 11⁄2 1.500 1.450 2.121 1.991 21
⁄32 0.684 0.628 0.625 0.09 0.03
11⁄8 1.1250 1.149 1.098 111⁄16 1.688 1.631 2.386 2.239 3
⁄4 0.780 0.720 0.625 0.09 0.03
11⁄4 1.2500 1.277 1.223 17⁄8 1.875 1.812 2.652 2.489 27
⁄32 0.876 0.812 0.625 0.09 0.03
GENERAL NOTE: Refer to section 5 for further information on lag screws.
21
ASME B18.2.1-2010
Table 15 Dimensions of Hex Lag Screws
See para. 2.1.4 A See para. 5.3 A
F H H
S 60 deg 60 deg
A
approx. approx.
G E E
R R Gimlet point Cone point
Configuration (see para. 2.1.1) Screw With Reduced See para. 5.7
Identification (see para. 2.11.1) Diameter Body +0
30 deg L
–15
Body or
Shoulder
Diameter, E
Minimum
Nominal Size or (See Paras. 5.4 Width Across Flats, F Width Across Shoulder Radius of
Basic Product and 5.5) (See Para. 2.1.2) Corners, G Head Height, H Length, S Fillet, R
Diameter Max. Min. Basic Max. Min. Max. Min. Basic Max. Min. (See Para. 5.5) Max. Min.
9 1
No. 10 0.1900 0.199 0.178 ⁄32 0.281 0.271 0.323 0.309 ⁄8 0.140 0.110 0.094 0.03 0.01
1 7 11
⁄4 0.2500 0.260 0.237 ⁄16 0.438 0.425 0.505 0.484 ⁄64 0.188 0.150 0.094 0.03 0.01
5 1 7
⁄16 0.3125 0.324 0.298 ⁄2 0.500 0.484 0.577 0.552 ⁄32 0.235 0.195 0.125 0.03 0.01
3 9 1
⁄8 0.3750 0.388 0.360 ⁄16 0.562 0.544 0.650 0.620 ⁄4 0.268 0.226 0.125 0.03 0.01
7 5 19
⁄16 0.4375 0.452 0.421 ⁄8 0.625 0.603 0.722 0.687 ⁄64 0.316 0.272 0.156 0.03 0.01
1 3 11
⁄2 0.5000 0.515 0.482 ⁄4 0.750 0.725 0.866 0.826 ⁄32 0.364 0.302 0.156 0.03 0.01
5 15 27
⁄8 0.6250 0.642 0.605 ⁄16 0.938 0.906 1.083 1.033 ⁄64 0.444 0.378 0.312 0.06 0.02
3
⁄4 0.7500 0.768 0.729 11⁄8 1.125 1.088 1.299 1.240 1
⁄2 0.524 0.455 0.375 0.06 0.02
7
⁄8 0.8750 0.895 0.852 15⁄16 1.312 1.269 1.516 1.447 37
⁄64 0.604 0.531 0.375 0.06 0.02
1 1.0000 1.022 0.976 11⁄2 1.500 1.450 1.732 1.653 43
⁄64 0.700 0.591 0.625 0.09 0.03
11⁄8 1.1250 1.149 1.098 111⁄16 1.688 1.631 1.949 1.859 3
⁄4 0.780 0.658 0.625 0.09 0.03
11⁄4 1.2500 1.277 1.223 17⁄8 1.875 1.812 2.165 2.066 27
⁄32 0.876 0.749 0.625 0.09 0.03
GENERAL NOTE: Refer to section 5 for further information on lag screws.
Table 16 Dimensions of Lag Screw Threads
Nominal Size or Basic Threads Major Diameter Root Diameter Length Tolerance
Product Diameter per Inch Max. Min. Max. Min. ≤ 6 in. > 6 in.
No. 10 0.190 11 0.199 0.178 0.122 0.107 ±0.12 ±0.25
1
⁄4 0.250 10 0.260 0.237 0.177 0.160 ±0.12 ±0.25
5
⁄16 0.312 9 0.324 0.298 0.228 0.210 ±0.12 ±0.25
3
⁄8 0.375 7 0.388 0.360 0.268 0.250 ±0.12 ±0.25
1
⁄2 0.500 6 0.515 0.482 0.374 0.354 ±0.12 ±0.25
5
⁄8 0.625 5 0.642 0.605 0.473 0.453 ±0.25 ±0.25
3
⁄4 0.750 41⁄2 0.768 0.729 0.582 0.562 ±0.25 ±0.25
7
⁄8 0.875 4 0.895 0.852 0.686 0.665 ±0.25 ±0.25
1 1.000 31⁄2 1.022 0.976 0.784 0.760 ±0.25 ±0.25
11⁄8 1.125 31⁄4 1.149 1.100 0.892 0.867 ±0.25 ±0.25
11⁄4 1.250 31⁄4 1.277 1.223 1.017 0.987 ±0.25 ±0.25
GENERAL NOTE: Pilot hole sizes can be established by starting with a fractional drill size closest to the root diameter. Hard woods require
a larger pilot hole size than softer woods.
22
标准分享网 www.bzfxw.com 免费下载
ASME B18.2.1-2010
MANDATORY APPENDIX I
GAGE AND GAGING PRACTICES FOR EXTERNAL LOBED HEAD
DRIVE SYSTEM
I-1 SCOPE I-4 INSPECTING EXTERNAL CONFIGURATION
This Standard outlines the inspection method and The gaging for the external drive is a single gage
acceptance criteria for external fastener drive configura-
consisting of a GO on one end and a NO-GO on the
tions having six lobes.
other. These fixed limit gages shall conform to the speci-
fications in Table I-1 (see Fig. I-2).
I-2 DEFINITIONS
drive system configuration: a gear-like shape comprising
six equally spaced external radii connected by six I-5 ACCEPTANCE CRITERIA
equally spaced internal radii.
external drive: has the configuration formed on the The external drive is acceptable only if it conforms to
extreme end of the product’s head or shank. The configu- all three of the following inspections (see Fig. I-3):
ration has an engagement length, Y, and a maximum (a) Configuration — Outside Diameter. The product
fallaway height. The top outer edge of the configuration must freely enter the gage GO hole.
may be chamfered or rounded (see Fig. I-1). The gage (b) Fallaway. Insert the product into the NO-GO
defined in this Standard inspects those characteristics. (Fallaway) hole from the bottom of the gage. The product
may enter the NO-GO hole but must not protrude above
I-3 GAGE TYPE the top surface of the gage.
(c) Engagement Length. Insert the product into the
Gages shall be manufactured of tool steel hardened
lobed portion of the gage from the bottom. The product
and tempered to a minimum of Rockwell HRC 61.
must enter the lobed portion of the gage and protrude
I-3.1 GO Gages above the step in the gage. Insert each product three
The external GO gages inspect the acceptability of the times rotating the product each time to inspect all three
configuration and its height of the external drive. pairs of interior lobes on the product. All three positions
must conform.
I-3.2 NO-GO Gages Screws with heavy coatings that fail to meet the gaging
The external NO-GO gages determine the amount of requirements shall be stripped of the coating and
nonconforming configuration (fallaway) present on the inspected for acceptance in the plain (uncoated)
external drive. condition.
23
ASME B18.2.1-2010
Fig. I-1 External Lobe Head Configuration
H
C Fallaway
[Note (1)] K
G [Note (1)]
B A
[Note (1)]
NOTE:
(1) Fallaway, G, A, B, and other configuration characteristic acceptance shall be determined based on
the gage and gaging practice in Mandatory Appendix I.
Table I-1 External Lobed Head Gage
A B R AA K T
Drive 0.0003 0.0003 0.0000 H L W J
0.0003 0.0050 0.0000
Size −0.0001 −0.0003 −0.0002 Ref. Ref. −0.0001 Ref. Ref. −0.0000 −0.0010
E8 0.2900 0.2070 0.0635 0.2500 3.0000 0.2710 0.7500 0.4571 0.0570 0.0630
E10 0.3650 0.2660 0.0922 0.2500 3.0000 0.3480 1.0000 0.6189 0.0720 0.0790
E12 0.4340 0.3100 0.0945 0.2500 3.0000 0.4060 1.0000 0.6799 0.0900 0.1000
E14 0.5020 0.3610 0.1035 0.3750 3.0000 0.4670 1.0000 0.7598 0.1190 0.1060
E16 0.5740 0.4110 0.1185 0.3750 4.0000 0.5340 1.0000 0.8531 0.1280 0.1170
E18 0.6490 0.4660 0.1325 0.3750 4.0000 0.6020 1.5000 0.9469 0.1470 0.1440
E20 0.7190 0.5180 0.1430 0.3750 4.0000 0.6650 1.5000 1.0630 0.1610 0.1620
E24 0.8640 0.6180 0.1860 0.3750 4.0000 0.8030 1.5000 1.3382 0.2220 0.2110
E28 1.0040 0.7190 0.2150 0.3750 6.0000 0.9340 2.0000 1.5230 0.2730 0.2490
E32 1.1420 0.8390 0.2250 0.3750 6.0000 1.0500 2.0000 1.6110 0.3160 0.2710
E36 1.2840 0.9430 0.2540 0.5000 8.0000 1.1800 4.0000 1.8550 0.3620 0.3120
E40 1.4240 1.0460 0.2820 0.5000 8.0000 1.3090 4.0000 2.0990 0.4130 0.3500
E44 1.5660 1.1510 0.3100 0.5000 8.0000 1.4410 4.0000 2.2250 0.4550 0.3910
GENERAL NOTE: Material: tool steel HRC 58-62.
24
标准分享网 www.bzfxw.com 免费下载
ASME B18.2.1-2010
Fig. I-2 External Lobed Head Gage
L
R 0.5L
H
0.125 ref. R 1/ min. 1/ min.
8 8
Lobe Head Size XX
W B
GO Fallaway
J A AA
K T
Fig. I-3 External Lobed Head Inspection
Lobe Head Size XX
GO Fallaway
Minimum Maximum Maximum
lobe height over lobes fallaway
25
ASME B18.2.1-2010
NONMANDATORY APPENDIX A
FORMULAS FOR BOLT AND SCREW HEAD DIMENSIONS
See Table A-1 for formulas for bolt and screw head
dimensions.
26
标准分享网 www.bzfxw.com 免费下载
ASME B18.2.1-2010
Table A-1 Head Formula
Width Across Flats Head Height
Tolerance Tolerance (Plus Width Across Comers
Product Size Basic [Note (1)] (Minus) Basic [Note (2)] or Minus) Limits
Square bolt and No. 10 F p 1.5000D − 0.050D H p 0.667D 0.016D + 0.012 Max. G p 1.4142 (Max. F )
square lag 0.004
1
screw ⁄4–11⁄2 F p 1.5000D 0.050D H p 0.667D 0.016D + 0.012 Min. G p 1.373 (Min. F )
1
⁄4 F p 1.500D + 0.050D H p 0.625D + 0.016 0.016D + 0.012
0.062 [Note (3)]
5
⁄16–7⁄16 F p 1.500D 0.050D H p 0.625D + 0.016 0.016D + 0.012
[Note (3)]
1
⁄2–7⁄8 F p 1.500D 0.050D H p 0.625D + 0.031 0.016D + 0.012
Hex bolt and hex [Note (3)] Max. G p 1.1547 (Max. F )
lag screw 1–17⁄8 F p 1.500D 0.050D H p 0.625D + 0.062 0.016D + 0.012 Min. G p 1.14 (Min. F )
[Note (3)]
2–33⁄4 F p 1.500D 0.050D H p 0.625D + 0.125 0.016D + 0.012
[Note (3)]
4 F p 1.500D 0.050D H p 0.625D + 0.188 0.016D + 0.012
[Note (3)]
1
⁄4 F p 1.500D + 0.015D + H p 0.625D 0.015D + 0.003
0.062 0.006
5
⁄16–5⁄8 F p 1.500D 0.015D + H p 0.625D 0.015D + 0.003
0.006
3
⁄4–7⁄8 F p 1.500D 0.025D + H p 0.625D 0.015D + 0.003
Hex cap screw 0.006 Max. G p 1.1547 (Max. F )
1 F p 1.500D 0.025D + H p 0.625D − 0.016 0.015D + 0.003 Min. G p 1.14 (Min. F )
0.006
11⁄8–17⁄8 F p 1.500D 0.050D H p 0.625D − 0.016 0.016D + 0.012
2–23⁄4 F p 1.500D 0.050D H p 0.625D − 0.031 0.016D + 0.012
3–6 F p 1.500D 0.050D H p 0.625D 0.016D + 0.012
3
⁄8–3 F p 1.500D + 0.050D Same as for hex bolt Same as for hex Max. G p 1.1547 (Max. F )
Heavy hex bolt
0.125 [Note (4)] bolt [Note (4)] Min. G p 1.14 (Min. F )
3
⁄8–6 F p 1.500D + 0.050D Same as for hex cap Same as for hex
Max. G p 1.1547 (Max. F )
Heavy hex screw 0.125 screw [Note (5)] cap screw
Min. G p 1.14 (Min. F )
[Note (5)]
NOTES:
(1) Adjusted to sixteenths.
(2) Size to 1 in. adjusted to sixty-fourths, 11⁄8 in. through 21⁄2 in. sizes adjusted upward to thirty-seconds, and 23⁄4 in. through 4 in. sizes
adjusted upward to sixteenths.
(3) Plus tolerance only. Minus tolerance adjusted so that minimum head height is equal to minimum head height of corresponding hex
cap screw. For sizes 31⁄4 in. through 4 in., minimum head height is equal to 0.625D − (0.016D + 0.012).
(4) In 1960, head heights for heavy hex bolts were reduced. Prior to 1960, head heights were 0.750D + 0.062 in. Plus tolerance was
0.016D + 0.012 in. Minus tolerance was adjusted so that minimum head height was the same as minimum head height of heavy hex
screw.
(5) In 1960, head heights for heavy hex screws were reduced. Prior to 1960, head heights were 0.750D + 0.31 in. for sizes 1⁄2 in. through
7
⁄8 in., 0.750D for sizes 1 in. through 17⁄8 in., and 0.750D − 0.062 in. for sizes 2 in. through 3 in. Tolerance on head height for all
sizes was ±0.016D + 0.012 in., where
D p basic (nominal) bolt or screw diameter
F p width across flats
G p width across corner
27
ASME B18.2.1-2010
NONMANDATORY APPENDIX B
WEIGHT IN POUNDS OF 100 STEEL HEX CAP SCREWS FOR
GIVEN DIAMETER/LENGTH COMBINATION
See Table B-1.
Table B-1 Weights
Lengths,
Multiple of Diameter
1 1 3
Diameter ⁄4 ⁄2 ⁄4 1
3D 1.44 11.59 38.23 90.96
4D 1.74 14.35 47.56 113.04
5D 2.08 17.11 56.89 135.12
6D 2.43 19.87 66.22 157.20
7D 2.77 22.63 75.55 179.30
8D 3.12 25.39 84.88 201.30
28
标准分享网 www.bzfxw.com 免费下载
ASME B18.2.1-2010
NONMANDATORY APPENDIX C
COUNTERSUNK CENTER HOLES
Plain or bell-type, 60-deg combined drills and counter-
sinks may be used to produce countersunk center holes
in the points for support of long parts under the provi-
sions of para. 2.7 (see Tables C-1 and C-2 and
ASME B94.11M-1993).
Table C-1 Maximum Allowable Countersunk Center Hole Size by Drill Designation Number for Various
Basic Bolt or Screw Diameters
Plain-Type Number Bell-Type Number
Bolt or Screw Diam. 1 2 3 4 5 6 7 8 11 12 13 14 15 16 17 18
3 3
⁄16 through ⁄8 X ... ... ... ... ... ... ... X ... ... ... ... ... ... ...
Over 3⁄8 through 5⁄8 ... X ... ... ... ... ... ... ... X ... ... ... ... ... ...
Over 5⁄8 through 7⁄8 ... ... X ... ... ... ... ... ... ... X ... ... ... ... ...
Over 7⁄8 through 13⁄8 ... ... ... X ... ... ... ... ... ... ... X ... ... ... ...
Over 13⁄8 through 2 ... ... ... ... X ... ... ... ... ... ... ... X ... ... ...
Over 2 through 3 ... ... ... ... ... X ... ... ... ... ... ... ... X ... ...
Over 3 through 5 ... ... ... ... ... ... X ... ... ... ... ... ... ... X ...
Over 5 through 8 ... ... ... ... ... ... ... X ... ... ... ... ... ... ... X
Table C-2 Maximum Allowable Center Hole
Depth
Drill Size Depth, Max.
1 0.101
2 0.149
3 0.250
4 0.297
5 0.422
6 0.485
7 0.594
8 0.704
[Notes (1), (2)] ...
NOTES:
(1) Based on included angle of 60 deg. Larger angles are not
recommended.
(2) Drill length tolerances of +0.008 in. through size 2 and
+0.016 in. for sizes 3 through 8.
29
INTENTIONALLY LEFT BLANK
30
标准分享网 www.bzfxw.com 免费下载
B18 AMERICAN NATIONAL STANDARDS FOR BOLTS, NUTS, RIVETS, SCREWS,
WASHERS, AND SIMILAR FASTENERS
Small Solid Rivets . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B18.1.1-1972 (R2006)
Large Rivets . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B18.1.2-1972 (R2006)
Metric Small Solid Rivets . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .B18.1.3M-1983 (R2006)
Square, Hex, Heavy Hex, and Askew Head Bolts and Hex, Heavy Hex, Hex Flange,
Lobed Head, and Lag Screws (Inch Series) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B18.2.1-2010
Square and Hex Nuts (Inch Series) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B18.2.2-1987 (R2005)
Metric Hex Cap Screws . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B18.2.3.1M-1999 (R2005)
Metric Formed Hex Screws . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B18.2.3.2M-2005
Metric Heavy Hex Screws . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B18.2.3.3M-1979 (R2001)
Metric Hex Flange Screws . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B18.2.3.4M-2001 (R2006)
Metric Hex Bolts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B18.2.3.5M-1979 (R2006)
Metric Heavy Hex Bolts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B18.2.3.6M-1979 (R2006)
Metric Heavy Hex Structural Bolts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B18.2.3.7M-1979 (R2006)
Metric Hex Lag Screws . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B18.2.3.8M-1981 (R2005)
Metric Heavy Hex Flange Screws . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B18.2.3.9M-2001 (R2006)
Metric Hex Nuts, Style 1 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B18.2.4.1M-2002 (R2007)
Metric Hex Nuts, Style 2 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B18.2.4.2M-2005
Metric Slotted Hex Nuts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B18.2.4.3M-1979 (R2006)
Metric Hex Flange Nuts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B18.2.4.4M-1982 (R2005)
Metric Hex Jam Nuts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B18.2.4.5M-2008
Metric Heavy Hex Nuts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B18.2.4.6M-2010
Metric Flanged 12-Point Head Screws . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B18.2.5M-2009
Fasteners for Use in Structural Applications . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B18.2.6-2010
Metric 12-Spline Flange Screws . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B18.2.7.1M-2002 (R2007)
Clearance Holes for Bolt, Screws, and Studs. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B18.2.8-1999 (R2010)
Straightness Gage and Gaging for Bolts and Screws . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B18.2.9-2010
Socket Cap, Shoulder, and Set Screws, Hex and Spline Keys (Inch Series) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .B18.3-2003 (R2008)
Socket Head Cap Screws (Metric Series) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .B18.3.1M-1986 (R2008)
Metric Series Hexagon Keys and Bits. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .B18.3.2M-1979 (R2008)
Hexagon Socket Head Shoulder Screws (Metric Series) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .B18.3.3M-1986 (R2008)
Hexagon Socket Button Head Cap Screws (Metric Series) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .B18.3.4M-1986 (R2008)
Hexagon Socket Flat Countersunk Head Cap Screws (Metric Series) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .B18.3.5M-1986 (R2008)
Metric Series Socket Set Screws . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .B18.3.6M-1986 (R2008)
Round Head Bolts (Inch Series) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .B18.5-1990 (R2003)
Metric Round Head Short Square Neck Bolts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B18.5.2.1M-2006
Metric Round Head Square Neck Bolts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B18.5.2.2M-1982 (R2005)
Wood Screws (Inch Series) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B18.6.1-1981 (R2008)
Slotted Head Cap Screws, Square Head Set Screws, and Slotted Headless Set Screws (Inch Series) . . . . . . . . . . . . . . . B18.6.2-1998 (R2010)
Machine Screws and Machine Screw Nuts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B18.6.3-2003 (R2008)
Thread Forming and Thread Cutting Tapping Screws and Metallic Drive Screws (Inch Series). . . . . . . . . . . . . . . . . . . . . . . . . . . . . B18.6.4-1998
Metric Thread-Forming and Thread-Cutting Tapping Screws . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .B18.6.5M-2000 (R2005)
Metric Machine Screws . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .B18.6.7M-1999 (R2010)
Wing Nuts (Inch Series). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B18.6.9-2010
General Purpose Semi-Tubular Rivets, Full Tubular Rivets, Split Rivets and Rivet Caps . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B18.7-2007
Metric General Purpose Semi-Tubular Rivets . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B18.7.1M-2007
Clevis Pins and Cotter Pins (Inch Series) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B18.8.1-1994 (R2000)
Taper Pins, Dowel Pins, Straight Pins, Grooved Pins, and Spring Pins (Inch Series) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B18.8.2-2000
Spring Pins: Coiled Type, Spring Pins: Slotted, Machine Dowel Pins: Hardened Ground,
and Grooved Pins (Metric Series) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B18.8.100M-2000 (R2005)
Cotter Pins, Headless Clevis Pins, and Headed Clevis Pins (Metric Series) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B18.8.200M-2000 (R2005)
Plow Bolts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B18.9-2007
Track Bolts and Nuts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .B18.10-1982 (R2005)
Miniature Screws . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .B18.11-1961 (R2005)
Glossary of Terms for Mechanical Fasteners . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .B18.12-2001 (R2006)
Screw and Washer Assemblies — Sems (Inch Series). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .B18.13-1996 (R2008)
Screw and Washer Assemblies: Sems (Metric Series) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B18.13.1M-1998 (R2003)
Forged Eyebolts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .B18.15-1985 (R2008)
Prevailing-Torque Type Steel Metric Hex Nuts and Hex Flange Nuts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B18.16M-2004 (R2009)
Serrated Hex Flange Locknuts 90,000 psi (Inch Series) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B18.16.4-2008
Nylon Insert Locknuts (Inch Series) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B18.16.6-2008
Inspection and Quality Assurance for General Purpose Fasteners . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B18.18.1-2007
Inspection and Quality Assurance for High-Volume Machine Assembly Fasteners . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B18.18.2-2009
Inspection and Quality Assurance for Special Purpose Fasteners . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B18.18.3M-1987 (R2005)
Inspection and Quality Assurance for Fasteners for Highly Specialized Engineered Applications . . . . . . . . . . . . . . . . B18.18.4M-1987 (R2005)
Inspection and Quality Assurance Plan Requiring In-Process Inspection and Controls. . . . . . . . . . . . . . . . . . . . . . . . . B18.18.5M-1998 (R2009)
Quality Assurance Plan for Fasteners Produced in a Third Party Accreditation System . . . . . . . . . . . . . . . . . . . . . . . . B18.18.6M-1998 (R2009)
Quality Assurance Plan for Fasteners Produced in a Customer Approved Control Plan . . . . . . . . . . . . . . . . . . . . . . . . B18.18.7M-1998 (R2009)
Washers: Helical Spring-Lock, Tooth Lock, and Plain Washers (Inch Series) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B18.21.1-2009
Lock Washers (Metric Series) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B18.21.2M-1999 (R2005)
Double Coil Helical Spring Lock Washers for Wood Structures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B18.21.3-2008
Metric Plain Washers. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B18.22M-1981 (R2010)
Part Identifying Number (PIN) Code System for B18 Fastener Products . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B18.24-2004
Square and Rectangular Keys and Keyways. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B18.25.1M-1996 (R2008)
Woodruff Keys and Keyways . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B18.25.2M-1996 (R2008)
Square and Rectangular Keys and Keyways: Width Tolerances and
Deviations Greater Than Basic Size . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B18.25.3M-1998 (R2008)
Tapered and Reduced Cross Section Retaining Rings (Inch Series) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .B18.27-1998 (R2005)
Helical Coil Screw Thread Inserts — Free Running and Screw Locking (Inch Series). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B18.29.1-2010
Helical Coil Screw Thread Inserts: Free Running and Screw Locking (Metric Series) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .B18.29.2M-2005
Open-End Blind Rivets With Break Mandrels (Metric Series) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B18.30.1M-2000 (R2005)
Metric Continuous and Double-End Studs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .B18.31.1M-2008
Continuous and Double-End Studs. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B18.31.2-2008
Threaded Rods (Inch Series). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B18.31.3-2009
Threaded Rod (Metric Series) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .B18.31.4M-2009
The ASME Publications Catalog shows a complete list of all the Standards published by the Society. For a complimentary catalog, or the latest
information about our publications, call 1-800-THE-ASME (1-800-843-2763).
标准分享网 www.bzfxw.com 免费下载
INTENTIONALLY LEFT BLANK
ASME B18.2.1-2010
M04410
标准分享网 www.bzfxw.com 免费下载
FF-S-92B
August 27, 1974
SUPERSEDING
FF-S-92a
January 26, 1965
FEDERAL SPECIFICATION
SCREW, MACHINE: SLOTTED, CROSS-RECESSED HEXAGON HEAD
This specification was approved by the Commissioner, Federal Supply Service,
General Services Administration, for the use of all Federal Agencies.
1. SCOPE AND CLASSIFICATION
1.1 Scope. This specification covers slotted, cross-recessed and
hexagon head machine screws.
1.2 Classification.
1.2.1 Type and style. Machine screws shall be of the following types
and styles (see 6.2).
Type I - Slotted (see fig. 1)
Style 1s - Round head Style 6s - Oval bead, 82 deg.
Style 2s - Flat head, 82 deg. Style 7s - Truss head
Style 3s - Flat head, 100 deg. Style 8s - Binding head
Style 4s - Fillister head Style 9s - Pan head
Style 5s - Fillister head, Style 10s - Hexagon head
drilled
Type II - Hexagon, Plain (see fig. 1)
Style 10p - Hexagon
Type III - Cross-Recessed, Recess Designs I and 11 (see fig. 2).
Style 1c - Round head Style 6c - Oval head, 82 deg.
Style 2c - Flat head, 82 deg. Style 7c - Truss head
Style 3c - Flat head, 100 deg. Style 8c - Binding head
Style 4c - Fillister head Style 9c - Pan head
NOTE: Use of cross-recess design II is not recommended.
FSC 5305
FF-S-92B
1.2.2 Size. Machine screws shall be classified according to size by
the nominal diameter of the body.
2. APPLICABLE DOCUMENTS
2.1 The following documents, of the issue In effect on date of invi-
tation for bids or request for proposal, form a part of this, specification
to the extent specified herein.
Federal Specifications
QQ-A-200/3 - Aluminum Allay Bar, Rod, Shapes, Tube and Wire, Extruded,
2024.
QQ-A-225/6 - Aluminum Alloy Bar, Rod and Wire; Rolled, Drawn or Cold
Finished, 2024.
QQ-B-613 - Brass, Leaded and Non-Leaded; Flat Products (Plate, Bar,
Sheet and Strip).
QQ-B-626 - Brass, Leaded and Non-Leaded: Rod, Shapes, Forgings and
Flat Products and Finished Edges (Bar and Strip).
QQ-B-637 - Brass, Naval: Rod, Wire, Shapes, Forgings and Flat
Products with Finished Edges (Bar, Flat Wire and Strip).
QQ-B-728 - Bronze, Manganese: Rod, Shapes, Forgings and Flat Products
(Flat Wire, Strip, Sheet, Bar and Plate).
QQ-B-750 - Bronze, Phosphor; Bar, Plate, Rod, Sheet, Strip, Flat Wire
and Structural and Special Shaped Sections.
QQ-C-586 - Copper-Nickel-Zinc Alloy; Rod, Shapes and Flat Products
with Finished Edges (Flat Wire, Strip and Bar).
QQ-C-591 - Copper-Silicon. Copper-Zinc-Silicon and Copper-Nickel-
Silicon Alloys: Rod, Wire, Shapes, Forgings and Flat
Products (Flat Wire, Strip, Sheet, Bar and Plate).
QQ-N-281 - Nickel-Copper Alloy: Bar, Plate, Rod, Sheet, Strip, Wire,
Forgings and Structural and Special Shaped Sections.
QQ-N-286 - Nickel-Copper-Aluminum Alloy, Wrought.
QQ-P-35 - Passivation Treatments For Corrosion-Resisting Steel.
QQ-P-416 - Plating, Cadmium (Electrodeposited).
QQ-S-634 - Steel Bar, Carbon, Cold Finished (Standard Quality).
QQ-S-637 - Steel Bar, Carbon, Cold Finished (Standard Quality, Free
Machining).
QQ-S-763 - Steel Bars, Wire, Shapes and Forgings, Corrosion-Resisting.
QQ-W-321 - Wire, Copper Alloy.
QQ-Z-325 - Zinc Coating, Electrodeposited, Requirements For.
PPP-H-1581 - Hardware (Fasteners and Related Items), Packaging and
Packing For Shipment and Storage of.
Federal Standards:
Fed. Std. No. 66 - Steel: Chemical Composition and Hardenabilty.
Fed. Std. No. 123 - Marking For Domestic Shipment (Civil Agencies).
Fed. Test Method Std. No. 151 - Metals; Test Methods
2
(Activities outside the Federal Government may obtain copies of Federal
Specifications and Standards as outlined under General Information in the
Index of Federal Specifications and Standards and at the prices indicated in
the Index. The Index, which includes cumulative monthly supplements as issued,
is for sale or a subscription basis by the Superintendent of Documents, U.S.
Government Printing Office, Washington, D.C. 20402.
(Single copies of specification and other product specifications
required by activities outside the Federal Government for bidding purposes
are available without charge at the General Services Administration Regional
Offices in Boston, New York, Washington, DC, Atlanta, Chicago, Kansas City,
MO, Fort Worth, Denver, San Francisco, Los Angeles, and Seattle, WA.
(Federal Government activities may obtain copies of Federal
Specifications and Standards and the Index of Federal Specifications and
Standards from established distribution points in their agencies.)
Military Specifications:
MIL-F-495 - Finish, Chemical, Black, For Copper Alloys.
MIL-A-562 - Anodic Coatings, For Aluminum and Aluminum Alloys.
MIL-C-13924 - Coating, Oxide, Black, For Ferrous Metals.
MIL-P-16232 - Phosphate Coatings, Heavy, Manganese or Zinc Base (For
Ferrous Metals).
MIL-1-17214 - Indicator, Permeability; Low-MU (Go-No Go).
MIL-M-20693 - Molding Plastic, Polyamide (Nylon), Rigid.
MIL-B-24059 - Bronze, Nickel Aluminum: Rod, Flat Products with
Finished Edges, Shapes and Forgings.
MIL-C-81562 - Coatings, Cadmium, Tin-Cadmium and Zinc (Mechanically
Deposited).
Military Standards:
MIL-STD-105 - Sampling Procedures and Tables for Inspection by
Attributes.
MIL-STD-129 - Marking for Shipment and Storage.
MIL-STD-1312 - Fasteners, Test Methods.
MS18116 - Bolt, Bolt-Stud, Stud, Stud-Bolt; Nickel-Copper-
Aluminum Alloy; Special Requirements.
MS18211 - Screw, Machine - 80 deg. and 100 deg., Flat Countersunk
Head, Slotted, Plastic (Nylon).
MS18212 - Screw, Machine - Pan Head, Slotted, Plastic (Nylon),
UNC-2A.
(Copies of specifications, standards, drawings and publications required
by suppliers in connection with specific procurement functions should be
obtained from the procuring activity or as directed by the contracting
officer.)
3
FF-S-92B
2.2 Other publications. The following documents form a part of this
specification to the extent specified herein. Unless otherwise indicated,
the issue in effect on date of invitation for bids or request for proposal
shall apply.
National Bureau of Standards Handbook:
H28, Part 17 - Screw-Thread Standards For Federal Services.
(Application for copies should be addressed to the Superintendent of
Documents, U.S. Government Printing Office, Washington, D.C. 20402.)
American National Standards Institute (ANSI) Standard:
ANSI B18.6.3 - Machine Screws and Machine Screw Nuts.
(Application for copies should be addressed to the American National
Standards Institute, 1430 Broadway, New York, N.Y. 10018.)
3. REQUIREMENTS
3.1 Materials. UNless otherwise specified (see 6.2), screws shall be
made of the materials specified in 3.1.1 through 3.1.9.
3.1.1 Carbon steel. Carbon steel shall be in accordance with QQ-S-634,
QQ-S-637 or Fed. Std. No. 66. Capped or rimmed steels shall be permitted.
The minimum ultimate tensile strength shall be 60,000 PSI.
3.1.2 Corrosion-resisting steel. Corrosion-resisting steel shall be
the 300 series in accordance with QQ-S-763 and Fed. Std. No. 66 or equal to
or interchangeable with 16-18 or 18-8 chromium nickel alloy steel (developed
for cold heading). The minimum ultimate tensile strength shall be 80,000 PSI.
Straight chromium alloys of the 400 series shall not be used.
3.1.2.1 Magnetic permeability. Corrosion-resisting steel screws shall
have a magnetic permeability of 2.0 maximum (air = 1.0) for a field strength
of H = 200 oersteds using a magnetic indicator per MIL-I-17214.
3.1.3 Brass. Brass shall be in accordance with QQ-B-613, QQ-B-626 or
QQ-W-321. The minimum ultimate tensile strength shall be 51,000 PSI.
3.1.4 Aluminum alloy. Aluminum allow, 2024, shall be in accordance
with QQ-A-200/3 or QQ-A-225/6. The minimum ultimate tensile strength shall
be 62,000 PSI.
3.1.5 Copper alloys. Copper alloys shall be in accordance with
QQ-B-637, QQ-B-728, QQ-B-750, QQ-C-586 or QQ-C-591. The mechanical
properties shall be as specified in Table II.
4
FF-S-92B
3.1.6 Nickel-copper alloy. Nickel-copper alloy shall be in accordance
with QQ-N-281, Class A. The mechanical properties shall be as specified in
Table II.
3.1.7 Nickel-copper-aluminum alloy. Nickel-copper aluminum alloy shall
be in accordance with QQ-N-286, Class A. The mechanical properties shall be
as specified in Table II.
3.1.8 Nickel-aluminum-bronze. Nickel-aluminum-bronze shall be in
accordance with MIL-B-24059. The mechanical properties shall be as specified
in Table II.
3.1.9 Plastic (nylon). Plastic (nylon) shall be in accordance with
MIL-M-20693, composition A, type 1. Plastic machine screws shall be as
specified on MS18211 and MS18212.
3.2 Protective finish. Unless otherwise specified (see 6.2), screws
shall be furnished uncoated with a naturally bright finish, not heat
treated. When finishes are specified, they shall be in accordance with the
following paragraphs.
3.2.1 Carbon steel screws.
3.2.1.1 Cadmium plating. Cadmium plating shall be in accordance with
QQ-P-416, Type II, Class 3 or MIL-C-81562, Type II, Class 3.
3.2.1.2 Zinc coating. Zinc coating shall be in accordance with
QQ-Z-325, Type II, Class 3 or MIL-C-81562, Type II, Class 3.
3.2.1.3 Phosphate coating. Phosphate coating shall be in accordance
with MIL-P-16232, Type Z, Class 2.
3.2.1.4 Embrittlement relief. Electrodeposited carbon steel screws
having a Rockwell Hardness of C40 or higher shall be subjected to an
embrittlement relief treatment conducted in accordance with the applicable
plating or coating specification.
3.2.2 Corrosion-resisting steel screws.
3.2.2.1 Passivation. Passivation treatment shall be in accordance with
QQ-P-35.
3.2.2.2 Black oxide. Black oxide coating shall be in accordance with
MIL-C-13924, Class 4.
3.2.3 Brass screws.
3.2-3.1 Black chemical. Black chemical finish shall be in accordance
with MIL-F-495.
5
FF-S-92B
3.2.4 Aluminum alloy screws.
3.2.4.1 Anodizing. Anodizing shall be in accordance with MIL-A-8625,
Type I or II, Class 1.
3.3 Dimensions. Dimensions and tolerances shall be in accordance with
the applicable Military Standard (MS) and ANSI B18.6.3.
3.4 Threads. Threads shall be Class 2A, UNC or UKF series, as speci-
fied (see 6.2), in accordance with Handbook H28. The method of forming shall
be at the manufacturer's option.
3.5 Workmanship. Screws shall be free from fins, burrs, sharp edges,
cracks and surface contamination.
4. QUALITY ASSURANCE PROVISIONS
4.1 Responsibility for inspection. Unless otherwise specified in
the contract or purchase order, the supplier is responsible for the
performance of all inspection requirements as specified herein. Except as
otherwise specified in the contract or order, the supplier any use his own or
any other facilities suitable for the performance of the inspection
requirements specified herein, unless disapproved by the Government. The
Government reserves the right to perform any of the inspections set forth in
the specification where such inspections are deemed necessary to assure
supplies and services conform to prescribed requirements.
4.2 Lot. A lot shall consist of all screws of the same material, type,
style, size, thread and protective finish, produced under the same conditions
and offered for acceptance at one time.
4.3 Sampling.
4.3.1 Sampling for examination. A random sample of screws shall be
selected from each lot in accordance with MIL-STD-105. Inspection Level I.
The Acceptable Quality Level (AQL) shall be as specified in Table I.
4.3.2 Sampling for tests. A random sample of screws shall be selected
from each lot in accordance with MIL-STD-105, Inspection Level S-1. The AQL
shall be 2.5 percent defective.
4.4 Examination. Each screw taken as specified in 4.3.1 shall be
examined to verify conformance with this specification. Examination shall be
conducted in accordance with Table I. Any screw in the sample containing one
or more defects shall be rejected, and if the number of defective screws in
any category exceeds the acceptance number for that category, lot represented
by the sample shall be rejected.
6
FF-S-92B
TABLE I. Classification of defects
Inspection
Category Defect Method
ÄÄÄÄÄÄÄÄ ÄÄÄÄÄÄ ÄÄÄÄÄÄÄÄÄÄ
Critical None defined
Major AQL = 2.5 percent defective
101 Size (1.2.2) SIE*
102 Length (3.3) SIE
103 Thread (3.4) SIE
104 Slot or recess dimensions (3.3) SIE
105 Bearing surface of flat head screws (3.3) SlE
Minor AQL = 4.0 percent defective
201 Magnetic permeability (3.1.2.1) SIE
202 Other dimensions (13.3) SIE
203 Protective finish missing or incomplete Visual
(3.2)
204 Workmanship (3.5) Visual
*SIE = Standard Inspection Equipment
4.5 Tests.
4.5.1 Tensile strength. Each screw taken as specified in 4.3.2 shall
be tensile strength tested in accordance with Test No. 8 of MIL-STD-1312 to
verify conformance with 3.1.
4.5.1.1 Screws too short to be tensile strength tested shall be
hardness tested in accordance with Test No. 6 of MIL-STD-1312. Screws shall
meet the minimum hardness requirement of the material from which they were
made.
4.5.2 Bending. When ferrous screws are of sufficient length in the
unthreaded portion to permit cold bending, each screw taken as specified in
4.3.2 shall withstand being bent 180 deg. without fracture, to a curve having
an inner radius equal to the major body diameter of the screw.
4.5.2.1 When the bending test cannot be applied, each test sample shall
withstand flattening cold to a thickness equal to one-half of its body
diameter, without cracking.
4.6 Protective finish. Examination and test of protective finishes
shall be in accordance with the applicable specification or 3.2.
4.7 Preparation for delivery. Examination and test of preparation for
delivery shall be in accordance with PPP-H-1581, to verify conformance with
Section 5.
7
FF-S-92B
4.8 Chemical analysis. The supplier shall furnish a still certificate
specifying the chemical composition of the material used in the manufacture
of the screws. When specified (see 6.2), chemical analysis shall be in
accordance with Method 11.1.2 or 112.2 of Fed. Test Method Std. No. 151. In
case of dispute, Method 112.2 shall apply.
5. PREPARATION FOR DELIVERY
5.1 Packaging and @king. Packaging shall be Level A or C and packing
shall be Level A, B or C in accordance with PPP-H-1581, as specified (see
6.2).
5.2 Marking.
5.2.1 Civil agencies. In addition to marking required by the contract
or order, all interior packages and shipping containers shall be marked in
accordance with Fed. Std. No. 123.
5.2.2 Military agencies. In addition to marking required by the
contact or order, all interior packages and shipping containers shall be
marked in accordance with MIL-STD-129.
6. NOTES
6.1 Intended use. Machine screws are intended to be used in the
assembling of parts in relation to each other, either permanently or
temporarily.
6.2 Ordering data. Purchasers should exercise any desired options
offered herein, and procurement documents should specify the following:
(a) Title, number and date of this specification.
(b) Type, style and size (1.2).
(c) Material (3.1).
(d) Protective finish, when required (3.2).
(e) Thread series (3.4).
(f) Chemical analysis, when required
(g) Selection of applicable level of packaging and packing (5.1).
(h) Applicable MS part number.
6.3 Military procurement. Items procured under this specification
for military use are to be limited, wherever possible, to the variety shown
on the applicable Military Standard (MS).
6.4 Preferred screws. It is recommended that pan head screws be used
in lieu of round, truss or binding head screws and that cross-recessed drive
(design I) be used in lieu of slotted drive.
8
FF-S-92B
9
Downloaded from http://www.everyspec.com
FF-S-92B
10
FF-S-92B
11
FF-S-92B
Military Custodians: Preparing Activity:
Army - WC Army - WC
Navy - None
Air Force - 82 Project No. 5305-1221
Reviewer Activities: Civil Agencies Interest:
Army - AV, EA, MU GSA-FSS
Navy - None COM-NBS
Air Force - None
DSA - IS
User Activities:
Army - AT, CE, ME, PA, WT
Navy - AS, MC, OS, SH, YD
Air Force - None
U. S. GOVERNMENT PRINTING OFFICE : 1974 - 585-644/1353
Orders for this publication are to be placed with the General Services
Administration, acting as an agent for the Superintendent of Documents. See
section 2 of this specification to obtain extra copies and other documents
referenced herein. Price 35 cents each.
12
ÚÄÄÄÄÄÄÄÄÄÄ¿
³INCH-POUND³
ÀÄÄÄÄÄÄÄÄÄÄÙ
TT-P-645B
12 March 1990
SUPERSEDING
TT-P-645A
April 23, 1979
(See 6.10)
FEDERAL SPECIFICATION
PRIMER, PAINT, ZINC-MOLYBDATE, ALKYD TYPE
This specification was approved by the Commissioner, Federal Supply Service,
General Services Administration, for the use of all Federal agencies.
1. SCOPE
1.1 Scope. This specification covers a 2.8 pound per gallon
(340 gram/liter) volatile organic content (VOC) complying, zinc-molybdate
paint for use as a general primer for application to steel and aluminum (see
6.1). Product is to be used as delivered.
2. APPLICABLE DOCUMENTS
2.1 The following documents, of the issues in effect on date of invitation
for bids or request for proposal, form a part of this specification to the
extent specified herein:
Federal Specifications:
TT-R-266 - Resin, Alkyd; Solutions.
TT-T-291 - Thinner, Paint, Mineral Spirits, Regular and Odorless.
PPP-F-320 - Fiberboard; Corrugated and Solid, Sheet Stock
(Container Grade), and Cut Shapes.
PPP-P-1892 - Paint, Varnish, Lacquer, and Related Materials;
Packaging, Packing, and Marking of.
ÚÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄ¿
³ Beneficial comments (recommendations, additions, deletions) and any pertinent ³
³ data which may be of use in improving this document should be addressed to: ³
³ Commander, Naval Sea Systems Command, SEA 5523, Department of the Navy, ³
³ Washington, DC 20362-5101 by using the self-addressed Standardization ³
³ Document Improvement Proposal (DD Form 1426) appearing at the end of this ³
³ document or by letter. ³
ÀÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÙ
AMSC N/A FSC 8010
DISTRIBUTION STATEMENT A. Approved for public release; distribution is
unlimited.
Federal Standards:
FED-STD-141 - Paint, Varnish, Lacquer, and Related Materials:
Methods of Inspection, Sampling, and Testing.
FED-STD-313 - Material Safety Data, Transportation Data and Disposal
Data for Hazardous Materials Furnished to Government
Activities.
FED-STD-595 - Colors.
Federal Publications:
U.S. Environmental Protection Agency
40 CFR CH.1. Part 60. Appendix A, Method 24 - Determination of
Volatile Matter Content, Water Content, Density, Volume Solids
and Weight Solids of Surface Coatings.
U.S. Department of Labor
Occupational Health and Safety Administration
29 CFR Parts 1910, 1915, 1917, 1918, 1926 and 1928 - Hazard
Communication Act, Final Rule.
(Activities outside the Federal Government may obtain copies of Federal
specifications, standards, and Commercial Item Descriptions as outlined under
General Information in the Index of Federal Specifications, Standards, and
Commercial Item Descriptions. The Index, which includes cumulative bimonthly
supplements as issued, is for sale on a subscription basis by the
Superintendent of Documents, U.S. Government Printing Office, Washington, DC
20402.)
(Copies of listed federal and military standards, specifications,
Commercial item Descriptions (CIDs), handbooks and associated documents listed
in the Department of Defense Index of Specifications and Standards (DoDISS),
should be obtained from the DoD Single Stock Point, Commanding Officer, Naval
Publications and Forms Center, 5801 Tabor Avenue, Philadelphia, PA 19120.
Copies of industry association documents should be obtained from the sponsor.
Copies of all other listed documents should be obtained from the contracting
activity or as directed by the contracting officer.)
(Federal Government activities may obtain copies of Federal standardization
documents and the Index of Federal Specifications, Standards, and Commercial
Item Descriptions from established distribution points in their agencies.)
(The Code of Federal Regulations (CFR) and the Federal Register (FR) are
for sale on a subscription basis by the Superintendent of Documents, U.S.
Government Printing Office, Washington, DC 20402. When indicated, reprints of
certain regulations may be obtained from the Federal agency responsible for
issuance thereof.)
2.2 Other publications. The following documents form a part of this
specification to the extent specified herein. Unless a specific issue is
identified, the issue in effect on date of invitation for bids or request for
proposal shall apply.
2
AMERICAN SOCIETY OF TESTING AND MATERIALS (ASTM)
D 562 - Standard Test Method for Consistency of Paints Using the
Stormer Viscometer. (DoD adopted)
D 563 - Standard Test Method for Phthalic Anhydride Content of
Alkyd Resins and Resin Solutions. (DoD adopted)
D 869 - Standard Method of Evaluating Degree of Settling of Paint.
D 1296 - Standard Test Method for Odor of Volatile Solvents and
Diluents.
D 1308 - Standard Test Method for Effect of Household Chemicals on
Clear and Pigmented Organic Finishes.
D 1364 - Standard Test Method for Water in Volatile Solvents
(Fischer Reagent Titration Method). (DoD adopted)
D 1394 - Standard Test Methods for Chemical Analysis of White
Titanium Pigments.
D 1475 - Standard Test Method for Density of Paint, Varnish,
Lacquer, and Related Products.
D 1542 - Standard Test Method of Qualitative Tests for Rosin in
Varnishes. (DoD adopted)
D 1849 - Standard Test Method for Package Stability of Paint.
D 2369 - Standard Test Method for Volatile Content of Coatings.
(DoD adopted)
D 2698 - Standard Test Method for Determination of the Pigment
Content of Solvent-Reducible Paints by High-Speed
Centrifuging. (DoD adopted).
D 3278 - Standard Test Methods for Flash Point of Liquids by
Setaflash Closed-Cup Apparatus. (DoD adopted)
D 3335 - Standard Test for Low Concentrations of Lead Cadmium and
Cobalt in Paint by Atomic Absorption Spectroscopy.
D 3363 - Standard Test Method for Film Hardness by Pencil Test.
E 11 - Standard Specification for Wire-Cloth Sieves for Testing
Purposes.
F 718 - Standard Shipbuilders and Marine Paints and Coatings
Product/Procedure Data Sheet.
(Application for copies should be addressed to the American Society for
Testing and Materials, 1916 Race Street, Philadelphia, PA 19103.)
(Industry association specifications and standards are generally available
for reference from libraries. They are also distributed among technical groups
and using Federal agencies.)
2.3 Order of precedence. In the event of a conflict between the text of
this document and the references cited herein, the text of this document takes
precedence. Nothing in this document, however, supersedes applicable laws and
regulations unless a specific exemption has been obtained.
3. REQUIREMENTS
3.1 Formula. Zinc-molybdate primer shall consist of ingredients
conforming to the requirements of the applicable specifications in the
proportions shown in table I (see 6.4.1).
3
Table I. Formula number 84.
ÚÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÂÄÄÄÄÄÄÄÄÄÄÄÄÄÄÂÄÄÄÄÄÄÄÄÄÄ¿
³ Ingredients ³ Pounds ³ Gallons ³
ÃÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÅÄÄÄÄÄÄÄÄÄÄÄÄÄÄÅÄÄÄÄÄÄÄÄÄÄ´
³Zinc-molybdate [1] ³ 285.10 ³ 6.77 ³
³Titanium dioxide [2] ³ 115.59 ³ 3.40 ³
³Hydrophobic silica [3] ³ 10.20 ³ 0.68 ³
³Magnesium silicate [4] ³ 120.00 ³ 5.13 ³
³Nickel antimony titanium yellow rutile pigment [5] ³ 219.90 ³ 6.43 ³
³Dispersing agent [6] ³ 4.40 ³ 0.58 ³
³Resin alkyd, TT-R-266, type I, class A [7] ³ 433.75 ³ 54.50 ³
³Paint thinner, mineral spirits (TT-T-291, type I) ³ 155.00 ³ 24.03 ³
³Nuxtra LTD [8] ³ 1.20 ³ 0.13 ³
³Manganese naphthanate, 6 percent [8] ³ 0.80 ³ .10 ³
³Cobalt naphthanate, 6 percent [8] ³ .40 ³ .05 ³
³ ³ ³ ³
³Totals ³ 1346.34 ³ 101.80 ³
ÀÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÁÄÄÄÄÄÄÄÄÄÄÄÄÄÄÁÄÄÄÄÄÄÄÄÄÄÙ
[1] Molywhite 101, Sherwin Williams Chemicals, 501 Murray Road, Cincinnati, OH
45217, or equal.
[2] ASTM D 476, TYPE III
[3] NS-720, Cabot "CAB-O-SIL" Division, P.O. Box 188, Tuscola, IL 61959, or
equal.
[4] Cyperfil 325, Cyprus Industrial Minerals Company, Box 3419, Englewood, CO
80155, or equal.
[5] Light Yellow Pigment 8G, Mobay Chemical Corp., Mobay Road, Pittsburgh, PA
15205, or equal.
[6] Busperse 47, Buckman Laboratories, Inc., Memphis, TN, or equal.
[7] Cargil 5070, Cargill Incorporated, P.O. Box 9300, Minneapolis, MN 55440,
or equal.
[8] Nuodex, Incorporated, Trumen Place, P.O. Box 365, Piscataway, NJ 08854, or
equal.
3.1.1 Formula number 84. The formula shown in table I is designated
formula number 84. When formula number 84 is specified, or when this
specification is referenced without reference to formula number, the primer
shall conform to the requirements of this specification. Manufacturers may
substitute equivalent materials in the formulation, but shall demonstrate
equivalency by performance tests specified by the Naval Seas Systems Command
(NAVSEA) (and carried out at a laboratory approved by NAVSEA) and have the
alternate formulation approved. Small amounts of antisettling and antiskinning
agents may be added to meet the requirements specified in 3.1.2 and 3.3.6,
provided all other requirements of this specification are met, and the exact
formula used is included in method 1031 of FED-STD-141.
3.1.2 Manufacture. The component raw materials shall be mixed and ground
as required to produce a product which is uniform, free from grit, entirely
suitable for the purpose intended, and in full conformance to the requirements
of this specification.
4
3.2 Quantitative requirements. The primer shall conform to the
quantitative requirements in table II (see 4.3).
Table II. Quantitative requirements.
ÚÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÂÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄ¿
³ Characteristics ³ Requirements ³
³ ÃÄÄÄÄÄÄÄÄÄÄÂÄÄÄÄÄÄÄÄÄÄÄ´
³ ³ Minimum ³ Maximum ³
ÃÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÅÄÄÄÄÄÄÄÄÄÄÅÄÄÄÄÄÄÄÄÄÄÄ´
³Pigment, percent by weight ³ 54.0 ³ 58.0 ³
³Volatile, percent by weight ³ 19.2 ³ 21.2 ³
³Nonvolatile vehicle, percent by weight of ³ ³ ³
³ paint calculated by difference ³ 22.0 ³ 24.0 ³
³Phthalic anhydride, percent by weight of ³ ³ ³
³ nonvolatile vehicle ³ 23.0 ³ 30.0 ³
³Water, percent by weight of paint ³ 1.0 ³ 2.0 ³
³Course particles and skins percent by ³ ³ ³
³ weight of paint ³ -- ³ 0.5 ³
³Weight per gallon, pounds ³ 12.6 ³ 13.6 ³
³Fineness of grind ³ 4.5 ³ 5.5 ³
³Flash point (degrees C) ³ 38.0 ³ -- ³
³Titanium dioxide (TiOÚ2¿), percent by ³ ³ ³
³ weight of pigment ³ 14.5 ³ 16.0 ³
³Viscosity, Krebs units ³ 75.0 ³ 91.0 ³
³Time of drying to recoat, hours ³ 6.0 ³ 8.0 ³
³Time of setting to touch, hours ³ 4.0 ³ 6.0 ³
³Sag, mils ³ 7.0 ³ 13.0 ³
³Grams solvent per liter of paint ³ -- ³ 340.0 ³
³VOC, grams/liter ³ -- ³ 340.0 ³
³Asbestos content ³ none ³ -- ³
³Lead (as metal), percent by weight ³ -- ³ 0.06 ³
³Molybdenum (nominal percent by weight of ³ ³ ³
³ pigment) ³ 5.0 ³ -- ³
ÀÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÁÄÄÄÄÄÄÄÄÄÄÁÄÄÄÄÄÄÄÄÄÄÄÙ
3.3 Qualitative requirements. The primer shall conform to the qualitative
requirements specified in 3.3.1 through 3.3.12.
3.3.1 Odor. The odor shall be characteristic of the volatiles permitted
when tested as specified in table III.
3.3.2 Color. The color shall be an approximate match to color chip number
33793 of FED-STD-595.
3.3.3 Flexibility. The primer shall show no evidence of cracking or
flaking when subjected to the flexibility test specified in 4.3.3.
3.3.4 Rosin and resin derivatives. Rosin and resin derivatives shall not
be present when the primer is tested as specified in 4.3.4.
3.3.5 Compatibility with thinner. There shall be no evidence of
incompatibility of any of the ingredients of the primer (see 4.3.5).
5
3.3.6 Condition in container. The product shall be readily broken up with
a paddle to a smooth uniform consistency, and shall not show any objectionable
properties for at least 1 year after date of manufacture (see 4.3.6).
3.3.7 Storage stability. The primer shall show no livering, curdling,
hard caking, or gummy sediment after aging in a partially filled container at
an elevated temperature (see 4.3.7). After such aging, it shall mix readily to
a smooth, uniform state, and any skin formed shall be easily removed.
3.3.8 Dilution stability. The primer shall remain stable and uniform when
thinned a maximum of 10%, showing no precipitation, curdling, or separation
(see table III). Slight pigment settling is permitted. Any thinning shall not
cause the primer to exceed the maximum allowed VOC limits.
3.3.9 Brushing properties. The primer shall brush satisfactorily in all
respects and shall dry to a smooth, uniform fill, free from seeds, runs, sags,
and streaks (see table III).
3.3.10 Spraying properties. The primer shall spray satisfactorily in all
respects and shall show no running, sagging, streaking, or pronounced orange
peel (see table III). The air-dried film shall show no seeding, dusting,
floating, fogging, mottling, hazing, or other film defect.
3.3.11 Knife test. A 0.001 inch (nominal) dry film of primer, prepared
as specified in FED-STD-141, method 6304.1, shall adhere tightly to and shall
not flake or crack from the metal (see table III). The cut shall show beveled
edges.
3.3.12 Water resistance and film hardness. A film of primer, prepared and
tested as specified in table III, shall show no wrinkling or blistering
immediately after removal of the panel from water. The primer shall have a
hardness of 4H when tested in accordance with 4.3.8. After 24 hours air
drying, the portion of the panel which was immersed shall also have a hardness
of 4H when tested in accordance with 4.3.8.
3.4 Material safety data sheet (MSDS). The contracting activity shall be
provided a material safety data sheet at the time of contract award. The MSDS
shall be provided in accordance with the requirements of FED-STD-313. The MSDS
shall be included with each shipment of the material covered by this
specification (see 6.5).
3.5 Directions for use. The manufacturer shall provide written directions
on each container for the mixing and applying of the primer supplied and this
direction shall include all information necessary to comply with OSHA Hazard
Communication Act and FED-STD-313. In addition, the manufacturer shall prepare
an ASTM F 718 data sheet which shall separately detail requirements for small
unit (pint, quart, gallon) and large unit (five gallon) containers (see 6.5).
4. QUALITY ASSURANCE PROVISIONS
4.1 Responsibility for inspection. Unless otherwise specified in the
contract or purchase order, the contractor is responsible for the performance
of all inspection requirements (examinations and tests) as specified herein.
6
Except as otherwise specified in the contract or purchase order, the contractor
may use his own or any other facilities suitable for the performance of the
inspection requirements specified herein, unless disapproved by the Government.
The Government reserves the right to perform any of the inspection set forth in
the specification where such inspections are deemed necessary to ensure
supplies and services conform to prescribed requirements.
4.1.1 Responsibility for compliance. All items shall meet all
requirements of sections 3 and 5. The inspection set forth in this
specification shall become a part of the contractor's overall inspection
system or quality program. The absence of any inspection requirements in the
specification shall not relieve the contractor of the responsibility of
ensuring that all products or supplies submitted to the Government for
acceptance comply with all requirements of the contract. Sampling inspection,
as part of the manufacturing operations, is an acceptable practice to
ascertain conformance to requirements, however, this does not authorize
submission of known defective material, either indicated or actual, nor does it
commit the Government to accept defective material.
4.2 Quality conformance inspection. Quality conformance inspection shall be
conducted in accordance with methods 1011, 1022, and 1031 of FED-STD-141, and
shall consist of the tests specified in table III and 4.3.1 through 4.3.9.
4.3 Test procedures.
TABLE III. Test procedures
ÚÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÂÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÂÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÂÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄ¿
³ ³ Applicable ³ Applicable ³ ³
³ Test ³ method in ³ ASTM test ³ Requirement ³
³ ³ FED-STD-141 ³ method ³ ³
ÃÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÅÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÅÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÅÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄ´
³ VOC, grams/liter ³ [1] ³ ³ Table II ³
³ Pigment content ³ 4021.1 ³ ³ Table II ³
³ Volatiles content ³ ³ D 2369 ³ Table II ³
³ Nonvolatile vehicle ³ 4053.1 ³ ³ Table II ³
³ content ³ ³ ³ ³
³ Water content ³ ³ D 1364 ³ Table II ³
³ Viscosity ³ ³ D 562 ³ Table II ³
³ Coarse particles ³ 4092.1 ³ ³ Table II ³
³ and skins ³ ³ ³ ³
³ Weight per gallon ³ ³ D 1475 ³ Table II ³
³ Flash point ³ ³ D 3278 ³ Table II ³
³ Odor ³ ³ D 1296 ³ 3.3.1 ³
³ Fineness of grind ³ 4411.1 ³ ³ Table II ³
³ Dilution stability ³ 4203.1 ³ ³ 3.3.8 ³
³ Brushing properties ³ 4321.2 ³ ³ 3.3.9 ³
³ Spraying properties ³ 2131.1 ³ ³ 3.3.10 ³
³ ³ and 4331.1 ³ ³ ³
³ Knife test ³ 6304.1 ³ ³ 3.3.11 ³
³ Water resistance ³ ³ ³ 3.3.12 ³
³ Sag resistance ³ ³ D 4400 ³ Table II ³
³ Lead content ³ ³ D 3335 ³ ³
ÀÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÁÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÁÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÁÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÙ
[1] Test in accordance with 4.3.10.
7
4.3.1 Phthalic anhydride. Phthalic anhydride content shall be determined
in accordance with ASTM D 563. A suitable portion of the vehicle, collected
during the determination of pigment and evaporated on a steam bath until the
volume has been reduced to approximately 10 milliliters (mL), shall be used as
a sample. The alcoholate precipitate obtained shall be corrected by use of the
method specified in ASTM D 563. (If desired, phthalic anhydride content may be
determined on the vehicle isolated by high-speed centrifuging in accordance with
ASTM D 2698.)
4.3.2 Drying time. Drying time shall be determined in accordance with
method 4061.2 of Fed-STd-141, except that the specified conditions of
temperature and humidity shall apply only for referee tests in case of dispute.
All other tests shall be conducted under prevailing laboratory conditions.
4.3.3 Flexibility. Flexibility shall be determined in accordance with
method 6221 of FED-STD-141. The primer shall be applied to a flat tin plate
panel of approximately 31 gauge by means of a doctor blade capable of yielding
a dry film thickness of 0.0010 + 0.0003 inch. The panel shall be allowed to
air-dry for 2 hours, then baked for 24 hours at 100 to 105 degrees Celsius (C).
The panel shall then be removed from the oven and allowed to stand for 30
minutes at 25 degrees C. The panel shall then be bent over 1 1/8-inch mandrel
and the film examined at the bend under a magnification of five diameters.
4.3.4 Rosin and resin derivatives. The test for rosin and resin
derivatives shall be in accordance with ASTM D 1542. A portion of the
separated volatile vehicle shall be used for the test.
4.3.5 Dilution stability. Dilution stability with thinner shall be
determined in accordance with method 4203.1 of FED-STD-141. Fifty mL of primer
and 50 mL of paint thinner conforming to grade 1 of TT-T-291 shall be used.
Observations shall be made immediately after mixing and 30 minutes after
mixing.
4.3.6 Condition in container. The stored sample shall be heated slightly
to 73 +/- 2 degrees Fahrenheit (F) (23 +/- 2 degrees C). Evidence of pressure
or vacuum in the unopened container shall be noted. The container shall then
be opened and examined for evidence of skinning, corrosion of container
interior, odor of putrefaction, rancidity or souring. If the sample is in a
1-quart (1-liter) or smaller container, the character of the lower (or settled)
lager shall be determined with a spatula as specified in ASTM D 869. If the
sample is larger than 1 quart, this step shall be omitted. The paint shall be
hand-stirred 300 stirs in 2 minutes with a spatula appropriate to the
container, stirring so as to ensure uniform distribution of any settled
material. Immediately after stirring, the consistency of the paint shall be
measured, using the Krebs-Stormer viscometer. The stored paint shall be
applied to a test panel, and after it has dried, the paint film shall be
examined for grains 1/32-inch (0.8 millimeter (mm)) in diameter, even larger
gelatinous lumps, and streaks caused by such grains or lumps.
4.3.7 Storage stability. Storage stability shall be tested in accordance
with ASTM D 1849. A 1-quart can shall be filled approximately three-quarters
full of the test specimen paint, closed tightly with a lid, and placed inside
a 1-gallon container which shall also be sealed. The sample shall be weighed
8
and stored for 1 month at 125 +/- 2 deg. F (52 +/- 1 deg. C), which will
simulate some of the effects of storage for 6 months to 1 year at 73 +/- 3.5
deg. F (23 +/- 2 deg. C). At the end of the storage period, the sample shall be
conditioned to 73 +/- 3.5 deg. F (23 +/- 2 deg. C) and weighed (without
shaking) to determine if there has been a loss of weight through faulty
closure. The can shall then be opened and the contents examined for skinning,
corrosion, and odor of putrefaction, rancidity, or souring. Carry out the
rest of the test specified in ASTM D 1849 as specified.
4.3.8 Water resistance. Spray apply a 0.003 inch (+/- 0.001 inch) film of
the primer on an abrasive blast cleaned steel test panel. Cure at room
temperature (approximately 73 deg. F) for 48 hours. Immerse 50% of the panel
in room temperature distilled water for 24 hours. Test for requirements to
3.3.12. The coated panel shall be placed on a firm horizontal surface. A set
of calibrated drawing leads or equivalent calibrated wood pencils meeting the
following hardness scale (6B-5B-4B-3B-B-HB-F-H-2H-3H-4H-5H-6H) shall be used in
the test. Whichever pencil is used, it shall be held firmly against the film
at a 45-degree angle (point away from the operator) and pushed away from the
operator in a 1/4-inch (6.5-mm) stroke. The process shall be started with the
hardest pencil and continued down the scale of hardness to either of two end
points, the pencil that will not cut into or gouge the film (pencil hardness),
or the pencil that will not scratch the film (scratch hardness).
4.3.9 Pigment analyses.
4.3.9.1 Molybdenum. Molybdenum (Mo) content shall be tested in accordance
with the following methods, as applicable: FED-STD-141, method 4021.1; and as
specified in 4.3.9.1.1 through 4.3.9.1.7.
4.3.9.1.1 General discussion of interference control. Since calcium
interferes with the determination of molybdenum in the nitrous oxide flame, the
addition of 2 percent ammonium chloride (NHÚ4¿C1) has been included as a means
of controlling these interferences, in case there should be any calcium
present. Additional interferences have been found but have not yet been
identified. In order to eliminate the interference, molybdenum content shall
be determined by a standard addition method, as specified in 4.3.9.1 through
4.3.9.1.7.
4.3.9.1.2 Apparatus. The apparatus used to test molybdenum content shall
be as follows:
(a) An atomic absorption spectrophotometer.
(b) A molybdenum hollow cathode lamp.
4.3.9.1.3 Reagents and solutions.
4.3.9.1.3.1 Stock solutions. Stock solutions used to test molybdenum
content shall be prepared as follows:
(a) Number 1 Mo solution (1 mL = 1 milligram (mg) Mo). Dissolve
1.500 grams of pure molybdic anhydride in 100 mL of HÚ2¿O, plus
10 mL concentrated ammonium hydroxide (NHÚ4¿OH). Heat to aid
solution. Then neutralize and make acid with concentrated
nitric acid (HNOÚ3¿). Cool. Transfer to a 1-liter volumetric
flask and dilute to the mark with distilled water (HÚ2¿O).
9
(b) Number 2 Mo solution (1 mL = 0.1 mg Mo) - Dilute 100 mL of Mo
solution no. 1 to 1000 mL with HÚ2¿O.
(c) Number 3 NHÚ4¿Cl (10 percent) - Dissolve 100 grams of reagent
grade NHÚ4¿Cl in about 500 mL HÚ2¿O. Transfer to a 1-liter
volumetric flask and dilute to the mark with distilled water
(HÚ2¿O).
4.3.9.1.3.2 1:1 nitric acid.
4.3.9.1.4 Procedure.
4.3.9.1.4.1 Sample preparation. The sample used to test molybdenum
content shall be prepared as follows:
(a) Weigh 2.000 grams of pigment, which has been separated in
accordance with FED-STD-141, method 4021.1, into a 150-mL
beaker. Add approximately 50 mL HÚ2¿O.
(b) Cover with watchglass, then slowly and carefully, while
stirring, add 10 mL 1:1 HNOÚ3¿. (Heat and then cool to aid
solution, if necessary.)
(c) Filter through a no. 42 Whatman filter paper. Wash well with
HÚ2¿O. Transfer filtrate to a 500-mL volumetric flask. Dilute
to the mark with HÚ2¿O.
(d) Prepare three 100-mL volumetric flasks and add as follows:
(1) Flask number 0 - Five mL of sample solution above, 0 mL of
stock solution number 2, 20 mL of stock solution number 3,
and dilute to mark with HÚ2¿O.
(2) Flask number 1 - Five mL of sample solution above, 5 mL of
stock solution number 1, 20 mL of stock solution number 2,
and dilute to mark with HÚ2¿O.
(3) Flask number 2 - Five mL of sample solution above, 10 mL of
stock solution number 2, 20 mL of stock solution number 3,
and dilute to mark with distilled water (HÚ2¿O).
4.3.9.1.5 Operation conditions. Operation conditions shall be as shown
in the following chart:
Standard conditions Perkin-Elmer instrument settings
ÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄ ÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄ
Models
303 403
ÄÄÄ ÄÄÄ
Range UV UV
Wave length 3133A Wave length 313 313
Slit 1 mm Slit 4 4
Source-Hollow cathode Source 30 mA 30 mA
Fuel-Acetylene (reducing flame) Flow 9 55
Oxidizer NÚ2¿O Flow 9 35
10
4.3.9.1.6 Analysis. The pigment analysis shall be conducted as follows:
(a) Make the necessary balancing and zero adjustments, according
to the particular instrument.
(b) Run the samples in flasks 0, 1, and 2 and record their absorption
or absorbance.
(c) Plot the absorbance values versus the Mo concentration
(micrograms (g) Mo/mL) on graph paper. Draw the straight line
through the points, extending on to the concentration axis.
(d) Determine from the graph the g Mo/mL in the sample.
4.3.9.1.7 Calculations. Molybdenum content shall be calculated as
follows:
Mg of Mo/mL found
Percentage of Mo = ÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄ
Weight of sample aliquot (Mg)/mL X 100
4.3.9.2 Titanium dioxide. The pigment analysis for titanium dioxide
content shall be conducted as follows. Weigh 0.400 gram (g) of the extracted
pigment into a 250-mL beaker. Add 25 ml of 1:1 hydrochloric acid and warm on
steam bath for 15 minutes. Add some paper pulp (prepared by shaking ashless
filter paper in distilled water until the paper is completely disintegrated) to
the beaker, and filter on a close-grained paper. Transfer residue
quantitatively to the filter paper and wash thoroughly with hot water.
Transfer paper to a porcelain crucible and ash at a moderate heat until all
carbon has been removed. Return ignited residue to a 250-mL beaker. Add 15 g
of ammonium sulfate and 20 mL of concentrated sulfuric acid. Heat strongly
until complete solution of titanium dioxide has been effected. Proceed with
the remainder of the chemical analysis as specified in ASTM D 1394.
4.3.10 Volatile organic content (VOC). VOC shall be determined in
accordance with 40 CFR CH. 1, Part 60, Appendix A, (U.S. EPA) method 24 and
checked for compliance with 3.1 and table II. Contractor shall file
certification of VOC compliance (see table II).
4.4 Inspection of packaging. Sample packages and packs, and the
inspection of the preservation, packing and marking for shipment, stowage and
storage shall be in accordance with the requirements of section 5 and the
documents specified therein.
5. PACKAGING
(The packaging requirements specified herein apply only for direct
Government acquisition.)
11
5.1 Packaging requirements. The primer shall be packaged level A, B, or
C, packed level A, B, or C as specified (see 6.2) and marked in accordance with
PPP-P-1892 and shall include bar codes and applicable packaging acquisition
options therein as specified (see 6.2). The product shall be furnished in
1-gallon cans or 5-gallon pails as specified (see 6.2). In addition, for Navy
acquisitions, the following applies:
(a) Navy fire-retardant requirements.
(1) Treated lumber and plywood. When specified (see 6.2), all
lumber and plywood including laminated veneer materials
used in shipping containers and pallet construction members,
blocking, bracing, and reinforcing shall be fire-retardant
treated material conforming to MIL-L-19140 as follows:
Levels A and B - Type II - weather resistant.
Category 1 - general use.
Level C - Type I - non-weather resistant.
- Category 1 - general use.
(2) Fiberboard. Fiberboard used in the construction of class-
domestic, non-weather resistant fiberboard and cleated
fiberboard boxes including interior packaging forms shall
meet the flamespread and the specific optic density
requirements of PPP-F-320.
5.1.1 Special marking. In addition to the markings required by the
contract or order (see 6.2), each container, interior and exterior shall be
marked with the following:
"Contains 340 grams per liter or less of volatile organic content per 40
CFR CH.1, Part 60, Appendix A, (U.S. EPA) method 24."
"This product is lead, chromate and asbestos free."
5.2 Material safety data sheet. A copy of the material safety data
sheet shall be attached to the shipping document for each destination (see
3.4).
6. NOTES
(This section contains information of a general or explanatory nature that
may be helpful, but is not mandatory.)
6.1 Intended use. Zinc-molybdate primer covered by this specification is
intended for use as a corrosion inhibiting primer on metal surfaces,
particularly in marine service. It may be applied by brush or spray, and is
suitable as an after-blast or after-pickling primer for plating, as an
undercoat for alkyd enamels, and for equipment where a quick-drying primer is
not required. The basic formulation provides a primer of yellow color. This
primer is formulated to comply with air pollution regulations which allow a
VOC of 340 grams per liter (2.8 pounds per gallon). The product contains 340
grams per liter, as delivered, and must not be thinned.
12
6.2 Acquisition requirements. Acquisition documents must specify the
following:
(a) Title, number, and date of this specification.
(b) Size of container, if other than required (see 5.1).
(c) Levels of packaging and packing required (see 5.1).
(d) Packaging acquisition options (see 5.1).
(e) Size of cans or pails (see 5.1).
(f) Whether fire-retardant wood containers are required (see 5.1).
(g) Marking requirements (see 5.1).
(h) Formula required.
6.3 Special considerations for alkyd resin solution. If alkyd resin
solution conforming to type I, class B of TT-R-266 is used, the weight of the
alkyd resin solution, as specified in this specification, should be multiplied
by 1.17, and the paint thinner, mineral spirits (grade 1), should be reduced
by 0.17 times the weight of alkyd resin solution.
6.4 Information regarding table I.
6.4.1 Allowance for manufacturing losses. The formula shown in table I
is based on 102 gallons (approximately) to allow for normal manufacturing loss.
6.4.2 Reference of commercial products. Notes for table I indicate
commercial products that are of appropriate quality. These products are listed
as examples only and their presence in this specification is not to be
considered an endorsement of any kind.
6.5 Material safety data sheet (MSDS), ASTM F 718 and Hazard Communication
Act Documents. Contracting officers must identify those activities requiring
copies of documents. Additional required Government MSDS information is
contained in FED-STD-313. In order to obtain the MSDS, FAR clause 52.223-3
must be in the contract.
6.6 Color chip sample. A dry color chip for primer formula number 84 may
be obtained from the General Services Administration (GSA).
6.7 Sub-contracted material and parts. The packaging requirements of
referenced documents listed in section 2 do not apply when material and parts
are acquired by the contractor for incorporation into the equipment and lose
their separate identity when the equipment is shipped.
6.8 Packaging considerations for civil agency acquisitions. For civil
agency acquisitions, FED-STD-102 should be referred to for definitions and
applications of the various levels of packaging and packing protection for
supplies and equipment.
13
6.9 Subject term (key word) listing.
Brushing properties
Dilution stability
Dispersing agent
Resin
Spraying properties
Titanium dioxide
Viscosity
Volatile organic compounds (VOC)
Zinc molybdate primer
6.10 Changes from previous issue. Marginal notations are not used in
this revision to identify changes with respect to the previous issue due to the
extensiveness of the changes.
MILITARY INTERESTS: CIVIL AGENCY COORDINATING ACTIVITIES:
Custodian: GSA - FSS
Navy - SH
Review activities: Preparing activity:
Army - ME Navy - SH
Navy - SA, YD, OS (Project 8010-0180)
User activities:
Navy - MS, EC
14